Loading...
HomeMy WebLinkAboutNCGNE1050_COMPLETE FILE - HISTORICAL_20150326NORTH CAROLINA Department of Environmental Qual STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. NCGNE, V 5 v DOC TYPE HISTORICAL FILE DOC DATE ❑ � u YYYYMMDD . 1 7LLA. NCDENR North Carolina Department of Environment and Natural Resources Fat McCrory Governor March 26, 2015 Neptco Inc., A Chase Corporation Company ATTN: Mr. Kevin Poovey PO Box 1766 Lenoir, NC 28645 Subject: No Exposure Certification — Approval NCGNE01050 Neptco Inc., A Chase Corporation Company 2012 Hickory Blvd, Lenoir Caldwell County Dear Mr. Poovey: Donald R. van der Vaart Secretary The Division has reviewed your application for a No Exposure Certification for Exclusion (NE) for the subject facility. Based on the information provided and a site visit conducted on March 23, 2015, the NE has been approved. Please note that you are obligated to maintain no -exposure conditions at your facility. If conditions change such that your facility can no longer qualify for a NE, you are obligated to immediately obtain NPDES permit coverage' for your stormwater discharge. Otherwise, the discharge becomes subject to enforcement as an un-permitted discharge, Your NE does not expire. In order to help assure that your facility stays.in compliance with all of the conditions in the Certification, you must self -recertify your facility at least annually. Please see the attachment for information on self -recertification. Your conditional exclusion from permitting does not affect your facility's legal requirements to obtain environmental permits that may be required under other federal, state, or local regulations or ordinances. If you have any questions or need further information, please contact Lee Hill at (828) 296- 4500, or at lee.hili@ncdenr.gov Sinc for Tracy E. Davis, PE, GPM Director Enc.(inspection Report and Self -Recertification Info) cc: Stormwater Permitting Unit/Ken Pickle, No -Exposure Files ARO Files Division of Energy, Mineral, and Land Resources 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 / FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:lportai.ncdenr.0g/web1lr1 An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Compliance Inspection Report Permit: NCGO30148 Effective: 11/01112 Expiration: 10/31117 Owner : Neplco Inc . SOC: Effective; Expiration: Faclhty: Neptco Incorporated county: Caldwell 2012 Hickory Blvd Region: Asheville Lenoir NC 28645 Contact Person: Chris Crane Title: Phone: 828-726-5951 Ext.2301 Directions to Facility: System Classiflcatlons: Primary ORC: Secondnry ORC(s): On -Site Rep rose ntative(s): Related Pormlts: Inspection Date: OM312015 Primary Inspector: Lee Hill Secondary tnspeetor(s): Certification: Phone: Entry Time: 01:50PM Exit Time: 03:30PM Phone: 828-296.4618 Shewna Riddle Phone Reason for Inspection: Routine inspection Type: Campllance Evaluation Permit Inspection Type: Metal Fabrication Stormwaier Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm water (See attachment summary) Page: 1 0 parrnit NCO030146 owner • Facility: Neplco Inc Inapaetlon Data: 03/23/2015 Inspection Type : Compliance Evaluation Reason for Visit: RoLtine Inspection Summary: Met with Kevin Pcovey, Plant Engineer. SWPP is up to date. Inspection for no exposure certification for the site. No Industrial activity takes place outside of the building. Recommend no exposure certification be Issued for the facility. Page; 2 . . ! Permtt NCG030148 owner - Faclttty: Neptca Inc Inspection Date: 0312312015 inspection Type : Compliance Evalua9lon Reason for Mille Routine storrnwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan inGude a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feaslbfa altematives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan Include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a Ilst of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan Include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been Implemented? Comment: Qualitative Moni rin Has the facility conducted its qualitative Monitoring semi-annually? Comment: Analytical Monitipril Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Qutfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the Inspection? # It the facility has representative cutfall status, is it properly documented by the Division? # Has the facflity evalualed ell illicit (non sormwater) discharges? —,—Comment. Yea ®❑❑❑ ®❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ ® ❑ ❑ ❑ v❑❑❑ ®❑❑❑ s❑❑❑ 2❑❑❑ ®❑❑❑ ®❑ ❑ ❑ M❑❑❑ ®❑ ❑ ❑ Yes No NA NE ® ❑ ❑ ❑ Yes- No NA K 0❑❑❑ ®❑❑❑ Yes No NA HE ®❑❑❑ ®❑❑❑ ❑ ❑ 0 ❑ ❑ ❑ M ❑ Page: 3 No -Exposure Self Re -Certification Information: You are obligated to maintain no -exposure` conditions at your facility. If conditions change such that your facility can no longer qualify for a no -exposure exclusion, you are obligated to immediately obtain NPDES permit coverage for your stormwater discharge. Otherwise, the discharge becomes subject to enforcement as an un-permitted discharge. State statute provides for fines of up to $25,000 per day for un-permitted discharges. Your conditional no -exposure exclusion must be self re -certified at least annually as follows: - Complete the re -certification at a minimum of once per year using the included Self Re - Certification Form. (additional copies can be downloaded from httpl/portal.ncdenr.org/web/wgtwslsu/npdesswgtab•5 1 - Maintain a record of re -certifications on file at the facility. Do not submit the re -certification to DWQ unless requested. If requested, submit a copy of the re -certification to the Division and/or the municipality in which the facility is located. -During an inspection by DWO or local government, provide the re -certifications immediately upon request. - Notify the Division of any changes in ownership, significant facility and/or activity changes, or if the facility can no longer maintain no -exposure. -Allow the NPDES permitting authority or, if discharging into a municipal separate storm sewer system, the operator of the system, to: (1) inspect the facility; and (2) make such inspection reports publicly available upon request. * "No exposure" means that all industrial materials and activities are protected by a storm resistant shelter to prevent exposure to rain, snow, snowmelt, and/or runoff. Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. Material handling activities include the storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product or waste product. (40 CFR 122.26(g)) Information and forms related No -Exposure Certifications can be accessed on the website at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#lab-5 Rev. 30Aug2010 ` r f Permit: NCG030148 SOC: County: Caldwell Region: Asheville Contact Person: Chris Crane Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/23/2015 Primary Inspector: Lee Hill Secondary Inspector(s): Compliance Inspection Report Effective: 11101M2 Expiration: 10131/17 owner: Neptco Inc Effective: Expiration: Facility: Neptco Incorporated 2012 Hickory Blvd Lenoir NC 28645 Title: Phone: 828-728-5951 Ext.2301 Certification: Phone: Entry Time: 01:50PM Exit Time: 03:30PM Phone: 828-296-4618 Shawna Riddle Phone : Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: ■ Storm water (See attachment summary) Page: 1 • 0 permit: NCG030148 Owner - Facility: Neptco Inc Inspection Date: 0312312015 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Kevin Poovey, Plant Engineer. SWPP is up to date. Inspection for no exposure certification for the site. No industrial activity takes place outside of the building. Recommend no exposure certification be issued for the facility. Page: 2 Permit NCGO30148 Owner • Facility: Neptoo InC Inspection Date: 0312312015 Inspection Type : Compliance Evaluation Reason for Visit: Routine ,SAormwater Pollution Prevention Plan Yen No NA NI: Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? M ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? M ❑ ❑ ❑ # Does the Plan include a BMP summary? M ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? M ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? M ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ # Is the Plan reviewed and updated annually? M ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yew NE Has the facility conducted its Qualitative Monitoring semi-annually? M ❑ ❑ ❑ Comment: Analytical Monitoring Yea No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 11110 Comment: Permit and Outfalls Yes No NA NE # 1s a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? M ❑ ❑ Cl # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page: 3 �;6/�-�" • i 7&ADivision of 11'atcr Qu�31it��`/Surface Water Protection da K N""., C®E�NR National Pollutant Discharge Elimination System ..,..,-" <,. NO EXPOSURE CER�IVICA110N for Exclusion NCGNEOOOO NO EXPOSURE CERTIFICATION FOR AGENCY USF ONLY DW Received Yom .Voillh !),n Ceiliricafe' ul C,ve ;,g• NICIGINIE1 National Pollutant Discharge Elimination System application for exclusion from a Stormwater Permit based on NO EXPOSURE: Submission of this No Exposure Certification constitutes notification that your facility does not require a permit for stormwater discharges associated with industrial activity in the State of North Carolina because' it qualifies for a no exposure exclusion. A condition of no exposure at an industrial facility means all industrial materials and activities are protected by a storm resistant shelter (with some exceptions) to prevent exposure to rain, snow, snowmelt, and%r runoff. For permitted facilities in North Carolina, DWO must approve your application for No Exposure Certification before this exclusion is effective. Until you are issued a No Exposure Certification and your NPDES permit is rescinded, your facility must continue to abide by the terms and conditions of the current permit. , 'Industrial materials or activities include, but are not limited to: material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. Material handling activities include the storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product or waste product. A storm resistant shelter is not required for the following industrial materials and activities: drums, barrels, tanks, and similar containers that are tightly sealed, provided those containers are not deteriorated and do not leak. "Sealed" means banded or otherwise secured and with locked or non -operational taps or valves; adequately maintained vehicles used in material handling; and final products, other than products that would be mobilized in stormwater discharges (e.g., rock salt). A No Exposure Certification must be provided for each facility qualifying for the no exposure exclusion. In addition, the exclusion from NADES permitting is available on a facility -wide basis only —not for individual outfalls. If any industrial activities or materials are, or will be, exposed to precipitation, the facility is not eligible for the no exposure exclusion, By signing and submitting this No Exposure Certification form, you certify that a condition of no exposure exists at this facility or site and are obligated to comply with the terms and conditions of 40 CFR 122.26(g). For questions, please contact the D WO Regional Office for your area. (See page 6) (Please print or type) 1) Mailing address of owner/operator (address to which all certification correspondence will be mailed): Name Neptco InclA Chase Company Contact Street Address City Telephone No. Email Kevin Poovey P.O Box 1766 Lenoir State NC ZIP Code 28645 828 728-5951 Fax; 828 728-5115 kpoovey@nepiGp.com, RECEIVED MAR 1 1 2015 -,Page 1 of 7 FEB 02 2015 SWU•NE-12Aug2010 Land Quality Section D�NR-LAND QUALITY Asheville srol?MWATER PERMITTING EE f :^i 1•� Y .i f V I%I 1 NCGNE0000 No Exposure Certification 2) Location of facility producing discharge: Facility Name Neptco Inc/A Chase Company Facility Contact Kevin Poovey Facility Street Address 2012 Hickory Blvd City Lenoir State INC ZIP Code 28645 County Caldwell Telephone No, 828 728 5951 Fax: 828 728-5115 Email kpoovey@neptco.com 3) Physical location information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and ' distance and direction from a roadway intersection), From 1 40 East take exit 123 North towards Lenoir, Go approximately ; 12 miles to 2012 Hickory Blvd, on the left. The facility is across tohe street from the JE Broyhill Civic Center. (A copy of a map with the facility clearly located on it should be included with the certification application.) 4) Is the facility located on Native American Lands? 0 Yes 19 No 5) Is this a Federal facility? ❑ Yes M No 6) Latitude 35' 52- 33" N Longitude 81 ° 30" 42" w (deg., min., seconds) 7) This NPDES No Exposure Exclusion application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin _ ® Existing Date operation began 1979 ❑ Renewal of existing No Exposure Certification Certification No.: NCGNE 8) Was this facility or site ever covered under an NPDES Sto.rmwater Permit? ❑ Yes F No If yes, what is the NPDES Permit Number? 9) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: -p $—. - 2 10) Provide a brief description of the types of industrial activities and products produced at this facility: Laminating and coating of foi4s and films. 11) Does this facility have any Non -Discharge permits (ex: recycle permits)?' B No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: . a. Page 2 of 7 SWU-NE-12Aug2010 NCGNE0000 No Exposure Certification Exposure Checklists (12. - 14.) 12) Are any of the following materials or activities exposed to precipitation, now or in the foreseeable future? (Please check either "Yes" or "No.") If you answer "Yes" to any of these items, you are not eligible for the no exposure exclusion. a. Using, storing, or cleaning industrial machinery or equipment, and areas where ❑ Yes N1 No residuals from using, storing or cleaning industrial machinery or equipment remain and are exposed to stormwater b. Materials or residuals on the ground or in stormwater inlets from spills/leaks ❑ Yes ® No c. Materials or products from past industrial activity ❑ Yes L111 No d. Material handling equipment (except adequately maintained vehicles) ❑ Yes LN No e. Materials or products during loading/unloading or transporting activities ❑ Yes Lq No f. Materials or products stored outdoors (except final products intended for outside ❑ Yes 9 No use [e.g., new cars] where exposure to stormwater does not result in the discharge of pollutants) g. Materials contained in open, deteriorated or leaking storage drums, barrels, tanks, h Yes X No and similar containers h. Materials or products handfed/stored on roads or railways owned or maintained by ❑'Yes LEI No the discharger i. Waste material (except waste in covered, non -leaking containers [e.g., dumpsters]) ❑ Yes M No j, Application or disposal of process wastewater (unless otherwise permitted) ❑ Yes IVR No k. Particulate matter or visible deposits of residuals from roof stacks and/or vents not ❑ Yes IN No otherwise regulated (i.e., under an air quality control permit) and evident in the stormwater outflow I. Empty containers that previously contained materials that are not properly stored ❑ Yes Ln No (i.e,, not closed and stored upside down to prevent precipitation accumulation) m. For any exterior ASTs, as well as drums, barrels, tanks, and similar containers ❑ Yes .N No stored outside, has the facility had any releases in the past three (3) years? 13) Above Ground Storage Tanks (ASTs): If you answer "No" to any of the following items, you are not eligible for the no exposure exclusion. a. Are exterior ASTs and piping free of rust, damaged or weathered coating, pits, or e Yes ❑ No ❑ N/A deterioration, or evidence of leaks? b. Is secondary containment provided for all exterior ASTs? If so, is it free of any Yes ❑ No ❑ NIA cracks, holes, or evidence of leaks, and are drain valves maintained locked shut? 0 Page 3 of 7 SWU-NE-12Aug2010 NCGNE0000 No Exposure Certification r 14) Secondary Containment: If you answer "No" to any of the following items, you are not eligible for the no exposure exclusion. a. Is secondary containment provided for all single above ground storage B Yes ❑ No ❑ NIA ' containers (including drums, barrels, etc.) with a capacity of more than 660- gallons? 1. b. Is secondary containment provided for above ground storage containers stored It Yes tD No ID NIA in close proximity to each other with a combined capacity of more than 1,320- gallons? , c. Is secondary containment provided for Title III Section 313 Superfund A Yes ❑ No ❑ NIA Amendments and Reauthorization Act (SARA) water priority chemicals'? d. Is secondary containment provided for Hazardous substances— designated in 40 9 Yes ❑ No f: NIA CFR §116? , e. Are release valves on all secondary containment structures locked? In Yes ❑ No ❑ NIA 15) Hazardous Waste: a. Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? © Yes a No b. Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste ❑ Yes M No ' generated per month) of hazardous waste? c. Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste 0 Yes ❑ No generated per month) of hazardous waste? If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: Flammable liquids, Methyl Ethyl Ketone, Toluene, Isopropyl Alcohol and Ethyl Acetate How is material stored: 55 Gallon, Metal Drums Where is material stored: Inside the facility How many disposal shipments per year: Approximately 15 per year Name of transport / disposal vendor: Giant Resource Recovery Vendor address: 755 Industrial Road, Sumter, SC 29151 Footnotes to Questions 14) c. & d. 'Note that amounts below the 660-gallon (single) and 1,320-gallon (combined) bulk storage minimums require i secondary containment. However, some exceptions may be made for de minimis amounts of certain substances, and/or other qualifiers, as described in the exemptions from reporting requirements of Title III SARA 313 in 40 CFR §372.38. "Note that amounts below the 660-gallon (single) and 1,320-gallon (combined) bulk storage minimums require secondary containment. However, some exceptions may be made for amounts less than the Reportable Quantities of the hazardous substances listed in 40 CFR §117.3, Page 4'of 7 SWU-NE-12Aug2010 NCGNE0000 No Exposure Certification 16) Other information: If you answer "Yes" to any of the following items, you might not be eligible for the no exposure exclusion. A more in-depth evaluation of the site circumstances may be required. a. Does your facility store used, recycled, or otherwise reclaimed pallets outside? ❑ Yes A No b. Does your fac+lity have coal piles on site? D Yes 9 No c. Does your facility store other fuel sources outside in piles, such as wood chips, I-] Yes X No sawdust, etc.? d. Does your facility have air emissions associated with its industrial activity (e.g., Yes ❑ No degreasing operations, plating, painting and metal finishing)? If so, describe the Industrial activity: Coating and Laminating e. If you answered yes to d., are those emissions permitted by an Air Quality Permit? 9 Yes ❑ No ❑ NIA Please specify: 04180 T20 f. Please list any other environmental program permits (federal, state, etc.) not specified earlier in this application (such as Hazardous Waste Permits, etc.): Permit: Program: Permit: Program: Permit: Program: Permit: Program: Permit: Program: , Permit: Program: Permit: 'Program: Page 5 of 7 SW U-NE-12Aug2010 NCGNE0000 No Exposure Certification 17) Certification: I certify under penalty of law that I have read and understand the eligibility requirements for claiming a condition of "no exposure" and obtaining an exclusion from NPDES stormwater permitting. I certify under penalty of law that there are no discharges of stormwater contaminated by exposure to industrial activities or materials from the industrial facility or site identified in this dccument (except as allowed under 40 CFR 122.26(g)(2)). I understand that I am obligated to annually self re.-ceaify NQ Exposure and, if requested, submit the re -certification to DWQ or the operator of the local municipal separate storm sewer system (MS4) into which the facility discharges (where applicable). I understand that I must allow the North Carolina Division of Water duality, or MS4 operator where the discharge is into the local MS4, to perform inspections to confirm the condition of no exposure and to make such inspection reports publicly available upon request. In the event that the site no longer qualities for a No Exposure Exclusion, i understand that I must obtain coverage under an NPDES permit prior to any point sourcodisrharge of stormwater from the facility. Additionally, t certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Thomas Herman Title; Plant Manager —1 Cam,-, (Signature of Applicant) (Date Signed) Please note: This application for the No Exposure Exclusion is subject to approval by the NCDENR Regional Office prior to issuance. The Regional Office may inspect your facility for compliance with no exposure conditions prior to that approval. The Regional Office may also inspect your facility at any time in the future for compliance with the No Exposure Exclusion. North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, 4record, report, plan, or other document filed or required to be maintained under this Article or a rule Implementing this Article, or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [EnOonmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed len thousand dollars ($10,000). There is currently no fee for a No Exposure Exclusion. Page 6 of 7 SWU-NE-12Aug2010 NCGNE0000 No Exposure Certification Final Checklist This application should include the following items. e This completed application and all supporting documentation. a A map with the location of the facility clearly marked. ❑ If the site currently has an NPDES Stormwater Permit, be sure to indicate the permit number in Question 8. Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of a No Exposure Exclusion. , For questions, please contact the D WO Regional Office for your area. DWQ Reaional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 7 of 7 SWU-NE-12Aug20i0 1/27/2015 N eptco Inc - Google Maps h I, Neptco Incly �2012 Hickory Boulevard Directions rectos Save Southeast Lenoir, NC 28545 neptco.com � W S�\. /arc 18rcross`j ix' r 0 �! t r r i ?s Paper �A!IE fr^.� 1 People talk about: pressure sensitive • adhesives • laminates \ r �cj, Cr Be the first to review - Add a photo Suggest a.' edit -'ANY You V* bmsiness (•Y--IO i Neplro Enc __�Op �_-_ k) ressuiesensitive- i�- �§� �• i -adttesirp4 31 E: --` southw ` `i 1�• ._clv+ltar,sly— �- 26j t1_ tr%:� `2 --•—..._Souihsves[Blsd � ���1 � �! .�x � i -=�� - f 'I ��== ^6Fee Fanml Lenoir ABC Store,( S. 4� �(_^1 - l�, �SOUIhWR6t.BIY�" -�' _-,...��� - �< '� ti. "'• �y`-�.. � `� LI •� _ �is1Fatf�7 �� `, s - } �� �f h � '�°' SduthW�tBJyd J7 0 • • ��rr 4(i e" „ i toot �Ortc-L Lot, —I t! r �SrA/r�7. tiiir'j� Y fr_. �1 __ I� �� �1 p �• Sy �l i+: .....� :E:auwoy�es�� �y-•--.i f� ; � �� `.. -� i -- J .. fAAap data 02015 (3009le 1000 tt - t1MKtY1 f4i:t. r.r -_ a:.__ ;!I itttps:lAvmv.goog Ie.corrVrnapslo acelN epico+l r1Ci@35.879618,-81.51284,15zldata=! 4m2! 3m1! 1 sO)O:Oxdedc32483O4f9a10 111 Herbert, Laura C From: kpoovey@neptco.com Sent: Tuesday, January 28, 2014 8:53 AM To: Herbert, Laura C Subject: RE: NCG03 Permit Questions My office is 828-757-7379. My cell is 828-292-2960. That would be great. I could definitely use the help. "Herbert, Laura C" <laura.herbert r(Dncdenr.gov> To "Fox, Tim" <tim.fo4Dncdenr,gov>, "k dove ne Ico.com" <kpoovey@neptcv_com>, cc'Watkins, Wayne" <waVne.watkins(@ncdenr.gov> 01/28/2014 08:50 AM Subject RE: NCG03 Permit Questions Kevin, Thank you for your inquiry. What is the best telephone number to reach you at? I would like to tail and discuss your facility and the general stormwater permit requirements. I will be out in the field this morning, but should be back in my office this afternoon. Thanks, Laura Laura Herbert, P.E. Regional Engineer Division of Energy, Mineral, and Land Resources - Land Quality Section NCDENR-Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 http:Hi)ortal.ncdenr.org/web/Ir Notice: ]",-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Fox, Tim Sent: Monday, January 27, 2014 2:57 PM To: kpoovey@neptco.com Cc: Herbert, Laura C Subject: NCG03 Permit Questions Kevin, Can you let me know that you have received this. Below are the links for the forms for NCG03. Link to NCG03 Monitoring reports: http://Portal.ncdenr.org/c/document library/pet file?uuid=lad5be32-4lb0-4d23-bac2-2cf58ellc07b&groupld=38364 Link to general monitoring report page: http://portal.ncdenr.org/web/Ir/npdes-stormwater#tab-3 Link to NCG03 permit information: Scroll down to NCG03 http://portal. ncdenr. ore/web/1 r/npdes-sto rmwater#tab-3 If you need direction on the forms please ask. As I discussed a re -organization has occurred please contact Laura Herbert for future correspondence. Her information is below: Laura Herbert, P.E. Regional Engineer Division of Energy, Mineral, and Land Resources - Land Quality Section NCDENR-Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 Tel:828-296-4500 Fax:828-299-7043 http-jlportal.ncdenr.org/web/ir Laura, After speaking with Kevin, he may benefit from an inspection and or guidance with any questions regarding his permit and facility. Thanks, Tim Tim Fox - tim.fox@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources — Water Quality Programs 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax:828-299-7043 Notice: Email correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. 2 i Herbert, Laura C From: Herbert, Laura C Sent: Tuesday, January 28, 2014 8:49 AM To: Fox, Tim; kpoovey@neptco.com Cc: Watkins, Wayne ! Subject: RE: NCG03 Permit Questions D,V- Kevin, Thank you for your inquiry. What is the best telephone number to reach you at? I would like to call and discuss your facility and the general stormwater permit requirements. I will be out in the field this morning, but should be back in my office this afternoon. Thanks, Laura Laura Herbert, P.E. Regional Engineer Division of Energy, Mineral, and Land Resources - Land Quality Section NCDENR-Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 Tel:828-296-4500 Fax:828-299-7043 http://Portal.ncdenr.org/web/ir Notice: F',-mail correspondence to and Isom this address may be subject to the North Carolina Public Records Law and therefore may he disclosed to third parties unless the content is exempt by statute or other regulation. From: Fox, Tim Sent: Monday, January 27, 2014 2:57 PM To: kpoovey@neptco.com Cc: Herbert, Laura C Subject: NCG03 Permit Questions Kevin, Can you let me know that you have received this. Below are the links for the forms for NCG03. Link to NCG03 Monitoring reports: http://Portal.ncdenr.org/c/document library/get file?uuid=lad5be32-41b0-4d23-bac2-2cf58ellc07b&groupld=38364 Link to general monitoring report page: http://portal.ncdenr.org/web/Ir/nodes-stormwater#tab-3 1 0 0 Link to NCG03 permit information: Scroll down to NCG03 http://Portal.ncdenr,org/web/ir/npdes-stormwater#tab-3 If you need direction on the forms please ask. As I discussed a re -organization has occurred please contact Laura Herbert for future correspondence. Her information is below: Laura Herbert, P.E. Regional Engineer Division of Energy, Mineral, and Land Resources - Land Quality Section NCDENR-Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 Tel: 828-296-4500 Fax, 828-299-7043 http://portal.ncdenr.ore/web/Ir La u ra, After speaking with Kevin, he may benefit from an inspection and or guidance with any questions regarding his permit and facility. Thanks, Tim Tim Fox - tim.fox@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources —Water Quality Programs 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: Email correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. 2 f.•?!'.'.Illfi• q.YJ.w,r1.1.I C:,>i ^'u L111jjjyyyr�T� d�L+■gyCDE �,.FS- \®� Y •m Y f North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor March 1, 2010 Neptco Incorporated Chris Crane, Plant Engineer PO Box 1766 Lenoir, NC 28645 Division of Water Quality Coleen H. Sullins Director SUBJECT: NPDES Stormwater Permit Compliance Inspection Neptco Inc. Permit No: NCG030148 Caldwell County Dear Mr. Crane: A Stormwater Permit Compliance Inspection was conducted at the Neptco facility in Caldwell County, NC on February 12, 2010. Present during the inspection were Dan Upton with Neptco and Warren DePrce with the City of Lenoir, The facility was found to be in compliance with permit NCG030148. The following observations and recommendations were noted during the Division of Water Quality (DWQ) inspection: Stormwater Discharge Outfalls Three piped stormwater conveyances and one overland flow stormwater conveyance were observed during the inspection. These four stormwater discharge outfalls will require all of the Analytical and Qualitative monitoring, including Total Toxic Organics Monitoring. Please add these Stormwater Discharge Outfalls (SDO) to your site plan and monitoring schedule. Also delineate drainage areas and conveyances for each stormwater discharge. HousekeeninL, Dee Freeman Secretary was present around the silos and had made its way to the south end of the parking area. This needs to be cleaned tip to avoid possible pollutant loads to nearby waters and possibly altering pl-I levels. Although not considered a significant spill, the release of any product needs immediate attention. Analytical Stormwater Mon itorin Sub,nittal Please submit the next two sampling events analytical monitoring results from all of the Stormwater Discharge Outfalls to the Asheville Regional Office (ARO) at the following address: Location: 2090 U.S. Highway 70, Swannanoa, NarM Carolina 28778 Phone: 826.296-45005 FAX: 828.299-70431 Customer Service: 1-877.623.6748 One fi5terneL• www.ncwateryuailty.org NorthCarolina)Vn��IN��1/� An ERuat OQPgnunity 1 Atl,rmative Action Employer 6t j t, i a Page Two Neptco-NCG0301 d8 March 1, 2010 Division of Water Quality -Linda Wiggs, 2090 US HWY 70, Swannanoa, NC 28778. Submittal of these results to the Central Office as directed in the permit is also required. Also make sure the units of measurement are reported correctly and tlfe reports are properly signed. It appears that in the past your Lead units have been reported incorrectly, indicating exceedances of benchmarks. It is recommended that you send an amended report with the corrected Lead units to Division of Water Quality. Attached is a copy of the inspection report. Please contact me at (828) 296-4653 or linda.wigs u,nederingov, if I can be of any further assistance. Sincerely, r Linda Wiggs Environmental Specialist Surface Water Protection Enclosure cc: Central Files C- Asheville Files Neptco-Dan Upton PO Box 2323 Pawtucket, RI 02861-0323 City of Lenoir -Warren DePree PO Box 958 801 West Ave NW Lenoir, NC 28645 S:\SWP\Caldwel[lStormwater\NCG03 Metal l-abrication\Neptco-NCG030148\Neptco-Inspect ltr Pcb-2010.doc 1 Permit: NCG030148 SOC: County: Caldwell Region: Asheville 0 • Compliance Inspection Report Effective: 1-1D4,UZ Expiration: tOL3jLt2_ Owner: Neptco Inc Effective: Expiration: Facility: Neptco incorporated 2012 Hickory Blvd Contact Person: Chris Crane Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: Inspection Date: 02/12/2010 Entry Time: 11:00 AM Primary Inspector: Linda S Wiggs Secondary Inspector(s): Lenoir NC 28645 Phone: 828-728-5951 Ext.2301 Certification: Exit Time: 01:50 PM Phone: Phone: $28-296-4500 Ext.4653 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: E Compliant ❑ Not Compliant Question Areas: ® Storm Water (Sots attachment summary) Page: 1 • Permit: NGG030148 owner -Facility! Neptco Inc 0 Inspection Date: 02/12/2010 inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Monitoring reports are currently filled out by commercial lab. Units have been reported incorrectly. If the lab continues to fill out form for facility then the facility needs to make sure the lab is converting units. Regardless of who fills out form, the form has to be signed by permittee or designated agent. Two Lead data points are recorded incorrectly with the Division of Water Quality, July 4, 2008 and July 22, 2009. It is recommended that an ammended Stormwater Discharge Monitoring Report be submitted to the Raleigh NC office. _ Total Toxic Organics need to be monitored. Four SDOs were found. Three piped, one overland. Outfalls, conveyances, and drainage areas need to be on site plan. Results from the next two monitoring events need to be sent to Asheville Office as well as Raleigh Office. CaCO3 lost at Silos and needs to be cleaned up_ Neptco down the road at 3908 Hickory Blvd needs to be permitted. Notice of Intent (application) was sent to Dan Upton via email 2/1512010. Page: 2 E Permit: NCGO30148 Owner - Facility: Neptco Inc • Inspection Date: 02/12/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® n n n # Does the Plan include a "Narrative Description of Practices"? is n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ® ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ® Cl ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ © o # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? ® n ❑ n # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ®❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? n n n Has the Stormwater Pollution Prevention Plan been implemented? ®❑ ❑ ❑ Comment: Site map needs to include all stormwater discharge outfall (SDO) points, four were observed during inspection. Facility needs to delineate drainage area and stormwater conveyances. The facility does not indicate any significant spills in the last three years. Although not "significant", at the Silos there was what was described as a blow down of Calcium Carbonate. Calcium Carbonate staining across the parking lot from the Silos and deposition of Calcium Carbonate in a snow mound was observed during inspection. The Calcium Cabonate needs to be properly cleaned up. There does not appear to have been a need for a feasibilty study. Depending on results from all SDOs it is possible there may be a need for one in the future. Also depending on the type of product stored in the silos a feasiblity study or possible secondary containment could be needed in the future. However the facility rep indicates the silos will be dismantled in the future. Qualitative Monitoring Yes No NA NE Has the facility Conducted its Qualitative Monitoring semi-annually? ■ n In n Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ n no Page: 3 0 Permit: NCG030148 Owner - Facility: Neptco Inc Inspection Date: 02/12/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: The facility believed it had only one outfall and did not need to perform Total Toxic Organic analysis. Analytical Monitoring needs to include Total Toxic Organics. All four SDOs need to be monitored for all parameters. Permit and Outfalls # is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Facility has three piped stormwater conveyances and one overland flow stormwater conveyance that need monitoring. m 0 01 0 U 0 0 0 D Q ■ ❑ 0000 Page: 4 0 %J 't '.'' 4Qr 4b 4t f I pe, J oo/ CEO ► �� Y rI I r Q--j U'a V -, f j G, i Qf r ---------------- � 1 - c., 1 � G C I® i 1 f d1t� Vs�9�S ti w,Lo �, e Ej, �� - - ��i A•{y `\�. __ll �.``', �'V�\ ,.Jul ''�%f�,,� �°�� ��,�1C� ��p�y •��\`��`f �u oN1�IJ/ } h1"'.-u' \' ��.r "•, .v / L^'� Eg - '.'ti,m `\ �� `�c�^�./� � nn�t_-.�.�`t .•a ,,� j.,��,1 \ ;m'( �o�ar1� nrl� "�`� .: In-, � $/ice Y' �i��•!. i' � \' � .. � u �il1�E^ � - �..� %'JJ� :. t1'C t( � i March 31, 2006 Neptco Inc PO Box 2323 Pawtucket, RI 02861 Subject: General Stormwater Permit Inspections Neptco Incorporated Permit No. NCG030148 Caldwell County Dear Sir or Madam: 0 Michae: F. Easley, Governor Wi:iiani G Koss Jr., secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, Y.E. Director Division of Water Quality Your facility holds a general permit from the North Carolina Division of Water Quality to discharge stormwater associated with industrial activities performed at your facility. Please be advised that the Asheville Regional Office will be performing NPDES stormwater inspections sometime in the near future. If this office has not previously inspected your facility, you should be prepared to demonstrate compliance with all terms and conditions included in the permit. Specifically, we will be evaluating the following: your stormwater. pollution prevention plan, stormwater outfall locations, qualitative and analytical monitoring data and any other activities required by your permit. Please note that any data reported to the State must be analyzed by a facility that has a North Carolina laboratory certification, either as a full laboratory or as a facility certified to perform on -site field testing. If you have any questions regarding the generation of your facility's data, please feel free to call Gary Francies at (828) 296-4677. Copies of the general permits and accompanying documents can be accessed from the following webpage: http://wwrl ncii,ctiergr.ralit3 01-gl. u/Fnr°ms_Docuiizents.htnili.ytornzla,atef•GP. If you have any questions, please contact me in the Asheville Regional Office at (828) 296-4500. cc: NPS Compliance & Assistance Oversight Unit S WP-Central Files ARO Files Sincerely, Roy Davis Environmental Engineer 1`pnc o thCarolina Alahtrully North Carolina Division of Water Quality 2090 U.S, l lwy 70 Internet: http:liwww.ncwaterquality.org/ An Equal Opportunity/Affirmative Action Employer Swannanoa, NC 28779 Phone (828) 296-4500 Fax (828) 299-7043 ��oF w A rF,�QG 0 � DAVID LLOYD NEPTCO INCORPORATED PO BOX 2323 PAWTUCKET. RI 02861 Dear Permittec: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Departme . Environment and Natural Resources August 23, 2002 Alan W. Klimek, P.E., Director Division of Water Quality AUG 2 g 1 Subject: NPDES Stormwater Permit Renewal NEPTCO INCORPORATED COC Number NCG030148 Caldwell County In response to your renewal application for continued coverage under general permit NCG030000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 * A copy of the Analytical Monitoring Dorm (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit sloes not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 548 Sincerely, ell Bradley Bennett. Supervisor Stormwater and General Permits Unit cc: Centrallriles Stormwater & General Permits Unit Hiles Asheville Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 ePADE NCNR Customer Service 1.800.623-7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM for establishments primarily engaged in the following activities: Metal Fabrication t�vjl� Pge ✓,e 7d 1 6L8) 9t - 595`I Y 2301 In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act, as amended, this permit is hereby issued to all owners or operators, hereinafter permittees, which are covered by this permit as evidenced by receipt of a Certificate of Coverage by the Environmental Management Commission to allow the discharge of stormwater to the surface waters of North Carolina or to a separate storm sewer system conveying discharges to surface waters in accordance with the terms and conditions set forth herein. Coverage under this General Permit is applicable to: ♦ All owners or operators of stormwater point source discharges associated with activities classified as establishments primarily engaged in activities classified as establishments primarily engaged in: ■ Rolling, Drawing, and Extruding of Nonferrous Metals, standard industrial classification (SIC 335) ■ Heat Treating of Metal (SIC 3398) ■ Fabricating of Metal Products (SIC 34) ■ Manufacturing of Industrial and Commercial Machinery (SIC 35) ■ Manufacturing of Electronic Equipment (SIC 36) ■ Manufacturing of Transportation Equipment (SIC 37) ■ Manufacturing of Measuring and Analyzing Instruments (SIC 38)) ♦ Stormwater point source discharges from like industrial activities deemed by DWQ to be similar to these operations in the process, or the discharges, or the exposure of raw materials, intermediate products, by-products, products, or waste products. Except upon DWQ determination of similarity as provided immediately above, the following activities and associated discharges are excluded from coverage under this General Permit: Establishments primarily engaged in the ship and boat building and repairing (SIC 373), which is covered by general stormwater permit NCG190000. The General Permit shall become effective on.November_1,.2012. The General Permit shall expire at midnight on October 31, 2 7. Signed this day October 25, 2012. Original signed by Mutt Matthews for Charles Wakild, P.E., Director Division of Water Quality By the Authority of the Environmental Management Commission • 0 Permit No, NCG030000 TABLE OF CONTENTS PART I INTRODUCTION Section A: General Permit Coverage Section B: Permitted Activities PART 11 MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B: Analytical Monitoring Requirements Section C: On -Site Vehicle and Equipment Maintenance Monitoring Requirements Section D: Qualitative Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS Section A: Compliance and Liability 1. Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability S. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability 8. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports 11. Onshore or Offshore Construction 12. Duty to Reapply Section B: General Conditions 1. a General Permit Expiration 2. Transfers 3. When an individual Permit May be Required 4. When an individual Permit May be Requested 5. Signatory Requirements 6. General Permit Modification, Revocation and Reissuance, or Termination I Permit No. NCG030000 PART II — MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The permittee shall develop and implement a Stormwater Pollution Prevention Plan (SPPP). The SPPP shall be maintained on site unless exempted from this requirement by the Division. The SPPP is public information in accordance with Part 111, Standard Conditions, Section E, paragraph 3 of this permit. The SPPP shall include, at a minimum, the following items: 1. Site Overview. The Site Overview shall provide a description of the physical facility and the potential pollutant sources that may be expected to contribute to contamination of stormwater discharges. The Site Overview shall contain the following: (a) A general location map (USGS quadrangle map or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters; the name of the receiving waters to which the stormwater outfalls discharge, or if the discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters; and accurate latitude and longitude of the points of stormwater discharge associated with industrial activity. The general location map (or alternatively the site map) shall identify whether any receiving waters are impaired (on the state's 303 (d) list of impaired waters) or if the site is located in a watershed for which a TMDL has been established, and what the parameters of concern are. (b) A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. A narrative description of the potential pollutants that could be expected to he present in the stormwater discharge from each outfall. (c) A site map drawn at a scale sufficient to clearly depict: the site property boundary; the stormwater discharge outfalls; all on -site and adjacent surface waters and wetlands; industrial activity areas (including storage of materials, disposal areas, process areas, loading and unloading areas, and haul roads); site topography and finished grade; all drainage features and structures; drainage area boundaries and total contributing area for each outfall; direction of flow in each drainage area; industrial activities occurring in each drainage area; buildings; stormwater Best Management Practices (BMPs); and impervious surfaces. The site map must indicate the percentage of each drainage area that is impervious, and the site map must include a graphic scale indication and north arrow. (d) A list of significant spills or leaks of pollutants during the previous three (3) years and any corrective actions taken to mitigate spill impacts. (e) Certification that the stormwater outfalls have been evaluated for the presence of non- stormwater discharges. The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in accordance with the requirements found in Part III, Standard Conditions, Section B, Paragraph 3. Part 11 Page 1 of 10 • Permit No. NCG030000 2. Stormwater Management Strategy. The Stormwater Management Strategy shall contain a narrative description of the materials management practices employed which control or minimize the stormwater exposure of significant materials, including structural and nonstructural measures. The Stormwater Management Strategy, at a minimum, shall incorporate the following: (a) Feasibility Study. An annual review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to rainfall and run-on flows. Wherever practical, the permittee shall prevent exposure of all storage areas, material handling operations, and manufacturing or fueling operations. In areas where elimination of exposure is not practical, this review shall document the feasibility of diverting the stormwater run-on away from areas of potential contamination, (b) Secondary Containment Requirements and Records. Secondary containment is required for: bulk storage of liquid materials including petroleum products; s.2aee ja any amount of Section 313 of Title 111 of the Sunerfund Amendments and Reauthorigation,Act (SARAI water priorijy chemicals and storage in any amount of hazardous substances, in order to prevent leaks and spills from contaminating stormwater runoff. A table or summary of all such tanks and stored materials and their associated secondary containment areas shall be maintained. If the secondary containment devices are connected to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices which shall be secured closed with a locking mechanism. Any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam, outfall staining, visible sheens, and dry weather flow, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated by any material. Records documenting the individual making the observation, the description of the accumulated stormwater, and the date and time of the release shall be kept for a period of five (5) years. (c) BMP Summary. A listing of site structural and non-structural Best Management Practices (BMPs) shall be provided. The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and on data collected through monitoring of stormwater discharges. The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs. The BMP Summary shall be reviewed and updated annually. 3. Spill Prevention and Response Procedures. The Spill Prevention and Response Procedures (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible person shall be on site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP. Part 11 Page 2 of 10 Permit No. NCG030000 4. Preventative Maintenance and Good Housekeeping Program. A preventative maintenance and good housekeeping program shall be developed and implemented. The program shall address all stormwater control systems (if applicable), stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including material storage areas, material handling areas, disposal areas, process areas, loading and unloading areas, and haul roads), all drainage features and structures, and existing structural BMPs. The program shall establish schedules of inspections, maintenance, and housekeeping activities of stormwater control systems, as well as facility equipment, facility areas, and facility systems that present a potential for stormwater exposure or stormwater pollution where not already addressed under another element of the SPPP. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. Timely compliance with the established schedules for inspections, maintenance, and housekeeping shall be recorded and maintained in the SPPP. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi- annual schedule, once during the first half of the year (January to June), and once during the second half (July to December), with at least 60 days separating inspection dates (unless performed more frequently than semi-annually). These facility inspections are different from, and in addition to, the stormwater discharge characteristic monitoring at the outfalls required in Part II B, C, and D of this permit. 6. Employee Training. Training programs shall be developed and training provided at a minimum on an annual basis for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. The facility personnel responsible for implementing the training shall be identified, and their annual training shall be documented by the signature of each employee trained. Responsible Party. The SPPP shall identify a specific person(s) or position(s) responsible for the overall coordination, development, implementation, and revision of the SPPP. Responsibilities for all components of the SPPP shall be documented and position assignments provided. 8. SPPP Amendment and Annual Update. The permittee shall amend the SPPP whenever there is a change in design, construction, operation, site drainage, maintenance, or configuration of the physical features which may have a significant effect on the potential for the discharge of pollutants to surface waters. All aspects of the SPPP shall be reviewed and updated on an annual basis. The annual update shall include: (a) an updated list of significant spills or leaks of pollutants for the previous three (3) years, or the notation that no spills have occurred (element of the Site Overview); (b) a written re-certif cation that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges (element of the Site Overview); (c) a documented re-evaluation of the effectiveness of the on -site stormwater BMPs (BMP Summary element of the Stormwater Management Strategy). (d) a statement that annual training requirements were met in the year past; (e) a review and comparison of sample analytical data to benchmark values (if applicable) over the past year, including a discussion about Tiered Response status. The permittee shall use the Division's Annual Summary Data Monitoring Report (DMR) form, available from the Stormwater Permitting Unit's website (See 'Monitoring Forms' here: http//portal.ncdenr.org/weblwgfws/emu/n dp essw). Part li Page 3 of 10 • 11 Permit No. NCG030000 The Director may notify the permittee when the SPPP does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SPPP to meet minimum requirements. The permittee shall provide certification in writing (in accordance with Part 111, Standard Conditions, Section B, Paragraph 3) to the Director that the changes have been made. SPPP Implementation. The permittee shall implement the Stormwater Pollution Prevention Plan and all appropriate BMPs to prevent contaminants from entering surface waters via stormwater. Implementation of the SPPP shall include documentation of all monitoring, measurements, inspections, maintenance activities, and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities. Such documentation shall be kept on -site for a period of five (5) years and made available to the Director or the Director's authorized representative immediately upon request. 10. Solvent Management Plan. Facilities that implement a Solvent Management Plan may so certify, and the requirement for Total Toxic Organics (TTO) monitoring in Part 11, Section B. may be waived. The Solvent Management Plan shall include: (a) an annually updated and quantified inventory of the total toxic organic compounds present on site during the previous three years; (b) a narrative description of the in -plant locations and uses of the toxic organic compounds, the method of disposal including quantities disposed on- and off -site; (c) the management procedures and engineering measures for assuring that toxic organics do not spill or leak into stormwater. DWQ may at its discretion require submittal, review, and approval of the Solvent Management Plan as a condition of continuing the TTO sampling waiver. For those facilities electing to employ the TTO sampling waiver, the permittee shall include the following signed certification statement on each discharge monitoring report. "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no leak, spill, or dumping of concentrated toxic organics into the stormwater or onto areas which are exposed to rainfall orstormwater runoff has occurred since filing the last discharge monitoring report. 1 further certify that this facility is implementing all the provisions of the Solvent Management Plan included in the Stormwater Pollution Prevention Plan." Part 11 Page 4 of 10 0 • Permit No. NCG030000 SECTION B: ANALYTICAL MONITORING REQUIREMENTS Analytical monitoring of stortwater discharges shall be performed as specified in Table 1. All analytical monitoring shall be performed during a measureable storm event at each stormwater discharge outfall (SDO). Only SDOs discharging stormwater associated with industrial activity must be sampled (See Definitions). A measurable storm event is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. See Definitions. Table 1 Analytical Monitoring Requirements Discharge Characteristics Units Measurement Fre uenc 1 Sample Typez Sample Location3 E-I standard semi-annual Grab SDO Total Suspended Solids m L semi-annual Grab SDO Non -Polar Oil & Grease / TPH EPA Method 1664 SGT-HEM mg/L semi-annual Grab SDO Copper, Total Recoverable m L semi-annual Grab SDO Lead, Total Recoverable m L semi-annual Grab SDO Zinc, Total Recoverable m L semi-annual Grab SDO Total Toxic Organics (TTO)4 m L semi-annual Grab SDO Total Rainfalls inches semi-annual I Rain Gauge I - Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event. 2 Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status (ROS) has been granted. A copy of the letter granting ROS shall be kept on site. 4 Total "Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 1; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31.) 5 For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge or local rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. The permittee shall complete the analytical samplings in accordance with the schedule specified below in Table 2, unless adverse weather conditions prevent sample collection (see Adverse Weather in Definitions). A minimum of 60 days must separate Period 1 and Period 2 sample dates, unless monthly monitoring has been instituted as part of other requirements of this permit. Inability to sample because of adverse weather conditions must he documented in the SPPP and recorded on the DMR. The permittee must report the results from each sample taken within the monitoring period (see Part 111, Section E). Part 11 Page 5 of 10 :7 C7 Table 2 Monitoring Schedule Permit No. NCG030000 Monitoring periodl,z Sample Number Start End Year 1 - Period 1 1 January 1, 2013 June 30, 2013 Year 1- Period 2 2 July 1, 2013 December 31, 2013 Year 2 - Period 1 3 January 1, 2014 June 30, 2014 Year 2 - Period 2 4 July 1, 2014 December 31, 2014 Year 3 - Period 1 5 January 1, 2015 June 30, 2015 Year 3 - Period 2 6 July 1, 2015 December 31, 2015 Year 4 - Period 1 7 January 1, 2016 June 30, 2016 Year 4 - Period 2 8 1 July 1, 2016 December 31, 2016 Year 5 - Period 1 9 January 1, 2017 June 30, 2017 Year 5 - Period 2 10 July 1, 2017 October 31, 2017 Footnotes: 1 Maintain semi-annual analytical monitoring throughout the permit renewal process (unless other provisions of this permit prompt monthly sampling). 2 If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow" or "No Discharge" within 30 days of the end of the sampling period. Failure to monitor semi-annually per permit terms may result in the Division requiring monthly monitoring for all parameters for a specified time period. "No discharge" from an outfall or inability to collect sample because of adverse weather conditions during a monitoring period, for example does not constitute failure to monitor, as long as it is properly reported. The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the implementation of the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install Stormwater Best Management Practices (BMPs) in a tiered program. See below the descriptions of Tier One, Tier Two, and Tier Three response actions. In the event that DWQ releases the permittee from continued monthly monitoring under Tier Three, DWQ's release letter remains in effect through the subsequent reissuance of this permit, unless the release letter provides for other conditions or duration. Table 3 Benchmark Values for Analytical Monitoring Discharge Characteristics Benchmark Values pH 1 6 - 9 standard units Total Suspended Solids TSS j00 m_g/,LJ TSS ORW HWQ, Trout & PNA waters [50 mg/L Non -Polar Oil & Grease TPH by EPA Method 1664 SGT-HEM 15 mg/L Copper, Total Recoverable t0.007 mg/L Lead Total Recoverable �0.030 m_g/L Zinc, Total Recoverable �0.067-aig/L Total Toxic Organics (TT01 mg/L Footnotes: 1 if pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation instead of 6 S. U. Readings from an on -site or local rain gauge must be documented to demonstrate background concentrations were below the benchmark pH range. Part 11 Page 6 of 10 0 0 Permit No. NCG030000 Tier One I If: The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any I narameter at anv outfall; Then: The permittee shall: 1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results. 2. Identify and evaluate possible causes of the benchmark value exceedance. 3. Identify potential and select the specific: source controls, operational controls, or physical improvements to reduce concentrations of the parameters of concern, and/or to bring concentrations within the benchmark range. 4. Implement the selected actions within two months of the inspection. 5. Record each instance of a Tier One response in the SPPP. Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the date the selected actions were implemented. Tier Two If: During the term of this permit, the first valid sampling results from two consecutive monitoring periods are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific discharge outfall; Then: The permittee shall: 1. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for all parameters. Conduct monthly monitoring at every outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark values or within benchmark range. 3. Submit a monthly monitoring report indicating "No Flow" if no discharge occurs during the sampling period. 4. Benchmark exceedances for a different parameter separately trigger a tiered response. S. Maintain a record of the Tier Two response and monitoring results in the SPPP. Tier Three During the term of this permit, if the first valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any specific outfall on four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may but is not limited to: • require that the permittee revise, increase, or decrease monitoring frequency for sonic or all parameters; • rescind coverage under the General Permit, and require that the permittee apply for an individual stormwater discharge permit; • require the permittee to install structural stormwater controls; • require the permittee to implement other stormwater control measures; • require the permittee to perform upstream and downstream monitoring to characterize impacts on receiving waters; or • require the permittee implement site modifications to qualify for the No Exposure Exclusion, Part 11 Page 7 of 10 STORNNIWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL PERINIIT NO. NCG030000 SAMPLES COLLECTED DURING CALENDAR YEAR: 2010 CERTIFICATE OF COVERAGE NO. NCG03 0148 (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY TAME NEPTCO INCORPORATED COUNTY CALDWELL PERSON COLLECTING SAMPLES Chris Crane PHONE NO. (628 ) 772 -5951 CERTIFIED LABORATORY Enviro, Conservation Lab Lab # 591 Lab # PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected, mold r 00530 00400 01051 00556 78141 Total Suspended Solids, m pH, Standard units Lead, mg/L Oil and Grease, m Total Toxic Organics , Benchmark - 100— Within 6.0-9.0 0.033 30 1 4 05/03/10 t 140 .E 6.85 0.0043 3.42 0,0210 Note: If you report a sampled value in excess of the benchmark value. or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes X no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall Date No. Sample Collected, mo/dd/ r 00556 00530 00400 Oil and Grease, mgj Total Suspended Solids, mg1l., pH, Standard units New Motor Oil Usage, Annual averse gallmo Benchmark - 30 100 6.0 — 9.0 - ]`rote: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date 5/03/10 (first event sampled) Total Event Precipitation (inches): 0.11 Date (list each additional event sampled this reporting period, and rain€all. amount) Total Event Precipitation (inches): Mail Original and one copy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1 b 17 S WU-245-031308 Page I of 2 E � 0 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE NO. NCG03 0148 FACILITY NAME NEPTCO INCORPORATED PERSON COLLECTING SAMPLES Chris Crane CERTIFIED LABORATORY Enviro. Conservation Lab Lab # 591 Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2010 (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY CALDWELL .PHONE NO. (828) 728-5951 PLEASE SIGN ON THE REVERSE 4 Outfall No. Date Sample Collected, mo/dd/ r 00530 00400 01051 00556 78141 Total Suspended Solids, pH, Standard units Lead, mg/L Oil and Grease, m Total Toxic Organics , Benchmark - 100 Within 6.0 — 9.0 0.033 30 1 1 05/03/10 2.4 6.92 0.0030 3.34 0.0021 2 05/03/10 2.0 6.85 0.0020 3.53 0.0015 3 05/03/10 78 7.05 0.0125 3.33 1 0,0005 Note: If you report a sampled value in excess of the benchmark value. or outside the benchmark range for pH. you must implement Tier I or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes X_no (if yes, complete Part B) Part B. Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected, mo/ddtvr 00556 00530 00400 Oil and Grease, m Total Suspended Solids, m pH, Standard units New Motor Oil Usage, Annual averse al/mo Benchmark - 30 100 6-0 — 9.0 - Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date 5/03/10 (first event sampled) Total Event Precipitation (inches): 0.11 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Mail Original and one copy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 SWU-245-031308 Page I of 2 L:-� Printing: Layout Page 0 . Page 1 of 1 Caldwell County Ma in / r4 IL IL ni Zr- S .v IL IN : C * ✓ 'cam ••I « � • It / 41�00 ti h i inch 300 feet Owner Account Info NEPTCO LAMINATED TAPES INC NCPIN: 2758545462 ATTN: ACCOUNTING Account##: 35343 PAWTUCKET , RI 02861 Parcel -id: 0913917 Property Info Acreage: 3.07222057 Land Units: 433 (FF ) Legal: 1014/1733 I990 0.00 Total Value: 1954500 Property Address: 2012 HICKORY BV This map is prepared for the inventory of real property found within this jurisdiction, and is compiled from recorded deeds, plats, and other public records and data. Users of this map are hereby notified that the aforementioned public primary information sources should be consulted for verification of the information contained on this map. Caldwell County and its mapping and software contractors assume no legal responsibility for the information contained on this map or in this website. This map and information are NOT of land survey quality and are NOT suitable for such use. http://gis.caldwelleountync.org/maps/layout.aspx 2/12/2010 Printing: Layout Page Page 1 of 1 i inch = 400 feet Owner Account Info NEPTCO LAMINATED TAPES INC NCPIN: 2776808422 ATTN: ACCOUNTING Account#: 35343 PAWTUCKET , RI 02861 Parcel -id: 085026 Property Info Acreage: 19.4376I 661 Land Units: 19.79 (** ) Legal: 1014/1730 1990 0.00 Total Value: 3421000 Property Address: 3908 HICKORY BV This map is prepared for the inventory of real property found within this jurisdiction. and is compiled from recorded deeds, plats, and other public records and data - Users of this map are hereby notified that the aforementioned public primary information sources should be consulted for verification of the information contained on this map. Caldwell County and its mapping and software contractors assume no legal responsibility for the information contained on this map or in this website. This map and information are NOT of land survey quality and are NOT suitable for such use. http://gis.caldwelicountync.org/maps/layout.aspx 2/12/2010