November 1, 1995
Caldwell County
DEM Project # 951122
APPROVAL of 401 Water Quality Certification
Mr. Martin Bolick
District Engineer
NC DOT
Post Office Box 1460
Boone, N.C. 28607
Dear Mr. Bolick:
You have our approval to place fill material in 0.01 acres of waters for the purpose of replacing
two pipes carrying live stream and installing a French drain at SR 1315, Brookshire Road, as you
described in your application dated 16 October 1995. After reviewing your application, we have
decided that this fill is covered by General Water Quality Certification Number 2735. This certification
allows you to use General Permit Number 031 when it is issued by the Corps of Engineers.
This approval is only valid for the purpose and design thai you described in your application. If
you change your project, you must notify us and you may be required to send us a new application.
For this approval to be valid, you must follow the conditions listed in the attached certification. In
addition, you should get any other federal, state or local perrniL before you go ahead with your
project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, T.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Enviroamental Management under Section 401
of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Sincerely,
PP..
ton Ho rd; Jr. Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
Asheville DEM Regional Office
Mr. John Domey
Central Files
951122.1tr
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50'. •ecycled/ 10% past-consumer paper
SUS _ g c5I I QZ
JAMES B. HUNT JR.
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS GARLAND B. GARRETi JR.
S ECRUARY
P. O. BOY 1460
Boone, North Carolina 28607
RECEjVED
OC 201995
ENVlRCN? "ENTAL SCIENCES
Mr. Steve Chapin
U.S. Army Corps of Engineers
151 Patton Avenue
Room 143
Asheville, North Carolina 28801-5006
Dear Mr. Chapin,
The N. C. Department of Transportation is proposing to grade,
drain, base, and pave SR 1315, Brookshire Road, in Caldwell
County. As part of this project we are proposing to replace
two pipes carrying streams and install a French drain in a
ditch carrying a small spring which heads up within the
right-of-way. The streams involved are unnamed tributaries
to Abingdon Creek and are classified by DENI as C. Therefore,
we are requesting a 404 Nationwide Permit for this project.
I am sending a joint application form, a straight line sketch
with the proposed erosion control, roadway typical section,
notes on pipe installation, and a marked county map.
By copy of this letter, I am requesting Ms. Stephanie
Goudreau, Mountain Region Coordinator, to comment directly to
you concerning the 404 Nationwide Permit request.
Also, by copy of this letter, I am requesting authorization
to proceed under Section 401 of the Clean Water Act from the
Division of Environmental Management...
We would like to replace this pipe as soon as possible. If
any further information is required, please advise. Your
early review and consideration will be greatly appreciated.
Sincerely,
Martin Bolick
District Engineer, NCDOT
MB : KWiV
Attachments
SR lJ! 15 H,•o0kshire i'Zo
? S
Mr. Eric Ga':amb, Wat-2 r'Quai i t y C==2rtif4. cation ::nit, DE`.4
fir, rl? n
li7 :.. chard Ph ..' ia? . P....
;1. E. Hoke, F.E. Division iI Eninee:
V 1 T .. v c t. n t' a U.: a ._1 j 71 r C i717] cn 1 7
._. .. _ 1'._ ; .. ,7 .:1 En-ii.C'__`?T
tl' K. IN. iYlnkir?r, CouritV Maintenance En-sneer
DEM ID: ACTION ID:
NATIONWIDE PERMIT APPLIED FOR (PROVIDE NATIONWIDE PERMIT #): ~
JOINT APPLICATION FORM FOR
NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEERS
NATIONWIDE PERMITS THAT REQUIRE SECTION 401 CERTIFICATION CONCURRENCE
NATIONWIDE PERMITS THAT REQUIRE INDIVIDUAL SECTION 401 CERTIFICATION
WILMINGTON DISTRICT ENGINEER
CORPS OF ENGINEERS.'
DEPARTMENT OF THE ARMY
P.O. BOX 1890
WILMINGTON, NC 28402-1890
ATTN: CESAW-CO-E ;
Telephone (919) 251-4511
WATER QUALITY PLANNING
DIVISION OF ENVIRONMENTAL MANAGEMENT, „
NC -DEPARTMENT' bF• ENVIRONMENT, HEALTE,
AND NATURAL' RESOURCES
P.O. BOX 29535
'RALEIGH, NC' 27626-0535
ATTN:- MR. JOHN DbRNEY
Telephone (919) 733-5083
ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF
ENGINEERS. SEVEN.•(7) COPIES`SHOULD BE SENT,TO THE•N.C. DIVISION OF
E: V'_r;Z0 N14ZNTAL MANAGEMENT.- PLEASE PRINT: '
1. OWNERS NAME:' N.G. DEPAfZ71nFN7- n,- T/t,41?s,eoP_7p7701V
2. OWNERS ADDRESS: & q4_x- D
leIAIC , AIC 2Saeo-7
3. OWNERS PHONE NUMBER (HOME): (WORK):
74f- 215- S3fS?
4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS,
PHONE NUMBER: _AM4711l) ,BOL/Gk
a°) sc 1-¢Cs 6
5. LOCATION OF PLANNED WORK (ATTACH MAP). COUNTY: C 0A c? wcc
NEAREST TOWN OR CITY: Leno%r
SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.):
SR 1315 - f3rookswl"t Rc5AA
6. NAME OF CLOSEST STREAM/RIVER: UAt-MMeA +ELU'ary lib„ AAcw% Greek
7. RIVER BASIN: Co.'cawba.- RIvPr 13o,,Sir\
8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW,
WS I, OR WS II? YES NO to
---=- 9.- HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS
PROPERTY? YES ( j NO
IF YES, EXPLAIN.
10. ESTIMATED TOTAL NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING
WETLANDS, LOCATED ON PROJECT SITE: D.OI iAcRE
. 3/30/92
-2-
11. NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS, IMPACTED BY
THE PROPOSED PROJECT:
FILLED:
DRAINED : 0.001
FLOODED:
EXCAVATED: 0.0ock
TOTAL IMPACTED: 0.01
12. DESCRIPTION OF PROPOSED WORK (ATTACH PLANS): Rgp?oce a Z4"p
elpt 'aria a 3(o°P+pe w/ a 3b" Qipe , $d'6. P?Pe arP [arrvi 0. s}rcarn Ynt ?H11 a
?Mr.r?. ar...... ..,. .. r.,.s11 _fe1L. .1.?. n'1P' ti. ?_ 1 r -- " - -?1J_ • _ .. _ . . ..
13. PURPOSE OF PROPOSED WORK: -A's worl is pa-+ OF
a p?ec,I- fip 1raap ara?r\
bast and jAve -SR 1315. 8epokl?+n"G Roots,
14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE
CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMIZE WETLAND
IMPACTS. 7xe PlAet aced •fo be 14pdraded -in av\ accra:?tble Gonalry,. ?, Tile Xrrlc.\
Arnim is nreJ la }sr Aver Qn dray -}fie .so .n e.e e P
WAV. 7%e pmobsez{ erorior? CDn ?fy ( rnratuwl At t1b,? nn Ac clan 'r1 puld i»in?%v,ru • e
imp-ar-+ on
1S. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE
(USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE
OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED
SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE
PROPOSED PROJECT. HAVE YOU DONE SO? YES ( ) NO >
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.
16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER
(SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH
MAY BE AFFECTED BY THE PROPOSED PROJECT?
HAVE YOU DONE SO? YES ( ) NO
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. ADDITIONAL INFORMATION REQUIRED BY DEH:
A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND LAKES ON
THE PROPERTY.
B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY
PROJECT.
C. IF DELINEATION WAS PERFORMED.BY_;A CONSULTANT, INCLUDE ALL DATA SHEETS
RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE.
D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH
COPY.
E.. WHAT IS LAND USE OF SURROUNDING PROPERTY? FC- ?Jfn4h-A
F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL?
. 44
OWNER'S SIGNATURE DATE
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
EROSION AND SEDIMENTATION CONTROL PLAN
PROJECT 6-,'73 ZOS5-`r SR rr J?Z i?-> -D COUNTY CALDWELL
PREPARED BY DATE Q))
APPROVED BY
1Std.
245.03
245.05
893.01
890.05
245.01
245.02
892.04
895.10
892.01
892.02 .
897.01
894.01
245.04
896.01
896.02
396.x`3
y-9S-
?????, DISTRICT ENGINEER
ROADSIDE ENVIRONMENTAL ENGINEER
DPgri2ion 3ym of -1
Temporary Silt Ditch .............................. no --- VI 2
Temporary Diversion _ To V1 - 4
??
nce
Silt F ??? ---- ---- VI 6
......................
---r,
e
Temporary -r-rrr
Temporary Slope Drain with Earth Berm ,......... !- ' _- vi - s
Silt Basin Type A • . .............................. -------- ---- vi- 10
Silt Basin Type B ..:........... .................... •........ --- vi 12
Temporary Rock Silt Check Type-A ------- ---- vx - 14
Temporary Rock Silt Check Type-B ............ > -------- ---- VI -16
Temporary Rock Sediment Dam Type-A ............ --- vi -18
Temporary Rock Sediment Dam Type-B VI-20
Rock Pipe Inlet Protection ..................... .... vi 22
Rock Silt Screen ........... ....................... .....
- -- - V1 - 24
----
Stilling Basin ........................................ ........... .. V:l vx - 26
Rock Inlet Protection:
Type A ............................... AD-- OR •• A ? ----- vi - 30
Type H ............................... B ?.. OR • B n - 3z
Tkjfno J C 771 •' OR C --- vI - 3d
Pipe Outlet EnerTy Diaoipator ..••.•
Inlet/Outlet Protection ............
a V I - 35
D N/A
March. 1993
GENERAL NOTES ON EROSION CONTROL
Silt Basin Type 8's will be constructed to the dimension of
six feet by three feet by three feet unless otherwise noted
on the plans.
Generally, the order of installation of the erosion control
measures will be as follows:
Temporary Silt Basins shall be installed before
clearing and grubbing begins
Silt Fences and Temporal Silt Ditches shall be
installed as soon as ditchline is established.
Temporal Stone Ditch Checks shall be installed as
soon as ditchline is established. .
Ple outlet and Inlet Protection will be done as soon
as pipe is installed.
Seedins eLe! Other Permanent Erosion Control Measures
are to be implemented as soon as practical.
Temporary Rock Silt Checks (Type B) will be spaced as
required by percent of grade as described on page VI-16 in
the Erosion and Sedimentation Control Guidelines.
No. 5 Stone, or equivalent, will be used in conjunction with
Temporary Rock Silt Check Type-B in location where water is
leaving the project or entering pipe.
4 "RV on Cu-str
oR rN STREP^
+00
+ o o
7
w
I OSTIX?
N C-400
v
S400
??y } 400
v
3+00
srtz=cup-,
Z +00
3F
4 00
0+00
9 Vie 1-t L 1 0v d-
I',/(,,
Aoo 30' 13 I
CMP
°o
o q
°o
O•.
4AD
D
1tU/?I?WnY
1'.
`?' ? 8 -t coo
I
4?o f"1-}o0
+ sO
ZgoI l6+00
7
IS 4 av
-.3/ 40 wt T. co a r. c.
+ 1 4 400
s%
13 400
v IZ 4 ov
I
LA 11 400
/0 400
7
? 9 ? 00
Z?tClZ
sr2f.i c. II?
S " D =To1? p, v
I
I
0
o`
O
I
i
I O
boo
?o
n
1 r l
Z7 } p o
I
I
Z,(- 4 O o
S?rtn.r Z'• P( fir:, Z? Zh' (' f (' = ??
i ZS+oo
I ,
VI z9 4 o o
CQ =PL,pe,V i?t13T1rYi Z$' P't,
N1 40? I8? fbfT, tawt cr+(?
+ z3 .} O o
o I
-}? 5O
0
ZZ 4 00
ti?l ,P-_PL.acy =?Ltsslf.K,? Ig' <pif,
4of t0" O Ir.coAT, cry 1`
Z -+00
n.
ZD 400
19 4 6O
P1A1?1.° ?i.?sTIr?C7 Z?? if3? C-t •f !/f1 Y'
h6 -} 00
s ?e L 3
-kom)whY
P,/,,
t?
I
I
I
.I
i
konl,w/w
I
i
s-rn-r i o vt S
3 S4 Oo
-14+00
3Z400
37-400
i
,0• 31 -4-Oo
4-70 2<3' JS" f,p-f
30' cm p
pupa
30400
-y _?slT n_?tti Z4PLAcs =1IST?Cy 7-4' s4" cf1(
f?Y w? 3G' 36" %M COnr rt-IP
I(?1 I
1 13v ?L3oL?C Zo' cVC YtrtT i+/ Zc?'r<" c?r?,
?Idl z.`j 4 00 W
zq
+9L
0
Z-7 400
-b - TNIL- ?ac' FTL`-NCN blLA%o
.57A. ZCs i 9 Z
lZA&M NA-rulZAI-
GCAuaA L%vac.
m ll'Il
_ 111--I1 A
l l
l-?
Ill?t 1
Ilr ? l
rll Wia1;Z„ L `v
?! III ., _.
r-
t?A? e S
z
0
H
U
W
U
H
a
N
S
U
h
O
F
0
x
M
r
d
--I1
t
?I
IN
V
4
1
PIPE fNSTALLATION NOTES
1) Install erosion control devices. In streams, where
necessary, rock silt screens will be used.
2) Remove material and existing pipe while limiting, as much
as possible, material and sediment from entering a stream
and/or escaping from project.
3) Prepare pipe foundation while again taking care to limit,
as much as possible, material and sediment from entering
a stream and/or escaping from project. Where possible,
new grade will be below existing stream bed. If needed,
bedding material will be clean stone.
4) Place the new pipe and compact backfill..
5) Install slope protection on outlet and inlet ends of
pipe. Also coplete installation of erosion control
measures and perform maintenance as needed on existing
measures.
6) Establish permanent vegetation as soon as possible.
-.A 7441
Jat.r• M..r ' '? ?, A.,r,s.y tt? ?..?''•
f.10 -Ir"
ILI
ANnB
90 12yRt .a a L
f
,r
N A t I o N ! A L i ?•? •? ,
A ?" i•
nn tAcpq aeV• ?. ?''? l ONES INUt ?]n r,r+o
H. •? I!UP
*114 lo Ira
'M YIN. •? `?-? 1 .. _
Ulm.
1 1 •'? •`'•\ / t \ /• % - ) NOIAN r.RAt'E \ j ,\
T fl?ttr?IrR CAP \ • r ?? ? Eti y I ?:
rt C S t _.??? 't "L?? 1 ^. I' / ? ?] i / 'J ,•A '!G?"' '? ?? • 111
AOAuS utN. O t Asa ' 1.. , / ?' _ •'r , ,`? I l
rrl '? ANOe ' ?? E ?.
tt (_ w
e.A"A6 to
S 131$ d
1, rS•s ('S ?f,7 "' -'t' • ?' " • •'r . ? M'ryplrq, urn. ?
119
.t tt» ^ ;411 \. 1 RdAJD utN. ?llt tae / t?f ??, t I / A. /, •r ..
r
/•1 % \ \ . ; t ror. 19,515
ct-vool
I ? I¢w • ?' 1 _ ` I I
IVq
?`' .\•` tom, r? ;' ,,' ',,' '?" •,- z, ? ??= , ; -=?, ?I'1? ?• ,
if 06
f3tol
L I><to 1]?t Jr /. ... i'• I t? `r :\ ? (INDSON ? ? ' ,.
? ..? ? '•? ? ?`. ? •? , ?,. t tit _ '\' . ,-'ti,•
LocwrloO MAP roe- '10
P2?s. 6.'732-055-T \ , )
r +ai. vws?tr C.o?,s,-y '?.\ ?\ ' ; ? ?\ , ( 'rt t! t
ORA,
pot
N \ LAKE li 1 RrAtryntf