HomeMy WebLinkAboutWQ0033433_Regional Office Historical File 2010ENGINEERING
PLANNING
ARCHITECTURE
1430B Old Lenoir Road, NW
Hickory, NC 28601
828.322.5533
October 1, 2010
:Zar�ytarts,. ,�
i
Mr. Roger C. Edward, Surface Water Protection Supervisor
N.C. Department of Environment and Natural Resources
Asheville Regional Office
2090 U.S. Highway 70
Swannanoa, NC 28778
R Fairway Acres Sanitary Sewer Extension
Permit No. WQ0033433 — Engineer's Certification
Town of Cajah's Mountain, Caldwell Coun/vJ
TWC Project No. 2808-Q 7��
Dear Mr. Edwards:
Attached please find the Final Engineer's Certification for the Sanitary Sewer to serve
the Fairway Acres Area project. Also included is a copy of the project record drawings.
Full-time construction observation was provided by qualified staff working under my
direct supervision. Also, periodic observation of the construction was performed by me
as well.
Please note that due to an issue with securing an easement, an alignment change was
made prior to receiving bids. This resulted in a reduction of the amount of sewer line
installed from the permitted amount of 14,500 feet to approximately 12,600 feet. No
services were deleted thus the permitted flow has not changed.
We appreciate your assistance with this project. If additional information is required
please,let me know.
Sincerely,
THE WOOTEN COMPANY
C Lc�__
Clarence M. L ka , PE, PLS
Enclosure
Pc: Mrs. Connie T. South, Town Manager
fax 828.322.5242
ENGINEERING CERTIFICATION — POST CONSTRUCTI
System Description:
14,500 linear feet of 8-inch diameter gravity sewer
Complete and submit this form to the Asheville regional office with the
• One copy of the project record drawings (plan & profile views of sE
system extension
supporting design calculations (selected pumps, system curve, operating point, available storage if portable
generator(s) or storage greater than longest past three year outage reliability option. selected) for any pump
stations permitted as part of this project
Changes to the project should be clearly identified on the record drawings or -in written summary form. Permit
modifications are required for any chances resulting in non-compliance with this permit, regulations or
minimum design criteria.
This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all
required supporting documentation have been received by the Division. Therefore, it is highly recommended
that this certification be sent in a manner that provides proof of receipt by the Division.
ENGINEER'S CERTIFICAKFin'al
TIOON
❑ Partial
I, ClAre4xe In • Goerlwnw , as a duly registered Professional Engineer in the State of North Carolina, having
been authorized to observe (❑ periodically, ❑ weekly, full time) the construction of the above referenced
project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance
of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design
Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting
materials.
North Carolina Professional Engineer's
seal, signature, and date:
SEND THIS FORM & SUPPORTING DOCUMENTATION
WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS
ROGER C. EDWARDS
SURFACE WATER PROTECTION SUPERVISOR
ASHEVILLE REGIONAL OFFICE
2090 US HIGHWAY 70
SWANNANOA, NC 28778
The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow
made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be
considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions.