United States Department of the Interior
FISH AND WILDLIFE SERVICE
Raleigh Field Office
Post Office Box 33726
Raleigh, North Carolina 27636-3726
June 19, 2006
Dennis Pipkm, PE
North Carolina Department of Transportation
Bridge Project Development Unit
1551 Mail Service Center
Raleigh, North Carolina 27699-1551
Dear Mr. Pipkin:
2 ?[ROb.
Lip
D
JUL 2 4 2006
WE'LANps ArJC STORMWATE BRMCH
This letter is in response to your request for comments from the U.S. Fish and Wildlife Service
(Service) on the potential environmental effects of the proposed replacement of Bridge No. 36 on
SR 1003 over the Tar River, Franklin County, North Carolina (TIP No. B-4514). These
comments provide information in accordance with provisions of the Fish and Wildlife
Coordination Act (16 U.S.C. 661-667d) and section 7 of the Endangered Species Act (ESA) of
1973, as amended (16 U.S.C. 1531-1543).
For bridge replacement projects, the Service recommends the following general conservation
measures to avoid or minimize environmental impacts to fish and wildlife resources:
1. Wetland, forest and designated riparian buffer impacts should be avoided and minimized
to the maximum extent practical;
2. If unavoidable wetland or stream impacts are proposed, a plan for compensatory
mitigation to offset unavoidable impacts should be provided early in the planning
process. Opportunities to protect mitigation areas in perpetuity via conservation
easements, land trusts or by other means should be explored at the outset;
3. Off-site detours should be used rather than construction of temporary, on-site bridges.
For projects requiring an on-site detour in wetlands or open water, such detours should be
aligned along the side of the existing structure which has the least and/or least quality of
fish and wildlife habitat. At the completion of construction, the detour area should be
entirely removed and the impacted areas be planted with appropriate vegetation,
including trees if necessary;
4. Wherever appropriate, construction in sensitive areas should occur outside fish spawning
and migratory bird nesting seasons. In waterways that may serve as travel corridors for
fish, in-water work should be avoided during moratorium periods associated with
migration, spawning and sensitive pre-adult life stages. The general moratorium period
for anadromous fish is February 15 - June 30;
r
5. New bridges should be long enough to allow for sufficient wildlife passage along stream
corridors;
6. Best Management Practices (BMP) for Construction and Maintenance Activities should
be implemented;
7. Bridge designs should include provisions for roadbed and deck drainage to flow through
a vegetated buffer prior to reaching the affected stream. This buffer should be large
enough to alleviate any potential effects from run-off of storm water and pollutants;
8. The bridge designs should not-alter the natural stream and stream-bank morphology or
impede fish passage. To the extent possible, piers and bents should be placed outside the
bank-full width of the stream; and
9. Bridges and approaches should be designed to avoid any fill that will result in damming
or constriction of the channel or flood plain. If spanning the flood plain is not feasible,
culverts should be installed in the flood plain portion of the approach to restore some of
the hydrological functions of the flood plain and reduce high velocities of flood waters
within the affected area.
Section 7(a)(2) of the Endangered Species Act requires that all federal action agencies (or their
designated non-federal representatives), in consultation with the Service, insure that any action
federally authorized, funded, or carried out by such agencies is not likely to jeopardize the
continued existence of any federally-listed threatened or endangered species. A biological
assessment/evaluation may be prepared to fulfill the section 7(a)(2) requirement and will
expedite the consultation process. To assist you, a county-by-county list of federally protected
species known to occur in North Carolina and information on their life histories and habitats can
be found on our web page at http://nc-es.fws.gov/es/countyfr.html .
Although the North Carolina Natural Heritage Program database does not indicate any known
occurrences of listed species near the project vicinity, suitable habitat for the federally
endangered dwarf wedgemussel (Alasmidonta heterodon) and/or Tar River spinymussel (Elliptio
steinstansana) is likely present at or near the project site. Both species are known to occur in the
upper Tar River watershed. If suitable habitat occurs within the project vicinity for any listed
species, surveys should be conducted to determine presence or absence of the species.
If you determine that the proposed action may affect (i.e., likely to adversely affect or not likely
to adversely affect) a listed species, you should notify this office with your determination, the
results of your surveys, survey methodologies, and an analysis of the effects of the action on
listed species, including consideration of direct, indirect, and cumulative effects, before
conducting any activities that might affect the species. If you determine that the proposed action
will have no effect (i.e., no beneficial or adverse, direct or indirect effect) on listed species, then
you are not required to contact our office for concurrence.
We reserve the right to review any federal permits that may be required for this project, at the
public notice stage. Therefore, it is important that resource agency coordination occur early in
the planning process in order to resolve any conflicts that may arise and minimize delays in
project implementation. In addition to the above guidance, we recommend that the
environmental documentation for this project include the following in sufficient detail to
facilitate a thorough review of the action:
1. A clearly defined and detailed purpose and need for the proposed project;
2. A description of the proposed action with an analysis of all alternatives being considered,
including the "no action" alternative;
3. A description of the fish and wildlife resources, and their habitats, within the project
impact area that may be directly or indirectly affected;
4. The extent and acreage of waters of the U.S., including wetlands, that are to be impacted
by filling, dredging, clearing, ditching, or draining. Acres of wetland impact should be
differentiated by habitat type based on the wetland classification scheme of the National
Wetlands Inventory (NWI). Wetland boundaries should be determined by using the 1987
Corps of Engineers Wetlands Delineation Manual and verified by the U.S. Army Corps
of Engineers;
5. The anticipated environmental impacts, both temporary and permanent, that would be
likely to occur as a direct result of the proposed project. The assessment should also
include the extent to which the proposed project would result in indirect and cumulative
effects to natural resources;
6. Design features and construction techniques which would be employed to avoid or
minimize impacts to fish and wildlife resources, both direct and indirect, and including
fragmentation and direct loss of habitat;
7. If unavoidable wetland or stream impacts are proposed, project planning should include a
compensatory mitigation plan for offsetting the unavoidable impacts.
The Service appreciates the opportunity to comment on this project. Please continue to advise us
during the progression of the planning process, including your official determination of the
impacts of this project.. If you have any questions regarding our response, please contact Mr.
Gary Jordan at (919) 856-4520, ext. 32.
Services Supervisor