HomeMy WebLinkAbout20200560 Ver 1_PCN Response Memo_20200529\ V40 00 \\ /� TO: Stephanie Goss, NCDWR Lyle Phillips, ACOE // 0 FROM: Dan Clinton, P.E. — itCy of Raleigh Raleigh DATE: May 29, 2020 MEMO SUBJECT: Lassiter Mill Culvert Cleaning Clarification Memo Breakdown of Stream and Buffer impacts on Lassiter Mill Culvert Sediment Removal Project Point of Clarification • Buffer zone areas were based upon current conditions for the approved permanent and temporary access easements (see attached easement map) • The sediment removal will stop at the downstream face of the culvert. See attached photo. Attachments: • Exhibit 1 — Revised Work Map • Revised work map shows Sediment Excavation Area, Access Area, and Buffer Zones. • Exhibit 2 — Easement Map • Attachment 1 — Additional photo Impacts: Buffer —Temporary impacts (recalculated from previous application) Zone 1 — 919 Sq Ft (calculated going to the water's edge) Zone 2 — 312 Sq Ft (included area in the right of way not previously included) Stream impacts 114 Linear Feet (75 LF within the culvert — Permanent 39 LF temporary) Clarification: Sediment will be removed (leaving a depth of remaining sediment of one foot) from 2 of the 4 culvert boxes. These boxes are 75 linear feet each. Additionally, a sediment bar which has formed in front of the two boxes and is now blocking flow to those boxes. This bar which is beginning to become rooted in with vegetation will be sloped from one foot above the waters base flow elevation at the waters edge at a slope of 12:1. The revised work map shows the location of excavation. All excavated material will be hauled off site to an approved spoil location. All soil is accumulated stream bar type sediment. Best Regards, Municipal Building 222 West Hargett Street Raleigh, North Carolina 27601 Dan Clinton, P.E. One Exchange Plaza Stormwater Department 1 Exchange Plaza, Suite 1020 Raleigh, North Carolina 27601 City of Raleigh Post Office Box 590 • Raleigh North Carolina 27602-0590 (Mailing Address)