Loading...
HomeMy WebLinkAboutWQCS00054_NOV-2020-DV-0174 Response_20200504Public Works 500 North Main Street Suite # 600 Monroe, NC 28112 T.704-296-4210 EST. 1842 May 4, 2020 Mr. W. Corey Basinger Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Subject: Notice of Violation &Intent to Issue Civil Penalty Tracking #: NOV-2020-DV-0174 Sanitary Sewer Overflows — March 2020 Collection System Permit — WQCS00054 Union County Dear Mr. singer Union County has received the NOV referenced above for collection system overflows. Explanations of the overflows were on the BIMS Overflow Reporting Forms submitted by Union County Public Works (UCPW) to the NCDEQ. However, we have added a few additional facts in the explanations below. Incident # Date Location 202000847 3/2/2020 2034 Iverson Lane Response: The SSO's listed in this section were due to a Grease accumulation and debris in the pipeline. Our Industrial Pretreatment Program Manager was notified and further investigations took place of the entire zone. Educational Material was distributed and this area will be monitored. Cleaning in this area has been increased as -well. Incident # Date Location 202000869 3/3/2020 4004 Sardis Church Road 202001077 3/25/2020 4004 Sardis Church Road Response: The SSO listed in this section were due to I&I introduction during heavy rains and flash flooding. The system associated with this area was inundated with floodwaters and increased flows at CCWRF. The new CCWRF EQ system was being utilized to attenuate peak flows experienced J�\CN CpUy�< 9TH CARpy during storm events . Further modification are being looked into by our I&C group to optimize some hydraulic issues we have found with the original design. Union County Public Works has underwent a comprehensive Master Plan (Black & Veatch) and improvements strategy in efforts to better identify areas of improvement within the Crooked Creek basin. Efforts such as flow monitoring studies (CDMSmith/Hydrostructures and Frazier Engineering) to identify areas of inflow and infiltration, capacity assessments of the CCWRF and associated lift stations, lift station assessments to identify aging infrastructure, among others. As a result of these studies, UCPW has developed a CIP plan to address certain areas of concern. A significant plant upgrade at the Crooked Creek WRF was completed including new headworks, a 3MG EQ basin, and process improvements. Total cost is $7.775M project also included a new 10.3 MGD influent PS, new headworks containing new bar screens, compactor, and grit removal/dewatering, and relocation of 1200' of 18" gravity sewer. I&I flow studies have been conducted by CDMSmith (Hydrostructures) and Frazier Engineering. These studies have narrowed the basin into concentrated sub -basins to target I&I reduction. The intended approach is a find -fix method to utilize funding efficiently and consistently. AM Liner has completed two sub -basin of repairs from the data provided for I&I abatement. This work has included lateral repairs and manhole rehab. Post flow meters where installed in November 2019 and removed in March 2020. These meters did not reflect much valuable data due to the record rain events. Further metering is being considered at this time. Incident# Date Location 202000889 3/6/2020 1909 Highway 205 Response: The SSO related to this incident was caused by two air -locked pumps. By the time the after- hours personnel arrived on scene there was a small spill from the upstream manhole of the station. The pumps where quickly repaired and the SSO was stopped. Lime and straw were spread on the affected area the next day. UCPW also has an aggressive Capital Improvement Program throughout the next 5 years. The projects include: ➢ Crooked Creek Basin Improvements - $23,900,000 ➢ Suburban Estates PS and FM - $1,000,000.00 ➢ Waxhaw Interceptor —$5,400,000 ➢ WW PS Improvements - $3,500,000 02`pN COGy�< o9TH ,cAPoJ Page 2 UCPW's current CIP projects are also ongoing with projects including: ➢ Blythe Creek Sewer Improvements - $6,200,000 ➢ Forest Park PS Replacement & Interceptor Improvements - $3,345,000 ➢ Crooked Creek I&I Study & Remediation - $476,000 Union County Public Works continues to invest funds into SSES work, capital improvements, maintenance, FOG, and operations to improve the wastewater collection system. If further information or details regarding the CCWRF Improvements, as well as, the CIP projects listed above are required, please feel free to contact Greg Morgan, Superintendent/ORC, at 704-289- 3288 or myself at 704-296-4215. Thank you for your consideration on this issue. Sincerely, V/L Vim" Andrew Neff, PE Water/Wastewater Division Director cc: Hyong Yi, Public Works Administrator Josh Brooks, Assistant Director, Water/Wastewater Operations Greg Morgan, Utility Field Services Superintendent/ORC Page 3