Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070824_Historical File_20071022
CartermBurgess 5811 Glenwood Avenue, Suite 300 Raleigh, North Carolina 27612 Phone: 919.783,5988 Fax: 919.783.5882 www.c-b.com CVS/pharmacy — Carolina Shores Store STORMWATER MANAGEMENT REPORT AND CALCULATIONS Prepared by: Carter & Burgess, Inc. 5811 Glenwood Avenue Suite 300 Raleigh, NC 27612 (919) 783-5988 (919) 783-5882 fax www.c-b.com August 20, 200 7 Carter & Burgess, Inc. Carter & Burgess Consultants, Inc. C&B Architects/Engineers, Inc. C&B Architects/Engineers, P.C. C&B Nevada, Inc. Carter - gurges. Glr-lwood Avg -Vox: 915'.783.5832 •vVrv.c•h.CC r: CVS/pharmacy — Carolina Shores Store STORM`Vii'ATER MANAGEMENT REPORT AND CALCULATIONS Prepared by: Carter & Burgess, Inc. 5811 Glenwood Avenue Suite 300 Raleigh, NC 27612 (919) 783-5988 (919) 783-5882 fax www.c-b.com August 20, 2007 ULCN[ a ti F ' J Wp1`�'�� (0 o+ee00000noOl�O/ RECEIVED AUG 2 0 7007 BY: LO—(90765 la.r ar c:. Eur„., Inc, trcrr- • & i•uc��,:-- Col.=ulirri° , ;nc. 1.�cEi:a!'ClRT6hts/a1_.orl�'?rf•. li'i _. 'F'J'C..16 �t_'L•r i.Y1[�1r.="' T.l... 1�.- TABLE OF CONTENTS: SECTION 1: Project Narrative SECTION 2: Design Summary Tabulations SECTION 3: Existing & Proposed Drainage Area Maps SECTION 4: Wetland Sizing Spreadsheet • First Flush Volume Calculations (Simple Mcthod) • Approximate Minimum Dimensions SECTION 5: Pond Routing Calculations • System Schematic • Calculation Table of Contents • Master Network Summary • Watershed Executive Summaries • Design Storms (1,10, & 25-year, Type III, 24 hour) • Time of Concentration (Tc) Calculations • Curve Number (CN) Calculations • Runoff Hydrograph Summaries • Pond Volume (Elevation — Area) Table • Outlet Structure Data (Input Data, Individual Outlet Curves, Composite Rating Curves) SECTION 6: Drawdown Time Calculations (2-5 day) SECTION 7: Rainfall Intensity Charts SECTION 8: Soils/Topo Information (USDA Data, USGS Quadrangle, and CN Table) SECTION 9: Geotechnical Report SECTION 10: Anti -floatation Calculations SECTION 11: Level Spreading Curb Weir Calculations SECTION 12: Wetlands Determination SECTION 13: Riprap Outlet Calculations SECTION 14: Ditch Sizing/Lining Calculations CVS Pharmacy — Town of Carolina Shores Site STORMWATER MANAGEMENT REPORT El' s• CALCULATIONS w6- % 01W Existing Site Description: Existing project site is located at the northwest col r of the intersection of US Highway 17 and Calabash Road in the Town of Carolina Shores. The existing 17.15 acres +/- tract consists of primarily a grassy farm field which has been left unmanaged for some time now. The existing topography includes a small knoll located immediately west of the proposed improvements. According to information provided to us, no wetlands have been located on the project site. However, there are some cattails located directly in front of some stormwater culverts within the NCDOT right-of-way and the Owner has pursued a wetlands determination. Preliminary findings by the wetlands consultant indicate that the NCDOT ditches adjacent to the site are not likely to be considered as wetlands but the USACE has been contacted and has performed a site visit (report of findings not yet released). Stormwater runoff from the project area eventually chains to Persimmon Swamp. Proposed Project: The proposed project consists of the construction of a 13,225 sf CVS Pharmacy on the existing tract of land as described above. The development proposed with this application includes approximately 1.64 acres of impervious area on the 17.15 acre tract. This translates into a percent impervious less than 10%. The soil material according to the geotechnical report: the surface material consists of 6" to 12" of topsoil. This is underlain by the subsurface material which consists mainly of; fine sandy silty clays, silts and silty sands. The foundation for the building will likely be on constructed piles. Approx. two to three feet of material will be required as embankment material for the building pad. The construction sequence will generally be; 1) Install the erosion control measures per the approved plan. 2) Conduct the site grading and pile installation 3) construct the building 4) construct the drives and walks 5) finalize stabilizing the site with any permanent measures as required. 6) complete wetland grading and planting. Stormwater Management Approach: At less than10% impervious, this project is proposed as a low density commercial development with a pocket of high density. Stormwater from the project area will flow via surface conveyance (sheet flow and gutter flow) to a stormwater wetland on the west side of the site. This swale conveys the runoff to the Calabash Road right-of-way. Stormwater management approach will also be subject to the Town of Carolina Shores stormwater policies. The proposed stormwater wetland is designed to meet all of the State's and Town's stormwater management requirements for this site. To follow is a brief summary of the stormwater requirements for this site: NCDENR: ® 85% Average Annual Total Suspended Solids (TSS) removal (',:� o Peak flow attenuation for the 1-year, 24 hr rainfall event 9, b ZpQI Town. of Carolina Shores: ® Peak flow attenuation for the 10 and 25-year, 24 hr rainfall events Included with this report are detailed design calculations to demonstrate compliance with NCDENR-DWQ and Town of Carolina Shores requirements for the design of this wetland and site. DESIGN SUMMARY TABULATION Project: CVS/pharmacy - Carolina Shores Store Date: 16-Aug-07 Revision: I. Hydrology Summary Drainage Area Curve Number Time of Concentration Peak Flows 1-Year 10-Year 25-Year (Acres) (CN) (Hours) (CFS) (CFS) (CFS) Pre -developed 3.00 61 0.3059 1.23 6.29 7.93 Post -developed" 3.00 81 0.1000 0.66 4.67 1 6.34 " Post -developed information shown is based upon the combination of detained and undetained areas. 11. Wetland Design Summary Drainage Area = 2.55 Acres % Impervious to BMP = 64,71% First Flush 1" Volume = 5853 Cubic Feet Minimum Surface Area @ 1' Deep = 5853 Square Feet ' 3 Surface Area Provided = 11,522 Square Feet - Due to Town 25-year peak flow attenuation requirement FFV Draw Down Time = 95 hours Depth Regime Table: Min. Required Area (SF) Provided Area (SF) % for Provided Area Shallow Land 1756 4460 38.70% Shallow Water 2341 5035 43.70% Deep Pool 585 2027 17.60% elbo � �3 �r 5�ef_,� J rlr 01 WI N 59,160, .1" ELEV. A2 EXISTING DRAINAGE AREA 3.00 ACRES A-` it /7 j-.4. 1 4, U 'A r % ! / / J SiJ 1 r # A; sjl If . L I k' rq f Ill All f 7y 0- Nl�-\` `� \ A \`\J r' r ' �!, 7 / , f '`/ / I /r' r r/ rrr'rfr" If EX. 30" RCP / f �.r ;� : ; % /,' in C) cq IF Vill', 40 i V 4, f if. h j ' N X V x if CD 2r. 2 IF Carter -:Burgess C'"It"t. 11 1111"h9* 1191-6",, A,Iil-t,,, C—t.-U- M ... g--t. ..d Rd.tW 5—ft.. CARTER & BURGESS, INC. 5811 GLENWOOD AVENUE, SUITE 300 TEL (919) 783-59BB FAX (919) 783-5822 E—MAIL: THOMAS.WAIN*RiGHToo-B.com I COPYRIGHT 02007 CARTER AND BURGESS I I L S—. SEAL pd. It.. U G q 0 no pharmacy LOCATED AT THE NORTHWEST CORNER OF US HIGHWAY 17 & CALABASH ROAD. DEVELOPER REDD REALTY SERVICES 1254 OLD HILLSBORO ROAD FRANKLIN, TN 37069 PHONE: (515) 591-5526 ,1-41JT COORD: PLANNING MGR: Jc TW DRAWING BY: JL/AP DATE: 05 JULY 2007 JOB NUMBER: 291164; TITLE. EXISTING DA MAP SHEET NUMBER: Exhibit 'A SHEET 5 OF COMMENTS: CONSTRUCTION DOCUMENTS N 453, W, DETAINED AREA 11 'If '/ ';`i -' 2.55 ACRES % I Al �j Ey UNDETAINED AREA C. 0.45 ACRES a% C4 ONCD Carter:: Burgess C..It,nL, Tn FlonnIng, EgInmoring. A,,hR,,tu,% cnnalrva(Icn 14-9—t. ..d Rd.t" 5.rW... CARTER & BURGESS, INC. 5811 GLENWOOD AVENUE. SUITE 300 TEL (919) 783-590B FAX (919) 783-5822 E-MAIL: THOMAS.WAiNWRiGHTOC-B.COM COPYRGiT 02007 CARTER AND BURGESS SEAL: lK.' C, JT= m AUG 2 0 2007 CVS/ phummy LOCATED AT THE NORTHWEST CORNER OF US HIGHWAY 17 & CALABASH ROAD. MaOPED REDD REALTY SERVICES 1254 OLD HILLSBORO ROAD E KU 14 r. TN 37069 2 ME. (615) 691-6525 LA i TCOORD: JG PLANNING MGR: Tw DRAWING BY. JL/AP DATE: 05 JULY 2007 JOB NUMBER: 2911649 TIME: PROPOSED DA MAP SHEET NUMBER: Exhibit SHEET 5 OF 'B COMMENTS: CONSTRUCTION DOCUMENTS -1 US/Pharmacy - Wetland Sizing Carolina Shores, NC b/20(2007 The following design is based on requirements set forth in Chapters 3 & 91 of NCDENR's July 2, 2007 version of "NCDENR Stormwater BMP Manual". I. Constructed Wetland 1) Calculate percent impervious draining to pond. Drainage Area = 2.55 acres�t{r r Impervious Area = 1.65 acres % Imperv. = 64.71 % 2) Determine Maximum Allowable Ponding Depth (Water Quality`Depth) it. 3) Find the volume of the 1" storm using the 'Simple Method" (Schueler 1987): The volume of the 1" storm must be detained in the pond above the permanent pool and must be drawn down over a period of two to five days. Rv = 0.05 + 0.009 (1) Rv = runoff coefficient (ratio of runoff to rainfall in inches) I = percent impervious Rv = 0.05 + 0.009 ( 64.71 ) = 0.6324 inrn Volume of 1 " storm (must exceed 3630 cf): Qv(,i,,,,,e Rv x design rainfall x drainage area 0.6324 x 1" x 1/12 fuln x 2.55 0.134 acre feet = 5853.38 cubic feet 4) Calculate required surface area based upon Qv°lume Min. SA = Qvdume / Dplams = 5) Calculate approximate dimensions: SA = 5853.4 square feet for a 1.5:1 length to width ratio: 5853.4 square feet 1.5W L therefore, W = 62.47 ft. and L = 93.70 ft. A 3 I n &�,�?r,7 AU G e J 0 ZN7 Pre -Developed Wetland Q Po§t-Dev Undet fao A, x 0 (D __L C) Pre-dev OUT Post-dev OUT Post-Dev to Pon( Table of Contents i Table of Contents ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary 1.01 *************** NETWORK SUMMARIES (DETAILED) Watershed....... 1 Executive Summary (Nodes) .......... 2.01 Watershed....... 10 Executive Summary (Nodes) .......... 2.02 Watershed....... 25 Executive Summary (Nodes) .......... 2.03 Watershed....... 50 Executive Summary (Nodes) .......... 2.04 Watershed....... 100 Executive Summary (Nodes) .......... 2.05 ****************** DESIGN STORMS SUMMARY ******************* Carolina Shores Design Storms 3.01 ********************** TC CALCULATIONS ********************* POST-DEV TO POND Tc Calcs 4.01 POST-DEV UNDET.. Tc Calcs 4.03 PRE -DEVELOPED... Tc Calcs 4.05 S/N: Bentley PondPack (10.00.027.00) 1:58 PIT Bentley Systems, Inc. 8/15/200V Table of Contents ii Table of Contents (continued) ********************** CN CALCULATIONS ********************* POST-DEV TO POND Runoff CN-Area ..................... 5.01 POST-DEV UNDET.. Runoff CN-Area ..................... 5.02 PRE-DEVELOPED....Runoff CN-Area ..................... 5.03 RUNOFF HYDROGRAPHS ******************** POST-DEV TO POND 1 Unit Hyd. Summary .................. 6.01 POST-DEV TO POND 10 Unit Hyd. Summary .................. 6.02 POST-DEV TO POND 25 Unit Hyd. Summary 6.03 POST-DEV TO POND 50 Unit Hyd. Summary 6.04 POST-DEV TO POND 100 Unit Hyd. Summary 6.05 POST-DEV UNDET.. 1 Unit Hyd. Summary .................. 6.06 POST-DEV UNDET.. 10 Unit Hyd. Summary .................. 6.07 POST-DEV UNDET.. 25 Unit Hyd. Summary .................. 6.08 POST-DEV UNDET.. 50 Unit Hyd. Summary ............... 6.09 POST-DEV UNDET.. 100 Unit Hyd. Summary .................. 6.10 PRE -DEVELOPED... 1 Unit Hyd. Summary .................. 6.11 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Table of Contents iii 0 Table of Contents (continued) PRE -DEVELOPED... 10 Unit Hyd. Summary .................. 6.1.2 PRE -DEVELOPED... 25 Unit Hyd. Summary .................. 6.13 PRE -DEVELOPED... 50 Unit Hyd. Summary .................. 6.14 PRE -DEVELOPED... 100 Unit Hyd. Summary .................. 6.15 *********************** POND VOLUMES *********************** WETLAND......... Vol: Elev-Area 7.01 ******************** OUTLET STRUCTURES ********************* Riser 2......... Outlet Input Data .................. 8.01 Individual Outlet Curves ........... 8.05 Composite Rating Curve ............. 8.25 SIN: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Carolina Shores �OQ'7 0 Total Depth Rainfall $Y: Return Event ------------ in ------ Type ---------------- RNF ID 1 3.7000 Synthetic Curve ---------------- TypeIII 24hr 10 7.0000 Synthetic Curve TypeIII 24hr 25 7.9000 Synthetic Curve TypeIII 24hr 50 8.6000 Synthetic Curve TypeIII 24hr 100 10.0000 Synthetic Curve TypeIII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type -- Event ------ cu.ft ---------- Trun -- hrs cfs ft cu.ft *POST-DEV OUT JCT 1 14208 --------- 12.8200 -------- .66 -------------------- *POST-DEV OUT JCT 10 44529 R 12.3800 4.67 -rd-V L. *POST-DEV OUT JCT 25 53210 R 12.3200 6.34 POST P4ZVELO-PED *POST-DEV OUT JCT 50 60053 R 12.2900 8.12 SiTZ F LoWS *POST-DEV OUT JCT 100 74246 R 12.2200 12.50 POST-DEV TO POND AREA 1 19520 12.1100 5.49 POST-DEV TO POND AREA 10 47577 12.1000 12.88 POST-DEV TO POND AREA 25 55531 12.1000 14.91 POST-DEV TO POND AREA 50 61764 12.1000 16.48 POST-DEV TO POND AREA 100 74320 12.1000 19.60 POST-DEV UNDET AREA 1 1162 12.1200 .28 POST-DEV UNDET AREA 10 4575 12.1200 1.29 POST-DEV UNDET AREA 25 5683 12.1100 1.60 POST-DEV UNDET AREA 50 6578 12.1100 1.86 POST-DEV UNDET AREA 100 8438 12.1100 2.38 SIN- Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Q Type.... Master Network Summary Page 1.02 Name.... Watershed File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method a 2 (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) �- Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event - cu.ft ---------- Trun -- hrs cfs ft cu.ft *PRE-DEV OUT JCT 1 7242 --------- 12.2800 -------- 1.23 -------- ------------ *PRE-DEV OUT JCT 10 29423 12.2300 6.29 ?PC- perVF-Lope-0 *PRE-DEV OUT JCT 25 36682 12.2300 7.93 S%TE FLOV.SS *PRE-DEV OUT JCT 50 42559 12.2300 9.25 *PRE-DEV OUT JCT 100 54799 12.2300 11.99 PRE -DEVELOPED AREA 1 7242 12.2800 1.23 PRE -DEVELOPED AREA 10 29423 12.2300 6.29 PRE -DEVELOPED AREA 25 36682 12.2300 7.93 PRE -DEVELOPED AREA 50 42559 12.2300 9.25 PRE -DEVELOPED AREA 100 54799 12.2300 11.99 WETLAND IN POND 1 19520 12.1100 5.49 WETLAND IN POND 10 47577 12.1000 12.88 WETLAND IN POND 25 55531 12.1000 14.91 WETLAND IN POND 50 61764 12.1000 16.48 WETLAND IN POND 100 74320 12.1000 19.60 WETLAND OUT POND 1 13048 12.9800 .61 43.72 10563 WETLAND OUT POND 10 39957 R 12.4200 4.17 44.60 22826 WETLAND OUT POND 25 47530 R 12.3600 5.61 44.75 25115 WETLAND OUT POND 50 53478 R 12.3200 7.20 44.84 26696 WETLAND OUT POND 100 65811 R 12.2300 11.03 45.00 29275 S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 I Type.... Executive Summary (Nodes) Page 2.01 Name.... Watershed Event: 1 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 1 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = Carolina Shores Storm Tag Name = 1 Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.7000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type ---- cu.ft ---------- Trun. hrs cfs ft Outfall POST-DEV OUT JCT 14208 ----------- 12.8200 ----------------- .66 POST-DEV TO POND AREA 19520 12.1100 5.49 POST-DEV UNDET AREA 1162 12.1200 .28 Outfall PRE-DEV OUT JCT 7242 12.2800 1.23 PRE -DEVELOPED AREA 7242 12.2800 1.23 WETLAND IN POND 19520 12.1100 5.49 WETLAND OUT POND 13048 12.9800 .61 43.72 WG 2 0 Jpzl SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 c Type.... Executive Summary (Nodes) Page 2.02 Name.... Watershed Event: 10 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 10 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = Carolina Shores Storm Tag Name = 10 ------------------------------------------------------- Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type ---- cu.ft ---------- Trun. hrs cfs ft Outfall POST-DEV OUT JCT 44529 ----------- R 12.3800 ----------------- 4.67 POST-DEV TO POND AREA 47577 12.1000 12.88 POST-DEV UNDET AREA 4575 12.1200 1.29 Outfall PRE-DEV OUT JCT 29423 12.2300 6.29 PRE -DEVELOPED AREA 29423 12.2300 6.29 WETLAND IN POND 47577 12.1000 12.88 WETLAND OUT POND 39957 R 12.4200 4.17 44.60 S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Executive Summary (Nodes) Page 2.03 Name.... Watershed Event: 25 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 25 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = Carolina Shores Storm Tag Name = 25 Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type ---- cu.ft ---------- Trun. hrs cfs ft Outfall POST-DEV OUT JCT 53210 ----------- R 12.3200 ----------------- 6.34 POST-DEV TO POND AREA 55531 12.1006 14.91 POST-DEV UNDET AREA 5683 12.1100 1.60 Outfall PRE-DEV OUT JCT 36682 12.2300 7.93 PRE -DEVELOPED AREA 36682 12.2300 7.93 WETLAND IN POND 55531 12.1000 14.91 WETLAND OUT POND 47530 R 12.3600 5.61 44.75 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Executive Summary (Nodes) Page 2.04 Name.... Watershed Event: 50 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 50 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) �-+l�/ DEFAULT Design Storm File, ID = Carolina Shores Storm Tag Name ---------------- ----_-----50---- Data Type, File, ID ----- ----------- = Synthetic Storm ----- TypeIII --------------- 24hr p,Y; Storm Frequency = 50 yr Total Rainfall Depth= 8.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type -------------- cu.ft Trun. hrs cfs ft Outfall POST-DEV OUT JCT -- 60053 R --------- 12.2900 -------- 8.12 --------- POST-DEV TO POND AREA 61764 12.1000 16.48 POST-DEV UNDET AREA 6578 12.1100 1.86 Outfall PRE-DEV OUT JCT 42559 12.2300 9.25 PRE -DEVELOPED AREA 42559 12.2.300 9.25 WETLAND IN POND 61764 12.1000 16.48 WETLAND OUT POND 53478 R 12.3200 7.20 44.84 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 n Type.... Executive Summary (Nodes) Page 2.05 Name.... Watershed Event: 100 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 100 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = Carolina Shores Storm Tag Name = 100 tt ry ----------------------------------------------------------------- -- Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type ---- cu.ft ---------- Trun. hrs cfs ft Outfall POST-DEV OUT JCT 74246 ----------- R 12.2200 ----------------- 12.50 POST-DEV TO POND AREA 74320 12.1000 19.60 POST-DEV UNDET AREA 8438 12.1100 2.38 Outfall PRE-DEV OUT JCT 54799 12.2300 11.99 PRE -DEVELOPED AREA 54799 12.2300 11.99 WETLAND IN POND 74320 12.1000 19.60 WETLAND OUT POND 65811 R 12.2300 11.03 45.00 S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Design Storms Name.... Carolina Shores Page 3.01 I File.... T:\JO13\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Title... Project Date: 8/20/2007 Project Engineer: Jamie E. Gollings, PE Project Title: CVS - Carolina Shores Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Storm Tag Name = 1 ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.7000 in ¢ PEii FSa-ve'Sw�GK �c�L1•+'C`9 �j'�tira�ysa'Cr 1�.. Duration Multiplier = 1 D�16�+1 MANUAL Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Carolina Shores Storm Tag Name = 10 Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 25 Data Type, File, Ill = Synthetic Storm TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 50 Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 8.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= ..1000 hrs End= 24.0000 hrs Storm Tag Name = 100 Data Type, File, ID = Synthetic Storm TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Tc Calcs Name.... POST-DEV TO POND Page 4.01 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: TR-55 Sheet Mannings n .0130 Hydraulic Length 30.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .85 ft/sec Segment #1 Time: .0098 hrs Segment #2: Tc: TR-55 Shallow Hydraulic Length 325.00 ft Slope .005000 ft/ft Paved Avg.Velocity 1.44 ft/sec Segment #2 Time: .0628 hrs ------------------------------------------------------------------------ Total Tc: .0726 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .1000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Tc Calcs Name.... POST-DEV TO POND Page 4.02 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ___= SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, % SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Tc Calcs Name.... POST-DEV UNDET Page 4.03 File.... T:\JOB\0902911649 CVS-CAL\CD`s\Stormwater\CVS-CarShores-Wetland.ppw TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time: .1000 hrs ------------------------------------------------------------------------ S/N: Bentley PondPack (10.00.027.00) Total Tc: .1000 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .1000 hrs 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Tc Calcs Name.... POST-DEV UNDET Page 4.04 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw ------------------------------------------------------------------------ Tc Equations used... --------------------------------------------------------------------------- ==== User Defined Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Tc Calcs Name.... PRE -DEVELOPED Page 4.05 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland,ppw TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: TR-55 Sheet Mannings n .1300 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .20 ft/sec Segment #1 Time: .2821 hrs Segment #2: Tc: TR-55 Shallow Hydraulic Length 107.00 ft Slope _010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0184 hrs Segment #3: Tc: TR-55 Shallow Hydraulic Length 300.00 ft Slope .950000 ft/ft Unpaved Avg.Velocity 15.73 ft/sec Segment #3 Time: .0053 hrs ------------------------------------------------------------------------ S/N: Bentley PondPack (10.00.027.00) Total Tc: .3059 hrs 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Tc Calcs Name.... PRE -DEVELOPED Page 4.06 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw ------------------------------------------------------------------------ Tc Equations used... --------------•----------------------------------------------------------- SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, % SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (.Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Runoff CN-Area Name.... POST-DEV TO POND Page 5.01 File.... T:\JOB\0902911649 CVS-CAL\CD,s\Stormwater\CVS-CarShores-Wetland.ppw RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- ------ Landscape - HSG B - Good 58 .900 58.00 Impervious 98 1.650 98.00 COMPOSITE AREA & WEIGHTED CN ---> 2.550 83.88 (84) SIN: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Runoff CN-Area Name.... POST-DEV UNDET Page 5.02 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RUNOFF CURVE NUMBER DATA Soil/Surface Description -------------------------------- Landscape - HSG B Impervious Impervious Area Adjustment Adjusted CN acres %C %UC CN ------------- ----- -- 58 .400 58.00 98 .050 98.00 COMPOSITE AREA & WEIGHTED CN ---> .450 62.44 (62) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Runoff CN-Area Name.... PRE -DEVELOPED Page 5.03 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- ------ Grassland HSG B - good 61 3.000 61.00 COMPOSITE AREA & WEIGHTED CN ---> 3.000 61.00 (61) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.01 Name.... POST-DEV TO POND Tag: 1 Event: 1 yr File.... T.\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 1 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 1 year storm Duration = 24.0000 hrs Rain Depth = 3.7000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV TO POND 1 Tc (Min. Tc) _ .1000 hrs Drainage Area = 2.550 acres Runoff CN= 84 Computational Time Increment = .01333 hrs Computed Peak Time = 12.1067 hrs Computed Peak Flow = 5.49 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1102 hrs Peak Flow, Interpolated Output = 5.49 cfs DRAINAGE AREA ID:POST-DEV TO POND CN = 84 Area = 2.550 acres S = 1.9048 in 0.25 = .3810 in Cumulative Runoff ------------------- 2.1088 in 19520 cu.ft HYG..Volume... 19520 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS *'-*** Time Concentration, Tc = .10000 hrs (ID: POST-DEV TO POND) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 28.89 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.02 Name.... POST-DEV TO POND Tag: 10 Event: 10 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 10 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV TO POND 10 Tc (Min. Tc) = .1000 hrs Drainage Area = 2.550 acres Runoff CN= 84 Computational Time Increment = .01333 hrs Computed Peak Time = 12.1067 hrs Computed Peak Flow = 12.91 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1002 hrs Peak Flow, Interpolated Output = 12.88 cfs DRAINAGE AREA ID:POST-DEV TO POND CN = 84 Area = 2.550 acres S = 1.9048 in 0.2S = .3810 in Cumulative Runoff ------------------- 5.1399 in 4757E cu.ft HYG Volume... 47577 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV TO POND) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% cinder rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 28.89 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.03 Name.... POST-DEV TO POND Tag: 25 Event: 25 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 25 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 7.9000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV TO POND 25 Tc (Min. Tc) _ .1000 hrs Drainage Area = 2.550 acres Runoff CN= 84 Computational Time Increment = 01333 his Computed Peak Time = 12.1067 hrs Computed Peak Flow = 14.93 cfs Time Increment for HYG File = .0100 his Peak Time, Interpolated Output = 12.1002 hrs Peak Flow, Interpolated Output = 14.91 cfs DRAINAGE AREA ID:POST-DEV TO POND CN = 84 Area = 2.550 acres S = 1.9048 in 0.2S = .3810 in Cumulative Runoff ------------------ 5.9993 in 55532 cu.ft HYG Volume... 55531 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV TO POND) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 28.89 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.04 Name.... POST-DEV TO POND Tag: 50 Event: 50 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 50 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 50 year storm Duration = 24.0000 hrs Rain Depth = 8.6000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV TO POND 50 Tc (Min. Tc) _ .1000 hrs Drainage Area = 2.550 acres Runoff CN= 84 Computational Time Time Increment = .01333 hrs Computed Peak Time = 12.1067 hrs Computed Peak Flow = 16.50 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1002 hrs Peak Flow, Interpolated Output = 16.48 cfs DRAINAGE AREA ID:POST-DEV TO POND CN = 84 Area = 2.550 acres S = 1.9048 in 0.2S = .3810 in Cumulative Runoff ------------------- 6.6727 in 61765 cu.ft HYG Volume... 61764 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV TO POND) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 28.89 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.05 Name.... POST-DEV TO POND Tag: 100 Event: 100 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 100 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV TO POND 100 Tc (Min. Tc) _ .1000 hrs Drainage Area = 2.550 acres Runoff CN= 84 Computational -Time Increment = 01333 hrs Computed Peak Time = 12.1067 hrs Computed Peak Flow = 19.63 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1002 hrs Peak Flow, Interpolated Output = 19.60 cfs DRAINAGE AREA ID:POST-DEV TO POND CN = 84 Area = 2.550 acres S = 1.9048 in 0.25 = .3810 in Cumulative Runoff ------------------- 8.0291 in 74322 cu.ft HYG Volume... 74320 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV TO POND) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 28.89 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.06 Name.... POST-DEV UNDET Tag: 1 Event: 1 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 1 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 1 year storm Duration = 24.0000 hrs Rain Depth = 3.7000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV UNDET 1 Tc (Min. Tc) _ .1000 hrs Drainage Area = .450 acres Runoff CN= 62 Computational ------------------------ Time Increment = .01333 hrs Computed Peak Time = 12.1333 hrs Computed Peak Flow = .28 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1302 hrs Peak Flow, Interpolated Output = .28 cfs DRAINAGE AREA ID:POST-DEV UNDET CN = 62 Area = .450 acres S = 6.1290 in 0.25 = 1.2258 in Cumulative Runoff ------------------- .7116 in 1162 cu.ft HYG Volume— 1162 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV UNDET) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 5.10 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.07 Name.... POST-DEV UNDET Tag: 10 Event: 10 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 10 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV UNDET 10 Tc (Min. Tc) _ .1000 hrs Drainage Area = .450 acres Runoff CN= 62 Computational -------------------- Time Increment = .01333 hrs Computed Peak Time = 12.1200 hrs Computed Peak Flow = 1.29 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1202 hrs Peak Flow, Interpolated Output = 1.29 cfs DRAINAGE AREA ID:POST-DEV UNDET CN = 62 Area = .450 acres S = 6.1290 in 0.25 = 1.2258 in Cumulative Runoff ------------------- 2.8010 in 4575 cu.ft HYG Volume... 4575 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMFTERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV UNDET) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 5.10 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.08 Name.... POST-DEV UNDET Tag: 25 Event: 25 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 25 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 7.9000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV UNDET 25 Tc (Min. Tc) _ .1000 hrs Drainage Area = .450 acres Runoff CN= 62 Computational ---------------------- Time Increment = _01333 hrs Computed Peak Time = 12.1200 hrs Computed Peak Flow = 1.61 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1202 hrs Peak Flow, Interpolated Output = 1.61 cfs DRAINAGE AREA ID:POST-DEV UNDET CN = 62 Area = .450 acres S = 6.1290 in 0.25 = 1.2258 in Cumulative Runoff ------------------- 3.4792 in 5683 cu.ft HYG Volume... 5683 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV UNDET) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46o under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 5.10 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.09 Name.... POST-DEV UNDET Tag: 50 Event: 50 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 50 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 50 year storm Duration = 24.0000 hrs Rain Depth = 8.6000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV UNDET 50 Tc (Min. Tc) _ .1000 hrs Drainage Area = .450 acres Runoff CN= 62 Computational Time Increment = .01333 hrs Computed Peak Time = 12.1200 hrs Computed Peak Flow = 1.86 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1202 hrs Peak Flow, Interpolated Output = 1.86 cfs DRAINAGE AREA ID:POST-DEV UNDET CN = 62 Area = .450 acres S = 6.1290 in 0.25 = 1.2258 in Cumulative Runoff ------------------- 4.0271 in 6578 cu.ft HYG Volume... 6578 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV UNDET) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 5.10 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.10 Name.... POST-DEV UNDET Tag: 100 Event: 100 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 100 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = T:\JOB\0902911649 CVS-CAI,\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - POST-DEV UNDET 100 Tc (Min. Tc) _ .1000 hrs Drainage Area = .450 acres Runoff CN= 62 Computational Time Time Increment = .01333 hrs Computed Peak Time = 12.1067 hrs Computed Peak Flow = 2.39 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.1102 hrs Peak Flow, Interpolated Output = 2.38 cfs DRAINAGE AREA ID:POST-DEV UNDET CN = 62 Area = .450 acres S = 6.1290 in 0.25 = 1.2258 in Cumulative Runoff ------------------- 5.1658 in 8438 cu.ft HYG Volume— 8438 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .10000 hrs (ID: POST-DEV UNDET) Computational Incr, Tm = .01333 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6696 (solved from K = .7491) Unit peak, qp = 5.10 cfs Unit peak time Tp = .06667 hrs Unit receding limb, Tr = .26667 hrs Total unit time, Tb = .33333 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.11 Name.... PRE -DEVELOPED Tag: 1 Event: 1 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 1 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 1 year storm Duration = 24.0000 hrs Rain Depth = 3.7000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - PRE -DEVELOPED 1 Tc = .3059 hrs Drainage Area = 3.000 acres Runoff CN= 61 ------------------- Computational Time Increment = .04078 hrs Computed Peak Time = 12.2754 hrs Computed Peak Flow = 1.23 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.2802 hrs Peak Flow, Interpolated Output = 1.23 cfs DRAINAGE AREA ID:PRE-DEVELOPED CN = 61 Area = 3.000 acres S = 6.3934 in 0.25 = 1.2787 in Cumulative Runoff ------------------- .6651 in 7243 cu.ft HYG Volume... 7242 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .30586 hrs (ID: PRE -DEVELOPED) Computational Incr, Tm = .04078 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 11.11 cfs Unit peak time Tp = .20391 hrs Unit receding limb, Tr = .81564 hrs Total unit time, Tb = 1.01955 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.12 Name.... PRE -DEVELOPED Tag: 10 Event: 10 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 10 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - PRE -DEVELOPED 10 Tc = .3059 hrs Drainage Area = 3.000 acres Runoff CN= 61 Computational Time Increment = 04078 hrs Computed Peak Time = 12.2346 hrs Computed Peak Flow = 6.30 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.2302 hrs Peak Flow, Interpolated Output = 6.29 cfs DRAINAGE AREA ID:PRE-DEVELOPED CN = 61 Area = 3.000 acres S = 6.3934 in 0.2S = 1.2787 in Cumulative Runoff ------------------- 2.7019 in 29424 cu.ft HYG Volume... 29423 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .30586 hrs (ID: PRE -DEVELOPED) Computational Incr, Tm = .04078 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 11.11 cfs Unit peak time Tp = .20391 hrs Unit receding limb, Tr = .81564 hrs Total unit time, Tb = 1.01955 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.13 Name.... PRE -DEVELOPED Tag: 25 Event: 25 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 25 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 7.9000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - PRE -DEVELOPED 25 Tc = .3059 hrs Drainage Area = 3.000 acres Runoff CN= 61 ------------------ Computational Time Increment = .04078 hrs Computed Peak Time = 12.2346 hrs Computed Peak Flow = 7.95 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.2302 hrs Peak Flow, Interpolated Output = 7.93 cfs DRAINAGE AREA ID:PRE-DEVELOPED CN = 61 Area = 3.000 acres S = 6.3934 in 0.2S = 1.2787 in Cumulative Runoff ------------------- 3.3686 in 36684 cu.ft HYG Volume... 36682 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .30586 hrs (ID: PRE -DEVELOPED) Computational Incr, Tm = .04078 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 11.11 cfs Unit peak time Tp = .20391 hrs Unit receding limb, Tr = .81564 hrs Total unit time, Tb = 1.01955 hrs S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Unit Hyd. Summary Page 6.14 Name.... PRE -DEVELOPED Tag: 50 Event: 50 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 50 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 50 year storm Duration = 24.0000 hrs Rain Depth = 8.6000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - PRE -DEVELOPED 50 Tc = .3059 hrs Drainage Area = 3.000 acres Runoff CN= 61 Computational Time Time Increment = .04078 hrs Computed Peak Time = 12.2346 hrs Computed Peak Flow = 9.27 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.2302 hrs Peak Flow, Interpolated Output = 9.25 cfs DRAINAGE AREA ID:PRE-DEVELOPED CN = 61 Area = 3.000 acres S = 6.3934 in 0.2S = 1.2787 in Cumulative Runoff ------------------- 3.9083 in 42562 cu.ft HYG..Volume... 42559 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .30586 hrs (ID: PRE -DEVELOPED) Computational Incr, Tm = .04078 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 11.11 cfs Unit peak time Tp = .20391 hrs Unit receding limb, Tr = .81564 hrs Total unit time, Tb = 1.01955 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Unit Hyd. Summary Page 6.15 Name.... PRE -DEVELOPED Tag: 100 Event: 100 yr File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Storm... TypeIII 24hr Tag: 100 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ Rain File -ID = - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\ HYG File - ID = - PRE -DEVELOPED 100 Tc = .3059 hrs Drainage Area = 3.000 acres Runoff CN= 61 Computational ---------------------- Time Increment = .04078 hrs Computed Peak Time = 12.2346 hrs Computed Peak Flow = 12.00 cfs Time Increment for HYG File = .0100 hrs Peak Time, Interpolated Output = 12.2302 hrs Peak Flow, Interpolated Output = 11.99 cfs DRAINAGE AREA ID:PRE-DEVELOPED CN = 61 Area = 3.000 acres S = 6.3934 in 0.2S = 1.2787 in Cumulative Runoff ------------------- 5.0323 in 54801 cu.ft HYG Volume... 54799 cu.ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .30586 hrs (ID: PRE -DEVELOPED) Computational Incr, Tm = .04078 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 11.11 cfs Unit peak time Tp = .20391 hrs Unit receding limb, Tr = .81564 hrs Total unit time, Tb = 1.01955 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Vol: Elev-Area Name.... WETLAND Page 7.01 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume (ft) ------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) 42.80 ----- 10564 0 0 43.00 ----- 10962 32287 2152 43.35 ----- 11522 33723 3934 44.00 ----- 13345 37267 8075 45.00 ----- 17016 45430 15143 45.70 ----- 19600 54878 12805 POND VOLUME EQUATIONS Volume Sum (cu.ft) 0 2152 6087 > FFV ; F e R5T SECor'D�D►'L�`r 14161 OIL% F I 29305 42110 Ffv ° 5, SS3 Cr- * Incremental volume computed by the Conic Method for Reservoir Volumes_ Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Outlet Input Data Name.... Riser 2 Page 8.01 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw I REQUESTED POND WS ELEVATIONS: Min. Elev.= 42.80 ft Increment = .05 ft Max. Elev.= 45.70 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure ----------------- No. ---- Outfall E1, ft E2, ft Orifice-Circular 01 ---> ------- CO ------------------ 43.350 45.700 ° �S Stand Pipe RO ---> CO 44.300 45.700 4t" Q►SE1` Orifice -Circular 00 ---> CO 42.800 45.700 iC 'b Culvert -Circular CO ---> TW 42.800 45.700 !c IL%Sco-%pVi.,keL Weir-XY Points WO ---> TW 44.700 45.700 4—� ��-��NC.��.,iCIP S�+►l.Gw�� TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Outlet Input Data Name.... Riser 2 Page 8.02 r File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw OUTLET STRUCTURE INPUT DATA Structure ID = 01 Structure Type = Orifice -Circular ------------------------------------ # of Openings = 3 Invert Elev. = 43.35 ft Diameter = .3333 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type ------------------------------------ = Stand Pipe # of Openings = 1 Invert Elev. = 44.30 ft Diameter = 2.0000 ft Orifice Area = 3.1416 sq.ft Orifice Coeff. _ .620 Weir Length = 6.28 ft Weir Coeff. = 3.300 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = 00 Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 42.80 ft Diameter = .1200 ft Orifice Coeff. _ .600 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Outlet Input Data Name.... Riser 2 Page 8.03 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type ------------------------------------ = Culvert -Circular No. Barrels = 1 Barrel Diameter = 1.2500 ft Upstream Invert = 42.80 ft Dnstream Invert = 42.65 ft Horiz. Length = 30.00 ft Barrel Length = 30.00 ft Barrel Slope = .00500 ft/ft OUTLET CONTROL DATA... Mannings n = .0220 Ke = .5000 Kb m .066516 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.158 T2 ratio (HW/D) = 1.304 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 44.25 ft ---> Flow = 4.80 cfs At T2 Elev = 44.43 ft ---> Flow = 5.49 cfs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Outlet Input Data Name.... Riser 2 Page 8.04 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw OUTLET STRUCTURE INPUT DATA Structure ID = WO Structure Type = Weir-XY Points ------------------------------------ # of Openings = 1 WEIR X-Y GROUND POINTS X, ft --------- Elev, ft .00 --------- 45.70 3.00 44.70 13.00 44.70 16.00 45.70 Lowest Elev. = 44.70 ft Weir Coeff. = 3.000000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 c£s SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.05 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = 01 (Orifice -Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) NUMBER OF OPENINGS = 3 EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ------- ft -------- ft ------- +/-ft +/-cfs ft +/-ft 42.80 .00 ... ... ------ ... ------ ------- Free ------- Outfall WS below an invert; no flow. 42.85 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 42.90 .00 ... ... ... Free Outfall WS below an invert; no flow. 42.95 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.00 .00 ... ... Free Outfall WS below an invert; no flow. 43.05 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.10 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.15 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.20 .00 ... Free Outfall WS below an invert; no flow. 43.25 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 43.30 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 43.35 .00 .. ... ... ... Free Outfall WS below an invert; no flow. 43.40 .01 43.40 Free 42.94 .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .013ft Dcr= .036ft CRIT.DEPTH Hev= 43.45 .06 43.45 Free 42.98 .000 .000 Free Outfall .00ft CRIT.DEPTH CONTROL Vh= .027ft Dcr= .073ft CRIT.DEPTH Hev= 43.50 .12 43.50 Free 43.04 .000 .000 Free Outfall .00ft CRIT.DEPTH CONTROL Vh= .040ft Dcr= .109ft CRIT.DEPTH Hev= 43.55 .20 43.55 Free 43.10 .000 .000 Free Outfall .00ft CRIT.DEPTH CONTROL Vh= .054ft Dcr= .146ft CRIT.DEPTH Hev= .00ft 43.60 .31 43.60 Free 43.15 .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .071ft Dcr= .178ft CRIT.DEPTH Bev= .00ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.06 File.... T:\JOB\0902911649 CVS-CAL\CD'S\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = 01 (Orifice -Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) NUMBER OF OPENINGS = 3 EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan, TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ------- ft -------- ft ------- +/-ft +/-cfs ft +/-ft 43.65 .42 43.65 Free 43.21 ------ .000 ------ .000 ------- Free ------- Outfall CRIT.DEPTH CONTROL Vh= .090ft Dcr= .210ft CRIT.DEPTH Hev= 43.70 .54 43.70 Free 43.26 .000 .000 Free .00ft Outfall H =.18 43.75 .61 43.75 Free 43.29 .000 .000 Free Outfall H =.23 43.80 .67 43.80 Free 43.31 .000 .000 Free Outfall H =.28 43.85 .73 43.85 Free 43.34 .000 .000 Free Outfall H =.33 43.90 .78 43.90 43.36 43.36 .000 .000 Free Outfall H =.38 43.95 .83 43.95 43.37 43.37 .000 .000 Free Outfall H =.43 44.00 .88 44.00 43.39 43.39 .000 .000 Free Outfall H =.48 44.05 .92 44.05 43.41 43.41 .000 .000 Free Outfall H =.53 44.10 .96 44.10 43.42 43.42 .000 .000 Free Outfall H =.58 44.15 1.00 44.15 43.43 43.43 .000 .000 Free Outfall H =.63 44.20 1.04 44.20 43.45 43.45 .000 .000 Free Outfall H =.68 44.25 1.08 44.25 43.46 43.46 .000 .000 Free Outfall H =.73 44.30 1.12 44.30 43.47 43.47 .000 .000 Free Outfall H =.78 44.35 1.13 44.35 43.55 43.55 .000 .000 Free Outfall H =.80 44.40 1.09 44.40 43.65 43.65 .000 .000 Free Outfall H =.75 44.45 1.03 44.45 43.78 43.78 .000 .000 Free Outfall H =.67 S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.07 u File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = Ol -------------------------------------- (Orifice -Circular) Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) NUMBER OF OPENINGS = 3 EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ----------------------- ft +/-ft +/-cfs ft +/-ft ------- 44.50 .95 44.50 43.93 ------ -------------------- 43.93 .001 .000 Free Outfall H =.57 44.55 .86 , 44.55 44.09 44.09 .000 .000 Free Outfall H =.46 44.60 .72 44.60 44.28 44.28 .001 .000 Free Outfall H =.32 44.65 .46 44.65 44.52 44.52 .000 .000 Free Outfall H =.13 44.70 * 44.70 44.70 44.70 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.75 * 44.75 44.75 44.75 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.80 * 44.80 44.80 44.80 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.85 * 44.85 44.85 44.85 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.90 * 44.90 44.90 44.90 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.95 * 44.95 44.95 44.95 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.00 * 45.00 45.00 45.00 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.05 * 45.05 45.05 45.05 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.10 * 45.10 45.10 45.10 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.15 * 45.15 45.15 45.15 .000 . .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.20 * 45.20 45.20 45.20 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.25 * 45.25 45.25 45.25 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.30 * 45.30 45.30 45.30 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.08 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = O1 -------------------------------------- (Orifice -Circular) Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) NUMBER OF OPENINGS = 3 EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft --------------- ft +/-ft +/-cfs ft +/-ft ------- 45.35 * 45.35 45.35 ------ -------------------- 45.35 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.40 * 45.40 45.40 45.40 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.45 * 45.45 45.45 45.45 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.50 * 45.50 45.50 45.50 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.55 * 45.55 45.55 45.55 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.60 * 45.60 45.60 45.60 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.65 * 45.65 45.65 45.65 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.70 * 45.70 45.70 45.70 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.09 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = RO (Stand Pipe) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft ------- cfs -------- ft ------- -------- ft ------- ft +/-ft +/-cfs ft +/-ft 42.80 .00 ... ... ... ------ ------ ... ... ------- Free ------- Outfall WS below an invert; no flow. 42.B5 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 42.90 .00 ... ... Free Outfall WS below an invert; no flow. 42.95 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.00 .00 ... Free Outfall WS below an invert; no flow. 43.05 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.10 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 43.15 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 43.20 .00 Free Outfall WS below an invert; no flow. 43.25 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 43.30 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 43.35 .00 ... ... .._ Free Outfall WS below an invert; no flow. 43.40 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 43.45 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 43.50 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.55 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 43.60 .00 ... ... Free Outfall WS below an invert; no flow. 43.65 .00 ... ... Free Outfall WS below an invert; no flow. SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.10 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure -------------------------------------- ID = RO (Stand Pipe) Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft ------- cfs -------- ft ------- ft -------- ft +/-ft +/-cfs ft +/-ft 43.70 .00 ... ... ------- ------ ... ------ ... ------- Free ------- Outfall WS below an invert; no flow. 43.75 .00 ... ... ... Free Outfall WS below an invert; no flow. 43.80 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 43.85 .00 ... ... Free Outfall WS below an invert; no flow. 43.90 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 43.95 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 44.00 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 44.05 .00 ... ... ... Free Outfall WS below an invert; no flow. 44.10 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 44.15 .00 ... ... ... Free Outfall WS below an invert; no flow. 44.20 .00 ... ... ... Free Outfall WS below an invert; no flow. 44.25 .00 ... ... Free Outfall WS below an invert; no flow. 44.30 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 44.35 .23 44.35 Free 43.55 .000 .000 Free Outfall Weir: H =.05ft 44.40 .66 44.40 Free 43.65 .000 .000 Free Outfall Weir: H =.10ft 44.45 1.20 44.45 Free 43.78 .000 .000 Free Outfall Weir: H =.15ft 44.50 1.85 44.50 Free 43.93 .000 .000 Free Outfall Weir: H =.20ft 44.55 2.59 44.55 Free 44.09 .000 .000 Free Outfall Weir: H =.25ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.11 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABT,E FOR ONE OUTLET TYPE Structure ID = RO -------------------------------------- (Stand Pipe) Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ---------------- ft +/-ft +/-cfs ft +/-ft ------- 44.60 3.41 44.60 Free ------ -------------------- 44.28 .000 .000 Free Outfall Weir: H =.30ft 44.65 4.29 44.65 44.52 44.52 .000 .000 Free Outfall FULLY CHARGED RISER: ADJUSTED TO WEIR: H =.35ft 44.70 * 44.70 44.70 44.70 .000 .000 Free Outfall FULLY CHARGED RISER: ADJUSTED TO WEIR: H =.40ft 44.75 6.26 44.75 44.75 44.75 .000 .000 Free Outfall FULLY CHARGED RISER: ADJUSTED TO WEIR: H =.45ft 44.80 * 44.80 44.80 44.80 .000 .000 Free Outfall FULLY CHARGED RISER: ADJUSTED TO WEIR: H =.50ft 44.85 8.46 44.85 44.85 44.85 .000 .000 Free Outfall FULLY CHARGED RISER: ADJUSTED TO WEIR: H =.55ft 44.90 * 44.90 44.90 44.90 .000 .000 Free Outfall FULLY CHARGED RISER: ADJUSTED TO WEIR: H =.60ft 44.95 * 44.95 44.95 44.95 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.00 * 45.00 45.00 45.00 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.05 * 45.05 45.05 45.05 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.10 * 45.10 45.10 45.10 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.15 * 45.15 45.15 45.15 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.20 * 45.20 45.20 45.20 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.25 * 45.25 45.25 45.25 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.30 * 45.30 45.30 45.30 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.35 * 45.35 45.35 45.35 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.40 * 45.40 45.40 45.40 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.45 * 45.45 45.45 45.45 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 SIN: Inc. , Bentley SystemsBentley PondPack (10.00.027.00) 1:58 PM ems, nc Type.... Individual Outlet Curves Name.... Riser 2 Page 8.12 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID -------------------------------------- = RO (Stand Pipe) Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft ------ cfs -------- ft --------------- ft ft +/-ft +/-cfs ft +/-ft ------- 45.50 * 45.50 45.50 ------ -------------------- 45.50 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.55 * 45.55 45.55 45.55 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.60 * 45.60 45.60 45.60 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.65 * 45.65 45.65 45.65 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 45.70 * 45.70 45.70 45.70 .000 .000 Free Outfall FULLY CHARGED RISER, DOWNSTREAM CONTROL: Kev=O. Hev=0.000 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.13 File.... T:\JOB\0902911649 CVS-CAL\CD'S\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure -------------------------------------- ID = 00 (Orifice -Circular) Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ------- ft -------- ft ------- +/-ft +/-cfs ft +/-ft 42.80 ------ ------ ------- ------- .00 ... ._. Free Outfall WS below an invert; no flow. 42.85 .00 42.85 42.83 42.B3 .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .020ft Dcr= .030ft CRIT.DEPTH Hev= .00ft 42.90 .01 42.90 42.86 42.86 .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .033ft Dcr= .067ft CRIT.DEPTH Hev= 42.95 .01 42.95 42.88 42.88 .000 .000 Free .00ft Outfall H =.08 43.00 .02 43.00 42.88 42.88 .000 .000 Free Outfall H =.12 43.05 .02 43.05 42.89 42.89 .000 .000 Free Outfall H =.16 43.10 .02 43.10 42.90 42.90 .000 .000 Free Outfall H =.20 43.15 .03 43.15 42.90 42.90 .000 .000 Free Outfall H =.25 43.20 .03 43.20 42.90 42.90 .000 .000 Free Outfall H =.30 43.25 .03 43.25 42.91 42.91 .000 .000 Free Outfall H =.34 43.30 .03 43.30 42.91 42.91 .000 .000 Free Outfall H =.39 43.35 .04 43.35 42.91 42.91 .000 .000 Free Outfall H =.44 43.40 .04 43.40 42.94 42.94 .000 .000 Free Outfall H =.46 43.45 .04 43.45 42.98 42.98 .000 .000 Free Outfall H =.47 43.50 .04 43.50 43.04 43.04 .000 .000 Free Outfall H =.46 43.55 .04 43.55 43.10 43.10 .000 .000 Free Outfall H =.45 43.60 .04 43.60 43.15 43.15 .000 .000 Free Outfall H =.45 43.65 .04 43.65 43.21 43.21 .000 .000 Free Outfall H =.44 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.14 r File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = 00 (Orifice -Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ---- ft -------- ft ------- +/-ft +/-cfs ft +/-ft 43.70 .04 43.70 43.26 43.26 ------ .000 ------ .000 ------- Free ------- Outfall H =.44 43.75 .04 43.75 43.29 43.29 .000 .000 Free Outfall H =.46 43.80 .04 43.80 43.31 43.31 .000 .000 Free Outfall H =.49 43.85 .04 43.85 43.34 43.34 .000 .000 Free Outfall H =.51 43.90 .04 43.90 43.36 43.36 .000 .000 Free Outfall H =.54 43.95 .04 43.95 43.37 43.37 .000 .000 Free Outfall H =.58 44.00 .04 44.00 43.39 43.39 .000 .000 Free Outfall H =.61 44.05 .04 44.05 43.41 43.41 .000 .000 Free Outfall H =.64 44.10 .04 44.10 43.42 43.42 .001 .000 Free Outfall H =.68 44.15 .05 44.15 43.43 43.43 .000 .000 Free Outfall H =.72 44.20 .05 44.20 43.45 43.45 .000 .000 Free Outfall H =.75 44.25 .05 44.25 43.46 43.46 .000 .000 Free Outfall H =.79 44.30 .05 44.30 43.47 43.47 .000 .000 Free Outfall H =.83 44.35 .05 44.35 43.55 43.55 .000 .000 Free Outfall H =.80 44.40 .05 44.40 43.65 43.65 .000 .000 Free Outfall H =.75 44.45 .04 44.45 43.78 43.78 .000 .000 Free Outfall H =.67 44.50 .04 44.50 43.93 43.93 .001 .000 Free Outfall H =.57 44.55 .04 44.55 44.09 44.09 .000 .000 Free Outfall H =.46 SIN: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.15 File.... T:\JOB\0902911649 CVS-CAL\CD'S\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = 00 (Orifice -Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft -------- cfs ft ft ----------------------- ft +/-ft +/-cfs ft +/-ft ------- 44.60 .03 44.60 44.28 ------ -------------------- 44.28 .001 .000 Free Outfall H =.32 44.65 .02 44.65 44.52 44.52 .000 .000 Free Outfall H =.13 44.70 * 44.70 44.70 44.70 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.75 * 44.75 44.75 44.75 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.80 * 44.80 44.80 44.80 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.85 * 44.85 44.85 44.85 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.90 * 44.90 44.90 44.90 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 44.95 * 44.95 44.95 44.95 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.00 * 45.00 45.00 45.00 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.05 * 45.05 45.05 45.05 .000 .00.0 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.10 * 45.10 45.10 45.10 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.15 * 45.15 45.15 45.15 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.20 * 45.20 45.20 45.20 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLTNG STRUCTURE 45.25 * 45.25 45.25 45.25 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.30 * 45.30 45.30 45.30 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.35 * 45.35 45.35 45.35 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.40 * 45.40 45.40 45.40 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.45 * 45.45 45.45 45.45 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.16 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = 00 -------------------------------------- (Orifice -Circular) Upstream ID = (Pond Water Surface) DNstream ID = CO (Culvert -Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft -------- cfs -------- ft ft --------------- ft +/-ft +/-cfs ft +/-ft 45.50 * 45.50 45.50 ------- ------ -------------------- 45.50 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.55 * 45.55 45.55 45.55 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.60 * 45.60 45.60 45.60 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.65 * 45.65 45.65 45.65 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE 45.70 * 45.70 45.70 45.70 .000 .000 Free Outfall FLOW PRECEDENCE SET TO DOWNSTREAM CONTROLLING STRUCTURE SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.17 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw Pond WS. Elev. ft 42.80 42.85 42.90 42.95 43.00 43.05 43.10 43.15 43.20 43.25 43.30 43.35 43.40 43.45 43.50 43.55 43.60 43.65 Device Q cfs RATING TABLE FOR ONE OUTLET TYPE Structure ID = CO (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 2.90 cfs UPstream ID's= 01, RO, 00 DNstream ID = TW (Pond Outfall) (into) Converge Next DS HGL Q SUM HW HGL DS HGL DS HGL Error Error ft ft ft +/-ft +/-cfs .00 ... WS below an invert; no flow. .00 42.83 Free Free BACKWATER CONTROL.. Vh= .002ft .01 42.86 Free Free BACKWATER CONTROL.. Vh= .004ft .01 42.88 Free Free BACKWATER CONTROL.. Vh= .005ft .02 42.88 Free Free BACKWATER CONTROL.. Vh= .006ft .02 42.89 Free Free BACKWATER CONTROL.. Vh= .007ft .02 42.90 Free Free BACKWATER CONTROL.. Vh= .007ft .03 42.90 Free Free BACKWATER CONTROL.. Vh= .008ft .03 42.90 Free Free BACKWATER CONTROL.. Vh= .008ft .03 42.91 Free Free BACKWATER CONTROL.. Vh= .008ft .03 42.91 Free Free BACKWATER CONTROL.. Vh= .009ft .04 42.91 Free Free BACKWATER CONTROL.. Vh= .009ft .05 42.94 Free Free BACKWATER CONTROL.. Vh= .011ft .09 42.98 Free Free BACKWATER CONTROL.. Vh= .016ft .16 43.04 Free Free BACKWATER CONTROL.. Vh= .022ft .24 43.10 Free Free BACKWATER CONTROL.. Vh= .029ft .34 43.15 Free Free BACKWATER CONTROL.. Vh= .036ft .46 43.21 Free Free BACKWATER CONTROL.. Vh= .042ft DS Chan. TW TW Error ft +/-ft Free Outfall .000 .001 Free Outfall hwDi= .026ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall hwDi= .051ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .067ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .074ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .080ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .085ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall hwDi= .088ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .092ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall hwDi= .095ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall hwDi= .098ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .101ft Lbw-- 30.Oft Hev= .00ft .000 .001 Free Outfall hwDi= .118ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall hwDi= .160ft Lbw= 30.0ft Hev= .00ft .000 .000 Free Outfall hwDi= .204ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall hwDi= .252ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .300ft Lbw= 30.Oft Hev= .00ft .000 .002 Free Outfall hwDi= .346ft Lbw= 30.Oft Hev= .00ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.18 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = CO (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 2.90 cfs UPstream ID's= 01, RO, 00 DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next Elev. Q HW HGL DS HGL DS HGL ft cfs ---------------- ft ft ft 43.70 .57 ------- 43.26 -------- Free ------- Free BACKWATER CONTROL.. Vh= .049f 43.75 .65 43.29 Free Free BACKWATER CONTROL.. Vh= .052f 43.80 .71 43.31 Free Free BACKWATER CONTROL.. Vh= .055f 43.85 .77 43.34. Free Free BACKWATER CONTROL.. Vh= .058f 43.90 .82 43.36 Free Free BACKWATER CONTROL.. Vh= .060f 43.95 .87 43.37 Free Free BACKWATER CONTROL.. Vh= .062f 44.00 .92 43.39 Free Free BACKWATER CONTROL.. Vh= .064f 44.05 .96 43.41 Free Free BACKWATER CONTROL.. Vh= .066E 44.10 1.01 43.42 Free Free BACKWATER CONTROL.. Vh= .069f 44.15 1.05 43.43 Free Free BACKWATER CONTROL.. Vh= .069f 44.20 1.09 43.45 Free Free BACKWATER CONTROL.. Vh= .071E 44.25 1.13 43.46 Free Free BACKWATER CONTROL.. Vh= .073f 44.30 1.17 43.47 Free Free BACKWATER CONTROL.. Vh= .075f 44.35 1.41 43.55 Free Free BACKWATER CONTROL.. Vh= .083f 44.40 1.79 43.65 Free Free BACKWATER CONTROL.. Vh= .097f 44.45 2.28 43.78 Free Free BACKWATER CONTROL.. Vh= .113f 44.50 2.85 43.93 Free Free BACKWATER CONTROL.. Vh= .132ft 44.55 3.49 44.09 Free Free BACKWATER CONTROL.. Vh= .154ft DS HGL Q SUM DS Chan. TW Error Error TW Error +/-ft +/-cfs ft +/-ft ------ -------------------- .000 .001 Free Outfall t hwDi= .389ft Lbw= 30.0ft Hev= .00ft .000 .003 Free Outfall t hwDi= .413ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .433ft Lbw= 30.0ft Hev= .00ft .000 .004 Free Outfall t hwDi= .451ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .466ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .482ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall t hwDi= .494ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .507ft Lbw= 30.Oft Hev= .00ft .000 .003 Free Outfall t hwDi= .519ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .531ft Lbw= 30.0ft Hev= .00ft .000 .000 Free Outfall t hwDi= .541ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .551ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .561ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall t hwDi= .621ft Lbw= 30.Oft Hev= .00ft .000 .002 Free Outfall t hwDi= .708ft Lbw= 30.Oft Hev= .00ft .000 .001 Free Outfall t hwDi= .812ft Lbw= 30.Oft Hev= .00ft .000 .000 Free Outfall hwDi= .929ft Lbw= 30.Oft Hev= .00ft .000 .002 Free Outfall hwDi= 1.059ft Lbw= 30.Oft Hev= .00ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.19 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = CO (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 2.90 cfs UPstream ID's= 01, RO, 00 DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------------------------------------- ------ -------------------- 44.60 4.15 44.28 Free Free .000 .000 Free Outfall BACKWATER CONTROL.. Vh= .182ft hwDi= 1.204ft Lbw= 30.Oft Hev= 44.65 4.77 44.52 Free Free .000 .001 Free Outfall FULL FLOW ... Lfull=11.Olft Vh=.235ft HL=.524ft Hev= .00ft 44.70 5.19 44.70 Free Free .000 .060 Free Outfall FULL FLOW ... Lfull=17.39ft Vh=.277ft HL=.737ft Hev= .00ft 44.75 5.30 44.75 Free Free .000 .958 Free Outfall FULL FLOW ... Lfull=18.49ft Vh=.290ft HL=.792ft Hev= .00ft 44.80 5.41 44.80 Free Free .000 1.920 Free Outfall FULL FLOW ... Lfull=19.64ft Vh=.302ft HL=.848ft Hev= .00ft 44.B5 5.52 44.85 Free Free .000 2.940 Free Outfall FULL FLOW ... Lfull=20.66ft Vh=.314ft HL=.903ft Hev= .00ft 44.90 5.62 44.90 Free Free .000 4.014 Free Outfall FULL FLOW ... Lfull=21.54ft Vh=.326ft HL=.957ft Hev= .00ft 44.95 5.73 44.95 Free Free .000 5.139 Free Outfall FULL FLOW ... Lfull=22.37ft Vh=.338ft HL=1.011ft Hev= .00ft 45.00 5.83 45.00 Free Free .000 6.310 Free Outfall FULL FLOW ... Lfull=23.10ft Vh=.351ft HL=1.066ft Hev= .00ft 45.05 5.93 45.05 Free Free .000 7.538 Free Outfall FULL FLOW ... Lfull=23.81ft Vh=.363ft HL=1.119ft Hev= .00ft 45.10 6.07 45.10 Free Free .000 7.905 Free Outfall FULL FLOW ... Lfull=23.67ft Vh=.380ft HL=1.169ft Hev= .00ft 45.15 6.17 45.15 Free Free .000 8.234 Free Outfall FULL FL0W...Lfull=24.14ft Vh=.393ft HL=1.220ft Hev= .00ft 45.20 6.27 45.20 Free Free .000 8.552 Free Outfall FULL FLOW ... Lfull=24.63ft Vh=.406ft HL=1.273ft Hev= .00ft 45.25 6.37 45.25 Free Free .000 8.960 Free Outfall FULL FLOW ... Lfull=25.01ft Vh=.419ft HL=1.324ft Hev= .00ft 45.30 6.47 45.30 Free Free .000 9.158 Free Outfall FULL FLOW...Lfull=25.46ft Vh=.431ft HL=1.378ft Hev= .00ft 45.35 6.56 45.35 Free Free .000 9.447 Free Outfall FULL FLOW ... Lfull=25.74ft Vh=.445ft HL=1.428ft Hev= .00ft 45.40 6.66 45.40 Free Free .000 9.728 Free Outfall FULL FLOW ... Lfull=26.04ft Vh=.45Bft HL=1.479ft Hev= .00ft 45.45 6.75 45.45 Free Free .000 10.005 Free Outfall FULL FLOW ... Lfull=26.43ft Vh=.470ft HL=1.532ft Hev= .00ft 00ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.20 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = CO (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 2.90 cfs UPstream ID's= 01, RO, 00 DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next Elev. Q HW HGL DS HGL DS HGL ft ------- cfs -------- ft ------- ft ft 45.50 6.85 45.50 -------- ------ Free Free FULL FLOW ... Lfull=26.63ft 45.55 6.94 45.55 Free Free FULL FLOW ... Lfull=26.84ft 45.60 7.04 45.60 Free Free FULL FLOW ... Lfull=27.04ft 45.65 7.12 45.65 Free Free FULL FLOW ... Lfull=27.41ft 45.70 7.21 45.70 Free Free FULL FLOW ... Lfull=27.54ft DS HGL Q SUM DS Chan. TW Error Error TW Error +/-ft +/-cfs ft +/-ft ------ -------------------- .000 10.269 Free Outfall Vh=.484ft HL=1.582ft Hev= .00ft .000 10.526 Free Outfall Vh=.497ft HL=1.634ft Hev= .00ft .000 10.778 Free Outfall Vh=.511ft HL=1.686ft Hev= .00ft .000 11.038 Free Outfall Vh=.523ft HL=1.737ft Hev= .00ft .000 11.275 Free Outfall Vh=.537ft HL=1.788ft Hev= .00ft SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:5B PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.21 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = WO (Weir-XY Points) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q ---------------- Tail Water --------------- Notes WS Elev. Q TW Elev Converge -----------=-------------- ft -------- cfs ------- ft +/-ft -------- ----- Computation Messages -------------------------- 42.80 .00 Free Outfall WS below an invert; no flow. 42.85 .00 Free Outfall WS below an invert; no flow. 42.90 .00 Free Outfall WS below an invert; no flow. 42.95 .00 Free Outfall WS below an invert; no flow_ 43.00 .00 Free Outfall WS below an invert; no flow. 43.05 .00 Free Outfall WS below an invert; no flow. 43.10 .00 Free Outfall WS below an invert; no flow. 43.15 .00 Free Outfall WS below an invert; no flow. 43.20 .00 Free Outfall WS below an invert; no flow. 43.25 .00 Free Outfall WS below an invert; no flow. 43.30 .00 Free Outfall WS below an invert; no flow. 43.35 .00 Free Outfall WS below an invert; no flow. 43.40 .00 Free Outfall WS below an invert; no flow. 43.45 .00 Free Outfall WS below an invert; no flow. 43.50 .00 Free Outfall WS below an invert; no flow. 43.55 .00 Free Outfall WS below an invert; no flow. 43.60 .00 Free Outfall WS below an invert; no flow. SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.22 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = WO (Weir-XY Points) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q ---------------- Tail Water --------------- Notes WS Elev. Q TW Elev Converge -------------------------- ft -------- cfs ------- ft +/-ft -------- ----- Computation Messages -------------------------- 43.65 .00 Free Outfall WS below an invert; no flow. 43.70 .00 Free Outfall WS below an invert; no flow. 43.75 .00 Free Outfall WS below an invert; no flow. 43.80 .00 Free Outfall WS below an invert; no flow. 43.85 .00 Free Outfall WS below an invert; no flow. 43.90 .00 Free Outfall WS below an invert; no flow. 43.95 .00 Free Outfall WS below an invert; no flow. 44.00 .00 Free Outfall WS below an invert; no flow. 44.05 .00 Free Outfall WS below an invert; no flow_ 44.10 .00 Free Outfall WS below an invert; no flow. 44.15 .00 Free Outfall WS below an invert; no flow. 44.20 .00 Free Outfall WS below an invert; no flow. 44.25 .00 Free Outfall WS below an invert; no flow. 44.30 .00 Free Outfall WS below an invert; no flow. 44.35 .00 Free Outfall WS below an invert; no flow. 44.40 .00 Free Outfall WS below an invert; no flow. 44.45 .00 Free Outfall WS below an invert; no flow. S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.23 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLE FOR ONE OUTLET TYPE Structure ID = WO (Weir-XY Points) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water ---------------- --------------- Notes WS Elev. -------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----- 44.50 -------------------------- .00 Free Outfall WS below an invert; no flow. 44.55 .00 Free Outfall WS below an invert; no flow. 44.60 .00 Free Outfall WS below an invert; no flow. 44.65 .00 Free Outfall WS below an invert; no flow. 44.70 .00 Free Outfall WS below an invert; no flow. 44.75 .34 Free Outfall Max.H=.05; Max.Htw=free out;; W(ft)=10.30 44.80 .97 Free Outfall Max.H=.10; Max.Htw=free out;; W(ft)=10.60 44.85 1.80 Free Outfall Max.H=.15; Max.Htw=free out;; W(ft)=10.90 44.90 2.80 Free Outfall Max.H=.20; Max.Htw=free out;; W(ft)=11.20 44.95 3.95 Free Outfall Max.H=.25; Max.Htw=free out;; W(ft)=11.50 45.00 5.24 Free Outfall Max.H=.30; Max.Htw=free out;; W(ft)=11.80 45.05 6.67 Free Outfall Max.H=.35; Max.Htw=free out;; W(ft)=12.10 45.10 8.23 Free Outfall Max.H=.40; Max.Htw=free out;; W(ft)=12.40 45.15 9.92 Free Outfall Max.H=.45; Max.Htw=free out;; W(ft)=12.70 45.20 11.73 Free Outfall Max.H=.50; Max.Htw=free out;; W(ft)=13.00 45.25 13.66 Free Outfall Max.H=.55; Max.Htw=free out;; W(ft)=13.30 45.30 15.72 Free Outfall Max.H=.60; Max.Htw=free out;; W(ft)=13.60 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Individual Outlet Curves Name.... Riser 2 Page 8.24 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw RATING TABLF FOR ONE OUTLET TYPE Structure ID = WO (Weir-XY Points) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water ---------------- --------------- Notes WS Elev. -------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----- -------------------------- 45.35 17.89 Free Outfall Max.H=.65; Max.Htw=free out;; W(ft)=13.90 45.40 20.18 Free Outfall Max.H=.70; Max.Htw=free out;; W(ft)=14.20 45.45 22.59 Free Outfall Max.H=.75; Max.Htw=free out;; W(ft)=14.50 45.50 25.11 Free Outfall Max.H=.80; Max.Htw=free out;; W(ft)=14.80 45.55 27.75 Free Outfall Max.H=.85; Max.Htw=free out;; W(ft)=15.10 45.60 30.50 Free Outfall Max.H=.90; Max.Htw=free out;; W(ft)=15.40 45.65 33.38 Free Outfall Max.H=.95; Max.Htw=free out;; W(ft)=15.70 45.70 36.36 Free Outfall Max.H=1.00; Max.Htw=free out;; W(ft)=16.00 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Composite Rating Curve Name.... Riser 2 Page 8.25 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes ---------------- -------- Converge ------------------------- Elev. Q TW Elev Error ft -------- cfs ------- ft -------= +/-ft ----- Contributing Structures 42.80 .00 Free Outfall -------------------------- (no Q: O1,R0,O0,CO3W0) 42.85 .00 Free Outfall 00,C0 (no 0: O1,RO,W0) 42.90 .01 Free Outfall O0,C0 (no Q: O1,R0,W0) 42.95 .01 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.00 .02 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.05 .02 Free Outfall OO,CO (no Q: O1,R0,W0) 43.10 .02 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.15 .03 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.20 .03 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.25 .03 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.30 .03 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.35 .04 Free Outfall O0,C0 (no Q: O1,R0,W0) 43.40 .05 Free Outfall O1,O0,C0 (no Q: RO,WO) 43.45 .09 Free Outfall 01,0O,CO (no Q: RO,WO) 43.50 .16 Free Outfall 01,OO,CO (no Q: RO,WO) 43.55 .24 Free Outfall O1,OO,C0 (no Q: RO,WO) 43.60 .34 Free Outfall 01,0O,CO (no Q: RO,WO) 43.65 .46 Free Outfall O1,O0,CO (no Q: RO,WO) 43.70 .57 Free Outfall 01,0O,CO (no Q: RO,WO) 43.75 .65 Free Outfall O1,0O,CO (no Q: RO,WO) 43.80 .71 Free Outfall 01,OO,CO (no Q: RO,WO) 43.85 .77 Free Outfall 01,0O,CO (no Q: RO,WO) 43.90 .82 Free Outfall O1,OO,CO (no Q: RO,WO) 43.95 .87 Free Outfall 01,0O,C0 (no Q: RO,WO) 44.00 .92 Free Outfall O1,O0,CO (no Q: RO,WO) 44.05 .96 Free Outfall 01,0O,CO (no Q: RO,WO) 44.10 1.01 Free Outfall O1,0O,CO (no Q: RO,WO) 44.15 1.05 Free Outfall 01,O0,CO (no Q: RO,WO) 44.20 1.09 Free Outfall O1,OO,C0 (no Q: RO,WO) 44.25 1.13 Free Outfall O1,OO,CO (no Q: RO,WO) 44.30 1.16 Free Outfall O1,OO,CO (no Q: RO,WO) 44.35 1.41 Free Outfall O1,R0,O0,C0 (no Q: WO) 44.40 1.79 Free Outfall O1,RO,OO,C0 (no Q: WO) 44.45 2.28 Free Outfall O1,R0,O0,C0 (no Q: WO) 44.50 2.85 Free Outfall O1,RO,0O,C0 (no Q: WO) 44.55 3.49 Free Outfall 01,RO,0O,C0 (no Q: WO) 44.60 4.15 Free Outfall O1,RO,0O,C0 (no Q: WO) 44.65 4.77 Free Outfall O1,R0,O0,C0 (no Q: WO) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Type.... Composite Rating Curve Name.... Riser 2 Page 8.26 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw ***** COMPOSITE OUTFLOW SUMIARY **** WS Elev, Total Q Notes ---------------- -------- Converge ----------------- Elev. Q TW Elev Error ft -------- cfs ------- ft +/-ft -------- ----- Contributing Structures 44.70 5.19 Free Outfall -------------------------- RO,CO (no Q: 01,00,WO) 44.75 5.64 Free Outfall RO,CO,WO (no Q: 01,00) 44.80 6.38 Free Outfall RO,CO,WO (no Q: 01,00) 44.85 7.32 Free Outfall RO,CO,WO (no Q: 01,00) 44.90 8.42 Free Outfall RO,CO,WO (no Q: 01,00) 44.95 9.68 Free Outfall RO,CO,WO (no Q: 01,00) 45.00 11.08 Free Outfall RO,CO,WO (no Q: 01,00) 45.05 12.60 Free Outfall RO,CO,WO (no Q: 01,00) 45.10 14.30 Free Outfall RO,CO,WO (no Q: 01,00) 45.15 16.09 Free Outfall RO,CO,WO (no Q: 01,00) 45.20 18.00 Free Outfall RO,CO,WO (no Q: 01,00) 45.25 20.03 Free Outfall RO,CO,WO (no Q: 01,00) 45.30 22.18 Free Outfall RO,CO,WO (no Q: 01,00) 45.35 24.45 Free Outfall RO,CO,WO (no Q: 01,00) 45.40 26.84 Free Outfall RO,CO,WO (no Q: 01,00) 45.45 29.34 Free Outfall RO,CO,WO (no Q: 01,00) 45.50 31.96 Free Outfall RO,CO,WO (no Q: 01,00) 45.55 34.69 Free Outfall R0,CO3W0 (no Q: 01,00) 45.60 37.54 Free Outfall RO,CO,WO (no Q: 01,00) 45.65 40.49 Free Outfall RO,CO,W'O (no Q: 01,00) 45.70 43.58 Free Outfall RO,CO,WO (no Q: 01,00) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:58 PM 8/15/2007 Appendix A A-1 t Index of Starting Page Numbers for ID Names ----- C ----- Carolina Shores... 3.01 ----- P ----- POST-DEV TO POND... 4.01, 5.01, 6.01, 6.02, 6.03, 6.04, 6.05 POST-DEV UNDET... 4.03, 5.02, 6.06, 6.07, 6.08, 6.09, 6.10 PRE -DEVELOPED... 4.05, 5.03, 6.11, 6.12, 6.13, 6.14, 6.15 ----- R ----- Riser 2... 8.01, 8.05, 8.25 ----- W ----- Watershed... 1.01, 2.01, 2.02, 2.03, 2.04, 2.05 WETLAND... 7.01 S/N: Bentley PondPack (10.00.027.00) 1:58 PM Bentley Systems, Inc. 8/15/2007 Type.... Time-Elev Name.... FFV DRAWDOWN OUT Page 2.01 File.... T:\JOB\0902911649 CVS-CAL\CD's\Stormwater\CVS-CarShores-Wetland.ppw TIME vs. ELEVATION (ft) Time I Output Time increment = 1.0000 hrs hrs I ---------I-------------------------------------------------------------- Time on left represents time for first value in each row. .0000 I 43.30 43.29 43.28 43.27 43.26 5.0000 I 43.25 43.24 43.23 43.22 43.21 10.0000 1 43.20 43.19 43.18 43.17 43.16 15.0000 I 43.16 43.15 43.14 43.13. 43.12 20.0000 I 43.11 43.11 43.10 43.09 43.08 25.0000 I 43.07 43.07 43.06 43.05 43.05 30.0000 I 43.04 43.03 43.03 43.02 43.01 35.0000 I 43.01 43.00 42.99 42.99 42.98 40.0000 I 42.98 42.97 42.97 42.96 42.96 45.0000 I 42.95 42.95 42.94 42.94 42.93 50.0000 I 42.93 42.92 42.92 42.92 42.91 55.0000 I 42.91 42.91 42.90 42.90 42.90 60.0000 f 42.90 42.89 42.89 42.89 42.89 65.0000 I 42.88 42.88 42.88 42.88 42.88 70.0000 I 42.87 42.87 42.87 42.87 42.87 75.0000 I 42.87 42.87 42.86 42.86 42.86 80.0000 I 42.86 42.86 42.86 42.86 42.86 85.0000 I 42.86 42.85 42.85 42.85 42.85 90.0000 I 42.85 42.85 42.85 42.85 42.85 95.0000 I 42.85 42.85 42.85 42.85 42.85 100.0000 I 42.84 42.84 42.84 42.84 42.84 105.0000 I 42.84 42.84 42.84 42.84 42.84 110.0000 I 42.84 42.84 42.84 42.84 42.84 115.0000 I 42.84 42.84 42.84 42.84 42.83 120.0000 I 42.83 SIN: Bentley PondPack (10.00.027.00) 2:03 PM Bentley Systems, Inc. 8/15/2007 Figure B-5 10-year, 24-hour rainfall J.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE Figure B-6 25-year, 24-hour rainfall EEEEEmmt>!s U.S. DEPARTMENT OF AGRICULTURE 10-Year 24-Hour Rainfall (inches) Albers EqualArsa Projection 25-Year 24- Hour Rainfall (inches) Albers Equal Area Projection B-4 (210-VI-TR-55, Second Rd., June 1986) NATURAL RESOURCES CONSERVATION SERVICE Figure B-7 50 year, 24-hour rainfall Figure B-8 100-year, 24-hour rainfall M� v.a. U—M i men 1 Ur AUHIUUL 1 UHE 100-Year 24-Hour Rainfall (inches) Albers Equal Area Projection (210-VI-TR-55, Second Ed., June 1986) NATURAL RESOURCES CONSERVATION SERVICE B-5 � •4 F • f li� � i 4 � r� ',41 r - 4 S 3 . .-t .5� X � Y Y '� �`k '_' r -•�r$���d.�i�ifel- C' �-Y p / - �� �" � �� a rfti � row-.c. �"��' d• ,�-�#�.-yk --3. �+—�' .� � D M �� .� { t - �� �. fix' - 0 �s . • fY` � at S ,,,.i.. _ ', � " v 14. � 7 5 • }� �l T F r � i .ki t • o-,- 1y i r - } tT r - F254 rz 0 U U .3 N C m a m 0 to zQ a� 2 oU) 04 O > 41) 2.0) U)[2 W v0) CL O yU �m 0 z z" ci Z LU O W J IL N N a coO O N c iK �Loa N w . > :°mom m = am CD -0,c m rn c m E O_ f>0 N CO ` N f0 .N m O f0>+E me to U L) dmw E CO i N y Z Z O N c O rn a CD N O O C 7 L).OZ Z 'O t Q (U o N N� � : «N 7 N f�6 0 41 N L V 3 ti w 2 N O 3 c N O LL U 01 w CL m a (* aN E o r a T y p E� 074) N N2 W y3- a 0 C p J W _N m> m ID L y c d N O T 4) 4),S f6 f0 O 6I m C E m p m jca NL Q _Ov O f0 N y a � U CD lV V as cc'O C [6 'O 2 C C C E U 'D 2 N fn N o a cm m N O> O E U3:U Hw Unto o N L o m m m c m a a �° ° U r > a ` m m m = N 3 L v N yl M 2 p O O > L O 7 c C7 L L U O ��i w ._ U U > > O U C m g� 5 IZ' N � .O. U U t ° J O J m m jp {L O. m LL c y i ra .O IL 3 r Q a o m y _ 3 d m m � VI N c N m O. C O m O � O Q p 7 0 C a N d O. O d >, _ p d W W 7 N Co T m U °O_ N a Q° 2 �i '0 3 U m am = lL s o c O m >, m ° `o co U m 3 Q >, N > > v m 12 m °v d Y c '° m s m c O m O U C > < m c m m U U c7 c7 _9 g a m m in m in Un w° CL U) 32 0• C � 0 m d •Q (n Q N T (U O U N O N co Z > U = d O a U o m O yU c _p m Z Soil Map —Brunswick County, North Carolina Map Unit Legend Brunswick County, North Carotina (NC019) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GoA Goldsboro fine sandy loam, 0 to 2 percent slopes 152.2 46.1 % Lo Leon fine sand 17.4 5.3% Ly Lynchburg fine sandy loam 38.9 11.8% Me Mandarin fine sand 9.7 2.9% Mk Muckalee loam 46.1 13.9% On Onslow fine sandy loam 26.4 8.0% Re Rains fine sandy loam 25.5 7.7% Tm Tomahawk loamy fine sand 3.3 1.0% To Torhunta mucky fine sandy loam 10.9 3.3% Totals for Area of Interest (AOI) 330.3 100.0% )SSA Natural Resources Web Soil Survey 2.0 8/20/2007' Conservation Service National Cooperative Soil Survey Page 3 of 3 Page 1 of 1 � 77 — r f(�r 4_.:�.,y�� f .�' i _ �.�� .:� : r?��r.7: •„• � sac— ._' Y N'.,� ;r - Ir i— �Jf,•i - - `l — I 11 = rl• i.: I I. — ' http://gis.brunsco.net/outputB runswick_ARC-IMS-SERVER2644230069.jpg 8/6/2007 Exhibit A: Hydrologic Soil Groups for the United States FRYREAR...................................... B FT. DRUM ...................................... C FUEGO........................................... C FUEGOSTA...................................D FUGAWEE..................................... B FULCHER......................................0 FULCRUM...................................... C FULDA............................................ D FULLER .......................................... D FULMER..................................... C.D FULSHEAR....................................0 FULTS............................................D FUNMAR........................................ C FUNTER......................................... D FURLONG ...................................... A FURNISS........................................ D FURSHUR...................................... D FURY.......................................... CID FUSULINA...................................... D FUSUVAR......................................D GABBS...........................................0 GABE L............................................ C GABINO.......................................... D GABRIEL........................................ C GACIBA.......................................... D GADDES........................................0 GADONA........................................ B GADWELL...................................... C GAGEBY........................................ B GAGETOWN.................................. B GAHEE........................................... B GAIA............................................... B GAIBSON....................................... D GAILA............................................. B GAINESVILLE................................ A GAKONA........................................ B GALATA......................................... D GALBRETH.................................... D GALCHUTT.................................... C GALESTINA................................... C GALEY............................................ B GALI E NTE...................................... C GALILEE........................................0 GALLEGOS.................................... B GALLEN......................................... B GALLIA........................................... B GALLIME........................................ B GALLIMORE.................................. B GALLION........................................ B GALLIPOLIS..................................0 GALLUP......................................... B GALTSMILL................................... B GALVESTON.................................A GALVEZ......................................... C GALVIN..........................................D GALZUNI ........................................ C GAM BOA ......................................... 8 GAMBOGY.....:............................... B GAMELAKE................................... B GAMM............................................ D GANADO........................................ D GANAFLAN.................................... C GANHONA..................................... C GANIS............................................ D GANO......................................... BID GANSNER...................................... C GANY............................................. B GAP................................................ B GAPBUTTE.................................... B GAPCOT........................................ D GAPHILL........................................ B GAPO......................................... CID GARCENO..................................... C GARCIA.......................................... C GARCITAS..................................... C GARDELLA.................................... D GARDENCAN................................ B GARDENCREEK ........................... D GARDENISLE................................ B GARDENS ...................................... D GARDENVALE ............................... B GARDINER.................................... A GARDNER'S FORK ....................... B GARECK........................................ B GAREY........................................... B GARFAN......................................... D GARHILL........................................ D GARIPER....................................... D GARLAND...................................... B GARLIC .......................................... A QARLIN.......................................... D GARLO C K...................................... C GARMON....................................... C GARMORE..................................... B GARNE........................................... B GARNEL......................................... D GARNER........................................ D GARNES........................................ B GARO............................................. D GARR............................................. D GARRETT...................................... B GARROCHALES ........................... D GARSID.......................................... C GARTON........................................ C GARVIN.......................................... D GARWOOD.................................... D GASPER ......................................... B GASQUET...................................... B GASSAWAY................................... D GASSVILLE...................................0 GASTON........................................ C GASTROW..................................... C GASUP........................................... D GAT................................................ B GATCHEL...................................... B GATERIDGE.................................. C GATESON...................................... C GATEWALL.................................... B GATLIN.......................................... B GATTON......................................... B GAULD....................................... BID GAU LDY......................................... B GAUSE...........................................0 GAVEL............................................ B GAVERS......................................... C GAVILAN........................................ C GAVINS.......................................... D GAY............................................ BID GAYHART...................................... C GAYLORD...................................... C GAYVILLE...................................... D GAZELLE ....................................... D GAZWELL...................................... D GEARHART................................... A GED................................................ D GEE................................................ C GEEBURG.....................................0 GEEMORE.....................................0 GEERTSEN................................... B GEISEL.......................................... B GEISERCREEK ............................. B GELSINGER.................................. C GEM................................................ C GEM, Stony....................................D GEMELO........................................ B GEMSON........................................ B GENATS......................................... D GENEVA......................................... B GENTILLY...................................... D GENTRY......................................... D GEOCONDA..................................0 GEORGECANYON ........................ B GEORGECREEK ........................... B GERBANA...................................... D GERBER........................................ D GERLACH...................................... D GERLANE...................................... B GERMANO..................................... B GERMANTOWN ............................ B GERMER........................................ C GERRARD..................................... B GERSTLE....................................... B GESSNER.................................. BID GESTRIN....................................... B GETA.............................................. B GETCHELL.................................... C GETRAIL........................................ D GETZVILLE.................................... D GEWTER........................................0 GEYSEN......................................... C GHOLSON..................................... B GHORMLEY................................... C GIANELLA...................................... B GIARCH.......................................... D GIBBONSCREEK .......................... C GIBNEY..........................................0 GIBRALTAR...................................0 GIBSONVILLE ............................... D GIBWELL.......................................0 GICHIGAMI.................................... C GIDEON.........................................0 GIDWIN.......................................... D GIELOW.........................................0 GIESE............................................. D GIGGER......................................... C GILBERT........................................ D G I LBOA.......................................... B GILEAD..........................................0 GILES............................................. B GILFORD.......................................D GILLAND........................................0 GILLENDER................................... D GI LLIAM......................................... C GILLIGAN....................................... B GILLS............................ ................. C G I LLSBU RG................................... D GILMAN.......................................... D GILMORE....................................... D GILROY.......................................... C GILT EDGE .................................... D GILWOOD...................................... B GIMLETT........................................ B GINAT............................................. D GINEX............................................D GINGER.........................................D GIN] ................................................ B GINSBERG.................................... B GIRARD.......................................... D GIRARDOT....................................D GIST............................................... D GITABYTE...................................... C G ITAKU P........................................ C GITAM............................................D GIVEOUT....................................... C GIVIN..............................................0 G LA DDICE..................................... C GLADEVILLE................................. D GLANCE ......................................... B GLASGOW.....................................0 GLASSNER.................................... D GLAWE....................................... BID GLAZE............................................ B GLEN.............................................. B GLENBLAIR...................................0 GLENCARB...................................0 GLENCOE.................................. CID GLENDENNING ............................. C GLENDERSON .............................. B GLENDIVE.....................................0 GLENDO........................................ B GLENEDEN...................................D GLENEYRE.................................... D GLENHAM...................................... B GLENMEN...................................... B G LENMORA................................... C GLENOMA..................................... B GLENPOOL................................... A GLENRIO....................................... D GLENROSS...................................D GLENSTED.................................... D GLENTON......................................0 GLENTOSH...................................A GLENVIEW....................................B GLENWOOD.................................. B G LE NYO N...................................... B GLIDE............................................. B GLOHM.............................. ............ C GLOIN............................................0 GLORIA.......................................... D GLYNN...........................................0 GLYPHS......................................... B GNAWBONE.................................. B GNOJEK......................................... D GOATBUTTE................................. B GOATJOE...................................... A GOATROCK................................... B GOATROCKS................................ B GOBAR........................................... B GOBBLER ...................................... B GOBERNADOR ............................. D GODDE..........................................D GODECKE.....................................0 GODECKE, Clay Substratum .......D GODWIN........................................D GOEMMER....................................0 GOESSEL......................................D GOFFPEAK.................................... B GOGOMAIN ............................... BID GOL................................................ C GOLD CREEK ................................ D GOLDAHO..................................... D GOLDBEACH................................. C GOLDCORD................................... D GOLDEAGEL................................. C GOLDEN........................................D GOLDFINCH .................................. C GOLDHEAD ............................... BID GOLD H I LL, Loamy Substratum .... C GOLDHILL...................................... D GOLDIVIDE.................................... B GOLDLAKE.................................... B GOLDMAN..................................... C ----.......................................... - GOLDSTON...................................0 GOLDSTREAM, Thawed .............. B GOLDSTREAM .............................. D GOLDVALE.................................... C GOLDVEIN..................................... C GOLDYKE...................................... D GOLETA......................................... B GOLIAD.......................................... C GOLIME.......................................... C GOLLAHER.................................... D GOLONDRINA ............................... 8 GOLTRY......................................... A GOLVA........................................... B GOMERY........................................ B GOMEZ.......................................... B GOMINE......................................... D GQNZALES.................................... D GOODINGTON .............................. D GOODLAND................................... B GOODLOW.................................... B GOODNESS ................................... B GOODPASTER .............................. D GOODRICH.................................... B GOODSON..................................... C GOODVIEW................................... D GOODWILL .................................... B GOODWLN..................................... B GOOLAWAY.................................. C GOOSE CREEK ............................0 GOOSEBURY................................ B GOOSENAWT ............................... B GOOVAL........................................ D GORDONPOINT ............................ B GORE............................................. D GOREEN........................................ D GORESVILLE................................ B GORGONIO................................... B GORHAM................................... BID GORIN............................................ C GORMAN.......................................0 GORUS.......................................... B GOSHAWK..................................... B GOSIL............................................. A GOSINTA.......................................0 GOSNEY........................................0 GOSPER........................................ B GOTCHELL.................................... D GOTEBO........................................ B GOUGEVILLE ............................ AID GOULDER...................................... B GOULDSBORO ............................. D GOURDIN......................................0 GOURLEY...................................... C GOUVERNEUR .............................D GOV E............................................. B 7 (210-VI=PR-55, Second Ed., June 1986) A-15 58 shell fragments are present in most pedons. The soil contains few to many dark minerals. The A horizon has hue of i OYR or 5Y, value of 4 to 6, and chroma of 1 or 2. The Cg horizon has hue of 10YR to 5GY, value of 4- to 7, and chroma of 0 or 2. Mottles are in shades of brown. Texture is fine sand, sand, or loamy sand. Foreston Series The Foreston series consists of moderately well drained soils on uplands. The soils formed in moderately coarse textured sediment. Slopes are 0 to 2 percent. Typical pedon of Foreston loamy fine sand, 0.1 mile west of the intersection of State Road 1415 and State Road 1438, 0.1 mile north of State Road 1415, and 50 feet west of railroad: A--O to 4 inches; dark gray (10YR 4/1) loamy fine sand; weak medium granular structure; very friable; common fine roots; strongly acid; clear wavy boundary. E--4 to 12 inches; yellowish brown (10YR 5/4) loamy fine sand; weak medium granular structure; very friable; few fine roots; strongly acid; clear wavy boundary. Bt1--12 to 26 inches; yellowish brown (10YR 6/6) fine sandy loam; weak fine subangular blocky structure; very friable; very strongly acid; gradual wavy boundary. Bt2--26 to 40 inches; yellowish brown (1 OYR 5/6) fine sandy loam; few medium distinct light brownish gray (10YR 6/2) and reddish yellow (7.5YR 6/8) mottles; weak fine subangular blocky structure; very friable; very strongly acid; gradual wavy boundary. Btg-40 to 52 inches; light gray (10YR 7/2) fine sandy loam; common coarse distinct yellowish brown (10YR 5/8) mottles;. weak fine subangular blocky structure; very friable; very strongly acid; gradual wavy boundary. BCg--52 to 78 inches; light gray (10YR 7/1) fine sandy loam that has strata of loamy sand and small pockets of clean sand grains; common, coarse distinct brownish yellow (10YR 6/8) mottles; weak fine subangular blocky structure; very friable; very strongly acid; gradual wavy boundary. Cg--78 to 85 inches; light gray (iOYR 7/2) loamy ;sand that has strata of sandy clay loam and sandy loam; common medium distinct brownish yellow (10YR 6/6) mottles; massive; very friable; very strongly acid. The sandy and loamy horizons extend to more than 60 inches. The soil is very strongly acid or strongly acid, unless the surface layer has been limed. The Ap or A horizon has hue of 1OYR or 2.5Y, value of 3 or 4, and chroma of 1 or 2. Soil Survey The E horizon has hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 3 or 4. Texture is loamy fine sand or loamy sand. The Bt horizon has hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 4 to 6. Mottles in shades of gray are Within 18 to 30 inches of the surface. The Btg horizon has hue of 10YR or 25Y, value of 5 to 8, and chroma of 1 or 2. Mottles are in shades of yellow, brown, and red. The Bt and Btg horizons are sandy loam or fine sandy loam. The BCg and Cg horizons have hue of 10YR or 2.5Y, value of 6 or 7, and chroma of 1 to 6. These horizons are stratified fine sandy loam, sand, loamy sand, sandy loam, and sandy clay loam. (aoids�oro Series The Goldsboro series consists of moderately well drained soils on uplands. The soils formed in moderately fine textured sediment. Slopes are 0 to 2 percent. Typical pedon of Goldsboro fine sandy loam, 0 to 2 percent slopes, 2.5 miles southeast of Waccamaw, 3.25 miles northeast of Longwood, 250 feet east of the intersection of State Road 1323 and North Carolina Highway 130, in an open field: Ap-0 to 6 inches; grayish brown (10YR 5/2) fine sandy loam; weak medium granular structure; very friable; few fine and medium roots; very strongly acid; abrupt smooth boundary. Bt1---8 to 20 inches; yellowish brown (10YR 5/4) sandy clay loam; common medium faint strong brown (7.5YR 5/8) mottles; weak fine subangular blocky structure; friable, slightly sticky and slightly plastic; few fine roots; very strongly acid; gradual wavy boundary. Bt2-20 to 32 inches; yellowish brown (10YR 5/4) sandy clay loam; common medium distinct light gray (10YR 6/1) and strong brown (7.5YR 5/8) mottles; weak fine subangular blocky structure; friable, slightly sticky and slightly plastic; few patchy clay films on faces of peds; very strongly acid; gradual wavy boundary. Btg1-32 to 41 inches; light brownish gray (1OYR 6/2) sandy clay loam; common medium distinct yellowish brown (10YR 5/6) mottles and few fine prominent red (I OR 4/8) mottles; weak fine subangular blocky structure; friable, slightly sticky and slightly plastic; few patchy clay films on faces of pods; very strongly acid, gradual wavy boundary. Btg2-41 to 54 inches; mottled light gray (10YR 7/1), brownish yellow (10YR 6/8), and red (10R 4/8) sandy clay loam; weak fine subangular blocky structure; friable, slightly sticky and slightly plastic; few patchy clay films on faces of peds; very strongly acid; gradual wavy boundary. Brunswick County, North Carolina Btg3-54 to 70 inches; light gray (10YR 6/1) sandy clay loam that has thin strata of sandy loam; few fine distinct brownish yellow (10YR 6/8) mottles and few medium prominent red (2.5YR 4/8) mottles; weak fine subangular blocky structure; friable, slightly sticky and slightly plastic; very strongly acid; gradual wavy boundary. Cg-70 to 80 inches; light gray (1 OYR 6/1) loamy sand; common medium distinct light yellowish brown (10YR 6/4) mottles; massive; very friable; very strongly acid. The loamy Bt horizons are more than 40 inches thick over stratified sediment. The soil is very strongly acid or _strongly acid, unless the surface has been limed. The Ap or A horizon has hue of 10YR, value of 4 or 5, and chroma of i or 2. The E horizon, where present, has hue of 10YR, value of 5 to 7, and chroma of 3 or 4. The E horizon is sandy loam, fine sandy loam, or loamy sand. The St horizon has hue of 1 OYR, value of 5 or 6, and chroma of 4 to 6 in the upper part. Gray mottles are within 18 to 30 inches of the surface. The Btg horizon has chroma of 1 or 2 or is mottled in shades of red, yellow, or brown. The Bt and Btg horizons are sandy clay loam or sandy loam in the upper part and sandy clay loam or sandy clay in the lower part. The BCg horizon, where present, has hue of 10YR or 2.5Y, value of 5 to 7, and chroma of 1 or 2. Mottles are in shades of red, yellow, or brown. Texture is sandy loam, sandy clay loam, or loam. Texture of the Cg horizon ranges from loamy sand to sandy clay. Grifton Series The Griton series consists of poorly drained soils on uplands. The soils formed in moderately fine textured sediment mixed in soft marl. Slopes are 0 to 2 percent. Typical pedon of Grifton fine sandy loam, 0.5 mile west of Thomasboro, 150 feet north of the intersection of U.S. Highway 17 and Little Caw Caw Canal: Ap—O to 6 inches; dark grayish brown (10YR 4/2) fine sandy loam; weak medium granular structure; very friable; common fine roots; medium acid; clear wavy boundary. E-6 to 17 inches, grayish brown (iOYR 5/2) fine sandy loam; few fine distinct brownish yellow (IOYR 6/6) mottles; weak medium granular structure; very friable; common fine roots; slightly acid; gradual wavy boundary. Btg1-17 to 26 inches; light brownish gray (10YR 6/2) sandy clay loam; few pockets of sandy loam; few fine distinct yellow (10YR 7/6) mottles; weak fine subangular blocky structure; very friable; common fine roots; slightly acid; gradual wavy boundary. 59 Btg2-26 to 33 inches; grayish brown (10YR 5/2) sandy clay loam; few fine distinct yellowish brown (10YR 5/8) -mottles; weak fine subangular blockv structure: friable, slightly sticky and slightly plastic; few patchy clay films on faces of peds; neutral; gradual wavy boundary. BCg-33 to 60 inches; gray (10YR 6/1) sandy clay loam that has thin lenses of sandy clay; common medium distinct yellowish brown (1 OYR 5/8) and gray (N 5/0) mottles; weak fine subanguiar blocky structure; firm, sticky and slightly piastic; moderately alkaline; gradual wavy boundary. 20g1--60 to 70 inches; light gray (5Y 6/1) sandy loam that has thin strata of greenish gray (5GY 6/1) clay; massive; friable; moderately alkaline; gradual wavy boundary. 20g2-70 to 80 inches; light gray (5Y 6/1) fine sand; single grained; loose; moderately alkaline. The loamy Bt horizons are 15 to 45 inches thick over sandy or loamy material. Some pedons are over marl, and the transitional horizons are absent. The A and E horizons range from strongly acid to slightly acid, unless the surface layer has been limed. The B and C horizons range from slightly acid to moderately alkaline. The Ap or A horizon has hue of 10YR, value of 3 to 5, and chroma of 1 or 2. The E horizon, where present, has slightly higher chroma than the A horizon. The texture is fine sandy loam or sandy loam. The Btg horizon has hue of 10YR, value of 5 to 7, and chroma of 1 or 2. Texture is sandy clay loam or sandy loam. The BCg and Cg horizons are similar in color to the lower Bt horizons. The texture is sand, sandy clay loam, or sandy loam, with thin lenses of sandy clay loam or clay. The lower Bg horizon and Cg horizon contain friable to hard marl fragments and iron and manganese concretions in some pedons. Johns Series The Johns series consists of somewhat poorly drained and moderately well drained soils on stream terraces. The soils formed in moderately fine textured sediment. Slopes are 0 to 2 percent. Typical pedon of Johns fine sandy loam, 0.3 mile southeast of the Waccamaw River Bridge on N.C. Highway 904, 0.45 mile northeast of the intersection of N.C. Highway 904 and forest road, 25 feet east of forest road: A-0 to 4 inches; dark grayish brown (1 OYR 4/2) fine sandy loam; weak medium granular structure; very friable; common fine roots; very strongly acid; clear wavy boundary. 84 TABLE 4.--ACREAGE AND PROPORTIONATE EXTENT OF THE SOILS Soil Survey map symbol; coil name + Acres Percent BaB IBaymeade fine sand, 1 to 6 percent slopes------------------------------------ 55,973 I ; 10.2 and 6 to 12 percent slopes ---------------------------------- IBlantonefine 7,762 � 1.4 B S sandynOstol5, , percent slopes -------------------------------------------I 16,127 I 2.5 BO Bohgiccket silty clay loam ------------------------------------------------------------ IBra � BrB fine sand loam 2 to 6 percent slope:s---------------------------------------i CA 2,165 0.4 Carteret loamy fine sand ------------------------------------------------------------ IChowan I 1,085 0.2 CH silt loam------------------------ _,_ -------------- ------- - _I I Co Corolla fine sand --------------------------._-_ ------_--_-----_-------------I I 5 033 ,989 � 0.9 CTCroatan muck ------------------ --------,._---.--__---_ --I IDorovan 989 DO muck ------------------------------------------------------------------------ 29,703 I 5.2 Du IDuckston fine sand ----------------»-----__,----_-_ _ -I ---------------------_--I 16,311 ` 3.1 Fo iForeston loamy fine sand ------------------.-----_--_-_-_--- 312 ! -p GoA Goldsboro fine sandy loam, 0 to 2 percent :slopes------------------------------------j IGrifton 29,830 4.9 5.4 Gt fine sandy loam------------------------------------------------------------i j Jo (Johns fine sandy loam------------------- _ __ __ ____ __ _ -� - - ----- - ~- y -- --I IKureb 3r533 3,116 ( 0.6 0.6 KrB' fine sand, l to 8 percent slopes--------------- LA iLafitte 16,573 I 3.0 muck---------------------------------------------------------------------- Lo 1,415 + 0.3 ILeon fine sand, 0 to 2 percent slopes---------�-------------------------------------� 45,611 I 8.3 Lu Lumbee fine sandy loam ----------�-------------- - - -I - -- ------------------------------I ILynchburg , Ly fine sandy loam- (Mandarin 4,127 I 22;023 0.7 4.0 Ma fine sand ---------------------- '---------_`•-_________--------__-I IMuckalee 15,415 I 2.8 Mk loam ___-____-__,------------- _----^- I Mu IMurville mucky fine sand ---------------- ,------__---_-_-__-_--_----_-.,__-------__-I 39,490 I 5.2 7.2 NeE Newhan fine sand, 2 to 30 percent slopes -------------------------------------------- I 4,415 I 0.8 HhE percent - - -----� (Norfolkfine 3,510 I loamysand, finedredged, slopes--------------------------- NoB sand, 2 tot6 percent p---------------------------------------I 21 13,439 ± 2.6 On iOnslow fine sandy loam----------P--_-_--_,- 0.3 0.7 PaA Pactolus fine sand, 0 to 2 percent slopes Pe pe--^-----------»-------..__..---------------i IPantego ,994 3,994 � 0.7 Pn mucky loam- ---------------------------------------------I Pt(Pits---------------------------------- --------------------- 12,818 I 2.1 -------------I19 Ra +Rain fine sandy loam------------------------ + TM (Tomahawk loamy fine sand- _I -loam-------------» r ~^ -- - "' "'-~-____- --I 991 4,975 3.6 0.9 To Torhunta mucky fine sandy -- -------_I 47,740 + Ur Urban land--------------------------------- - WaB �Wando fine sand, 0 to 6 percent slopes ----------------------------------------------I WdB 305 I 8�634 0.1 1.1 IWando-Urban land complex, 0 to 6 percent slopes------------------------------------) I 0.1 Wo Woodington fine sandy loam --------------_._----_-_-_-_--------_-----------__-_--_---I IYaupon I 33 6.5 YaB silty clay loam, 0 to 3 percent slopes ----�----------------------------------i 012 I 0.5 Water- ' -I Total--------------------------------------------------------------------- Table 2-2. Values of SCS CN and Rational C for various cover conditions (Rased upon SCS,1986) Cover Description SCS Curve Number Rational C Percent HSG HSTSG THSG HSG HSG HSG HSG Impervious A B I A B C D loped urban areas n ace Poor condition (<50% 68 79 86 89 0.36 0.58 0.72 0.78 ass Fair condition (50 -75% 49 69 79 84 0.15 0.38 0.58 0.68 grass Good condition (>50% 39 1 Z4 80 0.15 0.22 0.48 0.60 araccl Impervious areas Pavement, roofs 98 98 98 98 0.96 0.96 0.96 0.96 Gravel 76 85 89 91 0.52 0.70 0.78 0.82 Dirt Urban districts 72 82 87 89 0.44 0:64 0.74 0.78 Commercial and business 89 92 94 95 0.78 0.84 0..88 0.90 85 Industrial Residential areas lot size 81 88 91 93 0.62 0.76 0.82 0.86 72 1/8 acre (town houses, condos 77 85 90 92 0.54 0.70 0.80 0.84 65 1/4 acre 1/3 acre 1/2 acre 61 57 54 75 72 70 83 81 80 870.50 86 85 0.15 0.15 0.44 0.40 0.66 0.62 0.60 0.74 0.72 0.70 38 30 25 1 acre 51 68 79 84 0.15 0.36 0.58 0.68 20 2 acres Agricultural areas 46 65 77 82 0.15 6-30 654 0.64 12 Pasture, grassland Poor 68 79 86 89 0.36 0.58 0.72 0.78 Fair 49 69 79 84 0.15 0.38 0.58 0.68 Good 39 61 74 80 0.15 0.22 0.48 0.60 Meadow mowed 30 58 71 78 0.15 0.16 0.42 0.56 Brush 0.15 0.15 0.15 0.15 Poor 48 67 77 83 0.15 0.34 Fair 35 56 70 77 0.15 0.15 0.54 Good 30 48 65 73 0.15 0.15 A0.66 0.46 Woods and pass orchard Poor 57 73 82 96 0.15 0.46 0.64 0.72 Fair 43 65 __76 82 0.15 0.30 0.52 0.64 Good 32 58 72 79 0.15 0.16 0.44 0.58 Woods Poor 45 66 77 83 0.'15 0.2 0.54 0.66 Fair 36 60 73 79 0.15 0.20 0.46 0.58 Good 30 55 70 1 77 0.15 0.15 0.40 0.54 Row crops, straight, good 67 78 85 1 89 0.34 0.56 0.70 0.78 Row crops, contoured, good 65 75 82 86 0.30 0.50 0.64 0.72 Small grain, good 63 75 83 87 0.26 0.50 0.66 0.74 Farmsteads 59 74 82 86 0.18 0 a8 0.64 0.72 JU!A - um ur n auunai t- were cOMPUtOa trorn U = 0.020 UN -1.0 Copyright H. R. Malcom, 2003 [2-I 0] Hydrologic estimates January 11, 2007 Anna CC Disser REDD REALTY SERVICES 1254 Old Hillsborough Road Franklin, TN 37069 Re: Report of Subsurface Investigation Proposed CVS Pharmacy @ Calabash Road & Hwy-17 Calabash, North Carolina GeoTechnologies Project No. 1-06-1919-EA Dear Ms. Disser: 3100 Raleigh. North r.'r:r,r: ,•.� !`. F Clk C • : r" . i 0 ')0 GeoTechnologies, Inc. has completed the authorized subsurface investigation to evaluate site grading and foundation support considerations for a proposed CVS Pharmacy to be constructed at the northeast quadrant of the intersection between Calabash Road and Highway 17 in Calabash, North Carolina. Subsurface conditions at the site were investigated by advancing 5 soil test borings at the approximate locations shown on the attached Figure 1. These locations were established in the field by taping distances and estimating right angles from existing site features and should therefore be considered approximate. The borings were advanced to termination depths of between 20 to 65 feet below existing site grade utilizing standard penetration test procedures at selected intervals to evaluate the consistency and density of the subsurface soils. This report presents the findings of our investigation and our recomrnendations for site grading and foundation support, SITE AND PROJECT INFORMATION It is our understanding that a parcel of land located at the northeast quadrant of the intersection between Calabash Road and Hwy-17 in Calabash, North Carolina will be developed with a freestanding CVS Pharmacy. The single story building will consist of 13,255 square feet of retail space. The site is currently undeveloped and is relatively level. The CVS �;eotechnical investigation requirements indicate the structure will have maximum column loads of 120 kips and maximurn wall loads of 3.5 kips per linear foot. In addition to the proposed building there will be asphalt paved areas surrounding the building. The asphalt pavements will be designed for a 20 year life and 18,000 equivalent 18 kip single axle loads (FSAL's). SUBSURFACE CONDITIONS A generalized subsurface profile prepared frorn the test boring data is attached to this report as Fir;-ure 2 to graphically illustrate subsurface conditions enCol.mtered at this site. More detailed descriptions of the conditions encountered at the individual test boring locations are then, presented on the attached test boring records. it C'e-ote-ctmicol Ind Construction Moteriols resting Services Redd Realty Services CVS —Calabash January 11, 2007 Page: 2 Subsurface conditions at the site consist of a 6 to 12 inch layer of topsoil underlain by clayey sands and sandy clays to 3 to 6 feet below site grade. Penetration resistances in these surface soils varied from 1 to 7 blows per foot (bpf). With increasing depth, the soils transition into a layer of highly plastic clays with penetration resistances ranging from 6 to 15 bpf These highly plastic clays extended to approximately 13 feet below site grade. The borings typically then encountered a layer of clayey sands with penetration resistances ranging from 5 to 22 bpf. These clayey sands were underlain by a layer of peat. The peat laver was identified as shallow as 17 feet below site grade in test boring B-3 and encountered to a depth no greater than 25 feet below site grade in test boring B-1. The peat layer was underlain by clayey sands and/or highly plastic clays with penetration resistances ranging from 0 to 5 bpf Test borings B-4 and B-5 were terminated at 20 feet below site grade. "test borings B-1 and 13=2 were extended to 65 feet below site grade, and test boring B-3 was extended to 50 feet below site grade. Beyond a depth of approximately 33 feet below site grade, test borings B-I, B-2, and B-3 encountered a gravely clayey sand mixture with penetration resistances varying from 8 to 22 bpf. Apparent Marl was encountered at 65 feet below site grade in test borings B-I and B-2. Groundwater was encountered between 1 and 2 feet below the existing site grade at the time of boring completion. Regional groundwater levels will fluctuate with seasonal and climatic changes and it may be different at other times. It should be noted that the near surface plastic clays are conducive to the development of temporary perched water conditions during periods of inclement weather. RECOMMENDATIONS The following recommendations are made based upon a review of the attached test boring data, our understanding of the proposed construction, and past experience with similar projects and subsurface conditions. Should existing plans change significantly from those now under consideration, we would appreciate being provided with that information so that these recommendations may be confirmed, extended, or modified as necessary. Additionally, should subsurface conditions adverse to those indicated by this report be encountered during construction, those differences should be reported to us for review and comment. Suitability of Site. Subsurface conditions on the site appear suitable for the proposed construction; however, the shallow plastic clays are moisture sensitive and during wetter times of the year will soften and likely require some undercut and replacement with compacted structural till. Additionally, the very loose sands, soft clays, and peat layer encountered between depth of 17 to 33 feet pose a potential risk of excessive settlements. We anticipate the most suitable type of foundation system would be driven timber piles. Timber piles driven to depths of 35 to 40 feet below grade could achieve allowable capacities of 20 tons per pile. Site Grading Considerations. Site grading should start with the removal of any vegetation or topsoil from the proposed building pads and pavement areas. After the removal of topsoil, those areas at grade or designated to receive fill should be proofi-olled with a partially loaded dump truck or similar piece of equipment in order to identify those areas needing additional repair. Any area which ruts or pumps excessively in the opinion of the engineer should be undercut to firm bearing and be backtilled with properly compacted structural fill or as directed by the engineer. The shallow plastic clays encountered over much of the site are moisture sensitive and will soften during periods of wet weather. The site should be graded to prornote surface drainage and minimize depressions where water- can pond. If grading is performed during the wetter winter months it is likely that the plastic clays will soften and II P oTethna agRi tc Redd Realty Services CVS — Calabash January 11, 2007 Page: 3 construction traffic will rut the site providing areas for water to stand and further soften the clays. If the site gradin' is performed during the wetter winter months, we recommend consideration be given to placement of a 2 feet thick compacted granular till over the proposed building pad and pavement areas to minimize the need for subgrade repairs. The on -site near surface soils are not suitable for reuse as structural Fill. if off -site borrow will be imported, we recommend importing a silty or clayey sand with USCS symbol SM or SC as structural fill. All new till should be compacted to not less than 95% of the standard Proctor maximum dry density except in the final Foot beneath pavements and floor slabs where this requirement should be increased to 98% of the standard Proctor maximum. Pile Foundation Support. We recommend that the structure be supported on pile foundations. In order to evaluate potential capacities, a static analysis was performed for an 8 inch tip timber pile and a 12 inch concrete pile. Figure 3 shows plots of ultimate skin friction and ultimate total capacity plotted versus depth in feet for timber piles. Timber piles with an ultimate capacity of 40 tons for a design capacity of 20 tons would need to penetrate to a depth of 35 to 40 feet below existing site grade. It is recommended that several penetration test piles be driven at the start of construction in order to establish pile driving criteria and to better evaluate the required length of piling before the order is placed for the remaining production piles. We suggest obtaining slightly over -length piles and then driving with the hammer selected for the project until achieving a dynamic set indicative of the design capacity based on the old state building code or the Hiley equation. It should be recognized that the actual required pile lengths may be different from those calculated using static equations and actual lengths may be longer or shorter than the estimated lengths. Slab -on -Grades. Provided plastic clays are not exposed or a significant amount of Fill(greater than 24 inches) is not place during the earthwork operation, the near surface soils will provide adequate support for lightly loaded slab -on -grades. if any soft soils or plastic clays are identified, repairs should consist of undercutting to a depth of 12 inches below design subgrade and replacing witli structural till compacted to 98°% of standard Proctor maximum dry density. Assuming that at least 12 inches of compacted granular structural fill exists over the shallow plastic clays, the slab can be designed using an assumed subgrade modulus of 100 Pei. Even if structural loads are supported on driven piles, we do not anticipate the need for a structural slab unless a significant amount of till will be placed on the site. If the site is loaded with fills of 2 feet or greater. the potential exists for some settlement of the peat layer encountered between 17 and 25 feet below the existing site elevation. As such; if existing grades will be raised, consideration should be given to pre -loading the slab areas to allow any settlements to subside prior to construction. A waiting period of 30 days should be exercised to allow potential settlements to subside. Once the Final grades for the slab areas are established, GeoTechnologies can assist in determining quantities need for pre -loading the site. General Pavement Design Considerations. No detailed laboratory testing was completed to enable us to perform a Final paverent design; however, based on our experience with similar soil types, a design CBR value of'_'% can be utilized for calculating a pavement section. Based on specifications provided by CVS, a traffic loading of 60,000 ESAL can be assumed. The subgrade soils will not be stable under Redd Realty Services CVS — Calabash January 11, 2007 Page: 4 traffic unless thev are either lime treated or an 18 to 24 inch thick layer of granular soil is placed over the clays. If lime treatment is used, it should be performed by an experienced contractor using proper equipment. Following subgrade repair, we anticipate a CBR value of 6% can be utilized resulting in a pavement section consisting of 3 inches of asphalt over 8 inches of CABC base course. In addition, we recommend that a concrete pad having a minimum thickness of 5 inches over 4 inches of ABC stone be placed immediately in front of dumpster pads to better distribute the heavy front wheel loads or trucks used to empty the dumpsters. The most important actors affecting pavement life in the area of the site are the condition or the subgrade immediately prior to base course stone placement and post -construction drainage. It is important the site grades be detailed to promote positive drainage away from paved areas and that all subgrades be recompacted to 98% of the standard Proctor maximum dry density immediately prior to base course stone placement. As previously discussed, we recommend that the subgrades of all pavement areas be proofrolled and that any yielding areas be identified and repaired during the initial grading operations. We recommend that all pavement areas be properly graded to promote runoff of water and to prevent ponding of water on the pavement surface which can lead to eventual saturation of subgrade soils and a loss of pavement support. Seismic Design Considerations. The results of the borings reveal the presence a soft soils profile to 65 feet below existing site grade. Based on these conditions, our experience in the area; and our knowledge of the North Carolina Building Code, we recommend that a site class "E" be utilized with regard to seismic design considerations. Geo'fechnologies, Inc. appreciates the opportunity to be of service on this phase of the project. Please contact us if you have any questions concerning this letter or if we may be of additional service on this of other projects. Sincerely, �e1sneiplrp:�aaair GeoTechnologies, Inc. pF;1e.•••••a.� z/ SEAL 026472 Toby Mallik; P.E. s z NC Registration No. 26472 '; • , Glpl-.a TM/pr-els/lam Attachments 061919ea.doe g: ,Technologi "Inc ar HI z �z N N N � L rrr, 1l {ii W r U � � U) 'O r V Q J Z Ci U p 2 C/) 7 LL 0 U .yam L O z W (Q 0 sCf) i w (� CL 0 CU U 131 C C 10 CJ1 N C O rn o c 0 E O a a ti C a F ® U U m m N m m m Z LLJ 0 a t — C R v v o to 0 rn a 1 U) c c c o m m 0 w m o 0 in a 0. [7 C9 a Lu c a, o i CD c14 N a 6 Q tT Z M o0 Z of r r � � LEI a 1Y] m LL LPL O w IL LU LoLL N m � N �I m■ 'D v+ , W N (N 00 t4 N N Cl) N N I- w Z LLI M r N r O Cl) CD r r Kt M N r 00 r 00 r Cn CN .Q L.. U t Q1 CV CD r r 6• Cn OD r r CV to O r r N r N N T_ W CC O U) m o Lf) a u) o Lf) o in C� en o uO o m > 0 r r N CV M Cl) EI' Ct to U) co C9 (, U W d 0 w v I 0 I z O IL U Q a Q U z n O � ~ .a I U ]E 2 I I LL °O z I .J Q O f-- w 1 Q I Q w Q a � w 0 c o o (suol)AI oedeo-iin co o 0 M N Q N ❑ I fn 7 o CV > N V) U � [0 7 ro N U a � pc - L 3 o t o to U E o N Cc A v= Cc ro m a ca ro E o Q �U Q (M LS Q. Q � U _ N 7 O U -- '- z Q DEPTH (FT.) 0.0 0. 3. 33.0 65.0 65.5 TEST BORING RECORD DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (BLOWS/FT.) SIX INCHES n In In do An inn To soil sc Tart Clayey Fine 0 Loose SAND 2-2-3 Stiff Brown & Gray Fuse Sandy CLAY CH 3-4--4 5-6-5 i 5-7-8 1-1-1 Dense Tan Fine Silty SAND SW Stiff Brown & Gray Silty CLAY 1 CL Very Solt Gray CLAY CH Very Loose Brown Fine SAND & Peat i Very Loose Gray Clayey Fine SAND SC WOH Medium Dense Gray Gravelly SAND 4-7-7 .a 7-10-9 7-10-12 -0 10-8-8 s' r e 7-9-12 . p. c c F c 8-10-11 a •o 4-3-50/2" c v. � a Partially Weathered Rock Borin.o terminated at 65.5' F Groundwater encountered at 2.0' at time of boring. JOB NUMBER 1-06-1919-EA BORING NUMBER B- 1 DATE 1-3-07 PAGE 1 OF 1 DEPTH (FT.) 0.0 1.0 2.5 7.0 12.5 18.0 23.0 27.0 32.0 56.5 58.0 62.5 64.5 TEST BORING RECORD DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (BLOWS/FT.) SIX INCHES 0 10 20 40 60 100 .1U SOT SC % � � � � � � � 2-1-2 I 2-2-4 667 6-4-7 2-2-2 1-1-1 3-4-5 5-6-6 3-4-4 9-6-5 3-3-5 5-9-5 5015" Q i Loose Brown Clavev Fine SAND Firm Orange Brown Fine Sandy CLAY CH Stiff Gray CLAY CH Medium Dense Light Gray Slihelty Silty Fine SAND SM Peat Very Loose Gray Clayey Fine SAND SC Very Soft Gray CLAY CH Medium Dense Gray Clayey Gravelly SAND o .o X Partially Weathered Rock - Possible Limestone Q Medium Dense Gray Ciayev Gravelly SAND Partially Weathered Rock Q Boring terminated at 64.5' GrOUndwater encountered at 1.5' at time of boring. JOB NUMBER BORING NUMBER DATE PAGE I OF I DEPTH (FT.) 0.0 0. 7 13.1 17.1 22.4 28.( 31.4 50.5 TEST BORING RECORD _j DESCRIPTION ELEVATION PENETRATION BLOWS PER. (FT.) (]BLOWS/FT.) SIX INCHES 0 10 20 40 60 100 5 Topsoil CL - Firm orange Brown Fine Sandy CLAY 1-2-1 I 3-3-d Stiff Gray & Red Fine Sandy CLAY CH 457 1 Medium Dense Orange & Tan Silly Fine SAND STvI 9-II-lI Peat 2-1-2 Very Loose Gray Clayey Fine SAND Sc 1-1-I Very Soft Gray Fine Sandy CLAY CH 1-1-1 Medium Dense Gray Clayey Gravelly SAND X 'a 'd 6-7-7 .a. Boring tenninated at 50.5' 5-6-6 4 i F c a c a `a i, c F C Groundwater encountered a1 1.0' 24 housrs after time of boring. JOB NUMBER 1-06-1919-EA BORING NUMBER B- 3 DATE 1-3-07 PAGE I OF I Groundwater encountered a1 1.0' 24 housrs after time of boring. JOB NUMBER 1-06-1919-EA BORING NUMBER B- 3 DATE 1-3-07 PAGE I OF I DEPTH DESCRIPTION (k T.) 0.0 0.8 3.0 6.5 12.5 20.5 TEST BORING RECORD ELEVATION PENETRATION BLOWS PER (FT.) (BLOWS/FT.) SIX INCHES 0 10 20 40 60 100 To soli Sm 1 1 3-3-4 3-5-1U 3-5-7 3-3-4 1 Veto Loose Brorwn Silty Fine SA\0 Firm Light Gray Clayey Fine SAND Sc Stiff Gray & Orange Fine Sandy CLAY CH Loose Orange & Tan Silty Fine SAND SM Boring terminated at 20.5' I Groundwater encountered at 1.5' at time of borinj. JOB NUMBER 1-06-1919-EA BORING NUMBER B- 4 DATE 1-3-07 PAGE 1 OF I r 0 DEPTH (FT.) 0.0 0.3 3.0 7.0 11.5 17.5 20.5 TEST BORING RECORD DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (BLOWS/FT.) SIX INCHES n In I)n An Ln Yn!\ To soil Sc a o 1-0-: L 4-7-6 2-4-4 2-2-3 a m' F- r 0 'a m 0 z a 0 _ Very Loose Brown Clayey Fine SANID Medium Dense Orange Clayey Fine SAND SC Firm Orange & Gray CLAY CH Loose Tan Silty Fine SAND SM Peat Boring tenninated at 20.5' Groundwater encountered at 2.0' at time of boring. JOB NUMBER 1-06-1919-EA BORING NUMBER B- 5 ''SATE l -3 -07 PAGE 1 OF 1 •GeTe � bg � 'i CarterilBurgess 42AD Am --1 24" Abow. C#,Ap Job No.: eoz-q H 4 41 Disc.: -'rl- Job Name: CAle-rng rHl Date: 0 F 1 Sheet of By: A,:�ee 24 je,:g v 4 ,Ov tl-el'i � -�, 21 �l 'I ( 1 A- q6t.-urAt �4pq.-K , �r 4 ZqG 2rb - Cartern-Burgess C. a-TD Job No.: d YDI l l " I Disc.: Job Name: Date: 0 6/ 16 / 0 1 Sheet Z of 2- By: 1 SF �r o� Of OF Uteri` W.4 6.-kAo: = PSID {Nc : Ida -- 2,rd r j� Fs7. GO' I &f<c- i 40 X ,�c •�� e- , ►�c IU-1it a 0x-1rC?��)�� ►3 -A v aj f E:.63,cj x 81.bo.�4 1 ►, ,. -VS Z,g3 F�vv-n-)Cc "X ;'Y Carter --Burgess Job No.: _ Job Name: Date: By: Disc.: Sheet of L. v EL S�REA�� N6 Gv� D E-Yr4k CALCd u k-P-r I ar.% C-= 3 0. 15' 1,6 -t ke IT-j -F 2 , "Tl1E %Z. G r OFL PavE""t'll Tb T'6? off- CxxR.y3 Cr T C"ni-.$ . kaquAeTcer Optimizing environmental resources i water. air. earth P.O. Box 1187 Brentwood, TN 37027-1187 � Phone (615) 373-8532 1 Fax (615) 373-8512 August 6. 2007 Ms. Anna Disser Redd Realty, Services 1254 Old Hillsboro Road Franklin TN 37069 071615 RE: Preliminary Report on the Wetlands Delineation of Proposed CVS Store #7420 at the Northwest Corner of the Intersection of Calabash Road and U.S. Highway 17 in Calabash, North Carolina Dear Ms. Disser: AquAeTer, Inc. (AquAeTer) conducted site reconnaissance on July 20-21. 2007 for the Proposed CVS Store #7420 at the Northwest Corner of the Intersection of Calabash Road and U.S. Highway 17 in Calabash. North Carolina. Prior to on -site activities. wetland indicator species, soils, aerial photographs. National Wetland Inventory maps, and topographic reaps were reviewed. Additionally, the proposed CVS site schematic provided by Redd Realty and a land survey provided by Mr. Dean Scarfoni mere reviewed prior to site reconnaissance. The delineation was performed by AquAeTer personnel, per the United States Army Corps of Engineers (USACE) wetlands Delineation Manual, Y-87-1 (on-line edition). WETLANDS DELINEATION The subject property: is L54-acre and is located at Latitude N 33.9064. Longitude W 78.5862 in Calabash. Brunswick County, North Carolina. The property is located northwest of the intersection of U.S. Highway 17 and Calabash Road (SR 1300). The nearest body of water to the subject property is Persimmon Swamp. located approximately. 1,000-feet to the southeast. across U.S. Highway 17. Isolated thundershowers occurred in the Calabash area on July 18. 2007 prior to on -site activities. During wetlands delineation. vegetation, soils. and hydrologic indicators on the subject property and adjacent drainage ditches were reviewed. AquAeTer found that the entire 1.54- acre parcel and the adjacent man-made drainage ditches are non -wet based upon absence of hydrologic indicators and hydric soils. All wetlands delineation findings are subject approval by the United States Corps of Engineers (USAGE) and North Carolina Department of Environment and Natural Resources (NCDENR). Division of Water Quality (DWQ). Ms. Anna Disser, Redd Realty Services August 6, 2007 PROFESSI 'NAL OPIl".^1 `f 071609 Page 2 AquAeTer is preparing the required documentation to request a Jurisdictional Determination (JD) from the USAGE Wilmington District Regulatory Branch. The USACE «'ill review the provided documentation and will conduct a site visit prior to issuing the JD. The Corps is the lead agency for wetland determination and will pass information, if required, to DWQ. The request for the JD will be submitted to USACE no later than August 9, 2007. Additionally. AquAeTer is investigating if submitting a Pre -Construction Notification (PCN) Form to USACE can accelerate the time line for receiving the JD and DWQ approval for the subject property. Relevant wetland and soil maps which indicate the subject property and adjoining ditches are non -wetlands are provided as attachments. A copy of the 7.5-Minute United States Geologic Survey, Calabash. North Carolina Quadrangle indicating the specific location of the subject site and a site diagram are included as an attachment to this letter. These maps. diagrams. USACE delineation data sheets, previous AquAeTer correspondence with the USACE Wilmington District and the United State Department of Agriculture Farm Service Agency (FSA) will be included in our request for JD to USACE. Due to the recent EPA rulemaking on USACE Jurisdiction there is a backlog of permit and JD requests at the Wilmington District office. The dine line to receive an approved Jurisdictional Determination is estimated to be 6 to 18 months. All wetland delineations are subject to USACE approval and are not final until a USACE Jurisdictional Determination is issued by the appropriate District Office. If you have any questions or need further information. please feel free to contact us by telephone at (615) 373-8532, by FAX at (615) 373-8512. or by electronic snail at a k-ilding�"tz:aquaeter.coni or careen itiaquaeter.com. Sincerely, AquAeTer, Inc. Amanda R. Wilding Project Biologist Attachments ATTACHMENTS Historical Topographic Map • • •a �-,1 Iji '1f ' a �!, + „. f hh, \ Subject ,•• r f • •• i � . • � i 0.) S 4 yr .. 14. S " •'•• " Ewa • •� i 'y * { • J ":, :v �'' " M ay , :. , li � •. ... t � +~ ( a r�is .fie � �. ; � Jr a 4y � . ��' �� _ � � . �. TARGET QUAD SITE NAME: Proposed CVS Pharmacy CLIENT: AquAeTer, Inc. N NAME: CALABASH ADDRESS: NEC of Calabash Rd/U-S Hwy CONTACT: Christopher S. Green MAP YEAR: 1990 Calabash, NC 28467 INQUIRY#. 1820094.4 LATILONG: 33.9067178.5859 RESEARCH DATE: 12/19/2006 SERIES: is SCALE: 1:24000 10011 viol �%!OSIH3 -Gu qos IN $11"I Id I! No 114 Sites at elevations higher ftn or equal to tho target property + Sites at elevations lower than the target property A Manuhmiured Gn Plants Sensitive Receptors National Priority List sites Landfill Sinks Dept. Defense Sites DETAIL MAP-1820094.2s -------------- .< Indian Reservations 81A Hazardous Sabstanos i oil 6 Gas pipetines drspasat Sass 100-year Rood zone y ` SOo-]rear flood zone National wetland inventory State Wetlands This report includes Interactive Map Layers to dis andfor hide map intormalion. The legen nudes only those icons for the delault map view. SITE NAME: Proposed CVS Pharmacy CLIENT: AquAeTer, Inc. ADDRESS: NEC of Calabash R&U.S. Hwy CONTACT: Christopher S. Green Calabash NC 28467 INQUIRY /: 1820094.2s LATfLONG: 33.9067178.5859 DATE: December 18, 2006 b.56 pm sess�rnc�e as :,� E :.ro;.»amps � Z N m SN �� - - - jjjFFF:::,���JJ�rr •,�� � �. n r� 6. Iv w r s a C.. CHANNEL SIZING/LINING CALCULATIONS 10 YEAR -�� F 7,.. FI DATA ; AREA = 0.50 (Ac.) C = 0.50 INTENSITY = 7.00 (in/hr) FLOW = 1.75 (cfs) DESIGN GM -RIA CHANNEL LINING: N = 0.060 (Mannings V) SLOPE= 0.006 (ft/ft) Z REQUID= 0.91 M = 3 :1 (sideslope) CHANNEL DIMENSIONS DEPTH = 0.36 (ft) WIDTH = 4.75 (ft) Bottom Width TRACTIVE FORCE T =Y*D*S Tractive Force (#/sq ft) Y = WEIGHT OF WATER (62.4 #/cf) D = DEPTH OF FLOW IN CHANNEL (ft) S = SLOPE OF CHANNEL (ft/ft) T = 0.1 (#/sq ft) Maximum Allowable Tractive Force L JUTE NET 0.45 (#/sq ft) I CURLED MAT 1.55 (#/sq ft) N TURF REINF. MATTING 3.20 (#/sq ft) I CLASS B RIPRAP 3.50 (#/sq ft) N CLASS I RIPRAP 5.00 (#/sq ft) G CLASS II RIPRAP 7.50 (#/sq ft) Z ACTUAL AREA = _ 2.10 (sq/ft) W P = 7.03 (ft) R = 0.30 Z ACTUAL = 0.94 MUST BE > THAN Z REQ'D. = 0.91 V = 0.86 (ft/sec) CiIANNqLDr-SIGN SE LINING: GRASS ONLY - 0.45 1 #/sq ft > 0.1 #/sq ft (TOPW I DTH) 6.91 ft 0.36 ft \ / (DEPTH) \ / 4.75 Ift (BOTTOM WIDTH) Page 1 of 1 7opoZone - USGS Calabash (NC,SC) Tlorp�o` Page 1 of 1 O r(c) °A - ;:._ bpMM r ,., ' 1. ? . ,r'• - :"u�ryNt"�f[lAe�s,}'a�Rr 17 1 + s ' ■ �T1 �' , 1 s • _ JJam�++ _ .-'.i .• • ■ t..,- 1. -� • + ■ •_+ *' . _... __.�...�.� __ .....�»_. _,..,.._..�.._ _ -.r -•-- . � �-+` ---� ,..�..-- 3. 3 ho ._Y''•• s ! y �i .. 'ter - '� • �, y .�. ft^p.:.- _ � y 'P`` 1 w� 'R ^ ' rr 1 ��� `� "4 .. �3:^ S f T + 1'�. • _Ir/I'M • ►.+, • ■: f 1 • -i ._-fir __.. •, a._-.,_-r ! �, _ !..« ....— �' ii] • d 1 p� �• •' ■s • r • r it Ak r.,-•�?r.r_'•- .'■C� it • r '• r ! y „`\r• ,�. :��1.'i'�.J7_ 10 M 0 0.3 0.6 0.9 1.2 1.5 km G 0 0.1 0.2 0.3 0.4 0.5 mi 330 54' 24"N, 780 35' 10"W (NAD27) USGS Calabash (NC,SC) Quadrangle N-_8.44 Projection is UTM Zone 17 NAD83 Datum C-1.347 http://www.topozone.conVprint.asp?la-33.90677&lon=-78.58623&s=48&size=m&u=6&1... 7/17/2007 Calabash Road and US Highway 17, Carolina Shores, NC - Google Maps Page 1 of 1 Address Carolina Shores Pkwy & cvj � d' 0 �:. J Calabash Dr c•��� S h u 5 Calabash NC 28467 7 0. ry .; a •ti Ott +/ m n *1 ,urn �• "ti!� S. a c Y Tsc Rl0 W m r. v " s .12 cam [is MiEii�na;i_ m S9. Waass.roads & It 3ell F... 02007 GOO& - M8 ft dalar�2007 N14V rEQ�' - -AkQf Use http://maps.google.com/maps?f=q&nl=en&geocode=&q=Calabash+Road+and+US+High... 7/17/2007 North Camlina. Secretary of Stale Page l of 1 &1410 'Nt010*.* C.apnratmw 4A�nx Aoarah RY CA rV,,, Nte rfNr t� Uwu* a5v Ms?KMrCd AOenf iln!a+rstttlt a±..Tf;M l:Gli7itrJrlitsllA rR�,. i:M„78P',+ni�l1� AyJVC!d t�� PAU, T_Uaesce !�WLY:E!•LYfrS fZ1S541i1IT�41 «lUft7 Y.erl-9rurlf are„arTs gf>rlr.: a,rn�A! !topofle WNKS a LaskFLAt1AN KBRE 020 Annuhl Rapoeta :q$fa B( mbe, CaFICCNOr ZWL 919 %bramtl-le? 009 Rant," wk,, e1.11n10 Rapo-Ya IN, COrµoriwUNIs 39m N''TimW roY ;;`Pro(=,'•dmg�ST CJ:FT. 41' t;4"HJQ <yN61 %txAslrrts Start ikyAr� nrdoe i, U'X'x 1"aY!`M�I' M':,CCtliI HtC CONYAGY O c ;6LW,+r Q10V$!n $1"W" of :ttW.'9 wob ! to rfttnY.� ,4ikTlrrtlry Tr` Bute rMm! ?rlrlYlHM a fmx t North Camlirta ,Fl0ine al" marstiall DEPARTMENT off' Secretary SECRETARY of STATE PO wart M22 Raislo, NO 27626,09n (019) -2000 Date: 8120/2W7 Click tier* to: View acmument Filings Print apre«popiilatod Annual Rgpert Form ! Annual Report Coant i Fite a" Aarsueil Repmet Corporation Names Mqy N4rr Typ* NC u114 Oak K. LLC Legal Limited UaWlity Company Information *Oslo; 9f a ,tp Status: CV,rWt-jtWvG Date Formed: W1012004 Citizenship: Domestic State of Inc,; NC Duration; Perpetual Registered Agent Agent Nance; Scacaral'sni, Dean .t. Rogistered Office Address, 618 Prino+se Vrest MrAingtor+ C 28401 Rogistamd Mailing Address: 616 Printass Street Wimington NC 28401 #rleoipml Office Address: el PrtnemsStreet W imington NC; 2$404 Principol Melling Address: 616 Princelas $trials# 1Mrknington NO 28401 far 4Jeat1yt, cr ao mJ—k# 4h/Y1 the 4SQrtto,v C! STace's woo s+u, rlw.r crud s•a.tl Tr wrlbfnaalyr. hit € fJl ' .seE J ; Nstate.z�c.usrcoxpo�r� 0 9 £ £ � £ 0 I Nib H d!� S �VV I ' l l ' a �! S �i'ai� W7 { 0 O l O C 0 (.�' ! V SOSID: 7397050 Date Filed. 8119/ 4 2.05:00 PM Elaine F. Madbail State of North Carolina North Carolina Secretary of Stste Department of the Secretary of State OW423100505 Limited Liability Company ARVICI ES x +�u�iRr'�.P'AiriZAMOINT Pursuant to §57C 2-20 of the General Statutes of North Carolina, the tmdersig,aed does bemby subrait thesc Articles of Orgonintio'n for the purpose of forming a iliraked liability company. l , The name of the iieerited liability company is: LIVE OAK NC, LLC 2, Ifthe HrWted i'eability cornpmw is to dissolve by a specific date, the latest done on wWch the lis *ed liability company is to dissolve. (If no darts for dinolud on is specified, there shill be na ftwit on the duration of the Uwfted liability company) 3. The name and address of'esch person ez=ting these ai*les of organization is as follows; (Mate whether each person is executing thane artwks of mganfaarion in rho capacity of a member, organizer or both). De= Scarsfimi — 0rSan zerfMmnber 616 i'zkmw Street VikbroN NC 29401 4. The street address rind county of the initial registered office of the limited liability eompew is: Number and Street: 616 Pr7gwas Street City, State, Zip Cote: WilmkWoz, Notrtl'x Garolioa 29401 County: New Hanover The miiiliteg add &% V dWenXt f oom #Ike street address, of the irliti i registered oiFice is: 6. The xta ne of the k6tial registered agent is: Demon Scarafoni 7, primi pal office fidbrmstioo: (Selwt either a or b.) a. The 11miitcd liability oompany has s principal off me, The street address and emmy of the principal ofitee of tits lktited liability onmpuny is; Number and Street: 616 Primm Street City, State. Zip Code: Wllmitigton, North Carollers 28401 County: New Hanover The mailing ad&MB, VdWenamfivM the onset ad -ens, of the principal ot'ix of the earporatim is; b. ❑ The firnited liability coeetQany does trot have a prinwipal office. £/Z 'd 0!Z'ON V B ti ���6WdHa �SW�i��[M1 rS�dfV l�'FO Ol �ODZ 'nZ'��" S. Chwk one of the following: —? (i) 1i vmbvrwmm d LLiC; all members by virtue of their stgus as tueuftrs shall be nanagen of U* limited liability company. 0) Mallr9P?-, LLC' except as provided by N-co.s. Section 57C-3-20(a), the mmbers oftivs &Aed liability company shall not be mapagers by virtue of their states as ems. 9. Any othcx pmvisiora which the limited liability oampaay elects to include we attached, 10. These articles wlu be effective upon filing. This is the day coifAA.ugust, 2004. scmar ow � '8�rlMentber NOTES: 1. F049 &a Is $125. This daement mwRt be it W whb the 9metary of fible. CORPORATIONS DIVISION PA Box 29622 (RevbedJauoy 2002) ItALEICiI NC (Form Ob22 ► F/F £t17 aN ,�QRfitfii;ifiN N�If1 CJH II' l���u ��w T��N�r n rnn7 n7,;nW CarternBurgess TO: Janet Russel LETTER OF TRANSMITTAL DATE: 10-17-07 Div. of Water Quality, NCDENR FAX: 127 Cardinal Drive Extension Wilmington, NC 919.788.5882 FROM: Tom Wainwright PHONE: 910-796-7427 PROJECT: CVS-Carolina Shores Stormwater RECEIVED PROJECT#: 291649 OCT 2 2 2007 Please find the following items for: Review and Comment 0 Approval 0 Pick-up 0 Your Use DWQ Transmitted via: PROD # 5N 30—f0 824- Fax Mail Delivery FX Fed -Ex # Of Fax pages COPIES DATE DESCRIPTION 1 10-17-7 ORIGINAL — Operations and Maintenance Plan 1 10-17-7 ORIGINAL — Stormwater Agreement between Owner and Tenant 1 Paul's comments I REMARKS: Janet — Please put in the hands of whoever needs this. Sent to you per Paul's comments. This should be the final documentation needed for permit issueance, I believe. Thanks, Tom CARTER & BURGESS, INC., 5811 GLENWOOD AVENUE, SUITE 300, RALEIGH, NC 27612 TELEPHONE (919) 783-6988 FAX (919) 783-5882 Re: CVS - Carolina Shores NCDENR Stormwater Agreement betwee... Subject: Re: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Thu, 27 Sep 2007 09:08:34 -0400 To: deanscarafoni@comcast.net CC: Linda Lewis <linda.lewis@ncmail.net> Mr. Scarafoni, All of our permits require that a change of ownership be submitted to and approved by DWQ within 30 days of such a transfer. The requested change to Item 3 is consistent with a requirement that will be in the permit when it is issued. The Agreement is to insure that the permit is transferred to succeeding owners and the responsibility for maintenance of the BMP is done by succeeding owners. Paul Bartlett Stormwater Permitting (919) 733-5083 X235 (ph) email: Paul.Bartlett@ncmail.net deanscarafoni@comcast.net wrote: ett, I have been informed of the following change in the "Stormwater Agreement Between Owner and Tenant" that NCDENR has requested: /DEHNR came back and requested a change to # 3 on the attached stormwater agreement that Diane Glass and Dean Scarfoni had signed./ /I have made the change as requested and attached the document for your approval prior to having this .re -executed./ /The previous version read "the responsibility for the maintenance of the BMPs for the stormwater system shall pass in the chain of title to the owners successor in interest./ /The new version reads "....system can only pass to another owner upon the division of water quality's receipt of an official request to transfer the permit and the divisions approval of that request"/ // First, there was no mention of this condition in your email of August 16. Beyond that, it places an unreasonable encumbrance on the property. Any sale is already subject to the government regulations, permits, tax liens, etc. that are in place, including this Stormwater Agreement - that is your agency's control. To require that a sale and purchaser be reviewed and approved by NCDENR in advance is inappropriate and an excessive burden on the owner and, for that matter, your agency. Does anyone know how long this process would take? Again, you have ample control through the permit process and enforcement of the conditions required by the permit. I respectfully request that this late change to the Agreement be set aside. Dean Scarafoni President Live Oak Development Company 910-538-5855 deanscarafoni@comcast.net 1 of 1 9/970nm 4•nQ a r/ Re: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement b... Subject: Re: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant] From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 26 Sep 2007 07:43:32 -0400 To: Paul Bartlett <Paul.Bartlett@ncmail.net> Paul: The lateness of this last addinfo item is due to me reviewing the permit at your request. All of our permits require that a change of ownership be submitted to and approved by the Division within 30 days of such transfer. Mr. Scarafoni's permit will be no different. He appears to be trying to foist off the responsibility of seeing that the maintenance is done to the succeeding owners without having to transfer the permit. He makes it sound like we have the control, when in fact, we have to rely on him to notify us of ownership changes. He just needs to change the agreement and be done with it. It sounds like he doth protest too much. We must have hit a nerve where he thought he'd outsmarted us or something. Linda Paul Bartlett wrote: Linda, Please review the attached email from Dean Scarafoni to me & either call or email me so we can discuss a response. I also received a voice mail from Dean re the Item#3 language that you wanted in the Agreement. The language referred to the BMP system, not the sale of the entire property which seems to be his concern. He doesn't want to sign the Agreement as it stands now & I am interested in what you might suggest for Item #3. The file is in WiRO. Thanks, Paul--------------------------------------------------------------------- Subject: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant From: deanscarafoni@comcast.net Date: Fri, 21 Sep 2007 14:21:17 +0000 To: Paul.Bartlett@ncmail.net To: Paul.Bartlett@ncmail.net CC: Thomas.Wainwright@c-b.com, MarlaneK@aol.com Mr. Bartlett, I have been informed of the following change in the "stormwater Agreement Between Owner and Tenant" that NCDENR has requested: /DEHNR came back and requested a change to # 3 on the attached stormwater agreement that Diane Glass and Dean Scarfoni had signed./ /I have made the change as requested and attached the document for your approval prior to having this re -executed./ /The previous version read "the responsibility for the maintenance of the BMPs for the stormwater system shall pass in the chain of title to the owners successor in interest./ /The new version reads "....system can only pass to another owner upon the division 1 of 2 9/27/2007 826 AN Re: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement b... of water quality's receipt of an official request to transfer the permit and the divisions approval of that request"/ // First, there was no mention of this condition in your email of August 16. Beyond that, it places an unreasonable encumbrance on the property. Any sale is already subject to the government regulations, permits, tax liens, etc. that are in place, including this Stormwater Agreement - that is your agency's control. To require that a sale and purchaser be reviewed and approved by NCDFNR in advance is inappropriate and an excessive burden on the owner and, for that matter. your agency. Does anyone know how long this process would take? Again, you have ample control through the permit process and enforcement of the conditions required by the permit. I respectfully request that this late change to the Agreement be set aside. Dean Scarafoni President Live Oak Development Company 910-538-5855 deanscarafoni@comcast.net 2 of 2 9/77/2()07 R•U ATn Re: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement b... Subject: Re: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant] From: Linda Lewis <Iinda.lewis@ncmail.net> Date: Wed, 26 Sep 2007 07:47:25 -0400 To: Paul Bartlett <Paul.Bartlett@ncmail.net> Paul: Basically what we want is a signed agreement between the Division and Mr. Scarafoni to maintain the pond and to make sure that the lease agreement between Mr. Scarafoni and CVS doesn't make CVS (or the leasee) the sole responsible party for maintenance. We want assurances in writing that Scarafoni will maintain the permitted system should CVS not live up to their lease, or should they vacate the property. Linda Paul Bartlett wrote: Linda, Please review the attached email from Dean Scarafoni to me & either call or email me so we can discuss a response. I also received a voice mail from Dean re the Item#3 language that you wanted in the Agreement. The language referred to the BMP system, not the sale of the entire property which seems to be his concern. He doesn't want to sign the Agreement as it stands now & I am interested in what you might suggest for Item #3. The file is in WiRO. Thanks, Paul------------------------------------------------------------------------ Subject: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant From: deanscarafoni@comcast.net Date: Fri, 21 Sep 2007 14:21:17 +0000 To: Paul.Bartlett@ncmail.net To: Paul.Bartlett@ncmail.net CC: Thomas.Wainwright@c-b.com, Mr. Bartlett, MarlaneK@aol.com I have been informed of the following change in the "Stormwater Agreement Between Owner and Tenant" that NCDENR has requested: /DEHNR came back and requested a change to # 3 on the attached stormwater agreement that Diane Glass and Dean Scarfoni had signed./ /I have made the change as requested and attached the document for your approval prior to having this re -executed./ /The previous version read "the responsibility for the maintenance of the BMPs for the stormwater system shall pass in the chain of title to the owners successor in interest./ /The new version reads "....system can only pass to another owner upon the division of water quality's receipt of an official request to transfer the permit and the divisions approval of that request"/ // First, there was no mention of this condition in your email of August 16. Beyond that, it places an unreasonable encumbrance on the property. Any sale is already subject to the government regulations, permits, tax liens, etc. that are in place, including this Stormwater Agreement - that is your agency's control. To require that a sale and purchaser be reviewed and approved by NCDENR in advance is inappropriate and an excessive burden on the owner and, for that matter, your 1 of2 Q/2',7L) 25 AIN, 40? 8:- Re: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement b... agency. Does anyone know how long this process would take? Again, you have ample control through the permit process and enforcement of the conditions required by the permit. I respectfully request that this late change to the Agreement be set aside. Dean Scarafoni President Live Oak Development Company 910-538-5855 deanscarafoni@comcast.net 2 of 2 9/270-007 8:25 ATM [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement betwe... Subject: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant] From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 25 Sep 2007 11:43:47 -0400 To: Linda Lewis <Iinda.lewis@ncmail.net> Linda, Please review the attached email from Dean Scarafoni to me & either call or email me so we can discuss a response. I also receilred a voice mail from. Dean re the Item#3 language that you wanted in the Agreement. The language referred to the BMP system, not the sale of the entire property which seems to be his concern. He doesn't want to sign the Agreement as it stands now & I am interested in what you might suggest for Item #3. The file is in WiRO. Thanks, Paul Subject: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant From: deanscarafoni@comcast.net Date: Fri, 21 Sep 2007 14:21:17 +0000 To: Paul.Bartlett@ncmail.net CC: Thomas.Wainwright@c-b.com, MarlaneK@aol.com Mr. Bartlett, I have been informed of the following change in the "stormwater Agreement Between Owner and Tenant" that NCDENR has requested: DEHNR came back am! requested a change to A 3 on the attached stormwater agreement that Diane Glass and Dean Scarfoni had signed I have made the change as requested and attached the document for your approval prior to having this re -executed The. previous version read "the responsibilityfor the maintenance of the BMPs for the stormwater system shall pass in the chain -of title to the owners successor in interest. The new version reads "....system can only pass to another owner upon the division of water quality's receipt of an official request to transfer the permit and the divisions approval of that request" First, there was no mention of this condition in your email of August 16. Beyond that, it places an unreasonable encumbrance on the property. Any sale is already subject to the government regulations, permits, tax liens, etc. that are in place, including this Stormwater Agreement - that is your agency's control. To require that a sale and purchaser be reviewed and approved by NCDENR in advance is inappropriate and an excessive burden on the owner and, for that matter, your agency. Does anyone know how long this process would take? Again, you have ample control through the permit process and enforcement of the conditions required by the permit. I respectfully request that this late change to the Agreement be set aside. Dean Scarafoni President Live Oak Development Company 910-538-5855 3eanscarafoni@comcast.net CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant.eml Content -Type: message/rfc822 Content -Encoding: 7bit 1 of 1 9/25/2007 11:44 Ali State of North Carolina Department of Environment and Natural Resources Division of Water Quality Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Michael F. Easley, Governor FAX COVEWSHEET William G. Ross, Jr., Secretary Date: 9/18/07 j/ ' \,f.No. of Pages: . 3 (Incl. Cover) To: Tom Wainwrighf From: Paul Bartlett Company: C & B Water Quality Section - Stormwater FAX #: (919) 783-5882 FAX #: 919-733-9612 Phone #: 919-733-5083 X235 DWQ Stormwater Project Number: SW8 070824 Project Name: CVS Carolina Shores Store MESSAGE: Tom, Attached are marked copies of changes that we need to the 2 Agreements before we can issue the permit. Please delete the current Item#3 and have Item #3 of the Owner/Tenant agreement read: "The responsibility for the maintenance of the BMP(s) for the Stormwater System can only --pass to another owner upon the Division of Water Quality's receipt of an official request to transfer the permit and the Division's approval of that request". Live Oak and CVS will need to sign/date and have notarized as before. The.Operations and Maintenance Agreement for the wetland BMP needs to be signed by the Applicant/Signing Official to whom we are issuing the permit, Live Oak NC, LLCiDean Scarafoni, Manager, and notarizedidated. Please send or deliver originals of the 2 requested items to the Wilmington Office to facilitate issuing the permit as follows: NCDENR — Div. Of Water Quality J�aj 127 Cardinal Drive Extension Wilmington, NC 28405 Attention: Janet Russell (919) 796-7421 (direct) ENB1ptb: S:IWQSISTORMWATER\ADDINF0120071070824FAX.sept07 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 FAX (919) 733-9612 An Equal Opportunity Affirmative Action Employer SEP-18-2007 TUE 12;27 PM NCDENR FAX NO, 9103502004 P. 03 STATE OF NORTH CAROLINA BRUNSWICK COUNTY STORMWATER AGREEMENT BETWEEN OWNER AND THIS AGREEMENT, made and entered into this the day of , 2007, by and between LIVE OAK NC, LLC, hereinafter referred to as Owner, and CVS 7420 NC, L.L.C., hereinafter referred to as Tenant. WITNESSETH THAT WHEREAS, Tenant is this day accepting responsibility for the stormwater device(s) installed on that certain real property known as , as shown on the plat thereof recorded in the Book of Maps , Page , Brunswick County Registry, hereinafter referred to as the property; and WHEREAS, subject to the terms and conditions of this Agreement, the Tenant accepts responsibility for the operation and maintenance: of the proposed best management practices for the stormwater devices :and associated stormwater conveyance systems (collectively, the "Stormwater System") located on the property; and WHEREAS, subject to the terms and conditions of this Agreement, the Owner will maintain the BMP(s) at his expense if the Tenant should decide to vacate the property and at the Tenant expense if the Tenant fails to provide the proper maintenance, as required by the State of North Carolina Department of Environment and Natural Resources Division of Water Quality and the Stormwater Permit issued by the Division of Water Quality; and WHEREAS, the Tenant understands that this Agreement shall inure to the benefit of its successors in title, whomsoever they may be in the future. NOW, THEREFORE, it is understood and agreed by and between the parties: 1. The maintenance of the BMP(s) for the Stormwater System shall be the responsibility of the Tenant during its occupancy of the property; provided, however, that if any stormwater runoff from any other party is diverted to the Stormwater System the Owner, then Tenant shall only be responsible for its pro rata share of the maintenance of the BMP(s) for the Stormwater System and the Owner would be liable for the remainder of such maintenance. 2. The maintenance of the BMP(s) for the Stormwater. System shall be the sole responsibility of the Owner, if the Tenant vacates property. respo- s'Mbi fhty for the maintenance of the BMP(s) for the Stormwater System Gh4L`-"'A 0 t) i y b T I e-Vc d�,�a-q a ka S f -f v 7'`r' - el4—c -e P �-w� r f a",� Own* . D)l /f r o yr 1' �� �� ✓a-P�Tenant• r F. Title: o_,� LC Date' 0,- l';1- -� CVS 7420 NC, L.L.0 ��@ °�• By: Name; Diane onvi., Gs Title, Assistant 5ecre4-Ar CV51ega1 approval ley Susan B. Cadson, Mintz Levin Date: r,7 Page I of 2 SEP-18-2007 TUE 12:29 PM NCDENR FAX NO. 9103502004 P. 12 n^ Operations and Maintenance Agrcemeut: r d ' VS 7 20 NC L.L.C., hereby acknowledges that it is the fh=cially respons C 4 Yible party for maintenance of this impoundment. It will perform the maintenance as outlined above•�CCe�c� CVS 7420 NC, L.L.C. By: — Date: CI'1-0 Name• `Dian a_McMon4e Mass Title: , Aaeletae+t ecretary CVS Legal Approval: Susan E. Carlson, Mintz Levin I, fir. Illa.r , a Notary Public for the State of = �''�� ",County of do hereby certify that 13 personally appeared before me this day of -5=. "—' _ .. 200i� and acimowledge due execution of the foregoing instrument. Witness my hand and official seal rq L Seal my commission expires: pawn M Allard Notory Public State of Rhode Island my Commission fuPlres 06/22/2011 �- c&� SEP-18-2007 TUE 12:26 PM NCDENR FAX NO. 9103502004 P. 01 ER North Carolina, Department of Envirorimefftoe and Natural Resources Wilmington Re9►onal 0 (910) 796-7215 W il4tam G. Ross ]r Secrciary altGha e! F. Easley, Governor Y w tJ '7 0 6-24 C Y 5 FAX COVED SHEET C x # pages From; To. Fax: Remarks: p 7 . ter: w A 7' 15 f FAX. 4<:,- -7f e,(. 1/0 - -(16 - 7402- 0) S'W8 070824 CVS Carolina Shores Store Subject: SW8 070824 CVS Carolina Shores Store From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 18 Sep 2007 12:06:16 -0400 To: Janet Russell <Janet.Russell@ncmail.net> Janet, Linda Lewis & I have been discussing CVS. We are not going to issue the permit until more info is received from the applicant. Please retrieve the file and send it to me (either Linda or Ed may have it). In the meantime, please FAX the 2 0&M Agreements in the file to me at (919) 733-9612. I'll be sending an AI request to them this Thurs & will need a copy of the Agreements before I send the AI request. Thanks, Paul 1 of 1 9/18/2007 12:06 PM Re: SW8 070824 Subject: Re: SW8 070824 From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 18 Sep 2007 11:52:18 -0400 To: Linda Lewis <linda.lewis@ncmail.net> You're welcome. Always a pleasure doing business... Paul J l0 �%n '`•J"�' 'f`� ! ' Linda Lewis wrote: I d-7 z'4 �( Paul: That sounds fine. Thanks for working with me on this. Linda Paul Bartlett wrote: Linda, Thank you for your review.& comments. Good call. I'll get Live Oak to sign an 0&M as well and strike Item#3 in the Agreement. How about replacing it with: "Maintenance responsibility can only pass to another owner upon the Division's receipt of an official request to transfer the permit and the Division's approval of that request." (per the last line of your email) Paul Linda Lewis wrote: I Paul: As requested, I looked over the permit for this constructed wetlands. In the absence of a dedicated high density shell for wetlands, I'm OK with altering the pond shell. One thing that worries me is that the person we are writing the permit to has not signed an 0 & M agreement. As w` we disc`u'ssed, the JJeTiLL±ee shou require a easee o maintain the wetlands through the "Stormwater Agreement B� n the property, but the ermittee~needs to sign an 0 & M with the Divis The permittee needs a separat protect itself, but our perms.. is wi C, L riot with the CVS, therefore, we need a separate 0 & M sign d by the permittee. The agreement should be clear in that the ultimate responsibility for maintaining the wetland falls to the permittee. The Division will not be enforcing against the CVS for failure to maintain- it will be enforcing against the permittee. I also don't care for the language in item #3 of the agreement that says the responsibility for the maintenance of the BMP shall pass in the chain of title to the Owner's successor i.n interest. Maintenance responsibility can only pass to another owner upon receipt of an official request to transfer the permit and the Division's approval of that request. Linda 1 of 1 9/18/2007 11:52 AM Re: SW8 070824 Subject: Re: SW8 070824 From: Linda Lewis <linda.lewis@ncmail.net> Date: Tue, 18 Sep 2007 11:02:50 -0400 To: Paul Bartlett <Paul.Bartlett@ncmail.net> Paul: That sounds fine. Thanks for working with me on this. Linda Paul Bartlett wrote: Linda, Thank you for your review & comments. Good call. I'll get Live Oak to sign an O&M as well and strike Item#3 in the Agreement. How about replacing it with: "Maintenance responsibility can only pass to another owner upon the Division's receipt of an official request to transfer the permit and the Division's approval of that request." (per the last line of your email) Paul Linda Lewis wrote: Paul: As requested, I looked over the permit for this constructed wetlands. In the absence of a dedicated high density shell for wetlands, I'm OK with altering the pond shell. One thing that worries me is that the person we are writing the permit to has not signed an 0 & M agreement. As we discussed, the permittee should require the leasee to maintain the wetlands through the "Stormwater Agreement Between -Owner and Tenant", while the leasee is on the property, but the permittee needs to sign an 0 & M with the Division. The permittee needs a separate O&M signed by the leasee to protect itself, but our permit is with Live Oak NC, LLC, not with the CVS, therefore, we need a separate 0 & M signed by the permittee. The agreement should be clear in that the ultimate responsibility for maintaining the wetland falls to the permittee. The Division will not be enforcing against the CVS for failure to maintain- it will be enforcing against the permittee. I also don't care for the language in item #3 of the agreement that says the responsibility for the maintenance of the BMP shall pass in the chain of title to the Owner's successor in interest. Maintenance responsibility can only pass to another owner upon receipt of an official request to transfer the permit and the Division's approval of that request. Linda 1 of 1 9/18/2007 11:50 AN SW8 070824 Subject: SW8 070824 From: Linda Lewis <linda.lewis@ncmail.net> Date: Mon, 17 Sep 2007 16:16:16 -0400 To: Paul Bartlett <Paul.Bartlett@ncmail.net> CC: Ed Beck <Ed.Beck@ncmail.net> Paul: As requested, I looked over the permit for this constructed wetlands. In the absence of a dedicated high density shell for wetlands, I'm OK with altering the pond shell. One thing that worries me is that the person we are writing the permit to has not signed an 0 & M agreement. As we discussed, the permittee should require the leasee to maintain the wetlands through the "Stormwater Agreement Between Owner and Tenant", while the leasee is on the property, but the permittee needs to sign an 0 & M with the Division. The permittee needs a separate O&M signed by the leasee to protect itself, but our permit is with Live Oak NC, LLC, not with the CVS, therefore, we need a separate 0 & M signed by the permittee. The agreement should be clear in that the ultimate responsibility for maintaining the wetland falls to the permittee. The Division will not be enforcing against the CVS for failure to maintain- it will be enforcing against the permittee. I also don't care for the language in item #3 of the agreement that says the responsibility for the maintenance of the BMP shall pass in the chain of title to the Owner's successor in interest. Maintenance responsibility can only pass to another owner upon receipt of an official request to transfer the permit and the Division's approval of that request. Linda P 1 of 1 9/17/2007 4:30 PM CVS - Carolina Shores NCDENR Stormwater Agreement between ... Subject: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant From: deanscarafoni@comcast.net Date: Fri, 21 Sep 2007 14:21:17 +0000 To: Paul.Bartlett@ncmail.net CC: Thomas.Wainwright@c-b.com, MarlaneK@aol.com Mr. Bartlett, I have been informed of the following change in the "Stormwater Agreement Between Owner and Tenant" that NCDENR has requested: DEHNR came back and requested a change to # 3 on the attached stormwater agreement that Diane Glass and Dean Scarfoni had signed. I have made the change as requested and attached the document for your approval prior to having this re -executed. The previous version read "the responsibility for the maintenance of the BMPs for the stormwater system shall pass in the chain of title to the owners successor in interest. The new version reads "....system can only pass to another owner upon the division of water quality's receipt of an official request to transfer the permit and the divisions approval of that request" First, there was no mention of this condition in your email of August 16. Beyond that, it places an unreasonable encumbrance on the property. Any sale is already subject to the government regulations, permits, tax liens, etc. that are in place, including this Stonnwater Agreement - that is your agency's control. To require that a sale and purchaser be reviewed and approved by NCDENR in advance is inappropriate and an excessive burden on the owner and, for that matter, your agency. Does anyone know how long this process would take? Again, you have ample control through the permit process and enforcement of the conditions required by the permit. I respectfully request that this late change to the Agreement be set aside. Dean Scarafoni President Live Oak Development Company 910-538-5855 deanscarafoni@comcast.net 1 of 1 9/25/2007 2:23 PM [Fwd: CVS Carolina Shores NCDENR Stormwater Agreement bet... Subject: [Fwd: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant] From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 25 Sep 2007 11:43:47 -0400 To: Linda Lewis <linda.lewis@ncmail.net> Linda, Please review the attached email from Dean Scarafoni to me & either call or email me so we can discuss a response. I also received a voice mail from Dean re the Item#3 language that you wanted in the Agreement. The language referred to the BMP system, not the sale of the entire property which seems to be his concern. He doesn't want to sign the Agreement as it stands now & r am interested in what you might suggest for Item 43. The file is in WiRO. Thanks, Paul Subject: CVS - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant From: deanscarafoni@comcast.net Date: Fri, 21 Sep 2007 14:21:17 +0000 To: Paul.Bartlett@ncmail.net CC: Thomas.Wainwright@c-b.com, MarlaneK@aol.com Mr. Bartlett, I have been informed of the following change in the "stormwater Agreement Between Owner and Tenant" that NCDENR has requested: DEHNR came back and requested a change to # 3 on the attached stormwater agreement that Diane Glass and Dean Scarfoni had signed. Ihave made the change as requested and attached the document foryour approval prior to having this re -executed. The previous version read "the responsibilityfor the maintenance of the BMPs for the stormwater system shall pass in the chain of title to the owners successor in interest. The new version reads "....system can only pass to another owner upon the division of water quality's receipt of an official request to transfer the permit and the divisions approval of that request" First, there was no mention of this condition in your email of August 16. Beyond that, it places an unreasonable encumbrance on the property. Any sale is already subject to the government regulations, pen -nits, tax liens, etc. that are in place, including this Stormwater Agreement - that is your agency's control. To require that a sale and purchaser be reviewed and approved by NCDENR in advance is inappropriate and an excessive burden on the owner and, for that matter, your agency. Does anyone know how long this process would take? Again, you have ample control through the permit process and enforcement of the conditions required by the permit. I respectfully request that this late change to the Agreement be set aside. Dean Scarafoni President Live Oak Development Company 910-538-5855 - Carolina Shores NCDENR Stormwater Agreement between Owner and Tenant.eml Content -Type: message/rfc822 Content -Encoding: 7bit 1 of 1 9/25/2007 2:06 PM SW'807G&N CVS Carolina Shores Subject: SW8070824 CVS Carolina Shores From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 18 Sep 2007 14:05:21 -0400 To: Janet Russell <Janet.Russell@ncmail.net> Janet, Attached is the FAX I just sent to Tom Wainwright at C-B. I also left him a voice mail about the 2 items and to look for the FAX. Thev will send or deliver originals of the requested items to WiRO & your attention. Toms' phone # is (919) 786-7535 (dir). Paul 070824FAX.sept07.doc Content -Type: application/msword Content -Encoding: base64 1 of 1 9/18/2007 3:08 PM Re: SWo C70824 CVS Carolina Shores Store Subject: Re: SW8 070824 CVS Carolina Shores Store From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 18 Sep 2007 12:39:18 -0400 To: Janet Russell <Janet.Russell@ncmail.net> Sounds good ... will do. Paul Janet Russell wrote: Paul: I am getting ready to fax you what I think you want. Linda says if you will make the calls and get them to send in or bring in what we need to the Wilmington Office - we will finish up the paperwork and issue permit here. No need to forward file back to you. Any additional information should be sent to my attention so that I car. be sure it gets to Linda & the correct file. How does that sound? Janet Paul Bartlett wrote: Janet, Linda Lewis & I have been discussing CVS. We are not going to issue the permit until more info is received from the applicant. Please retrieve the file and send it to me (either Linda or Ed may have it). In the meantime, please FAX the 2 0&M Agreements in the file to me at (919) 733-9612. I'll be sending an AI request to them this Thurs & will need a copy of the Agreements before I send the AI request. Thanks, Paul 1 of 1 9/18/2007 3:07 PM State of North Carolina Department of Environment and Natural Resources Division of Water Quality Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Michael F. Easley, Governor FAX COVER SHEET William G. Ross, Jr., Secretary Date: 9/13/07 No. of Pages: 3 (Incl. Cover) To: Tom Wainwright From: Paul Bartlett Company: C & B Water Quality Section - Stormwater FAX #: (919) 783-5882 FAX #: 919-733-9612 Phone #: 919-733-5083 X235 DWQ Stormwater Project Number: SW8 070824 Project Name: CVS Carolina Shores Store MESSAGE: Tom, Attached are marked copies of changes that we need to the 2 Agreements before we can issue the permit. Please delete the current Item#3 and have Item #3 of the Owner/Tenant agreement read: "The responsibility for the maintenance of the BMP(s) for the Stormwater System can only pass to another owner upon the Division of Water Quality's receipt of an official request to transfer the permit and the Division's approval of that request". Live Oak and CVS will need to sign/date and have notarized as before. The Operations and Maintenance Agreement for the wetland BMP needs to be signed by the Applicant/Signing Official to whom we are issuing the permit, Live Oak NC, LLC/Dean Scarafoni, Manager, and notarized/dated. Please send or deliver originals of the 2 requested items to the Wilmington Office to facilitate issuing the permit as follows: NCDENR — Div. Of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Attention: Janet Russell (919) 796-7421 (direct) ENB1ptb: S:IWQSISTORMWATERIADDINF0120071070824FAX. sept07 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 FAX (919) 733-9612 An Equal Opportunity Affirmative Action Employer CVS- Stormwater Subject: CVS- Stormwater From: "Wainwright, Thomas J." <Thomas.Wainwright@c-b.com> Date: Thu, 13 Sep 2007 10:54:53 -0500 To: <paul.bartlett@ncmail.net> Paul, We had some rounding errors etc. Bound application calculations are correct. See attached changes. Formal copy to be submitted. Please let me know if you have problems with this sheet. Thanks, Tom Thomas Wainwright I Carter & Burgess I Project Manager - Water Infrastructure, Raleigh 1919.786.7535 919.783.5882 fax I thomas.wainwright@c-b.com I www.c-b.com Content -Description: Scan001 (10).pdf ScanO01 (10).pdf Content -Type: application/octet-stream Content -Encoding:, base64 1 of 1 9/13/2007 12:42 PU CarterommBurgess TO: Paul Bartlett NCDENR a Is ury ree th loor Archdale Bldg. Raleigh, NC FROM: Tom Wainwright PROJECT: CVS- Carolina Shores - Stormwater PROJECT#: G Please find the following items for: UA .WSi Fx Review and Comment 0 Approval 0 Pick-up 0 Your Use LETTER OF TRANSMITTAL DATE: 9/13/07 FAX: 919.783.5882 PHONE: itted via: 0 Fax 0 Mail Delivery Fed -Ex # Of Fax pages COPIES DATE DESCRIPTION 2 9/13/07 Stormwater Agreement Between Owner and Tenant - Originals 2 9/13/07 Operations and Maintenance Plan -Originals REMARKS: CARTER & BURGESS, INC., 5811 GLENWOOD AVENUE, SUITE 300, RALEIGH, NC 27612 TELEPHONE (919) 783-5988 FAX (919) 783-5882 5811 Glenwood Avenue, Suite 300 Raleigh, North Carolina 27612 Carter"'Burgess Phone: 919.783.5988 Fax: 919.783.5882 www.c-b.com September 6, 2007 Mr. Paul Bartlett, P.E. Environmental Engineer Wetlands and Stormwater Branch NCDENR 1617 Mail Service Center 512 N. Salisbury St. Raleigh, NC 27604 RE: Response to the Request for Additional Information Stormwater Project No. SW8 unassigned c-, 70 E7,4- CVS Pharmacy Carolina Shores Store Brunswick County C$B No. 902911649 Dear Mr. Bartlett: On behalf of Dean Scarafoni and Redd Realty, attached please find responses to your comments of August 21, 2007 regarding the Stormwater Management Design at CVS- Carolina Shores. Two copies are being submitted of the changes for your use. 1.) Please either delineate......... RESPONSE. T" A note was added to Sheet C-SP-.01 that states the wetland delineation consultant did not see evidence of wetlands on the site. 2.) Ple Cse clffy7 (a) Drainage Area 1 (to BMP) ......... RESPONSE: �) Application has been revised to reflect square feet and corrected to drainage area. 3.) Please revise Rv......... RESPONSE. The calculations shown in Section 4 of the report is accurate based on drainage area to the BMP. The Application has been revised (see p. 2 of 4) as noted above. vt4.) Please clarify the scales......... Carter & Burgess, Inc. Carter & Burgess Consultants, Inc. C&B Architeds/Engineers, Inc. C&B Architects/Engineers, P.C. C&B Nevada, Inc. Mr. Paul Bartlett, PE September 6, 2007 Page 2 of 2 RESPONSE: The scales have been changed as noted. 5.) Please label contour elevations......... 61 RESPONSE. Contours have been labeled as requested. `6.) Please add 3 columns to the Plants List......... RESPONSE: These columns have been added. 7.) Please clarify Stormwater Management Note # 2......... RESPONSE. The note has been revised to read correctly. The -original" Operation and Maintenance Agreement and the Agreement between the Owner and Tenant are being submitted under a separate package. Should you have any questions regarding this revised information, please contact me. Sincerely, Tom Wainwright, P.E. Project Manager cc. Marlane Klintworth — Redd Realty Dean Scarafoni — Live Oak NC, LLC TV01310902911649 C10S-CAL\CD'sXNCDENR\ba. Llett9_o_07.doc Carter & Burgess, Inc. Carter & Burgess Consultants, Inc. C&B Architects/Engineers, Inc. C&B Architects/Engineers, P.C. C&B Nevada, Inc. RE: FW: CVS - Carolina Shores NCDENR Liability Issue Subject: RE: FW: CVS - Carolina Shores NCDENR Liability Issue From: "Robertson, Steve" <SteveR@reddrealtyservices.com> Date: Wed, 22 Aug 2007 15:59:44 -0400 To: "Wainwright, Thomas J." <Thomas.Wainwright@c-b.com>, "Paul Bartlett" <Paul.Bartlett@ncmail.net> CC "Robert V anSant" <Ro'inert@reddrealtyservices.corrn> Attached is a proposed copy of the Stormwater Agreement between Owner and Leasee for item 3 below. Let me know if you require any changes or additional information. Thanks, Steve Robertson Construction Manager REDD REALTY SERVICES 6700 Rollingwood Drive Raleigh, NC 27613 (919) 723-1798 Mobile (919) 870-4478 Fax SteveR@Reddrealtyservices.com -----Original Message ----- From: Wainwright, Thomas J. [mailto:Thomas.Wainwright@c-b.com] Sent: Wednesday, August 22, 2007 1:53 PM To: Paul Bartlett Cc: Robertson, Steve Subject: RE: FW: CVS - Carolina Shores NCDENR Liability Issue Paul, I just left a voice mail as well. Redd Realty is wondering how to address item No. 3, part b) which requires a recorded access easement to the BMP. I suggested that the agreement state: The access easement for said BMP to be recorded prior to CO of the building. Then your approval letter for the BMP could condition the final approval/CO of the building on receiving a satisfactory recorded document that shows the access easement(s) for the CVS - BMP's. Or something to that effect. I'm open to suggestions. Thanks, Tom -----Original Message ----- From: Paul Bartlett [mailto:Paul.Bartlett@ncmail.net] Sent: Thursday, August 16, 2007 10:12 AM To: deanscarafoni@comcast.net; Wainwright, Thomas J.; Gollings, Jamie E. Subject: Re: FW: CVS - Carolina Shores NCDENR Liability Issue Dean/Tom/Jamie, Thank you for your patience. The permit application and maintenance/liability approach should be as follows: 1. The permit will be issued to the Owner. Dean, if you are the Owner of record, you are both the Applicant and Owner per Section I.1 and 1.2 of the application. If the Owner of the property is Live Oak Development Company, they will be the Applicant and Dean can sign as President per NC Administrative Code Section 15A NCAC 2H.1003(e)(1). 1 of 2 8/23/2007 9:38 AM RE: FW: CVS - Carolina Shores NCDENR Liability Issue 2. The proposed project will be considered under a common plan of development for the 17 ac tract. The Total Project Area per Section III.3 of the application will be 17 ac. The proposed CVS leased and built -upon area within the tract will be considered a pocket of high density even if the balance of the 17 ac tract remains within low density thresholds with or without future development. Therefore, the permit will be reviewed as a high density permit and the -high density application fee applies. The proposed BMP(s) may either be designed for just the proposed CVS project or to handle projected BUA for the 17 ac- tract at build -out. Bear in mind, the permit will be issued for the entire 17 ac tract with future permit modifications and new permits required depending on how the tract will be sub-divided/developed. 3. The Agreement between the Owner and Leasee should: (a) state that the tenant is responsible for operation and maintenance of the proposed BMP(s) and associated stormwater conveyance systems; (b) include a recorded access easement to the BMP(s) and associated stormwater conveyance systems; and (c) include a clause that the Owner will maintain the BMP(s) at his expense if the Tenant should decide to vacate the property and at the Tenant's expense if the Tenant fails to provide the proper maintenance, as required by the Agreement and DWQ Stormwater Permit. Paul T. Bartlett, P.E. Stormwater Permitting (919) 733-5083 X235 (ph) (919) 733-9612 (FAX) Paul.Bartlett@ncmail.net deanscarafoni@comcast.net wrote: -------------- Forwarded Message: -------------- From: deanscarafoni@comcast.net To: paulbartlett@ncmail.net Cc: marlanek@aol.com, timregister@intrstar.net, pnorris@nkteng.com, thomas.wainwright@c-b.com Subject: CVS Carolina Shores NCDENR Liability Issue Date: Sat, it Aug 2007 15:07:37 +0000 Mr. Bartlett, I am the owner of a property that has an Express Stormwater Permit review scheduled for August 20. The permit is being submitted for a proposed CVS store by Tom Wainwright of Carter & Burgess. CVS will be leasing the land from me. They will responsible for building and maintaining the improvements on the property, including the stormwater system. Can you tell me what I need to do from NCDENR's perspective to assign the maintenance/liability responsibility to CVS? I can be reached via email or the phone number below. Thank you. Dean Scarafoni President Live Oak Development Company 910-538-5855 deanscarafoni@comcast.net 2 of 2 8/23/2007 9:38 AM STATE OF NORTH CAROLINA COUNTY STORMWATER AGREEMENT BETWEEN OWNER AND LEASEE THIS AGREEME114T, made and entered into this the day of _ .20 by and between Owner , hereinafter referred to as Owner, and hereinafter referred to as Tenant/Leasee; WITNESSETH THAT WHEREAS, Leasee is this day accepting responsibility for the stormwater device(s) installed on that certain real property known as , as shown on the plat thereof recorded in the Book of Maps , Page County Registry, hereinafter referred to as property; and WHEREAS, the Leasee accepts responsibility for the operation and maintenance of the proposed BMP(s) and associated stormwater'conveyance systems; and WHEREAS, the Owner will maintain the BMP(s) at his expense if the Leasee should decide to vacate the property and at the Leasee expense if the Leasee fails to provide the proper maintenance, as required by the Agreement and DWQ Stormwater Permit; and WHEREAS, the Leasee understands that this Agreement shall endure to the benefit of his successors in title, whomsoever they may be in the future. Owner: Owner Date: NOW, THEREFORE, it is understood and agreed by and between the parties: 1. The maintenance of the BPM(s) and Stormwater conveyance systems shall be the responsibility of the Leasee during occupancy of property. 2. The maintenance of the BPM(s) and Stormwater conveyance systems shall be the sole responsibility of the Owner, if the Leasee vacates property. 3. The responsibility for the maintenance of the BPM(s) and Stormwater conveyance systems shall pass in the chain of title to the Owner's successor in interest. Leasee: Lease Date: Page 1 of 3 Page 2 of 3 NORTH CAROLINA COUNTY I, THE UNDERSIGNED notary Public of the County and State aforesaid, certify that personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and notarial seal, this the day of , Notary Public My Comm. Exp. Page 3 of 3 t/c01Z4c)7_ © �ceST State of North Carolina Department of Environment and Natural Resources Division of Water Quality C) Wetlands and Stormwater Branch cc 1617 Mail Service Center Raleigh, NC 27699-1617 vl;lr- Michael F. Easley, Governor William G. Ross', Jr., Secretary FAX COVER SHEET Date: 8121/07 No. of Pages: 4 (Inci. Cover) To: Tom Wainwright From: Paul Bartlett Company: C & B Water Quality Section - Stormwater FAX #: (919) 783-5882 FAX #: 919-733-9612 Phone #: 919-733-5083 X235 DWQ Stormwater Project Number: SW8 witszkjned- Project Name: Ci/S Pharmacy Carolina Shores Store MESSAGE: Tom, A Request for Additional Information is attached for the subject project. The original will be mailed to Mr. Scarafoni, and a copy will be mailed to you. If you use a courier service, please send to my attention at: NCDENR — Div. Of Water Quality Archdale Building, 12th floor, Room1209E 512 N. Salisbury St. Raleigh, NC 27604 lacti ENB1ptb: S:IWQSISTORMWATERIADDINFO\20071unassigned_CVS.aug07 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 FAX (919) 733-9612 An Equal Opportunity Affirmative Action Employer OF W ATFR �• Q o -c August 21, 2007 Mr. Dean Scarafoni, Manager Live Oak NC, LLC 616 Princess Street Wilmington, NC 28401 Subject: Request for Additional Information �-,092-4-- Stormwater Project No. SW8 unassigned CVS Pharmacy Carolina Shores Store Brunswick County Dear Mr. Scarafoni: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality The Wilmington Regional Office received a Stormwater Management Permit Application for CVS Pharmacy Carolina Shores Store on August 20, 2007. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please either delineate all wetlands on site, disturbed or undisturbed, or note on the lans that none exist. ,i se clarify: (a) Draina a Ar 1 (to BMP) (111,078 sf or 2.55 ac per al ulations/plans and 13 er the application, Section 111.6); and (b) ervious Area in DA1 1 sf or 1.65 ac er the calculations/plans and 7 ,2�f r 1.7 ac per the applic III. to - Please repor�ia f5u"ilt-upon areas In re feet on the application. (Marked application, page 2 attached0. Please revise Rv, Qvol, and surface area calculations and plans for consistency based on the response to Item #2 above. . l•� ?Aease clarify the scales for Sheet #6 and Sheet #X1. It appears that the scale should 'be 1 "= - ,for both sheets instead of the 1 "=10' scale shown on the scale bars. 5. Please label contour elevations on Sheets #5 and #6 for the stormwater wetlands above the ermanent pool elevation. 6. Please add 3 columns to the Plants List table on Sheet #X1 and complete the new columns: umber of Plants (enter number for each), Shallow Water and Shallow Land ss C/ (enter " " or check mark where applicable). 7. P �selarify Stormwater Management Note #2 on Sheet #6. It should read:... "pocket r ., f high density... within an overall low density development." � e s derstanding that an original, signed/dated, and notarized wetlands Operation and n ce Plan and that an original, signed/dated, and notarized Agreement between Owner and t QTe t ill be provided either before or with the above items. N�" ee hCarolina AatarWIlly Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Intemet: h2o.ennstate.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612 An Equal OppMunitylAffinnallve Action Employer — 50% Recycled110% Post Consumer Paper Mr. Dean Scarafoni, Member August 21, 2007 Stormwater Application No. SW8 unassigned Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 5, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (919) 733-5083 X235. Since ly, Paul T. Bartlett, P.E. Environmental Engineer ENB/ptb: S:IWQSISTORMWATERIADDINFO120071unassigned_CVS.aug07 cc: Tom Wainwright, P.E., Carter & Burgess Paul Bartlett 2 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4, Additional Project Requirements (check applicable blanks): _CAMA Major —Sedimentation/Erosion Control _404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will mainly sheet flow from the parkin/store area into a level spreader and then into a constructed wetlands pond. 2. Stormwater runoff from this project drains to the Lumber River basin. 3.. Total Project Area: 17.15 acres 4. Project Built Upon Area: 9.9 96 5. How many drainage areas does the project have? 2 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Infoiination . ° Drainage Area. 1. Drainage Area 2 Receiving Stream Name persimmon Swamp same Receiving Stream Class c : SW same Drainage Area 3. 0 ac . = 13o a8o sr- 14 . 15 ac T(oty 3';q .5 Existing Impervious* Area na na Proposed Impervious*Area 1 7 = 4F 05z gi+ % Impervious" Area (total) Itpervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 0.3 0 a 13 '2Z.5 SF 0 On -site Streets na 0 On -site Parking 1. 3 ac . ' Sor 628 sr- 0 On -site Sidewalks E{ Vs & bF Other on -site Off -site Total: 1. 7 ac . _ -4 y, 7Z.0q SI` Total: U impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 r P P �! v a 1 i �rP i ? �z//© % e _ DATE: ����✓ L f1,0 (rAX: NC G.L C LETTER OF TRANSMITTAL 20 August 2007 NONE: ucad ee - �`1 Y _f_. .... _ ,-- --�--� �._ _.-_ / !�S � �ted� i'�ti" �.----nsm a:�(i►� s�► E'S PIE' © Fax # Of Fax pages ---4� Mail -Puy � -- --- DeliveAlv&l�5 - rd CC ._ — �RIPTION,, 2rmwater Express Review Submittal Package k.,e-t &pr ef,/-7 REMARKS: Paul, Please find attached two copies of our express review submittal documents. CARTER & BURGESS, INC., 5811 GLENWOOD AVENUE, SUITE 300, RALEIGH, NC 27612 TELEPHONE (919) 783-5988 FAX (919) 783-5882 CarternmemBurgess TO: Mr. Paul Bartlett NCDENR - DWQ FROM: Thomas Wainwright, PE PROJECT: CVS (Store # 07 PROJECT#: 0902911.649 Please find the following items for: x0 Review and Comment 0 Approval 0 Pick-up Your use DATE: FAX: LETTER OF TRANSMITTAL 20 August 2007 Ned Pe0-Q4 J PHONE: ' D - s7-�x.w��u- WdIwPS Transm 1pk ea e't 0 Fax # Of Fax pages % '7 0 Mailstilr it 3- ra&-y� %1 VlZf. �fDelive �.f . ( tA.`JS p qq Icy I F U 5 �t%�,y►ld if�iV r�l�, f��^ar-� COPIES DATE DESCRIPTION ®D REMARKS: Paul, Please find attached two O '"� PB /7, Lr v" 40al YC- of our express review submittal documents. !•' 9(4 59 f9 6�F'� 1 WAW CARTER & BURGESS, INC., 5811 GLENWOOD AVENUE, SUITE 300, RALEIGH, NC 27612 TELEPHONE (919) 783-5988 FAX (919) 783-5882 Carter:Gurge.ss TO: Mr. Paul Bartlett DATE: NCDENR - DWQ FAX: FROM. Thomas Wainwright, PE PHONE: PROJECT: CVS (Store # 07420) PROJECT#: 0902911.649 Please find the following items for: x0 Review and Comment 0 Approval Q Pick-up xQ Your Use LETTER OF TRANSMITTAL 20 August 2007 Transmitted via: 0 Fax # Of _Fax pages Mail n Delivery COPIES DATE DESCRIPTION 2 8/20/07 Stormwater Express Review Submittal Package REMARKS: Paui, Please find attached two copies of our express review submittal documents. CARTER & BURGESS, INC., 5811 GLENWOOD AVENUE, SUITE 300, RALEIGH, NC 27612 TELEPHONE (919) 783-5988 FAX (919) 783�5882 A*A SUJ 764 f� Reviewer NCDENR North Carolina Department of Environment and Natural Resources Submit o7 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 FAX (910)350-2004 Time Request for Express Permit Review Confirm FILL-IN all information below and CHECK required Permit(s). FAX io Express Coordinator along with a detailed narrative and vicinity ma o of the project location. Projects must be submitted by 5.00 pm the day before the review date, unless prior arrangements are made. APPLICANT Name / Title Dean Scarafoni, Manager ' +fir �d'� � J e�V7c0r Company Live Oak NC.LLC Address 616 Princess st. City Wilmington, NC Zip 28401 County New Hanover Phone (910)7624356 Fax (910)762-6019 Email dscarafoniO-Iiveoakdev.com PROJECT Name CVS Pharmacy — Carolina Shores Store County Brunswick PROJECT DRAINS TO Persimmon Swamp in the Lumber RIVER BASIN ENGINEER/CONSULTAN Nang7homas J. Wainwright V f ct wt j P ��i r 4rls I e 16 (� �o -7 Company a r - umess, nc. L T Address 5811 Glenwood Ave.. Sui a 300 CityRaleigh a e C Zip 7612 /,/0 7 �u Phone 919-786-7535 Fax 919-783-5882 Email Thomas.Wainwright0c-b.com --------------------------------------------- —____—_--------___----------- State or National Environmental Policy Act (SEPA or NEPA) — EA or EIS Required? ❑Yes ® No ---------------------------------------------- ------ -- ---- ------------------ STREAM ORIGIN DETERMINATION # of Stream calls Stream Name --------------------------------------- --------------------------------------------------------------------------- ® STORMWATER ❑ Low Density (w/ pocket High Density)❑ High Density -Detention Pond® High Density - Other (check all that apply)- ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration Off -site Wetlands MUST be addressed below B Plan Revision ------ —---- ----------------------------------------------- ------------------------------------------------ ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront --------------------------------------------------------------------------- ------------------------- --------- ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with acres to be disturbed --__— --------- _---- __ Yes VIETLANDS (401) Wetlands on Property ? ❑ No Isolated Wetlands on Property? ❑ Yes ® No (Check all that apply) Wetlands will be impacted? ❑ Yes ® No Wetland impacts: acre(s) Wetlands delineation has been completed? ® Yes ❑ No ❑ Buffers impacted: Acre(s) USACOE Approval of Delineation completed? ® Yes ❑ No 404 Application in Process w/USACOE? ❑ Yes ® No / Permit recv'd from USACOE❑Yes ® No 401 Application Required? ❑ Yes ® No If Yes, ❑ Regular ❑ Express --------------------------------------------------------------------------------------------- Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for subsequent reviews due to the insufficiency of the permit application. Total Fee:$ Stormwater $ Date Received CAMA $ LQS $ 401 $ Project Name:_ CVS Pharmacy -Carolina Shores Store Stormwater Express Questionnaire (8/8/2007) 1. What is the applicant's full legal name? Dean Scarafoni If a corporation, LLC or Partnership is involved, what is that name? Live Oak NC,LLC If it's an LLC, is it ❑ manager -managed or ❑ member -managed? Whatis the applicants title wicr iiii Tree corporation, LLC or partnership? Mana er Will an agent (someone other than the applicant) be signing the application? 1j Yes ®No If Yes, what is the agent's name and title? ❑Please note the application signature requirements are listed in NCAC 2H.1003 (e). In summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. 2 Where is the project located? County Brunswick Nearest Town/City Town of Carolina Shores (Attach a detailed vicinity map with both ocal Street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc. Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway.) If the project is located in Brunswick, Onslow or New Hanover Counties, NPDES Phase ll Post - Construction rules will apply. 3. What is the name of the receiving stream? Persimmon Swamp 4. What River Basin is it located in? Lumber What is the classification of the receiving stream? C;Sw For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the % mile radius from the property comer closest to the SA or SR receiving stream must be drawn on the map. 5. If the project is high density, what type of stormwater management BMP's are being proposed? check all that apply) Wet Detention Infiltration Trench HAltemative Infiltration Basin HOffsite Sand Filter Bio-retention Wetlands Dry Detention H Other How many separate BMP's are being proposed? 1 2 3 4 5 6 7 8 9 10 11 12 Other 5. Is there offsite runoff from the adjacent properties or public right-of-way that will drain into any of the proposed BMP's on the project and is not being diverted? ❑ Yes ® No 6. Is an access road across other property required to access the project? ❑ Yes ® No 7. Is there any existing development or pre-1988 existing BUA located on the pro erty? (Please provide documentation & delineate and identify on the plans.) � Yes ® No 8. For high density projects, has all of the proposed BUA been collected? ❑ Yes ® No (If not, attach a separate explanation sheet) 9. Will the project involve the subdivision and sale of property? ❑ Yes ® No Is the subdivision ❑ residential or ❑ commercial? Page 1 of 2 Project Name: CVS Pharmacy -Carolina Shores Store How many lots are proposed? (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Have the wetlands been delineated? ® Yes [:]No (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) 11. Are wet detention ponds or other engineered controls proposed to be located ad'acent wetlands? Yes ER No (If, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHINT must be provided to demonstrate that the permanent pool of the BMP is above the SHIN and will not dewater the wetlands over time. Mere possible, all BMP's and swales should outlet into back the wetland (with level spreaders). 12. For infiltration projects, has a site visit been completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report? ❑ Yes ® N/A If yes, what was the date of the site visit? Include a copy of the consultant's soil report with the application. 13. Does the project propose Level Spreaders at the outlet of all engineered controls and swales prior to entering surface waters or wetlands? ❑ Yes ® No (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project a modification to an existing permit, part of a larger subdivision, or is it a lot that will be treated in a BMP under a previously issued permit? ❑ Yes ® No If yes, what is the name of the permitted facility? What is the permit number of the permitted facility? Is the permitted facility in compliance with its permit? Yes VNo Have the deed restrictions been recorded? Yes Have the deed restrictions been submitted? Yes Has the Designer's Certification been submitted? Yes 15. Do the plans reflect all information as listed in 15A NCAC 2H.1003 (g)? ® Yes ❑ No 16. Have all of the design requirements of each proposed BMP been met? ® Yes ❑ No (If not, attach a separate explanation sheet. Please note that ;he Express progmm is not set up to handle any type of deviation from the standard design.) 17. For each BMP in all high density projects, and low density curb outlet swale projects, has a drainage area delineation map been provided? ® Yes" No 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. Page 2 of 2 CVS Pharmacy — Town of Carolina Shores Site STORMWATER NARRATIVE AUGUST 20, 2007 Existing Site: Existing project site is located at the northwest corner of the intersection of US Highway 17 and Calabash Road in the Town of Carolina Shores. The existing 17.15 acre +/- tract consists of primarily a grassy farm field which has been left unmanaged for some time now. The existing topography includes a small knoll located immediately west of the proposed improvements. According to information provided to us, no wetlands have been located on the project site. However, there are some cattails located directly in front of some stormwater culverts within the NCDOT right-of-way. AquAeTer performed an on -site reconnaissance of the area on July 20, 2007 and have made a determination that there are no wetlands on the site. Stormwater runoff from the project area eventually drains to Persimmon Swamp. Proposed Project: The proposed project consists of the construction of a 13,225 sf CVS Pharmacy on the existing tract of land as described above. The development proposed with this application includes approximately 1.7 acres of impervious area on the 17.15 acre tract. This translates into a percent impervious less than 10%. The soil material according to the geotechnical report: the surface material consists of 6" to 12" of topsoil. This is underlain by the subsurface material which consists mainly of; fine sandy silty clays, silts and silty sands. The foundation for the building will be on constructed piles. Approx. two to three feet of material will be required as embankment material for the building pad. The construction sequence will generally be; 1) Install the erosion control measures per the approved plan. 2) Conduct the site grading and pile installation 3) construct the building 4) construct the drives and walks 5) finalize stabilizing the site with any permanent measures as required. Stormwater Management Approach: At less than 10% impervious, this project is proposed as a low density commercial development. NCDENR has determined that this project area contains a pocket of high density development. St :,nnwater from the project area will flow via surface conveyance (sheet flow and gutter flow) to either a grassed swale or pretreatment level spreader and then to a constructed stormwater wetland. Stormwater management approach will also be subject to the Town of Carolina Shores stormwater policies. Re: FW: CVS � Carolina Shores NCDENR Liability Issue Subject: Re: FW: CVS - Carolina Shores NCDENR Liability Issue From: deanscarafoni@comcast.net Date: Fri, 17 Aug 2007 13:42:43 +0000 To: Paul Bartlett <Paul.Bartlett@ncmail.net>, "Wainwright, Thomas J." <Thomas.Wainwright@c-b.com>, "Gollings, Jamie E." <Jamie.Gollings@c-b.com> Paul, Thank you. This is the information that I was looking for. Dean Scarafoni President Live Oak Development Company 910-538-5855 deanscarafoni@comcast.net -------------- Original message -------------- From: Paul Bartlett <Paul.Bartlett@ncmail.net> > Dean/Tom/Jamie, > Thank you for your patience. The permit application and > maintenance/liability approach should be as follows: > 1. The permit will be issued to the Owner. Dean, if you are the Owner > of record, you are both the Applicant and Owner per Section I.1 and I.2 > of the application. If the Owner of the property is Live Oak > Development Company, they will be the Applicant and Dean can sign a$ > President per NC Administrative Code Section 15A NCAC 211.1003(e)(1). > 2. The proposed project will be considered under a common plan of > development for the 17 ac tract. The Total Project Area per Section > 111.3 of the application will be 17 ac. The proposed CVS leased arid! &g t; built -upon area within the tract wiii be considered a pocket of high > density even if the balance of the 17 ac tract remains within low > density thresholds with or without future development. Therefore, the > permit will be reviewed as a high density permit and the high density > application fee applies. The proposed BMP(s) may either be designed for > just the proposed CVS project or to handle projected BUA for the 17 ac > tract at build -out. Bear in mind, the permit will be issued for the > entire 17 ac tract with future permit modifications and new permits > required depending on how the tract will be sub-divided/developed. > 3. The Agreement between the Owner and Leasee should: (a) state that > the tenant is responsible for operation and maintenance of the proposed > BMP(s) and associated stormwater conveyance systems; (b) include a > recorded access easement to the BMP(s) a! nd asso ciated stormwater > conveyance systems; and (c) include a clause that the Owner will 1 of 2 8/20/2007 9-21 AM Re: FW: CVS 4, Carolina Shores NC1)F,NR Liability Issue > maintain the BMP(s) at his expense if the Tenant should decide to vacate > the property and at the Tenant's expense if the Tenant fails to provide > the proper maintenance, as required by the Agreement and DWQ Stormwater > Permit. > Paul T. Bartlett, P.E. > Stormwater Permitting > (919) 733-5083 X235 (ph) > (919) 733-9612 (FAX) > Paul.Bartlett@ncmail.net > > deanscarafoni@comcast.net wrote: > >-------------- Forwarded Message: -------------- > > From: deanscarafoni@comcast-net > > To: paulbartlett@ncmail.net > > Cc: marlanek@aol.com, timregister@intrstar.net, > > pnorris@nkteng.com, thomas.wainwright@c-b.com >.> Subject: CVS _ Carolina Shores NCDENR Liability Issue > > Date: Sat, 11 Aug 2007 ! 15:07:3 7 +0000 > > Mr. Bartlett, > > I am the owner of a property that has an Express Stormwater Permit > > review scheduled for August 20. The permit is being submitted for > > a proposed CVS store by Tom Wainwright of Carter & Burgess. CVS > > will be leasing the land from me. They will responsible for > > building and maintaining the improvements on the property, > > including the stormwater system. Can you tell me what I need to > > do from NCDENR's perspective to assign the maintenance/liability > > responsibility to CVS? I can be reached via email or the phone > > number below. Thank you. > > Dean Scarafoni > > President > > Live Oak Development Company > > 910-538-5855 > > deanscarafoni@comcast.net 2 of $/20/2.007 8-21 ,AM Re:. [Fwd: M CVS - Carolina Shores NCDENR Liability Issue] Subject: Re: [Fwd: FW: CVS - Carolina Shores NCDENR Liability Issue] From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 14 Aug 2007 17:43:01 -0400 To: Linda Lewis <linda.lewis@ncmail.net> Thanks Linda, Will do. Paul Linda Lewis wrote: i Paul: if this is the email you're asking about- I haven't had time to read it through all the way, but.--- permit should be issued to owner. The paperwork between the owner and the leasee is the place to deal with the issues of responsibility for maintaining the system. Make sure their agreement includes a recorded access easement to the basin and a clause that the owner will maintain the pond at his expense should the tenant vacate the property, and at the tenant's expense should the tenant fail to provide proper maintenance. I agree that the common plan of development should be applied to this site. Linda Paul Bartlett wrote: Linda, I had a preliminary meeting on 7/24/07 for this CVS project with Dean Scarafoni (Live Oak NC LLC) and Tom Wainwright & Jamie Gallings of Carter & Burgess. CVS intends to lease approx. 1.5 ac that is within a 17 ac tract owned by Live Oak. CVS intended to be the applicant and apply under low density rules by using the 17 ac as a project area (density > 50% within 1.5 ac CVS leased area). I told Dean at the meeting the the owner (Live Oak) needs to apply for the permit for the entire 17 ac tract that at least assumes a BUA at build -out since "Common Development" would apply to the balance of the 17 ac & the proposed CVS project is a pocket of HD even if the balace of the 17 ac isn't developed. I told them to plan ahead & locate the BMP(s) at the most favorable location within the 17 ac. This wasn't what they wanted to hear since treatment options are limited. Attached is their email response & I am interested in your opinion before I proceed with them. Previous experience with issuing a SW permit to a leasee (Carteret Crossing) has involved receiving a contractual agreement between the owner & leasee that the leasee is responsible for the BMP & associated collection & conveyance systems/easements. Shall we take a similar approach to Carteret Crossing here? In this case the BMP will likely be outside the 1.5 ac, and, I believe, should be either designed for or the permit worded to modify the permit for build -out of the 17ac. Thanks, Paul Subject: FW: CVS - Carolina Shores From: deanscarafoni@comcast.net Date: Sat, 11 Aug 2007 15:09:26 To: Paul.bartlett@ncmail.net NCDENR Liability Issue +0000 1 of 2 R00/9,017 R•99 AIU Re: [Fwd: FVJ. CVS - Carolina Shores NCDENR Liability Issue] To: paul.bartlett@ncmail.net -------------- Forwarded Message: -------------- From: deanscarafoni@comcast.net To: paulbartlett@ncmail.net Cc: marlanek@aol.com, timregister@intrstar.net, pnorris@nkteng.com, thomas.wainwright@c-b.com Subject: CVS Carolina Shores NCDENR Liability Issue Date: Sat, 11 Aug 2007 15:07:37 +0000 Mr. Bartlett, I am the owner of a property that has an Express Stormwater Permit review scheduled for August 2.0. The permit is being submitted for a proposed CVS store by Tom Wainwright of Carter & Burgess. CVS will be leasing the land from me. They will responsible for building and maintaining the improvements on the property, including the stormwater system. Can you tell me what I need to do from NCDENR's perspective to assign the maintenance/liability responsibility to CVS? I can be reached via email or the phone number below. Thank you. Dean Scarafoni President Live Oak Development Company 910-538-5855 deanscarafoni@comcast.net 2 of 2 8/20/2007 R-72 AM Re: CV5-..C4eolina Shorees: Constructed Wetland Design Subject: Re: CVS - Carolina Shorees: Constructed Wetland Design From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Tue, 14 Aug 2007 09:10:20 -0400 To: "Gollings, Jamie E." <Jamie.Gollings@c-b.com> CC: "Wainwright, Thomas J." <Thomas.Wainwright@c-b.com> Jamie, Correct - Shallow land max 12" depth above permanent pool elevation per Hunt, Doll, 2000 ref on p. 9-11 & Fig. 9-7a. Correct - Shallow water 3" - 6" below permanent pool elevation (note: identified as primary cause of failure if this layer >611). Almost Correct - Deep Pool 18" - 36" below bottom of shallow water, therefore 21" - 42" below PP elev per Figs. 9-7a & 9-7b. Forebay area (10%) can be distributed since using pretreatment. A deep pool (5 - 10% of wetland area, approx. 5 ft diam) is needed at the outlet structure. Correct - Quest re 6" - 18" below PP elev: per Figs 9-7a & 7b this depth is in the "Deep Pool" zone. Notice per Fig. 9-7a: design forebay and deep pools so they are 6" or more *below* seasonably *low* water table to keep wet. Paul Gollings, Jamie E. wrote: Paul, The BMP Manual seems to have a glitch or two in the depth zones. From what I can see (cross section from high to low): * Shallow Land (12" above normal pool - 30-40% of wetland area): Section 9.3.3 specifically lists 12". The major design elements states maximum of 12". *This should be a maximum of 1211, correct?* * Shallow Water (3-6" below normal pool - 40% of wetland area) * Deep Pool. (18-36" below normal pool - 5-10% of wetland area) * Forebay typically 5-10%. However, we do not have a traditional forebay system as we discussed. Therefore, forebay area to be distributed across other zones. *In addition to the question behind the first bullet, how do we account for the depth zone.between 6-18" below normal pool? Is this part of the deep pool?* This seems to be an omission. Thanks. Jamie E. Gollings, PE I Carter & Burgess I Sr. Engineer 1 919.786.7544 1 919.783.5882 fax I jamie.gollings@c-b.com I www.c-b.com ------------------------------------------------------------------------ This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secured or error -free as information could be intercepted, corrupted, lost, destroyed, received late or incomplete, or could contain viruses. The sender therefore does not accept liability for any error or omission in the contents of this message, which arises as a result of e-mail transmission. If verification is required, please request a hard -copy version from the sender. 1 of 1 8/20/2007 8:23 AM about:blank Amanda: If there are NO proposed wetland impacts, you will not need any wetland certification from DWQ. The Army Corps will look at findings and either concur or not. If they concur, they will provide paper. If there are proposed impacts to wetlands, then you can make application simultaneously to the Corps and DWQ. As far as stormwater project submittal through Express or DWQ, when the submittal is made - any wetlands on the site or adjacent to the property lines need to show up on the site plan. The signed delineation or JD letter from the Corps should accompany the submittal. If there are no wetlands on the property or adjacent to the project, that should be stated on the plans and in the narrative. Hope this answers your question. Janet Amanda Wilding wrote: Ms. Russell: We spoke this morning regarding the proposed location of a CVS Pharmacy in Calabash, Brunswick County. A wetlands delineation was conducted on July 21-22, 2007. The findings of this report are not finalized at this time, but the subject property and surrounding drainage ditches appear to be non -wetland areas. am aware of the current backlog at the Wilmington District Corp office and NCDENR, and I would like to know if is possible to submit our findings to both the Corp and to the state simultaneously. Any suggestions on how to streamline the process for the DWQ certification for the subject property would be appreciated. Thank you for you time and assistance, please let me know if you need any additional information. Sincerely, Amanda R. Wilding, M.S. Biologist AquAeTer, Inc. 615-373-8532 1 of 1 7/26/2007 9:35 AM Calabash„ 1VC Property Subject: Calabash, NC Property From: "Amanda Wilding" <AWilding@aquaeter.com> Date: Wed, 25 Jul 2007 15:46:59 -0500 To: <Janet.Russell@ncmail.net> CC: "Amanda Klink" <AKlink@aquaeter.com>, "Chris Green" <CGreen@aquaeter.com> Ms. Russell: We spoke this morning regarding the proposed location of a CVS Pharmacy in Calabash, Brunswick County. A wetlands delineation was conducted on July 21-22, 2007. The findings of this report are not finalized at this time, but the subject property and surrounding drainage ditches appear to be non -wetland areas. I am aware of the current backlog at the Wilmington District Corp office and NCDENR, and I would like to know if is possible to submit our findings to both the Corp and to the state simultaneously. Any suggestions on how to streamline the process for the DWQ certification for the subject property would be appreciated. Thank you for you time and assistance, please let me know if you need any additional information. Sincerely, Amanda R. Wilding, M.S. Biologist AquAeTer, Inc. 615-373-8532 1 of 1 7/26/2007 9:17 AM Re: C".VS-Carolina Shores Subject: Re: CVS- Carolina Shores From: Paul Bartlett <Paul.Bartlett@ncmail.net> Date: Mon, 30 Jul 2007 08:37:10 -0400 To: "Wainwright, Thomas J." <Thomas.Wainwright@c-b.com> CC: "Gollings, Jamie E." <Jamie.Gollings@c-b.com>, MarlaneK@aol.com, Janet Russell <Janet.Russell@ncmail.net> Tom, Mon., Aug 20 @ 9:00 for review meeting with applicant and you. Come to my office first. I'll reserve conference room on 12th floor, Archdale Bldg. Wainwright, Thomas J. wrote: Paul, Thanks again for meeting with us the other day. We would really like to get on your calendar for express review on August 20th. I'm not sure what your schedule is, but I also left a voice mail regarding the same. Thanks, Tom Thomas Wainwright I Carter & Burgess I Project Manager - Water Infrastructure, Raleiqh 1 919.786.7535 1919.783.5882 fax I thomas.wainwright@c-b.com www.c-b.com ------------------------------------------------------------------------ This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secured or error -free as information could be intercepted, corrupted, lost, destroyed, received late or incomplete, or could contain viruses. The sender therefore does not accept liability for any error or omission in the contents of this message, which arises as a result of e-mail transmission. If verification is required, please request a hard -copy version from the sender. 1 of 1 7/31/2007 8:40 AM CVS - Carolina Shores Subject: CVS - Carolina Shores From: "Goslings, Jamie E." <Jamie.Gollings@c-b.com> Date: Wed, 25 Jul 2007 07:52:58 -0500 To: <paul.bartlett@ncmail.net> CC: "Wainwright, Thomas J." <Thomas.Wainwright@c-b.com>, <MarlaneK@aol.com> Paul, Thank you very much for meeting with us yesterday. Attached is a summary of our notes from yesterday's pre -application meeting. Please review and let us know if you have any corrections or additions. Regards, Jamie E. Gollings, PE I Carter & Burgess I Sr. Engineer 1919.786.75441919.783.5882 fax jamie.gollings@c-b.com I www.c-b.com This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secured or error -free as information could be intercepted, corrupted, lost, destroyed, received late or incomplete, or could contain viruses. The sender therefore does not accept liability for any error or omission in the contents of this message, which arises as a result of e-mail transmission. If verification is required, please request a hard -copy version from the sender. NCDENR-DWQ Meeting_N Content -Description: NCDENR-DWQ Meeting Notes.doc Content -Type: application/msword Content -Encoding: base64 i of 1 7/26/2007 9:44 AM Cartern Bur Meeting Notes Meeting for Stormwater Permitting: Pre -application Meeting ®ate: July 24, 2007 Attendees: Paul Bartlett: NCDENR-DWQ Thomas Wainwright: Carter & Burgess, Inc. Jamie Gollings: Carter & Burgess, Inc. Location: NCDENR Office — Raleigh, NC Items Discussed: 1. Tom introduced the project including general location (Intersection of Hwy 17 & Calabash Road in the Town of Carolina Shores). 2. Paul went over some key items on the Application, particularly related to the applicant. Paul suggests that as the owner, Live Oak Development should be the applicant. It may be possible to list Reddland as the applicant with an appropriate documentation that shows that Reddland will be responsible for all aspects of the bmp(s). Whoever is the applicant, they need to be properly registered with the State of NC Secretary of State and signatures must come from appropriate individuals within the applicant's organization. 3. An appropriate representative of the applicant must attend the Express Review. This would include Dean Scarafoni if ownership of the pond is not transferred. 4. Though this project is only a CVS, Paul considers this project to be part of a "common development". As such, he considers this project to be ••overall low density with pocket of high density" 5. Paul strongly encouraged that the overall developer prepare a master plan, including a master stormwater plan for permitting. However, he understands that ultimately that work may come in the future as a separate project from CVS. 6. Tom and Jamie explained that our intent for the project is to treat this as a low density application since we were well under the built -upon threshold for low density development. We explained that whatever bmp is installed as part of this project could very well be obliterated and replaced with a semi -regional bmp in the future. However, Paul insists that this project must be developed as if it is a high density project. 7. We discussed design requirements which will be 85% TSS removal for the first 1" of runoff. Also, Brunswick County is a Phase II community Page 1 of 2 and peak flow attenuation for the 1-year, 24 hour storm will be required. Note that this attenuation requirement is less than that of the Town of Carolina Shores so it will not have a significant impact to the overall design. &. BMP design shaii be per NCDENWs recently adopted ( July 2007) BMP Manual. 9. Options for BMP's? After considerable discussion, it was determined that the only reasonable bmp options would be a constructed wetland or an infiltration device. However, due to an existing high groundwater elevation, the infiltration device might be difficult. Should an infiltration device be pursued, additional geotechnical investigation would be needed to determine infiltration rates and actual seasonal high groundwater elevations. Standard tables for soil permeability will not be accepted. If the constructed wetland is pursued, no further geotechnical work is required (notify Vincent Lewis of NCDENR prior to any additional soils investigation). 10. The design of a constructed wetland would include a level spreading _ depression at the top of bank since a traditional forebay would probably be impractical. A standpipe/barrel system with riprap protection at the outlet would be acceptable. 11. Express Review for Stormwater includes a $4,000 fee (Regular review is $420). Re -review, if applicable, would include fees up to an additional $4,000 depending on the extent of changes requested. We discussed in detail what our intents would be under both the infiltration as well as the constructed wetland options in order to clarify what types of modifications would require additional fees. The requirements for infiltration devices are not as clearly defined as they are for constructed wetlands and we requested leniency in assessment of additional fees, if required. 12. Paul will be on vacation for a week beginning August 27th. If we can resolve our issues and provide the application package by August 20th, he may be able to do the Express Review prior to leaving for vacation, We discussed that we needed to determine internally .ghat path we wal—Ited to pursue and also verify with the Town that this path will be acceptable to them. After doing so, we would let Paul know our schedule. Jamie E. Gollings_ prepared these meeting notes. Any corrections or additions should be e-mailed to jamle.gollings@c-b.com Page 2 of 2 r. 234 yiuekv if. . � I CVTCC,f;o �/� 4135 CVS Gum Branch Jacksonville Subject: CVS Gum Branch Jacksonville From: Mary Jean Naugle <Mary.Naugle@ncmail.net> Date: Tue, 17 Jul 2007 17:32:53 -0400 To: Paul Bartlett <paul.bartlett@ncmail.net>, Linda Lewis <Linda.Lewis@ncmail.net>, Rhonda Hall <Rhonda.Hall@ncmail.net>, chris.Baker@ncmail.net, David Cox <David.Cox@ncmail.net>, janet.russell@ncmail.net, Cameron Weaver <cameron.weaver@ncmail.net>, Ed Beck <Ed.Beck@ncmail.net>, Scott Vinson <Scott.Vinson@ncmail.net> f yi i returned this project after the 3rd ad info was not returned in time. They changed the design several times from bio retention to ponds to sand filters and never provided the shwt and it appeared to be too high, this was also a common plan of development from one of John Pierce LLCs, etc... = multiple issues each go round. i thought i would let you know because i heard that there have been prior problems with other CVS and it may be because they are not completing due diligence prior to purchase of land. MJ ......... . .__ __..... ....... Mary Jean Naugle NC DENR Express WiRO <Mary.Naugle(&,ncmail.net> Express DWQ NC DENR 1 of 1 7/19/2007 8:18 AM Ft V, J ..-16-2007 MON 11:07 AM NCDENR FAX NO. 9103502004 P. 01 Nort CDENR }7 Carolina Department of Environment and Natural Resaurt;es -76 � / wilmington Regional Once Michael F, Easley, Goverrl rr (910) 15 , `J %vlf1 a ff' C-ti� t rn C. Russ .l'r., .Secrets rY 'AX COVER SHEET # pages ' To •'6,ri 1 1VISlQII_.. Ire CIS Remarks: t 1Z7 —Cardinal Drive Ext, Wilmington, North Carolina 2 d 5-3t345 Phon. 9ip•3S0• 004 7le.?r ('q t(= IA 7�13 7b4 4�' i—A / IV 4w Sr` (( , fly 1 �JUL-16-2007 MON 11:08 AM NCDENR . FAX NO, 9103502004 P. 02 AizffiyA NCDIF11R► North Carolina Pepartment of Environment and Natural Resources 127 Cardinal Drive Fixtension, Wilmington, NC 28405 (910) 796-7215 FAX (91 Request for Express Permit Review Reviewer Submit Time Confirm FILL-IN all information below and CHECK required Penrut(s). FAX to Express Coordinator along with a detailed narradve and vicinity man of the project location. Projects must be submitted by 5:00 pm the day before the review date, unless prior arrangements are made. r'r f*� APPLICANT Name 1 Title Marlane Klintworth _ V/ �� Company Redd Realty Servioes-� (�" Address 1254 old Hillsboro Road City Franklin TN Zip 370691 County Williamson Phone 615-591-5525 Fax Email MarlaneK .aol.com PROJECT 'Name CVS Pharmacy - Carolina Shores Store County Brunswick PROJECT DRAINS TO Persimmon Swamp in the Lumber RIVER BASIN ame Thomas J. Wainwright Company Carter & Burgess ve. Suite 300 City Raleigh State NC Zip-27612 one 919-786--7535 F x 919-783-5882 Email Thomas.Wainwright@c-b.com State or Nationa nmental Policy Act (SEPA or NEPA) - EA or EIS Required? , []Yes Z No ®STR M ORIGIN DETERMINATION BD # of Stream calls Stream Ne le M c,�9 , J C °� --------_------------------ a._—.-.._.--_------------- ;.; Z"S;TORMWATER ❑ Low Densit y ❑High Density -Detention Pond ❑High Density -Other `'�chuck all that apply)-TSD ❑ Low Densi Curb & Gutter El High Density -Infiltration Off -site Wetlands MU T be addressed below B Plan Revision `COASTAL Y ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information rMANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront --._—_-..------ ------- —..-------------..... --....__-____----.-._.._.____._._--��.-_.-�_-.- =: ®'.LAND QUALITY ❑ Erasion and Sedimentation Control Plan with acres to be disturbed -----_-.-.---- ..... -.......... WETLANDS (401) Wetlands on Property ? ❑ Yes ❑ No Isolated Wetlands on Property? ❑ Yes ❑ No (Check all that apply) Wetlands will be impacted? ❑ Yes ❑ No Wetland impacts: acre(s) TBD Wetlands delineation has been completed? ❑ Yes ❑ No ❑ Buffers impacted; Acres) USACOE Approval of Delineation completed? ❑ Yes ❑ No 404 Application in Process w/USACOE? ❑ Yes ❑ No 1 Permit recv'd from USACOE❑Yes ❑ No 401 Application Required? ❑ Yes ❑ No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for �--��- subsequent reviews due to the insufficiency of the permit application. Total Fee:$ Stormwater $ Date Received LAMA $ LQS $ 401 $ JUL-16-2007 MON 11:09 AM NCDENR FAX NO. 9103502004 P. 03 W iti � H ' � l � r 114- ` �1 1101 -44 CPS fill CA up JR p Ott'' LU ni ee:"• e+xre 've ur xmm��la•u�t:Ma��v�sna awn iacaea:eorat JUL-16-2007 MON 11:10 AM NODENR FAX NO. 9103502004 P. 04 Project Name, CVS Pharmacy -Carolina Shores Store Stormwater Express Questionnaire (6/1512007) 1, What is the applicant's full legal name? Redd Realty Services. Inc. plf a corporation, LLC or Partnership is involved, what is that name? Redd Realty Services. ! „c Ids an LLC, is it 0 manager -managed or ® member mans e � f 6 Vf� � What is the icant's t in a corporation, LLC or partnership? l't� Will an agen o other than the applicant) be signing the application? LJ Yes IN No If Yes, what is the agent's name and title? OPlease note the application signature requirements are listed in NCAC 2H.1003 (e). In summary, only the sole proprietor of a sole proprletorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. 2 Where is the project located? County Brunswick Nearest Town/City Town of Carolina Shores (Attach a detailed vicinity map with both local street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc, Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NO, US or interstate highway.) If the project is located in Brunswick, Onslow or New Hanover Counties, NPDES Phase 11 Post - Construction rules will apply. 3. What is the name of the receiving stream? Persimmon Swamp V 4. What River Basin is 4 located in? Lumber What is the classification of the receiving stream? C;Sw Ill s- 23 P 2- I For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the % mile radius from the property comer closest to the SA or SR receiving stream must be drawn on the map. 5. If the project Is high density, what type ut storaTwater management SFAP's'are being proposed? (check all that apply) To Be Determined Wet Detention Infiltration Trench Infiltration Basin ❑ Sand Filter Bio-retention Wetlands Alternative Offsite Dry Detention Other Mow many separate BMP's are being proposed? 1 2 3 4 5 6 7 8 9 10 11 12 Other TBD S. Is there offsite runoff from the adjacent properties or public right-of-way that will drain into any of the proposed BMP's on the project and is not being diverted? [l Yes Z No 6. Is an access road across other property required to access the proje(V ❑ Yes ® No 7. Is there any existing development or re-1988 existing BUA located on the pro a ? (Please provide-locumentat'on & delineate and identify on the plans)-- - o Far high density projects, has all of the proposed BUA been collected? Yes o (If not, attach a separate explanation sheet) ❑ N Page'I'-- JUL-16-2007 MON 11:10 AM NCDENR FAX NO, 9103502004 P. 05 Project Name: CVS Pharmacy -Carolina Shores Store 9. Will the project involve the subdivision and sale of property? ❑ Yes ® No Is the subdivision ❑ residential or ❑ commercial? How many lots are proposed? (Dead restrictions are require or all residential, commercial, low density or high density sub- divi rts. ecific language for the various types of subdivisions is available from DENP.) Have-th wetlands been delineated? ❑ Yes � No �41fp ects-rec�ire either we an s e ineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) No wetlands are located onsite. Potential wetlands along NCDOT right-of-way are being evaluated. 11, Are wet detention ponds or other engineered controls proposed to be located ad'acent wetlands? Yes [0 No (if, yyas, a physical means to prevent the dewatedng of the wetland must be provided, or the SHOT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time. Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders), 12. For infiltration projects, has a site visit been completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report? ❑ Yes Z NiA If yes, what was the date of the site visit? Include a copy of the consultant's soil report with the application. Site Is not suitable for infiltration due to high groundwater. 13. Does the project propose level Spreaders at the outlet of all engineered controls and swales prior to entering surface waters or wetlands? TBD ❑ Yes [:]No (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14, Is this project a modification to an existing permit, part of a larger subdivision, or is it a lot that will be treated in a BMP under a previously issued permit? ❑ Yes ® No If yes, what is the name of the permitted facility? What is the permit number of the permitted facility? Is the permitted facility in compliance with its permit? Yes No Have the deed restrictions been recorded? Yes No Have the deed restrictions been submitted? Yes No Has the Designer's Certification been submitted? Yes No 15. Do the plans reflect all information as listed in 15A NCAC 2H.1003 (g)? [] Yes No Plans not yet complete. Plans will provide required information. 16. Have all of the design requirements of each proposed BMP been met? ❑ Yes ❑ No (if not, attach a separate explanation sheet. Please note that the Express program is not set up to handle any type of deviation from the standard design.) Plans not yet complete. 17. For each BMP in all high density projects, and low density curb outlet Swale projects, has a drainage area delineation map been provided? Will be provided with plan submittal. ❑ Yes U No 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and suppiarnents should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. Page 2 of 2 JUL-16-2007 MON 11:11 AM NODENR FAX NO. 9103502004 P. 06 about:blank Mr. Wainwright: We are in receipt of the Request for Express Review. However, the following is needed before we can schedule a date and tune .for submittal of the project: 1. A completed Review request with the questions answered. 2. A Vicinity Map with road names. 3. A project narrative that discusses the stormwater containment measures and site conditions. 4. If the proposed stormwater treatment is an infiltration basin., additional information will be needed for the soil scientist. All blanks for the types of express permits being applied, for have been checked (Stream Origin, Stormwater, Coastal Management, Land Quality). However, no further information has been given. We need clarification on this. Please provide as soon as possible. Janet Russell. Express Permitting 1 of 1 7/9/2007 11:47 AM