HomeMy WebLinkAboutNCC202726_ESC Approval Submitted_20200630ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA i'nvironmental Quality April 17, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Marine Corps Air Station Cherry Point Attn: Charles E. Schulz, Commanding Officer P.O. Box 8006 Cherry Point, NC 28533-0006 RE: Project Name: ATC Tower and Air Operations Project ID: Crave-2020-029 County: Craven City: Havelock/Cherry Point Address: 61h Avenue, A St., C St. River Basin: Neuse Submitted by: Burns & McDonnell Date Received by LQS: March 19, 2020 Plan Type: New Dear Sir, Acres Approved: 26.2 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas'fr ncdenn «ov or Paul Clark at Paul.clarkna,ncdenr. ov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: �� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources E QWashington Regional office 1 943 Washington Square Mall I Washington, North Carolina 27889 pmasa 252.946.6481 The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (15A NCAC 04B .0113). 2. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on - site natural watercourse or adjoining property. [NCGS 113A-57) PROJECT INFORMATION SHEET APPROVAL DATE: March 19, 2020 RESPONSIBLE PARTY: Marine Corps Air Station Cherry Point PROJECT NAME: ATC Tower and Air Operations COUNTY: Craven NO.: Crave-2020-029 OFF -SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON -SITE CONTACT: ON -SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: James Edwards 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 james.edwardsC@ncdenr.gov