Loading...
HomeMy WebLinkAbout19940296 Ver 1_Complete File_19941202State of North Carolina Department of Environment, XT" Health and Natural Resources • • Division of Environmental Management James B. Hunt, Jr., Governor ID E H N F=1 Jonathan B. Howes, Secretory A. Preston Howard, Jr., P.E., Director December 8, 1994 Surry County DEM Project # 94296 APPROVAL of 401 Water Quality Certification Mr. W. O. Atkins District Engineer NC DOT P.O. Box 558 Elkin, N.C. 28621 Dear Mr. Atkins: You have our approval to place fill material in less than 0.10 acres of wetlands or waters for the purpose of emergency replacement of a collapsed 48" CMP at SR 1328 (Haystack Road), as you described in your application dated 2 December 1994. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 2745. This certification allows you to use Nationwide Permit Number 3 when it is issued by the Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits beforeyou go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 30 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786. Sincerely, ti reston Howard, Jr. P. . Attachment cc: Wilmington District Corps of Engineers _ Corps of Engineers Raleigh Field Office Winston-Salem DEM Regional Office Mr. John Dorney Central Files 94296.1tr P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper J. JAMES B. HUNT, JR GOVERNOR P. 0. Box 558 Elkin, North Carolina 28621 November 30, 1994 Mr. Ken Jolly, Office Manager U. S. Army Corps of Engineers Regulatory Branch 6512 Falls of the Neuse Road Suite 105 Raleigh, North Carolina 27615 IZ. SAMUEL HUNT SECRETARY Z Wt Re: Emergency Permit - Replacement of a partially collapsed 48" CMP on SR 1328 (Haystack Rd.) in Surry County, NC. Dear Mr. Jolly: The North Carolina Department of Transportation, District I Maintenance plans to replace a partially collapsed 48" CMP on SR 1328 (Haystack Rd.) 1 Mi. from EOP at Reynolds Farm in Surry County. This pipe needs immediate attention and is a hazard to the traveling public. The above is involving a live stream which is a tributary to the South Fork of the Mitchell River. This 404 Permit is needed to improve safety of the traveling public. We are requesting a 404 Nationwide Permit (#3 Maintenance) from your agency. I am sending a sketch with the proposed erosion control plan along with a marked county map. By copy of this letter I am asking Ms. Stephanie Goudreau, North Carolina Wildlife Resources Commission Mtn'. Region Coordinator to comment directly to you concerning the 404 Nationwide Permit Request. This work does not involve designated Trout Water. Also by copy of this letter, I am requesting authorization to proceed under Section 401 of the Clean Water Act from the Division of Environmental Management. If further information is required, please let me know. r, - 2 1994 ii +4 WAiER 4L'?,L!aYSEC STATE OF NORTH CAROLINA DEPARTMENT OF TPANSPORTATION DIVISION OF HIGHWAYS E14), Your early review and consideration will be greatly appreciated. Sincerely, , &0 B 19i,?L,,?? Cr B. W. 0. Atkins, PE District Engineer WOA/cb Enclosures cc: W. E. Hoke, PE, Division Engineer R. M. Freeman, PE, County Maintenance Engineer Doug Miller, PE, Regional Engineer DEHNR Neil Trivette, Area Roadside Environmental Engineer Stephanie Goudreau, Mtn. Region Coordinator, WRC Eric Galamb, Water Quality Certification Unit DEM (7) ' bkfl Ibt ActtoN 1b4 NA?1ONf?ibt PEftlfiT ftEQUEs'TEti (PhovtbE NhfiioNWlbE PkRllifi ?) 4 ,? JotNT tOKM t6ft RA+tOh0tbb t l?11MITS tt?AT RtoUthb NOttttChTtON xd Tilt bOftP!4 Of ENdINE91t§ Nflfi1vNW1f?E'Pf*ftffiTS TllAt 118OU111E APPOCAtION tOft §tCfi1oN 401 CtftTitICnTfoN wamtNGToN btSThtCT ENG1NEEft VIATEh Q"ALtTY PLANNING.. cohPS Of" ENGiNEEhS DIVIStoN oP ENvtfiONlatfNTAL MANAGElfENT bkPAftffiENT 01" Tilt ARMY NC bEPAhTfIENT Of: tMVthONMENT, HEALtI4, P.O. Nox 1890 hub NATURAL ftESOUhCES WiLffiNGToN, NC 28402-1890 P.O. boX 29535 Att"! bESAvf-CO-E hAL1 tell, NC 27 25-(15 5 t616tiltofie (?i9) 25i-451i hTTNt tilt. J0114 boftNkY Telephone (919)' 73?-5083 ONk lit COPY of, t1lis Col-lfttno hPPLICATIoN SfloULb 130 SENT TO THE CORPS OP ENO10kNs. SEVEN (7) COPIES SiIOULb he SEN1' to tilt N.C. btVISiON OF f NvlitoNtfENfiAL MANAGEMENT. PLEASE PRINT. i . bWNI RS NAME! //, DW7- 2. bf4khAS hbbhESSs 00O, Bp1C SSS C//f ./?/. /tlola 1l C11,9.eol, -7, j . bookfis PfloNo Minn (ffoME) f A: ik RPP_L1Chottt mlbNg Nf1NNkrtf W 5. (wofik) 1 91,9 - 83 5- Itz or/ AGtflvS NAME Oh hESPON§ff3LE CohPomtk Ot ICIAL, ADDRESS, T,bch'tION Of WORK (MUST ATTAC1l hm') . COUNTY t _ .SLIg le Nf flf t§'T 'T'OWN Oh CITY! 'o C'yo T, 1-l §09ditIC LOChttoN (IficLUbE hOAb NUMBERS: LANbNnhKS. PTc. I 4 S'.P i ? ?cNT 6. 7: lilvllt fjAS1Nf ?/ /? t7 fc?rl § . t filll S PROJECT LOCATED Ili A WhMISHED CLhSS t f t Eb h§ tPOUT, SA, lIQW, OR14, WS I i bft Ws I 1 t YES ( ) NO („- 9. IMAM ANY btc; LION 404 PtlIMITS fIEEN HtViotlWt )tEQUkftki) tot USE ON Tflis PltoPkftft t~ - irEs t I No V 1 if tk6t fikothl". id. §9+tf4hTkb 'T'OTAL HUMBER OP hCtitS Op whtthS bf 'Flit U.§., 1NCLUb t4d Wktf,A"b§j. LOchtto ON PROJECT SITEi GCS-5 %f/9 w ?710 ? 7/8/92 NAM or CLOSEST STREAM/hlVEht Sp _2_ 11. NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS, IMPACTED BY THE PROPOSED PROJECTS. F I LLED s ?GSS T/yi}1 ed /? %?. DRAINED: -0 FLOODED: -O EXCAVATED! -.U TOTAL IMPACTED: 4 sS 7//AI?O./OiQ?. /? ?t 12. DESCRIPTION OF PROPOSED WORK (ATTACH PLANS) t 13. PURPOSE OF PROPOSED WORK, r?/QRy uc -s'AficTi/ mom' T,ea.?,c /, ,N ? Pu b l ? `c ? /°?vAc /c' ,O,e,g ? ` i?/? G c - C) 14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMISE WETLAND IMPACTS. /yIC,t G G CZ C C m 4e T 15. YOU ARE REQUIRED TO CONTACT TILE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FISIIERIES SERVICE (NMFS) REGARDING THE PRESENCE OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA T}IAT MAY BE AFFECTED BY THE PROPOSED PROJECT. HAVE YOU DONE SO? YES (X) NO ( 3 RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS: 16. YOU ARE REQUIRED TO CONTACT THE STATE IIISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF IIISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY TILE PROPOSED PROJECT? HAVE YOU DONE So? YES [ ) NO (x) RESPONSE FROM THE SIIPO SHOULD BE FORWARDED TO CORPS. 17. ADDITIONAL INFORMATION REQUIRED BY DEM! A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND LAKES ON THE PROPERTY. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH COPY. E. WHAT IS LAND USE OF SURROUNDING PROPERTY? F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE bISPOSALI !? ??.lirwrv?" C $ . OWNER'S SIGNATURE DATE Request for WRC Comment on a DOT project Comment for a 404 Nationwide hermit in the 25 trout counties (application package attached) Comment for a letter of approval to work within the "trout buffer zone" (detailed sedmentation & erosion control plans are attached) Return comments to: A- L,)Os. JjrsT e5, 7J- t P,o. ?C3ex ??? 22 „A1 e 2-8601 Comment for Catagorical Exclusion, and to be utilized also for a 404 NW trout county requirement at a future date (CV- and supporting documents ion attached) Other requests: Jl 1 v V? v A I ?J v -k 'I \ v J`J D LT AILS AND SPECIFICATIONS -5 R H- : /3 2 8 CotlN7Y -. S-URRY -- s 245.03 Temporary Sill Ditch Tab 245.05 Temporary Diversion 693.01 Temporary Sill Fence ...................... ---III 690.05 Temporary Slope Drain wilh Early Berrie - - ?- .......... Silt Basin Type A ................................. _ 2d5.OZ Silt Basin -,Type B .......................... 692.04 Temporary Rock Silt Check Type-A .......... 695.10. Temporary Rock Sill Check Type-7B ......?,,. 892.01 Temporary Rock Sediment Darn Type-A 692.02 Temporary Rock Sediment Dam Type-B, ,_. 697.01 Rock Pipe Inlet Protection T e-A 697.02 Rock Pipe Inlet Protection Type-B ............ 894.01 Rock Sill Screen ............................................. rail 245.04 Stilling Basin .......................................... Rock Inlet Protection: t?J W2 _.?... \?Jj, '•o ur -2444 t ?J \? ` ,{• A _. __1.0 " / ` ROUND PEAK \ ?'?1616 ,6 ELEV. 2,099 1397 1618 1408 ` ••: 1455 1606 • a 3 13% \ N d• BUCK MTN. \ 14479 ' _ -•) ! • ELEV. 1,850 .2 1693 \. '? "1 '\ \•311604- S Z1 .1 .-.- 0 - ) \ 0 1,_1409 1108' m 2.8 1607 1.7 SADDLE -- •N -1 %• .1339 • 1608 .J' .-, is '•` 19-- MTN. an 1612 6S9 .1 1 1 \ 1605 ? ELEV. 3.256'-' o4F, . y s '. 1609• ) '1 `' r:• 1472 a .\q \ 1397 ar '.` • i n,/ II, f WARRIOR MTN\ 1<da.: •?. 6'• /• 1 ,\ 1410 \. \\ 0 140 \ ....?. oak r 13% /,) ` \ \ =\. \ N.N \ 1346 76 3\ G'°" ELEV:, 1.850 - /, % \ Zpp?_ '•\ '\ 1421,3N 89 1•Boryp4 d 2 W /• 1 .\ \\. \'Y,r \ ?.YtP M -8 } 1397 1406 .: 1402 14727 6 c-* 44 399 ' / \ / )mac 14 .9 / N'•4& l \ J \ ` - \ \ _ `?,? - - \ 1442 \ 1403 \ 1 / RICH HILL MTN. 1330 •,\ '.\ \, 9y? '\ \ 1338 1460 ,•j Q' ELEV. 3,260 1331 ,? •s n /.3J / / \ -.\\ TS 1522. 4 1480 1332 r '1\331 In ?4 ot". ,\ ,~ \,yF?Q 1520 0 .6 )' ?.? ! I ti V pa` S \ 4. \ Sloe 1 0 146p F? •\ \ ''`-„ / .S- ,l 1405 17 ? Y1401 1337 ov' L ,' 144 a \•: \ ?1 1336 ' - N1523 '14 1348 \ lgp3 W 1330 ?• •/ N - MITCHELL "0 \ 1519 \ '•11338 \ ' \.\ o..on4e RIVER Z o -1.2 134] \ I I '1 1340 ? -534z \ ?? \ \ '1333 1339 / ..?_.\ \ m S I.' N 20 \ 13_44 1.1 1330 S -1347?rytty 1346 / / 1-. 132 '\ 5 y 1139 .\ 'I\ 1- / •\-'_m. / - I 1 \ 1334 1- Q / / 13ze •`• \ g \I\ I ) ) ?o'' 1341 ry '`` ( /• bol 338 - m a 1339 1518 1517' , 11325 \ m \' : / - ,7 r N 1482 .a 93 1001 .J \2 IJ42 1343 /• \ 1?9. ?2\ 323 '- 21 1330 7 •3 FAS .8 1.7 '? / 1 \ 1 .3 faS- i4 /-- 1001 /,/ i - 0r\ 130 '-\ j .1320 " \ 1001 \e 11184 `? 1P 124\ 1102 1.6 8 1322 -g 1328 I 1514 •v 1318 r 1125 -a ._. 117o \ 1515 o '\ 1417 9 ul'. •\ 1614 , /• 1317 ,8 Ilz Ile6 0 .z 1100 1103 -_\ /Cl?\ Y:J^.•\1301 '6 p„ 4 Nr 112] ^I -_\ 1419 1 Ldo* n I 1110\ \\C v?`c ` 3 h 1314 2 /'•) 1315 FAS 3 \ ?, , `5' \ S 6 'y i -ro ?oirw w 21 1326 315 - '9 \ ? y 4p _ . 1616 1530 1122 .0 0 'N 1. 1 1106 1105 12081 1100 \ 1 .s - •5 1`` A /116 - J 1301 1001 h N .2 '•{,% 5 0 1313 / \ •? \ N \ 9 `G \ • •,y /• i •,\ 13124t,? \? 2 '•J W 1•\ NO 123•?g 1123 1105 ?\ I / /- - 1307 - \ r \, \ :> o \\ \ b ,119 6 07 1108 11 \\': \ 1109 ./ l o. 1308 °, ,. a?1305 \ \ h 1475 62 '44 } 1110 \ < _ _ ^? 1310 -_ 1129 1122 - \ ?- 1 I\?1 ? ? 1499 N '-: e A 7. • ? 1302 \ 133 5 'a 1130\. / 1 1 J "". ter.3oed\ .? n 1177 1111'. \.3 FvLd... 9 1304 9 / C.wrwb y _- 1 /- ,E p/ ODI 3.3 1206 - yyj t, Q 3 Ii O-M P 1 o/Y .5 R 2 T i?r I P21134 14 , -s ?' -_ II.. .9 .6 \•- .3 I I } ?4 6 116ti l ? 4 169 _. 1203 . ?? _ \ .3 1112 b 1 1131 2 \?t^p 1.9 _ 1204 L.4 1113 I 1 1131 j 112 -9 ,•25 n !^".?', ••_ \ - I \ 131dn \ . 1197 \ / 1191 '.>(1 D 1114 ) • V-* 1117 -9 J' 1200 ? 113.1120 n 46 N R Q / BYP 1138 1 \ lP 1118 1115 5 S 1174 `Q - I _ \ 1 - - - 1139 Alrp- • 0 C A h • O C ?, I / 1 , I i b - 01119 Bid 0 ` u U 3 I68 ' ?' ??`_\,?IO?J79] \.\ 'BZP 6 3\ .,v.2 1141 - ?a 1205 I fie I - 268 FA )- 1165 Sp1fti l7 \r i I? t •?,?55 i "°"" P O EROSION QNTROT, PLAN SHEET' Silt Basin Type `B's will be constructed to the dimension of ,six feet by three feet by three feet unless.otherwise rioted on the.plans. Generally, the order of installation of the erosion control measures will be as follows: Temporary silt basins shall be installed before clearing and grubbing begins. Silt fences and temporary silt ditches.shall be ,installed after clearing and before, grading. Temporary stone ditch checks shall be installed as soon as ditchline is established. Pipe outlet and inlet protection will be done as soon as the pipe is installed: Seeding and other permanent erosion control measures are to be.implemented as soon as.practical. RS Always SUPER toward ditch line as a temporary measure in this situation! ; V IQZ h Z 0 I? 0 ti ?y ?y C 4 i i -e 12 a I i i ? Q I M i 0 ro ? U I o ? I ) ? I F N cc 4 ( I n1 I i.N 6i?rY_ 1 ??! y I I c-1 I M ( I ( JI Iul ?I VI of ?i of ?rl I ? i F M X ?N r• x M h