Loading...
HomeMy WebLinkAbout19920523 Ver al_Complete File_19930505DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. Box 1850 1NIL%11NGTCN. NCRTH CARCLINA 28402-1850 .N REPLY REFER TO horil Z7, 1993 Regulatory Branch Action ID. 199203615 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: 0 %?JV lI -- Reference the application of the North Carolina Department of Transportation, Division of Highways, for a Department of the Army permit to place fill material in the waters/wetlands of Oyster Creek associated with replacement of Bridge No. 48 on S.R. 1128, near Swan Quarter, Hyde County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. The area of the opening associated with the culverts will be equal to or greater than the area currently available for tidal exchange and ingress/egress of aquatic organisms (See National Marine Fisheries Service (NMFS) letter of April 15, 1993 (copy enclosed). b. Except as specified in a. above, all work authorized by this permit must be performed in strict compliance with the permit plans. C. All mucked materials will be placed and confined landward of the mean high water (MHW) elevation contour and any regularly or irregularly flooded vegetated wetlands. d. All fill materials will be obtained from a highground source and placed in accordance with permit plans. e. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. Iii 4 ? w -2- f. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. g. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 25 NTU's or less are not considered significant. Questions or comments may be addressed to Mr. Gary Mitchell, Washington Field Office, Regulatory Branch, telephone (919) 975-5811. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure Copies Furnished (without enclosure): !'-- John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Thomas Welborn, Chief U.S. Environmental Protection Agency - Region IV Wetlands Regulatory Unit 345 Courtland Street, N.E. Atlanta, Georgia 30365 Mr. David Griffin, District Manager N.C. Division of Coastal Management 1367 U.S. Highway 17 South Elizabeth City, North Carolina 27909 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 23516 - -ft o „a SPATE tee. d, L? •I r??? QQn. State of North Carolina Department of Environment, Health and Natural Resources Northeastern Region 1424 Carolina Avenue, Washington, North Carolina 27889-1424 James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary DIVISION OF COASTAL MANAGEMENT 19 March 1993 MEMORANDUM TO: Mr. A. Preston Howard,-t, Director Division of Environmental Management FROM: John R. Parker, Chief Major Permits Processing Section SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Dept. of Transportation Project Location: On SR 1128 at Bridge No. 48 over Oyster Creek, Hyde County Proposed Project: The applicant proposes to replace an existing bridge with two metal culverts. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 16 April 1993. If you have any questions regarding the proposed project, please contact David Moye at 946-6481. When appropriate, in-depth comments with supporting data is requested. REPLY _V This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed , Date P.O. Box 2188, Washin&non, North Carolina 27889-2188 Telephone 919-94"481 FAX: 919-975-3716/919-946-6639 An Equal Opportunity Arfirmarive Action Emplowr ?Ty ? ?t 0 M d r^^ State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James B. Hunt, Jr., Governor April 19, 1993 A. Preston Howard, Jr., P.E. Jonathan B. Howes, Secretary Director Mr. Barney O'Quinn Planning and Environmental Branch N.C. Dept. of Transportation P.O. Box 25201 Raleigh, N.C. 27611-5201 Dear Mr. O'Quinn: Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, //? Proposed bridge r%)lacement, # 48 over Oyster Creek on SR 1128 6, Project # 92523, COE # 199203615 Hyde County Attached hereto is a copy of Certification No. 2823 issued to N.C. Dept. of Transportation dated April 19, 1993. If we can be of further assistance, do not hesitate to contact us. Sincerely, 4.aeston Howar Jr. P. E. Attachments cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DEM Regional Office Mr. John Dorney Mr. John Parker Central Files Regional Offices Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 919/571-4700 919/946-6481 919/395-3900 919/896-7007 Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer 01 NORTH CAROLINA Hyde County . CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management Regulations in 15 NCAC 2H, Section .0500 to N.C. Dept. of Transportation pursuant to an application filed on the 19th day of March 1993 to replace Bridge #48 over oyster Creek on SR 1128. The Application provides adequate assurance that the discharge of fill material into wetlands adjacent to the waters of Oyster Creek in conjunction with the proposed bridge replacement in Hyde County will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction related discharge (increases such that the turbidity in the stream is 25 NTU's or less are not considered significant). Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 19th day of April, 1993. DIVISION OF ENVIRONMENTAL MANAGEMENT . Howard Jr. P.E. WQC# 2823 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME N. C. Department of Transportion 2. LOCATION OF PROJECT SITE Hyde County on SR 1128 at Bridge No. 48 over oyster Creek. PHOTO INDEX:'1989: N/A _ 1984: II /A 1978: 74-633, U-20 STATE PLANE COORDINATES: X: 2,801,000 Y: 607,800 QUAD. NAME -Swan Quarter (lower left corner) 3. INVESTIGATION TYPE: DREDGE & FILL X CAMA X 4. INVESTIGATION PROCEDURE: (A) DATES OF SITE VISIT 03/18/93 (B) WAS APPLICANT PRESENT NO 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 16 March 1993 WASHINGTON FIELD OFFICE 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Hyde County LAND CLASSIFICATION FROM LUP Conservation (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS X PUBLIC TRUST AREAS X ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES X NO (D) INTENDED USE: PUBLIC X PRIVATE COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING N/A PLANNED N/A (F) TYPE OF STRUCTURES: EXISTING Bridge PLANNED Replace bridge with 2 - 128" X 83" X 50' long metal culverts (G) ESTIMATED ANNUAL RATE OF EROSION 0 SOURCE Applicant 7. HABITAT DESCRIPTION: AREA (A) VEGETATED WETLANDS DREDGED FILLED OTHER Coastal Wetlands ±500 ft2 ±500 ft2 (B) NON-VEGETATED WETLANDS: Creek Bottom ±1,500 ft2 ±1,500 ft2 (C) OTHER: Highground ±1,500 ft2 ±1,500 ft2 (D) TOTAL AREA DISTURBED: ±3,500 ft2 (E) PRIMARY NURSERY AREA: YES X NO (F) WATER CLASSIFICATION: SA-ORW OPEN: YES NO X 8. PROJECT SUMMARY: The applicant proposes to replace an existing bridge with two metal culverts. • i Ab Project setting The N. C. Department of Transportation's (NC DOT) proposed bridge replacement site is located on SR 1128 at Bridge No. 48 crossing Oyster Creek in Hyde County, North Carolina. The bridge is bordered on the west by coastal wetlands primarily vegetated with Juncus roemerianus ai.d containing S artina alterniflora and some S. atens. The bridge is bordereu on the northeast by a developed lot with a dock and building and on the southeast by a spoil bank containing pines, cedars, and mixed shrubs and grasses. The spoil bank gives way to coastal marsh vegetated primarily with J. roemerianus and containing S. patens and some S. alterniflora. The site is approximately 2' to 3' above mean sea level. Oyster Creek is classified as SA ORW by the Environmental Management Commission. Project description NC DOT proposes to replace an existing ±28' X ±24' bridge with two - 128" X 83" X ±50' long metal culverts and fill an area approximately 50' X 70'. Concrete headwalls are proposed to retain the fill. The fill area consist of approximately 1,500 ft2 of creek bottom and 500 ft2 of coastal wetlands. Prior to the placement of the culverts and filling, the area will be mucked out and the spoil material transported to a highground disposal site. Anticipated impacts The project as proposed would result in the filling of approximately 500 ft2 of coastal wetlands and 1,500 ft2 of creek bottom. Localized turbidity would occur as a result of the mucking out and filling activities. David W. Moye - Washington Office - 18 March 1993 i NC DOT Bridge No. 48 Hyde County CONDITIONS 1. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 2. No excavated or fill material will be placed at anytime in any marsh or surrounding waters outside of the alignment of the fill area indicated on the work plat(s). 3. In order to protect water quality, runoff from the construction area must not visibly increase the amount of suspended sediments in adjacent waters. 4. A silt screen will be placed immediately upstream and downstream of the project site prior to any excavation and not removed until 24 hours after the completion of all excavation. ?,?f1711 )? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION IAM It B. HUNT. Ilt. DIVISION OF HIGHWAYS SAM HUNT COVfl'NCII'. IC, ? ? , SC. C)I,It IICX X52M ,,,. PAL'clGH. N.C. 2761!-5201 March 3, 1993 Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: John Parker Dear Sir: SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. As you know, the N.C. Department of Transportation (NCDOT) intends to replace the above-mentioned bridge in Hyde County. Our original application was submitted to you September 10, 1992, but was returned for revisions October 6, 1992. Since that time, the application has been revised to address the concerns of your field representative. An additional property owner has also been identified. You will find the revised application and property owner receipts enclosed. A copy of this information has been provided to your field representative for their review. If you need any additional information, please call Gordon Cashin at (919) 733-9770. Sin__cerely, B!. J. .'Quin PE cc: District Engineer, USCOE /?Tr. David Moye, DCM, Washington Regional Office Mr. John Dorney, DEM, DEHNR Mr. John Smith, PE, Structure Design Mr. C. 0. White, PE, Division 1 Engineer Assistant_.M? nager Planning and Environmental Branch BJO/gec s?r?? J?w IA I\.. yA TJ?J 1':.f??+J1YJ4tr ? STATE OF NORTJ-I C/V"OLINA DEPARTMENT OF TRANS POPTATION JAMIS Ii. HUNT. JIL DIVISION Of= HIGHWAYS SAM HUNT Govi RNOIl SLOUTARY I'.O. [SOX 25201. RALEIGH. N C. 17611-5201 March 3, 1993 Clem Walker 1021 Mockingbird Drive Raleigh, N.C. 27609 Dear Sir: SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 112£3. The North Carolina Department of Transportation proposes to replace the bridge over Oyster Creek on SR 1128 adjacent to your property. This replacement will occur on the same location as the existing bridge. The road at this location will be closed for a period of about one month during construction. Permits from the Department of the Army Corps of Engineers and the NC Division of. Coastal Management (CAMA) are required for this work; these are being obtained by the NC Department of Transportation. In that your property is adjacent to the site where this permit is required, a copy of the permit application is being provided for your review; however, no action is required on your part. If you have any questions, please contact your appropriate CAMA or Corps of Engineers representative, or call Mr. Dennis Pipkin, NCDOT at 919-733-9770. Sincerely, ?J B . J 1 O Quinn., PE Assistant 'Manager Planning and Environmental Branch -Please type or print. Carefully describe all anticipated development activities, including; construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 3-9 must be completed for all projects. 1 APPLICANT If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? Both c. Will the project be for community, private, or a. Name NC Dept. of Transportation commercial use? Attn: B.J. O'Quinn, Asst. Branch Mgr. Public Transportation Address Pn Rnx 252ol City Raleigh State NC 91 - - 7jp 27611 Day phone 919-733-3141 d. Describe the planned ruse of the project. X Landowner or Authorized agent b. Project name (if any) N/A c. If the applicant is not the landowner, also give tic owner's name and address. N/A 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number SR 1128 b. City, town, community, or landmark Swan Quarter b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum Datum in plats are assumed elevations. urouna elevation approximately I- d. Soil type(s) and texture(s) of tract Muck e. Vegetation on tract Coastal Vegetation f. Man-made features now on tract Bridge c. County Hyde g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) d. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Ovster Creek 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or ?icr . Replace existing bridge with 2' . 28 ' x 83" CSPA Approximately in length X Conservation Transitional -Developed Community -Rural Other li. How is the tract zoned by local government? N/A i. How ar ad'acent Waters c11?? s? V? Swan lua?rter Bay S?-?1W; PNA j. Has a professional archaeological survey been cirried out for the tract? -No_-- If so, by whom? 3/91 AOOJt4 AdOJ , 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structurespropcsed N/A b. Number of lots or parcels N/A c. Density (Give the number of residential units and the units per acre.) N/A d. Size of area to be graded or disturbed N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 7S feet of a. mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N/A m. Water supply source __ N/A n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. N/A h. If applicable, has a stormwater management plan been submitted to the Division of Envirorunental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facili ties. N/A j. Have these facilities received state or local approval? N/A k. Describe existing treatment facilities. N/A 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). Surface runoff along roadway Access channel (MI.W) or (NW -) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas Length Width Depth Average 50' 70' 4.1' 50' 10' b. Amount of material to be excavated from below water level in cubic yards 535 Cubic Yards c. Type of material Muck d. Does the area to be excavated include marshland, swamps, or other wetlands? e. High ground excavation, in cubic yards 290 Cubic Yards LOOOU - AdoJ tr I?irreiKsions of spoil disposal area c. Shoreline erosion during preceding 12 months, in 0 o nown feet g. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material Concrete County Trash Pump Site on SR 1127 e. -Amount of fill, in cubic yards, to be placed below h Do you claim title to the disposal area? No mean high water N A_ If not, attach a letter granting permission from the 0141 6 Type of fill material N/A f ) - owner. Contact James Blount (92 . Hyde County i. Will a disposal area be available for future maintenance? Gnunly to maintain If so, where? 8 ADDITIONAL INFORMATION _ j. Does the disposal area include any marshland, In addition to the completed application form, the follow- swamps, or water areas? No ing items must be submitted: k. Will the fill material be placed below mean high A copy of the deed (with state application only) or other water? Yes instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be 1. Amount of fill in cubic yards 7 S ,bi -Yards the owner of said property, then forward a copy of the Type of fill material sand gravQ1 in deed or other instrument under which the owner claims . title, plus written permission from the owner to cant' out n. Source of fill material local borrow site the project. o. Will fill material be placed on marsh orother • An accurate work plat (including plan view and cross wetiarids? Yes sectional drawings) drawn to scale in black ink on an 8 p. Dimensions of the wetland to be filled 112 x 11 white paper. (Refer to Coastal Resources Approximately 50' X10' Commission Rule 7J.0203 for a detailed description.) q. How will excavated or fill material be kept on site Please note that original drawings are preferred and and erosion controlled? By standard NCOOT erosion and only high quality copies will be accepted. Blue-line e imentation control methods prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's r. What type of construction equipment will be used use of larger drawings.) A site or location map is a part (for example, dragline, backhoe, or hydraulic of plat requirements and it must be.sufficiently detailed dredge)? Zyni r.al rnadway rnnstrurtion d line k kh d B to guide agency personnel unfamiliar with the area to the et . rag um ur- oe_. ac yi m n . [ , site. Include county road (SR) numbers, landmarks, and s. Will wetlands be crossed in transporting equipment the like. to project site? No If yes, explain steps that will be taken to lessen environmental impacts. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. 1' f th d 1 t addresses of the 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap 2 endwalls, approximately 75'each b. Average distance watcrward of mean high water or normal water level At the pipe ends A rst o c names an comp e e adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. Clem Walker. 1021 Mockingbird Drive Raleigh,N.C. 27609 Name Walter J. Lupton ` Address Swan Quarter, NC 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Name Jalain Sadler Any permit issued in response to this application will Address P. 0. Box 97 allow only the development described in the application. Vandemere, NC 2C56; The project will be subject to conditions and re ,--ictions contained in the permit. Name J. A. Mason Address Swan Quarter, NC A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the day of , 19- A signed AEC hazard notice for protects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). X Landowner or Authorized agent l 1.,.. I / / ?r \ 1 1 / N111Pin? /..? ( ?./ t•...Ir h rlnrln ?I\ / ._ I _ ar,tr ? H Y I`• I! 1 I' Rnr. A .. /A'r' 1 /PI Ilrlllrl lrll ?A ', ?, a• In+`!JJ( cra I........' L falrl IJI *? \ocfec:h,lh jr 'alr; ? Yrat. cvJl• ?Rrlnarcn r''a' \\11?? ?'? O tl•, „a' rCa'r ??(ngrlhard t\T ?' A 1? 0' R T ?; sr,anlpn LanJrnq f D,I• ,., i' H W!•. Baln \win6teanr'u l, M'ddle lo.n 1\ ?O ..,i„• - '? - SlaJar?n. ?1 r NPb,asla ` Rarvnv.. Rantmm?ll+ ' - New HOnand \ CUrr ,r. r r> = , ' ?I a? ?.` it n Qll ar lr, GUII Rn[1 ?• ley •' 1 Pn?^t n, III'v..bny R.,y ,, F A'hco Beal nt ?' ti\•., ?I!•rV 1 r ! f r',`, il' ?jrn'1J -_- r? _? r.` rl k•IDUrr >C•. r.r •--, I, /'J J L° \ O j? Fd.aM 1-.?' GtPI -In. LanJ ?N ?Q t J?,"_? N,?'? V-cl arlnn?^ (]II,I - Jr HoblKa•+ `\ \?\ ,y `' \ Natl.ras y F?I(r?-m M ?tlll ICaah ':,,'n%, {,- - l//L` ,'*'Yar•,lrmer au. + ll;vj)ll.,yN A, I—Dl aanliD,r.n Ilavl-?lr ' ?? t flm enr• . ? - '` CO 10 \ \ C° I a oCa. Il }? to 7n SCALF 01 MItfS ON( INC,, [OVALS APPROx I1 MItCS L% SCAIC Of .ICOMLTCRS ONE,NCH L041ALS Af'v ROx 71 KItOMCTERS it n III 70 1p an 46 I Mll IS f?Qllal To 1 I'm rItOMIIIRs ?• in, A 1 r?r6# Rw 607 IIOL ?"? ? _ \ .. '? ' 43 e+ b ° J S-tid.a Fo-a a i] r ' t r L - y, LN U It1, ? I!fa >> '? '?r!S7L •? ' ?? •?/4?/C Dliltr,?•1Fa r ? H7d.l...d ^? 11]1 1 c f ? J! It ?llfl FlT Co 7- /'/15 N r+s ?!nlta •_. ! * ,?? LI 177 - T 2111 • 1. a S..:d011 rAS 1 bill ?l? rv U,o U 0 r tSLMU ,C 1 r nlr S IJ __ % \) • .fi 7 1 _ / ? I J` LOndro YRfIl1GF.. off n !i, / Jv r 1' I C 4 fl ? k- r = 0fnr \ y'?r , t N t 1?- l COVE w wdrl+ ruro 1 AN WEST It. N,C. DEPT. OF TRANS. DIVISION OF HIGHWAYS HYDE COUNTY SCALE BR. #43 ON SR-1123 SCALE AS SHOWN r.--_ __.-3 SHEET 1 OF 3 i I NOV.1 G,1 3 J 2 I i = I Q? H .V n ? J = U J ? O AA /? w \ Q Ul V` . 1 V w v ,I II ? 11 ? ? o S C.] T Jc 11 Q •rJ Q •v `. ? U, ? ? Z a,' , T ? . ? Lk y ft: LL ? - CI, Q _ z W : LI u_ ¢ ? ? O . Z • ? 3 ? 1 w a k . u_ I I ? r c 41 -- - ? I I ? __ J 1 I I. lL 1 LIn r L I ®I I -1 ' lLi _ ? Ul rn Q ZU cn' ti m ? = ?, I I I ? ? ? _ 0 1 J LL I? -' ' cc m L 1 I I.L d N d J r_, J < Q pp - Q3 S ?J llOp?' y> 3 Ui I 1 .. .a 11 ?? I _ V) ??tD I ? \ J?• ?. i i u I I I ``fir I I ? I =I r I I I • i J ZI `? . D 1 I L G 11 CD 4 I T (', LU --4- I ( I' L c w \ cT- ? I 1 1 i.? 1 1 - rri I-I O W f\ ?1 Q? I I 'ol I ??? < m L--) ] v I I I O QO<(P Q Ljj I I I r V Q v _L1 N.C. DEPT. OF TRANS. W o DIVISION OF N15HWAY) HYDE CO. BR.148 ON SE-1128 SCALE AS SHOWN SHEET aOF 3 NoV. / /972 O O I. III I I I I ICI ' II ? r r I , ? It ? I r TI I II C r I ? I I i I I 1 I II 11 II II I? II II I I \\1 I 0 1 ? ?rJ v ? Q IV ? l< kA h c ? I LI J i ^? < o ,r W r ?. r 1. '' ? t. n . lV W u .n a.. d O? -41 OI 1 r r .i is 1 ti c V LQ 41 A 0 0 r Q? P I - I N 41 I f O I ?1 U S I c? ? J V O J C 4 CC 7 I O l O O 0 1 v) t. iI. HVH ?? _.C_- 7 Imo: l Nov. 16,1972- STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION: P.U. BOX 25201 RALEIGH 27611-5201 JAMES G. MARTIN GOVERNOR September 10, 1992 DIVISION OF HIGHWAYS THOMAS J. HARRELSON SECRETARY Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: John Parker Dear Sir: WILLIAM G. MARLEY, JR. P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation (NCDOT) intends to replace the above-mentioned bridge in Hyde County. This bridge must be replaced due to its deteriorated condition. The bridge will be replaced on existing location, and the road will be closed during construction for about one month. No temporary detour structure will be necessary. The replacement structure will consist of two 128" x 83" corrugated steel pipe arches with headwalls. This will require the placement of 360 cubic yards of fill below ordinary high water. The total fill in wetlands will be less than 0.01. acres, with 0.02 acres of fill in open water. Any temporary impacts from erosion and sedimentation will be minimized using NCDOT best management practices, which your agency has reviewed. NCDOT hereby applies for the CAMA Major Development permit as required for this project. A copy of this application is being provided to the U.S. Army Corps of Engineers and the N.C. Division of Environmental Management for their-,review. If you need any additional information, please call Gordon Cashin at (919) 733-9770. Sincerer F3 Quinn, PE arch %:anagcr Planning and Environmental Branch cc: District Mr. John Mr. A. L. Mr. John Mr. C. 0. Mr. Jimm, BJO/gec Engineer, USCOE Dorney, DEM, DEHNR Hankins, PE, Hydraulics Smith, PE, Structure Design White, PE, Division 1 Engineer y Lee, PE, Bridge Maintenance d ' To: John Dorney Planning Branch DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA/COE PERMIT APPLICATION REVIEW r , WaRO PROJECT # q3 -0Z `C_ WQ SUPERVISOR: TI RPE REVIEWER: SAWYER DATE: 3/ 3,( 3 WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING PERMIT YR: 92 PERMIT NO.: COUNTY: N/ ? PROJECT NAME: N e DoT., =i SYg, ? PROJECT TYPE: PERMIT TYPE: CAMA/COE COE #: DOT: RCD FROM CDA: 6 ? DATE FROM CDA: 311213Z REG OFFICE: WaRO AND SUB BASIN #: zr o 7 STREAM OR ADJACENT WATER BODY: GRIVER eAxz 1 0 STREAM INDEX c2 7 - O ?:R tOSED: WL IMPACT: Y 2 WL TYPE: WL REQUESTED: 5 00 WL ACR EST: HYDRO CNECT?: WL SCORE: MITIGATION: Al MITIGATION TYPE: MITIGATION SIZE-, _RATING SHEET ATTACHED? RECOMMENDATION ISSUE ISSUE/COND DENY HOLD , zzzz=_? ?? STORMWATER PLAN REQ'D:n 1) IF YES, DATE APPROVED: PROJECT DESCRIPTION: p :ez_ ?y ;"- ;?? ?. WATER QUALITY CERT. (401) CERT. REQ'D: Y . IF YES, TYPE : SEWAGE DISPOSAL v TYPE OF DISPOSAL PROPOSED: 1v (EXISTING, PROPOSED, SEPTIC TANK ETC.) TO BE PERMITTED BY: (DEM, DHS, COUNTY) IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: WATER/WETLAND FILL AREA OF FILL: WATERS"-15-0 I WETLAND : 7L 6D d PI) IS FILL ELIMINATING A SIGNIFICANT USE? DREDGING '_/ Z AREA TO BE DREDGED: R000 IS DREDGING ACTIVITY EXPECT TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? MARINA /97 ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: MARINA SERVICES: OXYGEN IN BASIN: CLOSURE OF SHELLFISHING WATERS: CC: ?"rCentral Files; DCM Field Offices; COE Washington Office RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: v-? 4-4 D 1 C ?-CJ ?A1i1- cis /ILP? .4 0 DIVISION 0 MEMORANDUM MANAGEMENT TO: Bill Moore, Environmental Engineer Water Quality Section, WaRO FROM: Deborah Sawyer, Environmental Technician Water Quality Section, WaRO SUBJECT: Dredge and Fill Reviews for Stormwater Review /% A Project: C 1 O I K n Project No.: Date Received: .F'"nat Date Comment: Description of Project: Comments: j? ? /1lv V MEMORANDUM TO: Jim Mulligan Deborah Sawyer FROM: David Moye 7 rn R7CEWM GTQH (OFFICE. •.l?i Ij135? t.! .. SUBJ: Application for CAMA Major Permit and/or Dredge & Fill Permit NC Dept. of Transportation Hyde County DATE: 19 March 1993 Attached is an application for a CAMA Major and a Dredge & Fill Permit which was received by me on 16 March 1993. I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me. MEMORANDUM n FLLU nul TO: John Dorney Planning Branch YVEiLA+1DS GRDUP SUBJECT: WETLAND STAFF REPORT AND RECOA?i -1'_1`+?iECT?G?! ***EACH ITEM MUST BE ANSWERED (N/A-NOT APPLICABLE)*** PERMIT _YR: 92 PERMIT _NO: 0000523 COUNT : APPLICANT NAME: NC DOT - REPLACE BRIDGE 48 OVERJOY TER C PROJECT TYPE: REPLACE BRIDGE P l _TYP COE_it : - - DOT_#? RCD_FROM_CDA: DOT E_-RM_CDA: REG_OFFICE: WARD IV ND_S B_BAS INITIALS: Reviewer: WQ Supv: Date: p STREAM-CLASS: (,- STR_INDEX_NO: D WL_IMPACT?: YIN JL -L-TYPE: WL_REQUESTED: WL_ACR_EST?: YIN HYDRO_CNECT?: YIN WL_SCORE(U : MITIGATION?: YIN ATION TYPE:/ MITIGATION-SIZE: c REt COMMENTS: 6LeA -&, r0" z3 92---` -p LP, .D? : Y/N E ISSUE/COND DENY cc: Regional Office Central Files °Wa IA ?. S1Aft„ • Jy pIMM'Rf.? K" STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY September 10, 1992 Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: John Parker Dear Sir: Z523 DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation (NCDOT) intends to replace the above-mentioned bridge in Hyde County. This bridge must be replaced due to its deteriorated condition. The bridge will be replaced on existing location, and the road will be closed during construction for about one month. No temporary detour structure will be necessary. The replacement structure will consist of two 128" x 83" corrugated steel pipe arches with headwalls. This will require the placement of 360 cubic yards of fill below ordinary high water. The total fill in wetlands will be less than 0.01 acres, with 0.02 acres of fill in open water. Any temporary impacts from erosion and sedimentation will be minimized using NCDOT best management practices, which your agency has reviewed. NCDOT hereby applies for the CAMA Major Development permit as required for this project. A copy of this application is being provided to the U.S. Army Corps of Engineers and the N.C. Division of Environmental Management for their review. If you need any additional information, please call Gordon Cashin at (919) 733-9770. An Equal Opportunity/Affirmative Action Employer Sincerely B Quinn, PE A to anch Manager Planning and Environmental Branch cc: District Mr. John Mr. A. L. Mr. John Mr. C. 0. Mr. Jimm- Engineer, USCOE Dorney, DEM, DEHNR Hankins, PE, Hydraulics Smith, PE, Structure Design White, PE, Division 1 Engineer jr Lee, PE, Bridge Maintenance BJO/gec Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? Both c. Will the projcct be for community, private, or a. Name NC Dept. of Transportation commercial use? Attn: B.J. O'Quinn, Asst. Branc Mgr. Public Transportation AddreSS_Pn Rnx Pion City Raleigh Stat 1 NC Zip 27611 Dayphone 9919-73373141 Landowner or X Authorized agent d. Describe the planned use of the project. Public Transportation b. Project name (if any) c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number SR 1128 b. City, town, community, or landmark Swan Quarter c. County Hyde d. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Ovster Creek 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or icr. Replace existing bridge with 2 1 8") x 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum Datum in plats are assumed elevations Ground elevation approximately 1' d. Soil type(s) and texture(s) of tract Muck c. Vegetation on tract Coastal vegetation f. Man-made features now on tract Bridge g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local govemmcnt? N/A i. How are adjacent waters classified? -.Swan Quarter Bay : SA-ORW J. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 3/91 , 5 UPLAND DEVELOPMENT Complete this secdon if the project includes any land development. a. Type and number of buildings, facilities. or structures proposed N/A b. Number of lots or parcels N/A c. Density (Give the numlFAvf residential units and the units per acre.) // d. Size of area t % Abe graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N/A g. List the materials. such as marl, paver stone, asphalt, or concrete, to l?ets/ed for paved surfaces. in. Water supply source N/A n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. N/A o. If the project is on the oceanfront, what will be the afion above sea level of the first habitable cclev A floor7 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MI.W) or MWL) Boat basin Length Width Depth h. If applicable, has a stormwater management plan Other (break- been submitted to the Division of Environmental water, pier, Site Management? N/A boat ramp, work i. Describe proposed sewage disposal and/or waste rock jetty) water treatment facilities. Fill placed in wetland or below MHW j. Have these facilities received state or local approval? Upland fill N/A areas k. Describe existing treatment facilities. N/A 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, indystrial/com rci effluent, "wash down"). Sur ace runo along roadway re 60' 70' Aver g 4.1' 60' 70' b. Amount of material to be excavated from below water level in cubic yards 640 Cubic yards c. Type of material muck d. Does the area to be excavated include marshland, swamps, or other wetlands? yes e. High ground excavation, in cubic yards 290 cubic yards T Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in N/A feet ;. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? N/A If so, where? Does the disposal area include any marshland, swamps, or water areas? No k. Will the fill material be placed below mean high water? Yes 1. Amount of fill in cubic yards 360 cubic yards m. Type of fill material sand gravel n. Source of fill material local borrow site o. Will fill material be placed on marsh or other wetlands? Yes p. Dimensions of the wetland to be filled See plats q r. S. e. -Amount of fill, in cubic yards, to be placed below mean high water ?/ A f. Type of fill material N/A 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan vic,,v and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) How will excavated or fill material be kept on site please note that original drawings are preferred and and erosion controlled? By standard NCDOT erosion and only high quality copies will be accepted. Blue-line sedimentation control methods prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's What type of construction equipment will be used use of larger drawings.) A site or location map is a part dredg(fore)? example. Typical ne, backh roadway y coronstructhydraulic of plat requirements and it must be.sufficiently detailed ion equipment (Backhoe, dumptruck, drag line , etcto)guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and will wetlands be crossed in transporting equipment the like. to project site? -ND- If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap N/A A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. b. Average distance waterward of mean high water or normal water level . N/A Name Walter J. Lupton ` Address Swan Quarter, Name Jalain Sadler Address P.O. Box 97 an emere, NU Z8b8/ Name J.A. Mason Address Swan Quarter, NC A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed - activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the 9?? 6 -. JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: John Parker Dear Sir: WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation (NCDOT) submitted an application for this bridge replacement on September 10, 1992. The site map and plan drawings were inadvertantly left out of this earlier mailing. These sheets are enclosed. I apologize for any inconvenience this may have caused. If you need any additional information, please call Gordon Cashin at (919) 733-9770. Si cerel?r, B. 'Quinn PE Ass stant B nch Manager Planning and Environmental Branch cc: District Mr. John Mr. A. L. Mr. John Mr. C. 0. Mr. Jimm? d ,,. SfA7L n / ? J Z O STATE OF NORTH CAROLINA i DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 owlt September 16, 1992 DIVISION OF HIGHWAYS Engineer, USCOE Dorney, DEM, DEHNR Hankins, PE, Hydraulics Smith, PE, Structure Design White, PE, Division 1 Engineer jr Lee, PE, Bridge Maintenance An Fnual nnnnrtunity/Affirmative Antinn Fmnlnver : WEST 0 % . % % ? BA _ % ' 0 E rf; % % 1\ % Gout. "IN SCALE CO. 1 D 1 ! ] (7II3I3FLtt=_-'-r----?-r =_? MA(S G?. Y4S 111 S?"1:10 O J 1 MAt SCALE FOR ENLARGEMENTS ,.,,P.. , I ..? \ 45 NIJ Pmetc- r'! A ,\ It I r ?OS`? \ \\ C(A RDA .?? Ave Telf$ ?nlt10 . K_ H r +C Ceu f p leechvdtr u'r„I 91 E? I, a"sh..f Waq m 0 32 So K1 ???inlr Faurvl \7 Yea1es 99 9erhi ei / t (.aAr 'alri /S Nallornwkrvl tlhpd `zyr Z . ,i l a It e 91 10 1 V O . 1 c ' H ( Undm 6 Gbb h (. R I ` $cnn to P . c.... 97 f? ddletown W c, ^J P,,in P ,. Wm d xt Sladesalte Cr3 ebr sla ` Rans ew Holland V - AaYrlew•.., I 11 r rL 45 H 1 ?• + 4Swon, uarter Gull J IPw,,, Arnv (toy 1 co" I[var1ir.? ?_ r ?rA I,J PO.nI t Pamhco Aesch Nn.r It,rv , t 0 j PDnnalron .e.(>t?,/ ? ? ?? ? r\ gr1 O SOU ?, ` \ • ? GP(Al I a)ull N. V. p t h Edward I -,_ Creek o?la \ p Arton%N N? _ N0b1. Hatterys y` loco! J ? \\ Q' nr(rtar` ACAP(HAtrl \ \ \ rl I J (lollrnllt 61et.r ?\? >1 IC rsh Co,nerl y ae n /' I Al + MAnnelpndt eCe \ Irmo aanhynrn .Aarboio ir?„?lFtxenc?e .? .. `. \ PII \ ? C rr OC1PC 0 S 10 70 SCALE OF MILES ONE INCH EQUALS APrROi IS MILES _ SCALE OF KILOMETERS ONE INCH EQUALS APPROA 71 KILOMETERS If 0 10 70 70 40 AK 1 MILT IS EQUAL TO 1601 KILOMETERS ?. It _ r '? C^ ?_?\ rA? ':?.• 1)01 r'? i s!y 7 , ?,. 'e y LVVVJ 0- 9-Y 43 Iru ? ,.. n,lt1 It G a? re L, S.ad.R?-4. tile. •!, t ? j1 \ ti ? ? ti? 1_22 l a ? I l ll ' 6 r L.W. l b I.a lW _ - 1'.. `? '! j S 1171 f. '?llil rAS LFII? . ti ? * Lit I.1 1 1( „ i lie SP - / /? r I AS • ` a S.•I+d.R 'u EL1S QwrPrrr l AELL ?1O llit. A . ISLAfO Al • ( r ;-F r•,.:i ll12 S i 1 V 1 1 ill l? 1: :, .??. y .. CIYPA.t CiMi ,L?uRD. 'r'- - L.,drq R(fL1Gl"-. s/ ?e J???+ rte,` QtAI.O % COVE `? AWRSPI rAAND -- Y -r v la .c ..J -= in r n 1 . 11l cam) /- __? n n n u it Ill ?- Ill ..i 'r Ill I L. L - I1. Q ll ti- 1 J l `! 1 .,L f.t' fJ] 1 ?_I Y I 1-1 I I _I n I a I , I I N I -c :r z r .?r I • •L • lal S_ i I fJ, " I u I I I rx I I l" I '.I I I I I I I (? I I •I I ' ul I I• I I .r I 1,- [l) f? l •- C. 1E°TY 5F 7RANS, DivisioN OF H7;: r:AYS HYDE Co. DR. ?48 ?:Aic Ay SH,'r :,..::ET ?LuF 3 IL G f- 1? Ill • Yt_ 1 Ll IJ l 1 ?. _. I_7 .1C L ,.] fJ7 ?? LLl lf7 r _J C7 lL Ul u- ® 1 fl7 Lll 1 Y/ - Iv \ o f 1 ? ql. ?r - iaa I T, i Il U71 I ^ i V l r 1 ?- ..I O r ?11 n' fry r:, {-_ li? 11.1 .r1 l,- Y. .1_ I? Y U.J -rJ ?I ® ? Op O 1 u ..., t u ?I o ^S. - _ V l r.. r 1 tit; Ix I I f PI o I 1? ? I 11 ? .I I ? ?ro ? ?I I ? ,f I I ' ~J 1 I JI I I I:: I it '? O O II ? ? p- II II O ? II 1 rJ: " Lu HYDE Cu. • _ I;i J 5.3. tie ,'?r SR-I1 9 O O lid 'LI „?, '[! C 4S a`IU'd li 3 OF J C r ?. i' ? OCT 2 3 I??2 El ® North Carolina Wildlife Resources Commission 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director MEMORANDUM TO: John Dorney Division of Environmental Management ?r'%??. r FROM: ??Dennis Stewart, Manager Habitat Conservation Program Date: October 23, 1992 SUBJECT: N. C. Department of Transportation (NCDOT) request for 401 Water Quality Certification, replacement of Bridge No. 48 over Oyster Creek on SR 1128, Hyde County, North Carolina, DEM Project No. 92523. The N. C. Wildlife Resources Commission (NCWRC) has reviewed the subject application for 401 Water Quality Certification, and our comments are provided in accordance with the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). The proposed project involves replacement at existing location of an obsolete bridge, with no on-site detour and less than 0.01 acres of total fill in wetlands. The project, as modified according to our recommendations on the attending CAMA Major Development permit, should not significantly impact water quality in Oyster Creek. The NCWRC therefore offers no further modifying comment on the 401 Water Quality Certification for this bridge replacement. Thank you for the opportunity to provide input to the permit review process for this project. If we can further assist your office, please call David Yow, Highway Project Coordinator, at (919) 528-9887. DLS/DLY cc: David Rowe, District 1 Wildlife Biologist Pete Kornegay, District 1 Fisheries Biologist David Yow, Highway Project Coordinator rT . a. SEP 23 1992 ENV. MANAGEMENT FAYMVILLE REG. OFFICE JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 September 10, 1992 Office of Coastal Management Department of Environment, Health Natural P.O. Box 27687 Raleigh, North Resources Carolina 2761 ATTENTION: John Parker Dear Sir: SUBJECT: Hyde County, Replacement Oyster Creek on SR 1128. DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR 5 ?? ? Igg 2 IYglER 0114UT y No. 48 over The North Carolina Department of Transportation (NCDOT) intends to replace the above-mentioned bridge in Hyde County. This bridge must be replaced due to its deteriorated condition. The bridge will be replaced on existing location, and the road will be closed during construction for about one month. No temporary detour structure will be necessary. The replacement structure will consist of two 128" x 83" corrugated steel pipe arches with headwalls. This will require the placement of 360 cubic yards of fill below ordinary high water. The total fill in wetlands will be less than 0.01 acres, with 0.02'acres of fill in open water. Any temporary impacts from erosion and sedimentation will be minimized using NCDOT best management practices, which your agency has reviewed. NCDOT hereby applies for the CAMA Major Development permit as required for this project. A copy of this application is being provided to the U.S.'Army Corps of Engineers and the N.C. Division of Environmental Management for their review. If you need any additional information, please call Gordon Cashin at (919) 733-9770. and An Equal Opportunity/Affirmative Action Employer i Z _ o z N Z W Q ~ W J J Q N 0 Q V r- w w W j m uj CL 7 a n Q U ce 'c7 ho fA 0 Z O w _ w o 0 W W Q w D O w w to O O w w N O Z D F- LLJ Q o o O a R < Z O W w ~ F- 0 Q Lf) Z Q m ^ v I C L m N 2 E 0 c W Q O DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO September 23, 1992 Regulatory Branch Action ID. 199203615 Mr. L. J. Ward, Manager Planning and Environmental Branch Division of Highways North Carolina Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Ward: On February 11, 1991, we renewed general permit No. CESAW-CO80-N-000-0291 (copy enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received September 17, 1992, for Department of the Army authorization to place fill material in the waters/wetlands of Oyster Creek associated with replacement of Bridge No. 48 on S.R. 1128, near Swan Quarter, Hyde County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State-Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. only after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act and Section 404 of the Clean Water Act, has been assigned Action ID No. 199203615 and will be coordinated by Mr. Gary Mitchell in our Washington Field Office. He is available at telephone (919) 975-5811. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure -2- Copies Furnished (without enclosure.): Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney Water Quality Section ivision of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief U.S. Environmental Protection Agency - Region IV Wetlands Regulatory Unit 345 Courtland Street, NE. Atlanta, Georgia 30365 Mr. Terry Moore Washington Regional office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO September 23, 1992 Regulatory Branch Action ID. 199203615 Mr. L. J. Ward, Manager Planning and Environmental Branch Division of Highways North Carolina Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Ward: Reference your application for Department of the Army (DA) authorization to place fill material in the waters/wetlands of Oyster Creek associated with replacement of Bridge No. 48 on S.R. 1128, near Swan Quarter, Hyde County, North Carolina. On February 6, 1990, the DA and the U.S. Environmental Protection Agency (EPA) signed a memorandum of agreement (MOA) establishing procedures to determine the type and level of mitigation necessary to comply with the Clean Water Act Section 404(b)(1) Guidelines. This MOA provides for first, avoiding impacts to waters and wetlands through the selection of the least damaging, practical alternative; second, taking appropriate and practical steps to minimize impacts on waters and wetlands; and finally, compensating for any remaining unavoidable impacts to the extent appropriate and practical. To enable us to process your application in full compliance with this MOA, we request that you provide the following additional information: a. Permits for work within wetlands or other special aquatic sites are available only if the proposed work is the least environmentally damaging, practicable alternative. Please furnish information regarding any other alternatives, including upland alternatives, to the work for which you have applied and provide justification that your selected plan is the least damaging to water or wetland areas. b. It is necessary for you to have taken all appropriate and practical steps to minimize wetland losses. Please indicate all that you have done, especially regarding development and modification of plans and proposed construction techniques, to minimize adverse impacts. C. The MOA requires that appropriate and practical mitigation will be required for all unavoidable adverse impacts remaining after all appropriate and practical minimization has been employed. Please indicate your plan to mitigate for the projected, unavoidable loss of waters or wetlands or provide information as to the absence of any such appropriate and practical measures. -2- This information is essential to our expeditious processing of your application and it should be forwarded to us by October 19, 1992. Also, a copy of this information must be sent to the North Carolina Division of Environmental Management to enable them to adequately evaluate your application for a Water Quality Certification pursuant to Section 401 of the Clean Water Act. If you have questions, please do not hesitate to contact Mr. Gary Mitchell, Washington Field Office, Regulatory Branch, telephone (919) 975-5811. Sincerely, G. Wayne Wright Chief, Regulatory Branch Copies Furnished: Mr. Thomas Welborn, Chief U.S. Environmental Protection Agency - Region IV Wetlands Regulatory Unit 345 Courtland Street, NE. Atlanta, Georgia 30365 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Terry Moore Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 N. C. DEPARTMENT OF TRANSPORTATION I TRANSMITTAL SLIP DATE TO: o.? ... .._ ___._ Mr. John Dorney Water Quality Planning DEM, DEHNR Room 625-D Archdale Building ? PLEASE ANSWER ? FOR YOUR COMMENTS ? PREPARE REPLY FOR MY SIGNATURE ? SIGNATURE ? TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT COMMENTS: 1 JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 September 10, 1992 Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: John Parker Dear Sir: q2_Sz-3 DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation (NCDOT) intends to replace the above-mentioned bridge in Hyde County. This bridge must be replaced due to its deteriorated condition. The bridge will be replaced on existing location, and the road will be closed during construction for about one month. No temporary detour structure will be necessary. The replacement structure will consist of two 128" x 83" corrugated steel pipe arches with headwalls. This will require the placement of 360 cubic yards of fill below ordinary high water. The total fill in wetlands will be less than 0.01 acres, with 0.02 acres of fill in open water. Any temporary impacts from erosion and sedimentation will be minimized using NCDOT best management practices, which your agency has reviewed. NCDOT hereby applies for the CAMA Major Development permit as required for this project. A copy of this application is being provided to the U.S. Army Corps of Engineers and the N.C. Division of Environmental Management for their review. If you need any additional information, please call Gordon Cashin at (919) 733-9770. An Equal Opportunity/Affirmative Action Employer Sincerely, B Quinn, PE A tant_-& anch Manager Planning and Environmental Branch cc: District ,Z4-r. John Mr. A. L. Mr. John Mr. C. 0. Mr. Jimm- Engineer, USCOE Dorney, DEM, DEHNR Hankins, PE, Hydraulics Smith, PE, Structure Design White, PE, Division 1 Engineer y Lee, PE, Bridge Maintenance BJO/gec V Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. I APPLICANT - C. Will the project be for community, private, or a. Name NC Dept. of Transportation commercial use? Attn: B.J. O'Quinn, Asst. Branch Mgr. Public Transportation Address_pn Rnx g52nl City Raleigh Stat NC 9 d. Describe the planned use of the project. 19-733-9 27611 y p p Da hone 919-73373141 Public Transportation Landowner or X Authorized agent b. Project name (if any) 4 LAND AND WATER c. If the applicant is not the landowner, also give tltc ' CHARACTERISTICS owner s name and address. a. Size of entire tract_ N/A b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 2 LOCATION OF PROPOSED Datum in plats are assumed elevations PROJECT Ground elevation approximately 1' d. Soil type(s) and texture(s) of tract Muck a. Street address or secondary road number SR 1128 c. Vegetation on tract _ Coastal vegetation b. City, town, community, or landmark Swan Quarter f. Man-made features now on tract Bridge c. County Hyde d.. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Oyster Creek 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or icr. Replace existing bridge with 2 1?8") x g. What is the LAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? N/A i. How are adjacent waters classified? Swan Quarter Bay : SA-ORW j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? Both 3/91 , 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed N/A b. Number of lots or parcels N/A c. Density (Give the numtrAof residential units and the units per acre.) // d. Size of area i % Abe graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N/A g. List the materials, such as mart, paver stone, asphalt, or concrete, to /Ted for paved surfaces. h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? N/A k. Describe existing treatment facilities. N/A 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, ind strial/com rci effluent, "wash down"). Surface runo along roadway m. Water supply source N/A n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach aceessways or provide new access. N/A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MI-W) or (NWL) Boat basin Length Width Depth e 60' 70' Aver g 4.1' 60' 70' Other (break- water, pier, Site pr boat ramp, work rock jetty) Fill placed in wetland or below MHW Upland fill areas b. Amount of material to be excavated from below water level in cubic yards 640 Cubic yards c. Type of material muck d. Does the area to be excavated include marshland, swamps, or other wetlands? yes e. High ground excavation, in cubic yards 290 cubic yards t Dimensions A of spoil disposal area c. Shoreline erosion during preceding 12 months, in feet N/A ;. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A t Do you claim title to the disposal area? N/A If not. attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? N/A If so, where? j. Does the disposal area include any marshland, swamps, or water areas? No k. Will the fill material be placed below mean high water? Yes 1. Amount of fill in cubic yards 360 cubic yards m. Type of fill material sand, gravel n. Source of fillmaterial local borrow site o. Will fill material be placed on marsh or other wetlands? Yes p. Dimensions of the wetland to be filled See plats q• r. S. e. -Amount of fill, in cubic yards, to be placed below mean high water N/ A f. Type of fill material N/A 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) How will excavated or fill material be kept on site and erosion controlled? Please note that original drawings are preferred and By standard NCDOT erosion and only high quality copies will be accepted. Blue-line sedimentation control methods prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers rcgactiiing that agency's What type of construction equipment will be used use of larger drawings.) A site or location map is apart dredg(fore)? example, Typical e, back roadway y or construhydraulicction of plat rrquircments and it must be.suffrciently detailed equipment (Backhoe, dumptruck, dragline, etct?!?)gurde agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and Will wetlands be crossed in transporting equipment the like. to project site? .RQ__ If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap N/A A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. b. Average distance watcrward of mean high water or normal water level ' N/A Name Walter J. Lupton Address Swan Quarter, NC Name Jalain Sadler Address P.O. Box 97 an emere, NU 28b8/ Name J.A. Mason Address Swan Quarter, NC A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 11 3A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed - activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the 0 day of Q 9f, or,Vjthoriz¢d agent I - r STATE STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY September 16, 1992 Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: John Parker Dear Sir: StP 1992 DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation (NCDOT) submitted an application for this bridge replacement on September 10, 1992. The site map and plan drawings were inadvertantly left out of this earlier mailing. These sheets are enclosed. I apologize for any inconvenience this may have caused. If you need any additional information, please call Gordon Cashin at (919) 733-9770. Si cerely, B. 'Quinn PE Assistant B nch Manager Planning and Environmental Branch cc: District VMr. John Mr. A. L. Mr. John Mr. C. 0. Mr. Jimm- Engineer, USCOE Dorney, DEM, DEHNR Hankins, PE, Hydraulics Smith, PE, Structure Design White, PE, Division 1 Engineer jr Lee, PE, Bridge Maintenance An Fnual nnnnrfunifv/Affirmation Anfinn Gmnlnvor r Kilkenny o1) r( 5-404 ? Pmelown (?! 99 1 ?o n ( d+ °t``` Rot f and e H if.3 y , A'c Acre Terra I Le chwlle? E t` War. c I a i. Innn..a` EAUhrI t IaysAan )A a J CJI I t 4 0 'airy Yea lesrdl t?8llh? fd a r?/51 !•UAv s\z qq/'?? (''?-'??/?I (?` N„no.n u.A,•vr Late p elhvd` ?zr} I 91??IO R \ 1 \ Sa,nfon \ ^ 1 L,ndm abe. n s ?oy N G••• \1, 1` A V/_\ ddle town ' ( alh a Wins !ad ip!\J .? 6 V y t' Sl,desvOle 261 rbr sks 1 /S I New Holland nl( t '``,Swan pwrter Coorr 11.111 Ji „ ?' ?1t _ 1 + Gull Rock ttb..n bnu Itav t ?- I n Pamlico BeicIt pn.rr/luv ?,_{? j 1Onn On ?? ? .'-s IN,,`il Ar.(1?" \\ O • t Z' 1 R 1 1 5- ??`('_ 4 I\ ,? N A r I it Dl r!(ar(, f. r ` O 1 O I EEdw,rd I_s. Creek -, ollaq ? \?J Gtu;I: alllrJJlVrr h. ?. ?D E too n l v lt!!" Qv ` *Bur Auror a ?? Royal TJ \•"C' T1 S,t O,+: Ir a• T ` \ b Hatless Ieco! ayton%N YO _ r Hob l' J \\ ?a ? rr((nrrr /? / AUrf NAr0 i ?II Hollyrdle (Cashtornerl• sVander4,ere a°r^ ?' ?°ry yes u' a Hurn.n. /n I" r + Manbel o? Aoy ?. (?Aro?h r \\ rt Nutt kd?N ymwa irsborn :Ra cdrnn"o ire . a\/ i t C ! 0 5 10 20 3 $LAl[ Or MACS ONE INCH EQUALS APPROa LJ MILES ? - SCALE OF KILOMETERS ONE INCH EQUALS APPROI 21 KILOMETERS IF 0 10 in JO n 40 49 1 MIIC IS EQUAL TO 1601 KILOMETERS /?. .a l J Row ta'e L74i ;'.,,\_ 3 CL t1s) ;1714 '' i r e L ,r? , i Swlndd f°.A 1114, •i: ` r 1 ? 1? •a _ laki'Cawk,A \ tLu 11 tl(} ,,, to ELu V 1.a if IJ.Y F " d°lowill lit '• ( 3 v} / LILL FAA ll1 Y ,a u14 LI. 1 » 111' rq • r' • ,? ? S?•i.d.t rU Ilii fArartae gru ISLAM Af • l t .. r :? ; r llH S O 4 tlRf) 13 VrM { Alt" WAND COVE MARSH ISLAND 04 00" 1? •F N ; p ?w S WEST % BA % % CANAT. ?l 'L s3ArO •?? e? ?? D V ;' Jr NI:HuAYS SCALE - 1 d pp o.i I MAI SCA E tis SCALE FOR ENLARCEMENiS j' - :HCC? llh 3 I ?S S' U l7 "J_ :-C Z [n ? G7 rJ) r1 rp • • IL Y.7 1- _J rl 11 11 11 rT. IlJ 'G r7 ? 2' rJ .J ? h- dal c=? _yi _z r_l L Il. Q LL• IL - I_ (. J h J 4 r<- f :* T I ?? I I ' ? I :'i I n r. I I • 'r ? i._I • I I i i _ I _ • I I. J r I I - r_ I:r L I -L -7= I I I ( I` 4?,,Jv T I "' INIJ ? I. a: I I I ? I ?I I ? I I I ( ?I i I I F. ? I 'w I I I I ,^• I I r,) I I ? I ? I Ir ff) ._7 1-- I' 1 Ir <L 1 1?i ?l I. Ill - lL T r) aT) r-,3 a_) f -. 7 c_) 7I z ._) l) LLI Lo In T • F- l !J' n_ x ar._ IL uJ u_ fn I.- t1l rJ ?l ?T ? y Irk 1i ' •71 - ? Il'7 I .7 Ill j ! - '1J L-J ..I . .• I '?.C. DEPT. OF 7RANS. DIViS:ON OF F':cH'nAYs HYDE CO. HR•?48 5 :CALZ A5 5HC'?!i ;;SEE 9_uF 3 1 0 O I <. 1 r. I 1l- IJJ (i_ _J I o p _J I ® 1 I , "l I 1 O .i ?) 1 O 1 U (T? 1-- I f- 1_.. Qr ' z 1? I r ? I ?` o I I /1 ? O I 11 ? I I I ? r.. `0 I I ~J I I . 1 i (Y: I J 11 ? p II ? ? Q II II ? ? II II Cat ! ?. Nisi wm ll? H.y['t ru, ,.i.",d O'N' 53-11:3 '! :?L? 1 ?t 3 . q , N. C. DEPARTUEN'C OF TRANSPORTATION TRANSMITTAL SLIP DATE q- TO: REF. NO. OR ROOM, BLDG. Mr John Dorney Water Quality Planning ? PREPARE REPLY FOR MY SIGNATURE I_j -nn,....- ? TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT COMMENTS: . `^p''? SiAITWWA? JAMES G. MARTIN GOVERNOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 September 10, 1992 DIVISION OF HIGHWAYS THOMAS J. HARRELSON SECRETARY WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR Office of Coastal Management Department of Environment, Health and Natural Resources p P.O. Box 27687 I? Raleigh, North Carolina 27611 _ 1992 ATTENTION: John Parker (I T Dear Sir: SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation (NCDOT) intends to replace the above-mentioned bridge in Hyde County. This bridge must be replaced due to its deteriorated condition. The bridge will be replaced on existing location, and the road will be closed during construction for about one month. No temporary detour structure will be necessary. The replacement structure will consist of two 128" x 83" corrugated steel pipe arches with headwalls. This will require the placement of 360 cubic yards of fill below ordinary high water. The total fill in wetlands will be less than 0.01 acres, with 0.02 acres of fill in open water. Any temporary impacts from erosion and sedimentation will be minimized using NCDOT best management practices, which your agency has reviewed. NCDOT hereby applies for the CAMA Major Development permit as required for this project. A copy of this application is being provided to the U.S. Army Corps of Engineers and the N.C. Division of Environmental Management for their review. If you need any additional information, please call Gordon Cashin at (919) 733-9770. Sincerely, B Quinn, PE A, t anch Manager Planning and Environmental Branch cc: District r . John Mr. A. L. Mr. John Mr. C. 0. Mr. Jimm, Engineer, USCOE Dorney, DEM, DEHNR Hankins, PE, Hydraulics Smith, PE, Structure Design White, PE, Division 1 Engineer y Lee, PE, Bridge Maintenance BJO/gec Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1.4 and 8-9 must be completed for all projects. 1 APPLICANT If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? Both c. Will the project be for community, private, or a. Name NC Dept. of Transportation commercial use? Attn: B.J. O'Quinn, Asst. Branch Mgr. Public Transportation Address_pn Rnx 2.,mi City Raleigh Stalel NC d. Describe the planned use of the project. p 27611 yp 9 - __ Public Transportation Zi Da hone 919-73373141 Landowner or X_ Authorized agent b. Project name (if any) c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number SR 1128 b. City, town, community, or landmark Swan Quarter c. County Hyde d.. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Oyster Creek 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier. Replace existing bridge with 2 1p811 x 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) _ N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum Datum in plats are assumed elevations. Ground elevation approximately 1' d. Soil type(s) and texture(s) of tract Muck c. Vegetation on tract Coastal vegetation f. Man-made features now on tract Bridge g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) _ Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? N/A i. How are adjacent waters classified? Swan Quarter Bay : SA-ORW j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 3/91 ,5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed N/A b. Numbcr of lots or parcels N/A c. Density (Give the numwfRf residential units and the units per acre.) d. Size of area to Abe graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N/A g. List the materials, such as marl, paver stone, asphalt, or concrete, to l?/ised for paved surfaces. h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? N/A m. Water supply source N/A n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. N/A o. If the project is on the oceanfront, what will be the ccleva7 tion above can sea level of the first habitable 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Length Width Depth 60' 70' Aver 4.1' 60' 70' Other (break- water, pier, Site pre boat ramp, work rock jetty) Fill placed in wetland or below MHW Upland fill areas 3e b. Amount of material to be excavated from below water level in cubic yards 640 Cubic yards c. Typeofmaterial muck d. Does the area to be excavated include marshland, swamps, or other wetlands7 yes e. High ground excavation, in cubic yards 290 cubic yards k. Describe existing treatment facilities. N/A 1. Describe location and type of discharges to waters of the state (for example, surface runoff. sanitary wastewater, dt1strial/com rci effluent, "wash down"). bur ace runo? a ong roadway 11 A 'o^ Dimensions of spoil disposal area N/A c. Shoreline erosion during preceding 12 months, in feet N/A ;. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A -L Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? N/A If so, where? j. Does the disposal area include any marshland, swamps, or water areas? No k. Will the fill material be placed below mean high water? Yes 1. Amount of fill in cubic yards 360 cubic yards m. Type of fill material sand gravel n. Source of full material local borrow site o. Will fill material be placed on marsh or other wetlands? Yes p. Dimensions of the wetland to be filled See plats q. How will excavated or fill material be kept on site and erosion controlled? By standard NCDOT erosion and sedimentation control methods r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Typical roadway construction equipment (Backhoe, dumptruck, dragline, s. Will wetlands be crossed in transporting equipment to project site? No If yes, explain steps that will be taken to lessen environmental impacts. e. -Amount of fill, in cubic yards, to be placed below mean high water N% A f. Type of fill material N/A 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and _ only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high _ quality copies arse provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be.suffrciently detailed etLl.guide agency personnel unfamiliar with the area to the o site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap N/A A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. b. Average distance waterward of mean high water or normal waterlevel . N/A Name Walter J. Lupton Address Swan Quarter, NC Name Jalain Sadler Address P.O. Box 97 an emere, NU 28b8/ Name J.A.' Mason Address Swan Quarter, NC A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed - activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the 9-V. . . , ??. S1ATC ?jo JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 September 10, 1992 Jalain Sadler P.O. Box 97 Vandemere, N.C. 28567 DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR Dear Madam or Sir: SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation proposes to replace the bridge over Oyster Creek on SR 1128 adjacent to your property. This replacement will occur on the same location as the existing bridge. The road at this location will be closed for a period of about one month during construction. Permits from the Department of the Army Corps of Engineers and the NC Division of Coastal Management (LAMA) are required for this work; these are being obtained by the NC Department of Transportation. In that your property is adjacent to the site where this permit is required, a copy of the permit application is being provided for your review; however, no action is required on your part. If you have any questions, please contact your appropriate CAMA or Corps of Engineers representative, or call Mr. Dennis Pipkin, NCDOT at 919-733-9770. Sincerel y B.'7 O Qu' nn, PE Assistan n Manager Planning and Environmental Branch STni[ T -N r• STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 JAMES G. MARTIN September 10, 1992 DIVISION OF HIGHWAYS GOVERNOR THOMAS J. HARRELSON WILLIAM G. MARLEY. JR., P.E. SECRETARY STATE HIGHWAY ADMINISTRATOR Walter J. Lupton P.O. Box 87 Swan Quarter, NC 27885 Dear Sir: SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation proposes to replace the bridge over Oyster Creek on SR 1128 adjacent to your property. This replacement will occur on the same location as the existing bridge. The road at this location will be closed for a period of about one month during construction. Permits from the Department of the Army Corps of Engineers and the NC Division of Coastal Management (CAMA) are required for this work; these are being obtained by the NC Department of Transportation. In that your property is adjacent to the site where this permit is required, a copy of the permit application is being provided for your review; however, no action is required on your part. If you have any questions, please contact your appropriate CAMA or Corps of Engineers representative, or call Mr. Dennis Pipkin, NCDOT at 919-733-9770. Sincerely, B• O'Q inn, PE Assistant Manager Planning and Environmental Branch ,,. ?• sin"rI M.„ •?? tr,nw N,~? JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY J.A. Mason P.O. Box 85 Swan Quarter, Dear Sir: STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 September 10, 1992 NC 27885 DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation proposes to replace the bridge over Oyster Creek on SR 1128 adjacent to your property. This replacement will occur on the same location as the existing bridge. The road at this location will be closed for a period of about one month during construction. Permits from the Department of the Army Corps of Engineers and the NC Division of Coastal Management (CAMA) are required for this work; these are being obtained by the NC Department of Transportation. In that your property is adjacent to the site where this permit is required, a copy of the permit application is being provided for your review; however, no action is required on your part. If you have any questions, please contact your appropriate CAMA or Corps of Engineers representative, or call Mr. Dennis Pipkin, NCDOT at 919-733-9770. SincerelyYLanager B. . 0 QPE Assistan Planning and Environmental Branch BJO/gec I \ l r JJJ tl-\ Soh°? t\_= ; Pmelown c-=• 99 a5 II \ r r Js: (I C Rov .A ` anlr20 H ifa \w< +IAcre Cert E rletchvdle? I,,I 94 ^ E ?• Wav. k0 a 11 iE.7 I ? fC{tnrrJ?trJ` ian lrrl \ ; `? tay Srwr n. 'alri Yeates"ll 5 r? ??• BlflterkeT---'. I ; f.uAv v\? r 911??,Q In A5 /ona.nurA,wLake EdeelMrd t c N l1 ` ll R r landrnGLw h, ^\ c\•w? Scranton o... 92 \ ` 1 6 ddletown s, rr Oalh wens eaer II i. I . A J? J \ ••0 ?,.;""'? 5 sudes"lle i61 1? ebr s1a r I payriew._ t RansMryHl v vc s Hew Holland 45 + /)N 1- 9 n \ ,t ntt ?'„ ` t _ r r ,Swan Ouarler Gulf RockC s /lCo r? rtrrr \ 1 N'v..n bnu NJv / Pony I Paml¢o Otich R-e ', , f I j \ • 0`nnnrton r NAr1 WIIDIIII A t 13 g Edwnd I GeeY r ?'?ta `\• _ GRIA a rrn ?: SrCe E ?.? u rat,<en ??? ` Buxtonr ` N Ur Orl ROral I, 13 rl\• \ \ ?'i ??L l J, 4 :E• Acton P? J Hoty{rcAe \ \ 1 Hatteras y' locos _ - J?? \\ ?a rrr[ rrrtr'/ ?/? A CAPE NArn Holfyvdlt Mrat ij?` `> \ \\? r (Cash Comers 1 a.r A Is tfulh+dt Miff 1/andt !rt ,\ 51tr NO + MAnbrl / \ Nrs EsSU pp \ rvt o? Irmp as IlJborn Rar \. ,c.. 17 otaKE ON( INCH EQUALS APPROX 13 MILES 0 5 10 10 SCAM SCALE Of Or KILOMILESM[TIR$ _ ONE INCH EQUALS APPROX 71 KILOMETERS tt C3 10 IO IO ad AR 1 MIL[ IS IOIIAL TO I An KILOMETERS a- 1"t Ilu ? 19 4P46 r• S.•a.d.t Fo.A )ilk i;r J s 1 10 ?y w t? a _ le11 CewdoA a.ru \ ALL11 1 a ?; tJ 11 ,..., b r.a ILti i • • LLX P r ti d'. I V f - , 13 G ru ! 7r A r... .h lift 1.1, fl n f J 111 I s. r,' • { M - IN e,• ` Sr 6116.4 t.Aa I ILS C)t _IW ALti 0) Lilt' ISLAM is • r _ I J .. lliL S 4 I j: C y lnnd•gyiltlvGE; - , I ,• /3 r B,4 p k, CINM . ? t 1 4 `. ISLAND COVE MARSH ISLAM ? t r? Q O ?? SvrNt vt M. ? Y 0,. ` N ? 1 F ? v WE s i "? h V'e>n.r v A t ? S ' C f? '' t % 9 ?ttts t v - r? t:a.tt. MAUD r . 1' .15H A Y S SCALE "lI` CO. tcl?rtr rro ____ 1 L s r .Lts ? a v 5?-114 9 q? 0,5 1 rAAt SCALE FOR ENLARGEMENTS .ACC L? 3 ryl -r_ [J Icy •L' '2 . S -z cn ? r.] IJ1 '- r tl w 1:7 1- .J 11 11 11 11 IT I11 1- C J r{; 1-• 1 L 1 1:?' .11 _2 1'_l ?Il Q' z r L _ - 1 _Jl Jl ,J _ 't1 '.1 1 ??? r 1 2 'Il ? ? lL T- IL ]C ti r:'1 t fJ) 1-• Jam.. ?._ ? !- LLl lA l Ta I-1 -1 Vy rf_ ? 1 ' I 1 ?r ? '?_ _J r::l X rY I" uj 0- I.J I [ C 1 I 1 I G' -? J I Iv ?. C__1 ;- \ 1 rf I ' ?'!' JI m I / I I m T ` f` . w I .? n= 1- UJ I 1 ( ?? I I r i i _rl i.'Z'11 1J I rte. C? r, .[n JEST. OF '?Ah,l F DIVISION OF Hi ,i'wAYS HYDE CO. EP.k48 0!i Sr-I128 ;;-Z;; a_uF 3 0 a 0 0 _,: IlI (Jj nc :.1' JL;'1 f ' YI 11 H ?,_ fY- I I l• I.IJ [i_ _I II ® 1 ? • Q? .t; I i 0 - C' 1 l l ?1 •. fir. r D I 1_ til C • • n ul -r n-1 ,?'I w f J , .el i., i • t \7V `? I I I I v' 1 ., I 1 I ?ro I 1' I 1 ft' I J II ? o '1 l l h II o° I? f ._. C' .- i. uF i3ANS OF HIL,?iWAYS Hy['F CU. -3.=4? ON 51'11.7 .n 1 WARRANTNO. 368134 0643 Ir loo, UL tincC 1 HL- I UHN I U OLPARIMGNT OF TRANSPORTATION DATE CONTROLLER'S OFFICE 3601 34 09-1 4-92 CODE INVOICE NUMBER DATE PURCHASE ORDER AMOUNT DISCOUNT NET AMOUNT NUMBER F i , ; 250,00 , , TOTAL 250 ; 00 REMARKS: MAJOR CAMA PERMIT HYDE COUNTY (5.0851) ?° ° "°•,,?VU°O' UCIHVr1 nCrUtir- UCh'UAIIINU 66-1059 STATE OF NORTH CAROLINA 531 DEPARTMENT OF TRANSPORTATION RALEIGH, NORTH CAROLINA Warrant NO. 368134 PAY TO MO. DAY YR. AMOUNT THE ORDER OF: N.C. ENVIRONMENT, HEALTH AND 9 14,2 $ ******250:00 NATURAL RESOURCES DIVISION 0F* COASTAL MANAGEMENT P0 BOX 27687 RALEIGH, NC. 27611-7687 PRESENT TO: STATE TREASURER PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM 11,36813411' 1:0 5 3 1 10 590: s"100011-Go 111¦ .1 'r 1 DEPARTMENT OF THE ARMY ;??.. WILMINGTON DISTRICT, CORPS OF ENGINEERS ? i P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO September 23, 1992 S: November 23, 1992 Regulatory Branch Action ID. 199203615 ,' ?%U L5 Mr. John Dorney Water Quality Section Division of Environmental Management r?T North Carolina Department of Environment, - ?f5g2 I Health and Natural Resources Post Office Box 27687 GAZER'UAurv SECTIOIJ I Raleigh, North Carolina 27611-7687 Dear Mr. Dorney: Enclosed is the application of the North Carolina Department of Transportation, Division of Highways, for Department of the Army authorization and a State Water Quality Certification to place fill material in the waters/wetlands of Oyster Creek associated with replacement of Bridge No. 48 on S.R. 1128, near Swan Quarter, Hyde County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request by November 23, 1992, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Mr. Gary Mitchell, Washington Field Office, Regulatory Branch, telephone (919) 975-5811. Sincerely, G. en (e-Wri rt Chief, Regulatory Branch Enclosure .i., -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Terry Moore Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 STArr ,lob STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 JAMES G. MARTIN GOVERNOR September 10, 1992 THOMAS J. HARRELSON SECRETARY Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: John Parker Dear Sir: R5'G0VED . St? 171992 tt5olow gRANCA DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Hyde County, Replacement of Bridge No. 48 over Oyster Creek on SR 1128. The North Carolina Department of Transportation (NCDOT) intends to replace the above-mentioned bridge in Hyde County. This bridge must be replaced due to its deteriorated condition. The bridge will be replaced on existing location, and the road will be closed during construction for about one month. No temporary detour structure will be necessary. The replacement structure will consist of two 128" x 83" corrugated steel pipe arches with headwalls. This will require the placement of 360 cubic yards of fill below ordinary high water. The total fill in wetlands will be less than 0.01 acres, with 0.02 acres of fill in open water. Any temporary impacts from erosion and sedimentation will be minimized using NCDOT best management practices, which your agency has reviewed. NCDOT hereby applies for the CAMA Major Development permit as required for this project. A copy of this application is being provided to the U.S. Army Corps of Engineers and the N.C. Division of Environmental Management for their review. If you need any additional information, please call Gordon Cashin at (919) 733-9770. r J Sincerely B Quinn, PE A anch Manager Planning and Environmental Branch cc: , 5istrict Mr. John Mr. A. L. Mr. John Mr. C. 0. Mr. Jimm,, Engineer, USCOE Dorney, DEM, DEHNR Hankins, PE, Hydraulics Smith, PE, Structure Design White, PE, Division 1 Engineer y Lee, PE, Bridge Maintenance BJO/gec Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, 5king, paving, land clearing, and stonnwater con- trol. If the requested information is not relevant to 0 project, write N/A (not applicable). Items yib must be completed for all projects. R 1 7 ly'? ? M-R 1 APPLICANT . ? .?p? o eR c a. Name NC Dept. of Transportation Attn: B.J. O'Quinn, Asst. Branch Mgr. Address_pn Rnx 252n1 If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? Both Will the project be for community, private, or commercial use? Public Transportation City Raleigh Start 1 NC - d. Describe the planned use of the project. 27611 Public Transportation Zip Day phone 919-733-73141 Landowner or X Authorized agent b. Project name (if any) c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number SR 1128 b. City, town, community, or landmark Swan Quarter c. CountyHyde d. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Oyster Creek 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier. Replace existing bridge with 2 1p8") x 83" CSPA 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum Datum in plats are assumed elevations. Ground elevation approximately 1' d. Soil type(s) and texture(s) of tract Muck c. Vegetation on tract Coastal vegetation f. Man-made features now on tract Bridge g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local govcrruncnt? N/A i. How are adjacent waters classified? Swan Quarter Bay : SA-ORW j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 3/91 .5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed N/A b. Number of lots or parcels N/A c. Density (Give the num?:W residential units and the units per acre.) d. Size of area to Abe graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N/A g. List the materials, such as marl, paver stone, asphalt, or concrete, to 1e uA cd for paved surfaces. h. If applicable, has a stonnwater management plan been submitted to the Division of Environmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? N/A k. Describe existing treatment facilities. N/A m. Water supply source N/A n. If the project is oceanfront development. describe the steps that will be taken to maintain established public beach accessways or provide new access. N/A o. If the project is on the oceanfront, what will be the mean sea level of the first habitable elevation above NA floo 67 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, Site p boat ramp, work rock jetty) Fill placed in wetland or below MI-iW Upland fill areas Length Width Depth re 60' 70' Aver g 4.1' 60' 70' b. Amount of material to be excavated from below water level in cubic yards 640 Cubic yards c. Type of material muck d. Does the area to be excavated include marshland, 1. Describe location and type of discharges to waters of swamps, or other wetlands? the state (for example, surface runoff, sanitary yes wastewater, ind st.rial/com rrci effluent. "wash down"). Surface runorr along roadway e. High ground excavation, in cubic yards 290 cubic vards .A Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in N/A feet N/A g. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A IL Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? N/A If so, where? j. Does the disposal area include any marshland, swamps, or water areas? No k. Will the fill material be placed below mean high water? Yes 1. Amount of fill in cubic yards 360 cubic yards m. Type of fill material sand gravel n. Source of fill material local borrow site o. Will fill material be placed on marsh or other wetlands? Yes p. Dimensions of the wetland to be filled See plats q. How will excavated or fill material be kept on site and erosion controlled? By standard NCDOT erosion and sedimentation control methods r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Typical roadway construction equipment (Backhoe, dumptruck, dragline, s. Will wetlands be crossed in transporting equipment to project site? -U- If yes. explain steps that will be taken to lessen environmental impacts. e. -Amount of fill. in cubic yards, to be placed below mean high water N/ A f. Type of fill material N/A 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the decd (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title. plus written permission from the owner to cant' out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 12 x 11 white paper. (Refer to Coastal Resources Commission Rule 71.0203 for a detailed description.) Please note that original drawings arc preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies arc provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be.sufficicntly detailed etLlopide agency personnel unfamiliar with the area to the . site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that - may have been developed in consultation with the - Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap N/A b. Average distance watcrward of mean high water or nonnalwater level ' N/A Name Walter J. Lupton Address Swan Quarter, NC Name Jalain Sadler Address P.O. Box 97 an emere, NU 28b8/ Name Address J.A. Mason Swan Quarter, NC A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed - activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that 1 am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the 9j_