Loading...
HomeMy WebLinkAboutSW6200601_Supplement-EZ Form_20200605SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name 2 Project Area (ac) 3 Coastal Wetland Area (ac) 4 ' Surface Water Area (ac) 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? `COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 8 Will the vegetated setback remain vegetated? 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? 10 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter .._.26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: 28 Organization: 29 Street address: 30 City, State, Zip: 31 Phone number(s): 32 Email: Roadmaster Truck School 7.85 0 0 High No 0 Yes Yes Yes 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Zak Shipman, PE -President Shipman Engineering, PLLC 137 Middlegreen Place Holly Springs, NC 27540 (919) 900-0006 zak@shipmanengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. •,SS/0 • ;L,y SEAS-- r 035027 - f/ �� ra�Q Z\�\ ��111111��, Seat Signature of Desig Z 2� b Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 Is ail/part of this project subject to previous rule 3 versions? ._ __. ,_- .__ _ No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site. '! W 4 Type of SCM _; Wet Pond 5 Total BUA in project (sq ft) 182890 sf 85948 sf � New BUA on subdivided lots (subject to 6 permitting) (sq ft) New BUA outside of subdivided lots (subject to _ 7 permitting) (sf) 85948 sf, Offsite - total area (sq ft) 9 Offsite BUA (sq ft) 10 Breakdown of new BUA outside subdivided lots: t - Parking (sq ft) 29897 sf 18298 sf i - Sidewalk (sq ft) 1503 sf 617 sf - Roof (sq ft) 10611 sf 10611 sf T - Roadway (sq ft) 9385 sf 7966 sf - Future (sq ft) r - Other, please specify in the comment box below (sq ft) 49237 sf 48456 sf New infiltrating permeable pavement on 11 X subdivided lots (sq ft) New infiltrating permeable pavement outside of 12 !,subdivided lots (sq ft) Exisiing BUA that will remain (not subject to 13 permitting) (sq ft) 14 i Existing BUA that is already permitted (sq ft) 82257 sf 157 Existing BUA that will be removed (sq ft) 39631 sf 28887 sf 16 Percent BUA 53% 75% 17 Design storm (inches) 1 in 18 Design volume of SCM (cu ft) 6915 cf 19Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): Other BUA is the concrete test pad shown. DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM -. N/A 5 Total BUA fr©m project (sq ft) . wit 6 i 1995 rules ; SL 2006-246. 2008 rules 2017 rules 182890 sf 85948 sf ` New BUA on subdivided lots (subject to 7 -permitting) (sq ft) 1995 rules SL 2006-246 + 2008 rules — 2017 rules - f New BUA outside of subdivided lots (subject 8 to permitting) (sf) i 1995 rules SL 2006-246 2008 rules z 2017 rules i 85948 sf 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 --- 2008 rules j rules ; h2017 10 , Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches) 1995 rules SL 2006-246 2008 rules 2017 rules_ . �v�..�-.r._a� 1 in 12 Breakdown of new BUA: ^ - Parking (sq ft) 29897 sf 18298 sf - Sidewalk (sq ft 1503 sf 617 sf - Roof (sq ft) 10611 sf 10611 sf - Roadway (sq ft) 9385 sf 7966 sf - Future (sq ft) - Other, please specify in the comment box y^below (sq ft) 49237 sf 48456 sf New infiltrating permeable pavement on 13 subdivided lots (sq ft) I New infiltrating permeable pavement outside of 14 I subdivided lots (sq ft) f Exisitng BUA that will remain (not subject to 1 15 permitting) (sq ft) 82257 sf 1.6 Existing BUA that is already permitted (sq_ ft� 17 Existing BUA that will be removed (sq ft) 39631 sf 28887 sf 18 _ Percent BUA _ate 53% _ 75% 19 Design volume of SCM (cu ft) 6915 cf 20 �_ Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional F 21 ! information about the drainage area(s): Nw4flU =ek 1 Drainage area number E 1 2 Design volume of SCM (cu ft) 6915 cf GENERAL MDC FROM 02H .1050 3 ' Is the SCM sized to treat the SW from all surfaces at build -out? yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 Does the SCM have retaining walls, gabion walls or other engineered �6 side slopes? No Are the inlets, outlets, and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes 9 What is the method for dewaterin the SCM for maintenance? g Pump referred P (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes If the SCM is on a single family lot, does (will?) the plat comply with 13 General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 18 Method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Elevation of the excavated main pool depth (bottom of sediment 20 removal) (fmsl) 191.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 192.00 22 Elevation of the bottom of the vegetated shelf (fmsi) 195.50 23 Elevation of the permanent pool (fmsl) 196.00 _ 4 24 Elevation of the top of the vegetated shelf (fmsl) 196.50 25 Elevation of the temporary pool (fmsl) 196.73 26 Surface area of the main permanent pool (square feet) 8135:1 T 27 Volume of the main permanent pool (cubic feet) 8515 cf 28 Average depth of the main pool (feet) 3.36 ft 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 3948 cf y 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 12 in 35 Design volume of SCM (cu ft) 6915 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 2 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) I 40 Drawdown time for the temporary pool (days) 2.64 _ Are the inlet(s) and outlet located in a manner that avoids short- 41 circuiting? Yes 42`Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 60 in 44 Depth of forebay at exit (inches) 6 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 Does the orifice drawdown from below the top surface of the 48 permanent pool? Yes Does the pond minimize impacts to the receiving channel from the 1- 49 yr, 24-hr storm? Yes Are fountains proposed? (If Y, please provide documentation that 50 MDC(9) is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52Are the dam and embankment planted in non -clumping turf grass? Yes _ 53 Species of turf that will be used on the dam and embankment Bermuda _...n_...._54 Has a planting plan been provided for the vegetated shelf? No ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 wet pond(s): Wet Pond 1 12:00 PM 5/21/2020