Loading...
HomeMy WebLinkAboutNCC190897_NOT Closeout Documents_20200619North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Randolph Project: Ramseur Laydown Yard River basin: Cape Fear Person financially responsible: Piedmont Natural Gas -Dave M Vena, Engineering project #: RANDO-2019-035 Project Manager Address: 4720 Piedmont Row Dr., Charlotte, NC 28210 1. Project Location: Foushee Rd, Ramseur Pictures: Yes - Digital 2. Weather and soil conditions: Sunny, Workable Soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: Yes If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Chris Friel Inspection report: Sent Report 9. Corrective action needed: Title: Duke Energy Date given/sent: June 02, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. Ensure that all temporary erosion control measures are removed from the site. Reported by: Blane Houck Others present: Tyler Pearson Date of inspection: May 28, 2020 Time arriving on site: 9:30 AM Time leaving site: 10:00 AM cc: