Loading...
HomeMy WebLinkAbout20040587 Ver 2_More Info Received_20061111Charlotte-Mecklenhurg ~ ~~(~'[}'~ J{ Charlotte Storm Water Services ,~ 4 .~_ WATER 600 E. Fourth St., 14~^ Floor Charlotte, NC 28202-2844 Services November 8, 2006 - r Ms. Cyndi Karoly NCDWQ 401/Wetlands Unit 2321 Crabtree Boulevard ~,,_. ~ , ; ~~ ~ ~. ~a~ ~ '~~~ ~~ <,a~~r'~ Raleigh, North Carolina 27604 Subject: Section 401 WQ Certification Project Compliance Inspection 501 Lyles Court Maintenance Project DWQ# 04-0587 Charlotte, North Carolina Dear Ms. Karoly: The City of Charlotte Storm Water Services (CSWS) is hereby contacting the NCDWQ 401/Wetlands Unit regarding jurisdictional impacts associated with the 501 Lyles Court Maintenance Project. On November 28, 2005, NCDWQ approved this project under Water Quality General Certification Numbers 3494 and 3495 (DWQ# 04-0587). Authorized jurisdictional impacts to the on-site perennial stream channel consisted of: 4001inear feet (400 bank feet) of gabion wall installation along the right bank, an additional 140 linear feet (140 bank feet) of right bank reshaping with soft stabilization (permanent erosion control matting), and the installation of a 10-linear foot rip rap apron at the outlet of a storm drainage pipe replacement. On October 31, 2006, CSWS's Isaac Hinson inspected the project for Nationwide Permit/Water Quality Certification compliance. Actual project impacts consisted o£ 4001inear feet (400 bank feet) of gabion wall installation along the right bank, an additional 1401inear feet (140 bank feet) of right bank reshaping with soft stabilization (permanent erosion control matting), placement of rip rap along the bottom half of 65 linear feet (65 bank feet) of reshaped bank, placement of an additional 18 linear feet (18 bank feet) of rip rap on the bank, and the installation of a 10-linear foot rip rap apron at the outlet of a storm drainage pipe replacement. Authorized and actual project impacts are summarized in the following table: Jurisd tional Actavitr` Authorized _ Actual <~ •~ I~nauthorized ~ Feature Im 'act Tin 'ac# Tm acts ~ Perennial Gabion wall installation along 4001inear feet 400 linear feet Stream the ri ht bank (400 bank feet) (400 bank feet) N/A Perennial Bank reshaping and soft 1401inear feet 1401inear feet Stream stabilization (ECM) (140 bank feet) (140 bank feet) N/A Perennial Rip rap placement along lower O if 65 linear feet 65 linear feet Stream ortion of resha ed bank 65 bank feet) (65 bank feet) Perennial Rip rap hard stabilization on O if 18 linear feet 18 linear feet Stream ri ht bank (18 bank feet) (18 bank feet) Perennial Rip rap apron installation at Stream newl re laced i e outlet 10 if l O if N/A To report drainage problems: 704-336-RAIN http://stormwafer.charmeck.org Charlotte-Mecklenburg ~TORIVI Charlotte Storm Water Services 600 E. Fourth St., 14~" Floor -- ~ ~~~~=~ WATER Charlotte, NC 28202-2844 Services-~-'~-~r Remedial corrective actions are not practicable as the project has been completed and fencing has subsequently been installed along the affected properties, which precludes site access. Since this project was not in compliance with its authorized impacts, CSWS is submitting this letter in lieu of the NCDWQ Certificate of Completion form. Please review and contact me with any comments or concerns. Sincerely, Isaac Hin~on Wetland Specialist City of Charlotte Storm Water Services Division Desk phone 704-336-4495 ihinson@ci.charlotte.nc.us cc: Mr. Steve Chapin, U.S. Army Corps of Engineers File To reporf drainage problems: 704-336-RAIN http.//stormwater.charmeck.org