HomeMy WebLinkAbout20190749 Ver 2_NWP 3 verification re_ SAW-2019-01013_20200610Wanucha, Dave
From: Alsmeyer, Eric C CIV USARMY CESAW (USA) < Eric.C.Alsmeyer@usace.army.mil >
Sent: Wednesday, June 10, 2020 10:47 AM
To: Euliss, Amy
Cc: Wanucha, Dave
Subject: [External] NWP 3 verification re: SAW-2019-01013 (NCDOT_17BP.9.C.12_Washout
replacement -SR 1128_Brown Rd -Danbury Creek -Br 290_Stokes_Div9).
Attachments: 2017NWP03.pdf; 20-06-10_NWP3_Brown Rd pipe repl_Br 290_17BP.9.C.12 Stokes.pdf
.....................................................................................................................................�.�..'�.............�.......................................................................................................................�......................................................................................................................................................................................................................................................................................................
Amy: Attached to this message is your requested Section 404 permit authorization for the following project:
DA# SAW-2019-01013 (NCDOT_17BP.9.C.12_Washout replacement -SR 1128_Brown Rd -Danbury Creek_Br
290_Stokes_Div9).
Also attached are the corresponding regional and general conditions, and a copy of the permit compliance
certification. The Wilmington District is committed to providing the highest level of support to the public. To help us
ensure we continue to do so, please complete the Customer Satisfaction Survey located at
.bit ://corpsmap-LA .-LA sace.army.miI cm a2exCf?p-136A-.0.
Please note that the general and special conditions must be strictly adhered to in order for this permit authorization to
remain valid and that the compliance certification must be returned to this office when the work is completed.
This electronic copy is your official Department of the Army authorization; no paper copy will be mailed.
Please reply or call if you have any questions or if I may serve you in any other way.
Eric
Eric Alsmeyer
Project Manager
Regulatory Division Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily)
Regulatory Homepage: htt www.saw.usace.arm .mil Missions Re ulator PermitPro rarn:as x