HomeMy WebLinkAboutSW4110401_Compliance Inspection Report_20110621Compliance Inspection Report
Permit: SW4110401 Effective: 05/18/11 Expiration: 05/17/21 Owner: Goodwill Industries of Northwest NC
Project: Goodwill Industries of Northwest NC
County: Forsyth 5151 Robinhood Rd
Region: Winston-Salem
Contact Person: Bill Haymore Title:
Directions to Project:
Type of Project: State Stormwater - HI] - Bioretention
Drain Areas: 001 - (Muddy Creek) (03-07-04 ) ( C)
On -Site Representative(s):
Related Permits:
Inspection Date: 11/0112013 EntryTime: 10:00 AM
Primary Inspector: Aana Taylor -Smith
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Winston Salem NC 27106
Phone: 336-714-3012
Exit Time: 10:15 AM
Phone: 336-771-5000
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW4110401 Owner - Project: Goodwill Industries of Northwest NC
Inspection Date: 11/01/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Upon inspection, Ms. Taylor -Smith noted that construction on the Goodwill site had not yet begun. Ms. Taylor -Smith
contacted Matt Osborne with the City of Winston-Salem Erosion Control Department, who confirmed that construction
never started. Ms. Taylor -Smith will contact Bill Haymore, owner, to determine whether site will ever be built and if
rescission of the stormwater management permit would be appropriate. No inspection letter sent.
File Review
Yes
No
NA
NE
Is the permit active?
■
n
❑
n
Signed copy of the Engineer's certification is in the file?
n
n
■
n
Signed copy of the Operation & Maintenance Agreement is in the file?
■
❑
❑
Copy of the recorded deed restrictions is in the file?
■
n
n
n
Comment: Site has not yet been built - no engineer's certification needed at this time.
Built Upon Area
Yes
No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
n
n
■
n
Is the drainage area as per the permit and approved plans?
n
❑
■
❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
n
n
■
n
Comment: Site has not been built.
5W Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
❑
❑
■
❑
Are the inlets located per the approved plans? ❑ ❑ ■ n
Are the outlet structures located per the approved plans? ❑ n ■ n
Comment: Site has not been built.
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? n n ■ n
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ■
upon request?
Comment: Site has not been built.
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? ■ n n n
Comment: Site has not been built.
Other WQ Issues Yes No NA NE
Is the site compliant with other water quality issues as noted during the inspection? ■ ❑ ❑ Q
Comment: Site has not been built.
Page: 2
t
State Stormwater Inspection Report
General
Project Name: jgpdLAISlyieS61 N,W, N.C.
Permit No: SW4{1pybj
Expiration Date: 5 I� .Z1
Contact Person: Zi11 .H� n�rpY2
Phone Number:-10`1"3U�L5
Inspection Type: CEt
Inspection Date:
Tirrte Ill: l pup
'lime Out: 01C
Current Weather: W hT-ratvt % LvDs
Recent Rain (Date)?
[fain — in
Location
Facility Address / Location: 5151 12Db� nkuC>d vzd
Cit Zip:2-1101n Coun[ Lai: "N Lon "W
y' 1Y1C-' Y)- St Iewy) *4- y'�VStl-ilrt
Permit Information
Rule Subject to (circle one): 1988 Coastal Rule 1995 Coastal Rule
Goose Creek High Quality Water,
Density (circle one): High (HD Low (LD)
Stormwater Best Management Practices (BM Ps) (insert m nlher of each):
Wet Ponds Infiltration Basins Infiltration Trenches
Dry Ponds y, Bioretention Permeable Pavement
Cistern Level Spreader/Filter Strip Other (sliecif):
File Review
2008 Coastal Rule Session Law 2006-246
Outstanding Resource Waters
LD Swales Stormwater Wetlands
Sand filters (circle one) Open Closed
Yes No NIA NIE
1. Is the perinit active?
t/
2. Signed Engineer's Certification on file?
✓
3. Signed Operation and Maintenance agreement on tile?
4. Recorded Deed Restrictions on file?
Site Visit- Rttilt tlnnn Area IRUAI
YPs No NIA NIF
5. BUA is constructed and consistent with the perinit requirements'?
6. BUA (aspermitted) is graded such that the runoff drains to the system? (high density onl
✓
7. Drainage area is consistent with crrnit? (i.e. no un ermitted drainage to the SW BMPs)✓
8. Drainage area is stabilized? to reduce risk of sedimentation to the SW BMPs
V.,
Site Visit- Starmwater RMP-q
Yes No NIA NIF
9. Stormwater BMPs are located per the approvedplans?
✓
10. Stormwater BMI's have dimensions (eg. length, width, area) matching the approvedplans?
✓
11. Stormwater BMI's are constructed per the approvedplans?
✓
Site Visit: Oneration and Maintenance
Yes No NIA NIE
12. Access points to the site are clear and well maintained?
✓
13. Trash has been removed as needed?
ri
14. Excessive landscape debris (grass clippings, leaves, etc) is controlled?
✓
15, Stormwater BMPs being operated and maintained as per the permit requirements?
✓
16. Inspection and Maintenance records are available for inspection? (high density only, 1995 — present only)
✓
Site Visit: Other Permit Conditions Yes No NIA NIE
17 is the site compliant with other conditions of thepert-nit? I✓
Site Visit: Other Water Quality Issues Yes No NIA NIE
18. Is the site compliant with other water quality issues as noted during the inspection? ✓
State Stormwater Inspection Report, Version 3.0_3-09 Page I of
f '
1
State Stormwater Inspection Report
lry 1 1 1 G0►1A_aC * o W ►fir A v Ye S U rrA Per A-t c Lg w'0_ {.
me of the pictures taken during the site vis
Compliance Status X Compliant ❑ , - Non -Compliant
Letter Sent (circle one): Yes No Letter type: CEI NOV NOVRE Other
Date Sent: Reference Number:
Inspector Name and.Signature: Y- Date: k \ /1 jig
State Stormwater Inspection Report, Version 3.0_3-09 Page 2 or2
BIORETENTION CELL: O & M Inspection Checklist
INLET and PERIMETER
j
1. Inlet and Perimeter are free of erosive gullies and bare soil areas:
❑
❑
❑
❑
2. Inlet device (swale, pipe, stone verge) is free of erosion, damage or clogs:
❑
❑
❑
❑
3. Weir heights appear to match approved plans:
❑
❑
❑
❑
PRETREATMENT
4. Flow is entering pretreatment area (not being bypassed):
❑
❑
❑
❑
5. Pretreatment area is free of erosion:
❑
❑
❑
❑
6. Pretreatment area is free of excessive sediment or clogs:
❑
❑
❑
❑
MAIN TREATMENT AREA
7. Side slopes are 3:1 or less:
❑
❑
❑
❑
8. The under drain system is free flowing and free of clogs (if applicable):
❑
❑
❑
❑
9. Cleanout(s) and cap is provided for the under drain as per the approved plans:
❑
❑
❑
❑
10. Heavy equipment has not been driven into the cell:
❑
❑
❑
❑
11. Surface is free of piles of heavy materials (piles of mulch, etc):
❑
❑
❑
❑
12. Ponding depth is 9-12 inches after rain:
❑
❑
❑
❑
13. All dimensions are >=10ft.:
❑
❑
❑
❑
SOIL/MULCH and VEGETATION
14. Plants are healthy and being maintained:
❑
❑
❑
❑
15. The proper amount and type of vegetation is present in the cell:
❑
❑
❑
❑
16. Mulch is in good condition (has not broken down or floated/ migrated towards the outlet):
❑
❑
❑
❑
17. Surface if free of excessive sediment and clogs:
❑
❑
❑
❑
18. Trees are free of stakes/wires > 6 months after planting:
❑
❑
❑
❑
19. The annual soil test shows the proper pH and absence of heavy metal accumulation:
❑
❑
❑
❑
OUTLET
20. Outlet is free of evidence of improper drainage (no standing water, cattails, etc.):
❑
❑
❑
❑
21. Outlet device (drop inlet, weir, etc.) is free of damage or clogs:
❑
❑
❑
❑
22. Orifice size matches approved plans:
❑
❑
❑
❑
23. Outlet is free of damage, clogs, or erosion:
❑
❑
❑
❑
24. Relative elevations match approved plans:
V3.3_09