Loading...
HomeMy WebLinkAbout20150467 Ver 1_Certification of Completion attachments_20200603 (2)Action ID Number: SAW-2014-01705 Permittee: NCDOT -Division 3 County: Pender Project Name: NCDOT / SR 1764 / Copperhead Lane / Division 3 Date Verification Issued: 05/18/2015 Project Manager: grad Shaver Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: - FIELD -OFFICE - Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. W� Date:2020.06.03 17:04:07-04'00' Signature of Permittee 6/3/2020 Date