Loading...
HomeMy WebLinkAbout20090992 Ver 1_Triage Comments_20100127DWQ# Use this form instead of writing inside the folder Z Triage Comment Sheet Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 ? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) Issue &ih conditions (Reviewer 1) If- ?? W ro V? ?,Jv Issue with conditions (Reviewer 2) -O? A, n-c? A J Date: ?2 / v Date: 41-ow Date: ? More Information (Reviewer 1) ? Return Application (Reviewer 1) ? Send to Regions (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY 09-0992 Town of Cary: Agassi Court Drainage Rehab Project take 2 AM L comments .1anuary 27, 2010 On the site plan, please provide: a. One-foot topographic contour lines. b. The boundaries of the protected riparian buffer and the pond. c. The entire storm pipe drainage system, with a clear distinction between the existing pipes and new proposed pipes. d. A scaled depiction of the dissipater pads you propose to use at each pipe outlet. 2. The plans should be sealed by an appropriate design professional. 3. Please explain how peak flow control will be provided for the undeveloped portions of the drainage area in order to protect the Wimbleton subdivision from future flooding problems after these improvements are made..