HomeMy WebLinkAboutNCS000589_MONITORING INFO_20190503F-� 0
STORMWATER DIVISION CODING SHEET
NCS PERMITS
PERMIT NO.
n/C S 000 61)
/ v
DOC TYPE
❑FINAL PERMIT
�k MONITORING REPORTS
0 APPLICATION
❑ COMPLIANCE
❑ OTHER
Q,� � c� 050
DOC DATE
❑
YYYYMMDD
DUKE
ENERGY,
PROGRESS
April 15, 2019
Certified Mail # 70172680 0000 1260 9416 (2 copies)
NC DEQ—DW R, Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
t ECFIVED
MAY 0 3 2019
CLN-i t-t6�L FILES
"'AIR SECTION
Subject: Weatherspoon's March 2019
Stormwater Discharge Monitoring Report (DMR) Submittal
Dear Sir or Madam:
W. H. Weatherspoon Plant
491 Power Plant Rd
Lumberton, NC 28358
Mailing Address:
Kent Tyndall
L. V. Sutton Energy Complex
801 Sutton Steam Plant Rd
Wilmington, NC 28401
o: 910.341-4775
1: 910.341.4790
Duke Energy Progress, LLC submits in duplicate the Stormwater Discharge Monitoring Report for W. H.
Weatherspoon. This submission is made in accordance with Part III, Section E of our NPDES Stormwater
Permit No. NCS000589.
SW-2 is in Tier I status due to 12/14/2018 TSS sampling result being above the benchmark value.
Therefore, we are required to conduct monthly monitoring at this outfall until three consecutive sample
results are below the benchmark values or within benchmark range. Neither SW-1, SW-2, or SW-3 had a
discharge in March 2019. The attached table list each day during the month that had rainfall. It also
explains why sampling was not performed on those days.
If there are any questions, please contact either:
• Mr. Kent Tyndall, Environmental Professional for the W. H. Weatherspoon Plant;
phone (910) 341-4775 or e-mail Kent.Tyndall@duke-energy.com; or
• Mr. Steve Cahoon, Environmental Specialist at our North Carolina Regional Headquarters, phone
(919) 546-7457 or email Steve.Cahoon@duke-enerqy.com.
Please direct all correspondence to Kent Tyndall via the mailing address shown above.
1 certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. l am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincerely,
DECEIVED
MAY r 2019
CENTRAL FILES
DWR SECTION
Jeffrey Flanagan
Station Manager
Weatherspoon's March 2019
Stormwater Discharge Monitoring Report (DMR) Submittal
Table Page 1 of 1
Date of Actual
rainfall stormwater
discharge?
311 /2019
>72-hrs
discharge?
Y
since
last
Y
Can sample
w/i first 30-
minutes?
N
Safe to Can
sample? w/i
business
Y
sample
normal
hrs?
N
3/2/2019
N
N
N
Y
N
3/3/2019
Y
N
N
Y
N
3/4/2019
N
N
Y
Y
Y
3/5/2019
N
N
Y
Y
Y
3/8/2019
Y
Y
N
Y
N
3/9/2019
N
N
N
Y
N
3/20/2019
N
Y
Y
Y
Y
3/21/2019
N
Y
Y
Y
Y
3/22/2019
N
Y
Y
Y
Y
3/25/2019
Y
Y
N
Y
N
3/26/2019
Y
N
N
Y
N
STORMWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
Permit Number NCS000589
FACILITY NAME W. H. Weatherspoon Plant
PERSON COLLECTING SAMPLE(S) Kent Tyndall
CERTIFIED LABORATORY(S$liealy Environmental Services, Inc. Lab # 329
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Lab # 248
Duke Energy Progress -Sutton Steam Electric Plant Lab # 5056
Part A: Specific Monitoring Requirements
Marc It
SAMPLES COLLECTED DURING CALENDAR YEAR: 2019
(This monitoring report shall be received by the Division no later than 30 days from
the date the facility receives the sampling results from the labotatory.)
COUNTY Robeson
PHONE NO. Kent Tyndall, o: 910-341-4775
SIGNATURE OF PERM=EE OR DESIGNEE
REQUIRED ON PAGE 2.
Outfall
No.
Date
Sample
Collected
50050
00400
00530
01097
Total
Flow (if app.)
Total
Rainfall
pH
Precip pH
(if taken)
TSS
Non -Polar
Oil & Grease
Antimony
(Sb)
mo/dd/yr
MG
inches
Units
Units.
mg/L
mg/L
mg/L
SW-1
No Flow
SW-2
No Flow
SW-3
No Flow
Benchmark
Value
6=9; (IF precip pH is lower,
THEN lower threshold is precip pH.)
lOO
15
0.09
Outfall
No.
01002
01012
01027
01034
01042.
01051,
71900
01067
01147
Arsenic.
(As)
Beryllium
(Be)
Cadmium
(Cd)
Chromium .
(Cr)
Copper,
(Cu)
Lead _
(Ph)
Mercury
(Hg)
Nickel
(Ni)
Selenium
(Se)
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
ng/L
mg/L
mg/L
SW -I
SW-2
SW-3
Benchmark
Value
0.34
0.065
0.003
0.9
0.01
0.075
12
0.335
0.056
Outfall
No.
01077
01092
01022
01059
Silver
(Ag)
Zinc
(Zn)
Boron
(B)
Thalliium
(TI) .
mg/L
mg/L
mg/L
mg/L
SW-
S W-2
SW-3
Benchmark
Value
0.0003
0.126
Form SWU-247, last revised 21212012
Page 1 of 2
Facility Name W. H. Weatherspoon Plant
Permit Number NCS000589
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
No
Outfall
No.
Date
Sample
Collected
50050
00556
00530
00400
Total Flow
(if applicable)
Total Rainfall
Oil & Grease "
(if appl.)
Non -polar
O&G/TPH
(Method 1664
SGT-HEM), if
appl.
Total
Suspended
Solids
pH
New Motor
Oil Usage
mo/dd/yr
MG
inches
mg/L
mg/L
unit
gaurno
STORM EVENT CHARACTERISTICS: Mail Original and one copy to:
Division of Water Quality
Date Attn: Central Files
Total Event Precipitation (inches) 1617 Mail Service Center
Event Duration (hours) (only if applicatle - see permit.) Raleigh, North Carolina 27699-1617
(if more than one storm event was sampled)
Date
Total Event Precipitation (inches)
Event Duration (hours) (only if applicatle - see permit.)
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathereing the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
Jeffrey Flanagan
(Signature of Permittee)
April 12. 2019
(Date)
Form SWU-247, last revised 21212012
Page 2 of 2
DUKE
ENERGY.
PROGRESS
March 19, 2019
Certified Mail #r 70f 7 2680 6060 1260 9294 (2 copies)
NC DEO—DWR, Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
RECEIVED
MAR 2 6 Z019
CC-NTRAL FILE;
0WR SECT10m
Subject: Weatherspoon's February2019
Stormwater Discharge Monitoring Report (DMR) Submittal
Dear Sir or Madam;
W. H. Weatherspoon Plant
491 Power Plant Rd
Lumberton, NC 28358
Mailing Address:
Kent Tyndall
L. V. Sutton Energy Complex
801 Sutton Steam Plant Rd
Wilmington, NC 28401
o: 910,341-4775
f: 910.341-4790
Duke Energy Progress, LLC submits in duplicate the February 2019 Stormwater Discharge Monitoring
Report for W. H. Weatherspoon. This submission is made in accordance with Part III, Section E of our
NPDES Stormwater Permit No. NCS000589.
SW-2 is in Tier I status due to 12/14/2018 TSS sampling result being above the benchmark value.
Therefore, we are required to conduct monthly monitoring at this outfall until three consecutive sample
results are below the benchmark values or within benchmark range. Neither SW-1, SW-2, or SW-3 had a
discharge in February 2019. The attached table list each day during the month that had rainfall. It also
explains why sampling was not performed on those days.
If there are any questions, please contact either:
• Mr. Kent Tyndall, Environmental Professional for the W. H. Weatherspoon Plant;
phone (910) 341-4775 or e-mail Kent.Tyrldall®duke-energy.com; or
• Mr. Steve Cahoon, Environmental Specialist at our North Carolina Regional Headquarters, phone
(919) 546-7457 or email Steve.CahoonOduke-energy.com.
Please direct all correspondence to Kent Tyndall via the mailing address shown above.
1 certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the
information submitted. eased on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. t am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincerely,
I � Ar
Jeffrey Flanagan
Station Manager
Weatherspoon's February 2019
Stormwater Discharge Monitoring Report (DMR) Submittal
Table Page 1 of 1
te of
Da:rainfall
Actual �>72-hrs since Can-'sarnple
Safe to
�Can sample
stormwater slast w/i first 30-
discharge?. discharge.? minutes?
sample?
w/i normal
business hrs?
�Y a K Y.' ' N:
Y .
N
2/12/2019
N N Y
Y
Y
„r
WO
- s� M
ON " � ti
�2/13/2019.�
N Y,..
, : �,<" N
2/16/2019
N Y N
Y
N
�
211712 119
N ..�N,. o
Y
N
2/18/2019
N Y Y
Y
Y
y
t
2/19/20191
N x , Y:, Y .,
YSIWA
Y '
2/20/2019
N Y Y
Y
Y
~
rm
NY..
Y22/2019'.
2/22/2019
N Y Y
Y
Y
/2019,,
' W, z�.:
N �Y �:,
2/24/ry�l2(Q�019
Y N
Y
Y
� �N{J�
Jx � 21","'Al-r
Y
Y� ...
2/28/2019
N Y N
Y
Y
A, ,�'�4 - ,R4r tS*✓" 4! i0. W$-.�� � :.%' ..�s�y �' 4*N A !µ h PnT� 4,y j� i p�+ M a �c mot' �
µ °yy i�+ k 3n r ? 1 'T h' f1 ! `ti 'Li i r p/I�'+t•'� ''1
�
�,�. 1
s
4 ,
V^
STORMWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
Permit Number NCS(W589
FACILITY NAME W. H. Weatherspoon Plant
PERSON COLLECTING SAMPLE(S) Kent Tyndall
CERTIFIED LABORATORY(SShealy Environmental Services, Inc. Lab # 329
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Lab # 248
Duke Energy Progress -Sutton Steam Electric Plant Lab # 5056
Part A: Sneciiic Monitorine Reauirements
y
February
SAMPLES COLLECTED DURING CALENDAR YEAR: 2019
(This monitoring report shalt be received by the Division no Eater than 30 days from
the date the facility receives the sampling results from the labotatory.)
COUNTY Robeson
PHONE NO. Kent Tyndall, o: 910-3414775
SIGNATURE OF PERMMMM OR DESIGNEE
RMUIRF,D ON PAGE 2.
Outfall- ,
No:
Date
Sample
&11ect&l,_� :'
50050 . - - ,'
:
00400 i
,
; '
W530 ,.
01097
Total`
Fl6w (if app.)
Total' '
Rainfall`s
pH-- -
'
PrectppH
(if{take�i) .
,
TSS:
Non=Polar`
Oily&.Grease
Antimony
mo/dd/yr: 7
MG- ;
inches
Unitsi',
Units,
ing/I;,'
mgM,
mg/L.
SW -I
No Flow
SW-2
No Flow
SW-3
No Flow
'Benchmark
Value
-
i-
r
6--9,: ''•.,(IFpr 4p_pH61ower,
THEN Iower,t[irestiold is preeip pH j?. ,
z
100
4
i5
0.09
OutfalV: .01002
No.
._
01012� . a
01027- _ =;
01034` `' ;
01042`
0105T'.. ,; •
71900 =
01067 ..-
01147
Arsenic>•
(As) +
Beryllium' r�
(Be)
CadmiuEti; "'
(id)
Chromium`-C a.
(Cr),`. Y
Clipper.
(Cu) I
Lead_.. '
(Pb)-,,
Mercury .
�fi):(Ni);,Se).
Ni_rkel', .
(Ni);
Selenium.
ing/L: ,-
mg/L-
mg/L.
n -
mg/I'
mg/L
SW-1
SW-2
SW-3
Benchmark~
Value;
034
0.065 =
`0.003 €
' 0:9'
0.01
! F 0:075:
-
12 .
t . 0:335 ..
0.056
Outfalh - :
0107,7,. , +
01092:
01022_ %
01059.=
No
Silver, +
Zinc-
Boron'
Thalliium '
m
m ,
mg/L
mg/L,
r a
_
SW-1
SW-2
SW-3
Benchmai:k "
Yaluer
0 0003' +1
- -
012b
Form SWU-247, last revised VW012
Page 1 of 2
Facility Name W. H. Weatherspoon Plant
Permit Number NCS000589
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
No
Outfall ^ E
Date
50050'. c
'
00556{ :
- _ = °.:
00530. :
11U400
No. 4
Sample
Total-flawr
Total,RainfalD
Oil & Grease "Nor
-polar' ' '
Total:.
pH;
New,Motor ,
..
Collected
(if applicab[e)''"
'
(if appl:) ;
O&GJTP '�
Suspended _
Oil Usage
(Melthod Iti64 -
3olids?
r
-
SGT I3EM), if
F
aPpl
mo/ddlyr.,
MG--,,
inche&
ing/L.' ,;
-
mg/G,.
unit-
gallmo
STORM EVENT CHARACTERISTICS: Mail Original and one copy to:
Division of Water Quality
Date Attn: Central Files
Total Event Precipitation (inches) 1617 Mail Service Center
Event Duration (hours) (only if applicatle - see permit.) Raleigh, North Carolina 27699-1617
(if more than one storm event was sampled)
Date
Total Event Precipitation (inches)
Event Duration (hours) (only if applicatle - see permit.)
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathereing the information, the information submitted is, to the
best of my knowledge and belief , true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
S//E; or j
(Date)
Form SWU-247, last revised 21212012
Page 2 of 2