Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4191201_17-116 - Stormwater Narrative_4th submittal_5/18/2020
STo RMWAT E R NARRATIVE Lewisville Middle School Lewisville Vienna Road Lewisville, North Carolina 27023 May 2020 2� QFESSlp • .fir • Q �3953 41 :etc+'• s- CLH design, .a.p 400 Regency Forest Dr r ve, Suite 120 Cal y, North Carolina 27518 Phone: (919) 319-6716 Fax: (919) 319-7516 CONTENTS Design Narrative Supporting Calculations STORMWATER MANAGEMENT PLAN LEWISVILLE MIDDLE SCHOOL LEWISVILLE-VIENNA ROAD LEWISVILLE, NC CLH Project No: 17-116 PROJECT DESCRIPTION: Lewisville Middle School is a new school that is being constructed on five tracts located southeast of the intersection of Lewisville -Vienna Road and Robinhood Road near the northern limits of Lewisville. The middle school project area is approximately 79 acres. This proposed project consists of constructing a new school with parking, sidewalks, play fields, utilities and stormwater control measures. The construction limits of the project contain approximately 30 acres. The stormwater runoff from the project site discharges easterly to a tributary of Tomahawk Creek (Classification: Q. Streams with 30-foot Town of Lewisville stream buffers are on site, as well as floodway and floodplains as indicated on FEMA FIRM #3710588600J dated January 2, 2009. Soils on the site consist predominately of Hiwasse with minor concentrations of Wahadkee along streams in low areas of site. STORMATER MANAGEMENT: This site is divided and under the stormwater jurisdiction of the Town of Lewisville and NCDEQ for stormwater review. Stormwater design has taken into consideration both Town and State requirements and was design to the most stringent of requirements. This site drainages to three major drainage points. Drainage point A encompasses the majority of drainage area and is located along the midpoint of the eastern property boundary. Drainage point B is located at the southeastern property corner. Drainage point C is located west of drainage point B, along the southern property boundary. Please refer to the stormwater drainage map for additional information. This site is high -density and employs a stormwater network to convey runoff and two ponds to treat. A wet pond treats the majority of the site's runoff and the wetland treats the bus -loop driveway. Per the Town of Lewisville's stormwater management manual, stormwater control measures were designed to control and treat runoff from the 25-year, 6-hour storm leaving the site. The majority of the site has a hydrological soil rating of HSG B and, therefore, storm calculations will reflect constants relating to HSG B type soils. Calculations were performed with Hydraflow software by Autocad 2017 which utilizes the TR-55 Hydrograph method. Additional modeling information has been provided, as requested by the state. This includes a model of the stage storage for the main pool and for the forebay. These were requested and shall be used only as verification with our calculations. There is a 0.2% discrepancy between the wet pond sizing calculations and the hydraflow model of the stage storage as a result of slightly different methodologies for calculating storage volume. This discrepancy should be acceptable per email conversation with Hannah Banks and Jim Farkas. In lieu of receiving a legal agreement among the offsite parcel owners for future BUA allotments as it pertains to the stormwater treatment in the wet pond, the portion of offsite drainage area has been concluded as 100% impervious for less restructure for future development. SUPPORTING CALCULATIONS DATE 8/15/19 PROJECT NAME PROJECT NO �0 Lewisville MS 17-116 LOCATION BY Forsvth Countv. NC KAL Drainage Area, (DA) = 18.65 ac Impervious Area c= 0.95 8.45 ac Includes 0.20 AC Future Pervious Area c= 0.30 10.20 ac Cc = 0.59 % Impervious = 45.31 % Soil Type: Hiwasse (Type B) Temporary Water Quality Pool Design Storm Rainfall 1.00 in (Typically 1-in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.46 in/in Required Volume (design rainfall)(Rv)(DA) = 30,991 cf Main Pool Volume Required, Vmp = 75,494 cf Main Pool Volume: Main Pool Max. Depth = 3.50 ft Area of Pond Bottom (Above PSS) = 20,780 sf Area at Bottom of Shelf = (826.00) 27,620 sf Area of Permanent Pool = (826.50) 30,040 sf Area at Top of Shelf = (827.00) 32,530 sf Perm. Pool Volume Provided = 87,015 cf > 75,494 cf Surface Area at 1" Storage Volume = 33,800 sf (based on 12" depth) 1" Storage Volume Provided = 32,225 cf > 30,991 OK Required Design Volume= 30,991 cf Interpolation From Stage -Storage Table (Hydraflow Hydrographs)= Elevation Depth Storaae 827.30 ft 0.80 ft 30484 cf Depth at Rea'd DE 827.35 ft 0.85 ft 32472 cf Volume (ft) _ 0.81 Temp. Storage Depth above Dewatering Hole = 0.81 ft Diameter of Dewatering Hole = 2.50 in Detention (Draw -Down) Time = 4.5 days T days=(Temp. Storage Vol Req / (0.6 * A (2'g*(h))^1/2) , 86400 (where h = one third temp. storage depth measured to centroid of orifice) Max Drawdow Rate= 0.14 cfs Main Pool Volume- 87,015 cf Forebay Volume: Forebay Max. Depth = Area of Forebay Bottom (Above PSS) _ Area at Bottom of Shelf = Area of Permanent Pool = Forebay Volume Required = Forebay Volume Provided = (2-5 days Required) 4.50 ft 1,540 sf 4,400 sf 5,330 sf 11,324 - 15,099 14,313 cf 16.45 % _ 75,494 OK 15-20 OK s:\1319\0001\calcs\17-116 - PondSize-Wet Pond-MDC-Piedmont and Mountain-HRTpXht&d: 5/15/2020 2:33 PM Page 1 Of 1 � DATE Wm 8/15/19 PROJECT NAME PROJECT NO Lewisville MS 17-116 LOCATION BY Forsvth Countv. NC KAL Drainage Area, (DA) = 2.05 ac Impervious Area c= 0.95 0.75 ac Includes 0.06 AC Future Pervious Area c= 0.30 1.30 ac Cc = 0.54 Wetland Surface Area & Volume % Impervious = 37 % Design Storm Rainfall 1.00 in Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.38 in/in Required Volume (design rainfall)(Rv)(DA) = 2,822 cf Depth of Temporary Pool (Dplants) = 12 in (15-in max) Approx. Ave. Surface Area for Design = 2,822 sf Surface Area at Permanent Pool= ( 812.00 ) 2,610 sf @ 0.0 in. ponding Surface Area at 1/2 Depth= ( 812.50 ) 3,922 sf @ 6.0 in. ponding Surface Area at Temporary Pool= ( 813.00 ) 4,670 sf @ 12.0 in. ponding Temporary Ponding Volume Provided= 3,781 cf > 2,822 cf OK Required Design Volume= 2,822 cf Interpolation From Stage -Storage Table (Hydraflow Hydrographs)= Elevation Depth Storage 812.60 ft 0.60 ft 2390 cf Depth at Req'd Design 812.80 ft 0.80 ft 3187 cf Volume (ft) _ 0.71 Surface Area at Design Volume Depth (sf) 4234 sf Temp. Storage Depth above Dewatering Hole = 0.71 ft Diameter of Dewatering Hole = 1.00 in Detention (Draw -Down) Time 2.6 days T days=(Req. Temp. Storage Vol / (0.6 * A * (2*g*(h))^1/2) * 86400 (where h = one third temp. storage depth measured to centroid of orifice) Wetland Zones Required Forebay Surface Area (10-15%) = 423 635 sf Non-Forebay Deep Pools (5-15%) = 212 635 sf Shallow Water Zone (35-45%) = 1482 1905 sf Temp. Inundation Zone (30-45%) = 1270 1905 sf Wetland Zones Provided Forebay Surface Area = 630 sf 15% OK Non-Forebay Deep Pools = 590 sf 14% OK Shallow Water Zone = 1,690 sf 40% OK Temporary Inundation Zone = 1,324 sf 31% OK s:\1319\0001\calcs\17-116 - PondSize-Wet1and-2017-MDC.XLS printed: 5/15/2020 2:32 PM Page 1 Of 1 Hydraflow Table of Contents 17-116 Pond Routing.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Area A - Pre.......................................................................... 4 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................... 5 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................... 6 Hydrograph No. 7, SCS Runoff, Area to SCM 1....................................................................... 7 Hydrograph No. 8, Reservoir, Route SCM 1............................................................................ 8 PondReport - SCM 1.......................................................................................................... 9 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 11 Hydrograph No. 11, Reservoir, Route SCM 2....................................................................... 12 PondReport - SCM 2........................................................................................................ 13 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs............................................. 14 Hydrograph No. 15, Combine, Total Area A - Post Dev........................................................ 15 2 - Year SummaryReport....................................................................................................................... 16 HydrographReports................................................................................................................. 17 Hydrograph No. 1, SCS Runoff, Area A - Pre........................................................................ 17 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................ 18 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 19 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 20 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 21 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 22 Hydrograph No. 11, Reservoir, Route SCM 2....................................................................... 23 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs............................................. 24 Hydrograph No. 15, Combine, Total Area A - Post Dev........................................................ 25 10 -Year SummaryReport....................................................................................................................... 26 HydrographReports................................................................................................................. 27 Hydrograph No. 1, SCS Runoff, Area A - Pre........................................................................ 27 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................ 28 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 29 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 30 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 31 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 32 Hydrograph No. 11, Reservoir, Route SCM 2....................................................................... 33 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs............................................. 34 Hydrograph No. 15, Combine, Total Area A - Post Dev........................................................ 35 25 - Year SummaryReport....................................................................................................................... 36 HydrographReports................................................................................................................. 37 Contents continued... 17-116 Pond Routing.gpw Hydrograph No. 1, SCS Runoff, Area A - Pre........................................................................ 37 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................ 38 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 39 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 40 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 41 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 42 Hydrograph No. 11, Reservoir, Route SCM 2....................................................................... 43 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs............................................. 44 Hydrograph No. 15, Combine, Total Area A - Post Dev........................................................ 45 100 - Year SummaryReport....................................................................................................................... 46 HydrographReports................................................................................................................. 47 Hydrograph No. 1, SCS Runoff, Area A - Pre........................................................................ 47 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................. 48 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 49 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 50 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 51 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 52 Hydrograph No. 11, Reservoir, Route SCM 2....................................................................... 53 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs............................................. 54 Hydrograph No. 15, Combine, Total Area A - Post Dev........................................................ 55 OFReport.................................................................................................................. 56 �y'draibw Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Return Period ReH Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 3.011 9.441 ------- ------- 43.34 71.95 ------- 127.39 Area A - Pre 2 SCS Runoff ------ 0.147 0.883 ------- ------- 4.334 6.951 ------- 11.83 Area B - Pre & Post 3 SCS Runoff ------ 0.048 0.290 ------- ------- 1.424 2.284 ------- 3.887 Area C - Pre & Post 7 SCS Runoff ------ 29.10 41.83 ------- ------- 79.43 103.53 ------- 144.14 Area to SCM 1 8 Reservoir 7 0.574 1.363 ------- ------- 5.545 10.15 ------- 49.34 Route SCM 1 10 SCS Runoff ------ 2.885 4.272 ------- ------- 8.379 11.10 ------- 15.72 Area to SCM 2 11 Reservoir 10 0.066 0.223 ------- ------- 2.390 5.997 ------- 11.66 Route SCM 2 13 SCS Runoff ------ 2.558 7.646 ------- ------- 33.24 54.48 ------- 95.18 Area A that bypasses SCMs 15 Combine 8, 11, 13, 2.719 8.459 ------- ------- 39.96 66.50 ------- 131.12 Total Area A - Post Dev Proj. file: 17-116 Pond Routing.gpw Friday, 05 / 15 / 2020 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.011 2 762 46,894 ------ ------ ------ Area A - Pre 2 SCS Runoff 0.147 2 722 1,393 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 0.048 2 722 458 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 29.10 2 720 66,934 ------ ------ ------ Area to SCM 1 8 Reservoir 0.574 2 1124 54,862 7 827.74 48,575 Route SCM 1 10 SCS Runoff 2.885 2 718 5,808 ------ ------ ------ Area to SCM 2 11 Reservoir 0.066 2 1020 4,644 10 813.03 4,120 Route SCM 2 13 SCS Runoff 2.558 2 760 36,954 ------ ------ ------ Area A that bypasses SCMs 15 Combine 2.719 2 760 96,460 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 1 Year Friday, 05 / 15 / 2020 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 73.220 ac Curve number Basin Slope = 1.8 % Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' ' 0 120 240 — Hyd No. 1 Area A - Pre Hyd. No. 1 -- 1 Year 360 480 600 720 840 Friday, 05 / 15 / 2020 = 3.011 cfs = 762 min = 46,894 cuft = 56.4* = 9400 ft = 41.99 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 V ' 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 Area B - Pre & Post Hyd. No. 2 -- 1 Year Friday, 05 / 15 / 2020 = 0.147 cfs = 722 min = 1,393 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 0.10 0.09 0.08 0.07 0.05 0.04 0.03 0.02 Area C - Pre & Post Hyd. No. 3 -- 1 Year Friday, 05 / 15 / 2020 = 0.048 cfs = 722 min = 458 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report I M Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 18.650 ac Curve number Basin Slope = 4.0 % Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(10.200 x 61) + (8.450 x 98)] / 18.650 Q (cfs) 30.00 25.00 15.00 10.00 5.00 0.00 0 120 240 Hyd No. 7 Area to SCM 1 Hyd. No. 7 -- 1 Year Friday, 05 / 15 / 2020 = 29.10 cfs = 720 min = 66,934 cuft = 78* = 1830 ft = 8.76 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used Q (cfs) 30.00 25.00 15.00 10.00 5.00 0.00 0 600 Hyd No. 8 Route SCM 1 Hyd. No. 8 -- 1 Year Friday, 05 / 15 / 2020 = 0.574 cfs = 1124 min = 54,862 cuft = 827.74 ft = 48,575 cuft Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 I_I_I_I_I_I_1 Total storage used = 48,575 cuft Pond Report 9 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Pond No. 1 - SCM 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 826.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 826.50 35,380 0 0 0.50 827.00 38,870 18,554 18,554 1.00 827.50 40,680 19,884 38,438 1.50 828.00 42,820 20,871 59,308 3.50 830.00 48,600 91,350 150,658 5.50 832.00 54,620 103,151 253,809 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 30.00 2.50 0.00 0.00 Crest Len (ft) = 19.00 10.00 1.00 0.00 Span (in) = 30.00 2.50 0.00 0.00 Crest El. (ft) = 829.50 830.00 827.50 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 823.50 826.50 0.00 0.00 Weir Type = 1 Broad Rect --- Length (ft) = 62.00 0.50 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 826.50 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.05 1,855 826.55 24.65 oc 0.00 is --- --- 0.00 0.00 0.00 --- --- --- 0.005 0.10 3,711 826.60 24.65 oc 0.02 is --- --- 0.00 0.00 0.00 --- --- --- 0.018 0.15 5,566 826.65 24.65 oc 0.04 is --- --- 0.00 0.00 0.00 --- --- --- 0.035 0.20 7,422 826.70 24.65 oc 0.05 is --- --- 0.00 0.00 0.00 --- --- --- 0.051 0.25 9,277 826.75 24.65 oc 0.06 is --- --- 0.00 0.00 0.00 --- --- --- 0.063 0.30 11,132 826.80 24.65 oc 0.07 is --- --- 0.00 0.00 0.00 --- --- --- 0.073 0.35 12,988 826.85 24.65 oc 0.08 is --- --- 0.00 0.00 0.00 --- --- --- 0.081 0.40 14,843 826.90 24.65 oc 0.09 is --- --- 0.00 0.00 0.00 --- --- --- 0.089 0.45 16,698 826.95 24.65 oc 0.10 is --- --- 0.00 0.00 0.00 --- --- --- 0.096 0.50 18,554 827.00 24.65 oc 0.10 is --- --- 0.00 0.00 0.00 --- --- --- 0.103 0.55 20,542 827.05 24.65 oc 0.11 is --- --- 0.00 0.00 0.00 --- --- --- 0.110 0.60 22,531 827.10 24.65 oc 0.12 is --- --- 0.00 0.00 0.00 --- --- --- 0.116 0.65 24,519 827.15 24.65 oc 0.12 is --- --- 0.00 0.00 0.00 --- --- --- 0.121 0.70 26,507 827.20 24.65 oc 0.13 is --- --- 0.00 0.00 0.00 --- --- --- 0.127 0.75 28,496 827.25 24.65 oc 0.13 is --- --- 0.00 0.00 0.00 --- --- --- 0.132 0.80 30,484 827.30 24.65 oc 0.14 is --- --- 0.00 0.00 0.00 --- --- --- 0.137 0.85 32,472 827.35 24.65 oc 0.14 is --- --- 0.00 0.00 0.00 --- --- --- 0.142 0.90 34,461 827.40 24.65 oc 0.15 is --- --- 0.00 0.00 0.00 --- --- --- 0.146 0.95 36,449 827.45 24.65 oc 0.15 is --- --- 0.00 0.00 0.00 --- --- --- 0.151 1.00 38,438 827.50 24.65 oc 0.16 is --- --- 0.00 0.00 0.00 --- --- --- 0.155 1.05 40,525 827.55 24.65 oc 0.16 is --- --- 0.00 0.00 0.04 --- --- --- 0.197 1.10 42,612 827.60 24.65 oc 0.16 is --- --- 0.00 0.00 0.11 --- --- --- 0.269 1.15 44,699 827.65 24.65 oc 0.17 is --- --- 0.00 0.00 0.19 --- --- --- 0.361 1.20 46,786 827.70 24.65 oc 0.17 is --- --- 0.00 0.00 0.30 --- --- --- 0.470 1.25 48,873 827.75 24.65 oc 0.18 is --- --- 0.00 0.00 0.42 --- --- --- 0.592 1.30 50,960 827.80 24.65 oc 0.18 is --- --- 0.00 0.00 0.55 --- --- --- 0.726 1.35 53,047 827.85 24.65 oc 0.18 is --- --- 0.00 0.00 0.69 --- --- --- 0.872 1.40 55,134 827.90 24.65 oc 0.19 is --- --- 0.00 0.00 0.84 --- --- --- 1.029 1.45 57,221 827.95 24.65 oc 0.19 is --- --- 0.00 0.00 1.00 --- --- --- 1.195 1.50 59,308 828.00 24.65 oc 0.19 is --- --- 0.00 0.00 1.18 --- --- --- 1.371 1.70 68,443 828.20 24.65 oc 0.21 is --- --- 0.00 0.00 1.95 --- --- --- 2.158 1.90 77,578 828.40 24.65 oc 0.22 is --- --- 0.00 0.00 2.84 --- --- --- 3.063 2.10 86,713 828.60 24.65 oc 0.23 is --- --- 0.00 0.00 3.84 --- --- --- 4.074 2.30 95,848 828.80 24.65 oc 0.24 is --- --- 0.00 0.00 4.94 --- --- --- 5.179 2.50 104,983 829.00 24.65 oc 0.25 is --- --- 0.00 0.00 6.12 --- --- --- 6.372 2.70 114,118 829.20 24.65 oc 0.26 is --- --- 0.00 0.00 7.38 --- --- --- 7.646 Continues on next page... 10 scM 1 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B ft cuft ft cfs cfs cfs cfs cfs cfs 2.90 123,253 829.40 24.65 oc 0.27 is --- --- 0.00 0.00 3.10 132,388 829.60 24.65 oc 0.28 is --- --- 2.00 0.00 3.30 141,523 829.80 24.65 oc 0.29 is --- --- 10.40 0.00 3.50 150,658 830.00 35.80 oc 0.26 is --- --- 22.37 0.00 3.70 160,973 830.20 49.06 is 0.18 is --- --- 37.06 2.33 3.90 171,288 830.40 54.02 is 0.11 is --- --- 44.86 s 6.58 4.10 181,604 830.60 55.88 is 0.08 is --- --- 47.69 s 12.08 4.30 191,919 830.80 57.29 is 0.07 is --- --- 49.75 s 18.60 4.50 202,234 831.00 58.50 is 0.06 is --- --- 51.44 s 26.00 4.70 212,549 831.20 59.59 is 0.05 is --- --- 52.89 s 34.18 4.90 222,864 831.40 60.62 is 0.04 is --- --- 54.18 s 43.07 5.10 233,179 831.60 61.60 is 0.04 is --- --- 55.37 s 52.63 5.30 243,494 831.80 62.55 is 0.03 is --- --- 56.51 s 62.79 5.50 253,809 832.00 63.47 is 0.03 is --- --- 57.56 s 73.54 ... End Wr C Wr D Exfil User Total cfs cfs cfs cfs cfs 8.72 --- --- --- 8.996 10.13 --- --- --- 12.42 11.62 --- --- --- 22.31 13.16 --- --- --- 35.80 11.83 s --- --- --- 51.38 9.05 s --- --- --- 60.59 8.10 s --- --- --- 67.96 7.46 s --- --- --- 75.89 7.00 s --- --- --- 84.50 6.64 s --- --- --- 93.77 6.37 s --- --- --- 103.67 6.15 s --- --- --- 114.19 5.98 s --- --- --- 125.32 5.84 s --- --- --- 136.97 Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.050 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 10 Area to SCM 2 Hyd. No. 10 -- 1 Year 360 480 600 720 840 Friday, 05 / 15 / 2020 = 2.885 cfs = 718 min = 5,808 cuft = 75* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 0.066 cfs Storm frequency = 1 yrs Time to peak = 1020 min Time interval = 2 min Hyd. volume = 4,644 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 813.03 ft Reservoir name = SCM 2 Max. Storage = 4,120 cuft Storage Indication method used Q (cfs) 3.00 2.00 1.00 0.00 0 600 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 1 Year 1200 1800 2400 Hyd No. 10 3000 3600 4200 4800 5400 I_I_I_I_I_I_I Total storage used = 4,120 cuft Q (cfs) 3.00 2.00 1.00 1 0.00 6000 Time (min) Pond Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Pond No. 2 - SCM 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 812.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 812.00 2,610 0 0 2.00 814.00 5,540 7,968 7,968 4.00 816.00 7,460 12,951 20,919 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 0.75 0.00 0.00 Crest Len (ft) = 11.00 8.00 1.00 0.00 Span (in) = 15.00 0.75 0.00 0.00 Crest El. (ft) = 814.00 815.00 813.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 809.50 812.00 0.00 0.00 Weir Type = 1 Broad Rect --- Length (ft) = 54.00 0.50 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 2.78 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 812.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.20 797 812.20 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.006 0.40 1,594 812.40 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.009 0.60 2,390 812.60 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.011 0.80 3,187 812.80 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.013 1.00 3,984 813.00 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.015 1.20 4,781 813.20 8.09 is 0.02 is --- --- 0.00 0.00 0.30 --- --- --- 0.314 1.40 5,577 813.40 8.09 is 0.02 is --- --- 0.00 0.00 0.84 --- --- --- 0.860 1.60 6,374 813.60 8.09 is 0.02 is --- --- 0.00 0.00 1.55 --- --- --- 1.567 1.80 7,171 813.80 8.09 is 0.02 is --- --- 0.00 0.00 2.38 --- --- --- 2.403 2.00 7,968 814.00 8.09 is 0.02 is --- --- 0.00 0.00 3.33 --- --- --- 3.351 2.20 9,263 814.20 8.09 is 0.02 is --- --- 3.28 0.00 4.38 --- --- --- 7.676 2.40 10,558 814.40 11.83 is 0.01 is --- --- 8.50 s 0.00 3.32 s --- --- --- 11.83 2.60 11,853 814.60 12.36 is 0.00 is --- --- 9.70 s 0.00 2.66 s --- --- --- 12.36 2.80 13,148 814.80 12.71 is 0.00 is --- --- 10.37 s 0.00 2.34 s --- --- --- 12.70 3.00 14,443 815.00 13.01 is 0.00 is --- --- 10.86 s 0.00 2.14 s --- --- --- 13.00 3.20 15,738 815.20 13.29 is 0.00 is --- --- 11.25 s 1.86 2.01 s --- --- --- 15.13 3.40 17,033 815.40 13.55 is 0.00 is --- --- 11.60 s 5.26 1.92 s --- --- --- 18.79 3.60 18,329 815.60 13.81 is 0.00 is --- --- 11.90 s 9.67 1.86 s --- --- --- 23.43 3.80 19,624 815.80 14.07 is 0.00 is --- --- 12.23 s 14.89 1.82 s --- --- --- 28.94 4.00 20,919 816.00 14.31 is 0.00 is --- --- 12.46 s 20.80 1.78 s --- --- --- 35.04 Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 52.920 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 3.00 2.00 1.00 0.00 ' ' 0 120 240 Hyd No. 13 Area A that bypasses SCMs Hyd. No. 13 -- 1 Year 360 480 600 720 840 Friday, 05 / 15 / 2020 = 2.558 cfs = 760 min = 36,954 cuft = 57.1 = 0 ft = 42.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 �i 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 2.719 cfs Storm frequency = 1 yrs Time to peak = 760 min Time interval = 2 min Hyd. volume = 96,460 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Q (cfs) 3.00 2.00 1.00 Total Area A - Post Dev Hyd. No. 15 -- 1 Year Q (cfs) 3.00 2.00 1.00 0.00 ' ' JrI 10.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 16 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 9.441 2 748 95,225 ------ ------ ------ Area A - Pre 2 SCS Runoff 0.883 2 720 2,978 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 0.290 2 720 979 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 41.83 2 720 95,747 ------ ------ ------ Area to SCM 1 8 Reservoir 1.363 2 902 83,192 7 828.00 59,215 Route SCM 1 10 SCS Runoff 4.272 2 718 8,543 ------ ------ ------ Area to SCM 2 11 Reservoir 0.223 2 794 7,373 10 813.14 4,539 Route SCM 2 13 SCS Runoff 7.646 2 746 73,447 ------ ------ ------ Area A that bypasses SCMs 15 Combine 8.459 2 750 164,011 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 2 Year Friday, 05 / 15 / 2020 Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 73.220 ac Curve number Basin Slope = 1.8 % Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 10.00 . 11 4.00 2.00 0.00 ' ' 0 120 240 Hyd No. 1 360 480 Area A - Pre Hyd. No. 1 -- 2 Year Friday, 05 / 15 / 2020 = 9.441 cfs = 748 min = 95,225 cuft = 56.4* = 9400 ft = 41.99 min = Type II = 484 Q (cfs) 10.00 . 11 4.00 2.00 .� 0.00 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 1.00 0.90 0.80 0.70 0.50 0.40 0.30 0.20 Area B - Pre & Post Hyd. No. 2 -- 2 Year Friday, 05 / 15 / 2020 = 0.883 cfs = 720 min = 2,978 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 Area C - Pre & Post Hyd. No. 3 -- 2 Year Friday, 05 / 15 / 2020 = 0.290 cfs = 720 min = 979 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 18.650 ac Curve number Basin Slope = 4.0 % Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(10.200 x 61) + (8.450 x 98)] / 18.650 Q (cfs) 50.00 40.00 O e 1l 20.00 10.00 0.00 0 120 240 Hyd No. 7 Area to SCM 1 Hyd. No. 7 -- 2 Year Friday, 05 / 15 / 2020 = 41.83 cfs = 720 min = 95,747 cuft = 78* = 1830 ft = 8.76 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used Q (cfs) 50.00 40.00 O e 1l 20.00 10.00 0.00 0 600 Hyd No. 8 Route SCM 1 Hyd. No. 8 -- 2 Year 1200 1800 2400 Hyd No. 7 Friday, 05 / 15 / 2020 = 1.363 cfs = 902 min = 83,192 cuft = 828.00 ft = 59,215 cuft 3000 3600 4200 4800 5400 I_I_I_I_I_I_I Total storage used = 59,215 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 1 0.00 6000 Time (min) Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.050 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 10 Area to SCM 2 Hyd. No. 10 -- 2 Year Friday, 05 / 15 / 2020 = 4.272 cfs = 718 min = 8,543 cuft = 75* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 5.00 4.00 IM11111 2.00 1.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation Reservoir name = SCM 2 Max. Storage Storage Indication method used Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 600 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 2 Year 1200 1800 2400 Hyd No. 10 Friday, 05 / 15 / 2020 = 0.223 cfs = 794 min = 7,373 tuft = 813.14 ft = 4,539 cuft 3000 3600 4200 4800 5400 I_I_I_I_I_I_I Total storage used = 4,539 cuft Q (cfs) 5.00 4.00 3.00 2.00 1.00 1 0.00 6000 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 52.920 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 8.00 4.00 2.00 0.00 ' 0 120 240 Hyd No. 13 Area A that bypasses SCMs Hyd. No. 13 -- 2 Year 360 480 600 720 840 Friday, 05 / 15 / 2020 = 7.646 cfs = 746 min = 73,447 cuft = 57.1 = 0 ft = 42.00 min = Type II = 484 Q (cfs) 8.00 4.00 2.00 % i 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 8.459 cfs Storm frequency = 2 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 164,011 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Q (cfs) 10.00 M 4.00 2.00 Total Area A - Post Dev Hyd. No. 15 -- 2 Year Q (cfs) 10.00 NMI] 4.00 2.00 0.00 ' ' F 11 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 26 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 43.34 2 742 282,010 ------ ------ ------ Area A - Pre 2 SCS Runoff 4.334 2 718 9,293 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 1.424 2 718 3,054 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 79.43 2 718 181,858 ------ ------ ------ Area to SCM 1 8 Reservoir 5.545 2 768 168,728 7 828.86 98,653 Route SCM 1 10 SCS Runoff 8.379 2 716 16,918 ------ ------ ------ Area to SCM 2 11 Reservoir 2.390 2 724 15,737 10 813.80 7,159 Route SCM 2 13 SCS Runoff 33.24 2 742 212,341 ------ ------ ------ Area A that bypasses SCMs 15 Combine 39.96 2 742 396,807 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 10 Year Friday, 05 / 15 / 2020 Hydrograph Report 27 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 73.220 ac Curve number Basin Slope = 1.8 % Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 4.97 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 50.00 40.00 O e 1l 20.00 10.00 0.00 0 120 240 Hyd No. 1 Area A - Pre Hyd. No. 1 -- 10 Year Friday, 05 / 15 / 2020 = 43.34 cfs = 742 min = 282,010 cuft = 56.4* = 9400 ft = 41.99 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 i i I I I I I I t 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.97 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 2 Area B - Pre & Post Hyd. No. 2 -- 10 Year Friday, 05 / 15 / 2020 = 4.334 cfs = 718 min = 9,293 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 5.00 4.00 IM11111 2.00 1.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.97 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 1 Area C - Pre & Post Hyd. No. 3 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 3 Friday, 05 / 15 / 2020 = 1.424 cfs = 718 min = 3,054 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 79.43 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 181,858 cuft Drainage area = 18.650 ac Curve number = 78* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(10.200 x 61) + (8.450 x 98)] / 18.650 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Area to SCM 1 Hyd. No. 7 -- 10 Year IiE Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report 31 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Route SCM 1 Hyd. No. 8 -- 10 Year Friday, 05 / 15 / 2020 = 5.545 cfs = 768 min = 168,728 cuft = 828.86 ft = 98,653 cuft Q (cfs) 80.00 70.00 I:IIIIII= 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 8 Hyd No. 7 �I Total storage used = 98,653 cuft Hydrograph Report 32 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.050 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.97 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 10.00 . 11 4.00 2.00 0.00 ' ' 0 120 240 Hyd No. 10 360 480 Area to SCM 2 Hyd. No. 10 -- 10 Year Friday, 05 / 15 / 2020 = 8.379 cfs = 716 min = 16,918 cuft = 75* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 10.00 . 11 4.00 2.00 ..6--� ' ' ' 0.00 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 33 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 2.390 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 15,737 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 813.80 ft Reservoir name = SCM 2 Max. Storage = 7,159 cuft Storage Indication method used Q (cfs) 10.00 . 11 4.00 2.00 0.00 ' ' 0 120 240 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 10 Year 360 480 600 Hyd No. 10 720 Q (cfs) 10.00 . 11 4.00 2.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) I_I_I_I_I_I_1 Total storage used = 7,159 cuft Hydrograph Report 34 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 52.920 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.97 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 Area A that bypasses SCMs Hyd. No. 13 -- 10 Year Friday, 05 / 15 / 2020 = 33.24 cfs = 742 min = 212,341 cuft = 57.1 = 0 ft = 42.00 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 IiZ17 0.00 ' 1 1 1 1 1" ' ' ' ' ' ' '!% ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 39.96 cfs Storm frequency = 10 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 396,807 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Q (cfs) 40.00 30.00 20.00 10.00 0.00 ' 0 240 Hyd No. 15 Total Area A - Post Dev Hyd. No. 15 -- 10 Year 480 720 Hyd No. 8 960 1200 Hyd No. 11 1440 1680 Hyd No. 13 Q (cfs) 40.00 30.00 20.00 10.00 =M`- 0.00 1920 Time (min) 36 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 71.95 2 740 425,708 ------ ------ ------ Area A - Pre 2 SCS Runoff 6.951 2 718 14,232 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 2.284 2 718 4,677 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 103.53 2 718 238,110 ------ ------ ------ Area to SCM 1 8 Reservoir 10.15 2 750 224,778 7 829.47 126,333 Route SCM 1 10 SCS Runoff 11.10 2 716 22,481 ------ ------ ------ Area to SCM 2 11 Reservoir 5.997 2 722 21,296 10 814.13 8,760 Route SCM 2 13 SCS Runoff 54.48 2 740 318,383 ------ ------ ------ Area A that bypasses SCMs 15 Combine 66.50 2 740 564,458 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 25 Year Friday, 05 / 15 / 2020 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 71.95 cfs Storm frequency = 25 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 425,708 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Area A - Pre Hyd. No. 1 -- 25 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1' ' ' ' ' ' ' ' "*, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 38 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.93 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 7.00 .M 5.00 i 3.00 2.00 1.00 Area B - Pre & Post Hyd. No. 2 -- 25 Year Friday, 05 / 15 / 2020 = 6.951 cfs = 718 min = 14,232 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 7.00 M 5.00 4.00 3.00 2.00 MR1111 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 39 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.93 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 2.00 1.00 1 Area C - Pre & Post Hyd. No. 3 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 3 Friday, 05 / 15 / 2020 = 2.284 cfs = 718 min = 4,677 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 40 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 18.650 ac Curve number Basin Slope = 4.0 % Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 5.93 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(10.200 x 61) + (8.450 x 98)] / 18.650 Q (cfs) 120.00 100.00 20.00 0.00 0 120 240 Hyd No. 7 Area to SCM 1 Hyd. No. 7 -- 25 Year Friday, 05 / 15 / 2020 = 103.53 cfs = 718 min = 238,110 cuft = 78* = 1830 ft = 8.76 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 —' ' ' ' 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 41 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used. Q (cfs) 120.00 100.00 20.00 0.00 0 480 Hyd No. 8 •.1 Route SCM 1 Hyd. No. 8 -- 25 Year Friday, 05 / 15 / 2020 = 10.15 cfs = 750 min = 224,778 cuft = 829.47 ft = 126,333 cuft Q (cfs) 120.00 100.00 40.00 20.00 6 6' 0.00 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 7 I_I_I_I_I_I_1 Total storage used = 126,333 CA Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.050 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.93 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 12.00 10.00 4.00 2.00 Area to SCM 2 Hyd. No. 10 -- 25 Year Friday, 05 / 15 / 2020 = 11.10 cfs = 716 min = 22,481 cuft = 75* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 10 Hydrograph Report 43 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 5.997 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 21,296 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 814.13 ft Reservoir name = SCM 2 Max. Storage = 8,760 cuft Storage Indication method used Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' ' 0 120 240 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 25 Year Q (cfs) 12.00 10.00 4.00 2.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 I_I_I_I_I_I_1 Total storage used = 8,760 cuft Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 52.920 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.93 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 13 Area A that bypasses SCMs Hyd. No. 13 -- 25 Year Friday, 05 / 15 / 2020 = 54.48 cfs = 740 min = 318,383 cuft = 57.1 = 0 ft = 42.00 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 I I i J I I I I I I I ` 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 45 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 66.50 cfs Storm frequency = 25 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 564,458 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Total Area A - Post Dev Q (cfs) Hyd. No. 15 -- 25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 46 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 127.39 2 740 698,793 ------ ------ ------ Area A - Pre 2 SCS Runoff 11.83 2 718 23,703 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 3.887 2 718 7,789 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 144.14 2 718 335,052 ------ ------ ------ Area to SCM 1 8 Reservoir 49.34 2 728 321,492 7 830.18 159,623 Route SCM 1 10 SCS Runoff 15.72 2 716 32,166 ------ ------ ------ Area to SCM 2 11 Reservoir 11.66 2 720 30,976 10 814.40 10,505 Route SCM 2 13 SCS Runoff 95.18 2 740 519,017 ------ ------ ------ Area A that bypasses SCMs 15 Combine 131.12 2 736 871,485 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 100 Year Friday, 05 / 15 / 2020 Hydrograph Report 47 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 73.220 ac Curve number Basin Slope = 1.8 % Hydraulic length Tc method = KIRPICH Time of conc. (Tc) Total precip. = 7.52 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Area A - Pre Friday, 05 / 15 / 2020 = 127.39 cfs = 740 min = 698,793 cuft = 56.4* = 9400 ft = 41.99 min = Type II = 484 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 48 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.52 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' ' 0 120 240 Hyd No. 2 Area B - Pre & Post Hyd. No. 2 -- 100 Year Friday, 05 / 15 / 2020 = 11.83 cfs = 718 min = 23,703 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 12.00 10.00 4.00 2.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 49 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.52 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' ' 0 120 240 — Hyd No. 3 Area C - Pre & Post Hyd. No. 3 -- 100 Year 360 480 600 720 840 Friday, 05 / 15 / 2020 = 3.887 cfs = 718 min = 7,789 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 144.14 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 335,052 cuft Drainage area = 18.650 ac Curve number = 78* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(10.200 x 61) + (8.450 x 98)] / 18.650 Q (cfs 160.00 140.00 120.00 100.00 :1 11 ,.1 11 i 1 11 20.00 Q (cfs) 160.00 140.00 120.00 100.00 :/ 11 •/ 11 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 7 Time (min) Hydrograph Report 51 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used Q (cfs) Friday, 05 / 15 / 2020 = 49.34 cfs = 728 min = 321,492 cuft = 830.18 ft = 159,623 cuft Route SCM 1 Hyd. No. 8 -- 100 Year Q (cfs) mom 0 240 Hyd No. 8 480 720 Hyd No. 7 960 1200 1440 1680 1920 Time (min) I_I_I_I_I_I_I Total storage used = 159,623 CA 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 15.72 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 32,166 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 18.00 15.00 12.00 .M 3.00 Area to SCM 2 Hyd. No. 10 -- 100 Year Q (cfs) 18.00 15.00 12.00 M 3.00 0.00 ' 1 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 10 Hydrograph Report 53 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 11.66 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 30,976 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 814.40 ft Reservoir name = SCM 2 Max. Storage = 10,505 cuft Storage Indication method used Q (cfs) 18.00 15.00 12.00 .M 3.00 0.00 ' ' 0 120 240 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 100 Year Q (cfs) 18.00 15.00 12.00 m 3.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 I_I_I_I_I_I_1 Total storage used = 10,505 cuft 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 95.18 cfs Storm frequency = 100 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 519,017 cuft Drainage area = 52.920 ac Curve number = 57.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hydrograph Report 55 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Friday, 05 / 15 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 131.12 cfs Storm frequency = 100 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 871,485 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Q (cfs 140.00 120.00 100.00 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 DO i111 WAVOTA, 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 11 Hyd No. 13 Hydraflow Rainfall Report 56 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 0.0000 0.0000 0.0000 -------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 0.0000 0.0000 0.0000 -------- 25 0.0000 0.0000 0.0000 -------- 50 0.0000 0.0000 0.0000 -------- 100 0.0000 0.0000 0.0000 -------- File name: Sample.idf Intensity = B / (Tc + D)^E Friday, 05 / 15 / 2020 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tc = time in minutes. Values may exceed 60. Storm rreci . The name: yam ie. c Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.80 3.39 0.00 3.30 4.97 5.93 6.80 7.52 SCS 6-Hr 1.93 2.34 0.00 3.38 3.41 4.04 4.57 5.07 Huff -1st 0.00 0.00 0.00 2.75 0.00 0.00 6.50 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 2.75 0.00 0.00 6.50 0.00 Custom 0.00 0.00 0.00 2.80 0.00 0.00 6.00 0.00 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Pond No. 4 - Forebay Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 822.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 822.00 1,540 0 0 2.00 824.00 2,800 4,277 4,277 4.00 826.00 4,400 7,139 11,417 4.50 826.50 5,330 2,429 13,845 Friday, 05 / 15 / 2020 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 1000.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 826.50 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = --- --- Broad --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked fororifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 822.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.20 428 822.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.40 855 822.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.60 1,283 822.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.80 1,711 822.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.00 2,139 823.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.20 2,566 823.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.40 2,994 823.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.60 3,422 823.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.80 3,850 823.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.00 4,277 824.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.20 4,991 824.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.40 5,705 824.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.60 6,419 824.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.80 7,133 824.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.00 7,847 825.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.20 8,561 825.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.40 9,275 825.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.60 9,989 825.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.80 10,703 825.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.00 11,417 826.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.05 11,659 826.05 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.10 11,902 826.10 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.15 12,145 826.15 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.20 12,388 826.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.25 12,631 826.25 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.30 12,874 826.30 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.35 13,117 826.35 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.40 13,359 826.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.45 13,602 826.45 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.50 13.845 826.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Pond No. 3 - Main Pool Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 823.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 823.00 20,780 0 0 1.00 824.00 22,990 21,874 21,874 3.00 826.00 27,620 50,534 72,408 3.50 826.50 30,040 14,409 86,817 Friday, 05 / 15 / 2020 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 1000.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 826.50 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = --- --- Broad --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked fororifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 823.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.10 2,187 823.10 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.20 4,375 823.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.30 6,562 823.30 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.40 8,749 823.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.50 10,937 823.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.60 13,124 823.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.70 15,311 823.70 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.80 17,499 823.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.90 19,686 823.90 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.00 21,874 824.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.20 26,927 824.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.40 31,980 824.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.60 37,034 824.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.80 42,087 824.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.00 47,141 825.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.20 52,194 825.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.40 57,247 825.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.60 62,301 825.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.80 67,354 825.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.00 72,408 826.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.05 73,849 826.05 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.10 75,290 826.10 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.15 76,731 826.15 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.20 78,171 826.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.25 79,612 826.25 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.30 81,053 826.30 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.35 82,494 826.35 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.40 83,935 826.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.45 85,376 826.45 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.50 86.817 826.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 'DATE NAME rLewisville MS 8/19/19 DESIGN PHASE PRELIM /XECT CONSTR / REVISION / / PROJECT NO 17-116 �J LOCATION Forsyth County, NC BY KAL RECORD / / OTHER / / CHECKED BY (SPECIFY) n= 0.013 9= 192 h= 23 STORM DRAINAGE SCHEDULE CONTINUED 1= 6.86 INLET AREA (SF) INLET AREA (AC) IMPERVIOUS N INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO Al A2 46,680 1.07 60 0.69 5.07 1.07 5.00 0.00 5.00 6.86 0.69 A2 A3 46,680 1.07 60 0.69 5.07 2.14 5.00 0.01 5.01 6.85 0.69 A3 A4 18,700 0.43 80 0.82 2.41 2.57 5.00 0.05 5.05 6.85 0.71 A4 A5 6,750 0.15 0 0.30 0.32 2.73 5.00 0.73 5.73 6.68 0.69 A5 A6 11,150 0.26 40 0.56 0.98 2.98 5.00 0.89 5.89 6.65 0.68 A6 A7 9,580 0.22 40 0.56 0.84 3.20 5.00 1.13 6.13 6.59 0.67 A7 A8 10,810 0.25 0 0.30 0.51 3.45 5.00 1.34 6.34 6.54 0.64 A8 A9 7,280 0.17 10 0.37 0.42 3.62 5.00 1.54 6.54 6.50 0.63 A9 A10 19,910 0.46 95 0.92 2.88 4.08 5.00 1.72 6.72 6.46 0.66 A10 All 2,420 0.06 95 0.92 0.35 4.13 5.00 1.83 6.83 6.44 0.67 All Al2 11,070 0.25 95 0.92 1.60 4.39 5.00 1.88 6.88 6.43 0.68 A50 A51 10,980 0.25 30 0.50 0.86 0.25 5.00 0.00 5.00 6.86 0.50 A51 A52 13,120 0.30 30 0.50 1.02 0.55 5.00 0.37 5.37 6.77 0.50 A52 A53 13,830 0.32 30 0.50 1.08 0.87 5.00 0.69 5.69 6.69 0.50 A53 A5 12,720 0.29 30 0.50 0.99 1.16 5.00 1.01 6.01 6.62 0.50 A510 A51 5,160 0.12 0 0.30 0.24 0.12 5.00 0.00 5.00 6.86 0.30 A520 A52 6,420 0.15 0 0.30 0.30 0.15 5.00 0.00 5.00 6.86 0.30 A530 A53 5,530 0.13 0 0.30 0.26 0.13 5.00 0.00 5.00 6.86 0.30 A80 A8 12,130 0.28 40 0.56 1.07 0.28 5.00 0.00 5.00 6.86 0.56 A90 A91 27,750 0.64 50 0.63 2.73 0.64 5.00 0.00 5.00 6.86 0.63 A91 A92 57,450 1.32 30 0.50 4.48 1.96 5.00 0.13 5.13 6.83 0.54 A92 A93 9,290 0.21 50 0.63 0.91 2.17 5.00 0.44 5.44 6.75 0.55 A93 A94 8,370 0.19 90 0.89 1.17 2.36 5.00 0.60 5.60 6.71 0.57 17-116-STRM-I-INVERTS.XLSSTORM Page 1 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION OTHER RECORDrT (SPECIFY) PR OJECT NO 17-116 LOCATION Forsyth County, NC BY KAL CHECKED BY n= 0.013 9= 192 h= 23 STORM DRAINAGE SCHEDULE - CONTINUED 1= 6.86 Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) PIPE COVER (FT) FROM TO Al A2 5.07 0.00 0.0167 18 13.6 7.7 6 0.01 833.20 833.10 837.30 2.46 A2 A3 10.14 0.00 0.0143 18 12.6 7.1 14 0.03 833.00 832.80 837.30 2.66 A3 A4 12.53 0.00 0.0058 24 17.2 5.5 224 0.68 832.70 831.40 838.10 3.22 A4 A5 12.55 0.00 0.0069 24 18.8 6.0 58 0.16 831.50 831.10 850.00 16.32 A5 A6 18.05 4.62 0.0070 30 34.3 7.0 100 0.24 831.00 830.30 849.40 15.67 A6 A7 18.75 0.00 0.0076 30 35.8 7.3 92 0.21 830.20 829.50 849.40 16.47 A7 A8 19.14 0.00 0.0071 30 34.7 7.1 84 0.20 829.40 828.80 850.00 17.87 A8 A9 20.50 1.07 0.0075 30 35.5 7.2 80 0.18 828.70 828.10 850.00 18.57 A9 A10 59.72 36.60 0.0071 42 85.0 8.8 56 0.11 828.00 827.60 852.70 20.88 A10 All 65.02 5.03 0.0071 42 85.0 8.8 28 0.05 827.50 827.30 851.05 19.73 All Al2 66.49 0.00 0.0076 42 87.8 9.1 92 0.17 827.20 826.50 851.05 20.03 A50 A51 0.86 0.00 0.0106 12 3.7 4.7 104 0.37 845.90 844.80 849.40 2.41 A51 A52 2.10 0.24 0.0100 15 6.5 5.3 100 0.32 844.70 843.70 849.40 3.34 A52 A53 3.43 0.30 0.0100 15 6.5 5.3 100 0.32 843.60 842.60 849.40 4.44 A53 A5 4.62 0.26 0.0913 15 19.5 15.9 104 0.11 841.00 831.50 849.40 7.04 A510 A51 0.24 0.00 0.0104 12 3.6 4.6 48 0.17 847.00 846.50 850.00 1.91 A520 A52 0.30 0.00 0.0104 12 3.6 4.6 48 0.17 847.00 846.50 850.00 1.91 A530 A53 0.26 0.00 0.0104 12 3.6 4.6 48 0.17 847.00 846.50 850.00 1.91 A80 A8 1.07 0.00 0.0196 12 5.0 6.3 56 0.15 846.40 845.30 849.40 1.91 A90 A91 2.73 0.00 0.0100 15 6.5 5.3 40 0.13 867.00 866.60 870.50 2.14 A91 A92 7.17 0.00 0.0500 15 14.4 11.8 224 0.32 866.50 855.30 870.50 2.64 A92 A93 8.89 0.90 0.0380 18 20.5 11.6 108 0.16 855.20 851.10 859.20 2.36 A93 A94 9.99 0.00 0.0136 18 12.3 6.9 22 0.05 851.00 850.70 855.00 2.36 17-116-STRM-I-INVERTS.XLSSTORM Page 2 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION PROJECT NO 17-116 LI LOCATION Forsyth County, NC BY KAL RECORD OTHER CHECKED BY (SPECIFY) n= 0.013 g= 192 h= 23 1= 6.86 HYDRAULIC GRADE LINE CONTINUED BEND LOSS K's 90° = 0.70 70' = 0.61 50' = 0.47 30' = 0.28 20° = 0.16 80° = 0.66 60' = 0.55 40' = 0.38 25' = 0.22 15' = 0.10 PIPE HYDRAULIC SIDESTREAM HEAD LOSS BEND FRICTION FRICTION AREA RADIUS SUMMATION Hf He He Hb Ht LOSS SLOPE VELOCITY (FT) (FT) (CFS) K (FT/FT) (FPS) FROM TO Al A2 1.7671 0.3750 0.00 0.01 0.03 0.00 0.00 0.05 0.00 0.0023 2.86 A2 A3 1.7671 0.3750 0.00 0.13 0.13 0.04 0.00 0.30 0.00 0.0093 5.71 A3 A4 3.1416 0.5000 0.00 0.68 0.06 0.18 0.31 1.23 0.61 0.0030 3.97 A4 A5 3.1416 0.5000 0.00 0.18 0.06 0.09 0.13 0.46 0.55 0.0031 3.97 A5 A6 4.9087 0.6250 4.62 0.19 0.05 0.09 0.07 0.40 0.28 0.0019 3.65 A6 A7 4.9087 0.6250 4.62 0.19 0.06 0.07 0.03 0.35 0.16 0.0021 3.80 A7 A8 4.9087 0.6250 4.62 0.18 0.06 0.08 0.12 0.44 0.55 0.0022 3.88 A8 A9 4.9087 0.6250 5.69 0.20 0.07 0.08 0.07 0.41 0.28 0.0025 4.15 A9 A10 9.6211 0.8750 42.29 0.20 0.15 0.09 0.07 0.51 0.28 0.0035 6.16 A10 All 9.6211 0.8750 47.32 0.12 0.17 0.21 0.32 0.82 0.55 0.0041 6.71 All Al2 9.6211 0.8750 47.32 0.40 0.18 0.24 0.38 1.21 0.55 0.0043 6.86 A50 A51 0.7854 0.2500 0.00 0.06 0.00 0.00 0.00 0.06 0.00 0.0006 1.09 A51 A52 1.2272 0.3125 0.24 0.10 0.01 0.01 0.00 0.12 0.10 0.0010 1.70 A52 A53 1.2272 0.3125 0.55 0.28 0.03 0.02 0.00 0.33 0.00 0.0028 2.79 A53 A5 1.2272 0.3125 0.81 0.53 0.05 0.04 0.01 0.64 0.10 0.0051 3.75 A510 A51 0.7854 0.2500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 0.31 A520 A52 0.7854 0.2500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0001 0.38 A530 A53 0.7854 0.2500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0001 0.33 A80 A8 0.7854 0.2500 0.00 0.05 0.01 0.00 0.00 0.06 0.00 0.0009 1.36 A90 A91 1.2272 0.3125 0.00 0.07 0.02 0.00 0.00 0.09 0.00 0.0018 2.22 A91 A92 1.2272 0.3125 0.00 2.75 0.13 0.03 0.05 2.96 0.70 0.0123 5.82 A92 A93 1.7671 0.3750 0.90 0.77 0.10 0.18 0.00 1.05 0.00 0.0071 5.01 A93 A94 1.7671 0.3750 0.90 0.20 0.12 0.14 0.27 0.73 0.70 0.0090 5.63 17-116-STRM-I-INVERTS.XLSSTORM Page 3 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION PROJECT NO 17-116 LI LOCATION Forsyth County, NC BY KAL RECORD OTHER CHECKED BY (SPECIFY) n= 0.013 g= 192 h= 23 1= 6.86 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. 3. INTENSITY = g/(h+T), FOR 10 YR STORM 4. MANNINGS "n" FACTOR=.013 5. RATIONAL METHOD: C= .30 GRASS, C= .95 PAVEMENT OUTLET W.S. ELEV (FT) INLET W.S.ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) UPSTREAM INLET TYPE COMMENTS FROM TO OUTLET CONTOL (FT) INLET CONTROL (FT) USE (FT) Al A2 835.93 835.98 834.31 835.98 OUTLET 0.82 CB OK A2 A3 835.63 835.93 835.17 835.93 OUTLET 0.87 CB OK A3 A4 834.40 835.63 834.39 835.63 OUTLET 1.97 CB OK A4 A5 833.95 834.40 833.19 834.40 OUTLET 15.60 DI OK A5 A6 833.55 833.95 832.83 833.95 OUTLET 15.45 DI OK A6 A7 833.20 833.55 832.08 833.55 OUTLET 15.85 DI OK A7 A8 832.75 833.20 831.31 833.20 OUTLET 16.80 DI OK A8 A9 832.34 832.75 830.70 832.75 OUTLET 17.25 DI OK A9 A10 831.83 832.34 831.41 832.34 OUTLET 19.86 CB OK A10 All 831.01 831.83 831.22 831.83 OUTLET 18.72 CB OK All Al2 829.30 830.51 831.01 831.01 INLET 19.54 CB OK Tailwater Elev= 829.30 A50 A51 845.45 845.52 846.45 846.45 INLET 2.95 DI OK A51 A52 844.56 844.69 845.45 845.45 INLET 3.95 DI OK A52 A53 842.60 842.93 844.56 844.56 INLET 4.84 DI OK A53 A5 833.95 834.58 842.24 842.24 INLET 7.16 DI OK Tailwater Elev= 833.95 A510 A51 847.30 847.30 847.50 847.50 INLET 2.50 DI OK Tailwater Elev= 847.30 A520 A52 847.30 847.30 847.51 847.51 INLET 2.49 DI OK Tailwater Elev= 847.30 A530 A53 847.30 847.30 847.50 847.50 INLET 2.50 DI OK Tailwater Elev= 847.30 A80 A8 846.10 846.16 846.98 846.98 INLET 2.42 DI OK Tailwater Elev= 846.10 A90 A91 868.60 868.69 867.84 868.69 OUTLET 1.31 CB OK A91 A92 857.04 860.00 868.60 868.60 INLET 1.40 CB OK A92 A93 853.13 854.18 857.04 857.04 INLET 1.66 CB OK A93 A94 852.24 852.97 853.13 853.13 INLET 1.37 CB OK 17-116-STRM-I-INVERTS.XLSSTORM Page 4 of 12 ' 'DATE NAME rLewisville MS 8/19/19 DESIGN PHASE PRELIM /XECT CONSTR / REVISION / / PROJECT NO 17-116 �J LOCATION Forsyth County, NC BY KAL RECORD / / OTHER / / CHECKED BY (SPECIFY) n= 0.013 9= 192 h= 23 STORM DRAINAGE SCHEDULE CONTINUED 1= 6.86 INLET AREA (SF) INLET AREA (AC) IMPERVIOUS N INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO A94 A95 8,010 0.18 90 0.89 1.12 2.55 5.00 0.65 5.65 6.70 0.60 A95 A96 25,860 0.59 0 0.30 1.22 3.14 5.00 0.73 5.73 6.68 0.54 A96 A97 9,200 0.21 0 0.30 0.43 3.35 5.00 1.24 6.24 6.57 0.52 A97 A98 8,350 0.19 90 0.89 1.16 3.54 5.00 1.52 6.52 6.50 0.54 A98 A99 8,740 0.20 85 0.85 1.17 3.74 5.00 1.75 6.75 6.45 0.56 A99 A100 11,020 0.25 90 0.89 1.54 4.00 5.00 2.00 7.00 6.40 0.58 A100 A101 16,920 0.39 55 0.66 1.75 4.38 5.00 2.15 7.15 6.37 0.59 A101 A102 5,050 0.12 0 0.30 0.24 4.50 5.00 2.41 7.41 6.31 0.58 A102 A103 3,800 0.09 0 0.30 0.18 4.59 5.00 2.69 7.69 6.26 0.58 A103 A9 5,850 0.13 0 0.30 0.28 4.72 5.00 2.94 7.94 6.21 0.57 A920 A92 6,700 0.15 85 0.85 0.90 0.15 5.00 0.00 5.00 6.86 0.85 A950 A95 21,250 0.49 75 0.79 2.63 0.49 5.00 0.00 5.00 6.86 0.79 A960 A961 9,000 0.21 50 0.63 0.89 0.21 5.00 0.00 5.00 6.86 0.63 A961 A962 4,750 0.11 80 0.82 0.61 0.32 5.00 0.44 5.44 6.75 0.69 A962 A963 27,220 0.62 90 0.89 3.79 0.94 5.00 0.52 5.52 6.73 0.82 A963 A96 9,990 0.23 90 0.89 1.39 1.17 5.00 0.60 5.60 6.71 0.83 A990 A991 15,430 0.35 75 0.79 1.91 0.35 5.00 0.00 5.00 6.86 0.79 A991 A99 15,430 0.35 75 0.79 1.91 0.71 5.00 0.01 5.01 6.86 0.79 A1000 A1001 9,910 0.23 30 0.50 0.77 0.23 5.00 0.00 5.00 6.86 0.50 A1001 A1002 11,890 0.27 40 0.56 1.05 0.50 5.00 0.36 5.36 6.77 0.53 A1002 A1003 12,960 0.30 30 0.50 1.01 0.80 5.00 0.73 5.73 6.68 0.52 A1003 A1004 13,790 0.32 30 0.50 1.07 1.11 5.00 1.10 6.10 6.60 0.51 A1004 A1005 12,830 0.29 30 0.50 1.00 1.41 5.00 1.41 6.41 6.53 0.51 A1005 A1006 5,060 0.12 10 0.37 0.29 1.53 5.00 1.56 6.56 6.49 0.50 A1006 A10 3,010 0.07 0 0.30 0.14 1.59 5.00 1.69 6.69 6.47 0.49 17-116-STRM-I-INVERTS.XLSSTORM Page 5 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION OTHER RECORDrT (SPECIFY) PR OJECT NO 17-116 LOCATION Forsyth County, NC BY KAL CHECKED BY n= 0.013 9= 192 h= 23 STORM DRAINAGE SCHEDULE - CONTINUED 1= 6.86 Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) PIPE COVER (FT) FROM TO A94 A95 11.06 0.00 0.0111 24 23.8 7.6 36 0.08 850.20 849.80 855.00 2.62 A95 A96 14.86 2.63 0.0104 24 23.0 7.3 222 0.51 849.70 847.40 854.50 2.62 A96 A97 21.62 6.54 0.0100 30 41.0 8.3 140 0.28 846.90 845.50 859.00 9.37 A97 A98 22.62 0.00 0.0102 30 41.4 8.4 118 0.23 845.40 844.20 861.40 13.27 A98 A99 23.62 0.00 0.0102 30 41.3 8.4 128 0.25 844.10 842.80 859.70 12.87 A99 A100 28.77 3.82 0.0108 30 42.6 8.7 74 0.14 842.70 841.90 858.30 12.87 A100 A101 33.01 2.69 0.0100 30 41.0 8.3 130 0.26 841.80 840.50 857.50 12.97 A101 A102 33.09 0.00 0.0100 30 41.0 8.3 140 0.28 840.40 839.00 857.50 14.37 A102 A103 34.69 1.58 0.0106 30 42.2 8.6 132 0.26 838.90 837.50 859.10 17.47 A103 A9 36.60 1.80 0.0704 30 108.8 22.1 98 0.07 837.40 830.50 856.00 15.87 A920 A92 0.90 0.00 0.0100 15 6.5 5.3 40 0.13 855.70 855.30 859.20 2.14 A950 A95 2.63 0.00 0.0100 15 6.5 5.3 20 0.06 851.80 851.60 855.30 2.14 A960 A961 0.89 0.00 0.0100 15 6.5 5.3 140 0.44 856.00 854.60 859.50 2.14 A961 A962 1.48 0.00 0.0115 15 6.9 5.6 26 0.08 854.50 854.20 859.50 3.64 A962 A963 5.19 0.00 0.0758 15 17.8 14.5 66 0.08 854.10 849.10 860.00 4.54 A963 A96 6.54 0.00 0.0722 15 17.4 14.1 18 0.02 849.50 848.20 858.90 8.04 A990 A991 1.91 0.00 0.0250 15 10.2 8.3 4 0.01 851.90 851.80 855.40 2.14 A991 A99 3.82 0.00 0.0755 15 17.7 14.4 102 0.12 851.70 844.00 855.40 2.34 A1000 A1001 0.77 0.00 0.0102 12 3.6 4.6 98 0.36 846.40 845.40 849.40 1.91 A1001 A1002 1.80 0.00 0.0106 12 3.7 4.7 104 0.37 845.30 844.20 849.40 3.01 A1002 A1003 2.76 0.00 0.0100 12 3.6 4.5 100 0.37 844.10 843.10 849.40 4.21 A1003 A1004 3.76 0.00 0.0100 15 6.5 5.3 100 0.32 843.00 842.00 849.40 5.04 A1004 A1005 4.67 0.00 0.0104 15 6.6 5.4 48 0.15 841.90 841.40 849.40 6.14 A1005 A1006 4.92 0.00 0.0100 15 6.5 5.3 40 0.13 841.30 840.90 850.00 7.34 A1006 A10 5.03 0.00 0.0111 15 6.8 5.5 36 0.11 840.80 840.40 849.50 7.34 17-116-STRM-I-INVERTS.XLSSTORM Page 6 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION PROJECT NO 17-116 LI LOCATION Forsyth County, NC BY KAL RECORD OTHER CHECKED BY (SPECIFY) n= 0.013 g= 192 h= 23 1= 6.86 HYDRAULIC GRADE LINE CONTINUED BEND LOSS K's 90° = 0.70 70' = 0.61 50' = 0.47 30' = 0.28 20° = 0.16 80° = 0.66 60' = 0.55 40' = 0.38 25' = 0.22 15' = 0.10 PIPE HYDRAULIC SIDESTREAM HEAD LOSS BEND FRICTION FRICTION AREA RADIUS SUMMATION Hf He He Hb Ht LOSS SLOPE VELOCITY (FT) (FT) (CFS) K (FT/FT) (FPS) FROM TO A94 A95 3.1416 0.5000 0.90 0.09 0.05 0.17 0.27 0.58 0.55 0.0024 3.50 A95 A96 3.1416 0.5000 3.53 0.95 0.09 0.07 0.05 1.16 0.28 0.0043 4.71 A96 A97 4.9087 0.6250 10.08 0.39 0.07 0.12 0.10 0.68 0.28 0.0028 4.38 A97 A98 4.9087 0.6250 10.08 0.36 0.08 0.10 0.03 0.57 0.10 0.0030 4.58 A98 A99 4.9087 0.6250 10.08 0.42 0.09 0.11 0.18 0.80 0.55 0.0033 4.78 A99 A100 4.9087 0.6250 13.90 0.36 0.13 0.12 0.10 0.72 0.28 0.0049 5.83 A100 A101 4.9087 0.6250 16.59 0.83 0.17 0.18 0.00 1.19 0.00 0.0064 6.69 A101 A102 4.9087 0.6250 16.59 0.90 0.17 0.24 0.49 1.81 0.70 0.0064 6.70 A102 A103 4.9087 0.6250 18.17 0.94 0.19 0.24 0.20 1.57 0.28 0.0071 7.02 A103 A9 4.9087 0.6250 19.97 0.77 0.21 0.27 0.42 1.68 0.55 0.0079 7.41 A920 A92 1.2272 0.3125 0.00 0.01 0.00 0.00 0.00 0.01 0.00 0.0002 0.73 A950 A95 1.2272 0.3125 0.00 0.03 0.02 0.00 0.00 0.05 0.00 0.0017 2.14 A960 A961 1.2272 0.3125 0.00 0.03 0.00 0.00 0.00 0.03 0.00 0.0002 0.72 A961 A962 1.2272 0.3125 0.00 0.01 0.01 0.00 0.01 0.03 0.70 0.0005 1.20 A962 A963 1.2272 0.3125 0.00 0.42 0.07 0.01 0.02 0.52 0.70 0.0064 4.22 A963 A96 1.2272 0.3125 0.00 0.18 0.11 0.10 0.00 0.39 0.00 0.0102 5.31 A990 A991 1.2272 0.3125 0.00 0.00 0.01 0.00 0.00 0.01 0.00 0.0009 1.55 A991 A99 1.2272 0.3125 0.00 0.36 0.04 0.01 0.02 0.43 0.61 0.0035 3.11 A1000 A1001 0.7854 0.2500 0.00 0.05 0.00 0.00 0.00 0.05 0.00 0.0005 0.98 A1001 A1002 0.7854 0.2500 0.00 0.26 0.02 0.01 0.01 0.30 0.55 0.0025 2.28 A1002 A1003 0.7854 0.2500 0.00 0.60 0.05 0.03 0.01 0.68 0.10 0.0060 3.50 A1003 A1004 1.2272 0.3125 0.00 0.34 0.04 0.07 0.00 0.44 0.00 0.0034 3.05 A1004 A1005 1.2272 0.3125 0.00 0.25 0.06 0.05 0.10 0.46 0.70 0.0052 3.79 A1005 A1006 1.2272 0.3125 0.00 0.23 0.06 0.08 0.00 0.37 0.00 0.0058 4.00 A1006 A10 1.2272 0.3125 0.00 0.22 0.06 0.09 0.00 0.37 0.00 0.0060 4.09 17-116-STRM-I-INVERTS.XLSSTORM Page 7 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION PROJECT NO 17-116 LI LOCATION Forsyth County, NC BY KAL RECORD OTHER CHECKED BY (SPECIFY) n= 0.013 g= 192 h= 23 1= 6.86 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. 3. INTENSITY = g/(h+T), FOR 10 YR STORM 4. MANNINGS "n" FACTOR=.013 5. RATIONAL METHOD: C=.30 GRASS, C=.95 PAVEMENT OUTLET W.S. ELEV (FT) INLET W.S.ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) UPSTREAM INLET TYPE COMMENTS FROM TO OUTLET CONTOL (FT) INLET CONTROL (FT) USE (FT) A94 A95 851.67 848.99 852.24 1 851.74 850.14 851.67 852.24 851.67 OUTLET 2.26 CB INLET 2.83 DI OK OK A95 A96 A96 A97 847.70 848.38 848.99 848.99 INLET 10.01 DI OK A97 A98 847.13 847.70 847.57 847.70 OUTLET 13.20 CB OK A98 A99 846.33 847.13 846.35 847.13 OUTLET 12.07 CB OK A99 A100 845.61 846.33 845.43 846.33 OUTLET 11.47 CB OK A100 A101 844.42 845.61 845.00 845.61 OUTLET 11.89 DI OK A101 A102 842.61 844.42 843.61 844.42 OUTLET 13.08 DI OK A102 A103 841.05 842.61 842.30 842.61 OUTLET 16.49 DI OK A103 A9 832.50 834.18 841.05 841.05 INLET 14.95 DI OK Tailwater Elev= 832.50 A920 A92 856.30 856.31 856.35 856.35 INLET 2.35 CB OK Tailwater Elev= 856.30 A950 A95 852.60 852.65 852.62 852.65 OUTLET 2.15 CB OK Tailwater Elev= 852.60 A960 A961 855.53 855.55 856.65 856.65 INLET 2.85 DI OK A961 A962 855.50 855.53 855.19 855.53 OUTLET 3.97 DI OK A962 A963 851.35 851.87 855.50 855.50 INLET 4.50 DI OK A963 A96 849.20 849.59 851.35 851.35 INLET 7.05 CB OK Tailwater Elev= 849.20 A990 A991 852.74 852.76 852.63 852.76 OUTLET 2.14 CB OK A991 A99 845.00 845.43 852.74 852.74 INLET 2.16 CB OK Tailwater Elev= 845.00 A1000 A1001 846.03 846.08 846.94 846.94 INLET 2.46 DI OK A1001 A1002 845.13 845.43 846.03 846.03 INLET 3.37 DI OK A1002 A1003 844.03 844.71 845.13 845.13 INLET 4.27 DI OK A1003 A1004 843.15 843.59 844.03 844.03 INLET 5.37 DI OK A1004 A1005 842.62 843.08 843.15 843.15 INLET 6.25 DI OK A1005 A1006 842.15 842.52 842.62 842.62 INLET 7.38 DI OK A1006 A10 841.40 841.77 842.15 842.15 INLET 7.35 DI OK 17-116-STRM-I-INVERTS.XLSSTORM Page 8 of 12 ' 'DATE NAME rLewisville MS 8/19/19 DESIGN PHASE PRELIM /XECT CONSTR / REVISION / / PROJECT NO 17-116 �J LOCATION Forsyth County, NC BY KAL RECORD / / OTHER / / CHECKED BY (SPECIFY) n= 0.013 9= 192 h= 23 STORM DRAINAGE SCHEDULE CONTINUED 1= 6.86 INLET AREA (SF) INLET AREA (AC) IMPERVIOUS N INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO A1010 A100 19,300 0.44 90 0.89 2.69 0.44 5.00 0.00 5.00 6.86 0.89 A1020 A1021 11,200 0.26 85 0.85 1.50 0.26 5.00 0.00 5.00 6.86 0.85 A1021 A102 1,870 0.04 0 0.30 0.09 0.30 5.00 0.11 5.11 6.83 0.77 A1030 A1031 5,680 0.13 5 0.33 0.30 0.13 5.00 0.00 5.00 6.86 0.33 A1031 A103 15,330 0.35 50 0.63 1.51 0.48 5.00 0.12 5.12 6.83 0.55 Bi B2 10,980 0.25 90 0.89 1.53 0.25 5.00 0.00 5.00 6.86 0.89 B2 B3 33,630 0.77 25 0.46 2.45 1.02 5.00 0.09 5.09 6.84 0.57 B3 B4 2,650 0.06 90 0.89 0.37 1.08 5.00 0.19 5.19 6.81 0.58 B4 B5 6,200 0.14 40 0.56 0.55 1.23 5.00 0.22 5.22 6.80 0.58 B30 B3 7,640 0.18 90 0.89 1.06 0.18 5.00 0.00 5.00 6.86 0.89 Ci C2 544,600 12.50 5 0.33 28.51 12.50 5.00 0.00 5.00 6.86 0.33 C3 C4 3,136,320 72.00 10 0.37 180.21 72.00 10.00 0.00 10.00 5.45 0.37 Di D2 42,750 0.98 50 0.63 4.21 0.98 5.00 0.00 5.00 6.86 0.63 17-116-STRM-I-INVERTS.XLSSTORM Page 9 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION OTHER RECORDrT (SPECIFY) PR OJECT NO 17-116 LOCATION Forsyth County, NC BY KAL CHECKED BY n= 0.013 9= 192 h= 23 STORM DRAINAGE SCHEDULE - CONTINUED 1= 6.86 Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) PIPE COVER (FT) FROM TO A1010 A100 2.69 0.00 0.0634 15 16.3 13.2 142 0.18 854.00 845.00 860.00 4.64 A1020 A1021 1.50 0.00 0.0200 15 9.1 7.4 50 0.11 856.00 855.00 860.00 2.64 A1021 A102 1.58 0.00 0.0271 15 10.6 8.7 70 0.13 854.90 853.00 860.00 3.74 A1030 A1031 0.30 0.00 0.0250 15 10.2 8.3 60 0.12 856.50 855.00 860.00 2.14 A1031 A103 1.80 0.00 0.0133 15 7.5 6.1 180 0.49 854.90 852.50 858.50 2.24 Bi B2 1.53 0.00 0.0107 15 6.7 5.4 28 0.09 821.00 820.70 824.50 2.14 B2 B3 3.97 0.00 0.0278 15 10.8 8.8 54 0.10 820.60 819.10 824.50 2.54 B3 B4 5.38 1.06 0.0906 15 19.4 15.8 32 0.03 819.00 816.10 823.58 3.22 B4 B5 5.92 0.00 0.0875 15 19.1 15.6 40 0.04 816.00 812.50 824.00 6.64 B30 B3 1.06 0.00 0.0100 15 6.5 5.3 28 0.09 820.08 819.80 823.58 2.14 Ci C2 28.51 0.00 0.0333 36 121.8 17.2 210 0.20 847.00 840.00 856.00 5.73 C3 C4 143.23 0.00 0.0116 54 212.1 13.3 86 0.11 804.00 803.00 822.00 13.09 D1 D2 4.21 0.00 0.0427 15 13.4 10.9 110 0.17 834.50 829.80 836.50 0.64 17-116-STRM-I-INVERTS.XLSSTORM Page 10 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM CONSTR REVISION /X / PROJECT NO 17-116 LI LOCATION Forsyth County, NC BY KAL RECORD OTHER CHECKED BY (SPECIFY) n= g= h= 1= 0.013 192 23 6.86 HYDRAULIC PIPE AREA (FT) GRADE LINE HYDRAULIC RADIUS (FT) SIDESTREAM SUMMATION (CFS) Hf 90° = 0.70 80° = 0.66 He 70' = 0.61 60' = 0.55 HEAD LOSS He BEND LOSS 50' = 0.47 40' = 0.38 Hb K's 30' = 0.28 25' = 0.22 Ht 20° = 0.16 15' = 0.10 BEND LOSS K CONTINUED FRICTION SLOPE (FT/FT) FRICTION VELOCITY (FPS) FROM TO A1010 A100 1.2272 0.3125 0.00 0.24 0.02 0.00 0.00 0.26 0.00 0.0017 2.18 A1020 A1021 1.2272 0.3125 0.00 0.03 0.01 0.00 0.00 0.03 0.00 0.0005 1.22 A1021 A102 1.2272 0.3125 0.00 0.04 0.01 0.01 0.01 0.06 0.28 0.0006 1.29 A1030 A1031 1.2272 0.3125 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 0.24 A1031 A103 1.2272 0.3125 0.00 0.14 0.01 0.00 0.00 0.15 0.61 0.0008 1.46 B1 B2 1.2272 0.3125 0.00 0.02 0.01 0.00 0.00 0.02 0.00 0.0006 1.24 B2 B3 1.2272 0.3125 0.00 0.20 0.04 0.01 0.02 0.27 0.70 0.0038 3.22 B3 B4 1.2272 0.3125 1.06 0.22 0.07 0.06 0.00 0.35 0.00 0.0069 4.37 B4 B5 1.2272 0.3125 1.06 0.33 0.09 0.10 0.21 0.74 0.70 0.0084 4.81 B30 B3 1.2272 0.3125 0.00 0.01 0.00 0.00 0.00 0.01 0.00 0.0003 0.86 Ci C2 7.0686 0.7500 0.00 0.38 0.06 0.00 0.00 0.44 0.00 0.0018 4.01 C3 C4 15.9043 1.1250 0.00 0.45 0.31 0.00 0.00 0.76 0.00 0.0052 8.93 D1 D2 1.2272 0.3125 0.00 0.46 0.05 0.00 0.00 0.51 0.00 0.0042 3.41 17-116-STRM-I-INVERTS.XLSSTORM Page 11 of 12 D • • ' PROJECT NAME Lewisville MS DATE 8/19/19 DESIGN PHASE PRELIM /X / CONSTR REVISION PROJECT NO 17-116 LI LOCATION Forsyth County, NC BY KAL RECORD OTHER CHECKED BY (SPECIFY) n= 0.013 g= 192 h= 23 1= 6.86 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. 3. INTENSITY = g/(h+T), FOR 10 YR STORM 4. MANNINGS "n" FACTOR=.013 5. RATIONAL METHOD: C= .30 GRASS, C= .95 PAVEMENT OUTLET W.S. ELEV (FT) INLET W.S.ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) UPSTREAM INLET TYPE COMMENTS FROM TO OUTLET CONTOL (FT) INLET CONTROL (FT) USE (FT) 846.00 Tailwater Elev= 846.26 854.83 841.40 854.83 INLET 5.17 DI OK A1010 A100 Tailwater Elev= 846.00 A1020 A1021 855.60 855.63 856.69 856.69 INLET 3.31 DI OK A1021 A102 854.00 854.06 855.60 855.60 INLET 4.40 DI OK Tailwater Elev= 854.00 A1030 A1031 855.62 855.62 857.13 857.13 INLET 2.87 DI OK A1031 A103 853.50 853.65 855.62 855.62 INLET 2.88 DI OK Tailwater Elev= 853.50 B1 B2 821.68 821.70 821.69 821.70 OUTLET 2.30 CB OK B2 B3 820.45 820.72 821.68 821.68 INLET 2.32 CB OK B3 B4 817.63 817.98 820.45 820.45 INLET 2.63 CB OK B4 B5 813.50 814.24 817.63 817.63 INLET 5.87 CB OK Tailwater Elev= 813.50 B30 B3 820.80 820.81 820.74 820.81 OUTLET 2.27 CB OK Tailwater Elev= 820.80 Ci C2 842.40 842.84 849.20 849.20 INLET 6.80 FES OK Tailwater Elev= 842.40 C3 C4 806.60 807.36 809.75 809.75 INLET 12.25 HW OK Tailwater Elev= 806.60 D1 D2 830.80 831.31 835.63 835.63 INLET 0.87 PE OK Tailwater Elev= 830.80 17-116-STRM-I-INVERTS.XLSSTORM Page 12 of 12 DATE low 8/19/19 PROJECT NAME PROJECT NO Lewisville MS 17-116 LOCATION BY Forsyth County, NC KAL CHECKED BY Riprap Apron Outlet Protection FES No.= C2 Pipe Dia= 36 in Q10 = 28.51 cfs Qfull = 121.80 cfs Vfull = 17.20 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Zone D50 D MAX Riprap Class Apron Thickness Apron Length Apron Width = 3xDia Riprap Apron Outlet Protection FES No.= C4 Pipe Dia= 54 in Q10 = 143.23 cfs Qfull = 212.10 cfs Vfull = 13.30 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Zone D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width = 3xDia Q10/Qfull = V/Vfull = V= Q10/Qfull = V/Vfull = V= DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) 0.23 0.81 13.9 fps 3 10 in 17 in 1 24 in 24 ft 9 ft 0.68 1.07 14.3 fps 4 10 in 17 in 1 24 in 36 ft 14 ft X/ ' ' DATE DESIGN PHASE PRELIM rLewisvillITe 8/19/19 PROJECT NO NAME CONSTR / X / MS 17-116 REVISION RECORD LOCATION BY Forsyth County, NC KAL OTHER (SPECIFY) CHECKED BY Riprap Apron Outlet Protection FES No.= D2 Q10/Qfull = 0.32 Pipe Dia= 15 in V/Vfull = 0.87 Q10 = 4.21 cfs V = 9.3 fps Qfull = 13.10 cfs Vfull = 10.60 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in Lim3 Apron Length = 8 ft Length Apron Width = 3xDia = 4 ft ' ' 1 DATE 8/19/19 NAME PRO Lewisville MS 17-116 LOCATION BY Forsyth County, NC KAL CHECKED BY Riprap Apron Outlet Protection (to Flat Ground) DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) FES No.= Al2 Q10/Qfull = 0.76 Pipe Dia= 42 in V/Vfull = 1.10 Q10 = 66.49 cfs V = 10.0 fps Qfull = 87.80 cfs Vfull = 9.10 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a: D50 = D MAX = a o Riprap Class = Apron Thickness = Outlet W = Do + La Apron Length (L) — diameter (Do) Width (W-1) = 3xDia = _La —y' 0.5Do Width (W2) = Dia + L = T ilwater < 8 in 12 in B 18 in 24 ft 11 ft 28 ft Riprap Apron Outlet Protection (to Flat Ground) FES No.= B5 Q10/Qfull = 0.31 Pipe Dia= 15 in V/Vfull = 0.87 Q10 = 5.92 cfs V = 13.6 fps Qfull = 19.10 cfs Vfull = 15.60 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a: D50 = 8 in DMAX = 12 in s o Riprap Class = B Apron Thickness = 18 in Outlet W = Do + La Apron Length (L) = 16 ft pipe diameter (Do) Width (W1) = 3xDia = 4 ft La 0.5Do Width (W2) = Dia + L = 18 ft T ilwater < DATE 8/19/19 PROJECT NAME PROJECT NO Lewisville MS 17-116 LOCATION BY Forsyth County, NC KAL CHECKED BY Riprap Apron Outlet Protection (to Flat Ground) DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) FES No.= SCM 1 Q10/Qfull = 0.02 Pipe Dia= 30 in V/Vfull = 0.32 Q10 = 0.46 cfs V = 1.9 fps Qfull = 29.00 cfs Vfull = 5.90 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a: D50 = 8 in DMAX = 12 in s o Riprap Class = B Apron Thickness = 18 in Outlet W = °o + La Apron Length (L) = 16 ft pipe diameter (Do) Width (W1) = 3xDia = 8 ft La 0.5Do Width (W2) = Dia + L = 19 ft T ilwater � Riprap Apron Outlet Protection (to Flat Ground) FES No.= SCM 2 Q10/Qfull = 0.25 Pipe Dia= 15 in V/Vfull = 0.83 Q10 = 2.65 cfs V = 7.3 fps Qfull = 10.80 cfs Vfull = 8.80 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a: D50 = 8 in DMAX = 12 in s o Riprap Class = B Apron Thickness = 18 in Outlet W = °o + La Apron Length (L) = 12 ft pipe diameter (Do) Width (W1) = 3xDia = 4 ft La 0.5Do Width (W2) = Dia + L = 14 ft T ilwater �