HomeMy WebLinkAboutNCS000504_17_S&EC Inspect Report_20171205FRP CONTACTL: J. Wayne Messangill
CONTRACTOR CONTACT:
PROJECT NAME:
Patriot Bluffs Subdivision
PERMIT ISSUE DATE:
12/5/2017
INSPECTION DATE:
Monday, April 9, 2018
INSPECTION
Not in Compliance with Wake County UDO
STATUS:
VIOLATIONS 1 NONCOMPLIANCE:
Check all that apply
A. Failure to have an approved plan (WC LIDO, 10-40-1)
X B. Failure to protect against off -site sedimentation (WC UDO, 10-40-3 & 1040-4)
X C. Failure to provide adequate groundcover (WC LIDO, 10-20-5 (A)(2) & 10-20-5(B)(5)
X D. Failure to maintain erosion control measures (WC UDO, 10-23-1, 10-23-2, 10-23-3, 10-23-4)
X E. Failure to follow approved plan (WC LIDO, 10-40-2)
_ F. Failure to renew permit (WC UDO, 10-30-9)
X G. Potential NPDES Violation
H. Failure to self inspect (G.S. 113A-54.1(a) & NCAC 413.0131)
OBSERVATIONS/CORRECTIVE ACTIONS:
FRP CONTACT EMAIL: JMWBIdrs(a)amail.com
CONTRACTOR EMAIL:
PERMIT NUMBER: S5827
PERMIT EXPIRATION DATE: 12/5/2019
WEATHER, SITE CONDITIONS, ETC. 60s Sunny
PREVIOUS INSPECTION STATUS: In Compliance with Wake County UDO
HAS SEDIMENT DAMAGE OCCURRED? YES
If YES, Check all that apply:
Lake/Stream/Buffer Onsite
Lake/Stream/Buffer Offsite
Other Property
Degree of Sediment damage? Slight
1. Slight off -site sediment was observed from the silt fence outlet near by the Sediment Basin 2. Remove off -site sedimentation. remove accumulated
sediment from the outlet. Repair and maintain the silt fence outlet. Install rip -rap outlet protection for the outlet pipe as shown in the approved plan (Sheet
C-23 and C-24). Stabilize the exterior slope of the Sediment Basin 2. Emergency spillway was not installed as per the approved plan. Re -install the
emergency spillway as mentioned in the approved plan (C-23).
2. Slight off -site sedimentation was observed from the silt fence outlet (near the Johnson Pond). Remove off -site sedimentation and repair and maintain the
silt fence outlet. Remove accumulated sediment from the outlet. Silt fences near this outlet was not installed properly. Re -install the silt fences at this
portion. Also, stabilize the area uphill of this outlet. This area is very critical. The area needs to be stabilized immediately to prevent further sediment lose.
Deadline to stabilize thsi area - April 16, 2018.
3. Most of the temporary ditches to the Sediment Basin 2 are either removed or backfilled. Re-establish all temporary ditches and stabilize them as mentioned
in the approved plan. Some erosion was noticed near by the Sediment Basin 1 and run-off and sediment were not directed to the Basin 1. It was because
temporary ditches to Sediment Basin 1 were not installed. Install all ditches to the Basin 1 as shown in the approved plan.
4. Skimmer from the Sediment Basin 4 was removed. Re -install skimmer to the basin. Maintain Skimmer basin 3 and 4. Also, repair and maintain silt fence
outlets for the basin 3 and 4.
5. Construction entrance was filled with mud. Provide some fresh stone to the construction entrance.
6. Rain -gauge was not provided on site. Please have a rain -gauge on site and record data on NPDES records.
7. Stabilize all bare and inactive areas as per NPDES requirement.
COMMENTS:
Reminder: Per 15A NCAC 04B .0131 SELF -INSPECTIONS, Section (2); Any documentation of inspections that occur on a copy of the approved erosion
and sedimentation control plan shall occur on a single co of the plan and that plan shall be made available on the site. An inspection reports shall also
P 9 PY P P Y P P
.............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
be made available on the site.
CORRECTIVE ACTION Thursday, April 19, 2018
DEADLINE:
ENVIRONMENTAL Jeevan Neupane
CONSULTANT: 919-819-8907
jeevan.neupane@wakegov.com
FRP CONTACT: J. Wayne Messangill FRP CONTACT EMAIL: JMWBIdrS(aiomail.Com
CONTRACTOR CONTACT:
CONTRACTOR EMAIL:
PROJECT NAME:
Patriot Bluffs Subdivision
PERMIT NUMBER:
S5827
PERMIT ISSUE DATE:
12/5/2017
PERMIT EXPIRATION DATE:
12/5/2019
INSPECTION
DETAILS
WEATHER, SITE
INSPECTION DATE:
4/9/2018
CONDITIONS, ETC.
60S Sunny
INSPECTION
PREVIOUS INSPECTION
STATUS:
Not in Compliance with Wake County UDO
STATUS:
In Compliance with Wake County LIDO
Photo 1- Provide fresh stone on the construction entrance.
Photo 2-Remove off -site sedimentation from the Sediment Basin 2 outlet.
Photo 3:Re-Install rip -rap for the outlet protection for the outlet pipe from the Photo 4: Off -site sedimentation from the outlet protection near Sediment
Sediment Basin 2. Stabilize slope. Basin 2. Remove off -site sedimentation.
Photo 5: Install emergency spillway for Basin 2. Stabilize slopes.
Photo 6: Remove off -site sedimentation from the silt fence outlet near the
Johnson Pond.
FRP CONTACT:
J. Wayne Messangill
FRP CONTACT EMAIL:
JMWBIdrS(aiomail.Com
CONTRACTOR CONTACT:
CONTRACTOR EMAIL:
PROJECT NAME:
Patriot Bluffs Subdivision
PERMIT NUMBER:
S5827
PERMIT ISSUE DATE:
12/5/2017
PERMIT EXPIRATION DATE:
12/5/2019
INSPECTION
DETAILS
WEATHER, SITE
INSPECTION DATE:
4/9/2018
CONDITIONS, ETC.
60s Sunny
INSPECTION
PREVIOUS INSPECTION
STATUS:
Not in Compliance with Wake County UDO
STATUS:
In Compliance with Wake County UDO
Photo 7- Remove accumulated sediment along the silt fence outlet ( Near
Johnson Pond). Repair and maintain the outlet.
Photo 9:Re-Install silt fences (Near Johnson Pond)
Photo 11: Re-establish all temporary ditches to the Sediment Basin 2.
Photo 8-Stabilize slope ( Near Johnson Pond) immediately.
Photo 10: Remove off -site sedimentation. (Near Johnson Pond)
Photo 12: Re-establish all temporary ditches to the Sediment Basin 2.
FRP CONTACT: J. Wayne Messangill FRP CONTACT EMAIL: JMWBIdrS(aiomail.Com
CONTRACTOR CONTACT:
CONTRACTOR EMAIL:
PROJECT NAME:
Patriot Bluffs Subdivision
PERMIT NUMBER:
S5827
PERMIT ISSUE DATE:
12/5/2017
PERMIT EXPIRATION DATE:
12/5/2019
INSPECTION
DETAILS
WEATHER, SITE
INSPECTION DATE:
4/9/2018
CONDITIONS, ETC.
60s Sunny
INSPECTION
PREVIOUS INSPECTION
STATUS:
Not in Compliance with Wake County UDO
STATUS:
In Compliance with Wake County UDO
Photo 13: Re -install skimmer to the Sediment Basin 4.
Photo 15: Install temporary ditch to the Sediment Basin 1 as shown in the
approved plan.
Photo 14- Repair and maintain silt fence outlet near Sediment Basin 3.