Loading...
HomeMy WebLinkAbout20091347 Ver 1_More Info Received_20100122- V. o?o? warFROG 1 I > ti 1?.?1 0 < oq-13%+I Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PC Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes El No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ? No For the record only for Corps Permit: ? Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes XNo 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ? No 2. Project Information 2a. Name of project: 0 kr\ 2b. County: k 2c. Nearest municipality / town: 2d. Subdivision name: Q 2e. NCDOT only, T.I.P. or state project no: v 610 3. Owner Information WETLANDS AND STORMWATER&RANcH 3a. Name(s) on Recorded Deed: iGK 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: ` n 3e. City, state, zip: 3f. Telephone no.: - 3g. Fax no.: 3h. Email address: fd 9-, C 14tmr in Ye &v 041, 9 Irkell I i4my Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. AgentJConsultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: Longitude: - (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: Q g3acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: asc 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 'SQ S 11-00 o 6 3b. List the total estimated acreage of II existing w tlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose f the roposed project: 3e. Describ the overall project in 'I, including the type of equipment to be used: ?' deta IS M C! I M 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes ? No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes >?No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ? No 6b. If yes, explain. Ift) ?r) Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T ? Yes ? Corps W1 ? P ? T ? No ? DWQ ? Yes ? Corps W2 ? P ? T ? No ? DWQ ? Yes ? Corps W3 ? P ? T ? No ? DWQ ? Yes ? Corps W4 ? P ? T ? No ? DWQ ? Yes ? Corps W5 ? P ? T ? No ? DWQ ? Yes ? Corps W6 ? P ? T ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average t Impact length number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ - non-404, ream s width (linear Temporary (T) (INT)? other) (feet) feet) ? PER ? Corps S1 ? P ? T ? INT ? DWQ ? PER ? Corps S2 ? P ? T ? INT ? DWQ ? PER ? Corps S3 ? P ? T ? INT ? DWQ S4 ? P ? T ? PER ? INT ? Corps ? DWQ S5 ? P ? T ? PER ? INT ? Corps ? DWQ S6 ? P ? T [I PER ? INT ? Corps ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water impact number - Name of waterbody (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. X Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 XP?T IVO V2? ,13D ?4 ?Nos 2 ,J ?Yes B2 ?P?T ? No ?Yes B3 ?P?T ? No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe m asures taken to av id or animize the pro osed impacts in deigning project. ?O __Milli I? -. trl, Y Q h Q n W aS V`nC ' 1b. Specifically describe measures taken avoid or minimiz the pr posed impacts through construction techniques. q t S (?? s , r ei S O 1 fio irvr ,. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Se k V-) r4_1 Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ? No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact Multiplier 6e. Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ? Yes No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase 11 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): ? NSW El USMP ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): ? ORW ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the El Yes 0 use of public (federal/state) land? ,?/?? 1b. If you answered "yes" to the above, does the project require preparation of an ? Y ? No environmental document pursuant to the requirements of the National or State es (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes N0 or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes XNo 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ? Yes ? No 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ? Yes ? No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? W11/1-0m ? g1oi-To sS7 ??/y a9 Applicant/Agent's Printed Name tsif Applicant! X signature (Agent's signature is valid only uthorization letter from the applicant is provided.) Date Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version R. Q ? r > `y Michact F- Easley Governor William G. Ross, Jr., 5ecretar} Department or Environment and Natural Resources 4 C Coleen H Sullins, Director Division of Water Qualio December 7, 2007 Buffer Interpretation/Clarification #2007-002 MEMORANDUM-MODIF/CA TION RE: DWQ's stance on wooden-slatted decks that are attached to a dwelling and its associated wooden-slatted steps within the Neuse and Tar-Pamlico Protected Riparian Buffers Problem: It has been brought to DWQ's attention that wooden-slatted decks that are attached to a dwelling and its associated steps in either zone of the protected riparian buffers have only been addressed in the definitions under 15A NCAC 028.0202(13), where wooden-slatted decks are considered pervious. However, DWQ has concerns that not all wooden-slatted decks are high enough to allow for adequate sunlight and moisture to penetrate them to ensure that Zones one and two of the buffers are continuing to be maintained in vegetation as required in 15 NCAC 2B.0233(4) and 15NCAC 28.0259(4). Solution: Provided that the wooden-slatted deck is attached to a dwelling, minimal vegetation is removed from Zone two and no vegetation is removed from Zone one during the installation of the deck, if the deck is at least 8 feet (ft) in height to allow fc guat ?„sett moist tr_e fgtwmalntaming vegetation beneath it and that it rnee ulremen[s I s" e 1Tow for Zone one and Zone two of the buffers, then wooden-slatted decks (arid associated steps) would be allowable in Zones one and two of the protected riparian buffers. However, if the deck does not meet any of the requirements listed above, it would be considered prohibited in Zone one and Zone two of the protected riparian buffers. Please note: if the deck is built within one of the 20 Coastal Counties that meets the criteria for the General Coastal Major Variance, this memorandum does not apply. Signature i Date: e 1, 401 Wetlands Certification Und 1550 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17$6 f FAX 919.733.68931 Internet htt p:Uh2o,enr.statg ne,usincwetlands 1VarthCarol ima Natimally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper LOT s SECTION BLOCK ------- PHASE ------- SUBDIVISION PRYNWOOD AS RECORDED IN MAP BOOK 1998 VOL. ------- PAGE 638 LEGEND: OF THE WAKE COUNTY REGISTRY. O= EXISTING IRON PIPE • = NEW IRON PIPE I declare that this survey complies with t e North Carolina Standards of Practice for Surveying (section. 1600) for P = PORCH, S = STOOP, SH = SHED class A surveys and that the calculated atio of precision before adjustments is 10,000+. Furthermore, building *)(-= FENCE, R = RADIUS = CREEK (APPROX. LOCATION) corners shown are primary control mon mentation for the re-establishment of property corners in the absence of E. = OVERHEAD ELECTRIC LINE grid monuments and other subdivision roperty corners. This survey is not to be recorded without the written LP = LIGHT POLE, PP = POWER LINE authorization of the surveyor. CP = CARPORT, PK = MASONRY NAIL PL = PROPERTY LINE, MH = MANHOLE Professional Land Surveyor PM = PRELIMINARY MAP LBS = LOCATION BY SCALE Notes: 1.) North arrow is referenced to record document shown above unless denoted otherwise. CL = CHAINLINK, WD = WOOD 2.) House ties are radial to Property lines unless shown otherwise. C = CHIMNEY, ¦ = ELECT. TRANSFORMER 3.) Underground pipes are!not located with this survey. -= RECORDED BUILDING ENVELOPE L = ARC LENGTH, CH= CHORD LENGTH 4.) All areas are computed by coordinates. YI = YARD INLET 5.) This map remains the property of the surveyor and is to be used only for the conveyance D = DECK, FH = FIRE HYDRANT of this lot to the person(s) shown on this map. NIF = NOW OR FORMERLY DU = DESTINATION UNKNOWN ;OK. N/F NON. MEDFIELD ESTATES BM 1969-87 1 t N4 ? \ . q?URq 3 09, , F \ /STOP OF BANK OF CREEK s?_ \ O e?FFF? NEIGHBORS EI 23?NCE \ \\- \Mq??r 50'NEUSE RIVER BUFFER A, clt- \? \FgSF(jF S6 a PRIVATE MAINTENANCE EASEMENT AREA=0.439AC. \ ? ( 9) if t BRI W ? \ 1 21r ED N y 1 PROEK N• in, `gyp N O1 BRICK RET.WALL I 0e, L? >TJ :i.. J f a 25(ORY '? 2•: `?•' :::.:..//% ' • BRICK RET. WALL ?. \ y? WOOD io •:.: '•'•;?,:: •,'.• & PLANTER F p 1j Lb'? 1'? S?Vt ??l to -50 \10! ?a9Py??? x15 L=38.98' DRAINAGE R=50,00' cS;, PIPE CH=38,00' S26°10'08'W o 0 PRYNNWOOD COURT U 50' RAN SURVEY FOR RICHARD L. SCHERTZ LEAH W. DAIL WAKE COUNTY, NORTH CAROLINA 0" 0.5° 1.5" BAR SCALE DATE: 13 OCTOBER 2000 TOWNSHIP CARY SCALE: 1- 50' (N CARP AL PRINCE & ASSOCIATES, I O?ESS/0? - ENGINEERS SURVEYORS PLANNERS LOT 8 PRYNNWOOD CT. Q y < - - SEAL L-1356 P.O. BOX 44 FINCASTLE DR. N a ? 975 WALNUT ST., SUITE 233 o sUR? le ?G F CARY, NORTH CAROLINA, 27511 h'T E. P PH. 467-3545 FAX 467-8607 VICINITY MAP N.T.S. 117 prynnwood ct, cary nc - Google Maps Page 1 of 1 Address 117 Prynnwood Ct Get Google Maps on your phone ??rJ Cary, NC 27607 Text the word "GMAPS" to 466453 eartfistone ` a7W N ? Arr. aron Rd K x Electra Cr co Q 1 v m M e? i 44 F " 0, M i i Pdutlens I'is Cvalp ch- ?t 54 14? Vera r<d iY ? 54 G En E $?te Rr,l.tirahryr,), ? rts?n, Raj z Q t i I._? a t? Y Pat Cr tip i, 4k. uti I 4)r Murk ;? i j Ki vFzJ ryq Lawrence Rc nliy , it rq 7.. t :'Or.w7' r t L p0 r9ruinsc?GY crve r r ' it.j ?? r a El y d tr. a a ."?- re x: ra. a .?' ? ?'nobl f2d Medfield Estates 818rrdYwlne Ra King Glenn Sietchek ?1<ev,. e Subdmsaon Ubdivosaart mrtr ?-? Vditrv,,,)odAve (?rdrv, :vu ytk?Mt, iJr "t &1i `,t C N s tt c 0 V n ? Ci U I Chapfq, H'W r'?d 54 +?s?'erns,iih Sf ?U v1k' a Had 3 0 G ; w .. -Google - Map data ©2009 Gc http://maps.google.com/maps?f=q&source=s_q&hl=en&geocode=&q=117+prynnwood+... 12/10/2009 Page 1 of 1 1141 Ar"4111 w WAKE WV6? S O W '' Add i"IE CITY OF A L I O 3 s"°` 117 Prynnwood Ct Cary http://imaps.co.wake.nc.us/imaps/printmap.asp?pin=0774069511 &pinext=000&minX=20 12/10/2009 Copyright 2008. City of Raleigh, Wake County. 0 138 ft TerraServer Image Courtesy of the USGS Page 1 of 1 Send To Printer Back To TerraServer Change to 11x17 Print Size Show Grid Lines Change to Landscape Image courtesy of the U.S. Geological Survey © 2004 Microsoft Corporation. Terms of Use Privacy Statement http://terraserver-usa.com/Printlmage.aspx?T=2&S=11 &Z=17&X=1756&Y=9910&W=3... 12/10/2009 0' 1200M 0' I200yd s Mom,•r s �5 wr.., ?`j s I s!11i 1 MEN i' ?... CI it- I ? I IE . ( 2 r ts` m Web-Based Email:: Print Print Close Window Subject: Construction pennit 50' easement From: "Rick Schertz" <RickScheriz@nc.rr.com> Date: Mon, Dec 21, 200910:00 pm To: <info@cdbnc.com> Willie, Page 1 of 1 Thank you for your call regarding the construction permit. I understand that a portion of the planned deck (the back right corner) extends into the 50' watershed easement based on the survey and that this grassy area under the deck in the easement is to remain vegetation. Rick Schertz 117 Prynnwood Ct Raleigh NC, 27607 Copyright © 2003-2009. All rights reserved. https:HemaiIO5. secureserver.net/view_prinLmulti.php?uidArray=4811INBOX&aEmIPart=O 12/22/2009