HomeMy WebLinkAboutWQ0000048_Staff Report_20200506DocuSign Envelope ID: 9D391389-5B73-4C69-89D3-88F317EEC453
State of North Carolina
®r- Division of Water Resources
Water Quality Regional Operations Section
Environmental Staff Report
Quality
May 6, 2020
To: ❑ NPDES Unit ® Non -Discharge Unit
Attn: Ranveer Katyal
From: Geoff Kegley
Wilmin on Regional Office
Application No.: WQ0000048 — City of Whiteville
Facility name: City of Whiteville RLAP
Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -
discharge and NPDES permit applications and/or renewals. Please complete all sections as they are gpplicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ❑ Yes or ® No
a. Date of site visit:
b. Site visit conducted by:
c. Inspection report attached? ❑ Yes or ❑ No
d. Person contacted: and their contact information:
e. Driving directions: N/A
2. Are the 4eatment f4eilit4es
fOF the type
disposal
system? E] Yes OF E] NE)
new ade"ate
of
waste and
3. Afe depth to
table,
the
D Yes E] No
site eendifiens (soils,
wa4ef ete) eeasistei4
with
stibmit4ed r-epefts?
if no, please e�plaiw:
4, Do the
the
lines,
ete.)? El Yes D No D N/,
pla-as and site map fepr-eseat
aettial site (pr-epef�y
wells,
if fie, please explain.: —
5. is the .. oa a,,.,ls
,.la . degi. ro7 I
—I Yes D NE)
I —I N,LA
Fesi management
if
no, please explain:
FORM: WQROSSR 04-14 Pagel of 5
DocuSign Envelope ID: 9D391389-5B73-4C69-89D3-88F317EEC453
e
11. n -et fe ,+. ent Preg -afn (POTWs only):
III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A
Designated Operators:
'Location CltM
Operator Cert
Name
�McCullen.
Status
-Role
*Effective Dt
Expiration Dt
Notification Dt
Contractor
LA
993122
Newlyn L.
lActive
JORG
0012712009
0610312010
❑
LA
LA11000533
Goad, James M.
Active
113ackup
0310112020
0312512020
❑
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? ® Yes or ❑ No
If no, please explain:
Description of existing facilities:
The City of Whiteville operates a land application of Class B residuals program under permit W00000048.
Residuals are generated by the City of Whiteville WWTP which operates under permit NC0021920.
The Whiteville WWTP is a 3.0 MGD activated sludge wastewater treatment plant with an average daily flow of
1.2 MGD. The facility utilizes dual oxidation ditches to process municipal wastewater. Activated sludge from the
treatment process is wasted from the system into one (1) 182,000 gallon aerobic sludge digester where it is treated
and thickened before being transferred into one (1) 880,000 gallon sludge storage
Proposed flow: Disposal of an estimated 600 dry tons per year (no increase) of residuals applied to 399.8 acres
(60.8 new acres,. o�y, pasture and row crop lands as a Class B residual.
Current permitted flow: Disposal of an estimated 600 da tons per year of residuals applied to 339.0 acres of hay,
pasture and row crop lands as a Class B residual.
3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately
assimilating the waste? ® Yes or ❑ No
If no, please explain:
FORM: WQROSSR 04-14 Page 2 of 5
DocuSign Envelope ID: 9D391389-5B73-4C69-89D3-88F317EEC453
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? ❑ Yes or ® No
If yes, please explain:
5. Is the residuals management plan adequate? ® Yes or ❑ No
If no, please explain:
6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No
If no, please explain:
7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A
If no, explain and recommend any changes to the groundwater monitoring program:
8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No
If yes, attach a map showing conflict areas. Included in modification package.
9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No
If no, please explain: Attachment B needs to be updated to reflect permit modification
10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A
If no, please explain:
!I. Are ♦I.e m ,. ito -;.. well ,. ,,,-, iaa4es a eet i BA4S? D Yes D No I4I 1�T/ A
if no please a plete the following (e..,...,,,.,1 table if eeessafy):
Monitoring
Latitude
Lwtgituide
a i n
a r rr
a i n
a r rr
a r it
a r rr
12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No
Please summarize any findings resulting from this review: Past annual reports consistently demonstrate
compliance.
.rsrsr�!rsess.
MM.
14. Check all that apply:
® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC
❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium
Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.)
LIMM
15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes ®No❑N/A
If yes, please explain:
16. Possible toxic impacts to surface waters: N/A
17. Pretreatment Program (POTWs only): Yes (permit
NC0021920)
FORM: WQROSSR 04-14 Page 3 of 5
DocuSign Envelope ID: 9D391389-5B73-4C69-89D3-88F317EEC453
IV. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
If yes, please explain:
2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an
additional information request:
Item Reason
4. List specific special conditions or compliance schedules recommended to be included in the permit when issued:
Condition Reason
FORM: WQROSSR 04-14 Page 4 of 5
DocuSign Envelope ID: 9D391389-5B73-4C69-89D3-88F317EEC453
Recommendation: ❑ Hold, pending receipt and review of additional information by regional office
❑ Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information
® Issue
❑ Deny (Please state reasons: )
5. Signature of report preparer:
Signature of regional supervisor:
Date:
V. ADDITIONAL COMMENTS
DocuSigned by:
C017E2515D3B417... 5/ 8/ 2 0 2 0
EDocuSigned by:
o 5�, 6"
E3ABA14AC7DC434...
This review was conducted for a request by Synagro for the City of Whiteville to modify their land
application of residuals permit. The permit modification requests the addition of two additional fields
(CO-39 field 1 for 32.6 acres and CO-39 field 2 for 28.2 acres) to bring the total amount of acres available
for land application of residuals to 399.8. In 2019, the City of Whiteville did not apply any residuals and
in 2018, 91.7 dry tons were applied on 32.8 acres.
Based on the current guidance to minimize the spread of COVID-19, the Department has adjusted
operations to protect the health and safety of the staff and public, therefore no site visit was performed for
this review. Both fields were evaluated using google earth pro and the DWR OneMap, in addition to the
soil scientist's report. CO-39 field 1 is reported as Lynchburg soil series and CO-39 field 2 is reported as
Goldsboro, but both fields also contain Rains soil series based on the NRCS maps. The soil scientist
determined the seasonal high water table to be at 16 inches and 22 inches for field 1 and 2, respectively.
Soil sampling analysis in field 1 indicates a lower pH of 5.5 and Zinc and Copper indexes are relatively
high and should be monitored in the future. The fields appear to be well managed farm land, appropriate
setbacks to ditches were applied and no houses/structures that might utilize a water supply well were
nearby. Ditches in the Northwestern portion of Field 2 are likely lowering the water table and producing
conducive conditions for farming and the Rains soil series label in this area may not reflect the actual
depth of the functional SHWT. The Southwest quadrant of field 1 appears on the aerial images to
potentially contain some wet areas resulting from precipitation. Depth to the water table in this area should
be verified to be greater than 12" prior to any land application activities.
The WiRO recommends issuance of the permit modification.
FORM: WQROSSR 04-14 Page 5 of 5