HomeMy WebLinkAbout20100752_Site Inspection_20070201of WAR
r
February 1, 2007
Mr. Mike Pettyjohn, P.E.
Division Engineer
N.C. Department of Transportation
Post Office Box 250
North Wilkesboro, North Carolina 28659
Subject: Inspection
US Highway 321
DWQ Project No. 041246
TIP No. R-2237B
Caldwell County
Dear Mr. Pettyjohn:
On January 31, 2007, I visually inspected the construction work on US Highway 321 in Caldwell County and
the project appeared to be in good shape. It appears that the construction work is progressing mainly at both
ends and at a small section near the middle of the project. The erosion and sedimentation control structures,
vegetative covering, mulching and matting appear to be working properly. Please continue to ensure that all
sediment and erosion control structures are maintained and that seeding and mulching are performed as
needed to protect downstream waters. A copy of the inspection report is attached to this letter.
If you have questions, please call me at 828.296.4500.
Sincerely,
i0/.?lam /' 4 ? ??
Michael R. Parker
Environmental Specialist
Attachment
cc: Frank Gioscio, P.E.
Heath Slaughter, Division 11, DEO
Neil Trivette, Roadside Environmental
Transportation Permitting Unit
Niki Maher, NPS Assistance and Compliance Oversight Unit
Mike Parker, Asheville Regional Office
One
NthCarolina
,/VlIfllPll??lf
North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service
Internet: www.ncwaterquality.org FAX (828) 299-7043 1-877-623-6748
Michael F. Easley, Governor
William G. Ross .1r., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
An Equal Opportunity/Affirmative Action Employer