Loading...
HomeMy WebLinkAboutNCS000549_MONITORING INFO_20191220STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. n/L � 0I/��%�'I Cl DOC TYPE ❑FINAL PERMIT L'( MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ �U I �l �� � YYYYMMDD t4*) DUKE ENERGY December 18, 2019 DEC 2 Q 2019 Division of Water Resources Attention: Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Duke Energy Carolinas, LLC NPDES Stormwater Discharge Monitoring Report for: Riverbend Steam Station — NCS000549 — Gaston County Environmental Services Duke Energy Riverbend Steam Station 175 Steam Plant Rd. Charlotte. NC 28120 In accordance with Part III, E(2) of the above referenced NPDES Stormwater permit, the original and one copy of the monitoring report for November 2019 is attached. Sample results above the benchmark values for analytical monitoring are listed below. Duke Energy continues to implement corrective actions as required by the Tier status at these outfalls. Please direct any correspondence or questions concerning the Riverbend Steam Station NPDES Stormwater Program to Brad Loveland at (980) 373-2820. Parameter Benchmark SW011 Zn 0.126 mg/L 0.138 mg/L Sincerely, Tim S. Hill General Manager CCP Regional Operations & Maintenance Attachment STORNIWATER DISCHARGE OUTFALL (SDO) NIONITORING REPORT Permit Number NCS000549 FACILITY NAME Riverbend Steam Station PERSON COLLECTING SAMPLE(S) Peter Dav/Marvin kNialdonado CERTIFIED LABORATORY(S) Duke Energv Carolinas, LLC NC Lab #248 Shealv Environmental Services Inc. NC Lab #329 Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Gaston PHONE NO. (980) 373-2820 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 3. Outfall No. Date Sample Collected 50050 00400 01077 01002 01022 01012 01027 Total Flow (if app.) Total Rainfall pH Silver, Total (as Ag) Arsenic, Total (as As) Boron, Total (as B) Beryllium, Total (as Be) Cadmium, Total (as Cd) mo/ddl yr NIG inches m L mgfL m L m L m SW002 11/12/19 N/A 0.44 7.4 <0.0002 <0.001 <0.05 <0.001 <0.00I SW003 11/12/19 N/A 0.44 7.3 <U.01)02 <[lmI <0.[15 <0.001 <{1.001 SWO04 NIA N/A NO QUALIFYING FLOW FOR THE MONTH OF NOVEINIBER 2019 SW[106 11/12/19 NIA 0.44 17.1 SWO10 N/A N/A NO QUALIFYING FLOW FOR THE MONTH OF NOVEMBER 2019 SW011 11/12/19 N/A 0.44 17.3 - SWI118 11/12/19 N/A 0.44 7.2 - Outfall No. Date Sample Collected (11034 01042 01067 01051 OI097 01147 01059 01092 Chromium, Total (as Cr) Copper, Total (as Cu) Nickel, Total (as NO Lead, Total (as Pb) Antimony, Total (as Sb) Selenium, Total (as Se) Thallium, Total (As TI) Zinc, Total (as Zn) mo/dd/vr m L MgL m L m L m L m L m L m L SW002 11/12/19 <0.001 0.00202 <0.00I <0.00I <0.001 0.00141 <0.0002 0.030 SW003 11/12/19 <0.001 0.00510 <0.001 <0.001 <0.001 <0.001 <0.0002 [1.044 SWO04 N/A NO QUALIFYING FLOW FOR THE ,MONTH OF NOVEMBER 2019 SW006 11/12/19 - - SW010 NIA NO QUALIFYING FLOW FOR THE NIONTH OF NOVEi14BER 2019 SWOI1 11/12/19 1 <0.005 - 0.138 Swo18 11/12/19 1 - - Permit Number NCS000549 Form SWU-247. last revised 2/2/2012 Page I of 3 Outfall No. Date Sample Collected 71900 CO530 00556 Mercury, Total, Method 1631E Solids, Total Suspended - Concentration Oil & Grease mo/dd/ yr n L m L m L SW002 11/12/19 1.28 Avg. <2.8 <5.0 SNVO03 11/12/19 3.68 111 <5.0 SW004 NIA NO QUALIFYING FLOW FOR THE MONTH OF NOVEMBER 2019 SNV006 11/12/19 - 1 <2.8 1 <5.0 SW010 NIA NO QUALIFYING FLOW FOR THE MONTH OF NOVEMBER 2019 SW011 11/12/19 1 <2.7 <5.0 SW018 11/12/19 18.6 <5.0 Outfall No. Date Sample Collected Aroclor 1016 Aroclor 1221 Aroclor 1232 Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor .1260 mo/dd/ r u u u L u L u L u L u L SNVO06 11/12/19 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Benchmark exceedanccs include Zinc at SWO11. Avg — Average of primary and duplicate mercury samples fir SWO02 (1.30 ng/L and 1.26 no/L = 1.28 nn/L) Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of"new motor oil per month? _ yes X no (if yes. complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall Date 50050 00556 00530 00400 Total Flow Total Oil & Grease Non -polar Total pH New Motor No. Sample Collected (if applicable) Rainfall (if appl.) O&G/TPH Suspended Oil Usage (Method 1664 Solids SGT-HEM), if a I. mo/dd/ r MG inches m m unit al1mo Permit Number NCS000549 Form SWU-247. last revised 21212012 Page 2 of-3