HomeMy WebLinkAbout20001085 Ver 1_Complete File_19970207e
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-189
IN REPLY REFER TO
CESAW-CO-R (1145b) 7 February 1997
MEMORANDUM FOR Commander, U.S. Marine Corps Base, Camp Lejeune,
ATTN: AC/S-EMD/Warren, Marine Corps Base,
Camp Lejeune, NC 28452-0004
SUBJECT: Action ID No. 199505124, Modifications to MILCON P-933
1. This correspondence confirms the 10 December 1996, meeting between
Mr. John Townson of USMC Environmental Branch, Ms. Debbie Bryant of LANTDIV,
and Messrs. Mickey Sugg and Allen Davis of my Regulatory Branch, regarding the
modification of wetland impacts associated with your Individual Department of
the Army (DA) permit issued 28 March 1996 for the construction of MILCON P-933
located in the Greater Sandy Run Area, on the west side of Highway 17, north
of Folkstone, Onslow County, North Carolina. Also, please reference the
5 August 1996 and 20 December 1996 receipt of your request to modify this
permit.
2. According to the meeting and the submitted revisions, the original
102.19 acre request for the construction of the multi-purpose training range
included 26.19 acres of high ground development. By the removal of the high
ground impacts, the total wetland impacts will be reduced to 76 acres. In
addition, the roads have been redesigned to decrease the width from 20 feet to
approximately 17 feet. This construction modification will further reduce
impacts to wetlands from 76 acres to 74.47 acres. These corrections will be
noted and our file will document 74.47 acres of wetland impacts replacing the
original 102.19 acres.
3. Despite the corrected acreage of wetland impacts, USMC has agreed to
adhere to the original 102.19 mitigation acreage for the pocosin impacts
associated with P-933. With the completion of Range P-933 pocosin mitigation
site, the excess mitigation acreage will be used by USMC to compensate for
wetland impacts in the proposed MILCON P-028 small arm range project.
P
MILCON P-028.
4. By copy of this letter, the U.S. Army Corps of Engineers is acknowledging
the high ground acreage inclusion of the original permit request, confirming
the reduced wetland impacts associated with the road construction
modifications, and agreeing that the excess mitigation from P-933 will fully
com ensate for the wetland impacts associated with the construction of
5. Thank you for your time and cooperation in this matter. Questions or
comments should be addressed to Mr. Mickey Sugg at telephone (910) 251-4811.
TERRY R. YOUNGBLUTH
Colonel, EN
Commanding
REGF?
rc 07y
ENV'P'0W&'4_rfu ',4,'IENCGS
r ?
CESAW-CO-R (1145b)
SUBJECT: Action ID No
CF:
7 February 1997
199505124, Modifications to MILCON P-933
Mr. John Townson
U.S. Marine Corps Base, Camp Lejeune
Environmental Management Department
Camp Lejeune, NC 28452-5001
Mr. Thomas Welborn, Chief
Wetlands Protection Section - Region IV
Wetlands, Oceans and Watersheds Branch
U.S. Environmental Protection Agency
Atlanta Federal Center
100 Alabama Street, SW
Atlanta, Georgia 30303
Mr. John Dorney
Division of Water Quality
Noaz`th Carolina Department of
Environment, Health, and
Natural Resources
4401 Reedy Creek Road
Raleigh, North Carolina 27607
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Environment, Health, and
Natural Resources
Post Office Box 27687
Raleigh, NC 27611-7687
Mr. Jim Gregson
Division of Water Quality
North Carolina Department of
Environment, Health, and
Natural Resources
127 Cardinal Drive
Wilmington, NC 28405
Mr. John Hefner
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mr. Larry Hardy
National Marine
Pivers Island
Beaufort, North
Fisheries, NOAA
Carolina 28516
Mr. Bob Stroud
Wilmington Regional Office
North Carolina Division of
Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405-3845
2
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
IN REPLY REFER TO
Regulatory Branch
September 2, 1997
Action ID 199603204, Greater Sandy Run Mitigation Bank
Mr. John Dorney
Division of Water Quality
North Carolina Department of Environment,
Health, and Natural Resources
4401 Reedy Creek Road
Raleigh, North Carolina 27607
Dear Colleague:
c 7
l
G"
SrP ; 1991
,...scrErocEs
'gA
Reference the proposed Greater Sandy Run Mitigation Bank. Although issues relative to
disposition of the property have prevented finalization of a Memorandum of Agreement
establishing this Bank, we feel it would be appropriate to convene the Mitigation Bank
Review Team (MBRT) to discuss the status of the mitigation plan and to ensure that any
issues regarding the technical merits of the plan have been addressed. If time permits, we
will make a visit to the field to inspect restoration work that has occurred to date.
Accordingly, we have a scheduled a meeting on Wednesday, September 10, 1997, at 10:00
am in Building 1 at the Marine Corps Base, Camp Lejeune. Please call the undersigned at
(910) 251-4725 if you are unable to attend.
Sincerely,
Scott McLendon