HomeMy WebLinkAbout20080396 Ver 2_Information Letter_20091221 (2);
t,
North Carolina
Beverly Eaves Perdue
Governor
e��
NCDENR
Department of Environment and
Division of Water Quality
Coleen H. Sullins
Director
June ] 0, 2010
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Natural Resources
Dee Freeman
Secretary
Subject: Inspection-US Highway 64
DWQ Project 08-0396
TIP No. A-0011 BB
Clay County
Dear Mc Setzer:
On June 9, 2009, I inspected the construction work on US Highway 64 in Clay CounTy and the project appears
to be in relatively good shape considering the amount of rainfall received on the project. Construction work
consists of heavy grading. The erosion and sedimentation control structures, vegetative covering, and matting
appear to be working properly; however, some cleaning of sediment and erosion control structures is needed.
Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and
mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached
to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
�.�:,�,���.
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: W. Trent Anderson
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional O�ce
(Se[zer) US Highway 64 Inspection Letter June 20I0
SURFACE WATER PROTECTION SECTION—Asheville Regional0(fice
2090 U.S 70 Hghway, Swannanoa, NC 28778�211
Phone:828-296-45001FAH:828-299-7043
Customer Service: 1-877-623-6746
IntemeC www,ncwatemualiN.ora
An Equal Oppo�uniry 1 Affumative Action Employer
NorthCarolina
�aturallr�
���w �
��� ��
North Carolina Department of Environment and Natural
eeverly Eaves Perdue
Governor
Mr. J. B. Setzer, P.L.
Division ]4 Bngineer
N.C. Departmeut of'l'ransportation
253 Webster Road
Sylva, North Carolin�i 28779
Division of Water Quality
Coleen H. Sullins
Director
Dccember 21, 2009
Subject Stonnwater Inspection
US Highway 64
DWQ Project No. 080396
7'IP No. A-0011 BI3
Clay County
Dear Mr. Setzer:
Dee Freeman
Secrelary
On December 9, 2009, 1 conducted a stormwater inspection for TiP Project No. A-001 1 I3I3 US llighway 64
construction project in Cluy County. The rainfall dtrta and erosion control records appear to be maintained in
good order.
Continue to monitor the storm�vater and ensure that these records are maintained during the life of the project.
I'Iease refer to the attached inspec[ion report for additional commen[s and/or rccommendations.
If you havc questions, please call me at 828-296-�lS00.
Sincercly,
���- �
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Trent Andcrson, P.G.
Mark Davis, Division 14, D�O
Ed [ngle, Roadside F3nvironmental
' �"1'ranspoitation Pennitting Unit )
Niki Mahcr, NPS Assistance and Compliancc Ovcrsight Unit
Mike Yarker, Asheville Regional Oftice
(Seizer) A-0011 BE3 Uecember 2009 S�onnwa[cr Inspeclion
Location: 2090 U.S. Highway 70, Swannanoa, Notlh Carolina 28776
Phane: 828-29G45001 FAX: 828-299-70431 Customer Service: 1-877823-6748
IntemeC ww�v.ncwalerquality.org
An Equal Opportunily 1 Affrmative Aclion Employe�
// -.; \ i ; --. . r, --s'.' �J
l � � { �� �'� ��
, �� , ��:
Resources
North Carol i na
�aturally