Loading...
HomeMy WebLinkAbout20200689 Ver 1_401 Application_20200526DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form April 11, 2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned * Version#* 20200689 1 Is a payment required for this project?* r No payment required What amout is owed?* r Fee received r $240.00 r Fee needed - send electronic notification IT $570.00 Reviewing Office * Winston-Salem Regional Office - (336) 776- Select Project Reviewer* 9800 Sue Homewood:eads\slhomewood Information for Initial Review 1a. Name of project: Ward Mill Dam Removal Project 1a. Who is the Primary Contact?* Jake McLean 1b. Primary Contact Email:* jmclean@Wldlandseng.com Date Submitted 5/26/2020 Nearest Body of Water Watauga River Basin Watauga Water Classification B, TR, and HQW Site Coordinates Latitude: Longitude: 36.2414-81.8304 A. Processing Information County (or Counties) where the project is located: Watauga Is this a NCDMS Project r Yes IT No Is this project a public transportation project?* r Yes IT No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1c. Primary Contact Phone:* (828)545-3865 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 27 - Restoration NWP Numbers (for multiple NWPS): 53 1d. Type(s) of approval sought from the DWR W 401 Water Quality Certification - Regular F- 401 Water Quality Certification - E)press r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: r Yes r No For the record onlyfor Corps Permit: r Yes r No 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Ray Floyd Ward and Virginia Cook Ward 2b. Deed book and page no.: DB: 111 PG: 544 2c. Responsible party: WA 2d.Address Street Address 443 Watauga River Road Address Line 2 City Sugar Grove Postal / Zip Code 28679-9560 2e. Telephone Number: (828)545-3865 2g. Email Address:* jmclean@wildlandseng.com State / Rwince / Ifgion NC Country United States 2f. Fax Number: 3. Applicant Information (if different from owner) 3a. Name: Jonathan Hartsell 3b. Business Name: Blue Ridge Resource Conservation & Development Council, Inc. 3c.Address Street Address 31 Cross Street Address Line 2 Suite 215 City Spruce Pine Postal / Zip Code 28777 3d. Telephone Number: (828)284-9818 3f. Email Address:* hartselljonathan@gmail.com 4. Agent/Consultant (if applicable) 4a. Name: Jordan Hessler 4b. Business Name: Wildlands Engineering, Inc. 4c.Address Street Address 167-B Haywood Road Address Line 2 city Asheville Postal / Zip Code 28806 Slate / Province / legion NC Country United States 3e. Fax Number: State / Province / Region NC Country United States 4d. Telephone Number: 4e. Fax Number: (828)551-8582 4f. Email Address:* jhessler@Wldlandseng.com Agent Authorization Letter* Wards Mill Dam Land Access Agreement_signed.pdf 143.6KB Landowner Agent Form Signed 5.21.20.pdf 117.56KB FC. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: 0 appropriate) 1c. Nearest municipality/ town: Sugar Grove 2. Project Identification 2a. Property Identification Number: 2b. Property size: 1961486427000 59 2c. Project Address Street Address 443 Old Watauga River Road Address Line 2 City State / Rovince / Region Sugar Grove NC Postal / Zip (ode Country 28679 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Watauga River 3b. Water Resources Classification of nearest receiving water:* B, TR, and HOW 3c. What river basin(s) is your project located in?* Watauga 3d. Please provide the 12-digit HUC in which the project is located. 060101030305 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The Ward Mill Dam Removal Project site is located at 443 Old Watauga River Road, Watauga County near Sugar Grove. The project site includes two jurisdictional streams, Watauga River and UT1. Watauga River has been historically dammed to generate power and has been in place in one form or another since the late 1890's. The dam's generation facilities were decommissioned in 2017 as part of forfeiture of the FERC license. There is moderate sediment build up behind the dam. The river is in a confined valley with large colluvial materials in the stream channel and flood prone area. The owners have indicated that the impoundment scours doom to rock after large flood events. The Land uses surrounding the project area includes forest and residential. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) F ig2_W MD_USGS_TOPO.pdf 820.39KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Fig4_WMD_Soils_Map.pdf 1.67MB 4f. List the total estimated acreage of all existing wetlands on the property: 4g. List the total estimated linear feet of all existing streams on the property: 1283 4h. Explain the purpose of the proposed project:* The purpose of the project is to remove Ward Mill Dam, a concrete and rock dam structure, on the Watauga River. It is estimated the dam removal will reconnect >100 miles of stream. The project Will include stabilization of the left floodplain and mill structure, as well as streambank restoration activities as necessary in the vicinity of the dam where sediment has built up behind the structure. Restoration of river continuity, organism passage, natural sediment movement and habitat redevelopment are anticipated outcomes. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project approach proposed is to drawing down water behind the dam several weeks prior to mobilization for dam removal. This will facilitate access by dam removal equipment. Two to three large track hoes with either hammer or bucket and hydraulic thumb attachments will be used to conduct the removal. The dam removal will be the first phase of a two-phase project approach. During this first phase, the dam Will be deconstructed from the top down. Dam materials will be used to buttress the Mill structure and left floodprone area. Concrete and other unnatural material will be buried below more natural or native materials. Floodplain sills and a single arm vane may be used to guide the reestablishing channel away from the left valley wall. The channel will be allowed to naturally erode and reform. Temporary sediment impacts will occur as sediment moves and disperses downstream. After several months of normal flows, or one or more larger flows, a 2nd phase of streambank restoration efforts will complete bank grading, benching, matting, toe stabilization, and bioengineering measures, followed by planting. Native riparian vegetation Will be reestablished through seeding, Iivestaking and container or bare root planting to enhance long-term stability. 4j. Please upload project drawings for the proposed project. Ward Mill Dam Permitting Set 5.19.20.pdf 14.5MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes Comments: r No 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Jordan Hessler Agency/Consultant Company: Wildlands Engineering, Inc. Other: 5d1. Jurisdictional determination upload Wards Mill Dam PJD 5-06-20.pdf 5.76MB r Unknown 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts ❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact (?) Jurisdiction* length* S1 Restoration Permanent Bank Stabilization Watau a River 9 Perennial Both 70 Average (feet) 1,163 (linearfeet) gy Relocate to facilitate dam removal Temporary Relocation lJT1 Intermittent Both 2 Average (feet) 120 (linearfeet) 31. Total jurisdictional ditch impact in square feet: 31. Total permanent stream impacts: 3i. Total temporary stream impacts: 1,163 120 31. Total stream and ditch impacts: 121 3j. Comments: All impacts are associated with the proposed dam removal and restoration activities. The Tennessee Valley Authority (TVA) and NC Dam Safety were contacted and do not have concerns or requirements. The dam is not classified as a high hazard dam. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The purpose of the project is to conduct stream restoration activities that will result in reestablishment of aquatic passage and increased habitat function. The design approach, sequence and methods will attempt to minimize temporary and permanent impacts through use of best management practices and proven techniques. Potential sediment impacts have been evaluated in reports being provided separately. 16. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction practices will follow guidelines from the NC Erosion and Sediment Control Planning and Design Manual. The natural erosion of the sediment wedge will be allowed to occur. R concerns develop during the course of removal, the rate of removal may be reduced or some of the wedge sediment may be stockpiled on the floodprone area. During construction, floodplain fill areas will be seeded and temporary measures will be implemented to reduce runoff from upgradient sources include staging and access. Banks being permanently stabilized during phase 1 will be seeded and matted. During phase 2, bank restoration will be stabilized the same day and areas will be reseeded and planted. Matting and bioengineering techniques will be use where possible, although the use of rock is appropriate to the setting as an alternative stabilization measure. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Project will be completed under Nationwide permit #27 and or #53. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? (' Yes If no, explain why: r No 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r- Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r- No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This is a dam removal and streambank restoration project. The project will not cause an increase in development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* rYes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r- No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No r Unknown Se. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r- Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?` r- Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r- Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Wildlands reviewed the USFWS Information for Planning Conservation (IPaC) online tool to identify federally listed endangered plant and animal species that might be impacted by the project. The IPaC review listed these potential endangered species: Bog Turtle (Glyptemys muhlenbergii), Carolina northern flying squirrel (Glauoomys sabrinus coloratus), Gray bat (Myotis grisescens), Northern long-eared bat (Myotis septentrionalis), Virginia big -eared bat (Corynorhinus townsendii virgin ianus), Rusty -patched bumble bee (Bombus affinis), Spruce -fir moss spider (Microhexura montivaga), Blue Ridge Goldenrod (Solidago spithamaea), Heller's blazing star (Liatris helleri), Roam mountain bluet (Hedyotis purpurea var, montana), Spreading Avens (Geum radiatum). No critical habitats were identified by the IPaC review. The USFWS was invited to a regulatory meeting held on December 4, 2019 at the project location. No representatives from the USFWS attended. A scoping letter was sent to the USFWS Service on February 28, 2020. No reply was received within 30 days. We assume they have no comments regarding associated laws and that they do not have any information relevant to this project at this time. The scoping letter is available for review. A scoping letter was also sent to the North Carolina Wildlife Resource Commission (NCWRC) on February 28, 2020. The NCWRC responded on March 23, 2020. The letter states Hellbender and Green Floaters have been found in the river near the vicinity of the dam. The project should not impact wild trout, and project activities do not need to be avoided during trout moratorium. In addition, they performed sediment modeling that showed the loss from the impounded section of the river will likely only be a portion of annual sediment volume transported by the river. The NCWRC recommends surveying the area below the dam for hellbenders before dam removal and relocating any animals captured. They also recommend closely monitoring the river for stability for several years after construction. Correspondence is attached in appendix of pJD. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* National Oceanic and Atmospheric Administration (NOAA) Essential Fish Habitat Mapper website. hftps://www.habitat.noaa.gov/application/efhmpper/indexhtml 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The NC State Historic Preservation Office (SHPO) GIS Service (HPOWEB) was reviewed for historic resources. The B. O. Ward House & Mill (WT0358) came up on the HPOWEB GIS service. The Mill house is attached to the eAsting dam structure to be removed. The project proposes to remove the epsting dam while leaving the epsting mill house structure intact. Once the dam is removed the epsting structure will be buttressed with rock and river sediment to train the river away from the building. A scoping letter was sent to SHPO on February 7, 2020 and SHPO responded on March 9, 2020. The letter request Wildlands to hire an experienced archaeologist to identify and evaluate areas of proposed disturbance prior to any ground disturbing activities. In addition, SHPO was unable to accurately assess impacts to The B. O. Ward House & Mill complex They requested Wildlands have the site evaluated by a Secretary of the Interior qualified Architectural Historian. Correspondence is attached in appendix A of the pJD. The project team has hired the requested consultants to prepare reports for SHPO. The archaeologist and Architectural historian reports have yet to be completed. These documents can be provided once complete. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: This is dam removal project and involves temporary work within the floodplain with no new insurable structures. The floodplain administrator has been contacted and a floodplain development permit will be obtained through no -rise certification, and more extensive modeling if required. 8c. What source(s) did you use to make the floodplain determination?* North Carolina Flood Insurance Rate Map (FIRM) Panel 1961 Map Number 370251196100J revised on December 3, 2009. Miscellaneous Comments Miscellaneous attachments not previously requested. WMD Final Design Report 5.19.20.pdf 3.26MB Signature W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. V Full Name Jordan Hessler Signature Date 5/26/2020 LAND ACCESS LICENSE AGREEMENT THIS LAND ACCESS LICENSE AGREEMENT ("License Agreement") is by and between Mr. Ray F. Ward ("Licensor"), and American Rivers, Inc. ("Licensee"), ("the Parties"). WHEREAS, the Licensor is the owner of the property Ward Mill Dam located at 443 Old Watauga River Rd. Sugar Grove, North Carolina 28679 ("Property"); WHEREAS, the Property contains the dam and certain related property; WHEREAS, the Licensor and the Licensee agree to review and evaluate the facilities for the purpose of considering the removal of the dam and restoring the river flow; WHEREAS, the Licensee has requested access to the Property for the purpose of consideration and evaluation of the dam removal and stream restoration (the "Work"); NOW THEREFORE, in consideration of the mutual premises, promises and covenants, that are hereby acknowledged by the parties, the parties agree as follows: Licensor grants to Licensee, its employees, representatives, contractors, and subcontractors, including but not limited to Blue Ridge Resource Conservation and Development Council, MountainTrue, and the US Fish and Wildlife Service ("Project Partners") the right to access the Property at all reasonable times for the purpose of performing the Work. 2. This License Agreement shall commence on the date that it is fully executed by the Parties and shall continue until Licensee completes the Work, but no later than December 31, 2020 The rights granted by this License are specifically designed to inure to the benefit of the Licensee and its contractors, subcontractors, employees and representatives, including the Project Partners. 3. The Licensor and the Licensee agree that this License Agreement does not convey any right, title, easement or interest of a permanent nature in the Property to the Licensee or any other person. The Licensor and Licensee agree that this License Agreement does not waive other rights either party may have under federal, state, and local law. 4. Upon termination of the Work, Licensee shall restore any portions of the Property disturbed by the Work, as set forth in a detailed site plan to be provided at a later date, with the understanding that the Dams will have been removed and associated habitat restoration activities will have been completed. 5. Licensee shall, at its own cost and expense, maintain and keep in force at all times during the License Period: (1) commercial general liability insurance, which shall include contractual liability coverage against third -party claims for bodily injury or property damage occurring on the Property as a result of Licensee or Project Partners' Work; primary coverage will be a minimum aggregate limit of not less than $1,000,000 and excess umbrella aggregate limit of not less than $2,000,000; and (2) Employers' Liability and Workers' Compensation Insurance to the extent required by law. Licensee accepts the condition of the Property "as is" and acknowledges that Licensor has not made and makes no warranty of any kind as to the condition of the Property for the use intended under this License. Licensee assumes no liability for any existing or future environmental conditions of the Property. Licensor indemnifies and holds harmless Licensee for any pollutants, hazardous materials and/or substances on the Property from acts or omissions of Licensor and/or past owners, operators, or tenants of the Property, and acts or omissions of any transporters and/or arrangers of any pollutants, hazardous materials and/or substances on the Property, which may be disturbed as a result of the Work. Licensee agrees to notify Licensor of any such pollutants, hazardous materials and/or substances discovered on the Property in accordance with, or as a result of, the Work. The Licensor's obligations under this section shall survive the termination of this License Agreement. Neither party shall be liable to the other for any liability for consequential, special or incidental damages including, without limitation, any damages arising out of business interruption, lost profits, loss of rental income, or loss of the use of the Property whether any such claim is brought by Licensor, Licensor's tenants or any other third party. This License Agreement shall be governed and construed under and in accordance with the laws of the State of North Carolina 10. This License Agreement constitutes the entire agreement by and between the parties hereto and no other oral or written agreements, arrangements, representations or understandings, unless specifically noted herein, shall be deemed to be in existence. This License Agreement, for all purposes, supersedes all prior agreements, written or oral, if any, between the parties hereto, and may not be amended or modified except by an instrument in writing signed by all parties to be bound. 11. The license granted hereby is personal to Licensee and shall not be assigned or sub -licensed without the prior written consent of Licensor. Licensor shall transfer the rights and obligations of this License Agreement to any successors, heirs, executors, lessees, or assigns of the Property for the remainder of the License Period, including but not limited to the remainder of Work to be completed by Licensee and its Project Partners. This Agreement shall be binding upon the parties hereto, and their respective successors and assigns. Any Notices under this License Agreement shall be deemed duly delivered if hand -delivered or mailed by U.S. certified mail, return receipt requested, to: Licensor: Mr. Ray F. Ward 443 Old Watauga River Road Sugar Grove, North Carolina 28679 Licensee: American Rivers 29 N. Market St., Ste 603A Asheville, NC 28806 Attn: Erin McCombs With a copy to: American Rivers, Inc. ATTN: General Counsel 1101 14`h St., NW Suite 1400 Washington, DC 20005 IN WITNESS WHEREOF, the Licensor and Licensee have executed this License Agreement as of the day and the year first set forth above. Witness: tL I 1A n lil U -�� ­1 Witness: MR. RAY WARD Date: �+ AMERICAN RIVERS, INC. By: Date: 62/,R (al / 3 LANDOWNER AUTHORIZATION FORM PROPERTY LEGAL DESCRITION: Deed Book: DB 111 Page: PG 543-552 County: Watauga Parcel ID Number: PIN: 1961486427000 PIN: 1961486427000 Street Address: 443 Old Watauga River Road Sugar Grove, NC 28679 Property Owner (please print): Ray Floyd Ward Property Owner (please print): Virginia Cook Ward (Owner names as specified on deed) The undersigned, registered property owner(s) of the above property, do hereby authorize American Rivers, Blue Ridge RC&D, MountainTrue, Watauga Soil & Water Conservation District, and Wildlands Engineering, Inc. (Wildlands) to conduct stream and/or wetland determinations and delineations, and issuance of, application for and/or acceptance of any required permit(s) or certification(s) for the proposed Ward NMI Dam Removal project. I authorize land disturbing activities in association with project assessment activities and construction. I agree to allow regulatory agencies, including the US Army Corps of Engineers, to visit the property as part of these environmental reviews. Property Owners(s) Address: (same as above) (if different from above) We hereby certify the above information to be true and accurate to the best of our knowledge. ZC, (Property Ofvner or Authorized Signit ure) (Date) ^_ ¹Figure 2 USGS Topographic MapWard Mill Dam Removal Project Watauga River Basin (06010103)Watauga County USGS 7.5-MINUTE QUADRANGLE VALLE CRUCIS 0 1,000500 Feet Assessment Area ^_Ward Mill Dam Site Coordinates: (36.2413, -81.8304) !( CsD RoA ArF CkE ¹Figure 4 Soils MapWard Mill Dam Removal Project Watauga River Basin (06010103)Watauga County 0 100 20050 Feet Assessment Area Project Parcels Existing Building Ward Mill Dam Perennial Stream Intermittent Stream Non-project Streams !(Stream Classification Point Soils ArF - Ash-Cleveland-Rock Outcrop Complex CkE - Chestnut-Edneyville Complex CsD - Cullasaja Very Cobbly Loam RoA - Rosman Fine Sandy Loam S1 Watauga River(1,163 LF) Old Watauga River Road S2 UT1(120 LF)