Erosion and Sediment Control
Site Inspection Report
Report Generated: 05-12-20 3:06pm
Project Name: Panera Bread Jurisdiction:
Henderson County
Inspected: Entire Project
Permittee:
Don Curry
The Curry Engineering Group Inspector:
Rick Brooks
don@curryeng.com Inspection Completed:
05-12-2020 02:54 pm
Report Completed:
05-12-2020 02:54 pm
Inspection weather:
Temperature: 59 degrees, Partly
Cloudy
Inspection Type:
Monthly
Current Activity:
Site Build Out;
Current Site Status:
In Compliance
1)
Do conditions prevent inspection at this time?
No
2)
Does this site qualify for stormwater phase 2 post construction runoff?
Yes
3)
Are plans, inspection logs and permits on -site and available for review,
Yes
as required?
4)
Are construction entrances installed and maintained, as required?
Yes
5)
Are roads and ROW's free of evidence of sediment?
Yes
6)
Are perimeter erosion and sediment controls installed and maintained,
Yes
as required?
7)
Are culvert, inlet and catch basin protections installed and maintained,
Yes
as required?
8)
Are sediment basins or sediment traps installed and maintained as
Yes
required and functioning correctly?
9)
Is site free of evidence of erosion?
Yes
10)
Are trash, debris, concrete waste and solid wastes managed, as
Yes
required?
11)
Are fuels and chemicals stored, managed and contained, as required?
Yes
Panera Bread inspected on 05-12-20 2:54pm Inspection Report Page 1 of 3
22343
H RS�N COUNTY
ENDS
Erosion and Sediment Control
Site Inspection Report
Report Generated: 05-12-20 3:06pm
12) Are vehicle and equipment fueling, cleaning and maintenance areas Yes
free of eveidence of spills leaks, or any other deliterious material?
13) Are all inactive slopes and disturbed areas stabilized, as required? Yes
14) Have BMPs kept sediment and pollutants out of surface waters? Yes
15) Are stockpiles and spoils managed, protected and stabilized, as Yes
required?
16) Are dewatering measures in use, as required? Yes
17) Does the site comply with dust control best management practices? Yes
18) Are discharge points and receiving waters free of evidence of sediment Yes
deposits?
19) Do all BMPs provided operate as designed?
20) Are discharge points and receiving waters free of evidence of pollution
(e.g. oil sheen, floating or suspended solids, etc.)?
Yes
Yes
21) General Notes & Observations See notes
Notes Recorded:
Project complete, parking lot paved and landscaping finished. Site is stabilized and erosion
control permit will be closed out.
Photo 1: Project complete, parking lot paved and
landscaping finished. Site is stabilized and erosion
control permit will be closed out. 5/12/2020 02:54pm
22) Is withholding of permits recommended as a result of this inspection?
No
Panera Bread inspected on 05-12-20 2:54pm
22343
Inspection Report Page 2 of 3
H RS�N COUNTY
ENDS
Erosion and Sediment Control
Site Inspection Report
Report Generated: 05-12-20 3:06pm
23) Are all temporary measures removed and has the site reached Yes
permanent stability?
In
Rick Brooks
Erosion Control Technician
Henderson County
(828) 694-6521
rbrooks@hendersoncountync.gov
Panera Bread inspected on 05-12-20 2:54pm Inspection Report Page 3 of 3