Reference the application of the North Carolina Department of
Transportation, Division of Highways, for a Department of the Army permit to
place fill material in the waters/wetlands of Oyster Creek associated with
replacement of Bridge No. 48 on S.R. 1128, near Swan Quarter, Hyde County,
North Carolina.
The Federal agencies have completed review of the proposal as presented by
the application and your field investigation report.
We recommend that the following conditions be included in the State
authorization:
a. The area of the opening associated with the culverts will be equal to
or greater than the area currently available for tidal exchange and
ingress/egress of aquatic organisms (See National Marine Fisheries Service
(NMFS) letter of April 15, 1993 (copy enclosed).
b. Except as specified in a. above, all work authorized by this permit
must be performed in strict compliance with the permit plans.
C. All mucked materials will be placed and confined landward of the mean
high water (MHW) elevation contour and any regularly or irregularly flooded
vegetated wetlands.
d. All fill materials will be obtained from a highground source and
placed in accordance with permit plans.
e. The fill material will be clean and free of any pollutants except in
trace quantities. Metal products, organic materials, or unsightly debris will
not be used.
Iii 4
? w
-2-
f. The temporary placement or double handling of excavated or fill
materials within waters or vegetated wetlands is not authorized.
g. The activity will be conducted in such a manner as to prevent a
significant increase in turbidity outside the area of construction or
construction-related discharge. Increases such that the turbidity in the
waterbody is 25 NTU's or less are not considered significant.
Questions or comments may be addressed to Mr. Gary Mitchell, Washington
Field Office, Regulatory Branch, telephone (919) 975-5811.
Sincerely,
G. Wayne Wright
Chief, Regulatory Branch
Enclosure
Copies Furnished (without enclosure):
!'-- John Dorney
Water Quality Section
Division of Environmental
Management
North Carolina Department of
Environment, Health, and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Ms. L. K. (Mike) Gantt
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mr. Thomas Welborn, Chief
U.S. Environmental Protection
Agency - Region IV
Wetlands Regulatory Unit
345 Courtland Street, N.E.
Atlanta, Georgia 30365
Mr. David Griffin, District Manager
N.C. Division of Coastal Management
1367 U.S. Highway 17 South
Elizabeth City, North Carolina 27909
Mr. Larry Hardy
National Marine Fisheries Service
Pivers Island
Beaufort, North Carolina 23516
- -ft
o „a SPATE tee.
d, L? •I r??? QQn.
State of North Carolina
Department of Environment, Health and Natural Resources
Northeastern Region
1424 Carolina Avenue, Washington, North Carolina 27889-1424
James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary
DIVISION OF COASTAL MANAGEMENT
19 March 1993
MEMORANDUM
TO: Mr. A. Preston Howard,-t, Director
Division of Environmental Management
FROM: John R. Parker, Chief
Major Permits Processing Section
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: NC Dept. of Transportation
Project Location: On SR 1128 at Bridge No. 48 over Oyster Creek, Hyde County
Proposed Project: The applicant proposes to replace an existing bridge with two metal
culverts.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by 16 April 1993. If you have any questions regarding the proposed
project, please contact David Moye at 946-6481. When appropriate, in-depth comments
with supporting data is requested.
REPLY _V This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the
attached comments.
Signed , Date
P.O. Box 2188, Washin&non, North Carolina 27889-2188 Telephone 919-94"481 FAX: 919-975-3716/919-946-6639
An Equal Opportunity Arfirmarive Action Emplowr
?Ty ? ?t 0
M d r^^
State of North Carolina
Department of Environment, Health and Natural Resources
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27604
James B. Hunt, Jr., Governor April 19, 1993 A. Preston Howard, Jr., P.E.
Jonathan B. Howes, Secretary Director
Mr. Barney O'Quinn
Planning and Environmental Branch
N.C. Dept. of Transportation
P.O. Box 25201
Raleigh, N.C. 27611-5201
Dear Mr. O'Quinn:
Subject: Certification Pursuant to Section 401 of the Federal
Clean Water Act, //?
Proposed bridge r%)lacement, # 48 over Oyster Creek on
SR 1128 6,
Project # 92523, COE # 199203615
Hyde County
Attached hereto is a copy of Certification No. 2823 issued
to N.C. Dept. of Transportation dated April 19, 1993.
If we can be of further assistance, do not hesitate to
contact us.
Sincerely,
4.aeston Howar Jr. P. E.
Attachments
cc: Wilmington District Corps of Engineers
Corps of Engineers Washington Field Office
Washington DEM Regional Office
Mr. John Dorney
Mr. John Parker
Central Files
Regional Offices
Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem
704/251-6208 919/486-1541 704/663-1699 919/571-4700 919/946-6481 919/395-3900 919/896-7007
Pollution Prevention Pays
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015
An Equal Opportunity Affirmative Action Employer
01
NORTH CAROLINA
Hyde County .
CERTIFICATION
THIS CERTIFICATION is issued in conformity with the
requirements of Section 401 Public Laws 92-500 and 95-217 of the
United States and subject to the North Carolina Division of
Environmental Management Regulations in 15 NCAC 2H, Section .0500
to N.C. Dept. of Transportation pursuant to an application filed
on the 19th day of March 1993 to replace Bridge #48 over oyster
Creek on SR 1128.
The Application provides adequate assurance that the
discharge of fill material into wetlands adjacent to the waters
of Oyster Creek in conjunction with the proposed bridge
replacement in Hyde County will not result in a violation of
applicable Water Quality Standards and discharge guidelines.
Therefore, the State of North Carolina certifies that this
activity will not violate Sections 301, 302, 303, 306, 307 of PL
92-500 and PL 95-217 if conducted in accordance with the
application and conditions hereinafter set forth.
Condition(s) of Certification:
1. That the activity be conducted in such a manner as
to prevent significant increase in turbidity
outside the area of construction or construction
related discharge (increases such that the
turbidity in the stream is 25 NTU's or less are not
considered significant).
Violations of any condition herein set forth shall result in
revocation of this Certification.
This Certification shall become null and void unless the
above conditions are made conditions of the Federal Permit.
This the 19th day of April, 1993.
DIVISION OF ENVIRONMENTAL MANAGEMENT
. Howard Jr. P.E.
WQC# 2823
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME N. C. Department of Transportion
2. LOCATION OF PROJECT SITE Hyde County on SR 1128 at Bridge No. 48 over
oyster Creek.
PHOTO INDEX:'1989: N/A _ 1984: II /A 1978: 74-633, U-20
STATE PLANE COORDINATES: X: 2,801,000 Y: 607,800
QUAD. NAME -Swan Quarter (lower left corner)
3. INVESTIGATION TYPE: DREDGE & FILL X CAMA X
4. INVESTIGATION PROCEDURE:
(A) DATES OF SITE VISIT 03/18/93
(B) WAS APPLICANT PRESENT NO
5. PROCESSING PROCEDURE: APPLICATION RECEIVED 16 March 1993
WASHINGTON FIELD OFFICE
6. SITE DESCRIPTION:
(A) LOCAL LAND USE PLAN Hyde County
LAND CLASSIFICATION FROM LUP Conservation
(B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X
COASTAL WETLANDS X PUBLIC TRUST AREAS X
ESTUARINE WATERS X OTHER
(C) WATER DEPENDENT: YES X NO
(D) INTENDED USE: PUBLIC X PRIVATE COMMERCIAL
(E) TYPE OF WASTE WATER TREATMENT: EXISTING N/A
PLANNED N/A
(F) TYPE OF STRUCTURES: EXISTING Bridge
PLANNED Replace bridge with 2 - 128" X 83" X 50' long metal culverts
(G) ESTIMATED ANNUAL RATE OF EROSION 0 SOURCE Applicant
7. HABITAT DESCRIPTION:
AREA
(A) VEGETATED WETLANDS DREDGED FILLED OTHER
Coastal Wetlands ±500 ft2 ±500 ft2
(B) NON-VEGETATED WETLANDS:
Creek Bottom ±1,500 ft2 ±1,500 ft2
(C) OTHER:
Highground ±1,500 ft2 ±1,500 ft2
(D) TOTAL AREA DISTURBED: ±3,500 ft2
(E) PRIMARY NURSERY AREA: YES X NO
(F) WATER CLASSIFICATION: SA-ORW OPEN: YES NO X
8. PROJECT SUMMARY: The applicant proposes to replace an existing bridge
with two metal culverts.
• i
Ab
Project setting
The N. C. Department of Transportation's (NC DOT) proposed bridge replacement site
is located on SR 1128 at Bridge No. 48 crossing Oyster Creek in Hyde County, North Carolina.
The bridge is bordered on the west by coastal wetlands primarily vegetated with Juncus
roemerianus ai.d containing S artina alterniflora and some S. atens. The bridge is bordereu
on the northeast by a developed lot with a dock and building and on the southeast by a spoil
bank containing pines, cedars, and mixed shrubs and grasses. The spoil bank gives way to
coastal marsh vegetated primarily with J. roemerianus and containing S. patens and some S.
alterniflora. The site is approximately 2' to 3' above mean sea level. Oyster Creek is classified
as SA ORW by the Environmental Management Commission.
Project description
NC DOT proposes to replace an existing ±28' X ±24' bridge with two - 128" X 83"
X ±50' long metal culverts and fill an area approximately 50' X 70'. Concrete headwalls are
proposed to retain the fill. The fill area consist of approximately 1,500 ft2 of creek bottom and
500 ft2 of coastal wetlands. Prior to the placement of the culverts and filling, the area will be
mucked out and the spoil material transported to a highground disposal site.
Anticipated impacts
The project as proposed would result in the filling of approximately 500 ft2 of coastal
wetlands and 1,500 ft2 of creek bottom. Localized turbidity would occur as a result of the
mucking out and filling activities.
David W. Moye - Washington Office - 18 March 1993
i
NC DOT
Bridge No. 48
Hyde County
CONDITIONS
1. The temporary placement or double handling of excavated or fill materials within waters
or vegetated wetlands is not authorized.
2. No excavated or fill material will be placed at anytime in any marsh or surrounding
waters outside of the alignment of the fill area indicated on the work plat(s).
3. In order to protect water quality, runoff from the construction area must not visibly
increase the amount of suspended sediments in adjacent waters.
4. A silt screen will be placed immediately upstream and downstream of the project site
prior to any excavation and not removed until 24 hours after the completion of all
excavation.
?,?f1711 )?
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
IAM It B. HUNT. Ilt. DIVISION OF HIGHWAYS SAM HUNT
COVfl'NCII'. IC, ? ? , SC. C)I,It
IICX X52M ,,,. PAL'clGH. N.C. 2761!-5201
March 3, 1993
Office of Coastal Management
Department of Environment, Health and
Natural Resources
P.O. Box 27687
Raleigh, North Carolina 27611
ATTENTION: John Parker
Dear Sir:
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
As you know, the N.C. Department of Transportation
(NCDOT) intends to replace the above-mentioned bridge in Hyde
County. Our original application was submitted to you
September 10, 1992, but was returned for revisions October 6,
1992. Since that time, the application has been revised to
address the concerns of your field representative. An
additional property owner has also been identified.
You will find the revised application and property owner
receipts enclosed. A copy of this information has been
provided to your field representative for their review. If
you need any additional information, please call Gordon
Cashin at (919) 733-9770.
Sin__cerely,
B!. J. .'Quin PE
cc: District Engineer, USCOE
/?Tr. David Moye, DCM, Washington Regional Office
Mr. John Dorney, DEM, DEHNR
Mr. John Smith, PE, Structure Design
Mr. C. 0. White, PE, Division 1 Engineer
Assistant_.M? nager
Planning and Environmental Branch
BJO/gec
s?r??
J?w IA I\.. yA
TJ?J 1':.f??+J1YJ4tr ?
STATE OF NORTJ-I C/V"OLINA
DEPARTMENT OF TRANS POPTATION
JAMIS Ii. HUNT. JIL DIVISION Of= HIGHWAYS SAM HUNT
Govi RNOIl SLOUTARY
I'.O. [SOX 25201. RALEIGH. N C. 17611-5201
March 3, 1993
Clem Walker
1021 Mockingbird Drive
Raleigh, N.C. 27609
Dear Sir:
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 112£3.
The North Carolina Department of Transportation proposes
to replace the bridge over Oyster Creek on SR 1128 adjacent
to your property. This replacement will occur on the same
location as the existing bridge. The road at this location
will be closed for a period of about one month during
construction.
Permits from the Department of the Army Corps of
Engineers and the NC Division of. Coastal Management (CAMA)
are required for this work; these are being obtained by the
NC Department of Transportation. In that your property is
adjacent to the site where this permit is required, a copy of
the permit application is being provided for your review;
however, no action is required on your part.
If you have any questions, please contact your
appropriate CAMA or Corps of Engineers representative, or
call Mr. Dennis Pipkin, NCDOT at 919-733-9770.
Sincerely, ?J
B . J 1 O Quinn., PE
Assistant 'Manager
Planning and Environmental Branch
-Please type or print. Carefully describe all anticipated
development activities, including; construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 3-9
must be completed for all projects.
1 APPLICANT
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
Both
c. Will the project be for community, private, or
a. Name NC Dept. of Transportation commercial use?
Attn: B.J. O'Quinn, Asst. Branch Mgr. Public Transportation
Address Pn Rnx 252ol
City Raleigh State NC
91 - -
7jp 27611 Day phone 919-733-3141
d. Describe the planned ruse of the project.
X Landowner or Authorized agent
b. Project name (if any) N/A
c. If the applicant is not the landowner, also give tic
owner's name and address.
N/A
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract N/A
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
SR 1128
b. City, town, community, or landmark
Swan Quarter
b. Size of individual lot(s) N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
Datum in plats are assumed elevations.
urouna elevation approximately I-
d. Soil type(s) and texture(s) of tract
Muck
e. Vegetation on tract Coastal Vegetation
f. Man-made features now on tract Bridge
c. County Hyde g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
d. Is proposed work within city limits or planning
jurisdiction? No
e. Name of body of water nearest project
Ovster Creek
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or ?icr . Replace existing bridge with 2'
. 28 ' x 83" CSPA
Approximately in length
X Conservation Transitional
-Developed Community
-Rural Other
li. How is the tract zoned by local government?
N/A
i. How ar ad'acent Waters c11?? s? V?
Swan lua?rter Bay S?-?1W; PNA
j. Has a professional archaeological survey been
cirried out for the tract? -No_-- If so, by whom?
3/91
AOOJt4 AdOJ
, 5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structurespropcsed N/A
b. Number of lots or parcels N/A
c. Density (Give the number of residential units and the
units per acre.) N/A
d. Size of area to be graded or disturbed
N/A
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 7S feet of a.
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
m. Water supply source __ N/A
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? N/A
6 EXCAVATION AND FILL
INFORMATION
Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
N/A
h. If applicable, has a stormwater management plan
been submitted to the Division of Envirorunental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facili ties.
N/A
j. Have these facilities received state or local approval?
N/A
k. Describe existing treatment facilities.
N/A
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down"). Surface runoff along roadway
Access channel
(MI.W) or (NW -)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
Length Width Depth
Average
50' 70' 4.1'
50' 10'
b. Amount of material to be excavated from below
water level in cubic yards 535 Cubic Yards
c. Type of material Muck
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
e. High ground excavation, in cubic yards
290 Cubic Yards
LOOOU - AdoJ
tr I?irreiKsions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
0
o nown feet
g. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material Concrete
County Trash Pump Site on SR 1127
e. -Amount of fill, in cubic yards, to be placed below
h Do you claim title to the disposal area? No mean high water N A_
If not, attach a letter granting permission from the
0141
6
Type of fill material N/A
f
)
-
owner. Contact James Blount (92 .
Hyde County
i. Will a disposal area be available for future
maintenance? Gnunly to maintain
If so, where?
8 ADDITIONAL INFORMATION _
j. Does the disposal area include any marshland, In addition to the completed application form, the follow-
swamps, or water areas?
No ing items must be submitted:
k. Will the fill material be placed below mean high A copy of the deed (with state application only) or other
water? Yes instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
1. Amount of fill in cubic yards 7 S ,bi -Yards the owner of said property, then forward a copy of the
Type of fill material sand gravQ1
in deed or other instrument under which the owner claims
. title, plus written permission from the owner to cant' out
n. Source of fill material local borrow site the project.
o. Will fill material be placed on marsh orother
• An accurate work plat (including plan view and cross
wetiarids? Yes
sectional drawings) drawn to scale in black ink on an 8
p. Dimensions of the wetland to be filled 112 x 11 white paper. (Refer to Coastal Resources
Approximately 50' X10' Commission Rule 7J.0203 for a detailed description.)
q. How will excavated or fill material be kept on site
Please note that original drawings are preferred and
and erosion controlled?
By standard NCOOT erosion and only high quality copies will be accepted. Blue-line
e imentation control methods prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
r. What type of construction equipment will be used use of larger drawings.) A site or location map is a part
(for example, dragline, backhoe, or hydraulic of plat requirements and it must be.sufficiently detailed
dredge)? Zyni r.al rnadway rnnstrurtion
d
line
k
kh
d
B to guide agency personnel unfamiliar with the area to the
et
.
rag
um ur-
oe_.
ac
yi m n . [ ,
site. Include county road (SR) numbers, landmarks, and
s. Will wetlands be crossed in transporting equipment the like.
to project site? No If yes, explain steps that will
be taken to lessen environmental impacts. A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
1' f th d 1 t addresses of the
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap
2 endwalls, approximately 75'each
b. Average distance watcrward of mean high water or
normal water level At the pipe ends
A rst o c names an comp e e
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
Clem Walker.
1021 Mockingbird Drive
Raleigh,N.C. 27609
Name Walter J. Lupton
` Address Swan Quarter, NC
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Name Jalain Sadler Any permit issued in response to this application will
Address P. 0. Box 97 allow only the development described in the application.
Vandemere, NC 2C56; The project will be subject to conditions and re ,--ictions
contained in the permit.
Name J. A. Mason
Address Swan Quarter, NC
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
A check for $100 made payable to the Department of
Natural Resources and Community Development to
cover the costs of processing the application.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the day of , 19-
A signed AEC hazard notice for protects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
X
Landowner or Authorized agent
l 1.,.. I / / ?r \ 1
1 / N111Pin? /..? ( ?./ t•...Ir h
rlnrln ?I\ / ._ I _ ar,tr ? H Y I`• I! 1 I' Rnr.
A .. /A'r' 1 /PI Ilrlllrl lrll ?A ', ?, a•
In+`!JJ( cra I........' L
falrl IJI *? \ocfec:h,lh jr 'alr;
? Yrat. cvJl• ?Rrlnarcn r''a' \\11?? ?'?
O tl•, „a' rCa'r ??(ngrlhard t\T ?'
A 1? 0' R T ?; sr,anlpn LanJrnq f D,I• ,., i' H
W!•. Baln \win6teanr'u l, M'ddle lo.n 1\ ?O
..,i„• - '? - SlaJar?n. ?1 r NPb,asla `
Rarvnv.. Rantmm?ll+ ' - New HOnand \
CUrr ,r. r r> = , ' ?I a? ?.` it n Qll ar lr, GUII Rn[1 ?• ley •' 1
Pn?^t n, III'v..bny R.,y
,, F A'hco Beal nt ?' ti\•., ?I!•rV 1 r ! f
r',`, il' ?jrn'1J -_- r? _? r.` rl k•IDUrr >C•. r.r •--, I, /'J J L° \ O j?
Fd.aM 1-.?' GtPI -In. LanJ ?N ?Q t J?,"_?
N,?'?
V-cl
arlnn?^ (]II,I - Jr HoblKa•+ `\ \?\ ,y `' \ Natl.ras y F?I(r?-m
M ?tlll
ICaah ':,,'n%, {,- -
l//L` ,'*'Yar•,lrmer au.
+ ll;vj)ll.,yN A,
I—Dl aanliD,r.n Ilavl-?lr ' ?? t flm enr• . ? - '` CO
10 \ \ C° I a oCa.
Il }? to 7n SCALF 01 MItfS ON( INC,, [OVALS APPROx I1 MItCS
L% SCAIC Of .ICOMLTCRS ONE,NCH L041ALS Af'v ROx 71 KItOMCTERS it
n III 70 1p an 46 I Mll IS f?Qllal To 1 I'm rItOMIIIRs ?•
in,
A 1
r?r6# Rw 607 IIOL ?"? ? _ \ .. '? '
43
e+ b °
J S-tid.a Fo-a a i] r ' t r
L -
y, LN U It1,
? I!fa
>>
'? '?r!S7L •? ' ?? •?/4?/C Dliltr,?•1Fa r ? H7d.l...d
^? 11]1
1 c f ? J! It ?llfl FlT Co 7- /'/15 N r+s ?!nlta
•_. ! * ,?? LI 177 -
T 2111
• 1. a S..:d011 rAS 1
bill ?l? rv U,o
U 0 r
tSLMU ,C 1 r nlr S
IJ __
%
\) • .fi 7
1 _ / ? I J` LOndro YRfIl1GF..
off n !i, / Jv r 1' I C 4
fl ? k- r
=
0fnr \ y'?r , t N t 1?-
l COVE w wdrl+ ruro 1
AN WEST
It.
N,C. DEPT. OF TRANS.
DIVISION OF HIGHWAYS
HYDE COUNTY
SCALE BR. #43 ON SR-1123
SCALE AS SHOWN
r.--_ __.-3
SHEET 1 OF 3
i I NOV.1 G,1 3 J 2
I
i =
I
Q?
H .V n ? J
=
U J ? O AA
/? w \
Q Ul V` . 1 V
w
v
,I II ? 11 ? ? o
S C.] T Jc 11 Q
•rJ Q •v `. ? U, ? ? Z a,'
,
T ? .
?
Lk
y ft:
LL
? -
CI,
Q
_ z W
:
LI
u_ ¢ ? ? O . Z • ? 3 ? 1 w a k .
u_
I I ? r c 41
-- - ? I I ?
__ J 1 I I. lL 1 LIn r L I ®I I
-1
' lLi _ ? Ul rn
Q
ZU
cn'
ti m
? = ?, I I I ? ? ? _ 0 1
J LL I? -' ' cc m
L 1 I I.L d N
d
J r_,
J < Q pp -
Q3 S ?J llOp?' y>
3 Ui I 1 .. .a
11 ??
I _
V) ??tD I ? \ J?•
?. i i u I I I ``fir
I I ? I =I
r I I I • i J ZI `? . D
1 I L G 11 CD
4 I T (', LU --4-
I ( I' L c w \ cT-
? I 1 1 i.? 1 1 - rri I-I O W f\ ?1
Q? I I 'ol I ??? < m L--) ] v
I
I I O QO<(P Q
Ljj
I I I r
V
Q
v _L1
N.C. DEPT. OF TRANS.
W o
DIVISION OF N15HWAY)
HYDE CO.
BR.148 ON SE-1128
SCALE AS SHOWN
SHEET aOF 3
NoV. / /972
O
O
I.
III
I I
I I
ICI
' II
? r
r I
,
? It
? I r
TI
I II C
r
I
? I
I
i
I
I
1 I
II
11
II
II
I?
II
II
I
I \\1
I
0
1
? ?rJ
v ? Q IV ?
l< kA
h
c
? I LI
J
i
^? <
o
,r W
r ?. r 1.
''
?
t. n
. lV W
u
.n
a..
d
O?
-41
OI
1
r
r .i
is
1
ti
c
V
LQ
41
A
0 0
r Q?
P
I
-
I N 41
I f O
I ?1 U S
I c? ?
J
V
O
J
C 4
CC 7
I
O
l
O O
0
1
v)
t.
iI. HVH
?? _.C_- 7 Imo: l
Nov. 16,1972-
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION:
P.U. BOX 25201
RALEIGH 27611-5201
JAMES G. MARTIN
GOVERNOR
September 10, 1992
DIVISION OF HIGHWAYS
THOMAS J. HARRELSON
SECRETARY
Office of Coastal Management
Department of Environment, Health and
Natural Resources
P.O. Box 27687
Raleigh, North Carolina 27611
ATTENTION: John Parker
Dear Sir:
WILLIAM G. MARLEY, JR. P.E.
STATE HIGHWAY ADMINISTRATOR
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation (NCDOT)
intends to replace the above-mentioned bridge in Hyde County.
This bridge must be replaced due to its deteriorated
condition. The bridge will be replaced on existing location,
and the road will be closed during construction for about one
month. No temporary detour structure will be necessary. The
replacement structure will consist of two 128" x 83"
corrugated steel pipe arches with headwalls. This will
require the placement of 360 cubic yards of fill below
ordinary high water. The total fill in wetlands will be less
than 0.01. acres, with 0.02 acres of fill in open water. Any
temporary impacts from erosion and sedimentation will be
minimized using NCDOT best management practices, which your
agency has reviewed.
NCDOT hereby applies for the CAMA Major Development
permit as required for this project. A copy of this
application is being provided to the U.S. Army Corps of
Engineers and the N.C. Division of Environmental Management
for their-,review. If you need any additional information,
please call Gordon Cashin at (919) 733-9770.
Sincerer
F3 Quinn, PE
arch %:anagcr
Planning and Environmental Branch
cc: District
Mr. John
Mr. A. L.
Mr. John
Mr. C. 0.
Mr. Jimm,
BJO/gec
Engineer, USCOE
Dorney, DEM, DEHNR
Hankins, PE, Hydraulics
Smith, PE, Structure Design
White, PE, Division 1 Engineer
y Lee, PE, Bridge Maintenance
d
' To: John Dorney
Planning Branch
DIVISION OF ENVIRONMENTAL MANAGEMENT
CAMA/COE PERMIT APPLICATION REVIEW
r ,
WaRO PROJECT # q3 -0Z `C_ WQ SUPERVISOR: TI RPE
REVIEWER: SAWYER DATE: 3/ 3,( 3
WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING
PERMIT YR: 92 PERMIT NO.: COUNTY: N/
?
PROJECT NAME: N e DoT., =i SYg, ?
PROJECT TYPE: PERMIT TYPE: CAMA/COE
COE #: DOT:
RCD FROM CDA: 6 ? DATE FROM CDA: 311213Z
REG OFFICE: WaRO AND SUB BASIN #: zr o 7
STREAM OR ADJACENT WATER BODY: GRIVER eAxz 1
0 STREAM INDEX c2 7 -
O ?:R tOSED:
WL IMPACT: Y 2 WL TYPE:
WL REQUESTED: 5 00 WL ACR EST:
HYDRO CNECT?: WL SCORE:
MITIGATION: Al MITIGATION TYPE:
MITIGATION SIZE-, _RATING SHEET ATTACHED?
RECOMMENDATION ISSUE ISSUE/COND DENY HOLD
,
zzzz=_? ??
STORMWATER PLAN REQ'D:n 1) IF YES, DATE APPROVED:
PROJECT DESCRIPTION: p :ez_ ?y ;"- ;??
?.
WATER QUALITY CERT. (401)
CERT. REQ'D: Y .
IF YES, TYPE :
SEWAGE DISPOSAL v
TYPE OF DISPOSAL PROPOSED: 1v
(EXISTING, PROPOSED, SEPTIC TANK ETC.)
TO BE PERMITTED BY:
(DEM, DHS, COUNTY)
IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE:
WATER/WETLAND FILL
AREA OF FILL: WATERS"-15-0 I
WETLAND : 7L 6D d PI)
IS FILL ELIMINATING A SIGNIFICANT USE?
DREDGING '_/ Z
AREA TO BE DREDGED: R000 IS DREDGING ACTIVITY EXPECT TO CAUSE A SIGNIFICANT LOSS OF
RESOURCE?
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED?
MARINA /97
ARE THE FOLLOWING ADEQUATELY ADDRESSED?
SEWAGE DISPOSAL: MARINA SERVICES:
OXYGEN IN BASIN: CLOSURE OF SHELLFISHING WATERS:
CC: ?"rCentral Files; DCM Field Offices; COE Washington Office
RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS:
v-?
4-4
D 1 C ?-CJ ?A1i1- cis /ILP?
.4 0
DIVISION 0
MEMORANDUM
MANAGEMENT
TO: Bill Moore, Environmental Engineer
Water Quality Section, WaRO
FROM: Deborah Sawyer, Environmental Technician
Water Quality Section, WaRO
SUBJECT: Dredge and Fill Reviews for Stormwater Review
/% A
Project: C 1 O I K n
Project No.:
Date Received:
.F'"nat Date Comment:
Description of Project:
Comments:
j? ? /1lv
V
MEMORANDUM
TO: Jim Mulligan
Deborah Sawyer
FROM: David Moye 7 rn
R7CEWM
GTQH (OFFICE.
•.l?i Ij135? t.! ..
SUBJ: Application for CAMA Major Permit and/or Dredge & Fill Permit
NC Dept. of Transportation
Hyde County
DATE: 19 March 1993
Attached is an application for a CAMA Major and a Dredge & Fill Permit which was
received by me on 16 March 1993. I am considering this application complete,
have acknowledged receipt, and have begun processing.
If you have any questions do not hesitate to contact me.
MEMORANDUM
n FLLU nul
TO: John Dorney
Planning Branch
YVEiLA+1DS GRDUP
SUBJECT: WETLAND STAFF REPORT AND RECOA?i -1'_1`+?iECT?G?!
***EACH ITEM MUST BE ANSWERED (N/A-NOT APPLICABLE)***
PERMIT _YR: 92 PERMIT _NO: 0000523 COUNT :
APPLICANT NAME: NC DOT - REPLACE BRIDGE 48 OVERJOY TER C
PROJECT TYPE: REPLACE BRIDGE P l _TYP
COE_it : - - DOT_#?
RCD_FROM_CDA: DOT E_-RM_CDA:
REG_OFFICE: WARD IV ND_S B_BAS
INITIALS:
Reviewer:
WQ Supv:
Date:
p
STREAM-CLASS: (,-
STR_INDEX_NO: D
WL_IMPACT?: YIN JL -L-TYPE:
WL_REQUESTED: WL_ACR_EST?: YIN
HYDRO_CNECT?: YIN WL_SCORE(U :
MITIGATION?: YIN ATION TYPE:/
MITIGATION-SIZE:
c
REt
COMMENTS:
6LeA -&, r0"
z3 92---`
-p LP,
.D? : Y/N
E ISSUE/COND DENY
cc: Regional Office
Central Files
°Wa
IA ?. S1Aft„
• Jy pIMM'Rf.? K"
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
September 10, 1992
Office of Coastal Management
Department of Environment, Health and
Natural Resources
P.O. Box 27687
Raleigh, North Carolina 27611
ATTENTION: John Parker
Dear Sir:
Z523
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation (NCDOT)
intends to replace the above-mentioned bridge in Hyde County.
This bridge must be replaced due to its deteriorated
condition. The bridge will be replaced on existing location,
and the road will be closed during construction for about one
month. No temporary detour structure will be necessary. The
replacement structure will consist of two 128" x 83"
corrugated steel pipe arches with headwalls. This will
require the placement of 360 cubic yards of fill below
ordinary high water. The total fill in wetlands will be less
than 0.01 acres, with 0.02 acres of fill in open water. Any
temporary impacts from erosion and sedimentation will be
minimized using NCDOT best management practices, which your
agency has reviewed.
NCDOT hereby applies for the CAMA Major Development
permit as required for this project. A copy of this
application is being provided to the U.S. Army Corps of
Engineers and the N.C. Division of Environmental Management
for their review. If you need any additional information,
please call Gordon Cashin at (919) 733-9770.
An Equal Opportunity/Affirmative Action Employer
Sincerely
B Quinn, PE
A to anch Manager
Planning and Environmental Branch
cc: District
Mr. John
Mr. A. L.
Mr. John
Mr. C. 0.
Mr. Jimm-
Engineer, USCOE
Dorney, DEM, DEHNR
Hankins, PE, Hydraulics
Smith, PE, Structure Design
White, PE, Division 1 Engineer
jr Lee, PE, Bridge Maintenance
BJO/gec
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
Both
c. Will the projcct be for community, private, or
a. Name NC Dept. of Transportation commercial use?
Attn: B.J. O'Quinn, Asst. Branc Mgr. Public Transportation
AddreSS_Pn Rnx Pion
City Raleigh Stat 1 NC
Zip 27611 Dayphone 9919-73373141
Landowner or X Authorized agent
d. Describe the planned use of the project.
Public Transportation
b. Project name (if any)
c. If the applicant is not the landowner, also give the
owner's name and address.
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
SR 1128
b. City, town, community, or landmark
Swan Quarter
c. County Hyde
d. Is proposed work within city limits or planning
jurisdiction? No
e. Name of body of water nearest project
Ovster Creek
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or icr. Replace existing bridge with 2
1 8") x
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract N/A
b. Size of individual lot(s) N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
Datum in plats are assumed elevations
Ground elevation approximately 1'
d. Soil type(s) and texture(s) of tract
Muck
c. Vegetation on tract Coastal vegetation
f. Man-made features now on tract Bridge
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
Developed Community
X Rural Other
h. How is the tract zoned by local govemmcnt?
N/A
i. How are adjacent waters classified?
-.Swan Quarter Bay : SA-ORW
J. Has a professional archaeological survey been
carried out for the tract? No If so, by whom?
3/91
, 5 UPLAND DEVELOPMENT
Complete this secdon if the project includes any land
development.
a. Type and number of buildings, facilities. or
structures proposed N/A
b. Number of lots or parcels N/A
c. Density (Give the numlFAvf residential units and the
units per acre.) //
d. Size of area t % Abe graded or disturbed
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials. such as marl, paver stone, asphalt,
or concrete, to l?ets/ed for paved surfaces.
in. Water supply source
N/A
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
N/A
o. If the project is on the oceanfront, what will be the
afion above sea level of the first habitable
cclev A
floor7 6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MI.W) or MWL)
Boat basin
Length Width Depth
h. If applicable, has a stormwater management plan Other (break-
been submitted to the Division of Environmental water, pier, Site
Management? N/A boat ramp, work
i. Describe proposed sewage disposal and/or waste rock jetty)
water treatment facilities. Fill placed in
wetland or below
MHW
j. Have these facilities received state or local approval? Upland fill
N/A areas
k. Describe existing treatment facilities.
N/A
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, indystrial/com
rci effluent, "wash
down"). Sur ace runo along roadway
re
60' 70' Aver g
4.1'
60' 70'
b. Amount of material to be excavated from below
water level in cubic yards 640 Cubic yards
c. Type of material muck
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
yes
e. High ground excavation, in cubic yards
290 cubic yards
T Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
N/A feet
;. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A
h. Do you claim title to the disposal area? N/A
If not, attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
maintenance? N/A
If so, where?
Does the disposal area include any marshland,
swamps, or water areas?
No
k. Will the fill material be placed below mean high
water? Yes
1. Amount of fill in cubic yards 360 cubic yards
m. Type of fill material sand gravel
n. Source of fill material local borrow site
o. Will fill material be placed on marsh or other
wetlands? Yes
p. Dimensions of the wetland to be filled
See plats
q
r.
S.
e. -Amount of fill, in cubic yards, to be placed below
mean high water ?/ A
f. Type of fill material
N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan vic,,v and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
How will excavated or fill material be kept on site please note that original drawings are preferred and
and erosion controlled?
By standard NCDOT erosion and only high quality copies will be accepted. Blue-line
sedimentation control methods prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
What type of construction equipment will be used use of larger drawings.) A site or location map is a part
dredg(fore)? example. Typical ne, backh roadway y coronstructhydraulic of plat requirements and it must be.sufficiently detailed
ion
equipment (Backhoe, dumptruck, drag line , etcto)guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
will wetlands be crossed in transporting equipment the like.
to project site? -ND- If yes, explain steps that will
be taken to lessen environmental impacts.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
b. Average distance waterward of mean high water or
normal water level . N/A
Name Walter J. Lupton
` Address Swan Quarter,
Name Jalain Sadler
Address P.O. Box 97
an emere, NU Z8b8/
Name J.A. Mason
Address Swan Quarter, NC
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
A check for $100 made payable to the Department of
Natural Resources and Community Development to
cover the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed -
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the
9??
6 -.
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
Office of Coastal Management
Department of Environment, Health and
Natural Resources
P.O. Box 27687
Raleigh, North Carolina 27611
ATTENTION: John Parker
Dear Sir:
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation (NCDOT)
submitted an application for this bridge replacement on
September 10, 1992. The site map and plan drawings were
inadvertantly left out of this earlier mailing. These sheets
are enclosed. I apologize for any inconvenience this may
have caused. If you need any additional information, please
call Gordon Cashin at (919) 733-9770.
Si cerel?r,
B. 'Quinn PE
Ass stant B nch Manager
Planning and Environmental Branch
cc: District
Mr. John
Mr. A. L.
Mr. John
Mr. C. 0.
Mr. Jimm?
d ,,. SfA7L n
/ ? J Z O
STATE OF NORTH CAROLINA i
DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 owlt September 16, 1992 DIVISION OF HIGHWAYS
Engineer, USCOE
Dorney, DEM, DEHNR
Hankins, PE, Hydraulics
Smith, PE, Structure Design
White, PE, Division 1 Engineer
jr Lee, PE, Bridge Maintenance
An Fnual nnnnrtunity/Affirmative Antinn Fmnlnver
: WEST
0 % .
%
%
? BA
_ %
' 0 E
rf;
%
% 1\
%
Gout.
"IN
SCALE CO.
1 D 1 ! ]
(7II3I3FLtt=_-'-r----?-r
=_? MA(S
G?. Y4S 111 S?"1:10
O J 1 MAt
SCALE FOR ENLARGEMENTS
,.,,P.. , I ..? \
45 NIJ
Pmetc- r'! A ,\ It I r ?OS`? \
\\ C(A RDA
.?? Ave Telf$ ?nlt10 . K_ H r
+C Ceu f p leechvdtr u'r„I 91 E? I, a"sh..f Waq
m 0 32 So K1 ???inlr Faurvl \7
Yea1es 99 9erhi ei / t (.aAr 'alri
/S Nallornwkrvl tlhpd `zyr Z
. ,i l a It e
91 10 1 V O
. 1 c ' H
( Undm 6 Gbb h
(. R I ` $cnn to
P . c.... 97 f? ddletown W
c,
^J P,,in P ,. Wm d
xt
Sladesalte Cr3 ebr sla `
Rans ew Holland
V - AaYrlew•.., I 11 r rL 45 H
1 ?• +
4Swon, uarter Gull J
IPw,,, Arnv (toy 1
co" I[var1ir.? ?_ r ?rA I,J
PO.nI t Pamhco Aesch Nn.r It,rv , t 0 j
PDnnalron .e.(>t?,/ ? ? ?? ? r\ gr1 O
SOU ?, ` \ • ? GP(Al I a)ull N. V. p t h
Edward I -,_ Creek o?la \ p
Arton%N N? _ N0b1. Hatterys y` loco!
J ? \\ Q' nr(rtar` ACAP(HAtrl
\ \ \
rl I J (lollrnllt 61et.r ?\? >1
IC rsh Co,nerl y ae n /' I Al + MAnnelpndt eCe \
Irmo aanhynrn .Aarboio ir?„?lFtxenc?e .? .. `. \ PII
\ ? C rr OC1PC
0 S 10 70 SCALE OF MILES ONE INCH EQUALS APrROi IS MILES
_ SCALE OF KILOMETERS ONE INCH EQUALS APPROA 71 KILOMETERS If
0 10 70 70 40 AK 1 MILT IS EQUAL TO 1601 KILOMETERS ?.
It _ r '? C^ ?_?\
rA? ':?.• 1)01 r'? i s!y 7 , ?,. 'e y
LVVVJ 0- 9-Y
43
Iru ? ,.. n,lt1
It G
a? re L, S.ad.R?-4. tile. •!, t ? j1 \
ti
? ? ti? 1_22 l a ? I l ll
' 6 r L.W.
l b I.a lW _ -
1'.. `? '! j S 1171 f.
'?llil rAS LFII? .
ti
? * Lit I.1 1 1( „ i
lie SP
- / /? r I AS
•
` a S.•I+d.R 'u EL1S QwrPrrr
l AELL ?1O llit. A .
ISLAfO Al • ( r ;-F r•,.:i
ll12 S
i 1
V 1 1 ill l? 1: :, .??.
y ..
CIYPA.t CiMi ,L?uRD. 'r'- -
L.,drq R(fL1Gl"-.
s/ ?e
J???+ rte,` QtAI.O
%
COVE `? AWRSPI rAAND
-- Y
-r
v
la
.c
..J
-= in
r n 1 . 11l
cam) /- __? n
n n u it
Ill
?- Ill
..i 'r Ill I L.
L -
I1. Q ll ti-
1
J
l `!
1 .,L
f.t'
fJ] 1
?_I
Y I 1-1
I I _I
n
I
a I ,
I I N
I
-c
:r
z
r
.?r
I • •L
• lal
S_
i I fJ,
" I
u I I I
rx I
I l" I
'.I I I
I I
I I
(? I I
•I I ' ul I
I• I I .r I
1,-
[l)
f?
l •-
C. 1E°TY 5F 7RANS,
DivisioN OF H7;: r:AYS
HYDE Co.
DR. ?48
?:Aic Ay SH,'r
:,..::ET ?LuF 3
IL
G f-
1? Ill
• Yt_ 1 Ll
IJ l 1 ?. _.
I_7
.1C L ,.]
fJ7 ??
LLl lf7
r
_J C7
lL Ul u-
® 1
fl7
Lll
1 Y/
-
Iv
\ o
f
1
?
ql.
?r
- iaa
I
T,
i
Il
U71
I ^
i V
l r 1
?-
..I
O
r ?11 n'
fry r:, {-_
li? 11.1 .r1 l,-
Y. .1_
I? Y
U.J
-rJ ?I ® ? Op O
1 u ...,
t u ?I o
^S. - _ V l
r.. r 1
tit;
Ix I I f PI
o I
1? ? I
11 ? .I I
? ?ro
? ?I I
? ,f I
I
' ~J
1 I JI
I I I::
I
it
'? O O
II ? ? p-
II
II O ?
II
1
rJ:
" Lu HYDE Cu.
• _ I;i J 5.3. tie ,'?r SR-I1 9
O O lid 'LI „?, '[! C 4S a`IU'd li
3 OF J
C
r ?.
i'
? OCT 2 3 I??2
El
® North Carolina Wildlife Resources Commission
512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391
Charles R. Fullwood, Executive Director
MEMORANDUM
TO: John Dorney Division of Environmental Management
?r'%??. r
FROM: ??Dennis Stewart, Manager
Habitat Conservation Program
Date: October 23, 1992
SUBJECT: N. C. Department of Transportation (NCDOT) request for
401 Water Quality Certification, replacement of Bridge
No. 48 over Oyster Creek on SR 1128, Hyde County, North
Carolina, DEM Project No. 92523.
The N. C. Wildlife Resources Commission (NCWRC) has reviewed
the subject application for 401 Water Quality Certification, and
our comments are provided in accordance with the Fish and
Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C.
661-667d).
The proposed project involves replacement at existing
location of an obsolete bridge, with no on-site detour and less
than 0.01 acres of total fill in wetlands. The project, as
modified according to our recommendations on the attending CAMA
Major Development permit, should not significantly impact water
quality in Oyster Creek. The NCWRC therefore offers no further
modifying comment on the 401 Water Quality Certification for this
bridge replacement.
Thank you for the opportunity to provide input to the permit
review process for this project. If we can further assist your
office, please call David Yow, Highway Project Coordinator, at
(919) 528-9887.
DLS/DLY
cc: David Rowe, District 1 Wildlife Biologist
Pete Kornegay, District 1 Fisheries Biologist
David Yow, Highway Project Coordinator
rT . a.
SEP 23 1992
ENV. MANAGEMENT
FAYMVILLE REG. OFFICE
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
September 10, 1992
Office of Coastal Management
Department of Environment, Health
Natural
P.O. Box 27687
Raleigh, North
Resources
Carolina 2761
ATTENTION: John Parker
Dear Sir:
SUBJECT: Hyde County, Replacement
Oyster Creek on SR 1128.
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
5
?? ? Igg
2
IYglER 0114UT y No. 48 over
The North Carolina Department of Transportation (NCDOT)
intends to replace the above-mentioned bridge in Hyde County.
This bridge must be replaced due to its deteriorated
condition. The bridge will be replaced on existing location,
and the road will be closed during construction for about one
month. No temporary detour structure will be necessary. The
replacement structure will consist of two 128" x 83"
corrugated steel pipe arches with headwalls. This will
require the placement of 360 cubic yards of fill below
ordinary high water. The total fill in wetlands will be less
than 0.01 acres, with 0.02'acres of fill in open water. Any
temporary impacts from erosion and sedimentation will be
minimized using NCDOT best management practices, which your
agency has reviewed.
NCDOT hereby applies for the CAMA Major Development
permit as required for this project. A copy of this
application is being provided to the U.S.'Army Corps of
Engineers and the N.C. Division of Environmental Management
for their review. If you need any additional information,
please call Gordon Cashin at (919) 733-9770.
and
An Equal Opportunity/Affirmative Action Employer
i
Z
_
o
z
N
Z
W Q
~
W J
J Q
N
0 Q
V r-
w
w
W
j
m uj
CL
7 a
n
Q U
ce 'c7
ho
fA
0 Z
O
w
_
w
o 0
W
W
Q
w D
O
w
w
to
O
O
w
w
N
O
Z
D
F-
LLJ
Q
o
o
O
a R
< Z
O
W
w
~ F-
0
Q
Lf)
Z
Q
m
^
v
I
C
L
m
N
2
E
0
c
W
Q
O
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
IN REPLY REFER TO September 23, 1992
Regulatory Branch
Action ID. 199203615
Mr. L. J. Ward, Manager
Planning and Environmental Branch
Division of Highways
North Carolina Department of Transportation
Post Office Box 25201
Raleigh, North Carolina 27611-5201
Dear Mr. Ward:
On February 11, 1991, we renewed general permit No. CESAW-CO80-N-000-0291
(copy enclosed), which provides Federal authorization for construction
activities that receive authorization from the State of North Carolina.
A review of your application received September 17, 1992, for Department
of the Army authorization to place fill material in the waters/wetlands of
Oyster Creek associated with replacement of Bridge No. 48 on S.R. 1128, near
Swan Quarter, Hyde County, North Carolina, indicates it to be a candidate for
Federal authorization under this general permit. Accordingly, the
administrative processing of your application will be accomplished by the
North Carolina Division of Coastal Management. Comments from Federal review
agencies will be furnished to the State.
If your application must be withdrawn from this general permit process for
any reason, you will be informed regarding its further management. If there
are no unresolved differences in State-Federal positions or policies, the
final action taken on your application by the State will result in your
receiving written notice from us that your application is consistent with the
general permit and you may commence your activity. only after receiving such
confirmation should you begin work.
Your application, pursuant to Section 10 of the River and Harbor Act and
Section 404 of the Clean Water Act, has been assigned Action ID No. 199203615
and will be coordinated by Mr. Gary Mitchell in our Washington Field Office.
He is available at telephone (919) 975-5811.
Sincerely,
G. Wayne Wright
Chief, Regulatory Branch
Enclosure
-2-
Copies Furnished (without enclosure.):
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Environment, Health and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. John Dorney
Water Quality Section
ivision of Environmental
Management
North Carolina Department of
Environment, Health and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Ms. L. K. (Mike) Gantt
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mr. Larry Hardy
National Marine Fisheries Service
Habitat Conservation Division
Pivers Island
Beaufort, North Carolina 28516
Mr. Thomas Welborn, Chief
U.S. Environmental Protection
Agency - Region IV
Wetlands Regulatory Unit
345 Courtland Street, NE.
Atlanta, Georgia 30365
Mr. Terry Moore
Washington Regional office
North Carolina Division of
Coastal Management
Post Office Box 1507
Washington, North Carolina 27889
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
IN REPLY REFER TO September 23, 1992
Regulatory Branch
Action ID. 199203615
Mr. L. J. Ward, Manager
Planning and Environmental Branch
Division of Highways
North Carolina Department of Transportation
Post Office Box 25201
Raleigh, North Carolina 27611-5201
Dear Mr. Ward:
Reference your application for Department of the Army (DA) authorization
to place fill material in the waters/wetlands of Oyster Creek associated with
replacement of Bridge No. 48 on S.R. 1128, near Swan Quarter, Hyde County,
North Carolina.
On February 6, 1990, the DA and the U.S. Environmental Protection Agency
(EPA) signed a memorandum of agreement (MOA) establishing procedures to
determine the type and level of mitigation necessary to comply with the Clean
Water Act Section 404(b)(1) Guidelines. This MOA provides for first, avoiding
impacts to waters and wetlands through the selection of the least damaging,
practical alternative; second, taking appropriate and practical steps to
minimize impacts on waters and wetlands; and finally, compensating for any
remaining unavoidable impacts to the extent appropriate and practical. To
enable us to process your application in full compliance with this MOA, we
request that you provide the following additional information:
a. Permits for work within wetlands or other special aquatic sites are
available only if the proposed work is the least environmentally damaging,
practicable alternative. Please furnish information regarding any other
alternatives, including upland alternatives, to the work for which you have
applied and provide justification that your selected plan is the least
damaging to water or wetland areas.
b. It is necessary for you to have taken all appropriate and practical
steps to minimize wetland losses. Please indicate all that you have done,
especially regarding development and modification of plans and proposed
construction techniques, to minimize adverse impacts.
C. The MOA requires that appropriate and practical mitigation will be
required for all unavoidable adverse impacts remaining after all appropriate
and practical minimization has been employed. Please indicate your plan to
mitigate for the projected, unavoidable loss of waters or wetlands or provide
information as to the absence of any such appropriate and practical measures.
-2-
This information is essential to our expeditious processing of your
application and it should be forwarded to us by October 19, 1992. Also, a
copy of this information must be sent to the North Carolina Division of
Environmental Management to enable them to adequately evaluate your
application for a Water Quality Certification pursuant to Section 401 of the
Clean Water Act.
If you have questions, please do not hesitate to contact Mr. Gary
Mitchell, Washington Field Office, Regulatory Branch, telephone (919)
975-5811.
Sincerely,
G. Wayne Wright
Chief, Regulatory Branch
Copies Furnished:
Mr. Thomas Welborn, Chief
U.S. Environmental Protection
Agency - Region IV
Wetlands Regulatory Unit
345 Courtland Street, NE.
Atlanta, Georgia 30365
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Environment, Health and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. John Dorney
Division of Environmental Management
North Carolina Department of
Environment, Health and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. Terry Moore
Washington Regional Office
North Carolina Division of
Coastal Management
Post Office Box 1507
Washington, North Carolina 27889
N. C. DEPARTMENT OF TRANSPORTATION
I
TRANSMITTAL SLIP DATE
TO: o.? ... .._ ___._
Mr. John Dorney
Water Quality Planning
DEM, DEHNR
Room 625-D
Archdale Building
? PLEASE ANSWER ? FOR YOUR COMMENTS
? PREPARE REPLY FOR MY SIGNATURE ? SIGNATURE
? TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT
COMMENTS:
1
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
September 10, 1992
Office of Coastal Management
Department of Environment, Health and
Natural Resources
P.O. Box 27687
Raleigh, North Carolina 27611
ATTENTION: John Parker
Dear Sir:
q2_Sz-3
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation (NCDOT)
intends to replace the above-mentioned bridge in Hyde County.
This bridge must be replaced due to its deteriorated
condition. The bridge will be replaced on existing location,
and the road will be closed during construction for about one
month. No temporary detour structure will be necessary. The
replacement structure will consist of two 128" x 83"
corrugated steel pipe arches with headwalls. This will
require the placement of 360 cubic yards of fill below
ordinary high water. The total fill in wetlands will be less
than 0.01 acres, with 0.02 acres of fill in open water. Any
temporary impacts from erosion and sedimentation will be
minimized using NCDOT best management practices, which your
agency has reviewed.
NCDOT hereby applies for the CAMA Major Development
permit as required for this project. A copy of this
application is being provided to the U.S. Army Corps of
Engineers and the N.C. Division of Environmental Management
for their review. If you need any additional information,
please call Gordon Cashin at (919) 733-9770.
An Equal Opportunity/Affirmative Action Employer
Sincerely,
B Quinn, PE
A tant_-& anch Manager
Planning and Environmental Branch
cc: District
,Z4-r. John
Mr. A. L.
Mr. John
Mr. C. 0.
Mr. Jimm-
Engineer, USCOE
Dorney, DEM, DEHNR
Hankins, PE, Hydraulics
Smith, PE, Structure Design
White, PE, Division 1 Engineer
y Lee, PE, Bridge Maintenance
BJO/gec
V
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
I APPLICANT -
C. Will the project be for community, private, or
a. Name NC Dept. of Transportation commercial use?
Attn: B.J. O'Quinn, Asst. Branch Mgr. Public Transportation
Address_pn Rnx g52nl
City Raleigh Stat
NC
9 d. Describe the planned use of the project.
19-733-9
27611 y p
p Da hone 919-73373141 Public Transportation
Landowner or X Authorized agent
b. Project name (if any)
4 LAND AND WATER
c. If the applicant is not the landowner, also give tltc
' CHARACTERISTICS
owner
s name and address.
a. Size of entire tract_ N/A
b. Size of individual lot(s) N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
2 LOCATION OF PROPOSED Datum in plats are assumed elevations
PROJECT Ground elevation approximately 1'
d. Soil type(s) and texture(s) of tract
Muck
a. Street address or secondary road number
SR 1128 c. Vegetation on tract _ Coastal vegetation
b. City, town, community, or landmark
Swan Quarter f. Man-made features now on tract Bridge
c. County Hyde
d.. Is proposed work within city limits or planning
jurisdiction? No
e. Name of body of water nearest project
Oyster Creek
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or icr. Replace existing bridge with 2
1?8") x
g. What is the LAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
Developed Community
X Rural Other
h. How is the tract zoned by local government?
N/A
i. How are adjacent waters classified?
Swan Quarter Bay : SA-ORW
j. Has a professional archaeological survey been
carried out for the tract? No If so, by whom?
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
Both
3/91
, 5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structures proposed N/A
b. Number of lots or parcels N/A
c. Density (Give the numtrAof residential units and the
units per acre.) //
d. Size of area i % Abe graded or disturbed
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials, such as mart, paver stone, asphalt,
or concrete, to /Ted for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
N/A
j. Have these facilities received state or local approval?
N/A
k. Describe existing treatment facilities.
N/A
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, ind strial/com rci effluent, "wash
down"). Surface runo along roadway
m. Water supply source N/A
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach aceessways or provide new access.
N/A
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? N/A
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MI-W) or (NWL)
Boat basin
Length Width Depth
e
60' 70' Aver g
4.1'
60' 70'
Other (break-
water, pier, Site pr
boat ramp, work
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
b. Amount of material to be excavated from below
water level in cubic yards 640 Cubic yards
c. Type of material
muck
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
yes
e. High ground excavation, in cubic yards
290 cubic yards
t Dimensions A of spoil disposal area c. Shoreline erosion during preceding 12 months, in
feet N/A
;. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A
t Do you claim title to the disposal area? N/A
If not. attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
maintenance? N/A
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
No
k. Will the fill material be placed below mean high
water? Yes
1. Amount of fill in cubic yards 360 cubic yards
m. Type of fill material sand, gravel
n. Source of fillmaterial local borrow site
o. Will fill material be placed on marsh or other
wetlands? Yes
p. Dimensions of the wetland to be filled
See plats
q•
r.
S.
e. -Amount of fill, in cubic yards, to be placed below
mean high water N/ A
f. Type of fill material
N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
How will excavated or fill material be kept on site
and erosion controlled? Please note that original drawings are preferred and
By standard NCDOT erosion and only high quality copies will be accepted. Blue-line
sedimentation control methods prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers rcgactiiing that agency's
What type of construction equipment will be used use of larger drawings.) A site or location map is apart
dredg(fore)? example, Typical e, back roadway y or construhydraulicction of plat rrquircments and it must be.suffrciently detailed
equipment (Backhoe, dumptruck, dragline, etct?!?)gurde agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
Will wetlands be crossed in transporting equipment the like.
to project site? .RQ__ If yes, explain steps that will
be taken to lessen environmental impacts.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
b. Average distance watcrward of mean high water or
normal water level ' N/A
Name Walter J. Lupton
Address Swan Quarter, NC
Name Jalain Sadler
Address P.O. Box 97
an emere, NU 28b8/
Name J.A. Mason
Address Swan Quarter, NC
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
A check for $100 made payable to the Department of
Natural Resources and Community Development to
cover the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 11 3A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed -
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the 0 day of Q 9f,
or,Vjthoriz¢d agent
I - r
STATE
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
September 16, 1992
Office of Coastal Management
Department of Environment, Health and
Natural Resources
P.O. Box 27687
Raleigh, North Carolina 27611
ATTENTION: John Parker
Dear Sir:
StP 1992
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation (NCDOT)
submitted an application for this bridge replacement on
September 10, 1992. The site map and plan drawings were
inadvertantly left out of this earlier mailing. These sheets
are enclosed. I apologize for any inconvenience this may
have caused. If you need any additional information, please
call Gordon Cashin at (919) 733-9770.
Si cerely,
B. 'Quinn PE
Assistant B nch Manager
Planning and Environmental Branch
cc: District
VMr. John
Mr. A. L.
Mr. John
Mr. C. 0.
Mr. Jimm-
Engineer, USCOE
Dorney, DEM, DEHNR
Hankins, PE, Hydraulics
Smith, PE, Structure Design
White, PE, Division 1 Engineer
jr Lee, PE, Bridge Maintenance
An Fnual nnnnrfunifv/Affirmation Anfinn Gmnlnvor
r Kilkenny o1) r( 5-404 ?
Pmelown (?! 99 1 ?o n ( d+ °t``` Rot
f and e H if.3 y ,
A'c Acre Terra I Le
chwlle? E t` War.
c I a i.
Innn..a` EAUhrI t IaysAan
)A a J CJI I t 4 0
'airy
Yea lesrdl t?8llh? fd
a r?/51 !•UAv s\z
qq/'?? (''?-'??/?I (?` N„no.n u.A,•vr Late p elhvd` ?zr} I
91??IO R \ 1 \ Sa,nfon \ ^ 1 L,ndm abe. n s ?oy N
G••• \1, 1` A V/_\ ddle town
' ( alh a Wins !ad ip!\J .? 6
V
y t' Sl,desvOle 261 rbr sks 1
/S I New Holland
nl( t '``,Swan pwrter
Coorr 11.111 Ji „ ?' ?1t _ 1 + Gull Rock ttb..n bnu Itav t
?- I n Pamlico BeicIt pn.rr/luv ?,_{? j
1Onn On ?? ? .'-s IN,,`il Ar.(1?" \\ O • t Z'
1 R 1
1 5-
??`('_ 4 I\ ,? N A r I it Dl r!(ar(, f.
r ` O 1 O I
EEdw,rd I_s. Creek -, ollaq ? \?J Gtu;I: alllrJJlVrr h. ?. ?D E too n l
v lt!!" Qv ` *Bur
Auror a
?? Royal TJ \•"C' T1 S,t O,+: Ir a•
T ` \ b Hatless Ieco!
ayton%N YO _ r Hob l' J \\ ?a ? rr((nrrr /? / AUrf NAr0
i ?II Hollyrdle
(Cashtornerl• sVander4,ere a°r^ ?' ?°ry yes u' a Hurn.n. /n I" r
+ Manbel o? Aoy ?. (?Aro?h r \\ rt Nutt kd?N
ymwa irsborn :Ra cdrnn"o ire . a\/ i t
C !
0 5 10 20 3 $LAl[ Or MACS ONE INCH EQUALS APPROa LJ MILES
? - SCALE OF KILOMETERS ONE INCH EQUALS APPROI 21 KILOMETERS IF
0 10 in JO n 40 49 1 MIIC IS EQUAL TO 1601 KILOMETERS /?.
.a l J Row ta'e L74i ;'.,,\_
3
CL t1s) ;1714
'' i r e L
,r? , i Swlndd f°.A 1114, •i: ` r 1
? 1? •a _ laki'Cawk,A
\ tLu
11 tl(} ,,, to ELu
V 1.a
if IJ.Y F " d°lowill
lit '• ( 3 v} / LILL FAA
ll1
Y ,a u14
LI. 1 » 111'
rq • r'
• ,? ? S?•i.d.t rU Ilii fArartae
gru
ISLAM Af • l t .. r :? ;
r llH S
O 4 tlRf)
13
VrM {
Alt"
WAND
COVE MARSH ISLAND
04 00"
1? •F N ;
p ?w
S WEST
% BA
%
%
CANAT.
?l 'L s3ArO •?? e?
?? D V ;' Jr NI:HuAYS
SCALE -
1 d
pp o.i I MAI SCA E tis SCALE FOR ENLARCEMENiS j' - :HCC? llh 3
I
?S
S'
U
l7 "J_
:-C
Z [n ?
G7 rJ) r1
rp • • IL
Y.7 1- _J rl
11 11 11 rT.
IlJ
'G r7 ?
2' rJ
.J ?
h- dal
c=? _yi _z r_l
L
Il. Q LL• IL
- I_
(.
J
h J
4
r<-
f :* T
I ??
I I '
? I :'i I n
r. I I
•
'r ? i._I • I I i i
_ I _
• I I. J
r I I
- r_
I:r
L
I -L
-7=
I
I I ( I` 4?,,Jv
T I "' INIJ
? I.
a: I I
I ? I
?I I ? I
I I
( ?I i I I
F. ? I 'w I
I I I ,^• I
I r,) I
I ? I ? I
Ir
ff)
._7
1--
I' 1
Ir
<L
1 1?i
?l
I. Ill
- lL
T r)
aT)
r-,3 a_) f -.
7 c_)
7I z ._)
l)
LLI Lo
In
T •
F-
l !J' n_
x ar._
IL uJ u_
fn
I.-
t1l
rJ
?l
?T
? y
Irk 1i '
•71
-
?
Il'7
I .7 Ill
j
! -
'1J
L-J
..I
. .• I
'?.C. DEPT. OF 7RANS.
DIViS:ON OF F':cH'nAYs
HYDE CO.
HR•?48 5
:CALZ A5 5HC'?!i
;;SEE 9_uF 3 1
0
O
I <.
1 r.
I 1l- IJJ (i_
_J I o p
_J I ® 1 I ,
"l I 1 O
.i ?) 1 O
1 U (T?
1-- I f- 1_.. Qr
' z
1? I
r ? I
?` o I
I
/1 ? O I
11 ? I I
I ?
r.. `0
I
I ~J
I I .
1 i (Y:
I J
11 ? p
II ? ? Q
II
II ? ?
II
II
Cat !
?.
Nisi wm
ll? H.y['t ru,
,.i.",d O'N' 53-11:3
'! :?L? 1 ?t 3
. q ,
N. C. DEPARTUEN'C OF TRANSPORTATION
TRANSMITTAL SLIP DATE
q-
TO: REF. NO. OR ROOM, BLDG.
Mr John Dorney
Water Quality Planning
? PREPARE REPLY FOR MY SIGNATURE I_j -nn,....-
? TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT
COMMENTS:
.
`^p''? SiAITWWA?
JAMES G. MARTIN
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
September 10, 1992
DIVISION OF HIGHWAYS
THOMAS J. HARRELSON
SECRETARY
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
Office of Coastal Management
Department of Environment, Health and
Natural Resources p
P.O. Box 27687 I?
Raleigh, North Carolina 27611
_ 1992
ATTENTION: John Parker
(I T
Dear Sir:
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation (NCDOT)
intends to replace the above-mentioned bridge in Hyde County.
This bridge must be replaced due to its deteriorated
condition. The bridge will be replaced on existing location,
and the road will be closed during construction for about one
month. No temporary detour structure will be necessary. The
replacement structure will consist of two 128" x 83"
corrugated steel pipe arches with headwalls. This will
require the placement of 360 cubic yards of fill below
ordinary high water. The total fill in wetlands will be less
than 0.01 acres, with 0.02 acres of fill in open water. Any
temporary impacts from erosion and sedimentation will be
minimized using NCDOT best management practices, which your
agency has reviewed.
NCDOT hereby applies for the CAMA Major Development
permit as required for this project. A copy of this
application is being provided to the U.S. Army Corps of
Engineers and the N.C. Division of Environmental Management
for their review. If you need any additional information,
please call Gordon Cashin at (919) 733-9770.
Sincerely,
B Quinn, PE
A, t anch Manager
Planning and Environmental Branch
cc: District
r . John
Mr. A. L.
Mr. John
Mr. C. 0.
Mr. Jimm,
Engineer, USCOE
Dorney, DEM, DEHNR
Hankins, PE, Hydraulics
Smith, PE, Structure Design
White, PE, Division 1 Engineer
y Lee, PE, Bridge Maintenance
BJO/gec
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1.4 and 8-9
must be completed for all projects.
1 APPLICANT
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
Both
c. Will the project be for community, private, or
a. Name NC Dept. of Transportation commercial use?
Attn: B.J. O'Quinn, Asst. Branch Mgr. Public Transportation
Address_pn Rnx 2.,mi
City Raleigh Stalel NC d. Describe the planned use of the project.
p 27611 yp 9 - __ Public Transportation
Zi Da hone 919-73373141
Landowner or X_ Authorized agent
b. Project name (if any)
c. If the applicant is not the landowner, also give the
owner's name and address.
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
SR 1128
b. City, town, community, or landmark
Swan Quarter
c. County Hyde
d.. Is proposed work within city limits or planning
jurisdiction? No
e. Name of body of water nearest project
Oyster Creek
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or pier. Replace existing bridge with 2
1p811 x
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract N/A
b. Size of individual lot(s) _ N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
Datum in plats are assumed elevations.
Ground elevation approximately 1'
d. Soil type(s) and texture(s) of tract
Muck
c. Vegetation on tract Coastal vegetation
f. Man-made features now on tract Bridge
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
_ Conservation Transitional
Developed Community
X Rural Other
h. How is the tract zoned by local government?
N/A
i. How are adjacent waters classified?
Swan Quarter Bay : SA-ORW
j. Has a professional archaeological survey been
carried out for the tract? No If so, by whom?
3/91
,5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structures proposed N/A
b. Numbcr of lots or parcels N/A
c. Density (Give the numwfRf residential units and the
units per acre.)
d. Size of area to Abe graded or disturbed
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to l?/ised for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
N/A
j. Have these facilities received state or local approval?
N/A
m. Water supply source
N/A
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
N/A
o. If the project is on the oceanfront, what will be the
ccleva7 tion above can sea level of the first habitable
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MLW) or (NWL)
Boat basin
Length Width Depth
60' 70' Aver
4.1'
60' 70'
Other (break-
water, pier, Site pre
boat ramp, work
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
3e
b. Amount of material to be excavated from below
water level in cubic yards 640 Cubic yards
c. Typeofmaterial muck
d. Does the area to be excavated include marshland,
swamps, or other wetlands7
yes
e. High ground excavation, in cubic yards
290 cubic yards
k. Describe existing treatment facilities.
N/A
1. Describe location and type of discharges to waters of
the state (for example, surface runoff. sanitary
wastewater, dt1strial/com rci effluent, "wash
down"). bur ace runo? a ong roadway
11 A 'o^
Dimensions of spoil disposal area
N/A
c. Shoreline erosion during preceding 12 months, in
feet N/A
;. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A
-L Do you claim title to the disposal area? N/A
If not, attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
maintenance? N/A
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
No
k. Will the fill material be placed below mean high
water? Yes
1. Amount of fill in cubic yards 360 cubic yards
m. Type of fill material sand gravel
n. Source of full material local borrow site
o. Will fill material be placed on marsh or other
wetlands? Yes
p. Dimensions of the wetland to be filled
See plats
q. How will excavated or fill material be kept on site
and erosion controlled?
By standard NCDOT erosion and
sedimentation control methods
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Typical roadway construction
equipment (Backhoe, dumptruck, dragline,
s. Will wetlands be crossed in transporting equipment
to project site? No If yes, explain steps that will
be taken to lessen environmental impacts.
e. -Amount of fill, in cubic yards, to be placed below
mean high water N% A
f. Type of fill material
N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
_ only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
_ quality copies arse provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be.suffrciently detailed
etLl.guide agency personnel unfamiliar with the area to the
o
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
b. Average distance waterward of mean high water or
normal waterlevel . N/A
Name Walter J. Lupton
Address Swan Quarter, NC
Name Jalain Sadler
Address P.O. Box 97
an emere, NU 28b8/
Name J.A.' Mason
Address Swan Quarter, NC
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
A check for $100 made payable to the Department of
Natural Resources and Community Development to
cover the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed -
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the
9-V.
. . ,
??. S1ATC ?jo
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
September 10, 1992
Jalain Sadler
P.O. Box 97
Vandemere, N.C. 28567
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
Dear Madam or Sir:
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation proposes
to replace the bridge over Oyster Creek on SR 1128 adjacent
to your property. This replacement will occur on the same
location as the existing bridge. The road at this location
will be closed for a period of about one month during
construction.
Permits from the Department of the Army Corps of
Engineers and the NC Division of Coastal Management (LAMA)
are required for this work; these are being obtained by the
NC Department of Transportation. In that your property is
adjacent to the site where this permit is required, a copy of
the permit application is being provided for your review;
however, no action is required on your part.
If you have any questions, please contact your
appropriate CAMA or Corps of Engineers representative, or
call Mr. Dennis Pipkin, NCDOT at 919-733-9770.
Sincerel
y
B.'7 O Qu' nn, PE
Assistan n Manager
Planning and Environmental Branch
STni[ T
-N r•
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
JAMES G. MARTIN September 10, 1992
DIVISION OF HIGHWAYS
GOVERNOR
THOMAS J. HARRELSON WILLIAM G. MARLEY. JR., P.E.
SECRETARY STATE HIGHWAY ADMINISTRATOR
Walter J. Lupton
P.O. Box 87
Swan Quarter, NC 27885
Dear Sir:
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation proposes
to replace the bridge over Oyster Creek on SR 1128 adjacent
to your property. This replacement will occur on the same
location as the existing bridge. The road at this location
will be closed for a period of about one month during
construction.
Permits from the Department of the Army Corps of
Engineers and the NC Division of Coastal Management (CAMA)
are required for this work; these are being obtained by the
NC Department of Transportation. In that your property is
adjacent to the site where this permit is required, a copy of
the permit application is being provided for your review;
however, no action is required on your part.
If you have any questions, please contact your
appropriate CAMA or Corps of Engineers representative, or
call Mr. Dennis Pipkin, NCDOT at 919-733-9770.
Sincerely,
B• O'Q inn, PE
Assistant Manager
Planning and Environmental Branch
,,. ?• sin"rI
M.„
•?? tr,nw N,~?
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
J.A. Mason
P.O. Box 85
Swan Quarter,
Dear Sir:
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
September 10, 1992
NC 27885
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation proposes
to replace the bridge over Oyster Creek on SR 1128 adjacent
to your property. This replacement will occur on the same
location as the existing bridge. The road at this location
will be closed for a period of about one month during
construction.
Permits from the Department of the Army Corps of
Engineers and the NC Division of Coastal Management (CAMA)
are required for this work; these are being obtained by the
NC Department of Transportation. In that your property is
adjacent to the site where this permit is required, a copy of
the permit application is being provided for your review;
however, no action is required on your part.
If you have any questions, please contact your
appropriate CAMA or Corps of Engineers representative, or
call Mr. Dennis Pipkin, NCDOT at 919-733-9770.
SincerelyYLanager
B. . 0 QPE
Assistan Planning and Environmental Branch
BJO/gec
I \ l r JJJ tl-\ Soh°? t\_= ;
Pmelown c-=• 99 a5 II \ r r Js: (I C Rov
.A ` anlr20 H
ifa \w<
+IAcre Cert E rletchvdle? I,,I 94 ^ E ?• Wav.
k0 a 11 iE.7 I ? fC{tnrrJ?trJ` ian lrrl \ ; `? tay Srwr n. 'alri
Yeates"ll 5
r? ??• BlflterkeT---'. I ; f.uAv v\?
r 911??,Q In A5 /ona.nurA,wLake EdeelMrd
t c N
l1 ` ll R r landrnGLw h,
^\ c\•w? Scranton
o... 92 \ ` 1 6 ddletown
s, rr Oalh wens eaer II i. I .
A J? J \
••0 ?,.;""'? 5 sudes"lle i61 1? ebr s1a r I
payriew._ t RansMryHl v vc s Hew Holland
45 + /)N 1- 9 n \ ,t
ntt ?'„ ` t _ r r ,Swan Ouarler Gulf RockC s
/lCo r? rtrrr \ 1 N'v..n bnu NJv
/ Pony I Paml¢o Otich R-e ', , f I j \
• 0`nnnrton
r NAr1 WIIDIIII A t 13
g
Edwnd I GeeY r ?'?ta `\• _ GRIA a rrn ?: SrCe E ?.?
u rat,<en ??? ` Buxtonr
` N Ur Orl ROral I, 13 rl\• \ \ ?'i ??L l J, 4 :E•
Acton P? J Hoty{rcAe \ \ 1 Hatteras y' locos
_ - J?? \\ ?a rrr[ rrrtr'/ ?/? A CAPE NArn
Holfyvdlt Mrat ij?` `> \ \\? r
(Cash Comers 1 a.r A Is tfulh+dt Miff
1/andt !rt ,\ 51tr NO
+ MAnbrl / \ Nrs EsSU
pp \ rvt o?
Irmp as IlJborn Rar \. ,c.. 17 otaKE
ON( INCH EQUALS APPROX 13 MILES
0 5 10 10 SCAM SCALE Of Or KILOMILESM[TIR$
_ ONE INCH EQUALS APPROX 71 KILOMETERS tt
C3 10 IO IO ad AR 1 MIL[ IS IOIIAL TO I An KILOMETERS
a- 1"t
Ilu ? 19
4P46 r• S.•a.d.t Fo.A )ilk i;r J s 1 10
?y w t? a _ le11 CewdoA a.ru \
ALL11 1 a ?; tJ 11
,..., b r.a ILti i
• • LLX P r ti d'.
I V f - ,
13
G
ru
! 7r A r... .h lift 1.1, fl n f
J
111
I s.
r,' • { M - IN
e,• ` Sr 6116.4 t.Aa I ILS C)t _IW
ALti 0) Lilt'
ISLAM is • r _ I
J .. lliL S
4 I j:
C y lnnd•gyiltlvGE; - , I ,•
/3 r
B,4 p k,
CINM . ? t 1 4 `.
ISLAND
COVE MARSH ISLAM
? t
r? Q
O ??
SvrNt vt M. ? Y
0,.
`
N ?
1
F
?
v WE
s i
"? h
V'e>n.r v
A t ?
S
' C f?
''
t
%
9 ?ttts
t
v
-
r? t:a.tt.
MAUD
r .
1' .15H A Y S
SCALE "lI` CO.
tcl?rtr rro ____ 1 L s r .Lts ? a v 5?-114 9
q? 0,5
1 rAAt
SCALE FOR ENLARGEMENTS
.ACC L? 3
ryl
-r_
[J
Icy
•L' '2 .
S
-z cn ?
r.] IJ1 '-
r tl w
1:7 1- .J 11
11 11 11 IT
I11
1-
C
J r{;
1-• 1 L 1
1:?' .11 _2 1'_l
?Il Q' z r
L _ -
1 _Jl Jl
,J
_ 't1
'.1
1
??? r 1 2 'Il
? ? lL
T- IL ]C ti r:'1
t fJ) 1-•
Jam.. ?._ ? !- LLl lA
l Ta
I-1 -1 Vy rf_
? 1 ' I 1 ?r ? '?_ _J r::l
X rY
I" uj 0-
I.J I [ C
1 I 1 I G'
-? J I Iv ?. C__1
;- \ 1 rf I ' ?'!' JI m
I
/ I I m
T `
f` .
w I .?
n=
1- UJ I 1 ( ??
I I r i i _rl i.'Z'11
1J I
rte. C?
r,
.[n
JEST. OF '?Ah,l
F DIVISION OF Hi ,i'wAYS
HYDE CO.
EP.k48 0!i Sr-I128
;;-Z;; a_uF 3
0
a
0
0
_,: IlI
(Jj nc :.1' JL;'1 f
'
YI
11 H ?,_
fY-
I I l• I.IJ [i_
_I II ® 1 ? • Q?
.t; I i 0
- C'
1
l l ?1 •. fir. r D I
1_ til
C • •
n ul
-r n-1 ,?'I w
f J , .el i., i •
t \7V `? I I
I
I v'
1 ., I 1
I ?ro
I 1'
I 1 ft'
I J
II ? o
'1 l l
h
II o°
I?
f ._. C' .- i. uF i3ANS
OF HIL,?iWAYS
Hy['F CU.
-3.=4? ON 51'11.7
.n
1
WARRANTNO. 368134 0643
Ir loo, UL tincC 1 HL- I UHN I U
OLPARIMGNT OF TRANSPORTATION DATE
CONTROLLER'S OFFICE 3601 34 09-1 4-92
CODE INVOICE
NUMBER
DATE PURCHASE
ORDER
AMOUNT
DISCOUNT
NET AMOUNT
NUMBER
F i
,
; 250,00
,
,
TOTAL 250 ; 00
REMARKS:
MAJOR CAMA PERMIT
HYDE COUNTY (5.0851)
?° ° "°•,,?VU°O' UCIHVr1 nCrUtir- UCh'UAIIINU
66-1059
STATE OF NORTH CAROLINA 531
DEPARTMENT OF TRANSPORTATION
RALEIGH, NORTH CAROLINA Warrant NO. 368134
PAY TO MO. DAY YR. AMOUNT
THE ORDER OF:
N.C. ENVIRONMENT, HEALTH AND 9 14,2 $ ******250:00
NATURAL RESOURCES
DIVISION 0F* COASTAL MANAGEMENT
P0 BOX 27687
RALEIGH, NC. 27611-7687 PRESENT TO: STATE TREASURER
PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM
11,36813411' 1:0 5 3 1 10 590: s"100011-Go 111¦
.1
'r
1
DEPARTMENT OF THE ARMY
;??.. WILMINGTON DISTRICT, CORPS OF ENGINEERS
? i P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
IN REPLY REFER TO
September 23, 1992
S: November 23, 1992
Regulatory Branch
Action ID. 199203615
,' ?%U L5
Mr. John Dorney
Water Quality Section
Division of Environmental Management r?T
North Carolina Department of Environment, - ?f5g2 I
Health and Natural Resources
Post Office Box 27687
GAZER'UAurv SECTIOIJ I
Raleigh, North Carolina 27611-7687
Dear Mr. Dorney:
Enclosed is the application of the North Carolina Department of
Transportation, Division of Highways, for Department of the Army authorization
and a State Water Quality Certification to place fill material in the
waters/wetlands of Oyster Creek associated with replacement of Bridge No. 48
on S.R. 1128, near Swan Quarter, Hyde County, North Carolina. Your receipt of
this letter verifies your acceptance of a valid request for certification in
accordance with Section 325.2(b)(ii) of our administrative regulations.
We are considering authorizing the proposed activity pursuant to Section
404 of the Clean Water Act, and we have determined that a water quality
certification is required under the provisions of Section 401 of the same law.
A Department of the Army permit will not be granted until the certification
has been obtained or waived.
In accordance with our administrative regulations, 60 days after receipt
of a request for certification is a reasonable time for State action.
Therefore, if you have not acted on the request by November 23, 1992, the
District Engineer will deem that waiver has occurred.
Questions or comments may be addressed to Mr. Gary Mitchell, Washington
Field Office, Regulatory Branch, telephone (919) 975-5811.
Sincerely,
G. en (e-Wri rt
Chief, Regulatory Branch
Enclosure
.i.,
-2-
Copies Furnished (without enclosure):
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Environment, Health and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. Terry Moore
Washington Regional Office
North Carolina Division of
Coastal Management
Post Office Box 1507
Washington, North Carolina 27889
STArr
,lob
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
JAMES G. MARTIN
GOVERNOR
September 10, 1992
THOMAS J. HARRELSON
SECRETARY
Office of Coastal Management
Department of Environment, Health and
Natural Resources
P.O. Box 27687
Raleigh, North Carolina 27611
ATTENTION: John Parker
Dear Sir:
R5'G0VED
. St? 171992
tt5olow gRANCA
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
SUBJECT: Hyde County, Replacement of Bridge No. 48 over
Oyster Creek on SR 1128.
The North Carolina Department of Transportation (NCDOT)
intends to replace the above-mentioned bridge in Hyde County.
This bridge must be replaced due to its deteriorated
condition. The bridge will be replaced on existing location,
and the road will be closed during construction for about one
month. No temporary detour structure will be necessary. The
replacement structure will consist of two 128" x 83"
corrugated steel pipe arches with headwalls. This will
require the placement of 360 cubic yards of fill below
ordinary high water. The total fill in wetlands will be less
than 0.01 acres, with 0.02 acres of fill in open water. Any
temporary impacts from erosion and sedimentation will be
minimized using NCDOT best management practices, which your
agency has reviewed.
NCDOT hereby applies for the CAMA Major Development
permit as required for this project. A copy of this
application is being provided to the U.S. Army Corps of
Engineers and the N.C. Division of Environmental Management
for their review. If you need any additional information,
please call Gordon Cashin at (919) 733-9770.
r
J
Sincerely
B Quinn, PE
A anch Manager
Planning and Environmental Branch
cc: , 5istrict
Mr. John
Mr. A. L.
Mr. John
Mr. C. 0.
Mr. Jimm,,
Engineer, USCOE
Dorney, DEM, DEHNR
Hankins, PE, Hydraulics
Smith, PE, Structure Design
White, PE, Division 1 Engineer
y Lee, PE, Bridge Maintenance
BJO/gec
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, 5king, paving, land clearing, and stonnwater con-
trol. If the requested information is not relevant to 0
project, write N/A (not applicable). Items yib
must be completed for all projects. R
1 7 ly'? ?
M-R
1 APPLICANT . ? .?p? o eR c
a. Name NC Dept. of Transportation
Attn: B.J. O'Quinn, Asst. Branch Mgr.
Address_pn Rnx 252n1
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
Both
Will the project be for community, private, or
commercial use?
Public Transportation
City Raleigh Start 1 NC - d. Describe the planned use of the project.
27611 Public Transportation
Zip Day phone 919-733-73141
Landowner or X Authorized agent
b. Project name (if any)
c. If the applicant is not the landowner, also give the
owner's name and address.
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
SR 1128
b. City, town, community, or landmark
Swan Quarter
c. CountyHyde
d. Is proposed work within city limits or planning
jurisdiction? No
e. Name of body of water nearest project
Oyster Creek
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or pier. Replace existing bridge with 2
1p8") x 83" CSPA
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract N/A
b. Size of individual lot(s) N/A
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
Datum in plats are assumed elevations.
Ground elevation approximately 1'
d. Soil type(s) and texture(s) of tract
Muck
c. Vegetation on tract Coastal vegetation
f. Man-made features now on tract Bridge
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
Developed Community
X Rural Other
h. How is the tract zoned by local govcrruncnt?
N/A
i. How are adjacent waters classified?
Swan Quarter Bay : SA-ORW
j. Has a professional archaeological survey been
carried out for the tract? No If so, by whom?
3/91
.5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structures proposed N/A
b. Number of lots or parcels N/A
c. Density (Give the num?:W residential units and the
units per acre.)
d. Size of area to Abe graded or disturbed
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to 1e uA cd for paved surfaces.
h. If applicable, has a stonnwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
N/A
j. Have these facilities received state or local approval?
N/A
k. Describe existing treatment facilities.
N/A
m. Water supply source
N/A
n. If the project is oceanfront development. describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
N/A
o. If the project is on the oceanfront, what will be the
mean sea level of the first habitable
elevation above NA
floo 67 6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
water, pier, Site p
boat ramp, work
rock jetty)
Fill placed in
wetland or below
MI-iW
Upland fill
areas
Length Width Depth
re
60' 70' Aver g
4.1'
60' 70'
b. Amount of material to be excavated from below
water level in cubic yards 640 Cubic yards
c. Type of material
muck
d. Does the area to be excavated include marshland,
1. Describe location and type of discharges to waters of swamps, or other wetlands?
the state (for example, surface runoff, sanitary yes
wastewater, ind st.rial/com rrci effluent. "wash
down"). Surface runorr along roadway e. High ground excavation, in cubic yards
290 cubic vards
.A
Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
N/A feet N/A
g. Location of spoil disposal area Site above wetlandsd. Type of bulkhead material N/A
IL Do you claim title to the disposal area? N/A
If not, attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
maintenance? N/A
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
No
k. Will the fill material be placed below mean high
water? Yes
1. Amount of fill in cubic yards 360 cubic yards
m. Type of fill material sand gravel
n. Source of fill material local borrow site
o. Will fill material be placed on marsh or other
wetlands? Yes
p. Dimensions of the wetland to be filled
See plats
q. How will excavated or fill material be kept on site
and erosion controlled?
By standard NCDOT erosion and
sedimentation control methods
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Typical roadway construction
equipment (Backhoe, dumptruck, dragline,
s. Will wetlands be crossed in transporting equipment
to project site? -U- If yes. explain steps that will
be taken to lessen environmental impacts.
e. -Amount of fill. in cubic yards, to be placed below
mean high water N/ A
f. Type of fill material
N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the decd (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title. plus written permission from the owner to cant' out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
12 x 11 white paper. (Refer to Coastal Resources
Commission Rule 71.0203 for a detailed description.)
Please note that original drawings arc preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies arc provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be.sufficicntly detailed
etLlopide agency personnel unfamiliar with the area to the
.
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
- may have been developed in consultation with the
- Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
b. Average distance watcrward of mean high water or
nonnalwater level ' N/A
Name Walter J. Lupton
Address Swan Quarter, NC
Name Jalain Sadler
Address P.O. Box 97
an emere, NU 28b8/
Name
Address
J.A. Mason
Swan Quarter, NC
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
A check for $100 made payable to the Department of
Natural Resources and Community Development to
cover the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed -
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that 1 am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the
9j_