Loading...
HomeMy WebLinkAboutNC0043532_Application (ATC)_20200501 ROY COOPER Governor 'I MICHAEL S.REGAN *� Secretary S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality May 1,2020 Mr. Andy Lucas County Manager Stanly County 1000 N.First Street, Suite 12 Albemarle,North Carolina 28001 SUBJECT: Authorization to Construct A to C No. 043532A01 Stanly County West Stanly WWTP NPDES Permit No.NC0043532 Dear Mr. Lucas: A letter of request for an Authorization to Construct was received September 05, 2019, by the Division of Water Resources(Division). With additional information received on March 4, 2020 and May 1, 2020, fmal plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.9 MGD West Stanly WWTP, with discharge of treated wastewater into the Long Creek in the Yadkin-Pee Dee River Basin. This authorization results in an increase in design and permitted capacity to 1.2 MGD, and is awarded for the construction of the following specific modifications: Modification to McCoy Creek influent pump station, installation of one (1) potassium permanganate feed system for odor control, one (1) influent magnetic meter vault, one (1) 9 MGD cylindrical bar screen, one (1) 9 MGD aerated grit removal system, one(1) aeration basin splitter box, one (1) refrigerated sampler, eight(8) 10 HP floating aerators and eight (8) 7 CFM floating blowers for aeration basin, one (1) WAS magnetic meter vault, one (1) 10"x21" downward opening weir gate and one (1) 18"x21" downward opening weir gate for the clarifier splitter box, one (1) 75' diameter circular secondary clarifier with 14' side-water depth, three(3) 1500 GPM vertical turbine effluent pumps for effluent force main, one (1) 96 GPM vertical turbine effluent pumps for plant water service, three (3) 625 GPM suction lift RAS pumps, one (1) sodium hydroxide chemical feed and delivery system for pH control, modification to chlorination/dechlorination contact tank by raising the top of wall of 2.6', and demolition of the emergency Outfall 001; in conformity with the project plans, specifications,and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. D E Q�J/ North Carolina Department of Environmental Quality I Division of Water Resources /P 512 North Salisbury Street 11611 Mail Service Center I Raleigh,North Carolina 27b99 loll u.r.�w d+w+..bi 0.+1;\/'" 919.707.9000 Mr.Andy Lucas,County Manager May 1,2020 Page 2 of 3 This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0043532 issued effective December 1, 2018, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No.NC0043532. It is the Owner's responsibility to ensure that the as-constructed project meets the requirements of all applicable regulations and statutes,the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through§143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number 704-663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an onsite inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center,Raleigh,NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility,and must comply with all other conditions of T15A:8G.0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. Page 2 of 3 Mr.Andy Lucas,County Manager May 1,2020 Page 3 of 3 During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction,the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies(local, state,and federal)which have jurisdiction. If you have any questions or need additional information, please contact Min Xiao at telephone number(919)707-3644. Sincerely, A for S. Daniel Smith Director,Division of Water Resources With Engineer's Certificate attached: cc: Central Files NPDES File ecopy: James Holland,P.E. W.K. Dickson&Co.,Inc. Email: jholland@wkdickson.com DWR Mooresville Regional Office,Water Quality Programs DWI/Ken Pohlig Without Engineer's Certificate attached: cc: Stanly County Health Page 3 of 3 Stanly County West Stanly WWTP Authorization to Construct No. 043532A01 Issued May 1,2020 NPDES Permit No.NC0043532 Engineer's Certification I, ,as a duly registered Professional Engineer in the State of North Carolina,having been authorized to observe(periodically/weekly/full time) the construction of the modifications and improvements to the West Stanly Wastewater Treatment Plant,located in Stanly County,hereby state that,to the best of my abilities,due care and diligence was used in the observation of the following construction: Modification to McCoy Creek influent pump station, installation of one(1) potassium permanganate feed system for odor control,one(1)influent magnetic meter vault,one(1)9 MGD cylindrical bar screen,one(1)9 MGD aerated grit removal system,one(1) aeration basin splitter box,one(1)refrigerated sampler, eight(8) 10 HP floating aerators and eight(8)7 CFM floating blowers for aeration basin,one(1) WAS magnetic meter vault, one(1) 10"x21"downward opening weir gate and one(1) 18"x21"downward opening weir gate for the clarifier splitter box, one(1) 75' diameter circular secondary clarifier with 14' side-water depth,three(3) 1500 GPM vertical turbine effluent pumps for effluent force main,one(1)96 GPM vertical turbine effluent pumps for plant water service,three(3)625 GPM suction lift RAS pumps,one(1)sodium hydroxide chemical feed and delivery system for pH control,modification to chlorination/dechlorination contact tank by raising the top of wall of 2.6', and demolition of the emergency Outfall 001; in conformity with the project plans, specifications,and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance,intent and in conformity with all applicable regulations and statutes and the project plans, specifications,and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Min Xiao sQL Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh,NC 27699-1617