HomeMy WebLinkAboutNCC190897_NOT Closeout Documents_20200619North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Randolph Project: Ramseur Laydown Yard River basin: Cape Fear
Person financially responsible: Piedmont Natural Gas -Dave M Vena, Engineering project #: RANDO-2019-035
Project Manager
Address: 4720 Piedmont Row Dr., Charlotte, NC 28210
1. Project Location: Foushee Rd, Ramseur
Pictures: Yes - Digital
2. Weather and soil conditions: Sunny, Workable Soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
Initial inspection: Yes
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Chris Friel
Inspection report: Sent Report
9. Corrective action needed:
Title: Duke Energy
Date given/sent: June 02, 2020
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released and coverage under
NPDES General Stormwater Permit for Construction Activities is terminated. Ensure that all
temporary erosion control measures are removed from the site.
Reported by: Blane Houck Others present: Tyler Pearson
Date of inspection: May 28, 2020 Time arriving on site: 9:30 AM Time leaving site: 10:00 AM
cc: