Loading...
HomeMy WebLinkAboutNC0043532_More Information (Received)_20200501 • 1 N.00- OS% •iy ,1` .13 4•In General Decision Number:NC20200070 01/03/2020 = 4 S A pro . Superseded General Decision Number:NC20190070 F Q. ;r State:North Carolina e011ic yi.FS•w . \ . r111i11111\ Construction Type:Heavy Counties:Bladen,Cleveland,Columbus,Davidson,Duplin, Harnett,Iredell,Lee,Lenoir,Lincoln,Montgomery,Moore, Richmond,Robeson,Rowan,Sampson,Scotland,Stanly and Wilson RECEIVED Counties in North Carolina. MAY 01 2020 NCDEQ/DWRINPDES HEAVY CONSTRUCTION PROJECTS Note:Under Executive Order(EO) 13658, an hourly minimum wage of$10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued)on or after January 1,2015.If this contract is covered by the EO,the contractor must pay all workers in any classification listed on this wage determination at least$10.80 per hour(or the applicable wage rate listed on this wage determination,if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination,the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(l)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself,but it does not apply to contracts subject only to the Davis-Bacon Related Acts,including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Stanly County Davis Bacon Wage Determination West Stanly WWTP and Sanitary Sewer Improvements SRF WKD Project Number: 20 1703 16.00.CL 1 Modification Number Publication Date 0 01/03/2020 SUNC2011-051 08/26/2011 Rates Fringes CARPENTER(Form Work Only) $15.47 1.50 CEMENT MASON/CONCRETE FINISHER...$13.10 1.32 LABORER: Common or General $ 9.52 0.00 LABORER: Pipelayer $12.13 0.00 OPERATOR: Backhoe/Excavator/Trackhoe $16.18 0.00 TRUCK DRIVER $12.02 0.00 WELDERS-Receive rate prescribed for craft performing operation to which welding is incidental. Note:Executive Order(EO)13706,Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded(and any solicitation was issued) on or after January 1,2017. If this contract is covered by the EO,the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.Employees must be permitted to use paid sick leave for their own illness,injury or other health-related needs,including preventive care;to assist a family member(or person who is like family to the employee)who is ill,injured, or has other health-related needs,including preventive care;or for reasons resulting from,or to assist a family member(or person who is like family to the employee)who is a victim of,domestic violence, sexual assault,or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). Stanly County Davis Bacon Wage Determination West Stanly WWTP and Sanitary Sewer Improvements SRF 2 WKD Project Number: 20170316.00.CL The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination.The classifications are listed in alphabetical order of""identifiers""that indicate whether the particular rate is a union rate(current union negotiated rate for local), a survey rate (weighted average rate)or a union average rate(weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than""SU""or""UAVG""denotes that the union classification and rate were prevailing for that classification in the survey.Example:PLUM0198-005 07/01/2014.PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification,which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable,i.e.,Plumbers Local 0198.The next number, 005 in the example,is an internal number used in processing the wage determination.07/01/2014 is the effective date of the most current negotiated rate,which in this example is July 1,2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement(CBA)governing this classification and rate. Survey Rate Identifiers Classifications listed under the""SU""identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey,it may include both union and non-union rates. Example:SULA2012-007 5/13/2014.SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates.LA indicates the State of Louisiana.2012 is the year of survey on which these classifications and rates are based.The next number,007 in the example,is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s)listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications;however, 100%of the data reported for the classifications was union data.EXAMPLE:UAVG-OH-0010 08/29/2014.UAVG indicates that the rate is a weighted union average rate. OH indicates the state.The next number,0010 in the example,is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. Stanly County Davis Bacon Wage Determination West Stanly WWTP and Sanitary Sewer Improvements SRF 3 WKD Project Number: 20170316.00.CL A UAVG rate will be updated once a year,usually in January of each year,to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.)Has there been an initial decision in the matter?This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate)ruling On survey related matters,initial contact,including requests for summaries of surveys,should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program.If the response from this initial contact is not satisfactory,then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here,initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S.Department of Labor 200 Constitution Avenue,N.W. Washington,DC 20210 2.)If the answer to the question in 1.)is yes,then an interested party(those affected by the action)can request review and reconsideration from the Wage and Hour Administrator(See 29 CFR Part 1.8 and 29 CFR Part 7).Write to: Stanly County Davis Bacon Wage Determination West Stanly WWTP and Sanitary Sewer Improvements SRF 4 WKD Project Number: 20170316.00.CL Wage and Hour Administrator U.S.Department of Labor • 200 Constitution Avenue,N.W. Washington,DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information(wage payment data,project description, area practice material,etc.)that the requestor considers relevant to the issue. 3.)If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board(formerly the Wage Appeals Board). Write to: Administrative Review Board U.S.Department of Labor 200 Constitution Avenue,N.W. Washington,DC 20210 4.)All decisions by the Administrative Review Board are final. END OF GENERAL DECISION Stanly County Davis Bacon Wage Determination West Stanly WWTP and Sanitary Sewer Improvements SRF 5 WKD Project Number: 20170316.00.CL �t\\iiI ii //, , ,.cN 2 2 Ll‘ // West Stanly WWTP :4t t Ap,, l y1` e� VIII. Effluent Pump Station .F fog:.,.fa." A. Calculating Design Effluent Flow iff/i!lj1110 Permitted Capacity 1.200 MGD 833 gpm Peak Flow 4.320 MGD 3,000 gpm B. Calculating the Proposed System Curve 1. PS Total Suction Head Pressure(psi) 0RECEIVED Initial Elevation 334.20 C,value 130 MAY 01 2020 Equivalent Length (ft) 15 NCDEQIDWRJNPDES Length(ft) 15 Diameter(in) 8 Material DIP Per Total 90°Bend 0 6 0 45°Bend 0 6 0 Tee-Straight 0 4 0 Tee-Branch 0 20 0 Swing Valve(full open) 0 7 0 Globe Valve (full valve) 0 210 0 0 2. PS Total Discharge Head Pressure (psi) 0 Final Elevation(ft) 435.7 C, value 130 Equivalent Length (ft) 13,147 Length 12,700 Diameter(in) 12 Material PVC Per Total 90°Bend 2 29 58 45°Bend 9 16 143 Tee-Straight 2 20 40 Tee-Branch 2 60 119 Swing Valve (full open) 1.5 50 75 Globe Valve (full valve) 0 338 0 Gate Valve (full open) 1.5 8 12 447 \/\lnll( West Stanly WWTP and Sanitary Sewer Improvements SRF DIC20170316.00.CL KS O N 4/28/2020 1 1 West Stanly WWTP 81111160 courinr C. PS Total Dynamic Head (ft) Total Total Discharge Flow(gpm) Velocity(ft/s) H„(S)(ft) Hf(s)(ft) Suction(ft) H„(D)(ft) Hf(D)(ft) (ft) TDH(ft) 600 1.70 0.05 0.11 334.35 0.05 12.90 448.65 114.60 900 2.56 0.10 0.22 334.53 0.10 27.32 463.12 129.25 1,200 3.41 0.18 0.38 334.76 0.18 46.52 482.40 148.76 1,500 4.26 0.28 0.58 335.06 0.28 70.29 506.27 172.93 1,800 5.11 0.41 0.81 335.42 0.41 98.48 534.59 201.61 2,100 5.96 0.55 1.08 335.83 0.55 130.98 567.24 234.67 2,400 6.82 0.72 1.38 336.30 0.72 167.69 604.11 272.01 2,700 7.67 0.91 1.71 336.83 0.91 208.51 645.13 313.55 3,000 8.52 1.13 2.08 337.41 1.13 253.39 690.22 359.23 3,450 9.80 1.49 2.70 338.39 1.49 328.15 765.34 435.33 3,900 11.08 1.91 3.38 339.49 1.91 411.70 849.31 520.40 D. Calculating NPSHA Elevations(ft) 331.69 hatm(ft) 33.6 he(ft) 14.19 hf(ft) 2.08 Temperature WW(0F) 60 hip(ft) 0.60 FS(ft) 2 NPSHA(ft) 43.11 1 Pump @ 1300 2 Pumps @ 1770 D.Pump Selection 1 TDH (ft) Q(gpm) TDH(ft) Q (gpm) - Goulds 14RJLC 250 0 480 0 Qpump(gpm) 1500 225 250 425 600 TDH(ft) 295 210 500 395 1200 Speed(rpm) 1300-1770 190 750 365 1800 Diameter(in) 10 170 1000 335 2400 NPSHR(ft) 16 140 1250 295 3000 Efficiency 79.27% 105 1500 240 3600 Power(hp) 158.8 Pump Curve WWI< West Stanly WWTP and Sanitary Sewer Improvements SRF 20170316.00.CL iiiP DI C KS O N 4/28/2020 2 West Stanly WWTP SThN 130UNIY Pump Impeller E.Pump Evaluation NPSHR , 16.00 ft NPSHA 43.11 ft Flow Rate of One Pump at Minimum Conditions 1,500 gpm Flow Rate of Two Pumps at Maximum Conditions 3,000 gpm Effluent Pump Station Proposed System Curve vs Pump Curves 600 — ..__._. ._ ______.__-_ _ _ ___.--,_._.-- 500 400 ! 300 qxq � I E-+ 200 100 0 0 500 1000 1500 2000 2500 3000 3500 4000 4500 Flow(gpm) —4—Pump Curve at Min.Conditions —0—System Curve —Pump Curve at Max.Conditions Wl< West Stanly WWTP and Sanitary Sewer Improvements SRF DICKSON11110 201703/28/20 20 3 \\`"H c�RO'/% ?Q':QEESS%0••I• SECTION 44 21 49 S AL 7 Vertical Turbine Pumps s W •I,d€ Q#ME� ��¢� PART 1 GENERAL l i/ S Me. \\ M/ 1.1 SUMMARY A. Section Includes:Vertical Turbine Pumps and accessories. B. Contractor shall furnish all labor,materials and equipment to fabricate,test, install,and place in satisfactory operation complete vertical turbine pump assemblies and appurtenances as specified herein,and as shown on the drawings. 1.2 REFERENCE STANDARDS A. Hydraulic Institute(HI) B. American Standards for Testing Materials(ASTM) RECEIVED C. American National Standards Institute(ANSI) MAY 01 2020 D. American Water Works Association(AWWA) NCDEQIDWR/NPDES E. International Organization for Standardization(ISO) F. American Society of Mechanical Engineers(ASME) G. Anti-Friction Bearing Manufacturers Association(AFBMA) H. National Electrical Manufacturers Association(NEMA) I. Underwriters Laboratory(UL) J. Institute of Electrical and Electronics Engineers(IEEE) K. National Electrical Code(NEC) 1.3 COORDINATION A. Section 01 30 00-Administrative Requirements:Requirements for coordination. B. Coordinate Work of this Section with Owner and to minimize impact to wastewater 1.4 SEQUENCING A. Section 01 10 00-Summary:Requirements for sequencing. B. Sequence Work to prevent interference with plant operation. Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF 43 21 49-1 WKD Project Number: 20170316.00.CL 1.5 SUBMITTALS A. 01 22 01—Electronic Project Management System and 01 33 01 —Submittal Procedures EPMS: Requirements for submittals. B. Product Data: 1. Submit pump performance characteristics. 2. Submit electrical characteristics and connection requirements. 3. Submit manufacturer model number,dimensions,service sizes,and finishes. C. Shop Drawings: 1. Submit detailed and certified dimensional Shop Drawings for materials and equipment, including wiring and control diagrams,performance charts and curves,installation and anchoring requirements,fasteners,and other details. D. Manufacturer's Instructions: 1. Submit detailed instructions on installation requirements,including storage and handling procedures,anchoring,and layout. 2. Submit application,selection,and hookup configuration. E. Field Quality-Control Submittals:Indicate results of Contractor-furnished tests and inspections. F. Manufacturer Reports:Indicate that equipment has been installed according to manufacturer's instructions. 1.6 CLOSEOUT SUBMITTALS A. Section 01 70 00-Execution and Closeout Requirements:Requirements for closeout procedures. B. Project Record Documents:Record actual locations and final orientation of equipment and accessories. C. Operation and Maintenance Data:Submit maintenance instructions for equipment and accessories. 1.7 DELIVERY, STORAGE,AND HANDLING A. Inspection:Accept pumps on-Site in manufacturer's original packaging and inspect for damage. B. Storage: 1. Store products in areas protected from weather,moisture,or possible damage. 2. Do not store products directly on ground. C. Handle products to prevent damage to interior or exterior surfaces. Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF 43 21 49-2 WKD Project Number: 20170316.00.CL PART 2 PRODUCTS 2.1 DESIGN CRITERIA A. General:The pumps shall be selected to perform within their preferred operating range at the flow range with the Design Point close to the Best Efficiency Point(BEP)of the pump. Pumps shall be open impeller design,water lubricated,open line shaft,above grade discharge design vertical turbine pumps of Cast Iron-Bronze Fitted(CI-BF)construction as detailed in this specification section. B. The Effluent Pump Station Pumps shall meet the following operating characteristics: 1. Design Point: 1500 GPM @ 295.00 Feet TDH @ bowl discharge @ 83.8%Eff 2. Pump Run-Out: 2062 GPM @ 60 Hz Speed 3. Maximum NPSHr: 16.0 Feet @ Pump Run-Out 4. Shut-off Head: 451.1 ft @ 60 Hz speed 5. Nominal Speed: 1770 rpm(Six Pole) 6. Motor HP: One Hundred and Fifty(150)HP C. The Non-Potable Water Pump shall meet the following operating characteristics: 1. Design Point: 96 GPM @ 472.00 Feet TDH @ bowl discharge @ 69.3%Eff 2. Pump Run-Out: 130 GPM @ 60 Hz Speed 3. Maximum NPSHr: 8.7 Feet @ Pump Run-Out 4. Shut-off Head: 595.0 ft @ 60 Hz speed 5. Nominal Speed: 3550 rpm(Six Pole) 6. Motor HP: Twenty(20)HP • D. Pump selection single pump performance curve shall cross the minimum system curve(at reduced speed)well before reaching the end of the operating curve without exception. Pump Selection single pump performance curve shall cross the maximum system curve at 60 Hz speed well before the end of the operating curve without exception. Selection shall be rated to operate in a single pump mode without cavitation with wet well levels ranging from the highest to lowest levels. System curve data for the Effluent Pump Selection is noted below: 1. Minimum Pump Curve Flow(GPM) Head(Feet) 0 115 300 100 600 85 900 60 2. Maximum Pump Curve Flow(GPM) Head(Feet) 0 480 600 395 1200 335 1800 240 Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF 43 21 49-3 WKD Project Number: 20170316.00.CL System curve data for the Non-Potable Water Pump Selection is noted below: 3. Minimum Pump Curve Flow(GPM) Head(Feet) 0 310 30 290 60 230 90 170 4. Maximum Pump Curve Flow(GPM) Head(Feet) 0 590 40 555 80 470 120 345 Pump curves with plotted system data shall be provided with submittal data. E. Bowl assembly: The bowls shall be flanged type constructed of close-grained cast-iron conforming to ASTM A48,class 30. They shall be free from sand holes,blowholes,or other faults and must be accurately machined and fitted to close tolerances. They shall be capable of withstanding a hydrostatic pressure equal to twice the pressure at rated flow or 1.5 times shut-off head,whichever is greater. The bowls shall have enamel or epoxy lined waterways for maximum efficiency and wear Protection. A discharge bowl shall be used to connect bowl assembly to the discharge column. All the bowls(including the discharge bowl)shall be fitted with sleeve type bearings of ASTM B584-00 C90300 bronze. F. Impeller: The impeller shall be constructed from ASTM B584-00 87610 silicon bronze and shall be the enclosed type. It shall be free from defects and must be accurately cast,machined and filed for optimum performance and minimum vibration. Impeller shall be securely attached to the bowl shaft with a collet of ASTM 582M Type 416 stainless steel. G. Suction: The suction bell shall be designed to permit even flow into the first stage impeller eye. The suction bearing shall be ASTM B584-00 C90300 bronze. H. Bowl Shaft: The bowl shaft shall be constructed from ASTM 582M Type 416 stainless steel. It shall be precision ground and polished with surface finish better than 40 RMS. Bowl shaft diameter shall be a minimum of 1.6875"diameter. I. Column Pipe:The column pipe shall be furnished in sections not exceeding a nominal length of five(5)feet and shall be connected by flanged joints. The pipes shall be of ASTM A53 grade B steel pipe with a diameter of six(6)inches and the wall thickness no less than 0.280". All column flange faces shall be parallel and machined for rabbet fit to permit accurate alignment. The inside diameter of the pipe shall be such that the flow velocity shall not exceed 7.01 ft/sec at rated flow. J. Lineshaft: The lineshaft shall be of ASTM 582M Type 416 stainless steel,ground and polished with a surface finish not to exceed 40 RMS. They shall be furnished in interchangeable sections not over five(5)feet in length and shall be coupled with threaded stainless-steel couplings machined from solid Type 416 stainless steel bar. It shall have left-hand thread to tighten during Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF • 43 21 49-4 WKD Project Number: 20170316.00.CL pump operation. The diameter of the shaft and coupling shall be designed in according with AWWA E103-07 Standard and no less than 1.000"in diameter. K. Lineshaft Bearing: Lineshaft bearings shall be ASTM D3568-98 fluted EPDM rubber. The bearing retainer shall be Type 304 stainless steel conforming to ASTM A744M-00. Bearings shall be spaced no more than five(5)feet apart. L. Discharge Head:It shall be of the high-profile type to allow shaft coupled above stuffing box and provided for mounting the driver and support the column and bowl assemblies.It shall be of high- grade ductile iron,ASTM A536-84. The above ground outlet shall be flanged to match six(6) inch ANSI class 150.It shall have a 1/2"NPT connection for a pressure gauge. M. Stuffing Box: The stuffmg box shall be cast iron or carbon steel constructed. It shall have a minimum of one(1)pressure relief connection plumbed to return to the wet well via a port on the pump discharge head base. Packing shall be graphite impregnated acrylic yarn with a minimum of five(5)rings. The stuffing box shall be secured in place with Type 316 stainless steel fasteners and sealed to the discharge head by an elastomeric 0-ring or gasket. The stuffing box bearing shall be ASTM B584-00 C90300 bronze. A rubber clinger shall be secured to the motor shaft above the stuffing box. N. Headshaft: The head shaft connecting the motor to the pump shall be of ASTM 582M Type 416 stainless steel. It shall be precision ground and polished with surface finish better than 40 RMS. Diameter shall match the line shaft and be no smaller than 1.000". Coupling shall be threaded and constructed from solid Type 416 stainless steel bar. It shall have left-hand thread to tighten during pump operation. O. Sole Plate:Pumps shall be provided with am ASTM A36 carbon steel sole plate with a minimum thickness of 0.75". P. Strainer: A suitable basket strainer of ASTM A555-97 Type 316 stainless steel shall be provided having a free area of at least four times the flow area of the suction pipe. Q. Fasteners: All bowl, column and discharge head fasteners shall be of ASTM A276-00a Type 316 stainless steel. R. Coatings:All pump assembly component coating shall be conducted at the factory to allow for immediate installation. The coating shall be a coal tar epoxy(Carboline 300M or equal). Coating shall be applied in a minimum of two(2)coats with a total dry film thickness(DFT)of sixteen (16)mils minimum. The bowl exterior,column and discharge head interior and exterior shall be factory coated. 2.2 ACCESSORIES A. Air Release Valve:Pumps shall be provided with one(1)one(1)inch air release valves of stainless steel fitted cast iron construction.Air release valves shall be installed on the pump discharge upstream of the first isolation or check valve and on the upper column section. Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF 43 21 49-5 WKD Project Number: 20170316.00.CL 2.3 FACTORY PUMP TESTING A. A non-witnessed factory performance test shall be performed on each pump per Hydraulic Institute Standard 14.6 Acceptance Grade 2B. The test shall determine pump capacity,head, and efficiency. B. A non-witness factory hydrostatic test shall be conducted on the pump bowls per Hydraulic Institute Standard 14.6 Appendix B. 2.4 Motors A. Service Conditions: 1. Suitable for service outdoors. 2. Ambient temperature not greater than 40 degrees C. 3. Voltage variation of+/- 10% 4. Frequency variation of+/-5% 5. Combination of C.3 and C.4,not to exceed 10% B. Effluent Pump motors to be equipped with a variable frequency drive(VFD)capable of operation under any combination of the following conditions without mechanical or electrical damage. Ambient Temperature: 0 to+40 degrees C 1. Relative Humidity:Less than 95%non-condensing 2. Altitude:Less than 1,000M(3300 ft)above sea level 3. Vibration: .006 inches displacement, 1G peak 4. Shock: 15G peak for 11mS (+/- 1.0mS) 5. Control Specification 6. Control System: Sinusoidal pulse width modulated voltage waveform 7. Frequency Accuracy:+/-0.4%of max.frequency 8. Volts/Hertz Ratio:V/Hz user programmable 9. Operation Frequency: 0 to 400 Hz 10. Overload Capacity: 110%Overload capability for up to 1 minute, 150%Overload capability for up to 3 seconds C. Motors shall be vertical hollow shaft(VHS)units with Totally Enclosed Fan Cooled(TEFCI) enclosure. D. Unless otherwise specified,power supply shall be 460/3/60(for nominal 480-volt system). E. Insulation shall be rated minimum Class F(155 degrees C). 1. Magnet wire shall be copper 2. Magnet wire shall be classified Pulse Endurance,suitable for variable frequency applications. 3. Varnish shall be 100%solids polyester.Water borne varnish is not acceptable. F. Rotor bar construction shall be cast aluminum. G. Maximum temperature ruse at rated HP shall not exceed Class B limits(80 degrees C). H. Maximum temperature rise at 1.15 Service Factor shall not exceed Class F limits(155 degrees C). Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF 43 21 49-6 WKD Project Number: 20170316.00.CL I. Motors applied to variable frequency drives shall adhere to NEMA MG-1 Part 31 and shall be name-plated accordingly. VFD driven motors shall have at a minimum one(1)insulated bearing and a shaft grounding ring to prevent eddy current damage. J. The driven machine shall not overload the motor rating at any operating point. K. Bearings: 1. Bearings shall be rated for an L-10 bearing life of 100,000 hours at operating condition. 2. Bearings shall be anti-friction type,ball or roller as required. 3. A minimum of one(1)motor bearing shall be insulated on motors applied to variable frequency drives. L. Lubrication: 1. Grease lubricated bearings shall be designed for electric motor use. 2. Grease fittings shall be Alemite type,no smaller than 1/8"NPT. 3. Grease exits shall be plugs no smaller than 1/8"NPT. 4. Oil lubricate bearings shall be provided with an oil level sight gauge. 5. Contractor shall supply sufficient lubricant for initial start-up. M. Motors shall be fitted with a non-reverse ratchet to prevent reverse rotation within 4.5 degrees of rotation. N. Vibration shall not exceed 0.08 inches per second,peak to peak. O. Noise level shall not exceed 85 db.(A)at 1 meter. P. Motors shall have permanent lifting eyes or lugs capable of a safety factor of five(5). Q. All external fasteners shall be hexagon-head,cadmium or zinc plated class 5 or better. Slotted head,Phillips head and socket head fasteners are acceptable only for use internally and not exposed to the external environment. Metric fasteners are not acceptable. R. Final paint finish shall be corrosive resistant and capable of passing ASTM-B 117 250-hour salt spray test. S. Anti-condensation heaters shall be provided to keep motor windings at least 10 degrees F. above ambient temperature. Heaters shall be 115/1/60 with leads terminating in a separate auxiliary outlet box or conduit. T. Winding thermostats shall be in each phase of the motor. There shall be one(1)per phase,NC, connected in series with leads terminating in the auxiliary outlet box. U. Grounding provisions shall be in the main terminal box. Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF 43 21 49-7 WKD Project Number: 20170316.00.CL PART 3 EXECUTION 3.1 INSTALLATION A. Install power and control and wiring as specified in Division 26. B. Installation Standards:Install Work according to owner's standards. 3.2 FACTORY START-UP SERVICES A. Section 01 70 00-Execution and Closeout Requirements:Requirements for testing,adjusting, and balancing—Requirements for demonstration and training. B. A factory trained service representative shall be made available for start-up service,inspection and necessary adjustments. Start-up service technician shall be a regular employee of the equipment provider normally tasked to perform such duties. Sales representatives shall not perform start-up services. C. Two(2)full days at job site for installation certification,start-up and training. 1. Training shall include demonstration of equipment startup,shutdown,routine maintenance, and emergency repair procedures to Owner's personnel. D. Start-up service to include four(4)bound O&M manuals. E. Start-up service report attested to by start-up technician and representative of Owner and Engineer shall be provided upon completion of the start-up. 3.3 SPARES A. Provide One(1)packing set for each pump. 3.4 WARRANTY A. Warranty shall be provided in written form for inclusion with both the submittal and Installation, Operation and Maintenance manuals covering the specified equipment. B. Pump manufacturer's warranty shall at a minimum cover: 1. A period of one(1)year commencing upon successful start-up. END OF SECTION Stanly County Vertical Turbine Pump West Stanly WWTP and Sanitary Sewer Improvements SRF 43 21 49-8 WKD Project Number: 20170316.00.CL THIS PAGE INTENTIONALLY LEFT BLANK vA,,H C AF' /'/i `,• 4.,of ®y. a SEA L I�' SECTION 46 33 44 . PERISTALTIC METERING PUMPS OV aQr� :.••N.� ' � l PART 1 GENERAL /• FSI w.I i �P ` L4 Zo 1.1 SUMMARY A. Section Includes:Peristaltic metering pumps and accessories. B. Contractor shall furnish all labor,materials,and incidentals required,for the installation of a skid mounted chemical metering pump system to be used for the sodium hydroxide feed system as well as the Potassium Permanganate feed system shown in drawings and specified herein. • C. Skid Assembly shall include: 1. Electronically controlled,peristaltic metering pump 2. Pump drive motor 3. Pump control and wiring 4. Calibration columns 5. Pre-plumbed piping and all appurtenances(pulsation dampeners,back pressure valves, pressure relief valves,etc.) 1.2 REFERENCE STANDARDS RECEIVED A. U.S.General Services Administration: MAY 01 2020 1. ZZ-R-765-Commercial Item Description:Rubber, Silicone. 1.3 COORDINATION NCDEQIDWRINPDES A. Section 01 30 00-Administrative Requirements:Requirements for coordination. B. Coordinate Work of this Section with Owner and to minimize impact to wastewater 1.4 SEQUENCING A. Section 01 10 00-Summary:Requirements for sequencing. B. Sequence Work to prevent interference with plant operation. 1.5 SUBMITTALS A. 01 22 01 —Electronic Project Management System and 01 33 01 —Submittal Procedures EPMS: Requirements for submittals. B. Product Data: 1. Submit pump performance characteristics. 2. Submit electrical characteristics and connection requirements. 3. Submit manufacturer model number, dimensions,service sizes,and finishes. Stanly County Peristaltic Metering Pumps West Stanly WWTP and Sanitary Sewer Improvements SRF 46 33 44-1 WKD Project Number: 20170316.00.CL C. Shop Drawings: 1. Submit detailed and certified dimensional Shop Drawings for materials and equipment, including wiring and control diagrams,performance charts and curves,installation and anchoring requirements,fasteners,and other details. D. Manufacturer's Instructions: 1. Submit detailed instructions on installation requirements,including storage and handling procedures,anchoring,and layout. 2. Submit application,selection,and hookup configuration. 3. Submit hanging and support requirements and recommendations. E. Field Quality-Control Submittals:Indicate results of Contractor-furnished tests and inspections. F. Manufacturer Reports: Indicate that equipment has been installed according to manufacturer's instructions. 1.6 CLOSEOUT SUBMITTALS A. Section 01 70 00-Execution and Closeout Requirements:Requirements for closeout procedures. B. Project Record Documents:Record actual locations and final orientation of equipment and accessories. C. Operation and Maintenance Data: Submit maintenance instructions for equipment and accessories. 1.7 QUALITY ASSURANCE A. Ensure that materials of construction on pump liquid end are compatible with sodium hydroxide, and potassium permanganate. B. All components of skid mounted system shall be factory pressure tested with water prior to shipment. Certification of factory testing shall be included in installation,operation,and maintenance manuals. 1.8 DELIVERY,STORAGE,AND HANDLING A. Inspection:Accept pumps on-Site in manufacturer's original packaging and inspect for damage. B. Storage: 1. Store products in areas protected from weather,moisture,or possible damage. 2. Do not store products directly on ground. C. Handle products to prevent damage to interior or exterior surfaces. Stanly County Peristaltic Metering Pumps West Stanly WWTP and Sanitary Sewer Improvements SRF 46 33 44-2 WKD Project Number: 20170316.00.CL PART 2 PRODUCTS 2.1 DESIGN CRITERIA A. Shall be a positive displacement,peristaltic type metering pump. B. Shall be capable of output volumes from 0.001 to 33.3 gallons per hour, C. Suction lift shall be 30 feet of water. 2.2 PERISTALTIC-TYPE METERING PUMPS 1. Furnish materials according to owner's standards. B. Description: Self-priming peristaltic metering pump. C. Operation: 1. Electrical Characteristics:As specified in Division 26 and following: 2. Disconnect Switch:Factory mounted at equipment. D. Controls: 1. Remote signal for proportional control. 2. Flow Direction:Toggle switches. E. Materials: 1. As recommended by manufacturer for chemical and process fluid and dosing chemical. 2.3 ACCESSORIES A. Tubing: 1. Material: a. Polyethylene: 2. Size and Wall Thickness: %inch diameter. B. Cables:2-footpump connecting cable with plug and 10-footsignal input cable. C. Calibration Column: 1. One graduated calibration column;materials of construction compatible with chemicals being used. 2. Size calibration column for two-minute run time at maximum capacity of largest pump. 2.4 DRIVE SYSTEM A. Shall be factory installed and totally enclosed in a NEMA 4X,(IP66)wash-down enclosure. Capable of operating on any input power from 110VAC to 240VAC,50/60 Hz single phase supply without user configuration or selection switches. B. Motor: 1. Reversible,brushless DC gear motor rated for continuous duty. 2. Motor shall include overload protection. Stanly County Peristaltic Metering Pumps West Stanly WWTP and Sanitary Sewer Improvements SRF 46 33 44-3 WKD Project Number: 20170316.00.CL 3. The maximum gear motor RPM shall be 125 RPM. C. Enclosure: 1. Pressure cast aluminum with acidic liquid iron phosphate three-stage clean and coat pretreatment and exterior grade corrosion resistant polyester polyurethane powder coat. 2. Rated NEMA 4X(IP66). 3. Provided with 316SS floor/shelf level mounting brackets and hardware. 4. A wiring compartment shall be provided for connection of input/output signal wires and alarm output loads to un-pluggable type terminal block connectors.Terminal board shall be positively secured to the rear of the pump housing by two polymeric screws and fully enclosed by the wiring compartment cover.The terminal board shall not be disturbed by the removal of the wiring compartment cover.Ribbon cables shall not be used in the wiring compartment.Conduit hubs,liquid-tight connectors,connector through holes and tapped holes shall be sized in U.S.inches. 2.5 CONTROL CIRCUITRY A. Control circuitry shall be integral to the pump and capable of adjusting the pump motor speed from 0.05%to 100.00%in 0.01%increments less than 1%motor speed and in 0.1%increments greater than 1%motor speed(2,500:1 turndown ratio). B. The pump output shall be capable of being manually controlled via front panel user touchpad controls.The pump motor speed shall be adjustable from 0.05%to 100.00%in 0.01%increments less than 1%motor speed and in 0.1%increments greater than 1%motor speed. C. The pump output shall be capable of being remotely control via 4-20mA analog input.The input resolution shall be 0.01 of input value and capable of adjusting the pump motor speed from 0%to 100.0%motor speed in 0.1%increments.Four values shall be user configurable to define the low and high points on the output slope;a low input value,the required pump percentage of motor speed at the low input value,a high input value,the required pump percentage of motor speed at the high input value. D. The pump output shall be capable of being remotely control via 0-10 VDC input. The input resolution shall be 0.01 of input value and capable of adjusting the pump motor speed from 0%to 100.0%motor speed in 0.1%increments.Four values shall be user configurable to define the low and high points on the output slope;a low input value,the required pump percentage of motor speed at the low input value,a high input value,the required pump percentage of motor speed at the high input value. E. The pump output shall be capable of being remotely control via TTL/Cmos digital high speed pulse type input and an AC sine wave type pulse input in the range of O to 1000 Hz. The frequency resolution shall be 1 Hz and capable of adjusting the pump motor speed from 0%to 100.0%motor speed in 0.1%increments.Four values shall be user configurable to define the low and high points on the output slope;a low input value,the required pump percentage of motor speed at the low input value,a high input value,the required pump percentage of motor speed at the high input value. F. The pump output shall be capable of being remotely control via pulse triggered batching. The pump shall accept a TTL/Cmos digital pulse type input and a contact closure type pulse input in Stanly County Peristaltic Metering Pumps West Stanly WWTP and Sanitary Sewer Improvements SRF 46 33 44-4 WKD Project Number: 20170316.00.CL the range of 1 to 9999 pulses per batch. The batch time shall be adjustable from 1 to 999.9 seconds.The pump motor speed during the batch shall be adjustable from 0%to 100.0%motor speed in 0.1%increments. G. The pump shall include an internal cycle timer capable of automatically cycling the pump on and off.The pumping total cycle time shall be adjustable from 1 to 999.9 seconds. The pumping on time during the cycle shall be adjustable from 1 to 999.9 seconds.The pump motor speed during the cycle shall be adjustable from 0%to 100.0%motor speed in 0.1%increments. H. The pump shall be capable of dispensing upon demand. The dispensing shall be manually triggered by pressing the front panel start button or by inputting a contact closure. The dispensing volume shall be adjustable from 1 to 9999 milliliters.The pump motor speed during the dispensing cycle shall be adjustable from 0%to 100.0%motor speed in 0.1%increments. I. The pump shall be capable of automatically calculating the pump motor speed required to achieve a part per million dosing output that is proportional to a fixed system flow rate. The pump shall permit the user to input the dispensing chemical percentage concentration from 0%to 100.0%in 0.1%increments. The pump shall permit the user to input the dispensing chemical specific gravity from 0.1 to 9.9 in 0.1 increments. The pump shall permit the user to input the fixed system flow rate from 1.0 to 9999.9 liters per minute in 0.1 liters per minute increments. The pump shall permit the user to input the required dosing parts per million(PPM)from 0.1 to 100.0 in 0.1 increments. J. The pump shall be capable of automatically calculating the pump motor speed required to achieve a part per million dosing output that is proportional to a variable system flow rate.The pump shall permit the user to input the dispensing chemical percentage concentration from 0%to 100.0%in 0.1%increments.The pump shall permit the user to input the dispensing chemical specific gravity from 0.1 to 9.9 in 0.1 increments. The pump shall permit the user to input a K-factor in pulses per liter from a sensor in the water system that outputs a high speed digital pulse from 0 to 1000 Hz that is proportional to the system water flow velocity. The pump shall permit the user to input the required dosing parts per million(PPM)from 0.1 to 100.0 in 0.1 increments. K. Provide a 4-20mA output signal which is scalable and proportional to pump output volume. L. Provide four contact closure alarm outputs.Three rated at 1A-115VAC, 0.8A-30VDC and one rated at 6A-250VAC,5A-30VDC.Each alarm output shall be assignable to any of the following pump functions: TFD system,FVS system,motor run/stop,motor failed to respond to commands, input signal failure, output signal failure,remote/local control setting,or monitor which of the nine different pump operating modes is currently active. PART 3 EXECUTION 3.1 INSTALLATION A. Install power and control and wiring as specified in Division 26. B. Flush tubing with clean water. Stanly County Peristaltic Metering Pumps West Stanly WWTP and Sanitary Sewer Improvements SRF 46 33 44-5 WKD Project Number: 20170316.00.CL C. Installation Standards:Install Work according to owner's standards. 3.2 FIELD QUALITY CONTROL A. Section 01 70 00-Execution and Closeout Requirements:Requirements for testing, adjusting, and balancing. B. Pre-operational Check:Before operating system or components,vent air from system to ensure water in pump. C. Startup and Performance Testing: 1. Test metering pump flow rate by measuring time to fill or by draining calibration column with potable water. 2. Operate each chemical feed system on clear water for continuous period of four hours. 3. Hydrostatically test system piping for leaks at 150 psig D. Equipment Acceptance: 1. Adjust,repair,modify,or replace components failing to perform as specified,and rerun tests. 2. Make final adjustments to equipment under direction of manufacturer's representative. E. After installation and final testing,the manufacturer shall provide written certification to the OWNER/ENGINEER that all equipment is properly installed and that the plant operators have been instructed on proper operation and maintenance procedures. Local manufacturer's representatives are not acceptable to perform these tasks. 3.3 DEMONSTRATION A. Section 01 70 00-Execution and Closeout Requirements:Requirements for demonstration and training. B. Demonstrate equipment startup,shutdown,routine maintenance, and emergency repair procedures to Owner's personnel. C. Demonstrate system control functions and alarms. END OF SECTION Stanly County Peristaltic Metering Pumps West Stanly WWTP and Sanitary Sewer Improvements SRF 46 33 44-6 WKD Project Number: 20170316.00.CL THIS PAGE INTENTIONALLY LEFT BLANK