Loading...
HomeMy WebLinkAbout20151265 Ver 1_Certification of Completion_20200508Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/8/2020 5:48:11 PM (Start) BIMSUpdated by Carpenter, Kristi 5/11/2020 9:45:26 AM (DOT Project) • The task was assigned to Carpenter, Kristi 5/8/2020 5:48 PM Staff Review DWR Project #:* 20151265 Version:* 1 Reviewer List* Joanne Steen h u is:eads\jhsteen h u is CERTIFICATION SUBMITTED ON 5/8/2020 Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to submit it to the DWR 401 & Buffer Permitting Branch. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Is this a Public Transportation Project? V Yes F- No USACE Permit# SAW-2015-02592 DWR Project M 20151265 Version: 1 County: Brunswick 401 Water Quality Certification Issued Date: 12/14/2015 Applicant: NCDOT Division 3 Project Name: SS-4903BR Ocean Isle Beach Roundabout (SR1184) Supplemental Attachments: aickthe upload button ordrag and drop fileshere toattach docurrent SS- 1.17MB 4903BR completionform DWR_201512... FDF only Who will be submitting the Certification of Completion? f Applicant r Agent f Certified Professional Agent's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. W By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of the "Certificate of Completion" form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) 0 1 agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the "Certificate of Completion" form." Printed Name: Anneliese Westphal Signature Water Resources ENVIRONMENTAL QUALITY NCDWR Project No.: 20151265 Applicant: NCDOT Division 3 Project Name: County: SS-4903BR OIB Roundabout (SR 1184) Date of Issuance of 401 Water Quality Certification: 12/14/2015 PAT MCCRORY Governor DONALD R. VAN DER VAART Brunswick Secretary S. JAY ZIMMERMAN lhrector Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: 1, Anneliese Westphal , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Date:2020.05.08 17:29:42 5/8/2020 Signature:-04'00' Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No. State of North Carolina lEnvironmental Quality I Water Resources 1617 Mail Service Center, Raleigh, North Carolina 27690,1617