HomeMy WebLinkAboutBogue Sound Marsh Mitigation Site
t
JAMES B. HUNT JR.
GOVERNOR
JAN 3 1 ?IJ01
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTAOI
January 29, 2001
Mr. David Timpy
US Army.Corps of Engineers
Wilmington Regulatory Field Office
PO Box 1890
Wilmington, North Carolina 28402-1890
Dear Mr. Timpy:
f
DAVID MCCoY
SECRETARY
Je X01 t,-
Subject: 2000 Annual Monitoring Report for the Bogue Sound (Weeks) Marsh
Mitigation Site, Carteret County
Please find enclosed the 2000 Annual Monitoring Report for the Bogue Sound (Weeks)
Marsh Mitigation Site, Carteret County.
This reports was prepared for NCDOT by The Triangle Group, Inc. The report details the
hydrologic and vegetation monitoring activities over the past year at the sites. Per the
attached e-mail from Mr. Scott McLendon, USACE Wilmington, the Department is in
agreement to wait to receive written comments from the regulatory and resource agencies
30 days after receipt of the reports. A meeting to discuss any outstanding issues on a site
by site basis will be scheduled for March 8, 2001 at the Transportation Building in
Raleigh.
If you should have any questions, please contact Mr. Randy Griffin, Natural Systems
Engineer, or Mr. Phil Harris, PE, Natural Systems Engineer, at (919) 733-3141. Thank
you for your continued support and cooperation.
ncerely,
V. Ch les Bruton, Ph.D.,
Assistant Branch Manager
Project Development and Environmental
Analysis Branch
Cc: w/ attachment
file
Scott McLendon, USACE (1)
MAILING ADDRESS: TELEPHONE: 919-733-3141 LOCATION:
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS FAX: 919-733-9794 TRANSPORTATION BUILDING
1548 MAIL SERVICE CENTER 1 SOUTH WILMINGTON STREET
RALEIGH NC 27699-1548 WEBSITE. WWW.DOH.DOT.STATE. NC.US RALEIGH, NC
rc ?o
Kelly Williams, NCDCM (2)
John Hennessy, NCDWQ (1)
David Cox, NCWRC (1)
Tom McCartney, USFWS (1)
Ron Sechler, NMFS (1)
w/o attachments
Gordon Cashin, NCDOT
Subject: Mitigation Monitoring Reports
' Date: Fri, 5 Jan 2001 17:10:14 -0500
From: Scott.C.McLendon@saw02.usace.army.mil
To: coxdr@mail.wildlife.state.nc.us, John.Hennessy@ncmail.net, Ron. Sechler@noaa.gov,
matthews.kathy@epamail.epa.gov, Tom_McCartney@ws.oov
CC: David.Franklin@saNv02.usace.army.mil, RGRIFFIN@DOT.STATE.NC.US
Greetings,
f
As you are aware,. NCDOT is in the process o sending the annual mitigation
monitoring reports out to the regulatory and resource agencies. Instead of We
bringing our comments to a meeting with NCDOT.as we have done in the pas for to
have elected to provide our written comments to NCDOT for their review p
having any sort of meeting. If any outstanding issues remain after NCDOT has
had an opportunity to review our.comments, we would plan to meet at the
Transportation Building in Raleigh on March 8, 2001.
As there is a time factor involved, we would like tosprovo e ourecomments back
to NCDOT within 30 days of the receipt
via e-mail is perfectly acceptable. Please provide your comments on these
reports to the appropriate NCDOT Project Manager with a copy to me in
.Wilmington.
If you have any questions regarding this. message, I may be reached at
910-251-4725. Point of.Contact at NCDOT is Randy Griffin.
.Thanks,
Scott McLendon
01/18/2001 11:19A
1 of l .