Loading...
HomeMy WebLinkAbout20090688 Ver 1_Closeout comments to DMS_202007067/6/2020 Mail - Merritt, Katie - Outlook Sandy Creek/Charles Williams file & credits Merritt, Katie <katie.merritt@ncdenr.gov> Mon 7/6/2020 7:09 PM To: Allen, Melonie <melonie.allen@ncdenr.gov> Bcc: Wojoski, Paul A <Paul.Wojoski@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov> U 3 attachments (3 MB) Sandy RestPlanComment.pdf, Sandy AsBuilt.pdf, Sandy Yr1.pdf; Hey Melonie, Now that I have the correct DWR project number for UT Sandy Creek/Charles Williams, I found that DWR has a pretty good electronic file, but it's likely missing key information. After researching the docs I have online, there are a lot of inconsistencies in the buffer credits than what was submitted with the Closeout Report. I've attached a few pages from the Restoration Plan, the AsBuilt Report and the Year 1 monitoring report for examples. Since I can't find the MOA that is referenced in some documents and in the Restoration Plan, I can only assume it means the MOA between DOT, DMS & the IRT. Which, to my knowledge, doesn't address the buffer mitigation program. What I am also assuming based on the 2014 Year 1 Monitoring Report Attribute table, is that DMS may have chosen to apply this 2013 Memo to get credit beyond 50' from the UT since it wasn't originally described in the Restoration Plan (2009) as getting buffer credit along the UT or out to 200' and nothing about Grandfathering. But, if applied to the credits, it still was not applied correctly considering the ratios used are not the ratios described in that 2013 memo. I'm just having a real hard time tracking what DMS was using to determine its credits from Restoration Plan Submittal to AsBuilt, to Year 1 Monitoring. I'm doing the best I can to figure it out based on what i have in the file and the memos I remember DWR issuing. It would be helpful for DMS to indicate what rules, memos, etc they want to apply to their credits and provide the correct references along with an appendix of the references in the Closeout Report for DWR to review. Trying to figure it all out on my end to validate the credits you are requesting is extremely complicated. At this point in my review of the file, the only credits I know I can approve are the 1.56 acres of Enhancement credits along Sandy Creek approved in the Restoration Plan & AsBuilt and possibly some credits along the UT that comply with the 2013 Memo. Either way, I'm happy to discuss. Please let me know if you have anything in your files from DWR that may close the loop on some of these questions. Thanks, Katie https://outlook.office365.com/mail/sentitems/id/AAQkADk0OTc5NWUwLWIwOTItNGFkYil hNmQOLTdjNjEOZGEyNDIhMAAQAKj%2FujhiaopPvK8Di9w... 1 /1