Loading...
HomeMy WebLinkAboutSW4101001_APPROVED PLANS_20110124STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT I� APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 5-,Q&z69 Id YYYYMMDD Progress Energy Carolinas, Inc. Raleigh, NC RAMSEUR 115/24 KV SUBSTATION 357 KING ROAD, RAMSEUR, RANDOLPH COUNTY,- NORTH CAROLINA TOWN Dewberr Dewberry & Davis, Inc. 2301 REMOODS DRIVE SUITE 2W RALEIGH, NC 27612 PHONE. 919.M.9M FAX: 919.881,9923 NCBELS # F-0679 OF RAMSEUR ZONING DISTRICT - RA20 49 SITE �o M co 0 Q o TO SIL£R CITY fm 64 Q 'TO ASH£BORO O C� VICINITY MAP NOT TO SCALE CCU"II"R SHEET RX 56524 SHT 1 OF 14 EXIS 'NONG CONDITIONS RDC-52524 SHT 2 OF 14 OVERALL SITE LAYOUT RDC-56524 SHT 3 OF 14 DEMCLITION PLAN RDC-56524 SHT 4 OF 14 SITE PLAN RDC-56524 SHT 5 OF 14 PHA-.`a�E­ I EROSION CONTROL PLAN RDC-56524 SHT 6 OF 14 PHASE II EROSION CONTROL PLAN RDC-56524 SHT 7 OF 14 GRADING & DRAINAGE PLAN RDC-56524 SHT 8 OF 14 DETAILS SHT 1OF 5 RDC-56524 SHT 9 OF 14 DETAILS SHT 2 OF 5 RDC-56524 SHT 10 OF 14 DETAILS :'HT 3 OF 5 RDC-56524 SHT 11 OF 14 DETAILS SHT 4 OF 5 RDC-56524 SHT 12 OF 14 DETAILS SHT 5 OF 5 RDC-56524 SHT 13 OF 14 LANDSCAPE PLAN & DETAILS RDC-56524 SHT 14 OF 14 "DoI RDC-56524 SHT 1 OF 14 a T'�.'.'� 1i S ITC �i Ts1T—. �YrtTt 'T ryT'�. _ f. � 7 Y f , ! Lr ! I •.1 .1 f .ti`:5`'r�rp,l A, � i' � ,� Sf;•I �`7; ifs ,) r ,i� 1 7 f �, } 1 r �r' is �'1.s f,jCl t i� -�� �y'f•'f ,�i r; ��'I�S�f' fl.; �f id i 7 -T I r- -7 r :7 i N/F ARGARET LENNIEDEANE I -DEADEN PIN: 8702-764009 D.B. 113,E PG, 410 z0NED: RA d 53 14% x 5 570 5� �V\,LL- :1P1 1 `♦ 55 + C) 5— `r♦ 531L � N/F MARLENE W. I';riONTAGUE PIN- 8 702 - 7 56802 D,B. 1606 PG. 407 ZONED -RA LEGEND LIMITS OF CONSTRUCTION NEW SPOT SHOT ELEVATION SHWL BORING LOCATION SEASONAL HIGH WATER TABLE (§HWTI SOIL BORING SUMMARY X 566.6 BORING EXISTING SURFACE ELEV. DRILL DEPTH SHWL DETAILS 3 562.5' 72 INCHES SHWL APPEARS TO BE BELOW 72 INCH DEPTH 2 560,5' 72 INCHES SHWL APPEARS TO BE BELOW 72 INCH DEPTH 1 557.5' 72 INCHES SHWL OBSERVED AT 68 INCH DEPTH (ELEV. 551.83) + 4J 5:�) CHAIN LINK FENCE ....---46-1 5 5 ipp 5 l 16. _ �Y - LP ` 56-- g `� Lu 64a pE G---`"� ma`s __ 0 1 / i ,� 1 P 5Bl 0 61, \ �`6 62 " v A � '� f ,. C++7 s 1 CL 55-- 559 \ � Q$ P 1PP 5 r;. - LIMITS OF CONSTRUCTION, P. �' ' 6 7 L \ i��8 P O PP 57 €s; " \ _� _._. _ EXISTING BASELINE 57� 60N 1 62 1 i 54L P i 9 PP 56 F 4 jb-- VIP N./�. _ -^_,_ �, Pam, REMOVE EXISTING 'r -� - CPP PIPE AND REPLACE -- 6 t c;` € WITH RCP 7 C.. SH 3 s� 57 57 +i4-11 Xx LC LO I I ENGINEERED FILTER STRIP _ SEE SHEET 11 FOR -DETAIL I 11 FOR DETAIL = P=3 15' WIDE ACCESS DRKIF, COMPACT I GROUND TO 95% I 56 �AND�SEED � I � . 638 " + DRY PONM SEE S-HEET 13 FOR DETAIL SHWT 1 7 P 8 58L 2 -11.56 P{ IAA NENT LEV �FF SPREADER, ti 2.5:1 f2 SEE SHEET 1 FOR IL t�t/ATIONS `` 562 561 � 564 3:1~ 60 p-5 ., �- 563 56.1 FES-6 _6 DRY POND OUTLET, SEA SHEET-fjS— FOR DETAIL _ 63�.. V LO c+� NOTES: 1. SEE SHEET 2 FOR EXISTING CONDITIONS. 2. TOTAL DISTURBED AREA =1.5 ACRES 3. EARTHWORK QUANTITIES: APPROX. UNSUITABLE SOIL EXCAVATION: NONE EXPECTED BASED ON GEOTECHNICAL RECOMMENDATIONS APPROX. CUT (NOT INCLUDING UNSUITABLE SOIL): 315 CY APPROX. FILL (NOT INCLUDING UNSUITABLE SOIL): 2,741 CY APPROX. NET (NOT INCLUDING UNSUITABLE SOIL): 2,426 CY 4. SEE SHEETS 6 AND 7 FOR EROSION AN SEDIMENT CONTROL MEASURES. 5. PROGRESS ENERGY CAROLINAS, INC. EQUIPMENT PLAN NOT SHOWN FOR CLARITY. 6. 6" ABC STONE NOT INCLUDED IN INITIAL GRADING WORK. 7. CHAIN LINK FENCE NOT INCLUDED IN INITIAL GRADING WORK. S. GRADES SHOWN ARE FINISH DIRT GRADES PRIOR TO PLACEMENT OF STONE. li PP �j P 9 6` 5�30 PENT ERSIQIHA�NNEL2,JD .3 PP 29 S ,E SHEET 8 FTR DETAIL --tt-- ,� �` �* r , ........ ............. . .... ......... . .. _ .,� ^ i AUGE CHAIN i_INK FENCE PP 28 -_ PP 7 67— "- OHE IT G �5g OHE �s;�=_TAl POLE PP 40 �/y -�_... - rv1 I-,, 'W e. PP 45 i 4 F 00 P 27 53 61 ~ / � & I ''`` t 22-73.01 METAL ----- - ............... t � . • � _ ..._ _. _ f PP, --CHAIN LINK FENCE 5 60�.. $f 6-7 66 _.._. ._ �ASTiWES ' 04PERMANENT DIVERSION Cw��L SEA SHEET 9 FOR nvTkit, PP GATE POST GRAVEL I DRIVE } GATE POST fE � f f EDGE OFGW1E = 564.42 -- i 65- t ,• - -- — -- _' 1 1 ~ 60�- 1 66 57 66-- 60— �`` `a` / ti o�Ll 1 �- - 56l i r '' 1--_ � � LIMITS OF CONSTRUCTION, TYP. [ f 7 tf7 € t 6, - f r r LLJ ~ S, _ r �- I _ f b l f I I _- I-, 66— f j f I GIL!61 11 `` �- EDEQI:TO (BY OTHERS) I • -�- 5 ♦ I f ! ' P-1 �`� CB-1 = y I GA s L- GATE j ._561 9 I j' SOSI/ R _ S 46 + 777 .-A ............ ........ ............. - - - --- — - -- - - — —— _ _- _ _ -- =- w_F__ -- — b 5— q f ' S - -- �_ � - 67 7 8" DIP SAND A Y S -_ _ E9-0 + MH-3 P2 7 +6 CB-2 �, +65-- 64� ,, EX. SS \,,� 64 U " DIP �i TRY SEWER --- S�INV=566.1 �---INfir'_566.0 �' -' � 3 + K -" � .. � �� MANHOLE L � E bb 6 - � ;A AN G + , 3 INV -- _ ...-. L./ ' i r-.-� -r- S. ' i ! \ �+j ���� 1 if P �.�. ,..�...�..� -�ti:.: ry4 � � 5 v �' - .,...i�.-.ti. ��` _.....---.._ - - --- -- — — — _. CO t RI-�I_AD EE C- R cBURIED: PP —R -- w-- . b3� = ,, 4` `�` _ '' . D.TGH E 4 WOOD FENCE rAT �; s FENCE �' - 5° WOVEN NI RE FENCE i `� '' _ ,' - ♦`� r 'T`�, .-_` _-. Pi� METER <t z *1-10 I REF r ♦ TREE LIE .� 6SI�S 1 r l 1 INS ! \ , • 6 < LIMITS OF{CONSTRUCTION, TYI' ueWDerry & uaV15, Inc. 2301 REXWOODS DRIVE SUITE 200 RAEEIGH, NC 27612 PHONE: 919.881.9939 FAX 919.881.9923 NCI3ELS # F W79 PERMANENT BAFFLE, SEE SHEET 13 FOR DETAIL. / GRAPHIC SCALE 20 0 10 20 40 ( IN FEET) 1 inch = 20 ft_ ao 6 09/03/2010 5 07/20/2010 4 3 05/07/2010 04/16/2010 2 04/06/2010 1 03/18/2010 NO. DATE REVISED PERMITTING PACKAGES REVISED PERMITTING PACKAGES PERMITTING PACKAGES FINAL RELEASE FOR BID AND PERMITTING 95% CONSTRUCTION DOCUMENTS PRELIMINARY SUBMITTAL REVISION ♦00v •r, 0•• DE*�S5! , :r.SE� E X . SS — MANHOLE A Progress Energy Progress Energy Carolinas, Inc. Raleigh, NC FVR SFP TFB RAMSEUR 115/24 KV SUBSTATION FVR SFP TFB FVR SFP TFB GRADING & DRAINAGE PLAN FVR SFP TFB LOCATION RANDOLPH COUNTY, NORTH CAROLINA FVR SFP TFB SCALE 1" = 20' SCALE RATIO 1:1 FVR SFP TFB DRAWN FVR CHK. SFP APP. TFB BY CK. APP. DATE 09/03/10 DWG. NO. ROC-56524 SHT 8 OF 14 CAT_ EROSION AND SEDIMENT CONSTRUCTION SEQUENCE 1. THE CONTRACTOR SHALL POST THE SEDIMENTATION CERTIFICATE OF APPROVAL AT THE CONSTRUCTION ENTRANCE AND MAINTAIN COPIES OF THE PROJECT EROSION PERMITS IN THE PERMITS BOX. ANY CHANGES IN THE PROJECT DESIGN THAT RESULT IN ADDITIONAL DISTURBANCE, OR CHANGE THE DRAINAGE PATTERNS SHALL BE SUBMITTED TO NCDENR FOR PERMIT MODIFICATION. 2. NOTIFY THE STATE LAND QUALITY SECTION AT 3W-771.6000 (WINSTON SALEM REGIONAL OFFICE) AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. 3. NO CLEARING, CONSTRUCTION, OR LAND DISTURBANCE ACTIVITIES MAY BEGIN ON THE SITE UNTIL ALL EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED IN LOCATIONS AS SHOWN ON THE CONTRACT DRAWINGS. IF CLEARING IS REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE, ALL OTHER MEASURES SHOWN SHALL BE INSTALLED FIRST. THE NECESSARY LAND DISTURBANCE ACTIVITIES REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE MAY THEN PROCEED. 4. INSTALL GRAVEL CONSTRUCTION ENTRANCE IN LOCATIONS SHOWN ON THE DRAWINGS. 5. INSTALL SILT FENCE AND STABILIZED OUTLETS FOR SILT FENCE IN LOCATIONS SHOWN ON DRAWINGS. 6. GRADE THE DRY POND TO THE DIMENSIONS SHOWN AND INSTALL THE RISER STRUCTURE AND THE EMERGENCY WEIR RISER. INSTALL THE SKIMMER AND ATTACH THE SKIMMER TO THE 6" ORIFICE IN THE RISER STRUCTURE. INSTALL POROUS BAFFLES ACCORDING TO THE DETAIL ON SHEET 13. INSTALL P 'ti5 AND THE CLASS B RIP RAP FOREBAY. .7 INSTALL TEMPORARY DIVERSIONS AND TEMPORARY LINING/MATTING' IN LOCATIONS SHOWN ON DRAWINGS. 8. PROVIDE TEMPORARY SEEDING AFTER CLEARING AND GRUBBING OPERATION IF THE AREA IS TO REMAIN INACTIVE FOR MORE THAN 15 WORKING DAYS OR 60 CALENDAR DAYS, WHICEVER IS LESS. PROVIDE PERMANENT SEEDING WITHIN 15 WORKING DAYS OR 60 CALENDAR DAYS, WHICHEVER IS LESS, OF ESTABLISHING FINAL GRADES, SLOPES SHALL BE SEEDED WITHIN 21 CALENDAR DAYS. 9. BEGIN SITE STRIPPING AND EXCAVATION WITHIN THE LIMITS OF CONSTRUCTION. 10. INSTALL PERMANENT STORMWATER DEVICES TO BY-PASS OFF SITE FLOW PRIOR TO BEGINNING. GRADING. 11. INSTALL INLETIOUTLET PROTECTION AS SHOWN ON THE DRAWINGS. 12. GRADE THE SITE TO DIMENSIONS AND ELEVATIONS SHOWN ON DRAWINGS. REMAINING PERMANENT STORMWATER DEVICES SHALL BE INSTALLED CONCURRENT WITH SITE GRADING. INSTALL RIP RAP DISSIPATORS. 13. INSTALL FENCE. 14. INSTALL EQUIPMENT. 15. INSTALL STONE ON PAD. 16. STORM DRAINAGE INLETS AND OUTLETS SHALL BE PROTECTED WITH THE APPROPRIATE EROSION CONTROL MEASURES AT ALL TIMES. RIP RAP OUTLET PROTECTION PADS SHALL BE INSTALLED AT THE LOCATIONS AND DIMENSIONS SHOWN AS SOON AS EACH STORM DRAIN CHANNEL OR PIPE RUN IS COMPLETE, 17. PROGRESS ENERGY CAROLINAS, INC. SHALL CONDUCT PROJECT NPDES INSPECTIONS OF EROSION CONTROL MEASURES AND STORMWATER OUTLETS ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT 112 INCH OR GREATER. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFICED IN THE NCDENR EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. THE CONTRACTOR SHALL MAINTAIN THESE RECORDS IN THE PERMIT BOX FOR AUDIT BY REGULATORY AGENCIES. 18. REMOVE ALL SEDIMENT DEPOSITED DURING CONSTRUCTION IN THE DRY POND, REMOVE TEMPORARY BAFFLES. REPAIR EROSION FEATURES AND RESTORE THE VEGETATED SLOPES. REMOVE SKIMMER AND RESTORE RISER TO PERMANENT DRY POND DESIGN. INSTALL THE LEVEL SPREADER AND FILTER STRIP. 19. AFTER SITE IS STABILIZED, REMOVE ALL TEMPORARY MEASURES, AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUNDCOVER IS NOT ADEQUATE. TYPICAL SEEDING SCHEDULE FOR PIEDMONT AREAS . 1. LIME, SEED, AND FERTILIZER SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION OF THESE MATERIALS. THE KINDS OF MATERIALS TO BE APPLIED PER ACRE: TEMPORARY SEEDING DATE TYPE PLANTING RATE FERTILIZER LIMESTONE STRAW MULCH JAN. 1 - MAY. 15 MAY. 1 S-AUG. 15 RYE (GRAIN) KOBE LESPEDEZM GERMAN MILLET"* AUG. 15 - DEC. 30 RYE (GRAIN) PERMANENT SEEDING DATE. �fEE 120 LBSIACRE 50 LBSIACRE 40 LBSIACRE 120 LBSIACRE AUG. 1 - OCT. 15 BLEND OF 50% KY-31 100 LB.S/ACRE FEB. 1 - MAR. 31 BAHIA GRASS 50 LBSIACRE TALL FESCUE AND 50% MIXTURE OF TWO OR MORE TURF -TYPE TALL FESCUE 100 LBSIACRE BERMUDA 30 LBSIACRE JO-10-10 BLEND 760 LBSIACRE 2000 LBSIACRE 750 LBS/ACRE 1000 LBS/ACRE FERTILIZER*** 1000 LBSIACRE 2000 LBSIACRE 2000 LBS/ACRE LIMESTONE*** 3000 LBSIACRE *OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. ** A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUED AT A RATE OF 50 LBSIACRE. ***QUANTITY OF FERTILIZER AND LIME SHALL BE COMFIRMED BY SOILS TEST. 4000 LBSIACRE 4000 LBSIACRE 4000 LBSIACRE STRAW MULCH 4000 LBSIACRE 2. SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED. 3, GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATIONS ARE ACHIEVED, THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. 4. MULCHED AREA SHALL BE TACKED WITH ASPHALT (APPLICATION RATE OF 438 GALIACRE), ROVING, OR NETTING, OR BY CRIMPING WITH A MULCH ANCHORING TOOL. ON STEEP SLOPES, NETTING IS PREFERRED. 5. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASSISYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. 6. VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 15 DAYS OF COMPLETION OF ANY PHASE OF GRADING ACTIVITIES OR WHERE CONSTRUCTION WILL TEMPORARILY CEASE FOR MORE THAN 60 CALENDAR DAYS. Dewberry Dewberry & Davis, Inc. 23M REKWOODS DRIVE SUITE 200 RALEIGH, NO 27612 PHONE: 919.881.9939 FAX: 919.881.9923 NCBELS # F-W79 METAL POSTS 1.5' INTO GROUND MAX. 1.5' APART /-GRASS-1 GALVANIZED HARDWARE WIRE EXTENDS TO TOP OF BOX (3/8" MESH) GRASS) #57 WASHED7 STONE /!. /-GRASSJ r GRASS J 12" -GRASS-J l MAINTENANCE: GRASS 1. CONTRACTOR SHALL INSPECT THE GRAVEL FILTER EVERY 7 DAYS AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL AND MAKE REPAIRS AS NEEDED. 2. CONTRACTOR SHALL REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, THE CONTRACTOR SHALL REMOVE ALL MATERIALS AND UNSUITABLE SOIL. CONTRACTOR SHALL BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT AND APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. TYPICAL CATCH BASIN PROTECTION {TEMPORARY) NITS 1 1' WV%f vv CLASS B RIP RAP, 18" MINIMUM THICKNESS r 1 `j � M SMOOTHLY BLEND CONTACT AREA FILTER FABRIC PROVIDE TEMPORARY CHANNEL LINING PRIOR TO ESTABLISHING PERMANENT GROUND COVER xxxxxxx X& x x 1Ix 4xx XXX M GRASS LINED 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA AND DISPOSE OF PROPERLY. 2. EXCAVATE THE CHANNEL, AND SHAPE IT TO NEAT LINES AND DIMENSIONS AS SHOWN ON THE PLANS PLUS A 0.2 FOOT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS. 3.. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4. ESTABLISH GRASS IN THE CHANNEL ACCORDING TO THE SEEDING SPECIFICATIONS ON SHEET 8. PROTECT THE CHANNEL WITH TEMPORARY LINERS AS SHOWN IN THE SCHEDULE. A FOR PERMANENT CHANNELS: INSPECT EVERY 7 DAYS AND AFTER EACH RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL; CHECK IT AFTER EVERY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. CHECK THE CHANNEL OUTLET FOR BACK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES, REMOVE ALL SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP ALL GRASS AT HEALTHY VIGOROUS CONDITION AT ALL TIMES. PERMANENT DIVERSION CHANNEL SCHEDULE CHANNEL DEPTH BOTTOM SIDE SLOPE BOTTOM LENGTH LINING TYPE MINIMUM SHEAR STRESS NUMBER WIDTH {B) SLOPE (LBI(LB/FTSQ) (M) 1 12" 4 3 0.21 % 76 EXCELSIOR MATTING 1.50 2 12" 4 3 6.0% 72' CLASS B RIP RAP 1.50 TYPICAL DIVERSION CHANNEL (PERMANENT) NTS COARSE ;REGATE NOTES: WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT WILL NOT BE REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL PROPERLY TO GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRIC BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EVERY RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATEDLY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. COMPACTED SOIL BERM TYPICAL CONSTRUCTION ENTRANCE(TEMPORARY) NTS V 1.. 6' -TYPICAL N T TION ECf I TI 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION OF THE SEDIMENT TRAP, PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION. MAINTENANCE: INSPECT TEMPORARY DIVERSION EVERY SEVEN DAYS AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. TEMPORARY DIVERSION CHANNEL SCHEDULE BOTTOM CHANNEL NO DEPTH SLOPE (S) LENGTH TEMPORARY LINING 1 18" 0.5% 70' EXCELSIOR MATTING TYPICAL DIVERSION CHANNEL(TEMPORARYI NTS 6 09/03/2010 REVISED PERMITTING PACKAGES 5 07/20/2010 REVISED PERMITTING PACKAGES 4 05/07/2010 PERMITTING PACKAGES 3 04/16/2010 FINAL RELEASE FOR 6ID AND PERMITTING 2 04/06/2010 95% CONSTRUCTION DOCUMENTS 1 03/I8/2010 PRELIMINARY SUBMITTAL N0. DATE REVISION &a Progress Energy Progress Energy gy Carolinas, Inc. Raleigh, NC � FVR SFP TFB RAMSEUR 115/24 KV SUBSTATION C FVR SFP TFB DETAILS C/ FVR SFP TFB FVR SFP TFB LOCATION RANDOLPH COUNTY, NORTH CAROLINA FVR SFP TFB SCALE N/A SCALE RATIO 1:1 �S FVR SFP TFB DRAWN FVR CHK. SFP APP. TFB BY I CK. I APP. I DATE 09/03/10 DWG. NO. ROC-56524 SHT 9 OF 14 - - - -- , r r .i {'_`... !'r.ul:,`:-'!'. �.il i� ..u't.•.. .. -."_ s. 1--- - --- TYPICAL SURFACE ROUGHENING NTS CONSTRUCTION SPECIFICATIONS: 1. DRIVE STEEL POST 18" INTO THE GROUND AND EXCAVATE A 6"X6" TRENCH UPHILL ALONG THE LINE OF THE POSTS. MAX. V BETWEEN POSTS. 2. ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 6" INTO THE EXCAVATED TRENCH. 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND THE BOTTOM OF THE FABRIC 6" INTO THE TRENCH. 4. BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE SO THAT RUNOFF IS FORCED TO GO THRU THE FENCE AND CANNOT GO UNDER IT. STEEL POST FENCE DER FABRIC BACKFILL TRENCH WITH SOIL MATERIAL AND TAMPING TO 6" ABOVE GROUND. MAI ENANCE: 1. INSPECT SILT FENCE EVERY SEVEN DAYS AND AFTER EVERY 112 INCH OF RAINFALL. 2. PERIODICALLY REMOVE ACCUMULATED SEDIMENT AND REPAIR DAMAGE TO FENCE. TYPICAL SILT FENCE (TEMPORARY) NTS Of f.AV - V MIN --I SPLASH PAD CONSTRUCTED ON . - - DOWNSTREAM SIDE OF SILT FENCE MAINTENANCE: (USE FABRIC UNDER RIP RAP) 1. INSPECT SILT FENCE EVERY SEVEN DAYS AND AFTER EVERY 1/2 INCH OF RAINFALL. 2. PERIODICALLY REMOVE ACCUMULATED SEDIMENT AND REPAIR DAMAGE TO FENCE. TYPICAL STABILIZED OUTLET FOR SILT FENCE (TEMPORARY) NTS ewberry Dewberry & Davis, Inc. 2301 REXWOODS DRIVE SUITE 200 RALEIGH, NC 27612 PHONE: 919.881.9939 FAX: 919.881.9923 NCBELs # F-0679 ENERGY DISSIPATORIOUTLET PROTECTION SCHEDULE STRUCTURE TYPE LENGTH PROVIDED La, (FEET) WIDTH PROVIDED W, (FEET) DEPTH PROVIDED d, (INCHES) STONE TYPE OUTLET ! INLET TYPE DRAWING WHEN SHOWN COMMENTS 1 FES-4 12 13.5' 18" CLASS B A SHEETS 2 FES- 10 11.25' 18" CLASS :B�= A TSHEET 6 NOTE: 1. FOR OUTLET TYPE "B", PLACE RIP -RAP FROM TOP OF BANK TO TOP OF BANK IN RECEIVING CHANNEL. NOTES: 1. La IS THE LENGTH OF THE RIPRAP APRON. 2. D =18" MINIMUM FOR NCDOT CLASS B RIPRAP. 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP ON THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TOP OF BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION AND UNDER THE FLARED END SECTION. TYPE A - PIPE OUTLET TO FLAT AREA - NO WELL-DEFINED CHANNEL SECTION_A A- 'ER BLANKET TYPE B - PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN " co SECTION AA BLAND TYPICAL RIPRAP DISSIPATOR PAD (PERMANENT) RIP RAP OUTLET PROTECTION: 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN ON THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL SHALL BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER SHALL CONFORM TO THE SPECIFIED "GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED -AREA. ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIP RAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE AS SPECIFIED IN THE SCHEDULE. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE, IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGH ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACT IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. I"r,u11,1li INSPECT RIPRAP OUTLET STRUCTURES EVERY SEVEN DAYS AND AFTER EACH RAINFALL EVENT (1/2 INCH OR GREATER) TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. 1w CONSTRUCTION SPECIFICATIONS: ,��,� ` - - O �•••N.•.• R• 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, 4?•�o AND SEED. ' R A L ` fl 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE �3y1 TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. �'•�%,p'� yslE�`•'• 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL. IN 4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH AN 18" OVERLAP. USE A DOUBLE ROW I A.rV OF STAGGERED STAPLES 4" APART TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHOTED IN A 66DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. BLANKETS IN SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAPLED (2" FOR C350 MATTING). 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL. AND COMPACT THE TRENCH AFTER STAPLING.. E407, Progress, Energy TYPICAL INSTALLATION OF NETTING AND MATTING PERMANENT NTS Progress Energy Carolinas, Inc. Raleigh, NC - -77�. j ' Ie i 1� 1 jf 't I 5 � � I I ; •5 � r .I t } 1�f1 { irq{Ile 7 1.. L�.t 1, ; 1 � �i — ----- .': f..'- _'_s!..t.: __,S•,�,. �]�_si•]��.�.. _ ._..._. �.�.. ..•yl,� �.. .. .ti.-'�1':i�t __i.�•.i f�.��;_. ����1}f ls_.., SJ. .;.� CLASS B RIP RAP FOREBAY LEVEL SPREADER LIP, AT ELEV. 560.5' OUTLET PIPE FROM DRY POND zcr' X 25' ENGINEERED FILTER STRIP. PROVIDE 6" TOPSOIL WITH MINIMUM 2°�b ORGANIC CONTENT. SOD WITH TALL FESCUE OR COMMON BERMUDA. 7 DOWNSTREAM LIP MUST BE LEVEL THE ENTIRE LENGTH OF SPREADER, LIP ELEVATION 560.6 CONCRETE RIBBON WEIR, SEE DETAIL BELOW 3" LAYER OF #57 STONE FILTER FABRIC - 36w 314' CHAMFER (TYP.) #4 DOWEL WITH STANDARD 90 DEGREE HOOK AT 12' OC (2) # 4 BARS CONT. CONCRETE RIBBON WEIR (2) #4 BARS CONT. #4 BARS AT 36' OC GRASS LINED CHANNEL 6 INCHES DEEP 4' WIDE. EXCELSIOR MATTING TO BE INSERTED AND SECURED IN GRASS LINED CHANNEL. 11 d 3' i f 4' WIDE GRASS LINED CHANNEL, CENTER ELEV. AT 560.0' LEVEL SPREADER LIP, CONCRETE RIBBON ' WEIR PARALLEL TO CONTOUR LINES. LENGTH = 25' #57 STONE ON FABRIC STABILIZED UNDISTURBED AREA CLASS B RIP RAP FOREBAY (4' WIDE X V LONG X 18" DEEP) ON TOP OF FILTER FABRIC END OF PIPE WIRRA01�Yjv"LL CloA&FF/LTa' F.49W,F06ESAAV AEF Sf/AP� T4PROl%OE UNDISTURBED GROUND AOEQUATFPXi'07gCl�NAROUNOTh'Ep/PE Ddl/TFAL� fNCI!/O/NGTfi(ETOoDFTf/Ep/PE CONSTRUCTION SPECIFICATIONS: 1. ENSURE THAT THE SPREADER IS LEVEL, FOR UNIFORM SPREADING OF STORM RUNOFF. 2. CONSTRUCT THE LEVEL SPREADER LIP ON UNDISTURBED SOIL TO UNIFORM HEIGHT AND ZERO GRADE OVER THE. LENGTH OF THE SPREADER. 3. CONSTRUCT A SMOOTH TRANSITION FROM THE PIPE OUTFALL TO THE LEVEL SPREADER. 4. DISPERSE RUNOFF FROM THE SPREADER ACROSS A PROPERLY STABILIZED SLOPE. MAKE SURE THE SLOPE IS SUFFICIENTLY SMOOTHED TO KEEP THE FLOW FROM CONCENTRATING. 5. IMMEDIATELY AFTER ITS CONSTRUCTION, APPROPRIATELY SEED AND MULCH THE ENTIRE DISTURBED AREA. 6. THE LEVEL SPREADER DESIGN AND CONSTRUCTION SHALL BE BASED ON CURRENT NCDENR DIVISION OF WATER QUALITY DESIGN STANDARDS. MAINTENANCE: NOTE: USE 3000 PSI 1. INSPECT THE LEVEL SPREADER AFTER EVERY SEVEN DAYS AND 112 INCH OF RAINFALL UNTIL VEGETATION IS ESTABLISHED AND PROPERLY MAKE ANY NEEDED REPAIRS. AFTER THE AREA HAS BEEN STABILIZED, MAKE PERIODIC INSPECTIONS AND KEEP VEGETATION IN A HEALTHY, VIGOROUS CONDITION. 2. LEVEL SPREADER (PERMANENT)_ NTS 19. Dewberry Dewberry & Davis, Inc. 2301 RD(WOODS DRIVE SUITE 200 RALEIGH, NC 27612 PHONE: 919.881.9939 FAX: 919.881.9923 NCBELS # F-4)M MAINTAIN THE ENGINEERED FILTER STRIP WITH REGULAR MOWING AND RESODDING IF NECESSARY. MAINTAIN A DENSE, VIGOROUS STAND OF TURF. RECOMMENDED GRASSES INCLUDE TALL FESCUE AND COMMON BERMUDA. `�- 7—' .. ) i ' f .. f . r •�� �' �. � .. v . . - f .. - ' �. , � �- '�' _ .r � f' `'f ! .. �. � .� � •. r . , S %t GRATE ZD C.I. FRAME & GRATE FOR 36"x36" DROP INLET SIMILAR TO US FOUNDRY USF-4156 FRAME & USF-6241 GRATE OR APPROVED EQUAL, H.D. CASTING FINISHED GRADE PRECAST CONCRETE —� WAFFLE BOX PIPE NOTE: FOR STRUCTURES OVER 4` DEEP PROVIDE STEPS CAST IN WALL OF RISER STRUCTURE TYPICAL CATCH BASIN NTS CI RING & COVER, SIMILAR TO US 6IPACTED SOIL GRADE F MAXIMUI PREW DESIGN TYPICAL PRECAST STORM MANHOLE NTS JIM iv Dewberry Dewberry & Davis, Inc. 23M REXWOODS DRIVE Sum 200 RAIEIGH, NC 27612 PHONE. 919.881.91939 FAX 919.881.9923 NC9ELS # F -M79 FINISHED FINAL BACKFILL CONCRETE S1 COLLAR INITIAL 4 BACKFILL •f• MINIMUM SIDE #67 STONE 6" O.D. OF PIPE 6" CLEARANCE WHEN ROCK IS MAXIMUM SIDE ENCOUNTERED 12" O.D. OF PIPE 12" CLEARANCE NOTES: I SEEDED SLOPE VARIES SHOULDE ROADBED (TYPICAL) t.DITCH SOIL 3 fl 1:711 1. FOR TRENCHES REQUIRING SHORING AND BRACING, DIMENSIONS SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING AND BRACING. 2. NO ROCKS OR BOULDERS 4" OR LARGER TO BE USED IN INITIAL BACKFILL. 3. ALL BACKFILL MATERIAL. SHALL BE SUITABLE NATIVE MATERIAL. 4. BACKFILL SHALL BE TAMPED IN 6" LIFTS IN TRAFFIC AREAS, 12" IN NON TRAFFIC AREAS. 5. ACHIEVE 80% COMPACTION IN NON TRAFFIC AREAS AND 95% IN TRAFFIC, AREAS. 6. NO BOULDERS 8" IN DIAMETER OR GREATER ALLOWED. TRENCH BOTTOM DIMENSIONS & BACKFILLING REQUIREMENTS FOR RCP PIPES NTS 9nl-n" 20'-0" ACCESS DRIVE 6" COMPACTED ABC STONE FABRIC 8'-fl" ROADBED TYPICAL ACCESS DRIVE SECTION NTS 6 09/03/2010 REVISED PERMITTING PACKAGES 5 07/20/2010 REVISED PERMITTING PACKAGES 4 05/07/2010 PERMITTING PACKAGES 3 04/16/2010 FINAL RELEASE FOR BID AND PERMITTING 2 04/06/2010 95% CONSTRUCTION DOCUMENTS 1 03/18/2010 PRELIMINARY SUBMITTAL NO. DATE REVISION 114 INCH PER FOOT (2%) SLOPE (TYPICAL) COMPACTED SOIL �� a w 0 U I SEEDED SLOPES (TYPICAL DITCH I 11 1 NOTES: 1. ALL CUT & FILL SLOPES SHALL BE GRADED TO A 3:1 HORIZONTAL TO VERTICAL SLOPE OR FLATTER UNLESS OTHERWISE NOTED ON THE GRADING PLAN. 2. ALL SLOPES AND DITCHES SHALL BE SEEDED & MULCHED UNLESS OTHERWISE NOTED ON THE GRADING PLAN. Progress Energy Progress Energy Carolinas, Inc. Raleigh, NC FVR SFP TFB RAMSEUR 115/24 KV SUBSTATION DETAILS LOCATION RANDOLPH COUNTY, NORTH CAROLINA SCALE N/A SCALE RATIO 1:1 DRAWN FVR CHK. SFP APP. TFB DATE 09/03/10 DWG. NO. RDC-56524 SHT 12 OF 14 FVR SFP TFB FVR FVR SFP SFP TFB TFB FVR SFP TFB FVR SFP TFB BY CK. APP. T PRUNE PROPORTIONALLY TO COMPENSATE FOR REDUCTION OF ROOTS AND TO PROMOTE NATURAL CHARACTER OF GROWTH SHURBS SHALL BEAR SAME RELATIONSHIP TO FINISHED GRADE AS PREVIOUS EXISTING GRADE CUT & REMOVE BURLAP FROM TOP 113 OF ROOT BALL 3" THK. MULCH LAYER 6" MIN. FORM 2" DEEP SAUCER HAND TAMPED \� \ ' ° i PLANTING MIXTURE \ D O APPROVED BACKFILL -• � ' ' ' - � � - - • o o . MIXTURE TO BE TAMPED (SEE SPECS) - 1I2 LB. 10-10-10 FERTILIZER `� � / fSUBSOIL BROKEN WITH PICK PER CU. YD. OF BACKFILL VARIES / TWICE ROOT BALL SIZE ti < \ TYPICAL SHRUB INSTALLATION DETAIL _ us X iw �\ r F44S4"�` s 01 \ (37) INKB RRY, 4' O.C. FOR SCREENING e-� I ENGINEERED FILTER STRIP SEE SHEEN FQR�MTAIL [ NOTES. 1. ALL PLANT MATERIAL AND PLANTING BEDS SHALL BE LOCATED BY SCALED DIMENSIONS FROM CURBS, PAVEMENTS, ETC. LOCATION OF ALL PLANTS SHALL BE REVIEWED BY PROGRESS ENERGY CAROLINAS, INC. PRIOR TO INSTALLATION. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXACT LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION OR PLANTING AND SHALL BE RESPONSIBLE FOR THEIR REPAIR OR PAY FOR ALL DAMAGES MADE TO UNDERGROUND UTILITIES. 3. THE CONTRACTOR SHALL VERIFY ALL PLANT QUANTITIES. 4. PROGRESS ENERGY CAROLINAS, INC. SHALL BE NOTIFIED IN WRITING OF ANY PROPOSED PLANT SUBSTITUTIONS BY THE CONTRACTOR. NO SUBSTITUTIONS SHALL BE MADE UNDER ANY CIRCUMSTANCES WITHOUT THE APPROVAL OF.PROGRESS ENERGY CAROLINAS, INC. 5. THE CONTRACTOR SHALL RESTORE THE DISTURBED AREAS TO EXISTING GRADE UNLESS OTHERWISE NOTED ON THE DRAWINGS. 6. A PRE -EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANTING BEDS IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 7. ALL PLANTS, BEDS, SAUCERS, AND AREAS DESIGNATED TO BE MULCHED SHALL BE MULCHED WITH A MINIMUM OF 3-4 INCHES OF DOUBLE SHREDDED HARDWOOD MULCH. 8. PLANTING BEDS AND SAUCERS SHALL BE EDGED TO PROVIDE A 2" TO 3" DEEP "V" CUT ALONG THE BORDER WITH SODDED OR SEEDED AREAS. 9. ALL SAUCERS SHALL BE SOAKED WITH WATER AND MULCHED IMMEDIATELY FOLLOWING PLANTING. 10, GUYING SHALL BE REMOVED AFTER ONE FULL GROWING SEASON. 11. THE CONTRACTOR SHALL INSTALL ALL LANDSCAPING IN ACCORDANCE WITH THE DETAIL SHOWN ON THIS SHEET UNLESS ALTERNATIVE METHODS OR PRACTICES ARE REVIEWED AND ACCEPTED BY PROGRESS ENERGY CAROLINAS, INC. 12. NATIVE SOIL SHALL NOT BE USED AS BACKFILL FOR THE LANDSCAPE INSTALLATION BUT IS ACCEPTABLE FOR CONSTRUCTION OF REQUIRED SAUCERS AROUND PLANTS. THE REMAINDER OF UNUSED NATIVE SOIL SHALL BE HANDLED ACCORDING TO THE SPECIFICATIONS. BACKFILL MATERIAL FOR LANDSCAPE INSTALLATION SHALL BE A BLEND SOIL MATERIAL AND SHALL CONSIST OF k :, r! 1__,IJ''y 40% COMPOST, 35% SAND, AND 25°/o CLAY. THE SAND SHALL BE OBTAINED FROM A SAND QUARRY AND FREE OF ALL VIABLE i r_. �r WEED SEED. OTHER CONDITIONS OF THE BACKFILL USED FOR LANDSCAPE INSTALLATION SHALL BE AS FOLLOWS: 0ILJ1 E _ ___ _— CL dINJ , C r� ` t, L'- f _tl pt ipP 3s [ MAXIMUM SOLUBLE SALTS: 330 PPM { LIMITS OF CON TRUCTION, tYP. �t RELATIVE DENSITY: 25%-50% t 60 � �`� � � � LOOSE RELATIVE PERMEABILITY: 2.5-10 INIHR P I I I I EXISTING BASELINE i \ ►-- I — "i PLASTIC INDEX, 4-10 PH RANGE: 6.0-6.8 PPS t � tv �0 BACKFILL MATERIAL USED FOR LANDSCAPE INSTALLATION SHALL BE TESTED AND TEST RESULTS SHALL BE FURNISHED TO PROGRESS ENERGY CAROLINAS, INC. FOR APPROVAL PRIOR TO USE. - OHL L- r PPLO P-6, REMOVE EXISTING .-•, �� . � ; � �\ � tom- CPP PIPE AND REPLACE f I ; WITH RCP a 60 g • w Mills - �? 1 " �i■ `QXP I 15' WIDE ACCESS DRIVE, COMPACT GROUND TO �95% 5 �- I DRY POyU SEE 6 4 SHEET 12 FOR f DETAIL xx. xxx ..j Co CDC �... 2 * i'i...f8 SPRE�, P>7=`RT LEV I SEE SHEET 10 FOR IL 8� ELEVATIONS k 561 - 562 663 1 5"•v, — 6 •� P-5 563 P-4 O 7 562 ~ 5&1 _ FES-6 DRY POND OUTLET, SEE SHEET 12- FOR DETAIL "`� � 561 r-.- _ 562 564 DIP SANITA ', v MH-3 _ _ P-2t� Ep DHE — _-- V�j WA E` I `rp "uf F ENCE - NA T E R Q� f �, ewberry Dewberry & Davis, Inc. 23M REXWOODS DRIVE SUITE 200 RALEIGH, NC 27612 PHONE: 919.881.9939 FAX: 919.881.9923 NCBELS # F-0679 PLANT LIST QTY. BOTANICAL NAME COMMON NAME HEIGHT AT INSTALLATION ROOT 106 ILEX CRENATA'SKY PENCIL' SKY PENCIL JAPANESE HOLLY 24"-30" 3 GAL. 37 ILEX GLABRA INKBERRY HOLLY 24"-30" 5 GAL. 21 MYRICA PENSYLVANICA NORTHERN WAX MYRTLE 36" 7 GAL pp 29 UGE CHAIN LINK 1 F E°_N1C 4 PF 28 •1] — 4 ' —0.5% t E _._.__ w 0 H I- P P 47 `__.� Ln �) H --- _ - ` - ¢ t C !Jet[ POLE Tt' OH`'g f pp RP 45 k t I kCn i f • 36r [ It F. p r ; % 1 ; �d a- i ! 3 2 , U, I ', t ME 7 AL ------------------ -4—- #=P GAIN LINK FENCE _.__ — — i '� — — EAST%WES 0 NV OHEt jam{, 1 \ � . � FF�y�'� `,•_. � } .,�..,(���;_«....._».-.w_M.._,_..........;�....--._�,w_._..._•__""_�"___ CD 6 '.••.` t LIMITS OF CONSTRUCTION, TYP. LLJ IV eONt ;7-1 CA t (21) NORTHERN WAX MYRTLE, 5' O.C. FOR SCREENING ED Q TO (BY OTHERS) \ i GAIL GATE P-1 CB-1 I POST 0 S T ------ - co Cp CB-2 I I -_ EX. SS � � .. A/ �, ��iP ,��i � AY SEWER MANHOLE 6 X 11 s�. -fir _ � j+� -- P �-' ; f'1 � t� r L; \ "' •'-^- -..._ � � �"�f�' ._.... _� ...�..� .5 "aa� ,�.�""�"' '�.'.. F _ ,�...,..,...,.'.-,: � . .._..,....;.,� I"T b+��i � .--�..4 ...,�...—,�.._---•.•.., Ef; _A n!OVEN._.-,. IRE F E�N Ls � -_,M_ � � \ �,� r I (�I �� {,'� .-•-•-�y'i \ � Y "�/`•�..,._ �� r--',� ,....»..� , /"W""... r'�'� �"---•.� � ; iJ �' RE `y (45) SKY PENCIL HOLLY, f LIMITS OF C0NSTRUCTI6N,TYP. T O.C. FOR SCREENING / N' (61 ) SK� PENCIL HOLLY, ! T O.C. FOR SCREENING PERMANENT BAFFLE, SEE 5 07/20/2010 REVISED PERMITTING PACKAGES �SHEET 12FOR DETAIL. GRAPHIC SCALE 4 05/07/2010 PERMITTING PACKAGES 20 0 10 20 40 80 3 04/16/2010 FINAL RELEASE FOR BID AND PERMITTING ;Jm— 2 04/06/2010 95% CONSTRUCTION DOCUMENTS ( IN FEET) 1 03/18/2010 PRELIMINARY SUBMITTAL 1 inch = 20 ft. N0. DATE REVISION t 9 i GATE ' POST RA4VEL i DRIVE Ji POST III I1 I �l 1 11; Ex. sIQ. —.- MANHOLE A to Progress Energy Progress Energy Carolinas, Inc. Raleigh, NC j RAMSEUR 115/24 KV SUBSTATION LANDSCAPE PLAN & DETAILS , FVR SFP TFB FVR SFP TFB FVR SFP TFB LOCATION RANDOLPH COUNTY. NORTH CAROLINA SCALE V = 20' SCALE RATIO 1:1 DRAWN FVR CHK. SFP APP. TFB DATE 07/20/10 DWG. NO. RDC-56524 8HT 13 OF 13 FVR SFP TFB FVR SFP TFB BY CK. APP. t., IT h- 31, �� 'r� J ►,� 4 �. ,1�«-,t�xia�, .l.dti.�...,r... .,1,..'-! �. ,! .t, 1�� �1 L i;St: ;.I4� ' .�. ! . .. ,- ,! f !. .�; , .^,t u�l,. ',•Hw Y rr,-. r'a!fp. }c'er v'�i 1ri��' N /' F ;E_ 1_ E7NNi�=L � f°ENE HEADE ti .r ~� AtF''e PIN- 87102-7f')-(J-109 D.B. 1"_ 3 PC. 4 10 NIED� RA 4 LL lr y % ` TEMPORARY SILT FENCE, I I EMOVE THIS SECTION 0 , IMMEDIATELY AFTER �DISSIPATOR PAp IS INSTALLED - PERMANENT RIP �•�' ' ' ' ' ' ' ' ' ` LIMITS OF CONSTRUCTION TEMPORARY SILT FENCE SF - TEMPORARY CATCH BASIN PROTECTION RIP RAP DISSIPATOR PAD/OUTLET PROTE ;`'ION j�4 �.- TEMPORARY SILT FENCE OUTLET,, DIRECTION OF FLOW N/ F I V i 1-'i{ 1 t_ i•_ N E.._ W P i N : 8 7 0 2 - 15680,2 D.r. 1610,6 ,),;, f' 0 r CHAIN [-INK F ^ rC - _ +� , •� __--�,.'m- .._>m.......,...�r.-...� .-,_.-.e..-�: � _'�"a'"`.."'e.."--.�+. I .-.....� -tit---'-- _.-..._......_....._. 4i 'IRAP, DISSIPATOR STABILIZEQ 1--�-PAQA, SEED-� SILT FENqE !SHEET 10 FOR DETAIL-- �" w - -- 4" I , i ENGINEERED FILTER STRIP SEE SHEET 11 FOItDETAIL I RIP RAP FF p RELAY;--SEE- SHEET 11 FOR DETAIL 15' WIDE ACCESS DRIVE, COMPACT GROUND TO 95% AND SEED -� U- DRY POND, SEE SHEET 13 FOR I DETAIL < < I 60 11� f_ ■ - P-:'i 3 T F(W CIE SHEET I \ _J I PERMANENT LEVEL, , SPREADER, SEE SHEET 11 FOR IL & ELEVATIONS SF pp f F 5fi1 562 �✓ �' _WA �-- 562 ... 56.1 -� FES-6 ---r DRY POND OUTLET, SEE SHEET 13- FOR DETAIL 001 %3vf. 5" 13 DIP SANITA ,Y SE, MH-3 i P_2 E 156" r I 566.0 TEMPQRARY_SKIMMER, _-------- I V SE tHEET ..F 158TAIL �' 2 � � R C u � I:� K;-IEAD EL-EG- r"A I I srC TEMPORARY BAFFLES, ,fir a j- c ' ' � SEE CONSTRUCTION M LE T E R < I SPECIFICATIONS ON SHEET 13 Dewberry Dewberry & Davis, Inc. 2301 REXWOODS DRIVE SURE 200 RALEIGH, NC 27612 PHONE: 919.W.9939 FAX 919-M-9923 NCBELS # F-W79 y rF ; ik- OF CON TRUCTION TYP NOTES: 1. DISTURBED AREA =1.52 ACRES 2. SEE SHEET 2 FOR EXISTING CONDITIONS. 3. CONTRACTOR SHALL INSTALL ALL MEASURES NECESSARY FOR EROSION AND SEDIMENT CONTROL, 4. CONTRACTOR SHALL MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 5. CONTRACTOR SHALL RESTORE THE DISTURBED AREA TO EXISTING GRADE UNLESS OTHERWISE NOTED ON DRAWINGS. CONTRACTOR SHALL SEED AND MULCH ALL AREAS NOT RECEIVING STONE. 6. CONTRACTOR SHALL INSTALL JUTE OR EXCELSIOR MATTING ON ALL SLOPES 3:1 OR STEEPER. 7. SEE SHEET 9 FOR EROSION AND SEDIMENT CONTROL SEQUENCE AND SEEDING SCHEDULE. PIPE NO. PATH _ TO FROM i SIZE (INCHES) LENGTH (FEET) PIPE INV OUT INV IN SLOPE (%) MATERIAL P-1 CB-1 CB-2 18 121 557.03 556.42 0.5 RCP P-2 CB-2 MH-3 18 112 556.22 555.66 0.5 RCP P-3 MH-3 FES-4 18 156 555.46 555.00 0.3 RCP P-4 CB-5 FES-6 15 22 561.03 561.00 0.15 RCP P-5 w OS-7 FOREBAY 12 29 561.00 560.85 0.5 DIP P•$ 12 45 564.9 562.6 5.1 RCP 0 PERMANENT DIVERSIO L 2,,., I ({ �/ ; LINE WITH CLASS B RIP RAP, PEk, i' `-, i EXISTING BASELINE - TEMPORARY SILT FENCE, 'SHEET 9 FOR DETAIL \. SEE SHEET 10 FOR DETAIL j \ SF -- SF SF ' r P-G, REMOVE EXISTING CPP PIPE AND REPLACE WITH RCP • r� -x • _t � .� - !�E 4, to qua +n { ! ........ ..................i------•---- ,.. _I`,i`'t_ r i , C Z LEGEND CB = CATCH BASIN P = PIPE MH : STORM MANHOLE FES = FLARED END SECTION OS = OUTLET STRUCTURE _ [ - EQGEOFGRADE �POWIANENT WEFtSION r�i car," CHANNEL 1, SEESHEEfL. _�_..w i ltii I r , COD �3 j ' 1 __r-i--^--� --- --- f . .. .ti i in I FOR DETAIL i' : ' ;- __ __ . Ilk I ! , r......,........... , ;E' -�,'tE I` - -- - E' - ' - u. i + EASTf W S- BASELINE - + v I _ L+� ... TEMPORARY ONSTRUCTIC) l`! '`try _ - =-« - ' ENTRANCE, SEE SHE F,OR nJ _ `� LIMITS OF CONSTRUCTION, TYP. Q0 mot`- Jrr'' i CA =-•-=--- \ -' STRUC, TOP ELEV. CB-1 561.50 CB-2 562.50 MH-3 566.00 FES - 4 -- CB-5 563.00 FES-6 - OS-7 561.00 FES-8 PERMANENT RIP D �� -�v # `�` �M� TEMPORARY CONST,,,r(UCTION RAP DISSIPATOR '` �- ` r t �. ENTRANCE, SEE SHEL7 9 FOR 9 - PAD 2. SEE SHEEN 11 EDCE,\b f STONE (BY OTHERS) , DETAIL _ 10 FOR DETAIL , a 8'� $`�" .� " P-1 � CB-1 TEMPORARY CATCH BASIN;-� PROTECTION Tl(P SEE \ j JU1.. a8 ; jZ '- •"°` ' 1' \ SHEET 9 FOR DETAIL : �(+� �i ..a -��- - ` � '� � � s � � � � � �..> s•4' Q"II��' 1I,���s;,- a'c�,�;,-;;.r '.y�zC.r ... .ems-__.� __..__�_-r,---'-'--'��� ��� F� ���f1 \,�.... • c n tC� !'���axa` r: scs J J EP>Au �O +op v19 � w a43'�aa : \ j :N :.r�l . r. ;i , r <�` c. - +.R t °+ii °' ` ;4 a 1� cp • • �� ,' i is ............... ... ....... ..; �: ..�1 .. .... .. ............ Iy ........ , ........ i . .:.. ,.� ws.a ' + tJ;-°a �aS's. is� A w^� a sin �' : .• a !1 -v _ ..�_"---_..,-..w- R��,: • _ _- .- ._.._... ....-�.r _. ._... _..--_. .__'_""'_-._._._._._._-._..-..�._....._.,... �. _--.-..., _..-... 'N � ?'� ttd FaO ta��� O t94 G4 `.'A' 'j _ .® .rees._s�.._�_�Y.pY' ... _ • mSF SF w MY..A•� - ----•_ .»... - ._- t. -� -.1 .- ~_. -- w.- �-`._ / 1- - -~- �'--.-_ __- _.' �.� i ,._�'_---`_�. '~ -• f� -.__ -. - Gl ' �'-`•ce d' d n z ._. ���-�-_ i.-�[SN SY �..f'e crr�4s�a a}C>✓4ix �...+. iFys ter..../--........�.._....------• _`--`_ _-....._� ' �- �; CB-2 -�-_ h. �'.�- SM f _) ��t�lLiLC RICE r I '•1 j I iE.� . T- ''`'� , LIS r_` �.---•...C,> »___.. - _J .,. .� _ .� _ - -' _ - r �- ----.-.._. I i _ 0 4 t Li V F iN W F E N i i C �. L LE � � r -y j � . .4 l "V OUTT�.561-:% �` LINE EA BETWEEN EX-1 S" OUTFALL �=- UTILIZE PERM4IENT POND 1 r- -4[ NEW'CATCH BASIN WITH CLASS\B RIP RAP FOR SEDIMENftTORAGE , SEE ` rr D SHEET 13 FOR DETAILS ON TRANSITION r; 9 03/16/11 PERMIT DRAWING REVISI.;INS FROM SEDIMENT STORAGE TO DRY POND " LIMITS OF?CONSTRUCTIf3N, iYP. E r 8 12/13/10 REVISED PERMITTING PAC:'AGES j 7 12/03/10 REVISED PERMITTING PAC:AGES 6 09/03/2010 REVISED PERMITTING PA0 AGES 5 07/20/2010 REVISED PERMITTINGW PACK ALES PERMANENT BAFFLE, SEE _ SHEET 13 FOR DETAIL. GRAPHIC SCALE 4 05/07/2010 PERMITTING PACKAGE.`? 20 0 10 20 40 so 3 04/16/2010 FINAL RELEASE FOR BID AND. [FRMITTING 2 04/06/2010 95% CONSTRUCTION DOCUNEN T S ( IN FEET) 1 03/18/2010 PRELIMINARY SUBMIT T iii- 1 inch = 20 it. N0. I DATE REVISION 6 a � FVR SFP TFB Progress Energy FVR SFP TFB Progress Energy Carolinas, Inc. Raleigh, NC FVR SFP TFB FVRI SFP TFB RAMSEUR 115/24 KV SUBSTATION FVR SFP TFB PHASE II EROSION CONTROL PLAN FVR SFP TFB FVR SFP TFB LOCATION RANDOLPH COUNTY, NORTH CAROLINA FVR SFP TFB SCALE V = 20' SCALE RATIO 1:1 FVR SFP TFB DRAWN FVR CHK. SFP APP. TFB BY CK. APP. DATE 03/16/11. DWG. NO. RDC-56524 SHT 7 OF 14 J\ 0 ' 1 ' f , i � � 1 a > i, •. , � 1t tr,, ` ;,1, i' {! i � � ' ! i � r �� ' t ., ' ' � I� � � �'� � ��' 1 4 ! ' ti i • 1 !' � �1 � r� 1 i� y 4', , � I s I �i I l I• �