Loading...
HomeMy WebLinkAboutNC0021121_Pretreatment Compliance Inspection - Winston-Salem_20190702ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Chris Marion WWTP Supervisor City of Mount Airy P.O. Box 70 Mount Airy, North Carolina 27030 NORTH CAROLINA Environmental Quality July 2, 2019 SUBJECT: Pretreatment Compliance Inspection (PCI) City of Mount Airy NPDES# NCO021121 Surry County Dear Mr. Marion: On June 4, 2019 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Mr. Chris Marion was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 7 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) (Hanesbrands, Inc.) which is non -categorical. This facility is scheduled to be shut down in September 2019. Another industry, Professional Rental Services, an industrial laundry, may expand and produce enough flow to enter the pretreatment program in the near future. POTW Interview There are no plant problems related to pretreatment issues and no NPDES permit limit or monitoring violations were recorded from March 2018 through April 2019. The facility is very well operated. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on March 14, 2016. The HWA was approved on May 20, 2016. The next HWA is due on April 30, 2021. NORTH CAROLINAD_E Q�� o.�ro�em m e�w���vi nu.i� North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 The last Industrial Waste Survey (IWS) was submitted on October 30, 2018. The IWS was approved on January 7, 2019. The next IWS is due on October 31, 2023. The Sewer Use Ordinance (SUO) was approved on October 25, 2012. The Enforcement Response Plan (ERP) was approved on October 25, 2012. The Long -Term Monitoring Plan (LTMP) was approved on September 18, 2017. LTMP File Review The Long -Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the file for Hanesbrands, Inc (#0001) revealed that the monitoring data was well organized and compliant. The slug control plan for Hanesbrands, Inc. (#0001) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Mr. Marion runs an excellent pretreatment program. If you have any questions please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, /I D__ocuSiiggned by, �11Ib l 5mgcr 1 _"49 2! C 4EA... Lon T. m er Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: PERCS Unit — Monti Hassan Central Files WSRO Files