HomeMy WebLinkAbout19951238 Ver 1_Complete File_19951128State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., RE., Direclor
APPROVAL of 401 Water Quality Certification
Mr. Martin Bolick
District Engineer
NC DOT
P. 0. Box 1460
Boone, N.C. 28607
Dear Mr. Bolick:
a 0
??
December 7, 1995
Caldwell County
DEM Project # 951238
You have our approval to excavate material in 0.02 acres of wetlands or waters for the purpose of
replacing existing pipes along SR 1721 (McCrary Creek Road), as you described in your application
dated 15 November 1995. After reviewing your application, we have decided that this fill is covered
by General Water Quality Certification Number 3026. This certification allows you to use Nationwide
Permit Number 3 when it is issued by the Corps of Engineers.
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new application.
For this approval to be valid, you must follow the conditions listed in the attached certification. In
addition, you should get any other federal, state or local permits before you go ahead with your
project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Environmental Management under Section 401
of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Sincercl
P ston Howard, Jr. P
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
Asheville DEM Regional Office
Mr. John Domey
Central Files
95 1238.1tr
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-7?3-2496
An Equal Opportunity Affirmative Act;n Employer 50% recycled/ 10% post-consumor parr
r -101i
g?i
La
,
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HuNT JR- DIVISION OF HIGHWAYS GARIAND B. GARRETT JR.
GOVERNOR SECRETARY
P. O. Box 1460
Boone, North Carolina 28607
1VOV6-M13C-2 /S1 /Fy5
Mr. Steve Chapin
U.S. Army Corps of Engineers
151 Patton Avenue
Room 143
Asheville, North Carolina 28801-5006
Dear ;,fr. Chapin,
r..
The N. C. Department of Transportation is proposing to grade,
drain, base, and pave SR 1721, McCrary Creek Road, in
Caldwell County. As part of this project we are proposing to
replace four pipes carrying streams. The streams involved
are unnamed tributaries to :McCrary Creek and are classified
by DEM as WS-IV&B CA. In addition to the pipe replacements,
we are also proposing to install gabions along McCrary Creek.
McCrary Creek is also classified by DIEM as 1VS-IW<B CA.
The- efore, we are requesting a 404 Nationwide Permit for this
project.
I am sending a joint application form, a straight line sketch
with the proposed erosion control, cross section notes for
gabion installation, notes on pipe installation, roadway
typical section, and a marked county map.
By copy of this letter, I am requesting Ms. Stephanie
Goudreau, Mountain Region Coordinator, to comment directly to
you concerning the 404 Nationwide Permit request.
Also, by copy of this letter, I am requesting authorization
to proceed under Section 401 of the Clean Water Act from the
Division of Environmental Management.
We would like to perform this work as soon as possible. if
any further information is required, please advise. `lour
early review and consideration will be greatly appreciated.
RECEIVED
NOV 2 8 1995 1
EWRONYENTAL SCIENCES
RECEIVED
'! a 1995
'-?L SCIENCES
Sincerely,
Martin Bolick
District Engineer, N'CDOT
0*
Page 2
Mr. Steve Chapin, U.S. Army Corps of Engineers
SR 1721 McCrary Creek
MB:KWW
Attachments
Qua lit , M
Mr. Richard Phillips, P.E., Regional Engineer, DEHNR
Mr. W. E. Hoke, P.E., Division 11 Engineer
Mr. Neil Trivette, Area Roadside Environmental Engineer
Mr. K. W. Winkler, County Maintenance Engineer
cc: bye. Stephanie Goudreau, Mt. Region coordinator, NCWRC
ir. Eric Galamb Water lit Certification Unit DE
DEM ID: ACTION ID:
NATIONWIDE PERMIT APPLIED FOR (PROVIDE NATIONWIDE PERMIT 0):
JOINT APPLICATION FORM FOR
NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEERS
NATIONWIDE PERMITS THAT REQUIRE SECTION 401 CERTIFICATION CONCURRENCE
NATIONWIDE PERMITS THAT REQUIRE INDIVIDUAL SECTION 401 CERTIFICATION
WILMINGTON DISTRICT ENGINEER
CORPS OF ENGINEERS
DEPARTMENT OF THE ARMY
P.O. BOX 1890
WILMINGTON, NC 28402-1890
ATTN: CESAW-CO-E
Telephone (919) 251-4511
WATER QUALITY PLANNING
DIVISION OF ENVIRONMENTAL MANAGEMENT
NC DEPARTMENT OF ENVIRONMENT, HEALTH,
AND NATURAL RESOURCES
P.O. BOX 29535
RALEIGH, NC 27626-0535
ATTN: MR. JOHN DORNEY
Telephone (919) 733-5083
ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF
ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF
ENVIRONMENTAL MANAGEMENT. PLEASE PRINT.
1. OWNERS NAME: ?.Depar-Vmer% of -rrwISPOf'IA4)?H
2. OWNERS ADDRESS:
3. OWNERS PHONE NUMBER (HOME):
(WORK) : (70y) Z"- 6-380
4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS,
PHONE NUMBER: /17a? fir? Solick
F. O. Box /IYW
Boone. A1C Z860'7
(70) Z&&-S'38O
5. LOCATION OF PLANNED WORK (ATTACH MAP). COUNTY: C-a41Wtlk
NEAREST TOWN OR CITY: Lenoir
SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.):
S'R )f7Zl - Ytnt('rarv, Cref-k Roark
6. NAME OF CLOSEST STREAH/RIVER: MC CrarU Gre k
7. RIVER BASIN: co-ajoa- R,)vFr Smsiy\
8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW,
WS I, OR WS II? YES ( ] NO V-j
9. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS
PROPERTY? YES ( ) NO (}q
IF YES, EXPLAIN.
10. ESTIMATED TOTAL NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING
WETLANDS, LOCATED ON PROJECT SITE: D•D rI
3/30/92
N
-2-
11. NUMBER OF ACRES OF WATERS O€ THE U.S., INCLUDING WETLANDS, IMPACTED BY
THE PROPOSED PROJECT:
FILLED:
DRAINED:
FLOODED:
EXCAVATED: O.0 Z
TOTAL IMPACTED: 0.07
12. DESCRIPTION OF PROPOSED WORK (ATTACH PLANS) : Ree6 a esoS '14 Zl4",e!6Le w/ pm,
Z4'o,+ srj9 9+30SSf 7o el* w. Z4- s-s// ia 36" on eja -A'oo'w'40c
Z;V-6ll IabionS A? <44 1?*2f(Armyj 4o S7W Z4144lo(41mx,)
13. PURPOSE OF PROPOSED WORK! ?flis Abrk ;s Arir-'eFi? argie- - -jo grad,-, Arai,,,
bast. and j@ve sk 1'7?J. lnc6waX cnPek rao?,
• r
14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE
CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMIZE WETLAND
IMPACTS.
15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE
(USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE
OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED
SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE
PROPOSED PROJECT. HAVE YOU DONE SO? YES [ ) NO {,-q
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.
16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER
(SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH
MAY BE AFFECTED BY THE PROPOSED PROJECT?
HAVE YOU DONE SO? YES ( ) NO 64
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. ADDITIONAL INFORMATION REQUIRED BY DEH:
A. WETLAND DELINEATION HAP SHOWING ALL WETLANDS, STREAMS, AND LAKES ON
THE PROPERTY.
B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY
PROJECT.
C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS
RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE.
D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH
COPY. 1r E. WHAT IS LAND USE OF SURROUNDING PROPERTY? ??S?C7ermal?AgrrWj?tJra?
F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL?
N/A-
OWNER'S SIGNATURE DATE
NORTH CAROLINA'DEPARTMENT OF TRANSPORTATION
EROSION AND SEDIMENTATION CONTROL PLAN
PROJECT /??soy SR # ,1,2,°2/ COUNTY _CALDWELL
PREPARED BY // / DATE ?X?4?
APPROVED BY 0/? C/?' O C G 1
DISTRICT ENGINEER
ROAns i nE ENVIRONMENTAL ENGINEER
symbol Fagg
245.03
245.05
no ___
Temporary Silt Ditch ..............................
Temporary Diversion ............................. ro ___
v1- 2
V1-4
893.01
890.05 Temporary Silt Fence ......................
Temporary Slope Drain with Earth Berm ......... - --------
. -------- vI - 6
vI - s
245.01
245.02
892.04 "
895.10
892.01
892.02 Silt Basin Type A .............................. -0 ____________
Silt Basin Type B ........................• .................. = ---
Temporary Rock Silt Check Type-A .......... ___________
Temporary Rock Silt Check Type-B ......,,,.,.} ____________
Temporary Rock Sediment Dam Type-A ............ ___
Temporary Rock Sediment Dam Type-13 v1-10
V1 -12
v1- la
vI -16
v1- is
vI - 20
897.01
8
94.01
245.04 Rock Pipe Inlet Protection
pock Silt Screen ........................ ..................
Stilling Basin ..................... ..:............................ u ___ v1- 22
------------ v1 - za
... ®----- Yt - 26
896.01 Rock Inlet Protection:
Type A ..................... .:........ A OR
" A ----- v1- 30
896.02 Type B B ? -,-OR --.13 ----- v1- 32
896.03 Type C ............................... C ? •- OR -- C ---- VI - 34
••
•..... • ••••
Pipe Outlet Energy Dissipator
•40?4•
vt ss
-
Inlet/Outlet Protection ...•...••••• D •••• N/A
March, 1993
?y
i,
v
t
i ,
4
A
? CI
s
M1
a,?
GENERAL NOTES ON EROSION CONTROL
Silt Basin Type B's will be constructed to the dimension of
six feet by three feet by three feet unless otherwise noted
on the plans.
Generally, the order of installation of the erosion control
measures will be as follows:
Temporary Silt Basins shall be installed before
clearing and grubbing begins
'Silt Fences and Temporary Silt Ditches shall be
installed as soon as ditchline is established.
Temporary Stone Ditch checks shall be installed as
soon as ditchline is established.
Plpe Outlet and Inlet Protection will be done as soon
as pipe is installed.
Seeding and Other Permanent Erosion Control Measures
are to be implemented as soon as practical.
Temporary Rock Silt Checks (Type B) will be spaced as
required by percent of grade as described on page VI-16 in
the Erosion and Sedimentation Control Guidelines.
No. 5 Stone, or equivalent, will be used in conjunction with
Temporary Rock Silt Check Type-B in location where water is
leaving the project or entering pipe.
,?R,4 de '42
r_
I
GRAde .57
I
I
? C
d
I
A
qto °
S+nO
v
p2?JC WC Y
t40
400 '
? ( `I-`lo C2d5s
_t o f?
3foo
I
atao
fffvo
I
I
9 vie -pt L-
I
1
i
1
I
I.?
4
ti I$tao
I
Q Q I
13+0 0
._. ? a goo
I
Il?.oo
?D ` ptb0 C8-,) C2o5S ?,r?
Add a?- ?}b.
i
I
gfp0 S Vie ?at-
1 r
I V
ROm s-m I g k O 4o s Zy?p?
q }e,.?oro? diversion ben+?
1??? of rood Prey^}
117e (ru y Beek. Also
JdwAy
?- un'Icr ?rp?. Crtek 1o di?L`•?
'p.onuwI\Y
}ten
1
a{gtoo
W
.-?• ?5+ o 0
SI•1WVI1?r(1:
V ?
i.
•-. a 1-1- O o
d ?
v
a.o +oo
?a
)q foo
5,!p I k s A 2e n
?? ? %S F1 RQ A
I
i
IV
Tr?ont,wnY
t?l
d
;l
one )?:1?- C=am 6???
3b-too toss 1- !-oe,?f?o,
I
L
a
-4.3ytoo
3'+00
D
1
.?- 3a+o 0
I
31.}.po
r
I
F4
I
r
,' ?? ?,e !e SS
,?IAI
I•
i
i I
FtoADvYr.Y
r_
Q
I I
t
?L
i
i
-D i ReP<<*[F
v -?-' J/3 f o°
>?,? too
+ L. p d2?Ve-any
1,'.ptDv
?D ? 3q?oo cRoSs ?;h?. ?;?? ?'
??eP1r''ca
1
I
38+0o dR' `'e`er: y
1
37+00
I
i
rIOAVwI Y
t'
_1?
5 s
t}+oo
I
5 300
+o a
51 +00
rt-5o+o0
n J+Cj }Oo
0
4$+OO
4- µp cl?;veW? v
-rn-r i c? r I ?,
`GC, S',
p,oAvwnY ;LD cR PC
pf
P i p e.
C 1 +pO
Old.
C+2°i.5 f4c
+C)
I ? 1
?l
V, ve 6.
I
i
..1-. 54?°OS e ?? n t
it
t
?
3
I n
Ia
I
v
J
I
P,0AUwAY
_v
e,1'/1-r I cI t (•,
I
._._ (o(o-F OO c?RiuG?e??
1
I I
65'0°
I
..1. l?3+oa S Vi e t n 4' . . _
_ r_?_
i y' I 1 ? 1 r ! i i
_ 1 ! L 1+ ' ? r
f -
...?--!
(--
-
i?
-
-
-
-
I
-,
- t
•-- ill
-t-
-
?-?
-
-
?-,
1
i
---
?
_
Ll_.• l i._:' t-
o:.. 1.-•-
14-
I
I
1
1
1
?
1
!
:
t
t It I
i
T, _i_1 =I _ 1 7 = _ ;_:
a 1-i !- 1
L1
-
?
-
t J? ) 11
-*- I tom. • ? ' --
_T
Y
I ? •
, I 1
H 4 1 -1
-
4
+
I
d
_
-
-4
-
-}
-
-
-
?
-
3
1
I 1
1 4
- 4 4
_
r
} r
-
-
-
-
-
- - - - - - - -1 -. - - --;-
}
/T u it
i t - - - - - - - - - - - - - - - - - - - - - - ,. }
- - - _ r- U L
-
-
-
-
-
u
:,
}
-
- ?
1
I - - r 1
- _ -
- -
1 ' - - - - - - - - Vi - t -1- -
- } - - - -
- i - - i.
- - ' - - - - -
-
L
-
i - l
P
-
-
-
I
i
' H 4 1 1 1 1
-
-
-
14
-
-
-4- +
-
+
_4d
_'
- s - - .
+ I +
- _ -
-
'
_
- - T 7 r
-
- 4 +
.
j _ p _ 14 +
-
-,
_
t, t
- , - - -
•
_. I 4 4 +
mot-.
1
_
_
_
?
- - - - ?
?-? `
!
-
-
_
_
i
•
_.?
-
_`
- _ - - ' 1
4
4
-
4
7
I
+ R
-
- 1 - 1 J
l
+ + I II
'
i
i
'
1
-
-
-
-?
-
-
-
-
-
-
1
-
-
-
-
'
-
-
-
4
-
-
1
-
[
-
-
4
-
-
+
-
.
-
4
-
+
-
+
-
'
-
[
r L
i L
-
T T T t
p ( - _ _ _ -IA i
4 + 1 R. J
4 } - c a - - - - - - - - - - - - - - - -
-
- -- }- s
} } j
?
- 1 1
?- - - - - - - _ - L i
- 1
-
-
-
- - 1- -1 - - } -'
- - - - - - i _ f
- -
-
-
-
-
-
-
-
-
-
- -
-
-
14
h
- - - - - 1-
j - - d a 1 4 -
-
-
-
?-
.*
i t f - - - - - - - - - + 1
-
-
-
H
-
4
- +
-
-
-
-
-
-
-
1-
-
1
-1 1
-`
' 1 - - - - + . - - - 1- -- - -{ - } - }- -f - - 1- 1. - ?- - - +
4
'O fA
S , I 1
? - - - - : - - - - - ` - - - - - ` - - r • - -- -
-
- - - 1 -
- - - - - 5 - -
I -
-
l i t
d . 'O O d . '
t
3? -
?- T
1 -}
1 - - - -
t - }-
- 1 1 , ,
PIPE INSTALLATION NOTES
1) Install erosion control devices. In streams, where
necessary, rock silt screens will be used.
2) Remove material and existing pipe while limiting, as much
as possible, material and sediment from entering a stream
and/or escaping from project.
3) Prepare pipe foundation while again taking care to limit,
as much as possible, material and sediment from entering
a stream and/or escaping from project. Where possible,
new grade will be below existing stream bed. If needed,
bedding material will be clean stone.
4) Place the new pipe and compact backfill.
5) Install slope protection on outlet and inlet ends of
pipe. Also complete installation of erosion control
,measures and perform maintenance as needed on existing
measures.
6) Establish permanent vegetation as soon as possible.
a
M
z
O
H
r^
U
W
U
h
°
a F
?J F
M N
a
H
1
0.
d
NI