Loading...
HomeMy WebLinkAbout20030489 Ver 1_COMPLETE FILE_20030502State of North Carolina Department of Environment . and Natural Resources Raleigh Regional Office Michael F. Easley, Governor NCDENR Wiiliam G: Ross, Jr.-Secreta?/ "°'?TM*-?°v"'rD?""E"r° --- ' J ENVIRONMENT AND NATURAL RESOURCES Alan W. Klimek, P.E. Director February 14, 20032 Mr. Max Barbour Real Estate Development Post Office Box 97397 Raleigh, N.C. 27624-7397 WETLANDS/ 401 GROUP WATER QUALITY SECTION Subject: Application of Neuse Buffer Rules Vested Rights Opinion Raleigh International Business Park, Highway 64 New Hope Road, Raleigh Wake County Dear Mr. Barbour: This letter is to inform you that the Environmental Division of the North Carolina Department of Justice (Attorney's General Office)has completed its review of your request for a vested right determination for the subject property from the Neuse Buffer Rules (15A NCAC 02B .0233) The information that you have submitted requesting a determination of whether the Neuse Buffer Rules apply to the project commonly known as Raleigh International Business Park has been reviewed by the Attorney's General Office. House Bill 1402 specifically exempted property with existing vested rights from the application of the Neuse Buffer Rules. The determination of whether vested rights exist depends on the application of the common law vested rights criteria which are as follows: 1. Substantial expenditures and contractual obligations which occurred prior to the enactment of the law; 2. Expenditures and obligations incurred in good faith; 3. Expenditures and obligations were made in reasonable reliance upon governmental permits and/or approvals; and, 4. Detriment would result with application of the law. Based on the AG's opinion, it appears that the Raleigh International Business Park meets the requirements for common law vested rights. First, according to the materials submitted, the developers made substantial expenditures on the infrastructure of the project prior to the imposition of the Neuse Buffer Rules. Second, the developers acted in good faith as the received approval of the project from the City of Raleigh prior to the effective date of the Neuse Buffer Rules. Third, the developers relied upon governmental permission as the project was exempt from 401/404 Water Quality Certification since the project was under the threshold requirements for impacts. Fourth and finally, imposition of the Neuse Buffer Rules will cause the developers to suffer a detriment as they will incur substantial costs. Since it appears that the developer meets the four criteria of common law vested rights, the Raleigh Regional Office of the Division of Water Quality will not impose the requirements of the Neuse Buffer Rules on the 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX (319)571-071 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post-corsauner pape Raleigh Intemational Business Park for the development plans proposed prior to the enactment of the Neuse Buffer Rule. The proposed activities will not have to comply with the requirements of the riparian rule as long as there are no new or additional impacts. If you have any questions or comments, please contact me at 919-571-4700. Steve Mitchell Environmental Scientist cc: Attorney General's Office Planning Branch John Domey nbrlet. for/neuse.buf/ralbuspk ?DF W A T ?RQ ?O ?? r Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality October 22, 2003 Glen and Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Dear Mr. and Mrs. Partin: Subject: Raleigh International Business Park/New Bern Commons DWQ Project No. 030489 Wake County This Office is in receipt of the plans dated August 8, 2003, revised August 12, 2003, and revised again September 23 2003 for the two extended wet detention basins followed by level spreaders with forested filter strips at the subject facility prepared on your behalf by Piedmont Land Design and submitted to the Division on September 26, 2003. Staff from the Wetlands Unit reviewed the plans and found them acceptable as long as the discharge at outlet no. 40 at velocities will not destabilize the downstream channel. Please note that this approval is for water quality purposes only and shall not be construed as an approval of the design for dam/outlet structure integrity, Dam Safety, public safety, or flood attenuation purposes. If you have any questions regarding this matter, please contact Mr. Todd St. John at (919) 733-9584. I R. Do e y ands Unit S erv' or cc: Raleigh Regional Office Todd St. John Mr. Ron Hendricks, PE, PLD, 8366-104 Six Forks Road, Raleigh, NC 27615 City of Raleigh Inspections, 222 West Hargett Street, Raleigh NC 27602 File North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetiands/ W A T ?RQG r o = -mac Mich William G. Ross, Jr., Department of Environment and Natural RL Alan W. Klimek, P.E., L Division of Water G August 12, 2003 Glen and Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Dear Mr. and Mrs. Partin: Subject: Raleigh International Business Park/New Bern Commons DWQ Project No. 030489 Wake County This Office is in receipt of the plans dated August 8, 2003 and revised August 12, 2003 (by email) for the two extended wet detention basins followed by level spreaders with forested filter strips at the subject facility prepared on your behalf by Piedmont Land Design and submitted to the Division on August 12, 2003. Staff from the Wetlands Unit reviewed the plans and found them acceptable as long as the offsite stormwater/stream that currently enters the site at junction box no. 26 is bypassed through the site, is not combined with the onsite stormwater, and is discharged at or near the outlet no. 40 at velocities that will not destabilize the downstream channel. (The 3.11 acres that drains from offsite into #49 and #54A does not need to be bypassed.) Please note that this approval is for water quality purposes only and shall not be construed as an approval of the design for dam/outlet structure integrity, Dam Safety, public safety, or flood attenuation purposes. If you have any questions regarding this matter, please contact Mr. Todd St. John at (919) 733-9584. 6 pe isor cc: Raleigh Regional Office Todd St. John Mr. Ron Hendricks, PE, PLD, 8366-104 Six Forks Road, Raleigh, NC 27615 City of Raleigh Inspections, 222 West Hargett Street, Raleigh NC 27602 File North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncweUands/ OO? WA N T ?RQG > ow Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality August 12, 2003 Glen and Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Subject: Raleigh International Business Park/New Bern Commons DWQ Project No. 030489 Wake County Dear Mr. and Mrs. Partin: This Office is in receipt of the plans dated August 8, 2003 and revised August 12, 2003 (by email) for the two extended wet detention basins followed by level spreaders with forested filter strips at the subject facility prepared on your behalf by Piedmont Land Design and submitted to the Division on August 12, 2003. Staff from the Wetlands Unit reviewed the plans and found them acceptable as long as the offsite stormwater/stream that currently enters the site at junction box no. 26 is bypassed through the site, is not combined with the onsite stormwater, and is discharged at or near the outlet no. 40. (The 3.11 acres that drains from offsite into #49 and #54A does not need to be bypassed.) Please note that thi approval is for water quality purposes only and shall not be construed as an approval of the design for dam/o?tlet structure integrity, Dam Safety, public safety, or flood attenuation purposes. 1' If you have any questions regarding this matter, please contact Mr. Todd St. John at (919) 733-9584. Sincerely, John R. Dorney Wetlands Unit Supervisor cc: Raleigh Regional Office Todd St. John Mr. Ron Hendricks, PE, PLD, 8366-104 Six Forks Road, Raleigh, NC 27615 City of Raleigh Inspections, 222 West Hargett Street, Raleigh NC 27602 File North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ ? ?2 O?O? I NA T ?RQG Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality August 12, 2003 To: John Dorney From: Todd St. John Re: Raleigh International Business Park DWQ# 030489 Wake County reviewed the plans and noticed that the designer had combined offsite stream and onsite stormwater and then proposed to split the flow proportionally to the drainage areas (sort of). I have never seen this proposed before and so no potential benefits to water quality to allow them to do so, although I did notice some downsides including the fact that the splitter could foul without any noticeable affect resulting in complete bypass of pond 2, and the fact that they do not control the offsite drainage to name two potential problems. The designer and developer agreed to provide the bypass of the stream with the understanding that we may not approve any design changes in the future. When the bypass is provided, I determined that pond 2 will be receiving more stormwater than the calculations indicate; however, conservatively, the pond should be very close to the proper size (1.3% undersized based on an overall impervious area of 83.6%). 1 recommend that we approve the plans with the caveat as proposed and cc the City on the approval. J North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ IJ111 Piedmont LandDesign,LLP IJ 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax: (919) 845-7703 TRANSMITTAL f? .r=te DATE September 26, 2003 -? TO NCDENR , DWQ - Wetlands/401 Unit ATTENTION Todd St. John REFERENCE DWQ Project No. 03-0489 COPIES DESCRIPTION 2 Stormwater Management Plan ? FOR YOUR REVIEW 1 Letter ? FOR YOUR COMMENT ? FOR YOUR APPROVAL ? FOR YOUR USE COMMENTS Please call if y ou have any questions. Thanks, FROM COPY Ron Hendricks JOB CODE RIBPCW Civil Engineers • Landscape Architects • Land Planners PLD Piedmont Land Design, LLP 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax: (919) 845-7703 September 26, 2003 North Carolina Division of Water Quality, Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Attention: Todd St. John Reference: Raleigh International Business Park DWQ Project No. 03-0489 Dear Mr. St. John: Enclosed are two copies of the revised site construction plans (Sheet No. C-3, 3.1, 3.2, 3.5, 3.6, 7, and 7.1) for the proposed wet detention ponds and the stormwater calculations for each pond. We have revised the plans to provide separate stormwater systems for the off-site stormwater runoff to by-pass the ponds as required in your letter dated July 31, 2003 and per our correspondence via email. Please provide the final approval letter for this project. We appreciate your help on this matter. Please call if you have any additional questions. Since ely, Ron Hendricks RIBPCW RPH: rph Enclosure Civil Engineers • Landscape Architects • Land Planners • r 1 Piedmont Land Design, LLP 8366.104 Six Forks Rodd • Raleigh, NC 27615 • (919) 845-7600 • FdX (919) 845-7703 23 September 2003 New Bern Commons New Bern Avenue/U.S. Highway 64 Raleigh, North Carolina Stormwater Calculations Runoff Calculations L, •, ? ate` ?? 3'' 6 3 Using Rational Method I?o = 7.50 in/hr; 1100 = 9.72 in/hr; Composite c values are based on c = 0.95 for impervious areas and c = 0.2 for pervious areas. Using HDS No. 3, n = 0.015 for pipe sizing: *All stone structures are to be City of Raleigh approved structures unless othenvise noted. Drainage to Wet Pond #1 Raised Top Catch Basin #1 IA = DA = 0.95 acres Qio= 0.85(7.50) 0.95 = 6.1 cfs #1 -#2 15" rcp @ 3.0%, vio = 8.2 fps, dio = 0.65', HW/D = 3.2, QmaX = 9.0 cfs Curb Inlet #2 IA = 0.12 acres DA = 0.95 + 0.12 = 1.07 acres Q10 = 0.85(7.50) 1.07 = 6.8 cfs #2 - #3 18" rcp @ 1.0%, vio = 5.5 fps, dio= 0.90', HW/D = 2.3, Q.,,X = 12.0 cfs Curb Inlet #3 IA = 0.11 acres DA = 1.07 + 0.11 = 1.18 acres Qio= 0.85(7.50) 1.18 = 7.5 cfs #3 - #4 18" rcp @ 1.5%, vio = 6.8 fps, dio= 0.90', HW/D = 3.0, QmaX = 16.0 cfs Civil Engineers • Landscape Archilecls • ' Land Planners 1 2 Curb Inlet #4 IA = 0.33 acres DA = 1.18 + 0.33 = 1.51 acres Qio= 0.85(7.50) 1.51 = 9.6 cfs #4-#5 18" rep @ 1.0%, vio = 5.9 fps, d,o= 1.25', HW/D = 2.3, Q,,,a, = 13.5 cfs Storm Manhole #5 IA=0 DA = 1.51 acres Qio= 9.6 cfs Catch Basin #6 IA = DA = 0.21 acres Qio= 0.85(7.50) 0.21 = 1.3 cfs #6 - #6A 15" rep @ 3.25%, vio = 5.3 fps, dio= 0.33', HN'V/D = 2.8, Qma, = 10.0 cfs Curb Inlet #6A IA = 0.18 acres DA = 0.21 + 0.18 = 0.39 acres Qio= 0.85(7.50) 0.39 = 2.5 cfs #5 - #7 18" rep @ 3.0%, vlo = 9.8 fps, dio= 0.75', HW/D = 2.5, Qmax = 14.5 cfs #6A - #7 15" rep @ 1.0%, vio = 4.5 fps, dio= 0.55', HW/D = 2.7, Qmax = 10.0 cfs Curb Inlet #7 IA = 0.28 acres DA = 1.51 + 0.39 +0.28 = 2.18 acres Qio= 0.85(7.50) 2.18 = 13.9 cfs Catch Basin #8 IA = DA = 0.40 acres Qio= 0.85(7.50) 0.40 = 2.6 cfs #8 - #9 15" rep @ 1.0%, vio = 4.5 fps, dio= 0.55', HW/D = 4.3, Qmax = 12.0 cfs Catch Basin #9 IA = 0.48 acres DA = 0.40 + 0.48 = 0.88 acres Qio= 0.85(7.50) 0.88 = 5.6 cfs RMPCW_Stormwater Calculations.doc New Bern Commons PLD 3 #7-#10 18" rep @ 3.3%, vio = 10.5 fps, d,o= 1.0', HW/D = 2.7, Q,,,?x = 15.5 cfs #9-#10 15" rep @ 1.0%, vlo = 5.3 fps, dio= 0.95', HW/D = 4.3, Qm,x = 12.0 cfs Curb Inlet #10 IA = 0.31 acres DA=2.18+0.88+0.31 =3.37 acres Qio= 0.85(7.50) 3.37 = 21.5 cfs #10 - #1 l 24" rep @ 1.0%, vio = 7.0 fps, dio= 1.55', HW/D = 4.0, Qmax = 38.0 cfs Curb Inlet #11 IA = 0.13 acres DA = 3.50 acres Qio= 0.85(7.50) 3.50 = 22.3 cfs #11 - #12 24" rep @ 1.2%, vio = 7.4 fps, dio= 1.7', HW/D = 4.2, Q?„?x = 40.0 cfs Curb Inlet # 12 IA = 0.03 acres DA = 3.50 + 0.03 = 3.53 acres Qio = 0.85(7.50) 3.53 = 22.5 cfs #12 - #13 24"rcp@ 1.5%,vio=8.8fps, dio= 1.6',HW/D=4.5,Qm,x=45.0 cfs Curb Inlet #13 IA = 0.59 acres DA = 3.53 + 0.59 = 4.12 acres Qio= 0.85(7.50) 4.12 = 26.3 cfs Curb Inlet #14 IA = DA = 0.08 acres Q1o= 0.85(7.50) 0.08 = 0.5 cfs #14 - #15 15" rep @ 1.0%, vio = 2.7 fps, dio= 0.25', HW/D = 2.6, QR„x = 9.5 cfs Curb Inlet # 15 [A = 0.39 acres DA = 0.08 + 0.39 = 0.47 acres Qio= 0.85(7.50) 0.47 = 3.0 cfs RMPCW Stornmatcr Calculations.doe New Bern Commons PLD 4 #15 - #16 15" rep @ 1.0%, vio = 4.5 fps, dio= 0.65', HW/D = 3. 1, Qmax = 11.0 cfs Curb Inlet #16 IA = 0.32 acres DA = 0.47 + 0.32 = 0.79 acres Q?o= 0.85(7.50) 0.79 = 5.0 cfs #16 - #17 15" rep @ 1.0%, vio = 5.2 fps, dio= 0.85', HW/D = 5.9, Qmax = 16.0 cfs Storm Manhole # 17 IA=0 DA = 0.79 acres Q1o= 5.0 cfs Curb Inlet #18 IA = DA = 0.16 acres Qjo= 0.85(7.50) 0.16 = 1.0 cfs #18 - #19 15" rep @ 1.0%, vio = 3.3 fps, dio= 0.38, HW/D = 2.6, Qmax = 9.5 cfs Curb Inlet #19 IA = 0.35 acres DA = 0.16 + 0.35 = 0.51 acres Qio= 0.85(7.50) 0.51 = 3.3 cfs #19 - #20 15" rep @ 1.0%, vio = 4.7 fps, dio= 0.67', HW/D = 5.2, Qmax = 15.0 cfs Curb Inlet #20 IA = 0.24 acres DA = 0.51 + 0.24 = 0.75 acres Qio= 0.85(7.50) 0.75 = 4.8 cfs #20 - #21 15" rep @ 1.0%, vio = 5.1 fps, d,o= 0.87', HW/D = 5.7, Qmax = 15.5 cfs Curb Inlet #21 IA = 0.14 acres DA = 0.75 + 0.14 = 0.89 acres Qio= 0.85(7.50) 0.89 = 5.7 cfs IMPCW_Stornmater Calculations.doe New Bern Commons PLD 5 #17 - #22 15" rcp @ 1.5%, vio = 5.0 fps, d,o = 0.85, HW/D = 6. 1, Qmax = 16.5 cfs #21 - #22 18" rcp @ 1.0%, vio = 5.5 fps, dio= 0.85, HW/D = 6.9, Q,,,?x = 27.0 cfs Double Curb Inlet #22 IA = 1.39 acres DA = 0.79 + 0.89 + 1.39 = 3.07 acres Qio= 0.85(7.50) 3.07 = 19.6 cfs #13 - #23 24" rep @ 4.0%, vio = 13.5 fps, dio= 1.15', HW/D = 5.5, Qm = 48.0 cfs #22 - #23 24" rep @ 1.0%, vio = 7.0 fps, dio= 1.5', HW/D = 5.3,Qma, = 47. cfs Storm Manhole #23 IA=0 DA=4.12+3.07=7.19 acres Qio= 0.85(7.50) 7.19 = 45.8 cfs #23 - #23A 30" rep @ 1.5%, vio = 10.0 fps, djo = 1.9', HW/D = 5.6, Qmsx = 82.0 cfs Curb Inlet #23A IA = 0.24 acres DA = 7.19 + 0.24 = 7.43 acres Qio= 0.85(7.50) 7.43 = 47.4 cfs #23A -#24 30" rep @ 1.5%, vio = 10.0 fps, d,o= 2.0', HW/D = 5.9, Qm,X = 90.0 cfs Storm Manhole #24 IA=0 DA = 7.43 + 0.28 (RD) = 7.71 acres Qto= 0.85(7.50) 7.71 = 49.2 cfs #24 - #25 30" rep @ 2.0%, vio = 12.0 fps, dio= 1.8', HW/D = 4.0, Qm?x = 70.0 cfs RTWI #25C IA = 0.63 acres (Pond) DA = 8.34 acres Qio= 0.85(7.50) 8.34 = 53.2 cfs Qtoo= 0.85(9.72) 8.34 = 68.9 cfs RII3PCW Stormwater Calculations.doc New Bern Conanrons PLD 6 Minimum Weir Size Q. = c.,LH", cW = 3.0, L = 20' with 5'x 5' inside box dimension H = IT, Use 1.25' minimum opening height. #25C - #25D 42" rcp @ 0.5%, vjo = 7.3 fps, djo = 2.6', HW/D = 2.2, Q n.. = 105.0 cfs Off-site Drainage Junction Box/Storm Manhole #26 IA=0 DA = 14.84 acres (Off-site) Q10 = 0.85(7.50) 14.84 = 94.6 cfs #26 - #27 42" rcp @ 3.2%, vjo = 16.0 fps, djo= 2.0', HW/D = 3.5, QmaX = 150.0 cfs Junction Box/Storm Manhole #27 IA=0 DA = 14.84 acres (Off-site) Q10 = 0.85(7.50) 14.84 = 94.6 cfs Catch Basin #28 IA = DA = 2.71 acres Qjo= 0.85(7.50) 2.71 = 17.3 cfs #28 - #29 24" rcp @ 1.51%, v10 = 8.3 fps, djo= 13, HW/D = 8.4, Qmax = 70.0 cfs Junction Box/Storm Manhole #29 IA=0 DA = 2.71 acres Qjo= 0.85(7.50) 2.71 = 17.3 cfs #27 - #30 42" rcp @ 3.75%, vjo = 17.0 fps, djo= 1.9', HW/D = 3.3, Qmax = 145.0 cfs #29 - #30 24" rep @ 1.5%, vjo = 8.3 fps, djo= 13, HW/D = 5.4, Qmax = 47.0 cfs Junction Box/Storm Manhole #30 IA=0 DA = 14.84 + 2.71 = 17.55 acres Q10 = 0.85(7.50) 17.55 = 111.9 cfs RIBPCWY Stormivater Calculations.doc New Bern Commons PLD 7 #30 - #31 42" rcp @ 1.75%, v10 = 13.0 fps, dio = 2.6', HW/D = 4. 1, Q. = 165.0 cfs Junction Box/Storm Manhole #31 IA=O DA = 14.84 + 2.71 = 17.55 acres Q10= 0.85(7.50) 17.55 = 111.9 cfs #31 - #32 42" rcp @ 1.82%, vlo = 13.0 fps, dio= 2.6', HW/D = 5.4, Qmax = 195.0 cfs Junction Box #32 IA=O DA = 14.84 + 2.71 = 17.55 acres Q10 = 0.85(7.50) 17.55 = 111.9 cfs #32 - #33 48" rcp @ 1.0%, vlo = 11.5 fps, dio = 3.0', HW/D = 4.6, Qmax = 250.0 cfs Drainage to Wet Pond #2 Raised-Top Catch Basin #34 IA = DA = 1.15 acres Qio= 0.85(7.50) 1.15 = 7.3 cfs #34 - #35 15" rcp @ 4.25%, vio = 9.9 fps, dio= 0.75', HW/D = 6.4, Qmax = 16.0 cfs Raised-Top Catch Basin #35 IA = 1.03 acres DA = 1.03 + 1.15 = 2.18 acres Qio= 0.85(7.50) 2.18 = 13.9 cfs #35 - #36 18" rcp @ 5.5%, vlo = 13.0 fps, dio= 0.91, HW/D = 5.3, Qmax = 23.0 cfs Curb Inlet #36 IA = 0.31 acres DA=0.31+2.18 =2.49 acres Qio= 0.85(7.50) 2.49 = 15.9 cfs Curb Inlet #37 IA = DA = 0.24 acres Qto= 0.85(7.50) 0.24 = 1.5 cfs RIBMW Stornnwater Calculations.doc New Beni Commons PLD 8 #37 - #38 15" rcp @ 1.0%, v10 = 3.8 fps, dio= 0.45, HW/D = 3.0, Qmax = 10.5 cfs Curb Inlet #38 IA = 0.16 acres DA = 0.16 + 0.24 = 0.40 acres Q1o= 0.85(7.50) 0.40 = 2.6 cfs #38- #39 15" rcp @ 1.0%, vlo = 4.5 fps, d1o= 0.6', HW/D = 3.3, Qmax = 11.2 cfs Raised-Top Catch Basin #39 IA = 0.64 acres DA = 0.64 + 0.40 = 1.04 acres Q10= 0.85(7.50) 1.04 = 6.6 cfs #36 - #40 24" rcp @ 1.0%, vlo = 7.0 fps, d1o= 1.4', HW/D = 1.9, Qm,x = 27.5 cfs #39 - #40 15" rcp @ 2.5%, vlo = 8.0 fps, d1o= 0.85', HW/D = 1.8, Qmax = 7.5 cfs Curb Inlet #40 IA = 0.36 acres DA=0.36+ 1.04+2.49=3.89 acres Q10= 0.85(7.50) 3.89 = 24.8 cfs #40 - #41 24" rcp @ 1.75%, vlo = 9.5 fps, d10= 1.6', HW/D = 2.7, Qmax = 32.0 cfs Curb Inlet #41 IA = 0.48 acres DA = 0.48 + 3.89 = 4.37 acres Q10= 0.85(7.50) 4.37 = 27.9 cfs #41 - #42 30" rcp @ 2.5%, vlo = 12.0 fps, dto= 1.3', HW/D = 1.4, Qmax = 33.0 cfs Double Curb Inlet #42 IA = 2.31 acres DA = 2.31 + 4.37 = 6.68 acres Q10= 0.85(7.50) 6.68 = 42.6 cfs #42 - #43 36" rcp @ 3.25%, vlo = 14.0 fps, d1o= 1.4', HW/D = 1.6, Qmax = 58.0 cfs RIBI'MV Stornmater Calculations.doe New Beni Commons PLD 9 Double Curb Inlet #43 IA = 1.26 acres DA = 1.26 + 6.68 = 7.94 acres Qio= 0.85(7.50) 7.94 = 50.6 cfs #43 - #44 36" rcp @ 1.0%, vio = 9.1 fps, dio= 2.2', HW/D = 1.9, Qmax = 69.0 cfs Double Curb Inlet #44 IA = 1.39 acres DA = 1.39 + 7.94 = 9.33 acres Qio= 0.85(7.50) 9.33 = 59.5 cfs Double Curb Inlet #45 IA = DA = 1.86 acres Qio= 0.85(7.50) 1.86 = 11.9 cfs #44 - #46 36" rcp @ 2.0%, vio = 12.5 fps, dio= 1.9', HW/D = 2.8, QmaX = 88.0 cfs #45 - #46 18" rcp @ 3.0%, vio = 9.8 fps, dio= 1.0', HW/D = 2.5, Qmax = 14.5 cfs Junction Box/Storm Manhole #46 IA=0 DA = 1.86 + 9.33 = 11.19 acres Qto= 0.85(7.50) 11.19 = 71.4 cfs #46 - #47 42" rep @ 1.0%, vio = 10.1 fps, dio= 2.5', HW/D = 2.6, QmaX = 120.0 cfs Curb Inlet #47 IA = 0.09 acres DA = 0.09 +11.19 = 11.28 acres Qio= 0.85(7.50) 11.28 = 71.9 cfs #47 - #48 42" rcp @ 1.0%, vto = 10.1 fps, dio= 2.6', HW/D = 2.7, QmaX = 135.0 cfs Storm Manhole #48 IA=0 DA = 11.28 acres Qio= 0.85(7.50) 11.28 = 71.9 cfs #48 - #49 42" rcp @ 1.0%, vio = 10.1 fps, dio= 2.6', HW/D = 3. 1, QmaX = 139.0 cfs RIBMW_Stormwatcr Calculations.doc New Bern Commons PLD 10 Curb Inlet #49 IA = 0.39 acres DA = 0.39 + 11.28 = 11.67 acres Q10 = 0.85(7.50) 11.67 = 74.4 cfs #49 - #50 42" rcp @ 1.0%, vlo = 10.1 fps, dio= 2.6', HW/D = 3.4, Qinax = 145.0 cfs Curb Inlet #50 IA = 0.10 acres DA = 0.10 + 11.67 = 11.77 acres Q10 = 0.85(7.50) 11.77 = 75.0 cfs Curb Inlet #50A IA = DA = 0.53 acres Qio= 0.85(7.50) 0.53 = 3.4 cfs Double Curb Inlet #51 IA = DA = 1.16 acres Qia= 0.85(7.50) 1.16 = 7.4 cfs Curb Inlet #52 IA=DA=0.33+0.16=0.49 acres Qio= 0.85(7.50) 0.49 = 3.1 cfs #51 - #53 18" rcp @ 1.0%, vio = 5.8 fps, dio= 1.1', HW/D = 2.9, Qmax = 16.2 cfs #52 - #53 15" rep @ 9.0%, vio = 10.2 fps, dto= 0.36', HW/D = 2.8, Qmax = 10.0 cfs Curb Inlet #53 IA = 0.34 acres DA = 0.34 + 0.49 + 1.16 = 1.99 acres Q?o = 0.85(7.50) 1.99 = 12.7 cfs #53 - #54 24" rcp @ 1.0%, vio = 6.6 fps, djo= 1.25', HW/D = 2.8, Qma, = 33.0 cfs Curb Inlet #54 IA = 0.32 acres DA = 0.32 + 1.99 + 0.21 = 2.52 acres Qio= 0.85(7.50) 2.52 = 16.1 cfs RIBPCW_Stornmater Calculations.doc New Bern Commons PLD II Curb Inlet #55 IA = 0.21 acres DA = 0.21 + 0.68 = 0.89 acres Qto= 0.8(7.50) 0.89 = 5.7 cfs #54 - #56 24" rcp @ 1.0%, vio = 7.0 fps, djo= 1.4', HW/D = 1.6, Q., = 22.0 cfs #55 - #56 15" rcp @ 5.0%, vlo = 10.0 fps, dio= 0.6', HW/D = 1.7, Qmax = 7.0 cfs Curb Inlet #56 IA = 0.58 acres DA = 0.58 +2.52 +0.89 = 3.99 acres Q10 = 0.85(7.50) 3.99 = 25.4 cfs Curb Inlet #57 IA = DA = 0.23 acres Q10= 0.85(7.50) 0.23 = 1.5 cfs #56 - #58 30" rcp @ 1.0%, vio = 8.0 fps, djo= 1.6', HW/D = 2.0, QR,a, = 45.0 cfs #57 - #58 15" rep @ 5.0%, vio = 6.9 fps, dio= 0.28', HW/D = 2.3, Qmax = 9.0 cfs Curb Inlet #58 IA = 0.17 acres DA=0.17+0.23+3.99=4.39 acres Qio= 0.85(7.50) 4.39 = 28.0 cfs #58 - #59 30" rep @ 1.0%, v10 = 8.0 fps, dlo= 17, HW/D = 3.0, Qmax = 58.0 cfs MH/J13 #59 IA=0 DA = 4.39 + 2.48 = 6.87 acres Qio= 0.85(7.50) 6.87 = 43.8 cfs #59 - #60 36" rcp @ 1.0%, v10 = 9.1 fps, dio= 2.0', HW/D = 2.9, Qmaz = 90.0 cfs Curb Inlet #60 IA = 0.12 acres DA = 0.12 + 6.87 = 8.07 acres Qio= 0.85(7.50) 8.07 = 51.4 cfs RIBITNV Stormwater Calculations.doc New Bern Commons PLD 12 #60 - #61 36" rcp @ 1.0%, v10 = 9.4 fps, dio= 23, HW/D = 3.3, Q.a = 98.0 cfs Curb Inlet #61 IA = 0.13 acres DA=0.13+8.07+0.49=8.69 acres Qio= 0.85(7.50) 8.69 = 55.4 cfs #50- #62 42" rcp @ 1.0%, v10 = 10.0 fps, dio= 2.5', HW/D = 3.8, QmaX = 155.0 cfs #50A- #62 15" rcp @ 1.0%, vto = 4.6 fps, dio= 0.7', HW/D = 2.4, Qm,x = 8.8 cfs #61- #62 36" rcp @ 1.0%, vio = 9.3 fps, dlo= 2.4', HW/D = 3.8, Q,,,aX = 105.0 cfs Curb Inlet #62 IA = 0.15 acres DA=0.15+ 11.77+8.69+0.53=21.14 acres Q1o= 0.85(7.50) 21.14 = 134.77 cfs #62-#62A 48" rcp @ 1.2%, vlo = 12.0 fps, dio= 3.4', HW/D = 5.5, Q.,,, = 280.0 cfs RTWI #65 IA = DA = (21.14 + 0.40)/2 = 10.77 acres Q1o= 0.85(7.50) 10.77 = 68.7 cfs Qioo= 0.85(9.72) 10.77 = 89.0 cfs Final Minimum Weir Size Q1oo= c,,LH32, cW = 3.0, L = 28' with 7'x 7' inside box dimension H = 1.04', Use 15" minimum opening height. #65- #66 42" rcp @ 2.0%, vio = 14.0 fps, dio= 27, HW/D = 3.0, Q,,,,X = 135 cfs RTWI #66 IA = (21.14 + 0.40)/2 = 10.77 acres DA = 10.77 +10.77 = 21.54 acres (temporary) Q1o= 0.85(7.50) 21.54 = 137.3 cfs Q1oo= 0.85(9.72) 21.54 = 178 cfs Final Minimum Weir Size Q?.= c,,LH31, c,,= 3.0, L=56' with (2) 7'x 7' inside box dimensions H = 1.04', Use 15" minimum opening height. RIBITNV_Stornnvatcr Calculations.doc New Benz Commmis PLD 13 #66- #67 60" rep @ 1.0%, vio = 12.0 fps, dio= 4.9', HW/D = 2.2, Q,,,?X = 260 cfs Rip-rap Apron Calculations - Using NYDOT chart FES #25 v = 12.0 fps d=30"=2.5' Requires Zone 3 Medium Stone Filling L=8x2.5=20' W = 3 x 2.5 = 7.5' Thickness = 22" .'. Use min. Class B erosion control stone 201 x 73W x 22"TH Endwall #25D (Outlet to Pond #1) v = 7.2 fps d=42"=3.5' Requires Zone 2 Light Stone Filling L=6x3.5=2P W = 3 x 3.5 = 10.5' Thickness = 22" .'. Use min. Class B erosion control stone 211 x 12'W x 22"TH Endwall #33 v= 11.5 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .'. Use min. Class B erosion control stone 32'L x 12'W x 22"TH Endwall #62A v=l2 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" Use min. Class B erosion control stone 32'L x 12'W x 22"Tl-1 RIBMW_Stormrvater Calculations.doe New Bern Commons PLD 14 Endwall #67 (Outlet to Pond #2) v = 9.0 fps d=60"=5' Requires Zone 3 Medium Stone Filling L=8x5=40' W=3x5=15' Thickness = 22" .'. Use min. Class B erosion control stone 40'L x 15'W x 22"TH RIBPCW DLH/dlh RIBPCW_Stormwater Calculations.doc New Bern Commons PLD tuYYYYYIYYir? j 7/17/03 "M : 9 WET POND #1 CALCULATIONS Drainage Area = 8.34 ac Impervious Area = 6.19 ac % Impervious Cover = 74 % Avg. Permanent Pool Depth Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permanent Pool Depth feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = Surface Area Min. Forebay Volume (Vol)a„?„= (Vol)P,.,= NOT" = (VOI)F«•Gy BASIN VOLUME 3.07 0.26 ac = 11,153 ft: 8,811 cf 21,736 cf • Note: Design Rainfall - 1' 0 Elov. 248.68 44,055 cf ' Note: See Table Below 0 Elev. 247.30 65,791 cf Berm Elov. 250.78 9,403 cf • Note: See Table Below (Min. 20% of Pool Volume) Water Level ft Llso rface rea Elevation ft Incremental Volume c Accumulated Volume c 0 4,605 242 0 0 1 5,635 243 5,120 5,120 2 6,755 244 6,195 11,315 3 7,960 245 7,358 18,673 4 10,375 246 9,168 27,840 5 5 3 13,610 14 540 247 247 3 11,993 4 223 39,833 . 6 , 15,655 . 248 , 10,568 44.055 54,623 7 17,290 249 16,473 71,096 8 18,990 250 18,140 89,236 8.8 20,350 250.8 15,736 104,972 FOREBAY VOLUME Water Level ft Surface Area s Elevation ft Incremental Volume c Accumulated Volume c 0 584 242 0 0 1 890 243 737 737 2 1,242 244 1,066 1,803 3 1,640 245 1,441 3,244 4 2,440 246 2,040 5,284 5 5 3 3,564 3 883 247 3,002 8,286 . .11 , Mann 247.3 1,117 9,403 RIBPCW_Wetpond Calculations.xls Wetpond #I 40 C3 PLD 7/17/03 WET POND #2 CALCULATIONS Drainage Area = Impervious Area = % Impervious Cover = Avg. Permanent Pool Depth = 21.54 ac 17.94 ac 83 % Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permanent Pool De th feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = 2.63 Min. Surface Area = 0.57 ac = 24,677 ft2 Min. Forebay Vol = 22,633 cf (Vol)a,,,o„ = 62,282 cf • Note: Design Rainfall - f' 0 Elov. 252.29 (Vol)e., = 113,163 cf • Note: Soo Table Below 0 Elov. 250.00 (VOI)T. w = 175,445 cf Berm Elov. 254.31 (VOI)Fmo., = 24,135 cf • Note: See Table Below (Min. 20% of Pool Volume) BASIN VOLUME Water Level it Surface Area (SA- Elevation (ft) Incremental Volume c Accumulated Volume cf 0 6,465 241.2 0 0 0.8 7,355 242 5,528 5,528 2.8 9,780 244 17,135 22,663 4.8 12,505 246 22,285 44,948 6.8 15,505 248 28,010 72,958 8.8 24,700 250 0 205 113 163 10.8 27,635 252 , 52,335 , 165,498 12.8 30,718 254 58,353 F T 223,851 FOREBAY VOLUME Water Surface Elevation Incremental Accumulated Level Area Volume Volume ft s ft c c 0 975 241.2 0 0 0.8 1,225 242 880 880 2.8 1,970 244 3,195 4,075 4.8 2,880 246 4,850 8,925 6.8 3,965 248 6,845 15,770 8.8 4 400 18 365 , . R250 -24,135- RIBPCW-Wctpond Calculations.xis Wetpond #2 PLD Wet Pond #1 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(74.2) = 0.72" Volume = Rv(DA) = 0.72"(8.34 acres )(1'/12")(43,560 sf/ 1 acre) = 21,736 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (21,736 cf/48 hours)(1 hour/3600 sec) = 0.13 cfs Required release rate for drainage in 5 days Q = (21,736 cf/120 hours)(1 hour/3600 sec) = 0.05 cfs Try 2" diameter pipe Average head = 1.4'/2 - 0.08' = 0.62' Q = cdA(2gh)o.s = 0.6(0.0218)(2(32.2)(0.62))0-' = 0.08 cfs Use 2" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (65,791 cf/24 hours)(1 hour/3600 sec) = 0.76 cfs Try 8" diameter pipe Average head = 7.8'/2 - 0.33' = 3.57' Q = cdA(2gh)os = 0.6(0.34)(2(32.2)(3.57))0-' = 3.09 cfs Use 8" drainpipe since it will drain pond in less than one day. Calculate anti-flotation block at RTWI #25A Displacement = 5'(5')7.47' tall =186.8 cf Buoyant Force = 186.8 cf(62.41bs/cf) = 11,6563 1bs. Weight of walls and base = (181f(0.5' thick)7.47' tall wall + 7(7)0.67' thick base) (1501bs/cf -62.4 lbs/cf) = 8,765.31bs Weight of Soil above base = (241f (1' thick) 4' high) 100 lbs/cf = 9,6001bs. Total weight of walls, base, and soils = 18,365.3 lbs which exceed the buoyant force by 57%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. PLD Calculate anti-flotation block at RTWI #25C Displacement = 6'(6')6.7' tall = 241.2 cf Buoyant Force = 241.2 cf(62.4 lbs/cf) = 15,050.9 lbs. Weight of walls and base = (22 If(0.5' thick)6.7' tall wall + 8(8) P thick base)(150 lbs/cf - 62.41bs/cf) = 12,062.51bs Weight of Soil above base = (28 if (1' thick) 4.3' high) 100 lbs/cf = 12,040 lbs. Total weight of walls, base, and soils = 24,102.5 lbs which exceed the buoyant force by 6001o. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Wet Pond #2 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(83.0) = 0.80" Volume = Rv(DA) = 0.80"(21.54 acres )(1'/12")(43,560 sf/ 1 acre) = 62,282 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (62,282 cf/48 hours)(1 hour/3600 sec) = 0.36 cfs Required release rate for drainage in 5 days Q = (62,282 cf/120 hours) (I hour/3600 sec) = 0.14 cfs Try 3" diameter pipe Average head = 2.2972 - 0.13' = 1.01' Q = cdA(2gh)o.s = 0.6(0.0491)(2(32.2)(1.01))°-' = 0.24 cfs Use 3" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (175,445 cf/24 hours)(1 hour/3600 sec) = 2.03 cfs Try 8" diameter pipe Average head = 11.372 - 0.33' = 5.32' Q = cdA(2gH)0.5 = 0.6(0.34)(2(32.2)(5.32))0-' = 3.8 cfs Use 8" drainpipe since it will drain pond in less than one day. PLD Calculate anti-flotation block at RTWI ##63 Displacement = 5'(5')8.38' tall = 209.5 cf Buoyant Force = 209.5cf(62.4 lbs/cf) = 13,072.81bs. Weight of walls and base = (181f(0.5' thick)8.38' tall wall + 7(7)0.67' thick base)(150 Ibs/cf -62.4 lbs/cf) = 9,482.71bs Weight of Soil above base = (24 If (1' thick) 4' high) 1001bs/cf = 9,600 lbs. Total weight of walls, base, and soils = 19,082.7 lbs which exceed the buoyant force by 46%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Calculate anti-flotation block at RTWI #65 and 1166 Displacement = 8'(8')10.2' tall = 652.8 cf Buoyant Force = 652.8cf(62.4 lbs/cf) = 40734.7 lbs. Weight of walls and base = (30 lf(0.5' thick) 10.2' tall wall + 10(10)1' thick base)(150 lbs/cf - 62.41bs/cf) = 22,162.8 lbs Weight of Soil above base = (36 if (1' thick) 7' high) 1001bs/cf = 25,2001bs. Total weight of walls, base, and soils = 47,362.81bs which exceed the buoyant force by 16%. This calculation excludes friction forces of soils which will provide an additional factor of safety. RIBPCW PLD a F s Y s A 0 C D E F c d • r '.rr?r/ii 2 3 r-- 5 1 I i I I ----- -----------------? /. PROPOSED CORPORATION PARKWAY 00 I I I Ii 1 1 _ I 8 9 I I e S? 4i ` oy 1 p I ?G 0 yam' 0 1 I I I 1 - POND d2 TOTAL DA = 21.54 AC SITE IMPERVIOUS = 15.73 AC LOT 2-4 IMPERVIOUS = 2.21 AC 1 I TOTAL IMPERVIOUS = 17.94 AC (837.) I • NOTE: OUTPARCELS ARE ASSUMED i TO BE 707' . IMPERVIOUS BASED ON 1 SKETCHES PROVIDED BY ARCHITECT. I POND 1 -- ------ 1 TOTAL DA = 8.34 AC ITE IMPERVIOUS = 5.51 AC 1 LOT 5 IMPERVIOUS = 0.68 AC TOTAL IMPERVIOUS = 6.19 AC (74%) NOTE: OUTPARCELS ARE ASSUMED TO BE 70: IMPERVIOUS BASED ON SKETCHES PROVIDED BY ARCHITECT- 1 4 I 1 z v W Ca Q z- a Q Z ? J 0 N < Z Q c m? oz ?i w (? i? i3f Z W J Q REVISIONS By 0 "TE - - NORTH °- r•a ?_'>:?? iarcw ?? ? i gar w,t x rtn IMPERVIOUS AREA MAP IMP.1 ti B c 0 E a F a b - L` l \\ 2 \ s. 1 1 \ 1 \ 1 \ I ,\ I[--1 a a r-7 z J3 rn w ra a Q? a$ f? Q z J 2 CC Q 0 U w 1 Z m U1z J Q ? , REVISIONS BY I : AL B? IGFF•??; J L _ '` - O;5A 019 i rj n?r.wm °M A 1 O i -0/8A I C`57 I ,.%6A 1 'SA. LOSA .0955 -•- A:1---_- 1 1 ----- I, ------ ----- I 1 Q r 012/ OJOA 411- ` -` rroRTEE _ u sc? AEw BERN AVE. (U.S. 'GWAY 64) ON-SITE IMPROVEMENTS DRAINAGE AREA MAP DA-4 -------------------- B ? 1 1 ? ti I L.r.1 I c KM - IH I ~n 1 ,. 3 D ` 4 ? 5 6 1 t ) r r1h 1 Piedmonl Land Design, LLP 8366-104 Six Forks Road . Raleigh, NC 27615 . (919) 845-7600 . Fax (919) 845-7703 - A D 23 September 2003 New Bern Commons New Bern Avenue/U.S. Highway 64 Raleigh, North Carolina Stormwater Calculations Runoff Calculations YI/ Using Rational Method Ilo = 7.50 in/hr; Iioo = 9.72 in/hr; Composite c values are based on c = 0.95 for impervious areas and c = 0.2 for pervious areas. Using HDS No. 3, n = 0.015 for pipe sizing: *All storm structures are to be City of Raleigh approved structures carless othenvise noted. Drainage to Wet Pond #1 Raised Top Catch Basin #1 IA = DA = 0.95 acres Q10= 0.85(7.50) 0.95 = 6.1 cfs #1 - #2 15" rcp @ 3.0%, vio = 8.2 fps, dio= 0.65', HW/D = 3.2, QR,,,, = 9.0 cfs Curb Inlet #2 IA = 0.12 acres DA = 0.95 + 0.12 = 1.07 acres Q10 = 0.85(7.50) 1.07 = 6.8 cfs #2 - #3 18" rcp @ 1.0%, vio = 5.5 fps, dio= 0.90', HW/D = 2.3, Qmaz = 12.0 cfs Curb Inlet #3 IA = 0.11 acres DA = 1.07 + 0.11 = 1.18 acres Qio= 0.85(7.50) 1.18 = 7.5 cfs #3 - #4 18" rcp @ 1.5%, vio = 6.8 fps, dlo= 0.90', HW/D = 3.0, Qma, = 16.0 cfs Civil Engineers • Landscape Arthiletls • Land Planners 2 Curb Inlet #4 IA = 0.33 acres DA = 1.18 + 0.33 = 1.51 acres Qio= 0.85(7.50) 1.51 = 9.6 cfs #4-#5 18" rep @ 1.0%, vio = 5.9 fps, dio= 1.25', HW/D = 2.3, Qrnax = 13.5 cfs Storm Manhole #5 IA=0 DA = 1.51 acres Qio= 9.6 cfs Catch Basin #6 IA = DA = 0.21 acres Qio= 0.85(7.50) 0.21 = 1.3 cfs #6 - #6A 15" rep @ 3.25%, vio = 5.3 fps, dio= 0.33', HW/D = 2.8, Q„„x = 10.0 cfs Curb Inlet #6A IA = 0.18 acres DA 0.21 +0.18=0.39 acres Q10= 0.85(7.50) 0.39 = 2.5 cfs #5 - #7 18"rep @3.0%,vio=9.8fps, dio=0.75',HW/D=2.5,Q,,,,, =14.5 cfs #6A - #7 15"rcp@ 1.0%,vio=4.5 fps, dio=0.55',HW/D=2.7,Q.,= 10.0 cfs Curb Inlet #7 IA = 0.28 acres DA = 1.51 + 0.39 +0.28 = 2.18 acres Qio= 0.85(7.50) 2.18 = 13.9 cfs Catch Basin #8 IA = DA = 0.40 acres Qio= 0.85(7.50) 0.40 = 2.6 cfs #8-#9 15" rep @ 1.0%, vio = 4.5 fps, d10= 0.55', HW/D = 4.3, QR„X = 12.0 cfs Catch Basin #9 IA = 0.48 acres DA = 0.40 + 0.48 = 0.88 acres Qio= 0.85(7.50) 0.88 = 5.6 cfs RIBMW Stormwatcr Calculations.doc _ New Bern Commons PLD 3 #7-#10 18" rep @ 3.3%, via = 10.5 fps, dio= 1.0', HW/D = 2.7, Qm,X = 15.5 cfs #9-#10 15" rcp @ 1.0%, via = 5.3 fps, dio= 0.95', HW/D = 4.3, Q,,,,x = 12.0 cfs Curb Inlet #10 IA = 0.31 acres DA=2.18+0.88+0.31 =3.37 acres Qio= 0.85(7.50) 3.37 = 21.5 cfs #10-#I1 24" rep @ 1.0%, vio = 7.0 fps, dio= 1.55', HW/D = 4.0, Qm,X = 38.0 cfs Curb Inlet #11 IA = 0.13 acres DA = 3.50 acres Qio= 0.85(7.50) 3.50 = 22.3 cfs #11 - #12 24"rep@ 1.2%,vio=7.4fps, dio= 1.7',HW/D=4.2,Q,,,,X=40.0 cfs Curb Inlet #12 IA = 0.03 acres DA = 3.50 + 0.03 = 3.53 acres Qio = 0.85(7.50) 3.53 = 22.5 cfs #12 - #13 24" rcp @ 1.5%, vio = 8.8 fps, dio= 1.6', HW/D = 4.5, Q. = 45.0 cfs Curb Inlet #13 IA = 0.59 acres DA=3.53+0.59=4.12 acres Qio= 0.85(7.50) 4.12 = 26.3 cfs Curb Inlet #14 IA = DA = 0.08 acres Qio= 0.85(7.50) 0.08 = 0.5 cfs #14 - #15 15" rep @ 1.0%, vio = 2.7 fps, dio= 0.25', HW/D = 2.6, Qma, = 9.5 cfs Curb Inlet #15 IA = 0.39 acres DA=0.08+0.39=0.47 acres Q 1 o = 0.85(7.50) 0.47 = 3.0 cfs RIB11CWV Stormwater Calculations.doe New Bern Commons PLD 4 #15 - #16 15" rcp @ 1.0%, vio = 4.5 fps, dio= 0.65', HW/D = 3. 1, Qmax = 11.0 cfs Curb Inlet #16 IA = 0.32 acres DA = 0.47 + 0.32 = 0.79 acres Q10= 0.85(7.50) 0.79 = 5.0 cfs #16 - #17 15" rep @ 1.0%, vio = 5.2 fps, d,o= 0.85', HW/D = 5.9, Qm„, = 16.0 cfs Storm Manhole #17 IA=0 DA = 0.79 acres Qio= 5.0 cfs Curb Inlet # 18 IA = DA = 0.16 acres Qjo= 0.85(7.50) 0.16 = 1.0 cfs #18 - #19 15" rep @ 1.0%, vio = 3.3 fps, djo= 0.38', HW/D = 2.6, Qmax = 9.5 cfs Curb Inlet #19 IA = 0.35 acres DA = 0.16 + 0.35 = 0.51 acres Qio= 0.85(7.50) 0.51 = 3.3 cfs #19 - #20 15" rep @ 1.0%, vio = 4.7 fps, d,o= 0.67', HW/D = 5.2, Qma, = 15.0 cfs Curb Inlet #20 IA = 0.24 acres DA = 0.51 + 0.24 = 0.75 acres Qio= 0.85(7.50) 0.75 = 4.8 cfs #20 - #21 15" rcp @ 1.0%, vio = 5.1 fps, dio= 0.87', HW/D = 5.7, Qmax = 15.5 cfs Curb Inlet #21 IA = 0.14 acres DA = 0.75 + 0.14 = 0.89 acres Qio= 0.85(7.50) 0.89 = 5.7 cfs IIIB11CW_Stormwatcr Calculations.doc New Bern Commons PLD 5 #17 - #22 15" rcp @ 1.5%, vio = 5.0 fps, djo= 0.85, HW/D = 6. 1, QmaX = 16.5 cfs #21 - #22 18" rep @ 1.0%, vio = 5.5 fps, dio= 0.85', HW/D = 6.9, QmaX = 27.0 cfs Double Curb Inlet #22 IA = 1.39 acres DA = 0.79 + 0.89 + 1.39 = 3.07 acres Qio= 0.85(7.50) 3.07 = 19.6 cfs #13 - #23 24" rep @ 4.0%, vio = 13.5 fps, dio= 1.15', HW/D = 5.5, QmaX = 48.0 cfs #22 - #23 24" rep @ 1.0%, vio = 7.0 fps, djo= I.5', HW/D = 5.3,Q,,,a, = 47. cfs Storm Manhole #23 IA=0 DA = 4.12 + 3.07 = 7.19 acres Qio = 0.85(7.50) 7.19 = 45.8 cfs #23 - #23A 30" rcp @ 1.5%, vio = 10.0 fps, dio= 1.9', HW/D = 5.6, QmaX = 82.0 cfs Curb Inlet #23A IA = 0.24 acres DA=7.19+0.24=7.43 acres Qio= 0.85(7.50) 7.43 = 47.4 cfs #23A - #24 30" rcp @ 1.5%, vio = 10.0 fps, dio= 2.0', HW/D = 5.9, QmaX = 90.0 cfs Storm Manhole #24 IA=0 DA = 7.43 + 0.28 (RD) = 7.71 acres Qio= 0.85(7.50) 7.71 = 49.2 cfs #24 - #25 30" rep @ 2.0%, vio = 12.0 fps, djo= 1.8', HW/D = 4.0, QmaX = 70.0 cfs RTWI #25C IA = 0.63 acres (Pond) DA = 8.34 acres Qio= 0.85(7.50) 8.34 = 53.2 cfs Qioo= 0.85(9.72) 8.34 = 68.9 cfs RIBPCW Stormwater Calculations.doc New Bert Commons PLD 6 Minimum Weir Size Qioo= c,,,LH"', c,, = 3.0, L = 20' with 5'x 5' inside box dimension H = 1.1', Use 1.25' minimum opening height. #25C - #25D 42" rcp @ 0.5%, vio = 7.3 fps, djo= 2.6', HW/D = 2.2, Qmax = 105.0 cfs Off-site Drainage Junction Box/Storm Manhole #26 IA=0 DA = 14.84 acres (Off-site) Q10 = 0.85(7.50) 14.84 = 94.6 cfs #26 - #27 42" rcp @ 3.2%, vio = 16.0 fps, dlo= 2.0', HW/D = 3.5, Qmax = 150.0 cfs Junction Box/Storm Manhole #27 IA=0 DA = 14.84 acres (Off-site) Q10 = 0.85(7.50) 14.84 = 94.6 cfs Catch Basin #28 IA = DA = 2.71 acres Qio= 0.85(7.50) 2.71 = 17.3 cfs #28 - #29 24" rcp @ 1.51%, vlo = 8.3 fps, dlo= 13, HW/D = 8.4, Qmax = 70.0 cfs Junction Box/Storm Manhole #29 IA=0 DA = 2.71 acres Qio= 0.85(7.50) 2.71 = 17.3 cfs #27 - #30 42" rcp @ 3.75%, v?o = 17.0 fps, dlo= 1.9', HW/D = 3.3, QR,ax = 145.0 cfs #29 - #30 24" rcp @ 1.5%, vio = 8.3 fps, dlo= 1.3', HW/D = 5.4, Qroax = 47.0 cfs Junction Box/Storm Manhole #30 IA=0 DA = 14.84 + 2.71 = 17.55 acres Q10 = 0.85(7.50) 17.55 = 111.9 cfs RIBPCW_Stormwater Calculations.doe New Bern Commons PLD 7 #30 - #31 42" rcp @ 1.75%, vio = 13.0 fps, d,o= 2.6', HW/D = 4. 1, Q?„X = 165.0 cfs Junction Box/Storm Manhole #31 IA=0 DA = 14.84 + 2.71 = 17.55 acres Q10= 0.85(7.50) 17.55 = 111.9 cfs #31 - #32 42" rcp @ 1.82%, vio = 13.0 fps, dlo= 2.6', HW/D = 5.4, Q. = 195.0 cfs Junction Box #32 IA=0 DA = 14.84 + 2.71 = 17.55 acres Q10 = 0.85(7.50) 17.55 = 111.9 cfs #32 - #33 48" rcp @ 1.0%, vlo = 11.5 fps, dlo= 3.0', HW/D = 4.6, Qmsx = 250.0 cfs Drainage to Wet Pond #2 Raised-Top Catch Basin #34 IA = DA = 1.15 acres Q10 = 0.85(7.50) 1.15 = 7.3 cfs #34 - #35 15" rcp @ 4.25%, vio = 9.9 fps, dio= 0.75', HW/D = 6.4, Qm = 16.0 cfs Raised-Top Catch Basin #35 IA = 1.03 acres DA = 1.03 + 1.15 = 2.18 acres Qio= 0.85(7.50) 2.18 = 13.9 cfs #35 - #36 18" rcp @ 5.5%, vlo = 13.0 fps, djo= 0.9', HW/D = 5.3, Q., = 23.0 cfs Curb Inlet #36 IA = 0.31 acres DA = 0.31 + 2.18 = 2.49 acres Qio= 0.85(7.50) 2.49 = 15.9 cfs Curb Inlet #37 IA = DA = 0.24 acres Qio= 0.85(7.50) 0.24 = 1.5 cfs RIBPCW_Stormwater Calculations.doc New Bern Commons PLD 8 #37 - #38 15" rcp @ 1.0%, vio = 3.8 fps, djo= 0.45', HW/D = 3.0, Qmax = 10.5 cfs Curb Inlet #38 IA = 0.16 acres DA = 0.16 + 0.24 = 0.40 acres Qlo= 0.85(7.50) 0.40 = 2.6 cfs #38- #39 15" rcp @ 1.0%, v10 = 4.5 fps, dio= 0.6', HW/D = 3.3, Qmax = 11.2 cfs Raised-Top Catch Basin #39 IA = 0.64 acres DA = 0.64 + 0.40 = 1.04 acres Qio= 0.85(7.50) 1.04 = 6.6 cfs #36 - #40 24" rcp @ 1.0%, vio = 7.0 fps, d,o= 1.4', HW/D = 1.9, Qmax = 27.5 cfs #39 - #40 15" rcp @ 2.5%, vio = 8.0 fps, dio= 0.85', HW/D = 1.8, Qmax = 7.5 cfs Curb Inlet #40 IA = 0.36 acres DA=0.36+ 1.04+2.49=3.89 acres Qio= 0.85(7.50) 3.89 = 24.8 cfs #40 - #41 24" rcp @ 1.75%, v?o = 9.5 fps, dlo= 1.6', HW/D = 2.7, Qmax = 32.0 cfs Curb Inlet #41 IA = 0.48 acres DA=0.48+3.89=4.37 acres Qio= 0.85(7.50) 4.37 = 27.9 cfs #41 - #42 30" rep @ 2.5%, vio = 12.0 fps, dio= 1.3', HW/D = 1.4, Qmax = 33.0 cfs Double Curb Inlet #42 IA = 2.31 acres DA = 2.31 + 4.37 = 6.68 acres Q10 = 0.85(7.50) 6.68 = 42.6 cfs #42 - #43 36" rep @ 3.25%, vlo = 14.0 fps, dio= 1.4', HW/D = 1.6, Qmax = 58.0 cfs RIBMW_Stormwatcr Calculations.doc New Bent Commons PLD 9 Double Curb Inlet #43 IA = 1.26 acres DA = 1.26 + 6.68 = 7.94 acres Qlo= 0.85(7.50) 7.94 = 50.6 cfs #43 - #44 36" rcp @ 1.0%, vio = 9.1 fps, dio= 2.2', HW/D = 1.9, QmaX = 69.0 cfs Double Curb Inlet #44 IA = 1.39 acres DA = 1.39 + 7.94 = 9.33 acres Qjo= 0.85(7.50) 9.33 = 59.5 cfs Double Curb Inlet #45 IA = DA= 1.86 acres Qio= 0.85(7.50) 1.86 = 11.9 cfs #44 - #46 36" rcp @ 2.0%, vio = 12.5 fps, dio= 1.9', HW/D = 2.8, Qmax = 88.0 cfs #45 - #46 18" rcp @ 3.0%, vio = 9.8 fps, dio= 1.0', HW/D = 2.5, Qmax = 14.5 cfs Junction Box/Storm Manhole #46 IA=0 DA = 1.86 + 9.33 = 11.19 acres Q10 = 0.85(7.50) 11.19 = 71.4 cfs #46 - #47 42" rep @ 1.0%, vio = 10.1 fps, dio= 2.5', HW/D = 2.6, Qmax = 120.0 cfs Curb Inlet #47 IA = 0.09 acres DA = 0.09 +11.19 = 11.28 acres Qio= 0.85(7.50) 11.28 = 71.9 cfs #47 - #48 42" rcp @ 1.0%, vio = 10.1 fps, dio= 2.6', HW/D = 2.7, Qmzx = 135.0 cfs Storm Manhole #48 IA=0 DA = 11.28 acres Qio= 0.85(7.50) 11.28 = 71.9 cfs #48 - #49 42" rcp @ 1.0%, vio = 10.1 fps, dio= 2.6', HW/D = 3.1, Qmax = 139.0 cfs RIBMW Stormwater Calculations.doc New Bern Conunars PLD 10 Curb Inlet #49 IA = 0.39 acres DA = 0.39 + 11.28 = 11.67 acres Q1o= 0.85(7.50) 11.67 = 74.4 cfs #49 - #50 42" rcp @ 1.0%, vlo = 10.1 fps, dio = 2.6', HW/D = 3.4, Qmax = 145.0 cfs Curb Inlet #50 IA = 0.10 acres DA = 0.10 + 11.67 = 11.77 acres Q1o= 0.85(7.50) 11.77 = 75.0 cfs Curb Inlet #50A IA = DA = 0.53 acres Q?o = 0.85(7.50) 0.53 = 3.4 cfs Double Curb Inlet #51 IA = DA = 1.16 acres Q?o= 0.85(7.50) 1.16 = 7.4 cfs Curb Inlet #52 IA=DA=0.33+0.16=0.49 acres Q10 = 0.85(7.50) 0.49 = 3.1 cfs #51 - #53 18" rcp @ 1.0%, vio = 5.8 fps, dio= 1.1', HW/D = 2.9, Q,„ax = 16.2 cfs #52 - #53 15" rcp @ 9.0%, vio = 10.2 fps, dio= 0.36', HW/D = 2.8, Qmax = 10.0 cfs Curb Inlet #53 IA = 0.34 acres DA = 0.34 + 0.49 + 1.16 = 1.99 acres Q1o= 0.85(7.50) 1.99 = 12.7 cfs #53 - #54 24" rcp @ 1.0%, vio = 6.6 fps, dio= 1.25', HW/D = 2.8, Q,,,ax = 33.0 cfs Curb Inlet #54 IA = 0.32 acres DA = 0.32 + 1.99 + 0.21 = 2.52 acres Q1o= 0.85(7.50) 2.52 = 16.1 cfs RIBPCW_Stormwater Calculations.doe New Bern Commom PLD Curb Inlet #55 IA = 0.21 acres DA = 0.21 + 0.68 = 0.89 acres Qio= 0.8(7.50) 0.89 = 5.7 cfs #54 - #56 24" rep @ 1.0%, vio = 7.0 fps, dio= 1.4', HW/D = 1.6, QmaX = 22.0 cfs #55 - #56 15" rcp @ 5.0%, vio = 10.0 fps, djo= 0.6', HW/D = 1.7, QmaX = 7.0 cfs Curb Inlet #56 IA = 0.58 acres DA = 0.58 +2.52 +0.89 = 3.99 acres Qio= 0.85(7.50) 3.99 = 25.4 cfs Curb Inlet #57 IA = DA = 0.23 acres Qio= 0.85(7.50) 0.23 = 1.5 cfs #56 - #58 30" rcp @ 1.0%, vio = 8.0 fps, dio= 1.6', HW/D = 2.0, QmaX = 45.0 cfs #57 - #58 15" rep @ 5.0%, vio = 6.9 fps, dio= 0.28', HW/D = 2.3, QmaX = 9.0 cfs Curb Inlet #58 IA = 0.17 acres DA = 0.17 + 0.23 + 3.99 = 4.39 acres Qio= 0.85(7.50) 4.39 = 28.0 cfs #58 - #59 30" rep @ 1.0%, v10 = 8.0 fps, dlo= 17, HW/D = 3.0, QmaX = 58.0 cfs MH/JB #59 IA=0 DA = 4.39 + 2.48 = 6.87 acres Qio= 0.85(7.50) 6.87 = 43.8 cfs #59 - #60 36" rcp @ 1.0%, vio = 9.1 fps, dlo= 2.0', HW/D = 2.9, QmaX = 90.0 cfs Curb Inlet #60 IA = 0.12 acres DA = 0.12 + 6.87 = 8.07 acres Qio= 0.85(7.50) 8.07 = 51.4 cfs RIBPCW Stormwater Calculations.doc New Bern Commons PLD 12 #60 - #61 36" rcp @ 1.0%, vio = 9.4 fps, djo= 2.3', HW/D = 3.3, Q?,ax = 98.0 cfs Curb Inlet #61 IA = 0.13 acres DA=0.13+8.07+0.49=8.69 acres Qio= 0.85(7.50) 8.69 = 55.4 cfs #50- #62 42" rcp @ 1.0%, vlo = 10.0 fps, d,o= 25, HW/D = 3.8, Qmax = 155.0 cfs #50A- #62 15" rcp @ 1.0%, vio = 4.6 fps, dio= 07, HW/D = 2.4, Qmax = 8.8 cfs #61- #62 36" rcp @ 1.0%, v10 = 9.3 fps, dio= 2.4', HW/D = 3.8, Qmax = 105.0 cfs Curb Inlet #62 IA = 0.15 acres DA=0.15+11.77+8.69+0.53=21.14 acres Q1o= 0.85(7.50) 21.14 = 134.77 cfs #62-#62A 48" rcp @ 1.2%, v10 = 12.0 fps, d,o= 3.4', HW/D = 5.5, Qmax = 280.0 cfs RTWI #65 IA = DA = (21.14 + 0.40)/2 = 10.77 acres Q1o= 0.85(7.50) 10.77 = 68.7 cfs Q1oo= 0.85(9.72) 10.77 = 89.0 cfs Final Minimum Weir Size Q1 oo= c,,,LH32, c,,,= 3.0, L = 28' with 7'x 7' inside box dimension H = 1.04', Use 15" minimum opening height. #65- #66 42" rcp @ 2.0%, v,o = 14.0 fps, dlo= 27, HW/D = 3.0, Qmax = 135 cfs RTWI #66 IA = (21.14 + 0.40)/2 = 10.77 acres DA = 10.77 +10.77 = 21.54 acres (temporary) Q1o = 0.85(7.50) 21.54 = 137.3 cfs Q1oo= 0.85(9.72) 21.54 = 178 cfs Final Minimum Weir Size Qloo= c,,,LH32, cW = 3.0, L = 56' with (2) 7'x 7' inside box dimensions H = 1.04', Use 15" minimum opening height. RIBPCIV Stormwater Calculations.doe New Beni Commons PLD 13 #66- #67 60" rep @ 1.0%, vio = 12.0 fps, d,o= 4.9', HW/D = 2.2, QmaX = 260 cfs Rip-rap Apron Calculations - Using NYDOT chart FES #25 v = 12.0 fps d=30"=2.5' Requires Zone 3 Medium Stone Filling L=8x2.5=20' W = 3 x 2.5 = 7.5' Thickness = 22" .'. Use min. Class B erosion control stone 201 x 73W x 22"TH Endwall #25D (Outlet to Pond #1) v = 7.2 fps d=42"=3.5' Requires Zone 2 Light Stone Filling L=6x3.5=21' W = 3 x 3.5 = 10.5' Thickness = 22" .'. Use min. Class B erosion control stone 211 x 12'W x 22"TH Endwall #33 v= 11.5 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .'. Use min. Class B erosion control stone 321 x 12'W x 22"TH Endwall #62A v = 12 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .'. Use min. Class B erosion control stone 32'L x 12'W x 22"TH RIBPCW_Stormwater Calculations.doe New Bern Commons PLD 14 Endwall #67 (Outlet to Pond #2) v = 9.0 fps d=60"=5' Requires Zone 3 Medium Stone Filling L=8x5=40' W=3x5=15' Thickness = 22" .'. Use min. Class B erosion control stone 40'L x 15'W x 22"TH RIBPCW DLH/dlh RIBPCW Stormwater Calculations.doc New Bern Commons PLD 11enreeeiey a 7117103 CA . ? ?FE?61m;1°?9 ".. WET POND 91 CALCULATIONS Drainage Area = 8.34 ac Impervious Area = 6.19 ac % Impervious Cover = 74 % Avg. Permanent Pool Depth = Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permanent Pool Depth feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = Surface Area = Min. Forebay Volume = (VOQR,a _ (Vol)p.d (Vol)ray (Vol)F.„p,r = BASIN VOLUME 3.07 0.26 ac = 11,153 ft= 8,811 cf 21,736 cf ' Note: Design Rainfall - t' 0 Elev. 248.68 44,055 cf ' Note: Soo Table Below 0 Elev. 247.30 65,791 cf Berm Elov. 250.78 9,403 cf ' Note: Soo Table Below (Min. 20% of Pool Volume) Water Level ft Surface Area s Elevation ft Incremental Volume c Accumulated Volume c 0 4,605 242 0 0 1 5,635 243 5,120 5,120 2 6,755 244 6,195 11,315 3 7,960 245 7,358 18,673 4 10,375 246 9,168 27,840 5 L 5 3 13,610 14 540 247 247 J3 11,993 4 223 39,833 . 6 . 15,655 . 248 . 10,568 44.055 54,623 7 17,290 249 16,473 71,096 6 18,990 250 18,140 89,236 8.8 20,350 250.8 15,736 104,972 FOREBAY VOLUME Water Levol ft Surface Area s Elevation ft Incremental Volume c Accumulated Volume 0 584 242 0 0 1 890 243 737 737 2 1,242 244 1,066 1,803 3 1,640 245 1,441 3,244 4 2,440 246 2,040 5,284 5 5 3 3,564 3 8 247 3,002 8286 1 . , 83 247.3 .1,117 9, 03 RIBPCW_Wetpond Calculations.xls Wotpond #1 P• PH 7/17/03 WET POND #2 CALCULATIONS Drainage Area = 21.54 ac Impervious Area = 17.94 ac % Impervious Cover = 83 % Avg. Permanent Pool Depth = Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious -- Permanent Pool Depth feet Cover I F3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = Min. Surface Area Min. Forebay Vol = (Vol)A,,,,,„ = (Vol)P.d = (Vol)T.W = (V01)Fa.wy = BASIN VOLUME 2.63 0.57 ac = 24,677 ft2 22,633 cf 62,282 cf ' Note: Design Rainfall - 1' - 0 Elev. 252.29 113,163 cf 'Note: Soo Table Below ® Elov. 250.00 175,445 ct Berm Elov. 254.31 24,135 cf • Note: Soo Table Below (Min. 20% of Pool Volume) Water Level ---1f 1L- Surface Area Elevation ft Incremental Volume c Accumulated Volume c 0 6,465 241.2 0 0 0.8 7,355 242 5,528 5,528 2.8 9,780 244 17,135 22,663 4.8 12,505 246 22,285 44,948 6.8 15,505 248 28,010 72,958 8.8 24,700 250 40 205 113 163 10.8 27,635 252 , 52,335 , 165,498 12.8 30,718 254 58,353 223,851 FOREBAY VOLUME al e r Surface Elevation Incremental Accumulated E , , Area Volume Volume F s It c c 975 241.2 0 0 1,225 242 880 880 . 1,970 244 3,195 4,075 4.8 2,880 246 4,850 8,925 6.8 3,965 248 6,845 15,770 8.8 4.400 250 8.365 -.24.135 RIBPCW_Wetpond Calculations.xis Wetpond #2 PLD Wet Pond #1 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(74.2) = 0.72" Volume = Rv(DA) = 0.72"(8.34 acres )(1'/12")(43,560 sf/ 1 acre) = 21,736 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (21,736 cf/48 hours)(1 hour/3600 sec) = 0.13 cfs Required release rate for drainage in 5 days Q = (21,736 cf/120 hours)(1 hour/3600 sec) = 0.05 cfs Try 2" diameter pipe Average head = 1.472 - 0.08' = 0.62' Q = cdA(2gh)o.s = 0.6(0.0218)(2(32.2)(0.62))0-' = 0.08 cfs Use 2" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (65,791 cf/24 hours)(1 hour/3600 sec) = 0.76 cfs Try 8" diameter pipe Average head = 7.8'/2 - 0.33' = 3.57' Q = cdA(2gh)o-' = 0.6(0.34)(2(32.2)(3.57))0'5 = 3.09 cfs Use 8" drainpipe since it will drain pond in less than one day. Calculate anti-flotation block at RTWI #25A Displacement = 5'(5)7.47' tall = 186.8 cf Buoyant Force = 186.8 cf(62.4 lbs/cf) =11,656.3 lbs. Weight of walls and base = (18 lf(0.5' thick)7.47' tall wall + 7(7)0.67' thick base) (150 lbs/cf -62.4 lbs/cf) = 8,765.3 lbs Weight of Soil above base = (241f (1' thick) 4' high) 100 lbs/cf = 9,600 lbs. Total weight of walls, base, and soils = 18,365.31bs which exceed the buoyant force by 57%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. PLD Calculate anti-flotation block at RTWI #25C Displacement = 6'(6')6.7' tall = 241.2 cf Buoyant Force = 241.2 cf(62.4 lbs/cf) = 15,050.91bs. Weight of walls and base = (22 If(0.5' thick)6.7' tall wall + 8(8) P thick base)(150 lbs/cf - 62.4 lbs/cf) = 12,062.5 lbs Weight of Soil above base = (281f (1' thick) 4.3' high) 100 lbs/cf = 12,040 lbs. Total weight of walls, base, and soils = 24,102.5 Ibs which exceed the buoyant force by 60%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Wet Pond #2 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(83.0) = 0.80" Volume = Rv(DA) = 0.80"(21.54 acres )(1'/12")(43,560 sf/ 1 acre) = 62,282 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (62,282 cf/48 hours)(1 hour/3600 sec) = 0.36 cfs Required release rate for drainage in 5 days Q = (62,282 cf/120 hours)(1 hour/3600 sec) = 0.14 cfs Try 3" diameter pipe Average head = 2.2972 - 0.13' = 1.01' Q = cdA(2gh)os = 0.6(0.0491)(2(32.2)(1.01))0.5 = 0.24 cfs Use 3" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (175,445 cf/24 hours)(1 hour/3600 sec) = 2.03 cfs Try 8" diameter pipe Average head = 11.372 - 0.33' = 5.32' Q = cdA(2gH)0-5 = 0.6(0.34)(2(32.2)(5.32))05 = 3.8 cfs Use 8" drainpipe since it will drain pond in less than one day. PLD Calculate anti-flotation block at RTWI 03 Displacement = 5'(5')8.38' tall = 209.5 cf Buoyant Force = 209.5cf(62.4 lbs/cf) = 13,072.81bs. Weight of walls and base = (18 lf(0.5' thick)8.38' tall wall + 7(7)0.67' thick base)(150 lbs/cf -62.41bs/cf) = 9,482.7 lbs Weight of Soil above base = (241f (1' thick) 4' high) 100 lbs/cf = 9,6001bs. Total weight of walls, base, and soils = 19,082.71bs which exceed the buoyant force by 46%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Calculate anti-flotation block at RTWI #65 and ##66 Displacement = 8'(8')10.2' tall = 652.8 cf Buoyant Force = 652.8cf(62.4 lbs/cf) = 40734.7 lbs. Weight of walls and base = (30 If(0.5' thick)10.2' tall wall + 10(10)1' thick base)(150 Ibs/cf - 62.41bs/cf) = 22,162.8 lbs Weight of Soil above base = (36 If 0' thick) 7' high) 100 Ibs/cf = 25,200 lbs. Total weight of walls, base, and soils = 47,362.81bs which exceed the buoyant force by 16%. This calculation excludes friction forces of soils which will provide an additional factor of safety. RIBPCW PLD F P A 0 Ic ID IE IF I 2 } 4 s 6 7 I 1 I I I I PROPOSED CORPORATION PARKWAY , 7--?4 / ?? Ic ?. r--------;, I _ I B 9 1 O I I 1-I POND N2 TOTAL DA = 21.54 AC I SITE IMPERVIOUS = 15.73 AC LOT 2-4 IMPERVIOUS = 221 AC TOTAL IMPERVIOUS = 17.94 AC (837) I ' I • NOTE: OUTPARCELS ARE ASSUMED TO BE 707 IMPERVIOUS BASED ON SKETCHES PROVIDED BY ARCHITECT. 1 I I POND- I ------ TOTAL OA = 8.33 AC 1 SITE IMPERVIOUS = 5.51 AC LOT 5 IMPERVIOUS = 0.68 AC \ TOTAL IMPERVIOUS = 6.19 AC (74-7) NOTE: OUTPARCELS ARE ASSUMED j TO BE 70: IMPERVIOUS BASED ON . SKETCHES PROVIDED BY ARCHITECT. I I I I E a NORTH NEW BERN AVE. CUS. HIOHVAY 64) _.? SCNf H RR IMPERVIOUS AREA MAP a a z W A A z. A? Q Z J O N cr z Q ,c ? w O I o Z mli : n W siz.° W3 W J Q cc REVISIONS BY 1ap*NTS f r A d 2 A 18 IC ID IE i G L /F ?Y Y/ `al ' I Ill ) 1 /l 1. I ? 511A 'J' L ct. JO?A \ti O1SA . I I I I I? ? 1 1 1 1 1 1 1 1 O1pA gyp. C) A. I 1 ,' I I . ' '10'25a 1. I 022E I 1 I '. 1 I 1' I ?- ?? I 1'I I i I. 01?A- r?.? 01 •? ^2!,1 f6A f 048. IAA ? I 0 A I ? .-. _. ?.5rJr I _0 005A Ih - 029 f. 1 X11 - - _ O: F I __I. ----- C4hf. i i Qc?A 0514 OCOA I. Lr.S' 0954 ^ ....., 0.7SF"- 1 1 1 - 012 ------- I s 4411•. O. v40r. OJOA - -?.. - ` _ - - NORTH NEW. BERN AVE N.S. HICHWAY B., ON-SITE IMPROVEMENTS --?`-- ------------=----------------"-- -% - DRAINAGE AREA MAP _. a 8 9 5 c, 7 1 9 ? a. s ? f1 I ?G( V ? / 1 \ I O.iEA O A ) y U25A oJ1 ;a ).52A OJ` O11A • ?l I ' If I 1?5 `\\ I 4 a z Ea C;ID W L L •4 F? I? a z m co CC 0a U U Li m a W3 Z W J a REVISIONS BY ¦um ? pN ?lYlf W LWpt ? wMrMll ywr p[o In ISM art w_Yw" f•P pr DA-4 w lw? imap://todd.st.johns/o40dwq.denr.ncmail.net@nplex Lncmail.net:143/f... Subject: FW: Raleigh International Business Park/New Bern Commons From: "Ron" <ronh@piedmontlanddesign.com> Date: Tue, 12 Aug 2003 12:41:37 -0400 To: "Todd St. John" <todd.stJohn@ncmail.net> Todd, The Owner called back and they will by-pass the water as required. We understand you may not approve an alternate submitted in the future. Please fax me the letter to the number below as soon as possible. Thanks, Ron Hendricks Piedmont Land Design, LLP 8366-104 Six Forks Road Raleigh, North Carolina 27615 (919) 845-7600 (919) 845-7703 Fax ronh@piedmontlanddesign.com --- Uriginal Message----- From: Ron [mailto:ronh@piedmontlanddesign.com] Sent: Tuesday, August 12, 2003 11:24 AM To: Todd St. John Subject: FW: Raleigh International Business Park/New Bern Commons Todd, The Owner called back and does not want to commit to this until they know the cost implication. Hold off on the letter for know. Thanks, Ron Hendricks Piedmont Land Design, LLP 8366-104 Six Forks Road Raleigh, North Carolina 27615 (919) 845-7600 (919) 845-7703 Fax ronh@piedmontlanddesign.com -----Original Message----- From: Ron [mailto:ronh@piedmontlanddesign.com] Sent: Tuesday, August 12, 2003 10:53 AM To: Todd St. John Subject: RE: Raleigh International Business Park/New Bern Commons I just spoke to the Owner. They agree they will by-pass the water as required. We understand you may not approve an alternate submitted in the future. Please fax me the letter to the number below. Thanks for your help. Ron Hendricks 1 of 2 8/12/03 12:51 PM imap://todd.st. john%40dwq.denr.ncmai1.net@nplex I.ncmail.net:143/f... Piedmont Land Design, LLP 8366-104 Six Forks Road Raleigh, North Carolina 27615 (919) 845-7600 (919) 845-7703 Fax ronh@piedmontlanddesign.com -----Original Message----- From: Todd St. John [mailto:todd.st Sent: Tuesday, August 12, 2003 8:45 To: ronh@piedmontlanddesign.com Subject: Re: Raleigh International john@ncmail.net] AM Business Park/New Bern Commons Does the applicnat agrees to either by-pass the all of offisite stormwater (yes or no)? you cannot count on the combining and splitting the flows as a viable idea. We may be able to consider it, but there's several more issues than the amount of impervious area invovlved. In other words, we must have an agreement that the off-site will be bypassed before we will issue an approval because I cannot give you much hope that we will consider the combining idea because of all of the potential problems and no perceived benefits from our point of view.. We may consider future proposals, but the bypass is the only acceptable alternative to resizing the ponds to accept all of the offsite draiange at this time. Ron wrote: Todd, As we discussed yesterday, please send us an approval letter with conditions for the stormwater management plan for this project. We still would like to review the combined stormwater system to see if it treats the same amount of impervious area. If it does we would like for this to be considered for approval. Thanks for your help. Ron Hendricks Piedmont Land Design, LLP 8366-104 Six Forks Road Raleigh, North Carolina 27615 (919) 845-7600 (919) 845-7703 Fax ronh@piedmontlanddesign.com 2 of 2 8/12/03 12:51 PM imap://todd.st.john%40dwq.denr.ncmai1.net@ nplex Lncmail.net:143/f... Subject: Re: Raleigh International Business Park From: "Todd St. John" <todd.st.john@ncmail.net> Date: Mon, 11 Aug 2003 12:07:35 -0400 To: ronh@piedmontlanddesign.com CC: "Todd.St.John" <Todd.St.John@ncmai1.net> Ron, Sorry I didn't notice this earlier, but this is the first time I've ever seen (or noticed, anyway) a proposal to split the stormwater as proposed at 38. Briefly, I recommend that the splitter concept be eliminated and that the the offsite be bypassed by a completely separate conveyance system. Also, I am not certain as to the reliability of such a system in that I think it could have a tendency to foul with desbris since it will go from a large pipe to a small opening which drains to the pond. Second, I do not aggree with the approach used as the upstream runoff may not be as polluted as what would be directly discharged from onsite impervious cover. Also, I could not find an accounting the offsite impervious converage for comparison. Finally, it is not clear how the system would respond in smaller than 10 year events. Most "first flush" events that are reported to contain the pollutants are much smaller. Now, it is only required that new onsite impervious cover be treated. Also, from time to time existing on site or existing as well as untreated offsite impervious area can be traded for onsite impervious area if the areas are similar (pollutant-wise). However, the collection systems should be discrete. However, in this case the flows are not discrete but are mixed and the offsite impervous coverage or nature of the impervious coverage is not specified. Also, in general if such a trade is proposed, it is a good idea to clearly indicate that fact and how it would be achieved... I would recommend preliminary discussions.... thanks, todd Ron wrote: Todd, I have the signed operation and maintenance agreements. Is the information on the fax acceptable? If so we will send full size plans along with the agreements for final approval. Thanks for your help. Ron Hendricks Piedmont Land Design, LLP 8366-104 Six Forks Road Raleigh, North Carolina 27615 (919) 845-7600 (919) 845-7703 Fax ronh@piedmontlanddesign.com -----Original Message----- From: Todd St. John [mailto:todd.st.john@ncmail.net] Sent: Tuesday, August 05, 2003 11:42 AM To: ronh@piedmontlanddesign.com 8/11/03 12:09 PM imap://todd.st.john%40dwq.denr.ncmail.net@ nplex l.ncmail.net:143/f... Subject: Re: Raleigh International Business Park the actual "easements" are not required at this time... although access and the maintenance of the drainage patterns and BMPs will be required via the 401... i received the faxes and i have yet to review them... todd Ron wrote: Todd, We have one additional question. The wet detention basin supplement requires a drainage easement and access easement for each pond. We have assumed this is not required since the pond is located on one lot and that lot owner is responsible for maintaining it. Is this assumption correct? Please give me a call to discuss this as well as the fax we sent yesterday. Thanks, Ron Hendricks Piedmont Land Design, LLP 8366-104 Six Forks Road Raleigh, North Carolina 27615 (919) 845-7600 (919) 845-7703 Fax ronh@piedmontlanddesign.com 2 of 2 8/11/03 12:09 PM Project Name: Project No. DWQ 030489 1 SUBMITTED DESIGN: REQUIRED DESIGN: elevations 3.7 average depth status Bottom of Basin (ft) 242 Permanent Pool (ft) 247.3 5.3 ft. depth ok Temporary Pool (ft) 248.7 1.4 ft. depth ok areas Permanent Pool SA (sq ft) 14540 11199 sq. ft. ok Drainage Area (ac) 8.34 10585! based on avg depth ok Impervious Area (ac) 6.19 74.2 % - volumes Permanent Pool (cu ft) 53458 Temporary Pool (cu ft) 21736 21736 cu. ft. check tempo Forebay (cu ft) 9403 17.6 % check forebc other parameters SA/DA 3.08 - Orifice Diameter (in) 2 0.09 cfs drawdown - Design Rainfall (in) 1 2.9 day drawdown ok Linear Interpolation of Correct SAIDA*** 5.3 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 70 2.88 2.724775791 2.4 Project Impervious 74.2 3.08 2.91, 2.56 Next Highest 80 3.36 3.172437414 2.78 3 ft 4 Project Name: Project No. DWQ 030489 2 SUBMITTED DESIGN: REQUIRED DESIGN. elevations 5.6 average depth status Bottom of Basin (ft) 241.2 Permanent Pool (ft) 250 8.8 ft. depth check depth Temporary Pool (ft) 252.3 2.3 ft. depth ok areas Permanent Pool SA (sq ft) 24700 23195 sq. ft. ok Drainage Area (ac) 21.54 21981;; based on avg depth ok Impervious Area (ac) 17.94 83.3 % - volumes Permanent Pool (cu ft) 137298 Temporary Pool (cu ft) 62282 62519 cu. ft. check tempo Forebay (cu ft) 24135 17.6% check forebc other parameters SA/DA 2.47 - Orifice Diameter (in) 3 0.25 cfs drawdown - Design Rainfall (in) 1 2.8 day drawdown ok Linear Interpolation of Correct SA/DA*** 8.8 ft. Permanent Pool Depth % Impervious SAMA fron (Avg. Depth) Next Lowest 80 2.38 2.256414575 2.1 Project Impervious 83.3 2.47 2.341 2.18 Next Highest 90 2.66 2.518759514 2.34 5 ft 6 Project No. DWQ (to be provided by DJV0 ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : New Bern Commons Contact Person: Ron Hendricks, PE Phone Number: (919) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond #1 Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DA used Diameter of Orifice 242.0 ft. (average elevation of the floor of the basin) 247.3 ft. (elevation of the orifice invert out) 248.7 ft. (elevation of the outlet structure invert in) 14,540 sq. ft. (water surface area at permanent pool elevation) 8.34 ac. (on-site and off-site drainage to the basin) 6.19 ac. (on-site and off-site drainage to the basin) 53,458 cu. ft. (combined volume of main basin and forebay) 21,736 cu. ft. (volume detained on top of the permanent pool) 9,403 cu. ft. 3.07 (surface area to drainage area ratio) 2 in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. I fa requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. basin length to width ratio is greater than 3:1. basin side slopes are no steeper than 3:1. submerged and vegetated perimeter shelf at less than 6:1 is provided. ;etation to the permanent pool elevation is specified. n emergency drain is provided to drain the basin. The, average permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). he temporary pool draws down in 2 to 5 days. ..-The forebay volume is approximately equal to 20% of the total basin volume. ediment storage is provided in the permanent pool. access is provided for maintenance. minimum 50-foot vegetative filter is provided at the outlet. site specific operation and maintenance (O&M) plan is provided. ?1 egetation management/mowing schedule is provided in the O&M plan. emi-annual inspections are specified in the O&M plan. ?1? ebris check is specified in the O&M plan to be performed after every storm event. .,A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. ?? responsible party is designated in the O&M plan. FORM SWGI00 09/97 Page 1 of 1 Project No. DWQ (to be provided by DIVQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : New Bern Commons Contact Person: Ron Hendricks, PE Phone Number: (919) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond #2 Basin Bottom Elevation 241.2 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 250.0 ft. (elevation of the orifice invert out) Temporary Pool Elevation 252.3 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 24,700 sq. ft. (water surface area at permanent pool elevation) Drainage Area 21.54 ac. (on-site and off-site drainage to the basin) Impervious Area 17.94 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 137,298 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 62,282 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 24,135 cu. ft. SA/DA used 2.63 (surface area to drainage area ratio) Diameter of Orifice 3 in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Apnlic s Initials The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. 1WV00 e average pernanent pool depth is betw een 3 and 6 feet (required minimum of 3 feet). e temporary pool draws down in 2 to 5 days. te forebay volume is approximately equal to 20% of the total basin volume. diment storage is provided in the permanent pool. ccess is provided for maintenance. minimum 50-foot vegetative filter is provided at the outlet. site specific operation and maintenance (O&M) plan is provided. vegetation management/mowing schedule is provided in the O&M plan. mi-annual inspections are specified in the O&M plan. debris check is specified in the O&M plan to be performed after every storm event. specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. responsible party is designated in the O&M plan. 9/97 Page 1 of 1 PLD Piedmont Land Design, LLP 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax: (919) 845-7703 August 8, 2003 North Carolina Division of Water Quality, Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Attention: Todd St. John Reference: Raleigh International Business Park DWQ Project No. 03-0489 Dear Mr. St. John: Enclosed are two copies of the revised site construction plans (Sheet No. C-3, 3.1, 3.2, 3.5, 3.6, 7, and 7.1) for the proposed wet detention ponds and the signed and notarized Wet Detention Basin Supplement and the Wet Detention Basin and Level Spreader Worksheets for each pond. We have revised the plans to incorporate the comments in your letter dated July 31, 2003. The comments and responses are as follows: 1. Level Spreader - We have provided an enlarged plan (Sheet No. C-3.6) that shows additional elevation information and the extent of the forested vegetation to remain. We have also shifted the level spreader location to further insure this device will be hydraulically separate from the main pond outlet pipe at Pond 1. We have also noted the installation of additional ground cover and trees in the area below the level spreaders as we discussed on the Landscape Plan (Sheet No. C-7). 2. Operation and Maintenance Agreement - The signed and notarized Wet Detention Basin Supplement for each pond is enclosed. Part III is the Operation and Maintenance Agreement. As we discussed today we need to obtain the approval letter on Monday so that the closing on this property can occur. We appreciate your help on this matter. Please call if you have any additional questions. Sin e ly, Ron Hendricks RIBPCW RPH: rph Enclosure Civil Engineers • Landscape Archileds • Land Planners Permit No. State of North Carolina Department of Environment and Natural Resources Division of Water Quality (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: New Bern Commons Contact Person: Ron Hendricks, PE Phone Number: ( 919 ) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond #1 elevations Basin Bottom Elevation 242.0 ft. Permanent Pool Elevation 247.3 ft. Temporary Pool Elevation 248.7 ft. (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 14,540 sq. ft. (water surface area at the orifice elevation) Drainage Area 8.34 ac. (on-site and off-site drainage to the basin) Impervious Area 6.19 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 53,458 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 21,736 cu. ft. (volume detained above the permanent pool) Forebay Volume 9,403 cu. ft. (approximately 20% of total volume) Other parameters SA/DAt 3.07 (surface area to drainage area ratio front D1VQ table) Diameter of Orifice 2 in. (2 to 5 day temporary pool draw-down rewired) Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Fnntnntec* When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The average permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). ? b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. ?d. The temporary pool draws down in 2 to 5 days. ?e. If required, a 50-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) ?f. The basin length to width ratio is greater than 3:1. ?g. The basin side slopes above the permanent pool are no steeper than 3:1. ? h, A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). ? i. Vegetative cover above the permanent pool elevation is specified. N/A ? j. A trash rack or similar device is provided for both the overflow and orifice. N/A ?'k. A recorded drainage easement is provided for each basin including access to nearest right- ?1 of-way. l t f th d i l d i i d f di f h b i i . ean ou o e ment an eros on contro ur ng construct on, c s use or se I t e as n basin is specified prior to use as a wet detention basin. ?m . A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter with level spreader. This system (check one) V does 0 sloes not incorporate a vegetated filter at the outlet. This system (check one) O does (does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 8. All components of the wet detention basin system shall be maintained in good working order. ar•d/or w. ytticcc?cvc, ir? trkGr?? by Gohvti?A,.cL xv e- J I acknowledge and agree by my signature below that I a44 responsible for the performance of the eight maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system e?-?cspesile-paw. Print name: ( t m Title: Me-lrbei- Address: ?.p?'?ma???'<?I ?t t?1??"? {7Lr?nc? 5 ???Cl?znlry Vii, C`v?cxui??e,Ti1I 3"7)y. Phone: ?4 S 2 - l Date: S Ll D c Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of ti?? County of do hereby certify that Tern S?? ??t r:, personally appeared before me this day of ALAa; Ls i- and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, i, LLkL cnnr My commission expires Form SNU-102 Rev 3.99 Page 4 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads When the permanent pool depth reads 4 feet in the main pond, the sediment shall be removed. 4 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 247.3 Sediment Removal El. 243.3 Bottom Elevation 242.0` 2 FOREBAY Sediment Removal Elevation 243.3 75% - Bottom Elevation 242.0 ; 25% MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. Remove sediment from basin, repair any erosion problems and vegetation damage annually. Form SWU-102 Rev 3.99 Page 3 of 4 DWQ Project No. DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: New Bern Commons Contact Person: Ron Hendricks Phone Number: - Level Spreader ID:. # 1 Level Spreader Length 13 ft. Drainage Area N / A ac. Impervious Area N/A ac. Maximum Filter Strip/Buffer Slope A % grass Max. Discharge from a 10 Year Storm 0. 1 -1 cfs Max. Discharge to Level Spreader 0.13 cis Filter Strip/Buffer Vegetation Pre-treatment or Bypass Method Wet Pond #1 (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (6% for forested, leaf littler cover, 8% for thick ground cover)' * * thick round cover or grass, canopied forest with leaf litter group cover REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. A licants Initials Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. N/A ? Pre-Form Scour Holes are on flat slopes only ?No structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: Bypass method is specified (if applicable) and plan details and calculations are provided .,,Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. ?No structures are located in protected buffers. .? Plan details for the bypass and outlets are provided. ?Theoperation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. Permit No. State of North Carolina Department of Environment and Natural Resources Division of Water Quality (to be provided by D1VQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete Stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: New Bern Commons Contact Person: Ron Hendricks. PE Phone Number: ( 919 ) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond #2 elevations Basin Bottom Elevation 241.2 ft. (floor of the basin) Permanent Pool Elevation 250.0 ft. (elevation of the orifice) Temporary Pool Elevation 252.3 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 24,700 sq. ft. (water surface area at the orifice elevation) Drainage Area 21.54 ac. (on-site and off-site drainage to the basin) mpervious Area 17.94 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 137,298 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 62,282 cu. ft. (volume detained above the permanent pool) Forebay Volume 24,135 cu. ft. (approximately 20% of total volume) Other parameters SA/DAI 2.63 (surface area to drainage area ratio front DWQ table) Diameter of Orifice 3 in. (2 to 5 day temporary pool draw-down required) Design Rainfall I in. Design TSS Removal 2 85 % (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: l When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECIaIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants nitials V CJ ? a. b. c. ? d. ? e. ? f. ? g. h. ?i. N/A ?j N/A ? k. The average permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 50-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right- of-way. ? 1 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter with level spreader. This system (check one) does 0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does edoes not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 250.0 Sediment Ren oval El. 246.9_ ---? 7590 _ Sediment Removal Elevation 46.0 75% Bottom Ele anon 241.2 '?' % ------------------------------? ------------- - -- FOREBAY Bottom Elevation 241.2 425% MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. Remove sediment from basin, repair any erosion problems and vegetation damage annually. Form SWU-102 Rev 3.99 Page 3 of 4 DWQ Project DIVISION OF WATER QUALITY . LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: New Bern Commons Contact Person: Ron Hendricks Phone Number: (9 19) 945-7600 Level Spreader ID:. #2 Level Spreader Length 13 ft. Drainage Area N/A ac. Impervious Area N/A ac. Maximum Filter Strip/Buffer Slope 8 % grass Max. Discharge from a 10 Year Storm 0.36 cfs Max. Discharge to Level Spreader 0.36 cfs Filter Strip/Buffer Vegetation (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (6% for forested, leaf littler cover, 8% for thick ground cover)' * *(thick ground cover or grass, canopied forest with leaf litter groundcover) Pre-treatment or Bypass Method Wet Pond #2 REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. ApplicaRts In' Ws Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. N/A Pre-Form Scour Holes are on flat slopes only i,Nb structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: Bypass method is specified (if applicable) and plan details and calculations are provided ,Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. ?No structures are located in protected buffers. Plan details for the bypass and outlets are provided. ?Theoperation and maintenance agreement includes annual erosion and vegetation repair. ?rhe operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. 8. All components of the wet detention basin system shall be maintained in good working order. ?? w' 54?tceSSovb In t?ftveej by Covjveila„nGG I acknowledge and agree by my signature below that I-fttt}responsle ?or the performance of the eight J maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or. v gau??il , 4y- Print name: ?cn? Title: (l'l pn-, hc'r Address: ?Cll?ll Gl Ili, Nr ? l? j1J 3l"I C` t i? ccJ ??Ci lip?"I C Phone: Signature: U C. -- Date: L{ i 3 Note: The legally responsible party should not be a homeowners association unless more than 50/0 of the lots have been sold and a resident of the subdivision has been named the president. 4G,::- h t a Notarv Public for the State of N.^. C'CL6 County of do hereby certify that 'i t; tho j1, La personally appeared before me this L4 1g day of A u and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, 1(' SEAL My commission expires Form SWU-102 Rev 3.99 Page 4 of 4 i 1 A 'Lq 8 { ,1 11 D 1 'I E _k c.tr.niv ? ? - I F J J 4 5 6 7 g NOTE: THERE ARE NO STREAM BUFFER IMPACTS WITH THIS PROJECT DUE TO VESTED RIGHTS EXEMPTION PER D.W.Q. LETTER DATED FEBRUARY 14, 2003 5 WETLAND IMPACT 1: 7,242 S.F. (0.166 AC.) WETLAND IMPACT 2: 740 S.F. (0.017 AC.) INTERMITTENT STREAM A 1086 L.FJ3926 S.F.(0.090 AC.) PERENNIAL STREAM B: 149 L.FJ495 S.F.(0.011 AC.) \ J - 9 Existin ; Sanitary ?' I a n \ Sewer Easement 4 9 I? 1 ?1? WAL DIART i ?? ? ?- -192- CL I SUPERCENTCR k5292 .r a:=w.. I I C 92C-OL 203,952 FY E. 2'2.0 Ill\\ r, cam. QSHEcT2 1=T ?IIII r n? I ; 1 rwnwnt .+w \ SHEET,1 - -I /. r; O C" D I I I C?D --------------- BERN AVE. (L5. HIGHWAY 61) ?f0O1J L - -----I-------- f NO CRI,PHIC SCALE 1 ° = 200' 200 0 WETLAND EXHIBIT a- J J Z o F: ) z tt; Qr;R a{ 0? ? J w a- Q o wQ z W?U`6 o?v?i3 `YT w Q ?c o.rt :ter 08/04!2003 10:55 9158457703 PIEP-1011T LAf-+D DESIGN Piedmont Land Design, LLP 8366-104 Six Forks Road • 1laleigll, H 27615 • (919) 845-7600 * Fax: (919) 845-703 ? a TRANSMITTAL Ilk 0?,j qg o DATE August 4, 2003 V ?TO NC Division of Water Quality Crabtree Boulevard ATTENTION Todd St..1'ohn y REFERENCE Raleigh Inter rational Business Park COPIES 1 I 1 DESCRIPTION 1"-20' plans of pond outlets Marked up signature )a e. _ PAGE 01 FAQ NO. 733-6893 PAGES _* _'? Z FOR FOUR REVIEW ? FOR YOUR CONINIENT ? FOR YOUR APPROVAL ? FOR YOUR USE COMMENTS The enlarged plans show the outlet areas for each pond as requested. Please review and give me a call to discuss. We will provide a plait to attach to the previously submitted plans. The Owner would like to insert the language noted oil the enclosed signature page. This is in keepizlg with the approval letter which states the applicant shall notify future l?uyers of the 401 conditions and that the future buyer is responsible for meetiug these conditions once the property is sold. Please let ine know if this is acceptable. Please call to discuss. Thanks for your help. FROM Ron Hendricks COPY JOB CODE RIBPCW Civil Engineers • Laods(ape Ar(hilecls • Land Planers 4' \ 1 CD 110 1 r ' BERM !. / .?? • ` l/ , r-n t7q / I? rf ?/ ,• ./ / /?/•/ ?5? •J / C7 lo? Lo. I i CD buT?-??'s 42 T V-[BfCSj PLD PiedIDOIlI Lad DeS1gIl, L U P PROJECT: DATE: 06-01-0B 156-1041 FCrkS Road UdgUcrib Carta T1615 SCALE: T21 919M-7600 Faz 919.84-MM NORTH DWG. # SAC. CD `? `\ •`i/ • \? ?\ U7 \ 41 {s v J / \ \ 1 1? \ r _ 1 1 ' Yom` ' 1 / / /I LT1 BERM l G.T ?; •- ,- Ile, - T, '?tBj?Gt? m L D Piedmont dIldfleslg?,LAP PROJECT: ------- DATE: 06 -01-o CD 8366-104 S? Inks Rud 6a!Eig?, NoilCarkj 27613 SCALE: 20 Tel 919.845.700 Faz919.M.770 NORTH DWG. # SAC. t}fit \\ \ • ? ? ? / i /• i t' i" ,? !`eft •- / /' ? ry IV 0 - 0 rJ 0 w H Ul U1 L0 H co t> cn v v w H m tLl r d m Ul r-• J? m Fiedmopt Land Design, UP 41 d Mdg? hub Carolina 27615 83'.R-194 Six ForksBla Tel 919.645.7699 Fax 919.845803 NORTH PROJECT: DATE: 0$-o L 3 SCALE: DWG. # 5 0 09/04/2003 10:55 9198457703 PIED101AT LARD DESIGN PAGE 05 8. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that IJM responsible for the performance of the eight maintenance procedures listed above. I agree to notify DWQ of any problerns with the system or prior to any changes to the system Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a honicoNvners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me tliis day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL. T/Tz, 44,155 .9???/ate . /r7r' S UIGG ?'?.SO/? .S !N I/ • ? r l ??r ? 'd y L/F'?YG y?L N ? ??r My coma-fission expires Form SWU-X02 Rev 3.99 Page 4 of 4 PID Piedmont Land Design, UP 8366-104 Six Forks Road • Raleigh, Nt 27615 • (919) 845-7600 • Fax: (919) 845-703 TRANSMITTAL DATE -August 4, 2003 TO NC Division of Water Quality Crabtree Boulevard ATTEN'T'ION Todd St. john REFERENCE Raleigh International Business Park COPIES DESCRIP'T'ION T 1"=20' plans of pond outlets 1 Marked up signature page. _ FAX NO. 733-6893 PAGES ® FOR YOUR REVIEW ? FOR YOUR COMMENT ? FOR YOUR APPROVAL Q FOR YOUR USE COMMENTS The enlarged plans show the outlet areas for each pond as requested. Please review and give rue a call to discuss. We will provide a plan to attach to the previously submitted plans. T' lie Owner would like to insert the language noted on the enclosed signature a e.'I'his is in keeping with the approval letter which states the applicant shall notify future buyers of the 401 conditions and that the future buyer is responsible for meeting these conditions once the property is sold Please let me know if this is acceptable. Please call to discuss. Thanks fur our het . FROM COPT Ron Hendricks JOB CODE RIBPCVV Civil EngiQeels • Landscape Architects • Land Plalnels TO 39"d HOIS31 (MV-1 itI014(DId COLLSP86TG TT:OT 60OZ/tiO/8O .r W T I CL Co 0 C4 W IL M N W Ul e4 a) 0 M 0 CV 00 0 t• fr ' •? ,?y •,, it _ ,? f?? 'Porgy ? ?Z Dt?-tt,??5 Piedm Rand Desip, Up PROJECT: 63$6.104Sd FotksRoad BeHorhCaraka 27615 DATE: d$-ot ~a3 SCALE: t"? Zo` 'Pe1919.&#53504 Faz919.&#5.7703 NORTH DWG. # 2, c0i W C BZRM } L.J w /'Low gysr ,? i \ f 7h/ liS/ 9 : f ?'t ?C J J. ool cr) (TI r CD j N Vledmolland DesiaLIP PROJECT: 'i efG DATE: ?8 -oi-o3 8366104 k Forks Hoid Bal ft KoAb Cucb3 27613 SCALE: "= 20' M119,845.7600 E`ai91?.84a.7fC3 NORTH DWG. # SSG, 1,4 ?? ? ? ? ? •? BERM ? ?--_ ` ? ? \\ ? ,?/°'r! L-Li CY) 03 t Al f / cp f / . / y `? "?anl? ? ? OuT?rcTs © PROJECT: V%Sft,14 PiedmaIltIlan?Desi?n,LLP DATE: oe U66-104 IFo[hRed RaleiOotthCanta 23615 SCALE: ° Te1M 8457604 Fm 919.845.7703 DWG. # SAC, NORTH OF W ATF Michael F. Easley, Governor O? QG William G. Ross Jr., Secretary y North Carolina Department of Environment and Natural Resources r ? Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality June 26, 2003 DWQ Project No. 03-0489 County: Wake Page 1 of 2 Glen & Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Subject Property: Raleigh International Business Park, US64 & New Hope Road, Raleigh, NC UT to Crabtree Creek [03-04-02, 27-33-(10), C NSW (nutrient sensitive)] APPROVAL of 401 Water Quality Certification with ADDITIONAL CONDITIONS Dear Mr. & Mrs. Partin: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.183 acres of wetlands, 149 feet of perennial streams and 1,086 feet of intermittent streams for the purpose of constructing the proposed commercial / retail development as described within your application dated April 16, 2003. After reviewing your application, we have decided that the impacts are covered by the N.C. Division of Water Quality (DWQ) General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control and Non-discharge regulations. Also, this approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Conditions: 1. Stormwater Management An additional condition is that a final, written stormwater management plan shall be approved in writing by this Office before the impacts specified in this Certification occur per Condition No. 4 in GC No. 3402. The stormwater management plan must include plans and specifications for stormwater management facilities that are appropriate for surface waters classified as "C NSW" and designed to remove 85% TSS according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. 2. Water Quality Certification(s) The proposed project must comply with all of the conditions of General Water Quality Certification(s) (GC) 3402. North Carolina Division of Water Quality, WETLANDS / 401 UNIT 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands OF VJATFR O? QG (D-LUG Post-it' Fax Note 7671 Date y , j6 `>5 pages 11 l From CoJDept. Go. Phone # Phone # 7 j s ._ 4 }Z? / Fax # Michael F. Easley, Governor William G. Ross Jr., Secretary i Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality June 26, 2003 DWQ Project No. 03-0489 County: Wake Page 1 of 2 Glen & Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Subject Property: Raleigh International Business Park, US64 & New Hope Road, Raleigh, NC UT to Crabtree Creek [03-04-02, 27-33-(10), C NSW (nutrient sensitive)] APPROVAL of 401 Water Quality Certification with ADDITIONAL CONDITIONS Dear Mr. & Mrs. Partin: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.183 acres of wetlands, 149 feet of perennial streams and 1,086 feet of intermittent streams for the purpose of constructing the proposed commercial / retail development as described within your application dated April 16, 2003. After reviewing your application, we have decided that the impacts are covered by the N.C. Division of Water Quality (DWQ) General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control and Non-discharge regulations. Also, this approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Conditions: 1. Stormwater Management An additional condition is that a final, written stormwater management plan shall be approved in writing by this Office before the impacts specified in this Certification occur per Condition No. 4 in GC No. 3402. The stormwater management plan must include plans and specifications for stormwater management facilities that are appropriate for surface waters classified as "C NSW" and designed to remove 85% TSS according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. 2. Water Quality Certification(s) The proposed project must comply with all of the conditions of General Water Quality Certification(s) (GC) 3402. North Carolina Division of Water Quality, WETLANDS / 401 UNIT 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) ,,, ,.,,.-- ,.,,,--- % n,o_7V i_RAQ? Uaxl. htto://h2o.enr.state.nc.us/ncweUands Piedmont Land Design, LLP 1 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fag (919) 845-7703 t%jj1Vt1160,0 CARO o??,,......... tia June 6, 2003 10 New Bern Commons OUP New Bern Avenue/U.S. Highway 64 Raleigh, North Carolina '., y%0-. NE• p •.....•• Stormwater Calculations Runoff Calculations Using Rational Method Iio = 7.50 in/hr, Composite c values are based on c = 0.95 for impervious areas and c = 0.2 for pervious areas. Using HDS No. 3, n = 0.015 for pipe sizing: All storm structures are to be City of Raleigh approved structures unless otherwise noted. Drainace to Wet Pond #1 Raised Top Catch Basin #1 IA = DA = 0.95 acres Qio= 0.85(7.50) 0.95 = 6.1 cfs #1 - #2 15" rcp @ 3.0%, vio = 8.2 fps, dlo= 0.65', HW/D = 3.2, Qn„X = 9.0 cfs Curb Inlet #2 IA = 0.12 acres DA = 0.95 + 0.12 = 1.07 acres Qio= 0.85(7.50) 1.07 = 6.8 cfs #2 - #3 18" rcp @ 1.0%, vio = 5.5 fps, dio= 0.90', HW/D = 2.3, Q,„a?, = 12.0 cfs Curb Inlet #3 IA = 0.11 acres DA = 1.07 + 0.11 = 1.18 acres Qio= 0.85(7.50) 1.18 = 7.5 cfs #3 - #4 18" rcp @ 1.5%, vlo = 6.8 fps, dlo= 0.90', HW/D = 3.0, Q,,,,,, = 16.0 cfs Curb Inlet #4 IA = 0.33 acres DA = 1.18 + 0.33 = 1.51 acres Qio= 0.85(7.50) 1.51 = 9.6 cfs Civil Engineers • Landscape Archi(ecls • Land Planners 2 #4-#5 18" rcp @ 1.0%, vIo = 5.9 fps, dlo= 1.25', HW/D = 2.3, Q,,,,,, = 13.5 cfs Storm Manhole #5 IA=0 DA = 1.51 acres QIO= 9.6 cfs Catch Basin #6 IA = DA = 0.21 acres QIo= 0.85(7.50) 0.21 = 1.3 cfs #6 - #6A 15" rcp @ 3.25%, vlo = 5.3 fps, dIo = 0.33', HW/D = 2.8, Q,,,.,-, = 10.0 cfs Curb Inlet #6A IA = 0.18 acres DA = 0.21 + 0.18 = 0.39 acres QIO= 0.85(7.50) 0.39 = 2.5 cfs #5 - #7 18" rcp @ 3.0%, vlo = 9.8 fps, dio= 0.75', HW/D = 2.5, Q,,. = 14.5 cfs #6A - #7 15" rcp @ 1.0%, vlo = 4.5 fps, dlo= 0.55', HW/D = 2.7, Qmvc = 10.0 cfs Curb Inlet #7 IA = 0.28 acres DA = 1.51 + 0.39 +0.28 = 2.18 acres QIo= 0.85(7.50) 2.18 = 13.9 cfs Catch Basin #8 IA = DA = 0.40 acres QIO= 0.85(7.50) 0.40 = 2.6 cfs #8 - #9 15" rcp @ 1.0%, vlo = 4.5 fps, dlo= 0.55', HW/D = 4.3, Q= = 12.0 cfs Catch Basin #9 IA = 0.48 acres DA = 0.40 + 0.48 = 0.88 acres QIO= 0.85(7.50) 0.88 = 5.6 cfs #7 - #10 18" rcp'@ 3.3%, vIo =10.5 fps, dIo= 1.0', HW/D = 2.7, Qn= = 15.5 cfs #9-#10 15" rcp @ 1.0%, vIo = 5.3 fps, dIo = 0.95', HW/D = 4.3, Q. = 12.0 cfs RIBPCW_Stormwater Calculations New Beni Common PLD 3 Curb Inlet #10 IA = 0.31 acres DA=2.18+0.88+0.31 =3.37 acres Qto= 0.85(7.50) 3.37 = 21.5 cfs #10-#11 24" rcp @ 1.0%, vio = 7.0 fps, djo= 1.55', HW/D = 4.0, Q, a = 38.0 cfs Curb Inlet #11 IA = 0.13 acres DA = 3.50 acres Qio = 0.85(7.50) 3.50 = 22.3 cfs #11 -#12 24" rcp @ 1.2%, vio = 7.4 fps, dio= 1.7', HW/D = 4.2, Qmax = 40.0 cfs Curb Inlet #12 IA = 0.03 acres DA = 3.50 + 0.03 = 3.53 acres Qio= 0.85(7.50) 3.53 = 22.5 cfs #12 - #13 24" rcp @ 1.5%, v10 = 8.8 fps, dlo= 1.6', HW/D = 4.5, Qmax = 45.0 cfs Curb Inlet #13 IA = 0.59 acres DA = 3.53 + 0.59 = 4.12 acres Qio = 0.85(7.50) 4.12 = 26.3 cfs Curb Inlet #14 IA = DA = 0.08 acres Qio= 0.85(7.50) 0.08 = 0.5 cfs #14 - #15 15" rcp @ 1.0%, vlo = 2.7 fps, dlo= 0.25', HW/D = 2.6, Qmux = 9.5 cfs Curb Inlet #15 IA = 0.39 acres DA = 0.08 + 0.39 = 0.47 acres Qio= 0.85(7.50) 0.47 = 3.0 cfs #15 - #16 15" rcp-@ 1.0%, vlo = 4.5 fps, dlo= 0.65', HW/D = 3.1, Q. = 11.0 cfs RIBPCW_Stormwater Calculations New Bern Commons PLD 4 Curb Inlet #16 IA = 0.32 acres DA = 0.47 + 0.32 = 0.79 acres Qio= 0.85(7.50) 0.79 = 5.0 cfs #16 - #17 15" rcp @ 1.0%, vio = 5.2 fps, dio = 0.85', HW/D = 5.9, Q. = 16.0 cfs Storm Manhole #17 IA=0 DA = 0.79 acres Qio= 5.0 cfs Curb Inlet #18 IA = DA = 0.16 acres Qio= 0.85(7.50) 0.16 = 1.0 cfs #18 - #19 15" rcp @ 1.0%, vlo = 3.3 fps, dlo= 0.38', HW/D = 2.6, Qma,, = 9.5 cfs Curb Inlet #19 IA = 0.35 acres DA = 0.16 + 0.35 = 0.51 acres Qio= 0.85(7.50) 0.51 = 3.3 cfs #19 - #20 15" rcp @ 1.0%, vlo = 4.7 fps, dlo= 0.67', HW/D = 5.2, Q. = 15.0 cfs Curb Inlet #20 IA = 0.24 acres DA = 0.51 + 0.24 = 0.75 acres Qio= 0.85(7.50) 0.75 = 4.8 cfs #20 - #21 15" rcp @ 1.0%, vio = 5.1 fps, dlo= 0.87', HW/D = 5.7, Qmax = 15.5 cfs Curb Inlet #21 IA = 0.14 acres DA = 0.75 + 0.14 = 0.89 acres Qio= 0.85(7.50) 0.89 = 5.7 cfs #17 - #22 15" rcp,@ 1.5%, vlo = 5.0 fps, dio = 0.85', HW/D = 6. 1, Q. = 16.5 cfs #21 - #22 18" rcp @ 1.0%, vio = 5.5 fps, dlo= 0.85', HW/D = 6.9, Qmax = 27.0 cfs RIBPCW_Stormwatcr Calculations n New Bern Commons r 5 Double Curb Inlet #22 IA = 1.39 acres DA = 0.79 + 0.89 + 1.39 = 3.07 acres Q10= 0.85(7.50) 3.07 = 19.6 cfs #13 - #23 24" rcp @ 4.0%, vlo = 13.5 fps, dio = 1.15', HW/D = 5.5, 48.0 cfs #22 - #23 24" rcp @ 1.0%, vlo = 7.0 fps, dlo= 1.5', HW/D = 5.3,Q,,,,, = 47. cfs Storm Manhole #23 IA=0 DA=4.12+3.07=7.19 acres Qio = 0.85(7.50) 7.19 = 45.8 cfs #23 - #23A 30" rcp @ 1.5%, vio = 10.0 fps, dlo= 1.9', HW/D = 5.6, Qm = 82.0 cfs Curb Inlet #23A IA = 0.24 acres DA=7.19+0.24=7.43 acres Qio= 0.85(7.50) 7.43 = 47.4 cfs #23A - #24 30" rcp @ 1.5%, vlo = 10.0 fps, dlo= 2.0', HW/D = 5.9, Qm? = 90.0 cfs Storm Manhole #24 IA=0 DA = 7.43 + 0.28 (RD) = 7.71 acres Qio= 0.85(7.50) 7.71 = 49.2 cfs #24 - #25 30" rcp @ 2.0%, vlo = 12.0 fps, dlo= 1.8', HW/D = 4.0, Q,„? = 70.0 cfs RTWI #25C IA = 0.71 acres DA = 8.42 acres Qio= 0.85(7.50) 8.42 = 53.7 cfs Qioo= 0.85(9.72) 8.42 = 69.6 cfs Minimum Weir Size Qioo= c,LH"Z, L = 20' with 5'x 5' inside box dimension H = 1.1', Use 1.25' minimum opening height. #25C - #25D 42" rcp @ 0.5%, vio = 7.3 fps, dlo= 2.6', HW/D = 2.2, Q. = 105.0 cfs RIBPCW_Stormwater Calculations PLD New Bern Commons 6 Drainne to Wet Pond #2 & Off-Site Junction Box/Storm Manhole #26 IA=0 DA = 14.84 acres (Off-site) Q10 = 0.85(7.50) 14.84 = 94.6 cfs Raised Top Catch Basin #27 IA = DA = 1.15 acres Qio= 0.85(7.50) 1.15 = 7.3 cfs #26 - #27A 42" rcp @ 2.0%, vlo = 12.0 fps, dio = 2.5', HW/D = 4.3, Q. = 170.0 cfs #27 - #27A 15" rcp @ 10.0%, vlo = 13.5 fps, dlo= 0.55', HW/D = 5.8, Q. = 15.5 cfs Catch Basin #27A IA = 0.03 acres DA = 14.84 + 1.15 + 0.03 = 16.02 acres Q10 = 0.85(7.50) 16.02 = 102.1 cfs Raised Top Catch Basin #28 IA = DA = 1.03 acres Qio= 0.85(7.50) 1.03 = 6.6 cfs Curb Inlet #29 IA = DA = 0.24 acres Qio= 0.85(7.50) 0.24 = 1.5 cfs #29 - #30 15" rcp @ 1.0%, vio = 3.7 fps, dlo= 0.45', HW/D = 2.6, Q. = 9.5 cfs Curb Inlet #30 IA = 0.16 acres DA = 0.24 + 0.16 = 0.40 acres Q10= 0.85(7.50) 0.40 = 2.6 cfs #30 - #31 15" rcp @ 1.0%, vlo = 4.4 fps, dlo= 0.58', HW/D = 3.4, Q. = 11.6 cfs Catch Basin #31 IA = 0.64 acres DA = 0A0 + 0.64 = 1.04 acres Qio= 0.85(7.50) 1.04 = 6.6 cfs RIBPCW_Stormwater Calculations New Beni Commons PLD 7 #31 - #32 15" rcp @ 4.4%, vIo = 10.0 fps, dIo = 0.62', HW/D = 8.3, Qm = 20.5 cfs Curb Inlet #32 IA = 0.36 acres DA = 1.04 + 0.36 = 1.40 acres QIo= 0.85(7.50) 1.40 = 8.9 cfs #27A - #33 42" rcp @ 2.0%, vIo = 14.0 fps, dIo= 2.1', HW/D = 2.9, Q. = 188.0 cfs #28 - #33 15" rcp @ 4.0%, vIo = 9.3 fps, dIo= 0.68', HW/D = 9.4, Q., = 22.0 cfs #32 - #33 18" rcp @ 1.0%, vIo = 6.0 fps, dIo= 1.1', HW/D = 2.8, Q. = 16.0 cfs Curb Inlet #33 IA = 0.31 acres DA = 16.02 + 1.03 + 1.40 + 0.31 = 18.76 acres Q10= 0.85(7.50) 18.76 = 119.6 cfs Curb Inlet #34 IA = DA = 0.48 acres QIo= 0.85(7.50) 0.48 = 3.1 cfs #33 - #35 48" rcp @ 2.5%, vIo = 17.0 fps, dIo= 2.2', HW/D = 1.6, 120.0 cfs #34 - #35 15" rcp @ 2.5%, vIo = 6.5 fps, dIo= 0.49', HW/D = 2.6, Q. = 9.5 cfs Double Curb Inlet #35 IA = 2.31 acres DA = 18.76 + 0.48 + 2.31 = 21.55 acres QIo= 0.85(7.50) 21.55 = 137.4 cfs #35 - #36 48" rcp @ 1.2%, vIo = 12.0 fps, dIo = 3.0', HW/D = 2.0, Q = 145.0 cfs Double Curb Inlet #36 IA = 1.26 acres DA = 21.55 + 1.26 = 22.81 acres Q10 = 0.85(7.50) 22.81 = 145.4 cfs #36 - #37 48" rcp @ 1.2%, vIo = 12.5 fps, dIo= 3.4', HW/D = 2. 1, Q. = 150.0 cfs RIBPCW Storznwatcr Calculations New Benz Commons PL's 8 Double Curb Inlet #37 IA = 1.39 acres DA = 22.81 + 1.39 = 24.20 acres Qjo= 0.85(7.50) 24.20 = 154.3 cfs #37 - #38 54" rcp @ 1.0%, vio = 12.0 fps, dlo= 3.4', HW/D = 2.6, Qmax = 230.0 cfs Double Junction Box/Storm Manhole #38 (Splitter) IA=0 DA = 24.20 acres Qio= 154.3 cfs (temporary flow to #42) Off-Site -> #39 14.84 acres (#26) + 2.71 acres (#49) + 0.40 acres (#54A) _ 17.95 acres (74%) -* Qio = 0.85(7.50) 17.95 = 114.4 cfs( final flow to #39) On-Site -? #42 6.25 acres (26%) -? QIO= 0.85(7.50) 6.25 = 39.8 cfs (final flow to #42) 3.11 acres of flow diverted to creek at this location to make up for treatment of off- site drainage area coming into #49 and #54A. *Note: All pipes from structures #38 - 47 have been upsized to convey all of the initial on- site and off-site drainage to the temporary riser filter basin, based on headwater conditions. #38- #39 42" rcp @ 5.0%, vio = 21.0 fps, dlo= 1.9', HW/D = 3.7, Qma,, = 150.0 cfs Storm Junction Box #39 IA=0 DA = 17.95 acres Qio= 114.4 cfs #39 - #40 48" rcp @ 1.0%, vla =11.5 fps, dlo= 2.8', HW/D = 4.6, Qmax = 240.0 cfs #38 - #42 48" rcp @ 1.0%, HW/D = 3.3, Qmaz = 200.0 cfs Double Curb Inlet #41 IA = DA = 1.86 acres Qio= 0.85(7.50) 1.86 = 11.2 cfs #41 - #42 18" rcp @ 3.0%, vio = 9.8 fps, dio = 0.95', HW/D = 2.5, Qmax = 15.0 cfs RIBPCIV_Stormwatcr Calculations New Bern Commons PLD 9 Storm Manhole/Junction Box #42 IA=O DAI = 24.20 + 1.86 = 26.06 acres (temporary) DA2 = 6.25 + 1.86 = 8.11 acres (final) Temporary Q10= 0.85(7.50) 26.06 = 166.1 cfs Final Qlo= 0.85(7.50) 8.11 = 51.7 cfs #42 - #43 48" rcp @ 1.0%, HW/D = 3.6, Q.,a, = 220.0 cfs Curb Inlet #43 IA = 0.09 acres DAI = 26.06 + 0.09 = 26.15 acres (temporary) DA2 = 8.11 + 0.09 = 8.20 acres (final) Temporary QIo = 0.85(7.50) 26.15 = 166.7 cfs Final Q10= 0.85(7.50) 8.20 = 52.3 cfs #43 - #44 48" rcp @ 1.0%, HW/D = 3.8, Qm,, = 225.0 cfs Storm Manhole #44 IA=O DAI = 26.15 acres (temporary) DA2 = 8.20 acres (final) Temporary QIo = 166.7 cfs Final QIo= 52.3 cfs Curb Inlet #45 IA = 0.39 acres DAI = 26.15 + 0.39 = 26.54 acres (temporary) DA2 = 8.20 + 0.39 = 8.59 acres (final) Temporary QIo= 0.85(7.50) 26.54 = 169.2 cfs Final QIo= 0.85(7.50) 8.59 = 54.8 cfs #45 - #46 48" rcp @ 1.0%, HW/D = 4.2, Q. = 235.0 cfs Curb Inlet #46 IA = 0.10 acres DAI = 26.54 + 0.10 = 26.64 acres (temporary) DA2 = 8.59 + 0.10 = 8.69 acres (final) Temporary QIo= 0.85(7.50) 26.64 = 169.8 cfs Final Qjo= 0.85(7.50) 8.69 = 55.4 cfs Curb Inlet #47 IA = DA = 0.53 acres QIo = 0.85(7.50) 0.53 = 3.4 cfs RMCW_Stormwater Calculations T New Beni Commons PLD 10 #46 - #61 48" rcp @ 1.0%, HW/D = 4.5, Qm = 240.0 cfs #47 - #61 15" rcp @ 3.0%, vio = 7.1 fps, dio = 0.5', HW/D = 3.0, Q,,, = 10.0 cfs Catch Basin #49 IA = DA = 2.71 acres Qio= 0.85(7.50) 2.71 = 17.3 cfs #49 - #50 24" rcp @ 3.0%, vlo = 11.5 fps, dio = 1.0', HW/D = 6.4, Qmax = 53.0 cfs Double Curb Inlet #50 IA = 1.16 acres DA = 2.71 + 1.16 = 3.87 acres Qio= 0.85(7.50) 3.87 = 24.7 cfs Curb Inlet #51 IA = DA = 0.49 acres Qio= 0.85(7.50) 0.49 = 3.1 cfs #50 - #52 30" rcp @ 1.0%, vlo = 7.6 fps, dlo= 1.5', HW/D = 1.7, Q. = 39.0 cfs #51 - #52 15" rcp @ 9.0%, vlo = 10.5 fps, dlo= 0.35', HW/D = 2.4, Q. = 9.0 cfs Curb Inlet #52 IA = 0.34 acres DA = 3.87 + 0.49 + 0.34 = 4.70 acres Qio= 0.85(7.50) 4.70 = 30.0 cfs #52 - #53 30" rcp @ 1.0%, vlo = 7.8 fps, dlo= 1.7', HW/D = 2.5, Q. = 52.0 cfs Curb Inlet #53 IA = 0.32 acres DA = 4.70 + 0.32 = 5.02 acres Qio= 0.85(7.50) 5.02 = 32.0 cfs Curb Inlet #54 IA = DA = 0.21 acres Qio= 0.8(7.50) 0.21 = 1.3 cfs RIBPCW_Stormwater Calculations New Fern Commons PLD 11 Catch Basin #54A IA = DA = 0.40 acres QIO= 0.8(7.50) 0.40 = 2.6 cfs #53 - #55 30" rcp @ 1.0%, v10 = 8.0 fps, dlo= 1.8', HW/D = 2.9, Qmax = 57.0 cfs #54 - #55 15" rep @ 5.0%, vIo = 6.6 fps, dIo= 0.28', HW/D = 2.8, Qmax = 10.0 cfs #54A - #55 15" rcp @ 10.0%, vIo = 10.0 fps, dlo= 0.32, HW/D = 2.8, Qnm = 10.0 cfs Curb Inlet #55 IA = 0.58 acres DA = 5.02 + 0.21 + 0.40 + 0.58 = 6.21 acres QIo= 0.85(7.50) 6.21 = 39.6 cfs Curb Inlet #56 IA = DA = 0.23 acres QIo= 0.85(7.50) 0.23 = 1.5 cfs #55 - #57 36" rep @ 1.0%, vlo = 8.8 fps, dlo= 1.78', HW/D = 3.2, Qmax = 95.0 cfs #56 - #57 15" rcp @ 5.0%, vIo = 6.8 fps, dIo= 0.28', HW/D = 2.6, Off= = 9.5 cfs Curb Inlet #57 IA = 0.17acres DA = 6.21 + 0.23 + 0.17 = 6.61 acres QIO= 0.85(7.50) 6.61 = 42.1 cfs #57 - #58 36" rcp @ 1.0%, vIo = 8.8 fps, dIo = 1.8', HW/D = 3.9, Qnm = 105.0 cfs Curb Inlet #58 IA=0 DA = 6.61 + (1.72 + 1.28 + 0.13) (RD) = 9.74 acres QIO= 0.85(7.50) 9.74 = 62.1 cfs #58 - #59 42" rcp @ 1.0%, vIo = 9.8 fps, dIo= 2.1', HW/D = 3.8, Qmvc = 155.0 cfs Curb Inlet #59 IA = 0.12 acres DA = 9.74 + 0.12 = 9.86 acres RIBPCW_Stormwater Calculations New Beni Commoirs PLD 12 Qio= 0.85(7.50) 9.86 = 62.9 cfs #59 - #60 42" rcp @ 1.0%, vlo = 9.8 fps, dIo = 2.1', HW/D = 4.3, Qmax = 170.0 cfs Curb Inlet #60 IA = 0.13 acres DA = 9.86 + 0.13 + 1.78 (RD) = 11.77 acres QIO = 0.85(7:50) 11.77 = 75.0 cfs #60- #61 42" rcp @ 1.0%, vIo = 10.2 fps, dlo= 2.5', HW/D = 4.7, Qmax = 175.0 cfs Curb Inlet #61 IA = 0.15 acres DAI = 11.77 + 0.15 + 26.64 + 0.53 = 39.09 acres (temporary) DA2 = 11.77 + 0.15 + 8.69 + 0.53 = 21.14 acres (final) Temporary QIO= 0.85(7.50) 39.09 = 249.2 cfs Final QIO = 0.85(7.50) 21.14 = 134.8 cfs #61- #62 48" rcp @ 1.0%, HW/D = 6.0, Q. = 295.0 cfs RTWI #65 IA, = DA, _ (39.09 + 0.80)/2 = 19.95 acres (temporary) IA2 =DA2 = (21.14 + 0.80)/2 = 10.97 acres (final) Temporary Qlo= 0.80(7.50) 19.95 = 119.7 cfs Final Qlo= 0.80(7.50) 10.97 = 65.8 cfs Final Qloo= 0.80(9.72) 10.97 = 85.3 cfs Temporary Minimum Weir Size QIO= cWLH32, L = 28' with 7'x 7' inside box dimension H = 1.27', Maximum initial height of box = 248.35. Final Minimum Weir Size Qloo = cw,LH32, L = 28' with 7'x 7' inside box dimension H = 1.02', Use 1.25' minimum opening height. #65- #66 36" rcp @ 2.0%, vIo = 13.0 fps, dlo= 2.2', HW/D = 3.6, Qmax = 100 cfs RTWI #66 IA, = (39.09 + 0.80)/2 = 19.95 acres (temporary) DA, = 19.95 +19.94 = 39.89 acres (temporary) IA2 = (21.14 + 0.80)/2 = 10.97 acres (final) DA2 = (10.97 + 10.97 = 21.94 acres (final) Temporary QIo= 0.80(7.50) 39.89 = 239.3 cfs RIBPCW_Stormwater Calculations New Bern Commons PLD 13 Final Qlo= 0.80(7.50) 21.94 = 131.6 cfs Final Qloo= 0.80(9.72) 21.94 = 170.6 cfs Temporary Minimum Weir Size Q1o= cWLH"', L = 28' with 7'x 7' inside box dimension H = 1.27', Maximum initial height of box = 248.35. Final Minimum Weir Size Q100= c,LH"Z, L = 28' with 7'x 7' inside box dimension H = 1.02', Use 1.25' minimum opening height. #66- #67 60" rcp @ 1.0%, v10 = 12.0 fps, dlo= 4.9', HW/D = 2.2, Qmsx = 260 cfs Rip-rap Apron Calculations - Using NYDOT chart FES #25 v = 12.0 fps d=30"=2.5' Requires Zone 3 Medium Stone Filling L=8x2.5=20' W=3x2.5=7.5' Thickness = 22" :. Use min. Class B erosion control stone 20'L x 7.5'W x 22"TH Endwall #40 v = 11.5 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .•. Use min. Class B erosion control stone 32'L x 12'W x 22"TH RIBPCW_Storrnivatcr Calculations New Bern Commons PLD 14 Endwall #62 v= 12 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .•. Use min. Class B erosion control stone 321 x 12'W x 22"TH Endwall #25D (Outlet to Pond #1) v = 7.2 fps d=42"=IT Requires Zone 2 Light Stone Filling L=6x3.5=21' W = 3 x 3.5 = 10.5' Thickness = 22" .•. Use min. Class B erosion control stone 211 x 12'W x 22"TH Endwall #67 (Outlet to Pond #2) v = 9.0 fps d=60"=5' Requires Zone 3 Medium Stone Filling L=8x5=40' W=3x5=15' Thickness = 22" .•. Use min. Class B erosion control stone 40'L x 15'W x 22"TH RIBPCW DLH/dlh RIBPCw_Stormwatcr Calculations TT New Bern Commons PLD 6/72003 WET POND #1 CALCULATIONS Drainage Area = 8.42 ac Impervious Area = 6.17 ac % Impervious Cover = 73 % Avg. Permanent Pool Depth = 3.0 It Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permanent Pool Depth feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = Surface Area = Aproximate Dimensions = 3.04 0.26 ac = 11,136 ft2 Length x Width 183 x 61 (V00Runotl = 21,701 cf (Vol)P.,= 43,983 cf (Vol)Tot., = 65,684 cf (V01)Forebay = 9,294 cf Note: Design Rainfall - I' Note: See Table Below x Depth x 3 - @ Elev. 248.68 Note: See Table Below (Min. 20% of Pool Volume) Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 4,515 242 0 0 1 5,525 243 5,020 5,020 2 6,625 244 6,075 11,095 3 7,815 245 7,220 18,315 4 10,635 246 9,225 27,540 5 13,761 247 12,198 39,738 5.3 14,540 247.3 4,245 43,983 6 15,660 248 10,570 54,553 7 17,300 249 16,480 71,033 8 18,990 250 18,145 89,178 8.7 20,210 250.7 13,720 102,898 RIBPCW_Wetpond Calculations_rph Wetpond #1 0.08 cfs PLD 6/7/2003 Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 535 242 0 0 1 830 243 683 683 2 1,170 244 1,000 1,683 3 1,560 245 1,365 3,048 4 2,530 246 2,045 5,093 5 3,595 247 3,063 8,155 5.3 4,000 247.3 1,139 9,294 RIBPCW_Wetpond Calculations_rph PLD Wetpond #1 6/72003 WET POND #2 CALCULATIONS Drainage Area = 21.94 ac Impervious Area = 15.38 ac % Impervious Cover = 70 % Avg. Permanent Pool Depth = 4.0 It Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont -T- % Impervious Permanent Pool Depth feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = 2.40 Min. Surface Area = 0.53 ac = 22,908 ft2 Min. Forebay Vol = 18,704 cf (VOI)Runotf = 54,157 cf ' Note: Design Rainfall - 1 " - ® Elev. 252.17 (Vol)Poa= 93,520 cf 'Note: See Table Below (Vol)Tow = 147,677 cf (Vol)FOfet.y = 20,461 cf ' Note: See Table Below (Min. 20% of Pool Volume) Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 5,000 242 0 0 2 7,633 244 12,633 12,633 4 10,720 246 18,353 30,986 6 14,244 248 24,964 55,950 8 23,326 250 37,570 93,520 10 26,159 252 49,485 143,005 12 29,130 254 55,289 198,294 14 198,294 16 198,294 18 198,294 RIBPCW_Wetpond Calculations_rph Wetpond #2 0.21 cfs PLD 6/7/2003 Water Surface Elevation Incremental Accumulated Level Area Volume Volume ft sf ft c cf 0 515 242 0 0 2 1,201 244 1,716 1,716 4 2,137 246 3,338 5,054 6 3,313 248 5,450 10,504 8 6,644 250 9,957 20,461 RIBPCW_Wetpond Calculations_rph PLD Wetpond #2 Wet Pond #1 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(73.28) = 0.71" Volume = Rv(DA) = 0.71"(8.42 acres )(1'/12")(43,560 sf( 1 acre) = 21,701 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (21,701cf/48 hours)(1 hour/3600 sec) = 0.13 cfs Required release rate for drainage in 5 days Q = (21,701cf/120 hours)(1 hour/3600 sec) = 0.05 cfs Try 2" diameter pipe Average head = 1.4'/2 - 0.08' = 0.62' Q = cdA(2gH)°S = 0.6(0.0218)(2(32.2)(0.62))°s = 0.08 cfs Use 2" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (65,684cf/24 hours)(1 hour/3600 sec) = 0.76 cfs Try 8" diameter pipe Average head = 7.8'/2 - 0.33' = 3.57' Q = cdA(2gH)°-' = 0.6(0.34)(2(32.2)(3.57))0S = 3.09 cfs Use 8" drainpipe since it will drain pond in less than one day. Calculate anti-flotation block at RTWI #25A Displacement = 5'(5)7.47' tall = 186.8 cf Buoyant Force = 186.8 cf(62.41bs/cf) = 11,656.3 lbs. Weight of walls and base = (181f(0.5' thick)7.47' tall wall + 7(7)0.67' thick base)(150 lbs/cf -62.4 lbs/cf) = 8,765.3 lbs Weight of Soil above base = (241f (1' thick) 4' high) 1001bs/cf = 9,600 lbs. Total weight of walls, base, and soils = 18,365.3 lbs which exceed the buoyant force by 57%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. PLD Calculate anti-flotation block at RTWI #25C Displacement = 6'(6')6.7' tall = 241.2 cf Buoyant Force = 241.2 cf(62.4 lbs/cf) = 15,050.9 lbs. Weight of walls and base = (221f(0.5' thick)6.7' tall wall + 8(8)1' thick base)(1501bs/cf - 62.4 lbs/cf) = 12,062.5 lbs Weight of Soil above base = (281f (1' thick) 4.3' high) 100 lbs/cf = 12,040 lbs. Total weight of walls, base, and soils = 24,102.51bs which exceed the buoyant force by 60%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Wet Pond #2 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(70.10) = 0.68" Volume = Rv(DA) = 0.68"(21.94 acres )(1'/12")(43,560 sf/ 1 acre) = 54,157 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (54,157cf/48 hours)(1 hour/3600 sec) = 0.31 cfs Required release rate for drainage in 5 days Q = (54,157cf/120 hours)(1 hour/3600 sec) = 0.13 cfs Try 3" diameter pipe Average head = 2.17'/2 - 0.13' = 0.96' Q = c,A(2gH)O" = 0.6(0.0491)(2(32.2)(0.96))0S = 0.23 cfs Use 3" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (147,730cf/24 hours)(1 hour/3600 sec) = 1.71 cfs Try 8" diameter pipe Average head = 10.17'/2 - 0.33' = 4.76' Q = c,A(2gH)03 = 0.6(0.34)(2(32.2)(4.76))0-5= 3.6 cfs Use 8" drainpipe since it will drain pond in less than one day. PLD Calculate anti-flotation block at RTWI #63 Displacement = 5'(5')8.38' tall = 209.5 cf Buoyant Force = 209.5cf(62.4 lbs/cf) = 13,072.8 lbs. Weight of walls and base = (181f(0.5' thick)8.38' tall wall + 7(7)0.67' thick base)(150 lbs/cf -62.4 lbs/cf) = 9,482.7 lbs Weight of Soil above base = (241f (1' thick) 4' high) 100 lbs/cf = 9,600 lbs. Total weight of walls, base, and soils = 19,082.7 lbs which exceed the buoyant force by 46%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Calculate anti-flotation block at RTWI #65 and #66 Displacement = 8'(8')10.2' tall = 652.8 cf Buoyant Force = 652.8cf(62.41bs/cf) = 40734.7 lbs. Weight of walls and base = (301f(0.5' thick) 10.2' tall wall + 10(10)1' thick base)(150 lbs/cf - 62.4 lbs/cf) = 22,162.8 lbs Weight of Soil above base = (36 if (1' thick) 7' high) 100 lbs/cf = 25,2001bs. Total weight of walls, base, and soils = 47,362.8 lbs which exceed the buoyant force by 16%. This calculation excludes friction forces of soils which will provide an additional factor of safety. RIBPCW PLD 0 WATF9p Michael F. Easley O G Governor y William G. Ross, Jr., Secretary r Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality July 31, 2003 Mr. Ron Hendricks, PE PLD 8366-104 Six Forks Road Raleigh, NC 27615 Subject: Raleigh International Business Park DWQ Project No. 030489 Wake County Dear Mr. Hendricks: The Wetlands Unit staff reviewed the stormwater management plans for the subject project and determined that additional information is necessary to complete the technical review process. The required additional information is as follows: Level Spreaders/ Forested Filter Strips It is still not clear from the plans provided that the filter strips are to remain forested. In other words it appears that you are proposing grading in those areas. Also, the flow path shown from the level spreader from pond 1 can not be confirmed by the topography as shown. It is important that if forested filter strips are to be provided for the 1" rain draw down, as proposed, that they be forested, clearly hydraulically separate from the main outlet discharge, and will provide diffuse flow for at least 50 feet. More detail is necessary to show that this will be achieved. It is recommended that a detail page be provided, say at a 1" = 20 feet or 1" = 10 feet that has more precise elevation detail. Also, please show the extent of forest vegetation on the plan. 2. Operation and Maintenance Agreement An operation and maintenance agreement is required. An example operation and maintenance plan can be found at http://h2o.ehnr.state.nc.us/ncwetlands/mitresto.htmi. The operation and maintenance agreement must also be signed by the responsible party and notarized. If you have any questions or would like to discuss this project, please contact me at (919) 733-9584. Also, please note that the NC DENR Stormwater Best Management Practices Manual as well as other documents and information can be downloaded from the Wetlands Unit web site at http://h2o.ehnr.state.nc.us/ncwetlands/mitresto.html. Sincerely, Todd t. John E Environmental Engineer cc: Raleigh Regional Office File North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ 3 WET POND #1 CALCULATIONS Drainage Area = 8.34 ac Impervious Area = 6.19 ac % Impervious Cover = 74 % Avg. Permanent Pool Depth = Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont Impervious % Permanent Pool De th feet Cover 7 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.7A 1 3.10 _2.66 2 3d 2.11 1.83 1267 Notes: Numbers given in the body of the table are given in percentages. SA/DA = Surface Area = Min. Forebay Volume = (VOI)R-ft = (Vol)pw = (VOI)T°lal = (VOI)F.,.t.y = BASIN VOLUME 3.07 0.26 ac = 11,153 ft2 8,811 cf 21,736 cf *Note: Design Rainfall - 1' @ Elev. 248.68 44,055 cf *Note: See Table Below @ Elev. 247.30 65,791 cf Berm Elev. 250.78 9,403 cf ' Note: See Table Below (Min. 20% of Pool Volume) Water Level tt Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 4,605 242 0 0 1 5,635 243 5,120 5,120 2 6,755 244 6,195 11,315 3 7,960 245 7,358 18,673 4 10,375 246 9,168 27,840 5 13,610 247 11,993 39,833 5 3 i 247 3- 4 223 i . . . , 6 15,655 248 10,568 54,623 7 17,290 249 16,473 71,096 8 18,990 250 18,140 89,236 8.8 20,350 250.8 15,736 104,972 FOREBAY VOLUME Water Level tt Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 584 242 0 0 1 890 243 737 737 2 1,242 244 1,066 1,803 3 1,640 245 1,441 3,244 4 2,440 246 2,040 5,284 5 5 3 3,564 3 883 247 247 3 3,002 1 117 8,286 9 403 . , . , , RIBPCW_Wetpond Calculations.xls Wetpond #1 PLD ..itMItIit- 7/17103 . t , Permit No. (to be provided by DIVQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: New Bern Commons Contact Person: Ron Hendricks, PE Phone Number: ( 919 ) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond #1 elevations Basin Bottom Elevation 242.0 ft. Permanent Pool Elevation 247.3 ft. Temporary Pool Elevation 248.7 ft. State of North Carolina Department of Environment and Natural Resources Division of Water Quality areas Permanent Pool Surface Area 14,540 sq. ft. (water surface area at the orifice elevation) Drainage Area 8.34 ac. (on-site and off-site drainage to the basin) Impervious Area 6.19 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 53,458 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 21,736 cu. ft. (volume detained above the permanent pool) Forebay Volume 9,403 cu. ft. (approximately 20% of total volume) Other parameters SA/DA I Diameter of Orifice Design Rainfall Design TSS Removal 2 Form SWU-102 Rev 3.99 3.07 2 in. I in. 85 % (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (surface area to drainage area ratio front DWQ table) (2 to S day temporary pool draw-down required) (minimum 85% required) Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials .?a. The permanent average pool depth is between 3 and 6 feet (required minimum of 3 feet). w 1. The forebay volume is approximately equal to 20% of the basin volume. V-11"c. The temporary pool controls runoff from the design storm event. v""'d. The temporary pool draws down in 2 to 5 days. e. If required, a 50-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) ? / f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h,1A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- ..of-way. ?1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter with level spreader. This system (check one) Vdoes Zoes s not incorporate a vegetated filter at the outlet. This system (check one) 0 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a, maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads T feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 24T3 Sediment Ren oval El. 43.3 75 0 -------------- - o Sediment Removal Elevation 243.3 75% Bottom Ele ation M2.0 Io """"""'----- Bottom Elevation S42•0 1-25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. -7. i4emove 4edtncci - V'ov'i {7a6w/ V?_F Ly gnu ev, wv, Yvo6Vi,,5 cv?-?d \/egzJ4- i4% da?9t o v hL lY 1 Form SWU-102 Rev 3.99 Page 3 of 4 8. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and .1 resident of the subdivision has been named the president. I, a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SWU-102 Rev 3.99 Page 4 of 4 DWQ Project DIVISION OF WATER QUALITY . LEVEL SPREADER WORKSHEET 1. PROJECT INFOMW ON (please complete the following information): Project Name : Zdj?Ezil Cbok4m oN5 Contact Person: 0 2 rC KS Phone Number: f Oil)) 6q-G7-'1 (,o c, Level Spreader ID: l Level Spreader Length 13 ft. (perpendicular to flow) Drainage Area N ac. (on-site and off-site drainage to the level spreader) Impervious Area N /A ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope B % (6% for forested, leaf littler cover, 8% for thick ground cover)' grass Max. Discharge from a 10 Year Storm 0.13 cfs Max. Discharge to Level Spreader 0.13 cfs Filter Strip/Buffer Vegetation ' *1 c( ick round cover or grass, canopied forest with leaf litter group cover Pre-treatment or Bypass Method oar, II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials /Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. NJ? Pr?Form Scour Holes are on flat slopes only vflo structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: ByYppass method is specified (if applicable) and plan details and calculations are provided ?bischarge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass d' arge. o structures are located in protected buffers. n details for the bypass and outlets are provided. =fZZ operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders In series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design.Optionpocument. This potentially requires a minor variance in protected buffer'areas: In any event the second level spreader cannot be located In Zone 1 of a protected buffer area. 7/17/03 WET POND #2 CALCULATIONS Drainage Area = 21.54 ac Impervious Area = 17.94 ac % Impervious Cover = 83 % Avg. Permanent Pool Depth = Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permanent Pool Depth feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = Min. Surface Area = Min. Forebay Vol = (VoI)%..tf - 62,282 cf (VoI)POa= 113,163 cf (V00'ro,,1 = 175,445 cf (V01)Fo,ebay = 24,135 cf BASIN VOLUME 2.63 0.57 ac = 24,677 it2 22,633 cf Note: Design Rainfall - 1 ` 0 Elev. 252.29 Note: See Table Below 0 Elev. 250.00 Berm Elev. 254.31 Note: See Table Below (Min. 20% of Pool Volume) Water Level tt Surface Area si Elevation it Incremental Volume cf Accumulated Volume cf 0 6,465 241.2 0 0 0.8 7,355 242 5,528 5,528 2.8 9,780 244 17,135 22,663 4.8 12,505 246 22,285 44,948 6.8 15,505 248 28,010 72,958 p 8 8 24 700 250 i A . , 10.8 27,635 252 52,335 165,498 12.8 30,718 254 58,353 223,851 FOREBAY VOLUME Water Surface Elevation Incremental Accumulated Level Area Volume Volume ft st tt ci cf 0 975 241.2 0 0 0.8 1,225 242 880 880 2.8 1,970 244 3,195 4,075 4.8 2,880 246 4,850 8,925 6.8 3,965 248 6,845 15,770 ii RIBPCW_Wetpond Calculations.xls Wetpond 02 PLD Permit No. State of North Carolina Departinent of Environment and Natural Resources Division of Water Quality (to be provided by D{VQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application forth, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: New Bern Commons Contact Person: Ron Hendricks, PE Phone Number: ( 919 ) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond #2 elevations Basin Bottom Elevation 241.2 ft. (floor of the basin) Permanent Pool Elevation 250.0 ft. (elevation of the orifice) Temporary Pool Elevation 252.3 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 24,700 sq. ft. (water surface area at the orifice elevation) Drainage Area 21.54 ac. (on-site and off-site drainage to the basin) mpervious Area 17.94 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 137,298 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 62,282 cu. ft. (volume detained above the permanent pool) Forebay Volume 24,135 cu. ft. (approximately 20% of total volume) Other parameters SA/DAt 2.63 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 3 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: t When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials The permanent average pool depth is between 3 and 6 feet (required minimum of 3 feet). _??bTlie forebay volume is approximately equal to 20% of the basin volume. ?/c. The temporary pool controls runoff from the design storm event. c?. The temporary pool draws down in 2 to 5 days. e. If required, a 50-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) f The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). , i. Vegetative cover above the permanent pool elevation is specified. N j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter with level spreader. This system (check one) does 0 d s not incorporate a vegetated filter at the outlet. This system (check one) 0 does does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads -4 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads- feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanL) 0 Permanent Pool Elevation 9 •0 Sediment Ren oval El. o-- 75 0 - --------- - Sediment Removal Elevation - 75% -------------------------_'------------- ------- Bottom Ele ation °lo / Bottom Elevation ? •Z 25010 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. 7-c"vt 4ea IM61t . Yav--' tW6irl YCFLif any &a?on -p?oWe+-. &-Ad Velt+ahoh a"t ct'n r, K'rV1lI . Form SWU-102 Rev 3.99 Page 3 of 4 8. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Address: Phone: Signature:_ Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, County of a Notary Public for the State of , do hereby certify that personally appeared before me this day of execution of the forgoing wet detention basin maintenance requirements SEAL My commission expires , and acknowledge the due Witness my hand and official seal, Form SWU-102 Rev 3.99 Page 4 of 4 DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: ?F_W ZJZRQ CeMMON5 Contact Person: o tjtz rG fc5 Phone Number: ( Oil)) 845- ") Goo Level Spreader ID:. 2 Level Spreader Length 13 ft. (perpendicular to flow) Drainage Area N? ac. (on-site and off-site drainage to the level spreader) Impervious Area _ N?/A ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope g % (6% for forested, leaf littler cover, 8% for thick ground cover)' grass Max. Discharge from a 10 Year Storm 0.3? cfs Max. Discharge to Level Spreader o• 3(o cfs Filter Strip/Buffer Vegetation tk*(hick round cover or grass, canopied forest with leaf litter group cover Pre-treatment or Bypass Method o41, 4 Z II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ? Aevel spreader is at least 13 ft. per cis for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. N P e-Form Scour Holes are on flat slopes only No structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: ypass method is specified (if applicable) and plan details and calculations are provided ::?Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass ischarge. No structures are located in protected buffers. Ian details for the bypass and outlets are provided. The operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located In Zone 1 of a protected buffer area. Wet Pond #1 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(74.2) = 0.72" Volume = Rv(DA) = 0.72"(8.34 acres )(1'/12")(43,560 sf/ 1 acre) = 21,736 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (21,736 cf/48 hours)(1 hour/3600 sec) = 0.13 cfs Required release rate for drainage in 5 days Q = (21,736 cf/120 hours)(1 hour/3600 sec) = 0.05 cfs Try 2" diameter pipe Average head = 1.4'/2 - 0.08' = 0.62' Q = cdA(2gh)0.5 = 0.6(0.0218)(2(32.2)(0.62))0.5 = 0.08 cfs Use 2" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (65,791 cf/24 hours)(1 hour/3600 sec) = 0.76 cfs Try 8" diameter pipe Average head = 7.8'/2 - 0.33' = 3.57' Q = cdA(2gh)0.5 = 0.6(0.34)(2(32.2)(3.57))0" = 3.09 cfs Use 8" drainpipe since it will drain pond in less than one day. Calculate anti-flotation block at RTWI #25A Displacement = 5'(5')7.47' tall = 186.8 cf Buoyant Force = 186.8 cf(62.41bs/cf) = 11,656.3 lbs. Weight of walls and base = (18 lf(0.5' thick)7.47' tall wall + 7(7)0.67' thick base) (1501bs/cf -62.4 lbs/cf) = 8,765.3 lbs Weight of Soil above base = (241f (1' thick) 4' high) 1001bs/cf = 9,600 lbs. Total weight of walls, base, and soils = 18,365.3 lbs which exceed the buoyant force by 57%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. PLD Calculate anti-flotation block at RTWI #25C Displacement = 6'(6')6.7' tall = 241.2 cf Buoyant Force = 241.2 cf(62.4 lbs/cf) = 15,050.9 lbs. Weight of walls and base = (22 lf(0.5' thick)6.7' tall wall + 8(8)1' thick base)(150 lbs/cf - 62.4 lbs/cf) = 12,062.5 lbs Weight of Soil above base = (281f (1' thick) 4.3' high) 1001bs/cf = 12,040 lbs. Total weight of walls, base, and soils = 24,102.5 lbs which exceed the buoyant force by 60%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Wet Pond #2 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(83.0) = 0.80" Volume = Rv(DA) = 0.80"(21.54 acres )(1'/12")(43,560 sf/ 1 acre) = 62,282 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (62,282 cf/48 hours)(1 hour/3600 sec) = 0.36 cfs Required release rate for drainage in 5 days Q = (62,282 cf/120 hours)(1 hour/3600 sec) = 0.14 cfs Try 3" diameter pipe Average head = 2.2972 - 0.13' = 1.01' Q = cdA(2gh)0.5 = 0.6(0.0491)(2(32.2)(1.01))0'S = 0.24 cfs Use 3" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (175,445 cf/24 hours)(1 hour/3600 sec) = 2.03 cfs Try 8" diameter pipe Average head = 11.372 - 0.33' = 5.32' Q = cdA(2gH)o.s = 0.6(0.34)(2(32.2)(5.32))0" = 3.8 cfs Use 8" drainpipe since it will drain pond in less than one day. PLD Calculate anti-flotation block at RTWI #63 Displacement = 5'(5')8.38' tall = 209.5 cf Buoyant Force = 209.5cf(62.4 lbs/cf) = 13,072.8 lbs. Weight of walls and base = (18 lf(0.5' thick)8.38' tall wall + 7(7)0.67' thick base)(150 lbs/cf -62.4 lbs/cf) = 9,482.7 lbs Weight of Soil above base = (241f (1' thick) 4' high) 1001bs/cf = 9,600 lbs. Total weight of walls, base, and soils = 19,082.7 lbs which exceed the buoyant force by 46%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Calculate anti-flotation block at RTWI #65 and #66 Displacement = 8'(8') 10.2' tall = 652.8 cf Buoyant Force = 652.8cf(62.41bs/cf) = 40734.7 lbs. Weight of walls and base = (30 lf(0.5' thick)10.2' tall wall + 10(10)1' thick base)(150 lbs/cf - 62.4 ibs/cf) = 22,162.8 lbs Weight of Soil above base = (361f (1' thick) 7' high) 1001bs/cf = 25,200 lbs. Total weight of walls, base, and soils = 47,362.8 lbs which exceed the buoyant force by 16%. This calculation excludes friction forces of soils which will provide an additional factor of safety. RIBPCW PO r 7 9 F Y 5 S 9 z A D 1 C D E F D 1 2 J 4 I 1 1 TOTAL DA = 21.54 AC SITE IMPERVIOUS = 15.73 AC LOT 2-4 IMPERVIOUS = 2.21 AC TOTAL IMPERVIOUS = 1794 AC (837) I NOTE: OUTPARCELS ARE ASSUMED 0 BE 70: IMPERVIOUS BASED ON SKETCHES PROVIDED Bl ARCHITECT. I BOND I TOTAL DA = 8.34 AC ;ITE IMPERVIOUS = 5.51 AC LOT 5 IMPERVIOUS = 0.68 AC TOTAL IMPERVIOUS = 6.19 AC (74:) - NOTE: OUTPARCELS ARE ASSUMED TO BE 70% IMPERVIOUS BASED ON 1 SKETCHES PROVIDED BY ARCHITECT. I I I I NORTH NEW 8M4 AVE. (U.S. HIGHWAY 64) 120 5 I 6 I 7 I g I I ? I I sF I I 4i o? I p I 1 ?G I ?O I PROPOSED CORPORATION PARKWAY ?...ys,3?/t . . ? scv' x "" IMPERVIOUS AREA MAP cz, ..a a z W L Q --I-- " 4w????t Q Z J m 0 z 0 Q a 2 cr m? m z y w3 Y= z w J Q cc REVISIONS I BY acaen ure ce N. IMP.1 Piedmont Land Design, LLP 8366-104 Sig Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax (919) 845-7703 July 17, 2003 New Bern Commons New Bern Avenue and New Hope Road Raleigh, North Carolina Erosion Control Calculations Riser Basin No. 6 1171r Maximum drainage area = 39.89 acres (Final drainage area = 21.94 acres) Maximum disturbed area = 22.63 acres (Initial disturbed area = 13.1 acres) Qio= cIA = 0.8(7.5) 39.89 = 239.3 cfs For emergency spillway conduit Use 60" rcp @ 1.0%, vlo = 12 fps, dio = 4.9', HW/D = 2.2, Qmax = 260 cfs. Refer to stormwater calculations for weir overflow calculations. For temporary outlet pipe Q = 0.1 cfs/acre = 0. 1(39.89) = 4.0 cfs Use 18" cmp @ 1.0%, QmaX = 12 cfs, v = 3.5 fps, d = 1.5', HW/D = 3.3, Qmax = 16 cfs. For riser - 24" cmp, Qmax = 12 cfs Q = cLH"' H = (Q/cL)'J3 = 0.7', therefore use 1' freeboard to emergency spillway. Height = 5' For anti-flotation block Displacement = 7ir2x5 = 15.7 cf Buoyant force = 15.7 cf x 62.4 lbs./cf = 980 lbs. Concrete base - 150 - 62.4 = 87.6 lbs/cf (980/87.6) 1.1 = 13 cf required Use 4'x 4'x 1.0' thick conc. Base Sediment storage requirements - 22.63 acres disturbed Required volume = 22.63(1815) = 41,074 cf Use 129' long x 64' wide x 5' deep including 1' storage Civil Engineers • Landscape Archilecls • Land Planners Riser Basin No. 7 Maximum drainage area = 8.42 acres Maximum disturbed area = 8.42 acres (Initial disturbed area = 4.85 acres) Q10= cIA = 0.85(7.5) 8.42 = 53.7 cfs For emergency spillway conduit Use 42" rcp @ 0.5%, vio = 7.3 fps, dio = 2.6', HW/D = 2.0, Qmax = 100 cfs. Refer to stormwater calculations for weir overflow calculations. For temporary outlet pipe Q = 0.1 cfs/acre = 0.1(8.42) = 0.84 cfs Use 12" cmp @ 1.0%, Qmax = 4 cfs, v = 2.5 fps, d = 0.9', HW/D = 5, Qm. = 8 cfs. For riser - 18" cmp, Qma, = 4 cfs Q = cLH"' H = (Q/cL)" = 0.5', therefore use 1' freeboard to emergency spillway. Height = 5' For anti-flotation block Displacement = 7Cr2 x5 = 8.9 cf Buoyant force = 8.9 cf x 62.41bs./cf = 556 lbs. Concrete base - 150 - 62.4 = 87.6 lbs/cf (556/87.6) 1.1 = 7 of required Use 3.5'x 3.5'x 0.75' thick conc. Base Sediment storage requirements - 8.42 acres disturbed Required volume = 8.42(1815) = 15,283 cf Use 88' long x 44' wide x 5' deep including P storage Riser Basin No. 8 Maximum drainage area = 27.94 acres Maximum disturbed area = 13.1 acres Qio= cIA = 0.85(7.5) 14.84 + 0.6(7.5) 13.1 = 154 cfs Use c = 0.6 for on-site area only since graded land, not paved. P TT For emergency spillway conduit Use 48" rcp @ 1.0%, vlo = 10 fps, dio = 3.9', HW/D = 2.3, Qmax = 160 cfs. Temporary Minimum Weir Size Qio= cw,LH'n, cW= 3.0, L = 20' with 5'x 5' inside box dimension H = 1.88', Minimum 2.88' from top of berm to emergency spillway For temporary outlet pipe Q = 0.1 cfs/acre = 0. 1(27.94) = 2.79 cfs Use 18" cmp @ 1.0%, QmaX = 12 cfs, v = 3.5 fps, d = 1.5', HW/D = 3.3, Qmax = 16 cfs. For riser - 24" cmp, Q.,aX = 12 cfs Q = cLH'.s H = (Q/cL)" = 0.7', therefore use P freeboard to emergency spillway. Height = 5' For anti-flotation block Displacement = 7rr2x5 = 15.7 cf Buoyant force = 15.7 cf x 62.4 lbs./cf = 980 lbs. Concrete base -150 - 62.4 = 87.6 lbs/cf (980/87.6)1.1= 13 cf required Use 4'x4'x1.0' thick conc. Base Sediment storage requirements - 13.1 acres disturbed Required volume = 13.1(1815) = 23,777 cf Use 98' long x 49' wide x 5' deep including 1' storage RIBPCW: rph nip LL PLD Piedmont Land Design, LLP 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax: (919) 845-7703 July 17, 2003 North Carolina Division of Water Quality, Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Attention: John Dorney c/o Todd St. John Reference: Raleigh International Business Park DWQ Project No. 03-0489 Dear Mr. Dorney: Enclosed are two copies of the stormwater management plan as required by the Approval of the 401 Water Quality Certification with Additional Conditions dated June 26, 2003 for this project. We have revised the plans to incorporate the comments we received from Todd St. John on June 10, 2003. The comments and responses are as follows: 1. Pond 1 Level Spreader - We have relocated this device so that it discharges into a forested area, not the sanitary sewer easement. We have also noted additional ground cover to be installed so that thick ground cover will be provided. 2. Hydraulically Separate Level Spreader and Pond Outlet - We have added a berm between these outlets as requested. The existing topography in the areas we have chosen should also insure that these devices are hydraulically separate. 1, 3. Pond 2 Level Spreader - We have revised the location to provide 50' as required. 4. Impervious Area Calculations - We have rechecked the impervious areas to each poiid. The impervious area to Pond 1 increased from 73% to 74% due to changes in the outparcel impervious area. No pond changes were required due to this change. The impervious area to Pond 2 increased from 70% to 83% due to an error in calculating the outparcel impervious area. We increased the size and depth of this pond to account fo this increase. The following documents are included for your review and approval: 1. Sheet No. C-3, Grading and Storm Drainage Plan. 2. Sheet No. C-3.1, Erosion Control Plan. 3. Sheet No. C-3.2 and 3.5, Site Details. 4. Sheet No. C-7 and 7. 1, Landscape Plan and Details. 5. Storm Drainage Calculations and Drainage Area Maps. 6. Wet Pond Calculations. 7. Impervious Area Map. 8. Level Spreader Worksheets. 9. Wet Detention Basin Worksheets and Supplements. Civil Engineers * Landscape Architects • Land Planners Page Once these plans are approved we will have the Wet Detention Basin Supplement signed and notarized and submit an original for your use. We will also record the drainage and access easements at this time. Please call if you have any questions. If you need any additional information in order to comf your review please let us know and we will get it to you as quickly as possible so that we do delay your review. We would like to get this project approved as quickly as possible so that Owner can begin construction. Si r y, Ron Hendricks RIBPCW RPH: rph Enclosure DL i DT n Piedmont Land Design, LLP I JUV 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax: (919) 845-7703 TRANSMITTAL Vlff 01401 CMull, DATE July 18 2003 r'- --- ' tEU0 U, TO NCDENR DWQ - Wetlands/401 Unit ATTENTION Todd St. John REFERENCE DWQ Project No. 03-0489 COPIES DESCRIPTION 2 Stormwater Management Plan COMMENTS 0?g9 03 ? FOR YOUR REVIEW ? FOR YOUR COMMENT ? FOR YOUR APPROVAL ? FOR YOUR USE Please call if you have any questions. Thanks, FROM Danny Howell COPY JOB CODE RIBPCW Civil Engineers • Landscape Architects • Land Planners i I PLD Piedmont Land Design, LLP 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax: (919) 845-7703 July 17, 2003 North Carolina Division of Water Quality, Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 VEfUNDS1109 c f vvp Attention: John Dorney c/o Todd St. John 1fr QUALITY Reference: Raleigh International Business Park DWQ Project No. 03-0489 Dear Mr. Dorney: 10, 2003. The comments and responses are as follows: 1. Pond 1 Level Spreader - We have relocated this device so that it discharges into a forested area, not the sanitary sewer easement. We have also noted additional ground cover to be installed so that thick ground cover will be provided. 2. Hydraulically Separate Level Spreader and Pond Outlet - We have added a berm between these outlets as requested. The existing topography in the areas we have chosen should also insure that these devices are hydraulically separate. 3. Pond 2 Level Spreader - We have revised the location to provide 50' as required. 4. Impervious Area Calculations - We have rechecked the impervious areas to each pond. The impervious area to Pond 1 increased from 73% to 74% due to changes in the outparcel impervious area. No pond changes were required due to this change. The impervious area to Pond 2 increased from 70% to 83% due to an error in calculating the outparcel impervious area. We increased the size and depth of this pond to account for this increase. Enclosed are two copies of the stormwater management plan as required by the Approval of the 401 Water Quality Certification with Additional Conditions dated June 26, 2003 for this project. We have revised the plans to incorporate the comments we received from Todd St. John on Juile The following documents are included for your review and approval: 1. Sheet No. C-3, Grading and Storm Drainage Plan. 2. Sheet No. C-3.1, Erosion Control Plan. 3. Sheet No. C-3.2 and 3.5, Site Details. 4. Sheet No. C-7 and 7.1, Landscape Plan and Details. 5. Storm Drainage Calculations and Drainage Area Maps. 6. Wet Pond Calculations. 7. Impervious Area Map. 8. Level Spreader Worksheets. 9. Wet Detention Basin Worksheets and. Supplements. Civil Engineers • Landscape Architects • Land Planners r Pag 2 Once these plans are approved we will have the Wet Detention Basin Supplement signed and notarized and submit an original for your use. We will also record the drainage and access easements at this time. Please call if you have any questions. If you need any additional information in order to complete your review please let us know and we will get it to you as quickly as possible so that we do not delay your review. We would like to get this project approved as quickly as possible so that the Owner can begin construction. Si r y, Ron Hendricks RIBPCW RPH: rph Enclosure PLD Piedmont Land Design, LLP 1 8366-104 Sig Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax (919) 845-7703 21 July 2003 New Bern Commons (x'v'?"0163 New Bern Avenue/U.S. Highway 64 ;0,NCI Raleigh, North Carolina p'•••EN Stormwater Calculations Runoff Calculations Using Rational Method lio = 7.50 in/hr; 1100 = 9.72 in/hr; Composite c values are based on c = 0.95 for impervious areas and c = 0.2 for pervious areas. Using HDS No. 3, n = 0.015 for pipe sizing: *All storm structures are to be City of Raleigh approved structures unless othenvise noted. Drainace to Wet Pond #1 8/-`U1 culnur, Raised Top Catch Basin #1 IA = DA = 0.95 acres of Qio= 0.85(7.50) 0.95 = 6.1 cfs Je?j't #1 - #2 lO 15" rcp @ 3.0%, vio = 8.2 fps, dio= 0.65', HW/D = 3.2, Qma., = 9.0 cfs Curb Inlet #2 IA = 0.12 acres DA = 0.95 + 0.12 = 1.07 acres Qio= 0.85(7.50) 1.07 = 6.8 cfs #2 - #3 18" rcp @ 1.0%, vio = 5.5 fps, djo= 0.90', HW/D = 2.3, Qma,, = 12.0 cfs Curb Inlet #3 IA = 0.11 acres DA = 1.07 + 0.11 = 1.18 acres Qio= 0.85(7.50) 1.18 = 7.5 cfs #3 - #4 18" rcp @ 1.5%, vlo = 6.8 fps, dio= 0.90', HW/D = 3.0, Q., = 16.0 cfs Civil Engineers • Landscape Archilecis • Land Planners 2 Curb Inlet #4 IA = 0.33 acres DA = 1.18 + 0.33 = 1.51 acres Qio= 0.85(7.50) 1.51 = 9.6 cfs ##4 - #5 18" rcp @ 1.0%, vio = 5.9 fps, dio = 1.25', HW/D = 2.3, Qmaz = 13.5 cfs Storm Manhole ##5 IA=0 DA = 1.51 acres Qio= 9.6 cfs Catch Basin #6 IA = DA = 0.21 acres Qio= 0.85(7.50) 0.21 = 1.3 cfs ##6 - #6A 15" rcp @ 3.25%, vio = 5.3 fps, dio= 0.33', HW/D = 2.8, Qmax = 10.0 cfs Curb Inlet 46A IA = 0.18 acres DA = 0.21 + 0.18 = 0.39 acres Qio= 0.85(7.50) 0.39 = 2.5 cfs ##5 - #7 18" rcp @ 3.0%, vio = 9.8 fps, djo= 0.75', HW/D = 2.5, Qmax = 14.5 cfs #6A - #7 15" rep @ 1.0%, vio = 4.5 fps, dio = 0.55', HW/D = 2.7, Q,. = 10.0 cfs Curb Inlet #7 IA = 0.28 acres DA = 1.51 + 0.39 +0.28 = 2.18 acres Qio= 0.85(7.50) 2.18 = 13.9 cfs Catch Basin #8 IA = DA = 0.40 acres Qio= 0.85(7.50) 0.40 = 2.6 cfs #8 - ##9 15" rep @ 1.0%, v10 = 4.5 fps, dio= 0.55', HW/D = 4.3, Qmax = 12.0 cfs Catch Basin 119 IA = 0.48 acres DA = 0.40 + 0.48 = 0.88 acres Qio= 0.85(7.50) 0.88 = 5.6 cfs RIBMV-Stormwater Calculations.doe nT T New Bern Commons 3 #7-#10 18" rcp @ 3.3%, vio = 10.5 fps, dio= 1.0', HW/D = 2.7, Qmax = 15.5 cfs #9-#10 15" rcp @ 1.0%, vio = 5.3 fps, dio= 0.95', HW/D = 4.3, Qmax = 12.0 cfs Curb Inlet ##10 IA = 0.31 acres DA=2.18+0.88+0.31 =3.37 acres Qio= 0.85(7.50) 3.37 = 21.5 cfs #10-#11 24" rcp @ 1.0%, vio = 7.0 fps, dio= 1.55', HW/D = 4.0, Q,,,,x = 38.0 cfs Curb Inlet #11 IA = 0.13 acres DA = 3.50 acres Qio= 0.85(7.50) 3.50 = 22.3 cfs #11 -#12 24" rcp @ 1.2%, vio = 7.4 fps, dio= 1.7', HW/D = 4.2, Q,,,,x = 40.0 cfs Curb Inlet #12 IA = 0.03 acres DA = 3.50 + 0.03 = 3.53 acres Qio= 0.85(7.50) 3.53 = 22.5 cfs ##12 - #13 24" rcp @ 1.5%, vio = 8.8 fps, djo= 1.6', HW/D = 4.5, Qmax = 45.0 cfs Curb Inlet #13 IA = 0.59 acres DA = 3.53 + 0.59 = 4.12 acres Qio= 0.85(7.50) 4.12 = 26.3 cfs Curb Inlet #14 IA = DA = 0.08 acres Qio= 0.85(7.50) 0.08 = 0.5 cfs ##14 - #15 15" rcp @ 1.0%, v10 = 2.7 fps, dto= 0.25', HW/D = 2.6, Qma., = 9.5 cfs Curb Inlet #15 IA = 0.39 acres DA = 0.08 + 0.39 = 0.47 acres Qio= 0.85(7.50) 0.47 = 3.0 cfs RIBPCW_Stormwater Calculations.doc nT T New Bern Commons 4 #15 - #16 15" rcp @ 1.0°lo, vio = 4.5 fps, dio= 0.65', HW/D = 3. 1, Qmaz = 11.0 cfs Curb Inlet ##16 IA = 0.32 acres DA = 0.47 + 0.32 = 0.79 acres Q?o = 0.85(7.50) 0.79 = 5.0 cfs #16 - #17 15" rcp @ 1.0%, vlo = 5.2 fps, dio = 0.85', HW/D = 5.9, Qmax = 16.0 cfs Storm Manhole #17 IA=0 DA = 0.79 acres Qio= 5.0 cfs Curb Inlet ##18 IA = DA = 0.16 acres Q1o= 0.85(7.50) 0.16 = 1.0 cfs #18 - #19 15" rcp @ 1.0%, vio = 3.3 fps, dio= 0.38', HW/D = 2.6, Q n,, = 9.5 cfs Curb Inlet ##19 IA = 0.35 acres DA = 0.16 + 0.35 = 0.51 acres Qio= 0.85(7.50) 0.51 = 3.3 cfs #19 - #20 15" rep @ 1.0%, vlo = 4.7 fps, dio= 0.67', HW/D = 5.2, Qmax = 15.0 cfs Curb Inlet #20 IA = 0.24 acres DA = 0.51 + 0.24 = 0.75 acres Qio = 0.85(7.50) 0.75 = 4.8 cfs #20 - #21 15" rep @ 1.0%, vio = 5.1 fps, dlo= 0.87', HW/D = 5.7, Qmax = 15.5 cfs Curb Inlet #21 IA = 0.14 acres DA = 0.75 + 0.14 = 0.89 acres Qio= 0.85(7.50) 0.89 = 5.7 cfs It 17 - #22 RIBMV-Storn water Calculations.doc 1 I New Bern Commons P 5 15" rcp @ 1.5%, vlo = 5.0 fps, dio= 0.85', HW/D = 6. 1, Q,,,,, = 16.5 cfs ##21 - ##22 18" rcp @ 1.0%, vio = 5.5 fps, dio= 0.85', HW/D = 6.9, Qma, = 27.0 cfs Double Curb Inlet #22 IA = 1.39 acres DA = 0.79 + 0.89 + 1.39 = 3.07 acres Qio= 0.85(7.50) 3.07 = 19.6 cfs #13 - #23 24" rcp @ 4.0%, vio = 13.5 fps, dio= 1.15', HW/D = 5.5, QR„x = 48.0 cfs #22 - ##23 24" rcp @ 1.0%, vio = 7.0 fps, dio = 1.5', HW/D = 5.3,Q,,,aX = 47. cfs Storm Manhole #23 IA=0 DA = 4.12 + 3.07 = 7.19 acres Qio= 0.85(7.50) 7.19 = 45.8 cfs #23 - #23A 30" rcp @ 1.5%, vio = 10.0 fps, dio= 1.9', HW/D = 5.6, Qm,X = 82.0 cfs Curb Inlet #23A IA = 0.24 acres DA = 7.19 + 0.24 = 7.43 acres Qio= 0.85(7.50) 7.43 = 47.4 cfs #23A - #24 30" rcp @ 1.5%, vio = 10.0 fps, dio= 2.0', HW/D = 5.9, QmaX = 90.0 cfs Storm Manhole #24 IA=0 DA = 7.43 + 0.28 (RD) = 7.71 acres Q10 = 0.85(7.50) 7.71 = 49.2 cfs #24 - ##25 30" rep @ 2.0%, vlo = 12.0 fps, dlo= 1.8, HW/D = 4.0, Qm,X = 70.0 cfs RTWI ##25C IA = 0.63 acres (Pond) DA = 8.34 acres Qio= 0.85(7.50) 8.34 = 53.2 cfs Qioo= 0.85(9.72) 8.34 = 68.9 cfs RIBPCW_Stormwater Calculations.doc T T New Bern Commons P 6 Minimum Weir Size Qioo = cw,LH72, c,, = 3.0, L = 20' with 5'x 5' inside box dimension H = 1.1', Use 1.25' minimum opening height. #25C - #25D 42" rcp @ 0.5%, vio = 7.3 fps, dio= 2.6', HW/D = 2.2, Qmax = 105.0 cfs Drainage to Wet Pond #2 & Off-Site Junction Box/Storm Manhole #26 IA=0 DA = 14.84 acres (Off-site) Qio= 0.85(7.50) 14.84 = 94.6 cfs Raised Top Catch Basin #27 IA = DA = 1.15 acres Q10 = 0.85(7.50) 1.15 = 7.3 cfs #26 - #27A 42" rcp @ 2.0%, vio = 12.0 fps, dio= 2.5', HW/D = 4.3, Qmax = 170.0 cfs #27 - #27A 15" rcp @ 10.0%, vlo = 13.5 fps, dio= 0.55', HW/D = 5.8, Qmax = 15.5 cfs Catch Basin ##27A IA = 0.03 acres DA = 14.84 + 1.15 + 0.03 = 16.02 acres Q10 = 0.85(7.50) 16.02 = 102.1 cfs Raised Top Catch Basin ##28 IA = DA = 1.03 acres Qio= 0.85(7.50) 1.03 = 6.6 cfs Curb Inlet #29 IA = DA = 0.24 acres Qjo= 0.85(7.50) 0.24 = 1.5 cfs #29 - #30 15" rcp @ 1.0%, vio = 3.7 fps, dto= 0.45', HW/D = 2.6, Qm,., = 9.5 cfs Curb Inlet #30 IA = 0.16 acres DA=0.24+0.16=0.40 acres Qio= 0.85(7.50) 0.40 = 2.6 cfs RIBMV-Stormwater Calculations.doc New Bern Commons PLI 7 #30 - ##31 15" rcp @ 1.0%, vio = 4.4 fps, dio= 0.58', HW/D = 3.4, Qmax = 11.6 cfs Catch Basin #31 IA = 0.64 acres DA = 0.40 + 0.64 = 1.04 acres Qio= 0.85(7.50) 1.04 = 6.6 cfs #31 - ##32 15" rcp @ 4.4%, vio = 10.0 fps, dio= 0.62', HW/D = 8.3, Qmax = 20.5 cfs Curb Inlet #32 IA = 0.36 acres DA = 1.04 + 0.36 = 1.40 acres Qio= 0.85(7.50) 1.40 = 8.9 cfs #27A - ##33 42" rcp @ 2.0%, vlo = 14.0 fps, dip = 2.1', HW/D = 2.9, Qmax = 188.0 cfs #28 - #33 15" rcp @ 4.0%, vio = 9.3 fps, dio = 0.68', HW/D = 9.4, QR,a, = 22.0 cfs #32 - #33 18" rcp @ 1.0%, v10 = 6.0 fps, dio= 1. 1', HW/D = 2.8, Qmax = 16.0 cfs Curb Inlet ##33 IA = 0.31 acres DA = 16.02 + 1.03 + 1.40 + 0.31 = 18.76 acres Q10 = 0.85(7.50) 18.76 = 119.6 cfs Curb Inlet #34 IA = DA = 0.48 acres Qio= 0.85(7.50) 0.48 = 3.1 cfs #33 - #35 48" rcp @ 2.5%, vio = 17.0 fps, dio= 2.2', HW/D = 1.6, Qm,x = 120.0 cfs #34 - #35 15" rcp @ 2.5%, vlo = 6.5 fps, dio= 0.49', HW/D = 2.6, Qma,, = 9.5 cfs Double Curb Inlet #35 IA = 2.31 acres DA = 18.76 + 0.48 + 2.31 = 21.55 acres Q10 = 0.85(7.50) 21.55 = 137.4 cfs #35 - #36 48" rcp @ 1.2%, v10 = 12.0 fps, dio= 3.0', HW/D = 2.0, Qmax = 145.0 cfs RIBPCW_Stormwater Calculations.doc DT 1 New Bern Commons I 8 Double Curb Inlet #36 IA = 1.26 acres DA = 21.55 + 1.26 = 22.81 acres Qio= 0.85(7.50) 22.81 = 145.4 cfs ##36 - #37 48" rcp @ 1.2%, vio = 12.5 fps, d1o= 3.4', HW/D = 2. 1, Qm,X = 150.0 cfs Double Curb Inlet #37 IA = 1.39 acres DA = 22.81 + 1.39 = 24.20 acres Q 1 o = 0.85(7.50) 24.20 = 154.2 cfs #37 - #38 54" rcp @ 1.0%, v?o = 12.0 fps, d,o= 3.4', HW/D = 2.6, Qm?X = 230.0 cfs Junction Box/Storm Manhole #38 (Splitter Box) IA=0 DA = 24.20 acres Qio= 154.2 cfs (temporary flow to #42) Splitter Calculations Off-Site -> ##39 DA = 14.84 ac (#26) + 2.71 ac (#49) + 0.40 ac (#54A) =17.95 acres Q10 = 0.85(7.50) 17.95 = 114.4 cfs (final flow to ##39 - 74%) On-Site -+ #42 DA = 6.25 acres Q10= 0.85(7.50) 6.25 = 39.8 cfs (final flow to #42 - 26%) 3.11 acres of flow diverted to creek at this location to make up for treatment of off-site drainage area coming into structures #49 and ##54A. Check Orifice Size 48" (D rcp --> A = nd2A = 12.56 sf (74%) 26" 0 Orifice -+ A = nd2/4 = 3.69 sf (26%) Water elevation @ top of 48" rcp --> h48 = 4 - 1/2 d = 2' h26 = 4 - 1/2 d = 2.92' @ h48 = 2' -+ Q = cdAq(2gli) = 0.6(12.56)q[64.4(2)] = 85.5 cfs @ h26 = 2.92' --> Q = cdAq(2gh) = 0.6(3.69)q[64.4(2.92)] = 30.4 cfs 115.9 cfs 85.5/115.9 = 0.74 -? 74% 30.4/115.9 = 0.26 - ? 26% 100% RIBPCW_Stormwater Calculations.doc DT New Bern Commons I 9 Check Design Storm Qlo= cdAq(2gh) 154.2 = 0.6(3.69)q[(64.4)(h-1.083)] + 0.6(12.56)q[(64.4)(li-2)] 118.89 + 23,778 = 3,973.02 d h1o = 6.01' Q10= cdAq(2gh) 199.8 = 0.6(3.69)q[(64.4)(h-1.083)] + 0.6(12.56)4[(64.4)(h-2)] 118.89 + 39,920 = 3,973.02 d 11100 = 10.08' *Note: All pipes front structures #38 - 47 have been upsized to convey all of the initial on-site and off-site drainage to the temporary riser filter basin, based on headwater conditions. #38- #39 48" rcp @ 5.0%, vlo = 21.0 fps, d1o= 1.85', HW/D = 3.2, Q,,,ax = 200.0 cfs Storm Junction Box/Storm Manhole #39 IA=0 DA = 17.95 acres Q10= 114.4 cfs #39 - #40 48" rcp @ 1.0%, vlo = 11.5 fps, d10= 2.8', HW/D = 4.6, Qmix = 240.0 cfs #38 - #42 48" rcp @ 1.001o, HW/D = 3.3, Qm,X = 200.0 cfs Double Curb Inlet #41 IA = DA = 1.86 acres Q10 = 0.85(7.50) 1.86 = 11.2 cfs #41 - #42 18" rcp @ 3.0%, v1o = 9.8 fps, d10= 0.95', HW/D = 2.5, Qmax = 15.0 cfs Storm Manhole/Junction Box #42 IA=0 DA1= 24.20 + 1.86 = 26.06 acres (temporary) DA2 = 6.25 + 1.86 = 8.11 acres (final) Temporary Q1o= 0.85(7.50) 26.06 = 166.1 cfs Final Q10= 0.85(7.50) 8.11 = 51.7 cfs #42 - #43 48" rcp @ 1.0%, HW/D = 3.6, Qma, = 220.0 cfs RIBPCW_Stormwater Calculations.doc T 1 New Bern Commons P 10 Curb Inlet #43 IA = 0.09 acres DAB = 26.06 + 0.09 = 26.15 acres (temporary) DAz = 8.11 + 0.09 = 8.20 acres (final) Temporary Qjo = 0.85(7.50) 26.15 = 166.7 cfs Final Qio= 0.85(7.50) 8.20 = 52.3 cfs #43 - #44 48" rcp @ 1.0%, HW/D = 3.8, Qmax = 225.0 cfs Storm Manhole #44 IA=0 DA, = 26.15 acres (temporary) DA2 = 8.20 acres (final) Temporary Qlo= 166.7 cfs Final Qio= 52.3 cfs Curb Inlet #45 IA = 0.39 acres DAi = 26.15 + 0.39 = 26.54 acres (temporary) DAz = 8.20 + 0.39 = 8.59 acres (final) Temporary Qlo= 0.85(7.50) 26.54 = 169.2 cfs Final Qio= 0.85(7.50) 8.59 = 54.8 cfs #45 - #46 48" rcp @ 1.0%, HW/D = 4.2, Q,n = 235.0 cfs Curb Inlet #46 IA = 0.10 acres DAi = 26.54 + 0.10 = 26.64 acres (temporary) DA2 = 8.59 + 0.10 = 8.69 acres (final) Temporary Qlo= 0.85(7.50) 26.64 = 169.8 cfs Final Qio= 0.85(7.50) 8.69 = 55.4 cfs Curb Inlet #47 IA = DA = 0.53 acres Qio= 0.85(7.50) 0.53 = 3.4 cfs #46 - #61 48" rep @ 1.0%, HW/D = 4.5, Q., = 240.0 cfs ##47 - #61 15" rep @ 3.0%, vio = 7.1 fps, dlo= 0.5, HW/D = 3.0, Qm. = 10.0 cfs RIBPCW_StormwaterCalculations.doc DT I New Bern Commons I Catch Basin ##49 IA = DA = 2.71 acres Qio= 0.85(7.50) 2.71 = 17.3 cfs #49 - #50 24" rcp @ 3.0%, vio = 11.5 fps, dlo= 1.0', HW/D = 6.4, Q,, = 53.0 cfs Double Curb Inlet #50 IA = 1.16 acres DA = 2.71 + 1.16 = 3.87 acres Q10 = 0.85(7.50) 3.87 = 24.7 cfs Curb Inlet ##51 IA = DA = 0.49 acres Q10= 0.85(7.50) 0.49 = 3.1 cfs #50 - #52 30" rcp @ 1.0%, vio = 7.6 fps, dio= 1.5', HW/D = 1.7, Q,,,ax = 39.0 cfs #51 - #52 15" rcp @ 9.001o, vto = 10.5 fps, d,o= 0.35', HW/D = 2.4, QmaX = 9.0 cfs Curb Inlet #52 IA = 0.34 acres DA = 3.87 + 0.49 + 0.34 +0.11 = 4.81 acres Qio= 0.85(7.50) 4.81 = 30.7 cfs #52 - #53 30" rcp @ 1.0%, vio = 7.8 fps, dio= 1.7', HW/D = 2.5, Q,,a,, = 52.0 cfs Curb Inlet #53 IA = 0.32 acres DA = 4.81 + 0.32 = 5.13 acres Qio= 0.85(7.50) 5.02 = 32.7 cfs Curb Inlet #54 IA = DA = 0.21 acres Qto= 0.8(7.50) 0.21 = 1.3 cfs Catch Basin #54A IA = DA = 0.40 acres Q10 = 0.8(7.50) 0.40 = 2.6 cfs #53 - ##55 30" rcp @ 1.0%, vlo = 8.0 fps, dio= 1.8', HW/D = 2.9, Qmax = 57.0 cfs RIBPCW_Stormwater Calculations.doe nT I New Bern Commons r 12 #54 - #55 15" rep @ 5.0%, vio = 6.6 fps, dio= 0.28', HW/D = 2.8, Qmax = 10.0 cfs #54A - #55 15" rep @ 10.0%, vio = 10.0 fps, d,o= 0.32', HW/D = 2.8, Qmax = 10.0 cfs Curb Inlet ##55 IA = 0.58 acres DA=5.13+0.21 +0.40+0.58=6.32 acres Qlo= 0.85(7.50) 6.32 = 40.3 cfs Curb Inlet #56 IA = DA = 0.23 acres Qio= 0.85(7.50) 0.23 = 1.5 cfs #55 - ##57 36" rep @ 1.0%, vio = 8.8 fps, dlo = 1.78', HW/D = 3.2, Qmax = 95.0 cfs ##56 - #57 15" rep @ 5.0%, vlo = 6.8 fps, dio= 0.28', HW/D = 2.6, QmaX = 9.5 cfs Curb Inlet ##57 IA = 0.17 acres DA = 6.32 + 0.23 + 0.17 = 6.72 acres Qio= 0.85(7.50) 6.72 = 42.8 cfs ##57 - ##58 36" rep @ 1.0%, vio = 8.8 fps, dio = 1.8', HW/D = 3.9, Q. = 105.0 cfs Curb Inlet #58 IA=0 DA = 6.72 + (1.61 + 1.28 + 0.13) (RD) = 9.74 acres Qio= 0.85(7.50) 9.74 = 62.1 cfs #58 - #59 42" rep @ 1.0%, vlo = 9.8 fps, dio= 2.1', HW/D = 3.8, Qm,, = 155.0 cfs Curb Inlet #59 IA = 0.12 acres DA=9.74+0.12=9.86 acres Qlo= 0.85(7.50) 9.86 = 62.9 cfs #59 - #60 42" rep @ 1.0%, vio = 9.8 fps, dio= 2.1', HW/D = 4.3, Qmaz = 170.0 cfs RIBI'M-Stormwater Calculations.doc nT 1 New Bent Commoits 13 Curb Inlet ##60 IA = 0.13 acres DA = 9.86 + 0.13 + 1.78 (RD) = 11.77 acres Q10 = 0.85(7.50) 11.77 = 75.0 cfs #60- #61 42" rcp @ 1.0%, vio = 10.2 fps, dio= 2.5', HW/D = 4.7, Qr,,,x = 175.0 cfs Curb Inlet #61 IA = 0.15 acres DA, = 11.77 + 0.15 + 26.64 + 0.53 = 39.09 acres (temporary) DA2 = 11.77 + 0.15 + 8.69 + 0.53 = 21.14 acres (final) Temporary Qio= 0.85(7.50) 39.09 = 249.2 cfs Final Qio= 0.85(7.50) 21.14 = 134.8 cfs #61- #62 48" rcp @ 1.0%, HW/D = 6.0, Q,,,,, = 295.0 cfs RTWI #65 IA, = DA, = (39.09 + 0.40)/2 = 19.75 acres (temporary) IA2 = DA2 = (21.14 + 0.40)/2 = 10.77 acres (final) Temporary Qlo= 0.85(7.50) 19.75 = 125.9 cfs Final Q10 = 0.85(7.50) 10.77 = 68.7 cfs Final Q?oo = 0.85(9.72) 10.77 = 89.0 cfs Temporary Minimum Weir Size Q10= c.LH'n, cw,= 3.0, L = 28' with 7'x 7' inside box dimension H = 1.31', Maximum initial height of box = 248.35. Final Minimum Weir Size Qioo= c,LH32, c,= 3.0, L = 28' with 7'x 7' inside box dimension H = 1.04', Use 15" minimum opening height. #65- #66 42" rcp @ 2.0%, vlo = 14.0 fps, dio= 2.7', HW/D = 3.0, Q,,,ax = 135 cfs RTWI #66 IA, = (39.09 + 0.40)/2 = 19.75 acres (temporary) DA, = 19.75 +19.75 = 39.50 acres (temporary) IA2 = (21.14 + 0.40)/2 = 10.77 acres (final) DA2 = 10.77 + 10.77 = 21.54 acres (final) Temporary Qio = 0.85(7.50) 39.50 = 251.8 cfs Final Qio= 0.85(7.50) 21.54 = 137.3 cfs Final Qioo= 0.85(9.72) 21.54 = 178.0 cfs RIBMV-Stormivater Calculations.doc 1nT New Bern Commons - - 14 Temporary Minimum Weir Size Qio= c,LH"Z, c,= 3.0, L = 56' with (2) 7'x 7' inside box dimensions H = 1.31', Maximum initial height of box = 248.35. Final Minimum Weir Size Qioo = cwLH"I, cw= 3.0, L = 56' with (2) 7'x 7' inside box dimensions H = 1.04', Use 15" minimum opening height. ##66- #67 60" rcp @ 1.0%, vio = 12.0 fps, dio= 4.9', HW/D = 2.2, Qmax = 260 cfs Rip-rap Apron Calculations - Using NYDOT chart FES ##25 v = 12.0 fps d=30"=2.5' Requires Zone 3 Medium Stone Filling L=8x2.5=20' W=3x2.5=7.5' Thickness = 22" .•. Use min. Class B erosion control stone 20'L x 7.5'W x 22"TH Endwall #40 v = 11.5 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .'. Use min. Class B erosion control stone 32'L x 12'W x 22"TH Endwall #62 v = 12 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .•. Use min. Class B erosion control stone 32'L x 12'W x 22"TH RIBMV-Stormwater Calculations.doc TlY I New Bern Commoru 15 Endwall #25D (Outlet to Pond #1) v = 7.2 fps d = 42" = 3.5' Requires Zone 2 Light Stone Filling L=6x3.5=21' W = 3 x 3.5 = 10.5' Thickness = 22" .•. Use min. Class B erosion control stone 21'L x 12'W x 22"TH Endwall #67 (Outlet to Pond #2) v = 9.0 fps d=60"=5' Requires Zone 3 Medium Stone Filling L=8x5=40' W=3x5=15' Thickness = 22" .•. Use min. Class B erosion control stone 40'L x 15'W x 22"TH RIBPCW DLH/dlh RIBMW_Stormwatcr Calculations.doc D 1 1 New Bern Commons I = yE a r b 0 4 i g 1 2 3 4 5 6 7 g 9 A I 4 / O B c D E C It A ?t¢ , w.: Mw I I r i o. Jig f'= •- _ _ _ 00? a rN?i ? /(,, C 1 - . - I I CJSA?? . L I I i i , 0215 A 012A ?- r?? I I I I 2.i A I I 'I I - I. 1 I I 26 A .4k olq.,, 0.24A O.6A -- 1 048 UbAA J =L- C7 w A ? e Q JEFF Q Z J 09 O to U Qa 0 W4e o Es ©N; Z? LU Z ?? JQ u tt 1581- c? le : -- - 0.03A .EuSIONS BY 0 019 yi oroeem?u °N 0;3q , ,?= -- .0 F. -- - ?I ?A 09 4 0„q _ 098 P, i ^ GA_ 5 -0. F,' -037 ---- ,I - ? ? .. 012a L I _ ® --- 0114 _010A 0.) 0 A - -? - NORTH o? G ) r - r 1? 0 r 10 1M s w ?o r -- :-- _ _ r•p NNE M FFET , F! MS NEW,-BERN AVE.,(U.S. HIGHWAY 64)' -- ------ ------- --- ON-SITE IMPROVEMENTS DRAINAGE AREA MAP ?Q_4 rr .a„ A 095E - J17A )'A ,J / i 2A' o1*'? %? 0. - ?. O11A - • ! ??I 0. 15 A n Lt ? 75 ti Piedmont Land Design, LLP 8366-104 Six Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fag (919) 845-7703 July 17, 2003 New Bern Commons New Bern Avenue and New Hope Road Raleigh, North Carolina Erosion Control Calculations Riser Basin No. 6 ?k CARot! Maximum drainage area = 39.89 acres (Final drainage area = 21.94 acres) Maximum disturbed area = 22.63 acres (Initial disturbed area = 13.1 acres) Qio= cIA = 0.8(7.5) 39.89 = 239.3 cfs For emergency spillway conduit Use 60" rcp @ 1.0%, vlo = 12 fps, dio = 4.9', HW/D = 2.2, Qmax = 260 cfs. Refer to stormwater calculations for weir overflow calculations. For temporary outlet pipe Q = 0.1 cfs/acre = 0. 1(39.89) = 4.0 cfs Use 18" cmp @ 1.0%, QmaX = 12 cfs, v = 3.5 fps, d = 1.5', HW/D = 3.3, Qmax = 16 cfs. For riser - 24" cmp, Q,,,a, = 12 cfs Q = cLH"' H = (Q/cL)" = 0.7', therefore use 1' freeboard to emergency spillway. Height = 5' For anti-flotation block Displacement = 7rr2 x5 = 15.7 cf Buoyant force = 15.7 cf x 62.4 lbs./cf = 980 lbs. Concrete base - 150 - 62.4 = 87.6 lbs/cf (980/87.6) 1.1 = 13 cf required Use 4'x 4'x 1.0' thick conc. Base Sediment storage requirements - 22.63 acres disturbed Required volume = 22.63(1815) = 41,074 cf Use 129' long x 64' wide x 5' deep including 1' storage Civil Engineers • Landscape Archileos • Land Planners Riser Basin No. 7 Maximum drainage area = 8.42 acres Maximum disturbed area = 8.42 acres (Initial disturbed area = 4.85 acres) Q10= cIA = 0.85(7.5) 8.42 = 53.7 cfs For emergency spillway conduit Use 42" rep @ 0.5%, v10 = 7.3 fps, dlo = 2.6', HW/D = 2.0, Q,,,,, = 100 cfs. Refer to stormwater calculations for weir overflow calculations. For temporary outlet pipe Q = 0.1 cfs/acre = 0.1(8.42) = 0.84 cfs Use 12" ccnp @ 1.0%, Qm,X = 4 cfs, v = 2.5 fps, d = 0.9', HW/D = 5, 8 cfs. For riser - 18" cmp, Q,,,, = 4 cfs Q = cLH"' H = (Q/cL)" = 0.5', therefore use P freeboard to emergency spillway. Height = 5' For anti-flotation block Displacement = 7rr2x5 = 8.9 cf Buoyant force = 8.9 cf x 62.4 lbs./cf = 556 lbs. Concrete base - 150 - 62.4 = 87.6 lbs/cf (556/87.6) 1.1 = 7 cf required Use 3.5'x 3.5'x 0.75' thick conc. Base Sediment storage requirements - 8.42 acres disturbed Required volume = 8.42(1815) = 15,283 cf Use 88' long x 44' wide x 5' deep including 1' storage Riser Basin No. 8 Maximum drainage area = 27.94 acres Maximum disturbed area = 13.1 acres Q 10 = cIA = 0.85(7.5) 14.84 + 0.6(7.5) 13.1 = 154 cfs Use c = 0.6 for on-site area only since graded land, not paved. p i r For emergency spillway conduit Use 48" rcp @ 1.0%, vio = 10 fps, dio = 3.9', HW/D = 2.3, Qmax = 160 cfs. Temporary Minimum Weir Size Qio= cw,LH'n, cw,= 3.0, L = 20' with 5'x 5' inside box dimension H = 1.88', Minimum 2.88' from top of berm to emergency spillway For temporary outlet pipe Q = 0.1 cfs/acre = 0. 1(27.94) = 2.79 cfs Use 18" cmp @ 1.0%, Qmax = 12 cfs, v = 3.5 fps, d = 1.5', HW/D = 3.3, Qmax = 16 cfs. For riser - 24" cmp, Qma, = 12 cfs Q = cLH1' H = (Q/cL)2/3 = 0.7', therefore use 1' freeboard to emergency spillway. Height = 5' For anti-flotation block Displacement = 7rrZx5 = 15.7 cf Buoyant force = 15.7 cf x 62.4 lbs./cf = 980 lbs. Concrete base - 150 - 62.4 = 87.6 lbs/cf (980/87.6)1.1 = 13 cf required Use 4'x4'x1.0' thick conc. Base Sediment storage requirements - 13.1 acres disturbed Required volume = 13.1(1815) = 23,777 cf Use 98' long x 49' wide x 5' deep including l' storage RIBPCW: rph Pr n WET POND #1 CALCULATIONS Drainage Area = 8.34 ac Impervious Area = 6.19 ac % Impervious Cover = 74 % Avg. Permanent Pool Depth = Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Remc Efficiency in the Piedmont % Impervious Permanent Pool Depth feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = 3.07 Surface Area = 0.26 ac = 11,153 ft2 Min. Forebay Volume = 8,811 cf (Vol)fzu.ff = 21,736 cf *Note: Design Rainfall - 1' 0 Elev. 248.68 (Vol)P0.1 = 44,055 cf *Note: See Table Below 0 Elev. 247.30 (Vol)rot,, = 65,791 cf Berm Elev. 250.78 (VogF.I.W, = 9,403 cf ' Note: See Table Below (Min. 20% of Pool Volume) BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume c Accumulated Volume cf 0 4,605 242 0 0 1 5,635 243 5,120 5,120 2 6,755 244 6,195 11,315 3 7,960 245 7,358 18,673 4 10,375 246 9,168 27,840 5 13,610 247 11,993 39,833 5 3 r 247.3 223 4 i . , 6 15,655 248 10,568 54,623 7 17,290 249 16,473 71,096 8 18,990 250 18,140 89,236 8.8 20,350 250.8 15,736 104,972 FOREBAY VOLUME Water Level (t Surface Area sf Elevation ft Incremental Volume c Accumulated Volume cf 0 584 242 0 0 1 890 243 737 737 2 1,242 244 1,066 1,803 3 1,640 245 1,441 3,244 4 2,440 246 2,040 5,284 5 3,564 247 3,002 8,286 5 3 3 883 A 247 3 1 117 4 403- . , ' i . , , RIBPCW_Wetpond Calculations.xls Wetpond N1 TT P. ,.?»terer?, 7/17/03 i f . Permit No. State of North Carolina Department of Environment and Natural Resources Division of Water Quality (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: New Bern Commons Contact Person: Ron Hendricks, PE Phone Number: ( 919 ) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond #1 elevations Basin Bottom Elevation 242.0 ft. Permanent Pool Elevation 247.3 ft. Temporary Pool Elevation 248.7 ft. areas Permanent Pool Surface Area 14,540 sq. ft. Drainage Area 8.34 ac. Impervious Area 6.19 ac. (11oor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 53,458 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 21,736 cu. ft. (volume detained above the permanent pool) Forebay Volume 9,403 cu. ft. (approximately 20% of total volume) Other parameters SA/DA1 3.07 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 2 in. (2 to 5 day temporary pool drativ-down required) Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 9017o TSS removal. H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials .?a. The permanent average pool depth is between 3 and 6 feet (required minimum of 3 feet). ?b. The forebay volume is approximately equal to 20% of the basin volume. vf?'c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 50-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) ?f. The basin length to width ratio is greater than 3:1. ? g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- .of-way. ? 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter with level spreader. This system (check ate) Vdoes 0 Zoes es not incorporate a vegetated filter at the outlet. This system (check one) 0 does Q not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a, maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads !q feet in the main pond, the sediment shall be removed. When the permanent pool depth reads- feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 2.47.3 Sediment Ren oval E1.Bottom Ele anon 242.0 % V -------- Sediment Removal Elevation 243.3 FOREBAY Bottom Elevation 242.0 MAIN POND 75% 25% 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. -7• Femove 4edi wnt - V-om baicYi, vgn/iY a-nu e oo tom, -plro?+5 Gv A \1ege, Lt4toN otanu,gc LyhLW(Y. J Form SWU-102 Rev 3.99 Page 3 of 4 S. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 5017o of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SWU-102 Rev 3.99 Page 4 of 4 DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: IrW Iz-A CoMMON5 Contact Person: o c Phone Number. ( 0111) 84S7-1(moo Level Spreader ID: Level Spreader Length 117-1 ft. (perpendicular to flow) Drainage Area N A? ac. (on-site and off-site drainage to the level spreader) Impervious Area m/A ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope g % (6% for forested, leaf littler cover, 8% for thick ground cover)' grass Max. Discharge from a 10 Year Storm 0.13 cfs Max. Discharge to Level Spreader 0.13 cfs Filter Strip/Buffer Vegetation **( ick round cover or grass, canopied forest with leaf litter group cover Pre-treatment or Bypass Method Aer or1D 41 REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials evel spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. N?A Pr?Form Scour Holes are on flat slopes only vfl0 structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document B??yPpass method is specified (if applicable) and plan details and calculations are provided ?bischarge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass d' arge. o structures are located in protected buffers. n details for the bypass and outlets are provided. e operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% In areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option,Document This potentially requires -a minor vadand in protected buffer areas: In any event the second level spreader cannot bQ located In Zone 1 of a protected buffer area. 7/17/03 WET POND #2 CALCULATIONS Drainage Area = 21.54 ac Impervious Area = 17.94 ac % Impervious Cover = 83 % Avg. Permanent Pool Depth = Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permanent Pool Depth feet Cover 3 4 5 6 7 8 9 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. SA/DA = Min. Surface Area = Min. Forebay Vol = (Vol)n,,,,of = 62,282 cf (Vol)pod= 113,163 cf (V01)T.Ul = 175,445 cf (Volk,ebay = 24,135 cf BASIN VOLUME 2.63 0.57 ac = 24,677 fts 22,633 cf Note: Design Rainfall - 1' 0 Elev. 252.29 Note: See Table Below 0 Elev. 250.00 Berm Elev. 254.31 Note: See Table Below (Min. 20% of Pool Volume) Water Level ft Surface Area si Elevation ft Incremental Volume cf Accumulated Volume cf 0 6,465 241.2 0 0 0.8 7,355 242 5,528 5,528 2.8 9,780 244 17,135 22,663 4.8 12,505 246 22,285 44,948 6.8 15,505 248 28,010 72,958 8 8 24 700 250 40 205 113 163 . , , , 10.8 27,635 252 52,335 165,498 12.8 30,718 254 58,353 223,851 FOREBAY VOLUME Water Surface Elevation Incremental Accumulated Level Area Volume Volume ft si ft cf cf 0 975 241.2 0 0 0.8 1,225 242 880 880 2.8 1,970 244 3,195 4,075 4.8 2,880 246 4,850 8,925 6.8 3,965 248 6,845 15,770 8.8 i0 i 8,365 24,135 RIBPCW_Wetpond Calculations.xls Wetpond #2 Ti , T Permit No. State of Nortli Carolina Department of Environment and Natural Resources Division of Water Quality (to be provided by DIVA, STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin! supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: New Bern Commons Contact Person: Ron Hendricks, PE Phone Number: ( 919 ) 845-7600 For projects with multiple basins, specify which basin this worksheet applies to: Wet Pond ##2 . elevations Basin Bottom Elevation 241.2 ft. (floor of the basin) Permanent Pool Elevation 250.0 ft. (elevation of the orifice) Temporary Pool Elevation 252.3 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 24,700 sq. ft. (water surface area at the orifice elevation) Drainage Area 21.54 ac. (on-site and off-site drainage to the basin) mpervious Area 17.94 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 137,298 cu. ft. (combined volume of stain basin and forebay) Temporary Pool Volume 62,282 cu. ft. (volume detained above the permanent pool) Forebay Volume 24,135 cu. ft. (approximately 20% of total volume) Other parameters SAIDAt 2.63 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 3 in. (2 to S day temporary pool draw-down required) Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices M (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials The permanent average pool depth is between 3 and 6 feet (required minimum of 3 feet). /b. The forebay volume is approximately equal to 20% of the basin volume. ? c. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. e. If required, a 50-foot vegetative filter is provided at the outlet (include non-erosive flow calculations) L/ f The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). ? i. Vegetative cover above the permanent pool elevation is specified. N j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. in. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter with level spreader. This system (check one) 6vdoes 0 d Xs; not incorporate a vegetated filter at the outlet. This system (check one) 0 does does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads A feet in the main pond, the sediment shall be removed. When the permanent pool depth reads- feet in the forebay, the sediment shall be removed. BASIN DIAGRAM Ull in the blanks ) Permanent Pool Elevation '2?.0 Sediment Ren oval El. d 75 'o -------------- Bottom Ele ation 24L.7, olo Sediment Removal Elevation 24*0 ------------------------------------- Bottom Elevation241 •Z 75% 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. V_t"Ve 4eAtivic?,t . Vow, girl revaif A'nt' ?+' on -p?obltw.s C."d V13t+ chop damage; om W l? . Form SWU-102 Rev 3.99 Page 3 of 4 8. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Address: Phone: Signature:_ Date: Note: The legally responsible party should not be a homeowners association unless more than 5010 of the lots have been sold and a resident of the subdivision has been named the president. I, County of a Notary Public for the State of , do hereby certify that personally appeared before me this day of execution of the forgoing wet detention basin maintenance requirements SEAL My commission expires , and acknowledge the due Witness my hand and official seal, Form SWU-102 Rev 3.99 Page 4 of 4 DWQ Project N DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: fJ FEW ZQeQ e omm oNS Contact Person: o c S Phone Number: ( 0111) 845- "? Level Spreader ID: 2 Level Spreader Length 13 ft. (perpendicular to flow) Drainage Area N Ac ac. (on-site and off-site drainage to the level spreader) Impervious Area N /A ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope -erg % (6% for forested, leaf littler cover, 8% for thick ground cover)' grass Max. Discharge from a 10 Year Storm n• 3& cfs Max. Discharge to Level Spreader 3(o cfs Filter Strip/Buffer Vegetation ): tk3?( ick round cover or grass, canopied forest with leaf litter group cover Pre-treatment or Bypass Method o,1D 4 Z II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ? I Aevel spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. N P e-Form Scour Holes are on flat slopes only No structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: ypass method is specified (if applicable) and plan details and calculations are provided ::::?Poischarge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass ischarge. No structures are located in protected buffers. Ian details for the bypass and outlets are provided. he operation and maintenance agreement includes annual erosion and vegetation repair. 4 T The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. Wet Pond #1 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(74.2) = 0.72" Volume = Rv(DA) = 0.72"(8.34 acres )(1'/12")(43,560 sf/ 1 acre) = 21,736 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (21,736 cf/48 hours)(1 hour/3600 sec) = 0.13 cfs Required release rate for drainage in 5 days Q = (21,736 cf/120 hours)(1 hour/3600 sec) = 0.05 cfs Try 2" diameter pipe Average head = 1.4'/2 - 0.08' = 0.62' Q = cdA(2gh)1.5 = 0.6(0.0218)(2(32.2)(0.62))0.5 = 0.08 cfs Use 2" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (65,791 cf/24 hours)(1 hour/3600 sec) = 0.76 cfs Try 8" diameter pipe Average head = 7.8'/2 - 0.33' = 3.57' Q = cdA(2gh)0.5 = 0.6(0.34)(2(32.2)(3.57))0.5 = 3.09 cfs Use 8" drainpipe since it will drain pond in less than one day. Calculate anti-flotation block at RTWI #25A Displacement = 5'(5')7.47' tall = 186.8 cf Buoyant Force = 186.8 cf(62.4 lbs/cf) = 11,656.3 lbs. Weight of walls and base = (18 lf(0.5' thick)7.47' tall wall + 7(7)0.67' thick base) (1501bs/cf -62.4 lbs/cf) = 8,765.3 lbs Weight of Soil above base = (241f (1' thick) 4' high) 1001bs/cf = 9,600 lbs. Total weight of walls, base, and soils = 18,365.3 lbs which exceed the buoyant force by 57%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. PL] Calculate anti-flotation block at RTWI #25C Displacement = 6'(6')6.7' tall = 241.2 cf Buoyant Force = 241.2 cf(62.41bs/cf) = 15,050.91bs. Weight of walls and base = (221f(0.5' thick)6.7' tall wall + 8(8) P thick base)(150 lbs/cf - 62.4 lbs/cf) = 12,062.5 lbs Weight of Soil above base = (28 if (1' thick) 4.3' high) 100 lbs/cf = 12,040 lbs. Total weight of walls, base, and soils = 24,102.5 lbs which exceed the buoyant force by 60%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Wet Pond #2 Calculate Runoff from 1" Rainfall Event Rv = 0.05 + 0.0091 = 0.05 + 0.009(83.0) = 0.80" Volume = Rv(DA) = 0.80"(21.54 acres )(1'/12")(43,560 sf/ 1 acre) = 62,282 cf Calculate pipe size to drain temporary pool in 2-5 days. Required release rate for drainage in 2 days Q = (62,282 cf/48 hours)(1 hour/3600 sec) = 0.36 cfs Required release rate for drainage in 5 days Q = (62,282 cf/120 hours)(1 hour/3600 sec) = 0.14 cfs Try 3" diameter pipe Average head = 2.2972 - 0.13' = 1.01' Q = cdA(2gh)0-5 = 0.6(0.0491)(2(32.2)(1.01))°'S = 0.24 cfs Use 3" drainpipe since it will drain temporary pond in 2-5 days. Calculate pipe size to drain permanent and temporary pool in less than one day. Required release rate for drainage in 1 day Q = (175,445 cf/24 hours)(1 hour/3600 sec) = 2.03 cfs Try 8" diameter pipe Average head = 11.372 - 0.33' = 5.32' Q = cdA(2gH)"' = 0.6(0.34)(2(32.2)(5.32))0" = 3.8 cfs Use 8" drainpipe since it will drain pond in less than one day. pill Calculate anti-flotation block at RTWI #63 Displacement = 5'(5')8.38' tall = 209.5 cf Buoyant Force = 209.5cf(62.4 lbs/cf) = 13,072.8 lbs. Weight of walls and base = (18 If(0.5' thick)8.38' tall wall + 7(7)0.67' thick base)(150 lbs/cf -62.4 lbs/cf) = 9,482.7 lbs Weight of Soil above base = (241f (1' thick) 4' high) 100 lbs/cf = 9,600 lbs. Total weight of walls, base, and soils = 19,082.7 lbs which exceed the buoyant force by 46%. This calculation excludes friction forces of soils, which will provide an additional factor of safety. Calculate anti-flotation block at RTWI #65 and #66 Displacement = 8'(8')10.2' tall = 652.8 cf Buoyant Force = 652.8ef(62.4 lbs/cf) = 40734.7 lbs. Weight of walls and base = (301f(0.5' thick)10.2' tall wall + 10(10)1' thick base)(150 Ibs/cf - 62.4 lbs/cf) = 22,162.8 ibs Weight of Soil above base = (361f (1' thick) 7' high) 100 lbs/cf = 25,200 lbs. Total weight of walls, base, and soils = 47,362.8 lbs which exceed the buoyant force by 16%. This calculation excludes friction forces of soils which will provide an additional factor of safety. RIBPCW PLD A ai C D E a IF a 3 C 1 I 2 I 7 I 4 I 5 6 I 7 I 1 I PROPOSED CORPORATION PARKWAY i 8 1 1 ?e O II m I ?L( c1y? 0 I 1 I 1 PTOOND ID TAL DA = 21.54 AC SITE IMPERVIOUS = 15.73 AC LOT 2-4 IMPERVIOUS = 2.21 AC TOTAL IMPERVIOUS = 17.94 AC (83%) ' NOTE: OUTPARCELS ARE ASSUMED TO BE 707 IMPERVIOUS BASED ON SKETCHES PROVIDED BY ARCHITECT. POND 1 TOTAL DA = 8.34 AC 1 SITE IMPERVIOUS = 5.51 AC 1 LOT 5 IMPERVIOUS = 0.6B AC TOTAL IMPERVIOUS = 6.19 AC (74%) NOTE: OUTPARCELS ARE ASSUMED TO BE 707 IMPERVIOUS BASED ON ???JJJ SKETCHES PROVIDED BY ARCHITECT. 1 I` I I i /. a a z W A gpQB? w?J It f? Q Z .! 5 c') ir 1- 2WU6 Z C5 0. C5 Z w Z = W3 ° Z z REVISIONS BY - ?_ ate ® a,E NORTH NEW 6ERN AYE. (U.S. HIGHWAY 64) II(?I1II L?_? i s¢r IMPERVIOUSSTEAR \ I I \ W REA MAP IMP.1 9 Project Name: Project No. DWQ 030489 pond 2 SUBMITTED DESIGN: elevations Bottom of Basin (ft) 241.2 Permanent Pool (ft) 250 Temporary Pool (ft) 252.3 areas Permanent Pool SA (sq ft) 24700 Drainage Area (ac) 21.54 Impervious Area (ac) 17.94 volltnIes Permanent Pool (cu ft) 137298 Temporary Pool (cu ft) 62282 Forebay (cu ft) 24135 other parameters SA/DA Orifice Diameter (in) 3 Design Rainfall (in) 1 Linear Interpolation of Correct SAIDA *** % Impervious Next Lowest 80 Project Impervious 83.3 Next Highest 90 REQUIRED DESIGN: 5.6 average depth 8.8 ft. depth 2.3 ft. depth 23195 sq. ft. 21981 based on avg depth 83.3 % status check depth ok ok ok check tempo check forebt d.b .-/down ok 8.8 ft. Permanent Pool Depth SAIDA fron (Avg. Depth) 2.38 2.256414575 2.47 2.34 2.66 2.518759514 5 ft 2.1 2.18 2.34 6 ib.- - Project Name: Project No. DWQ 030489 pond 1 SUBMITTED DESIGN: elevations Bottom of Basin (ft) 242 Permanent Pool (ft) 247.3 Temporary Pool (ft) 248.7 areas Permanent Pool SA (sq ft) 14510 Drainage Area (ac) 8.34 Impervious Area (ac) 6.19 1'O111111es Permanent Pool (cu ft) 53458 Temporary Pool (cu ft) 21736 Forebay (cu ft) 9403 other parameters SA/DA Orifice Diameter (in) 2 Design Rainfall (in) 1 Linear Interpolation of Correct SAIDA "* no Impervious Next Lowest 70 Project Impervious 74.2 Next Highest 80 REQUIRED DESIGN: 3.7 average depth status 5.3 ft. depth ok 1.4 ft. depth ok 11199 sq. ft. ok 10163 based on avg depth ok 74.2 % - 21736 cu. ft. check tempo 17.6 % checkforebc 3.08 - 0.09 cfs drawdown - 2.9 day drawdown ok 5.3 ft. Permanent Pool Depth SA/DA fron (Avg. Depth) 2.88 2.62776066 2.1 3.08 2.80' 2.20 3.36 3.030148556 2.31 3 ft 4 Piedmont Land Design, LLP 1 8366-104 Sig Forks Road • Raleigh, NC 27615 • (919) 845-7600 • Fax (919) 845-7703 21 July 2003 New Bern Commons % New Bern Avenue/U.S. Highway 64 %0ti.?'•?,NCI tit 0 Raleigh, North Carolina ,??'?;?•o EN Stormwater Calculations Runoff Calculations Using Rational Method Iio = 7.50 in/hr, 1100 = 9.72 in/hr; Composite c values are based on c = 0.95 for impervious areas and c = 0.2 for pervious areas. Using HDS No. 3, n = 0.015 for pipe sizing: *All stone structures are to be City of Raleigh approved structures unless othenvise noted. Drainace to Wet Pond #1 Raised Top Catch Basin #1 IA = DA = 0.95 acres Qio= 0.85(7.50) 0.95 = 6.1 cfs #1 - #2 15" rcp @ 3.0%, vlo = 8.2 fps, dio= 0.65', HW/D = 3.2, QmaX = 9.0 cfs Curb Inlet #2 IA = 0.12 acres DA = 0.95 + 0.12 = 1.07 acres Qio = 0.85(7.50) 1.07 = 6.8 cfs ##2 - ##3 18" rcp @ 1.0%, vlo = 5.5 fps, dlo= 0.90', HW/D = 2.3, QmaX = 12.0 cfs Curb Inlet #3 IA = 0.11 acres DA = 1.07 + 0.11 = 1.18 acres Qio= 0.85(7.50) 1.18 = 7.5 cfs #3 - ##4 18" rcp @ 1.5%, vio = 6.8 fps, dio= 0.90', HW/D = 3.0, QmaX = 16.0 cfs Civil Engineers • Landscape Ar(hileclS • Land Planners 2 Curb Inlet #4 IA = 0.33 acres DA = 1.18 + 0.33 = 1.51 acres Qio= 0.85(7.50) 1.51 = 9.6 cfs #4 - #5 18" rcp @ 1.0%, vlo = 5.9 fps, dio = 1.25', HW/D = 2.3, Qmax = 13.5 cfs Storm Manhole ##5 IA=0 DA = 1.51 acres Qio= 9.6 cfs Catch Basin #6 IA = DA = 0.21 acres Qio= 0.85(7.50) 0.21 = 1.3 cfs #6 - #6A 15" rcp @ 3.25%, vio = 5.3 fps, dio= 0.33', HW/D = 2.8, Qn,ax = 10.0 cfs Curb Inlet #6A IA = 0.18 acres DA=0.21 +0.18=0.39 acres Qio= 0.85(7.50) 0.39 = 2.5 cfs #5 - #7 18" rcp @ 3.0%, vio = 9.8 fps, djo= 0.75', HW/D = 2.5, Qmax = 14.5 cfs ##6A - #7 15" rep @ 1.0%, vio = 4.5 fps, dio= 0.55', HW/D = 2.7, Qmax = 10.0 cfs Curb Inlet #7 IA = 0.28 acres DA = 1.51 + 0.39 +0.28 = 2.18 acres Qlo= 0.85(7.50) 2.18 = 13.9 cfs Catch Basin #8 IA = DA = 0.40 acres Q1o= 0.85(7.50) 0.40 = 2.6 cfs #8 - #9 15" rep @ 1.0%, vio = 4.5 fps, dio = 0.55', HW/D = 4.3, Qmu = 12.0 cfs Catch Basin #9 IA = 0.48 acres DA = 0.40 + 0.48 = 0.88 acres Qio= 0.85(7.50) 0.88 = 5.6 cfs RIBMV-Store water Calculations.doc n T T New Bern Commons 3 #7 - #10 18" rcp @ 3.3%, vlo = 10.5 fps, dio= 1.0', HW/D = 2.7, QmaX = 15.5 cfs #9-#10 15" rcp @ 1.0%, vio = 5.3 fps, dio = 0.95', HW/D = 4.3, QmaX = 12.0 cfs Curb Inlet #10 IA = 0.31 acres DA=2.18+0.88+0.31 =3.37 acres Qio= 0.85(7.50) 3.37 = 21.5 cfs #10-#11 24" rcp @ 1.001o, vio = 7.0 fps, dio= 1.55', HW/D = 4.0, QmaX = 38.0 cfs Curb Inlet #11 IA = 0.13 acres DA = 3.50 acres Qio= 0.85(7.50) 3.50 = 22.3 cfs #11 -#12 24" rcp @ 1.2%, vio = 7.4 fps, dio= 1.7', HW/D = 4.2, Qmax = 40.0 cfs Curb Inlet #12 IA = 0.03 acres DA = 3.50 + 0.03 = 3.53 acres Qio= 0.85(7.50) 3.53 = 22.5 cfs #12 - #13 24" rep @ 1.5%, vio = 8.8 fps, dio= 1.6', HW/D = 4.5, QmaX = 45.0 cfs Curb Inlet #13 IA = 0.59 acres DA = 3.53 + 0.59 = 4.12 acres Qio= 0.85(7.50) 4.12 = 26.3 cfs Curb Inlet #14 IA = DA = 0.08 acres Qio= 0.85(7.50) 0.08 = 0.5 cfs #14 - #15 15" rep @ 1.0%, vio = 2.7 fps, dio= 0.25', HW/D = 2.6, QmaX = 9.5 cfs Curb Inlet #15 IA = 0.39 acres DA = 0.08 + 0.39 = 0.47 acres Qio= 0.85(7.50) 0.47 = 3.0 cfs RIBI"MV_Stormwater Calculations.doc nT T New Bern Commons 4 #15 - ##16 15" rep @ 1.0%, vio = 4.5 fps, dio= 0.65', HW/D = 3.1, QmaX = 11.0 cfs Curb Inlet #16 IA = 0.32 acres DA = 0.47 + 0.32 = 0.79 acres Q1o= 0.85(7.50) 0.79 = 5.0 cfs #16 - #17 15" rep @ 1.0%, vio = 5.2 fps, dio= 0.85', HW/D = 5.9, QmaX = 16.0 cfs Storm Manhole #17 IA=0 DA = 0.79 acres Qio= 5.0 cfs Curb Inlet #18 IA = DA = 0.16 acres Qio= 0.85(7.50) 0.16 = 1.0 cfs #18 - #19 15" rep @ 1.0%, vlo = 3.3 fps, dio= 0.38', HW/D = 2.6, QmaX = 9.5 cfs Curb Inlet ##19 IA = 0.35 acres DA = 0.16 + 0.35 = 0.51 acres Qlo= 0.85(7.50) 0.51 = 3.3 cfs #19 - #20 15" rep @ 1.0%, vlo = 4.7 fps, dlo = 0.67', HW/D = 5.2, QmaX = 15.0 cfs Curb Inlet #20 IA = 0.24 acres DA = 0.51 + 0.24 = 0.75 acres Qio = 0.85(7.50) 0.75 = 4.8 cfs #20 - #21 15" rep @ 1.0%, vlo = 5.1 fps, dio= 0.87', HW/D = 5.7, QmaX = 15.5 cfs Curb Inlet ##21 IA = 0.14 acres DA = 0.75 + 0.14 = 0.89 acres Qio= 0.85(7.50) 0.89 = 5.7 cfs #17 - #22 RIBMV-Stormwater Calculations.doc DT i New Bern Commons I 5 15" rcp @ 1.5%, vio = 5.0 fps, dio= 0.85', HW/D = 6. 1, Q,,,ax = 16.5 cfs ##21 - ##22 18" rcp @ 1.0%, vio = 5.5 fps, dio = 0.85', HW/D = 6.9, Qmax = 27.0 cfs Double Curb Inlet ##22 IA = 1.39 acres DA=0.79+0.89+ 1.39=3.07 acres Qio= 0.85(7.50) 3.07 = 19.6 cfs #13 - #23 24" rcp @ 4.0%, vio = 13.5 fps, djo= 1.15', HW/D = 5.5, Q.. = 48.0 cfs #22 - ##23 24" rcp @ 1.0%, vio = 7.0 fps, dio= 1.5', HW/D = 5.3,Q,,,ax = 47. cfs Storm Manhole ##23 IA=0 DA=4.12+3.07=7.19 acres Qio= 0.85(7.50) 7.19 = 45.8 cfs ##23 - ##23A 30" rcp @ 1.5%, vio = 10.0 fps, dio = 1.9', HW/D = 5.6, Q,,,ax = 82.0 cfs Curb Inlet #23A IA = 0.24 acres DA = 7.19 + 0.24 = 7.43 acres Qio= 0.85(7.50) 7.43 = 47.4 cfs #23A - #24 30" rcp @ 1.5%, vio = 10.0 fps, dio= 2.0', HW/D = 5.9, Qmax = 90.0 cfs Storm Manhole 924 IA=0 DA = 7.43 + 0.28 (RD) = 7.71 acres Qio= 0.85(7.50) 7.71 = 49.2 cfs #24 - ##25 30" rep @ 2.0%, vto = 12.0 fps, dto= 1.8', HW/D = 4.0, Q,„ax = 70.0 cfs RTWI #25C IA = 0.63 acres (Pond) DA = 8.34 acres Q10 = 0.85(7.50) 8.34 = 53.2 cfs Qioo= 0.85(9.72) 8.34 = 68.9 cfs RIBPCNV_Stormivater Calculations.doc n T T New Bern Conunons 6 Minimum Weir Size Qioo= cw,LH'n, c,,, = 3.0, L = 20' with 5'x 5' inside box dimension H = 1.1', Use 1.25' minimum opening height. ##25C - ##25D 42" rcp @ 0.5%, vio = 7.3 fps, djo= 2.6', HW/D = 2.2, Qm,x = 105.0 cfs DrainajZe to Wet Pond #2 & Off-Site Junction Box/Storm Manhole #26 IA=0 DA = 14.84 acres (Off-site) Q10 = 0.85(7.50) 14.84 = 94.6 cfs Raised Top Catch Basin ##27 IA = DA = 1.15 acres Qio= 0. 85(7.50) 1.15 = 7.3 cfs #26 - #27A 42" rcp @ 2.0%, vio = 12.0 fps, dio = 2.5', HW/D = 4.3, Qrn,x = 170.0 cfs #27 - #27A 15" rcp @ 10.0%, vlo = 13.5 fps, dio = 0.55', HW/D = 5.8, Q,n,x = 15.5 cfs Catch Basin ##27A IA = 0.03 acres DA = 14.84 + 1.15 + 0.03 = 16.02 acres Q10 = 0.85(7.50) 16.02 = 102.1 cfs Raised Top Catch Basin #28 IA = DA = 1.03 acres Q1o= 0.85(7.50) 1.03 = 6.6 cfs Curb Inlet #29 IA = DA = 0.24 acres Qio= 0.85(7.50) 0.24 = 1.5 cfs #29 - #30 15" rcp @ 1.0%, vio = 3.7 fps, dio= 0.45', HW/D = 2.6, 9.5 cfs Curb Inlet #30 IA = 0.16 acres DA = 0.24 + 0.16 = 0.40 acres Qio = 0.85(7.50) 0.40 = 2.6 cfs RIBPCW_Storniwater Calculations.doc DT T New Bern Commons I 7 ##30 - ##31 15" rcp @ 1.0%, vio = 4.4 fps, dio= 0.58', HW/D = 3.4, Qmax = 11.6 cfs Catch Basin #31 IA = 0.64 acres DA = 0.40 + 0.64 = 1.04 acres Qio= 0.85(7.50) 1.04 = 6.6 cfs #31 - #32 15" rcp @ 4.4%, vio = 10.0 fps, dio= 0.62', HW/D = 8.3, Qm,x = 20.5 cfs Curb Inlet #32 IA = 0.36 acres DA = 1.04 + 0.36 = 1.40 acres Qio= 0.85(7.50) 1.40 = 8.9 cfs ##27A - ##33 42" rcp @ 2.0%, vio = 14.0 fps, dlo= 2.1', HW/D = 2.9, Qm,x = 188.0 cfs #28 - ##33 15" rcp @ 4.0%, vlo = 9.3 fps, dio= 0.68', HW/D = 9.4, Qmax = 22.0 cfs ##32 - #33 18" rcp @ 1.0%, vio = 6.0 fps, dio = 1.l', HW/D = 2.8, Q,,,,x = 16.0 cfs Curb Inlet ##33 IA = 0.31 acres DA = 16.02 + 1.03 + 1.40 + 0.31 = 18.76 acres Q10 = 0.85(7.50) 18.76 = 119.6 cfs Curb Inlet #34 IA = DA = 0.48 acres Qio= 0.85(7.50) 0.48 = 3.1 cfs #33 - ##35 48" rcp @ 2.5%, vio = 17.0 fps, dio = 2.2', HW/D = 1.6, Qmax = 120.0 cfs #34 - #35 15" rcp @ 2.5%, vlo = 6.5 fps, dlo= 0.49', HW/D = 2.6, Qmax = 9.5 cfs Double Curb Inlet #35 IA = 2.31 acres DA = 18.76 + 0.48 + 2.31 = 21.55 acres Qio= 0.85(7.50) 21.55 = 137.4 cfs ##35 - #36 48" rcp @ 1.2%, vlo = 12.0 fps, dio= 3.0', HW/D = 2.0, Qm,x = 145.0 cfs y RIBMV_Stornmater Calculations.doc 1 Nciv Bern Commons P = - 8 Double Curb Inlet #36 IA = 1.26 acres DA = 21.55 + 1.26 = 22.81 acres Q10 = 0.85(7.50) 22.81 = 145.4 cfs #36 - ##37 48" rcp @ 1.2%, v10 = 12.5 fps, dio= 3.4', HW/D = 2. 1, Qm,x = 150.0 cfs Double Curb Inlet #37 IA = 1.39 acres DA = 22.81 + 1.39 = 24.20 acres Q10 = 0.85(7.50) 24.20 = 154.2 cfs #37 - #38 54" rcp @ 1.0%, v10 = 12.0 fps, dio = 3.4', HW/D = 2.6, Qm,x = 230.0 cfs Junction Box/Storm Manhole #38 (Splitter Box) IA=0 DA = 24.20 acres Qlo= 154.2 cfs (temporary flow to #42) Splitter Calculations Off-Site --? #39 DA = 14.84 ac (#26) + 2.71 ac (#49) + 0.40 ac (#54A) =17.95 acres Q10= 0.85(7.50) 17.95 = 114.4 cfs (final flow to ##39 - 74%) On-Site --> 1142 DA = 6.25 acres Qlo= 0.85(7.50) 6.25 = 39.8 cfs (final flow to #42 - 26%) 3.11 acres of flow diverted to creek at this location to make up for treatment of off-site drainage area coming into structures #49 and #54A. Check Orifice Size 48" (D rcp -+ A = nd2/4 = 12.56 sf (74%) 26" (1) Orifice -? A = Tcd2/4 = 3.69 sf (26%) Water elevation @ top of 48" rcp --+ h48 = 4 - 1/2 d = 2' h26 = 4 - 1/2 d = 2.92' @ h48 = 2' -? Q = cdAq(2gh) = 0.6(12.56)q[64.4(2)] = 85.5 cfs @ h26 = 2.92' -+ Q = cdAq(2gh) = 0.6(3.69)q[64.4(2.92)] = 30.4 cfs 115.9 cfs 85.5/115.9 = 0.74 --> 74% 30.4/115.9 = 0.26 - ? 26% 100% RIBPCW_Storntivater Calculations.doe D T New Bern Commons I 9 Check Design Storm Q 1o = caAV(2gh) 154.2 = 0.6(3.69)q[(64.4)(h-1.083)] + 0.6(12.56)?[(64.4)(h-2)] 118.89 + 23,778 = 3,973.02 d 1110 = 6.01' Q10= cc1Aq(2gh) 199.8 = 0.6(3.69)q[(64.4)(h-1.083)] + 0.6(12.56)q[(64.4)(h-2)] 118.89 + 39,920 = 3,973.02 d 11100 = 10.08' *Note: All pipes front structures #38 - 47 have been upsized to convey all of the initial on-site and off-site drainage to the temporary riser filter basin, based on headwater conditions. #38- #39 48" rcp @ 5.0%, v1o = 21.0 fps, d10= 1.85', HW/D = 3.2, Q,nax = 200.0 cfs Storm Junction Box/Storm Manhole #39 IA=0 DA = 17.95 acres Q10= 114.4 cfs #39 - #40 48" rcp @ 1.0%, vlo = 11.5 fps, d1o= 2.8', HW/D = 4.6, Qmax = 240.0 cfs #38 - #42 48" rcp @ 1.0%, HW/D = 3.3, Qmax = 200.0 cfs Double Curb Inlet #41 IA = DA = 1.86 acres Q10= 0.85(7.50) 1.86 = 11.2 cfs #41 - #42 18" rcp @ 3.0%, vlo = 9.8 fps, d10= 0.95', HW/D = 2.5, Qmax = 15.0 cfs Storm Manhole/Junction Box #42 IA=0 DA1= 24.20 + 1.86 = 26.06 acres (temporary) DA2 = 6.25 + 1.86 = 8.11 acres (final) Temporary Qlo= 0.85(7.50) 26.06 = 166.1 cfs Final Q10= 0.85(7.50) 8.11 = 51.7 cfs #42 - #43 48" rcp @ 1.0%, HW/D = 3.6, Qma, = 220.0 cfs RIBPCw_Stornnvater Calculations.doc T 1 New Bern Canmons P 10 Curb Inlet #43 IA = 0.09 acres DAi = 26.06 + 0.09 = 26.15 acres (temporary) DA2 = 8.11 + 0.09 = 8.20 acres (final) Temporary Qjo = 0.85(7.50) 26.15 = 166.7 cfs Final Qio= 0.85(7.50) 8.20 = 52.3 cfs #43 - #44 48" rcp @ 1.0%, HW/D = 3.8, Q,,,ax = 225.0 cfs Storm Manhole #44 IA=0 DAi = 26.15 acres (temporary) DA2 = 8.20 acres (final) Temporary Qio= 166.7 cfs Final Qio= 52.3 cfs Curb Inlet #45 IA = 0.39 acres DAi = 26.15 + 0.39 = 26.54 acres (temporary) DAZ = 8.20 + 0.39 = 8.59 acres (final) Temporary Qio = 0.85(7.50) 26.54 = 169.2 cfs Final Q1o= 0.85(7.50) 8.59 = 54.8 cfs #45 - #46 48" rcp @ 1.0%, HW/D = 4.2, QmaX = 235.0 cfs Curb Inlet #46 IA = 0.10 acres DA1 = 26.54 + 0.10 = 26.64 acres (temporary) DA2 = 8.59 + 0.10 = 8.69 acres (final) Temporary Q10 = 0.85(7.50) 26.64 = 169.8 cfs Final Qio = 0.85(7.50) 8.69 = 55.4 cfs Curb Inlet #47 IA = DA = 0.53 acres Qio= 0.85(7.50) 0.53 = 3.4 cfs #46 - #61 48" rcp @ 1.0%, HW/D = 4.5, Qmax = 240.0 cfs #47 - #61 15" rcp @ 3.0%, vio = 7.1 fps, dio = 0.5', HW/D = 3.0, Qmax = 10.0 cfs RIBMV-Stormwater Calculations.doc P T I New Bern Commons Catch Basin ##49 IA = DA = 2.71 acres Qio= 0.85(7.50) 2.71 = 17.3 cfs #49 - #50 24" rcp @ 3.0%, vio = 11.5 fps, dio= 1.0', HW/D = 6.4, QR„x = 53.0 cfs Double Curb Inlet ##50 IA = 1.16 acres DA = 2.71 + 1.16 = 3.87 acres Qio= 0.85(7.50) 3.87 = 24.7 cfs Curb Inlet #51 IA = DA = 0.49 acres Qio= 0.85(7.50) 0.49 = 3.1 cfs #50 - #52 30" rcp @ 1.0%, vlo = 7.6 fps, djo= 1.5', HW/D = 1.7, Qmax = 39.0 cfs ##51 - #52 15" rcp @ 9.0%, vlo = 10.5 fps, dio= 0.35', HW/D = 2.4, Qmax = 9.0 cfs Curb Inlet #52 IA = 0.34 acres DA = 3.87 + 0.49 + 0.34 +0.11 = 4.81 acres Qio= 0.85(7.50) 4.81 = 30.7 cfs #52 - #53 30" rcp @ 1.0%, vio = 7.8 fps, dio= 1.7', HW/D = 2.5, Q,,,ax = 52.0 cfs Curb Inlet #53 IA = 0.32 acres DA = 4.81 + 0.32 = 5.13 acres Qio= 0.85(7.50) 5.02 = 32.7 cfs Curb Inlet #54 IA = DA = 0.21 acres Qio= 0.8(7.50) 0.21 = 1.3 cfs Catch Basin #54A IA = DA = 0.40 acres Qio= 0.8(7.50) 0.40 = 2.6 cfs #53 - #55 30" rcp @ 1.0%, vio = 8.0 fps, dio= 1.8', HW/D = 2.9, Qmax = 57.0 cfs RIBPCVV_Stornmater Calculations.doc DT i New Bern Commons I 12 #54 - #55 15" rcp @ 5.0%, vio = 6.6 fps, dio= 0.28', HW/D = 2.8, Qmax = 10.0 cfs #54A - #55 15" rcp @ 10.0%, vio = 10.0 fps, dlo= 0.32', HW/D = 2.8, Qmax = 10.0 cfs Curb Inlet #55 IA = 0.58 acres DA=5.13+0.21 +0.40+0.58=6.32 acres Qio= 0.85(7.50) 6.32 = 40.3 cfs Curb Inlet #56 IA = DA = 0.23 acres Q?o= 0.85(7.50) 0.23 = 1.5 cfs #55 - #57 36" rep @ 1.0%, v?o = 8.8 fps, dio = 1.78', HW/D = 3.2, Qmax = 95.0 cfs #56 - #57 15" rep @ 5.0%, vio = 6.8 fps, dio= 0.28', HW/D = 2.6, Q,,,aX = 9.5 cfs Curb Inlet #57 IA = 0.17 acres DA = 6.32 + 0.23 + 0.17 = 6.72 acres Qio= 0.85(7.50) 6.72 = 42.8 cfs ##57 - ##58 36" rcp @ 1.0%, vio = 8.8 fps, dio = 1.8', HW/D = 3.9, Qn,ax = 105.0 cfs Curb fillet #58 IA=0 DA = 6.72 + (1.61 + 1.28 + 0.13) (RD) = 9.74 acres Qio= 0.85(7.50) 9.74 = 62.1 cfs #58 - #59 42" rcp @ 1.0%, vlo = 9.8 fps, dio= 2.1', HW/D = 3.8, Qmaz = 155.0 cfs Curb Inlet #59 IA = 0.12 acres DA=9.74+0.12=9.86 acres Qio= 0.85(7.50) 9.86 = 62.9 cfs #59 - #60 42" rep @ 1.0%, vio = 9.8 fps, dio= 2.1', HW/D = 4.3, Qmaz = 170.0 cfs RIBI'CW_Stornmater Calculations.doc nT 1 New [Bern Commons 13 Curb Inlet #60 IA = 0.13 acres DA = 9.86 + 0.13 + 1.78 (RD) = 11.77 acres Q10 = 0.85(7.50) 11.77 = 75.0 cfs #60- 461 42" rcp @ 1.0%, v10 = 10.2 fps, dio= 2.5', HW/D = 4.7, Qmax = 175.0 cfs Curb Inlet #61 IA = 0.15 acres DAi = 11.77 + 0.15 + 26.64 + 0.53 = 39.09 acres (temporary) DA2 = 11.77 + 0.15 + 8.69 + 0.53 = 21.14 acres (final) Temporary Qto = 0.85(7.50) 39.09 = 249.2 cfs Final Qio= 0.85(7.50) 21.14 = 134.8 cfs #61- #62 48" rcp @ 1.0%, HW/D = 6.0, Qmax = 295.0 cfs RTWI #65 IA, = DA, = (39.09 + 0.40)/2 = 19.75 acres (temporary) IA2 = DA2 =(21.14 + 0.40)/2 = 10.77 acres (final) Temporary Qio= 0.85(7.50) 19.75 = 125.9 cfs Final Qio = 0.85(7.50) 10.77 = 68.7 cfs Final Qioo= 0.85(9.72) 10.77 = 89.0 cfs Temporary Minimum Weir Size Qio= c,LH'r, cw= 3.0, L = 28' with 7'x 7' inside box dimension H = 1.31', Maximum initial height of box = 248.35. Final Minimum Weir Size Qioo= cw,LH32, c.= 3.0, L = 28' with 7'x 7' inside box dimension H = 1.04', Use 15" minimum opening height. #65- #66 42" rcp @ 2.0%, vlo = 14.0 fps, dlo= 2.7', HW/D = 3.0, Qmax = 135 cfs RTWI #66 IA, _ (39.09 + 0.40)/2 = 19.75 acres (temporary) DA, = 19.75 +19.75 = 39.50 acres (temporary) IA2 =(21.14 + 0.40)/2 = 10.77 acres (final) DA2 = 10.77 + 10.77 = 21.54 acres (final) Temporary Qlo= 0.85(7.50) 39.50 = 251.8 cfs Final Qio= 0.85(7.50) 21.54 = 137.3 cfs Final Qioo= 0.85(9.72) 21.54 = 178.0 cfs RIBPCW_Stormwater Calculations.doe n T 1 New Bern Commons 14 Temporary Minimum Weir Size Qio= c.LH32, cw= 3.0, L = 56' with (2) 7'x 7' inside box dimensions H = 1.31', Maximum initial height of box = 248.35. Final Minimum Weir Size Qioo = cW,LHv, , cw= 3.0, L = 56' with (2) 7'x 7' inside box dimensions H = 1.04', Use 15" minimum opening height. #66- #67 60" rcp @ 1.0%, vto = 12.0 fps, dto = 4.9', HW/D = 2.2, Qm,X = 260 cfs Rip-rap Apron Calculations - Using NYDOT chart FES #25 v = 12.0 fps d=30"=2.5' Requires Zone 3 Medium Stone Filling L=8x2.5=20' W = 3 x 2.5 = 7.5' Thickness = 22" .•. Use min. Class B erosion control stone 20'L x 7.5'W x 22"TH Endwall #40 v = 11.5 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .•. Use min. Class B erosion control stone 32'L x 12'W x 22"TH Endwall #62 v = 12 fps d=48"=4' Requires Zone 3 Medium Stone Filling L=8x4=32' W=3x4=12' Thickness = 22" .•. Use min. Class B erosion control stone 32'L x 12'W x 22"TH RIBI'MV_Stormwater Calculations.doc TIT 7 New Bern Commons 15 Endwall #251) (Outlet to Pond #1) v = 7.2 fps d = 42" = 3.5' Requires Zone 2 Light Stone Filling L=6x3.5=21' W = 3 x 3.5 = 10.5' Thickness = 22" .•. Use min. Class B erosion control stone 21'L x 12'W x 22"TH Endwall #67 (Outlet to Pond #2) v = 9.0 fps d=60"=5' Requires Zone 3 Medium Stone Filling L=8x5=40' W=3x5= 15' Thickness = 22" •. Use min. Class B erosion control stone 40'L x 15'W x 22"TH RIBPCW DLH/dlh RIBMV-Stornmater Calculations.doc DT T New Bern Commons I - - I B C D E F G 1 2 J 4 I 5 6 7 ( B 9 I ` a ?- t1 " r Q % GV'3A o.7A 6 1 1 a? / t f ?/ //? o 1 t l OVA !A / --- ?? 0.52A ??21A X015 J A , I C35A„?,"_ 118h 73A G.IGF " i? 'N MA I I - 11c. ?.`? Ilee I I f`- ,gin! l)319 ?.? `?\ J ©' oO?f,?? c ?? ??? m O a t { ?' Z GJ', A ' ? Uy - I I r, i ? p A 6' = Og ?` I , f` 02•A_ I i t I `.i ;I r r r'I 6 I Z5 wii _ i I0,[tiA I 10-22 a h I h E I?I t I.I t I I W ?m0 Zb •i26 Iv-I I I.I I I 3' ?? A Lr, \ 0 w 0 14' ??1 ?- ?. z w r?A Ow, 02+,9. Q r6A 1 ? 1 -0.49a © (? ? ?' 1--9 A .0 6' A " r " I - A - Q59h. i 14 4r, 4, 0.0 REVISIONS BY SA .. puma eno eismeu t 4A C 4F < I? &A. 10 09,, 0 -' O.zP C57 ?? L I A ').03 A 012, Ott 0.2 A *J _ G4oh. O OA it, t - - - -- - _. tee. 4 NORTH -- -? NEW,BQiN-AYE (U.S.NICffNAY 64)-__-_- 7? -- _ --)- -? ON-SITE IMPROVEMENTS ?I DRAINAGE AREA MAP ?A-4 .an Soil & Environmental Consultants, 11010 Raven Ridge Road • Raleigh, North Carolina 27613 • Phone: (919) 816-5900 • Fax: (919) www.SandEC.com May 28, 2003 NCDENR-DWQ Attn: Mr. John Dorney 2321 Crabtree Blvd Parkview Building Raleigh, NC 27604 RE: Request for Additional Information ::,ti-ni. tonal Business Park Raleigh, Wake County, North Carolina S&EC Project #: 5410 DWQ# 03-0489 Dear Mr. Dorney: )VE- l i' IT0 PIO-I gIoUp OUAL 1`I YS1_:CTJO1%i We have received your request for additional infonnation for the Raleigh International Business Park project dated 5/23/03 (see attached). The letter states that NC-DWQ's two concerns with the proposed project pertain to the type of storniwater treatment facility proposed and the location of the proposed facilities with respect to stream "C". Stonnwater Treatment Facilities The 5/23/03 letter states that the General Certification for Nationwide Permit 39 requires installation of constructed wetlands in Nutrient Sensitive Waters. However, Condition 4 of Water Quality Certification #3402, which is associated with Nationwide Pen-nit 39 (see attached), states "...the Division shall require that extended detention wetlands, bio- retention areas, and ponds followed by forested filter strips (designed according to the latest version of the NCDENR Stonnwater Best Management Practices Manual) be constructed as part of the stonnwater management plan when a site-specific stonnwater plan is required." It is our belief, based on the above condition, that wet ponds followed by forested filter strips satisfy NC-DWQ's specifications for stonnwater treatment. The project engineer, Piedmont Land Design, is currently designing the proposed wet ponds to incorporate forested filter strips, as specified in the NCDENR Stormwater Best Management Practices Manual. Mr. David Lasley and Mr. Ron Hendricks, of Piedmont Charlotte Office: Greensboro Office: Hickory Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain a Concord, NC 28025 Greensboro, NC 27455 .-. . 1 Phone: (704) 720-9405 Phone: (336) 540-8234 Phone ••- Fax: (703) 720-9406 Fax: (336) 540-8235 Fax: MAY-25-2003 10:43 FROM:DWO-WETLANDS 9197336893 T0:98469467 P:2/2 of WATF9 Mchael F. EasWy, Govemcr C? 0 William G. Ross Jr., Secretary North Carolina Oupartment of Envirortrnent an0 Natural ResowwA Alan Kllmek. P.E., Director O .? Division of Water QuWlty May 23, 2003 DWQ # 03-0489 Wake County CERTIFIED MAIL-RETURN RECEIPT REQUESTED Mr Glen and Ms. Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Dear Mr. and Ms. Partin: The Division of Water Quality has reviewed your plans (received on April 16, 2003) for the discharge of fill material into 1,235 linear feet of streams and 0.183 acres of wetlands located at New Bern Avenue and New Hope Road in Raleigh In Wake County for commercial development at the Raleigh International Business Park site. Insufficient evidence is present in our files to conclude that your project must be built as planned in waters and/or wetlands in accordance with 15A NCAC 2H .0506. Therefore we must place your project on hold until the issues listed below are adequately addressed. Please provide us with information supporting your position that states your project must be constructed as planned and that you have no practicable alternative to the type and location of stormwater management that you have proposed on this site. Specifically the stormwater plans refer to both 'wet ponds" and "wetland type detention basins" (presumably constructed wetlands). The General Certification for Nationwide Permit 39 requires Installation of constructed wetlands in Nutrient Sensitive Waters (such as the Neuse River basin) since constructed wetlands do a much better job removing nutrients than wet ponds. In addition, it appears that the pond/wetlands and their fill slopes are within Zone 1 and Zone 2 of the protected stream buffers along "Stream C' although the scale of the map that was provided makes this difficult to confirm. Please revise and clarify your stormwater plan to 1) provide constructed wetlands with this facility and 2) relocate the structures so that they are outside the protected stream buffer along "Stream C'. Any documentation such as maps and narrative that you can supply to address alternative designs for your project may be helpful in our review of your 401 Certification. Please respond within three weeks of the date of this letter by sending a copy of this Information to me and, one copy to Steve Mitchell In our Raleigh Regional Office. If we do not hear from you In three weeks, we will assume that you no longer want to pursue this project and we'will consider the project as withdrawn. If you have any questions, please telephone John Dorney at 919-733-1786 or Steve Mitchell in our Raleigh Regional Office at 919-571-4700. Program cc: Raleigh DWQ Regional Office `.w Raleigh Feld Office Corps of Engineers Central Files File Copy Brad Suther, Soil and Environmental Consultants _ David Lasley; Piedmont Land Design N. C. Division of Water Quality, 401 Wetlands Certification unit, 1650 Mall Servioe Center, Raleigh, NC 27699.1= (Mailing Address) 2321 CrotJtrAA blvd., Ralelgh, NC 27604-2260 ((.oration) (919) 733.1788 (ptwrto). 919.733.6893 (fax), (httpJfh2o.enr.state.nr.us/ncwetland3 am? WQC #3402 must be maintained adjacent to all perennial waters except for allowances as provided under the Water Supply Watershed Protection Rules. For the purposes of this condition, perennial waters are defined as those shown as perennial waters on the most recent USGS 1:24,000 topographic map or as otherwise determined by local government studies; 4. Additional site-specific stormwater management requirements may be added to this Certification at DWQ's discretion on a case by case basis for projects that have or are anticipated to have impervious cover of greater than 30 percent. Site-specific stormwater management shall be designed to remove 85% TSS according to the latest version of DWQ's Stormwater Best Management Practices manual at a minimum. Additionally, in watersheds within one mile and draining to 303(d) listed waters, as well as watersheds that are classified as nutrient sensitive waters (NSW), water supply waters (WS), trout waters Jr), high quality waters (HQW), and outstanding resource waters (ORW), the Division shall require that extended detention wetlands, bio-retention areas, and ponds followed by forested filter strips (designed according to latest version of the NC DENR Stormwater Best Management Practices Manual) be constructed as part of the stormwater management plan when a site-specific stormwater management plan is required. For streams classified as Water Supply, High Quality Waters and Outstanding Resource Waters, post-construction, on-site stormwater management shall be required as appropriate and as outlined in 15A NCAC 2B .0104(m) and 2H .1000 to.1007, respectively, in addition to that required in this General Certification. Alternative designs may be requested by the applicant and will be reviewed on a case-by- case basis by the Division of Water Quality. Approval of stormwater management plans by the Division of Water Quality's other existing state stormwater programs including appropriate local programs are sufficient to satisfy this Condition as long as the stormwater management plans meet or exceed the design requirements specified in this condition. This condition applies unless more stringent requirements are in effect from other state water quality programs. • Unless specified otherwise in the approval letter, the final, written stormwater management plan shall be approved in writing by the Division of Water Quality's Wetlands Unit before the impacts specified in this Certification occur. • The facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. • Also, before any permanent building or other structure is occupied at the subject site, the facilities (as approved by the Wetlands Unit) shall be constructed and operational, and the stormwater management plan (as approved by the Wetlands Unit) shall be implemented. • The structural stormwater practices as approved by the Wetlands Unit as well as drainage patterns must be maintained in perpetuity. • No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. 5. Compensatory stream mitigation shall be required at a 1:1 ratio for not only perennial but also intermittent stream impacts that require application to DWQ in watersheds classified as ORW, HQW, Tr, WS-1 and WS-II unless the project is a linear, publicly-funded transportation project, which has a 150-foot per-stream impact allowance; 6. In accordance with North Carolina General Statute Section 143-215.3D(e), any application for a 401 Water Quality Certification must include the appropriate fee. If a FEB. -20' 03 (THU) 11:40 NUENR RRO TEL: 919 571 4718 P. 001 State of North Carolina Department of Environment and Natural Resources Raleigh Regional Offlcm McP ??.. - - - rnor_ Michaol F. rzanlo?r, Govo _ ?-==Wfn f am .1?OGG MY EN?r «,c?rr AND NJaurv+ rir,our+cra Alan W. KllmoUt p.E. piroctor February 14, 20032 Mr. Max Barbour Real Fstatc Development Post Office Box 97397 Raleigh, N.C. 27624-7397 Subject: Application of Ncusc Buffer Rules Vested Rights Opinion Raleigh International Business Park, Highway 64 New Hope Road, Raleigh Wake County Dear Mr. Barbour; This letter is to inform you that the Environmental Division of the North Carolina Department of Justice the (Attorney's General Office)has completed its review of your request for a vested right determination for th subject property from the Neese Huffer Rules l tNCAC 02D .0233) The Neuse Huffer Mules apply th_e pr ject commonly submitted requesting a determination of whether 's General Office, known as Raleigh International Business Park has been reviewed by the Attorney propcM with existing vested rights from the application of theNeuse House Bi111d02 specifically exon o red whether vested rights exist depends on the application of the common Buffer Rules. 'ihedeteminati law vested rights criteria which are as follows: , 1, Substantial expenditures and contractual obligations which occurred prior to the enactment of the law; 2. Expenditures and obligations incurred in good faith; overtimcatail 3. Fxpenditures and obligations were made in reasonable reliance upon 6 permits and/or approvals; and, 4. Detriment would result with application of the law. Based on the AG's opinion, it appears that the Raleigh International Business Park meets the requirements for common law vested rights. First, according to the materials submitted, Meuse Buffer Rules. Second, expenditucs on the infrastructure of the project prior to imp i of Raleigh prior the frorn project City the developers acted in goo usf c fferiRules.t Third, the adeve opera relied upon go ernmental permission the effective date of the Ne Certification since the project was under the as the-project was exempt from 401/404 Water Quality threshold requirements for impacts. Fourth and finally, imposition o of the Neuse Buffer Rules will cause the developers to suffer a detriment as they will incur substantial ei?h of the Ncu rights, Dthe uffclr Ru ?s on the ona Since it appears that the developer meets the four criteria common Office of the Division of Water Quality will not impose the requirements T©lvphono (91?s1571?t700 FPX??1?1`7"i-677 1620 ball Swtvlc© Ccnt=r, RN:oltlh, F.4 276 9-1f12a3 50°? rocycicdli 0`/. poet-c=_wrcT rzp: j Alan Klimek, P.E., Dirc;ct Division of Water Qual May 23, 2003 DWQ # 03-0489 Wake County CERTIFIED MAIL-RETURN RECEIPT REQUESTED Mr Glen and Ms. Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Dear Mr. and Ms. Partin: The Division of Water Quality has reviewed your plans (received on April 16, 2003) for the discharge of fill material into 1,235 linear feet of streams and 0.183 acres of wetlands located at New Bern Avenue and New Hope Road in Raleigh in Wake County for commercial development at the Raleigh International Business Park site. Insufficient evidence is present in our files to conclude that your project must be built as planned in waters and/or wetlands in accordance with 15A NCAC 2H .0506. Therefore we must place your project on hold until the issues listed below are adequately addressed. Please provide us with information supporting your position that states your project must be constructed as planned and that you have no practicable alternative to the type and location of stormwater management that you have proposed on this site. Specifically the stormwater plans refer to both "wet ponds" and "wetland type detention basins" (presumably constructed wetlands). The General Certification for Nationwide Permit 39 requires installation of constructed wetlands in Nutrient Sensitive Waters (such as the Neuse River basin) since constructed wetlands do a much better job removing nutrients than wet ponds. In addition, it appears that the pond/wetlands and their fill slopes are within Zone 1 and Zone 2 of the protected stream buffers along "Stream C" although the scale of the map that was provided makes this difficult to confirm. Please revise and clarify your stormwater plan to 1) provide constructed wetlands with this facility and 2) relocate the structures so that they are outside the protected stream buffer along "Stream C. Any documentation such as maps and narrative that you can supply to address alternative designs for your project may be helpful in our review of your 401 Certification. Please respond within three weeks of the date of this letter by sending a copy of this information to me and, one copy to Steve Mitchell in our Raleigh Regional Office. If we do not hear from you in three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. If you have any questions, please telephone John Dorney at 919-733-1786 or Steve Mitchell in our Raleigh Regional Office at 919-571-4700. Si cer?I , ? i in R. DorneyJ 40,1 Water Qua ertification Program cc: Raleigh DWQ Regional Office Raleigh Field Office Corps of Engineers Central Fi'.:J File Copy Brad Suther; Soil and Environmental Consultants David Lasley; Piedmont Land Design r r *A z INCDENR N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetlands OF VIArF9 Michael F. Easley, Governor William G. Ross Jr., Secretary O?^' '^ ?G North Carolina Department of Environment and Natural Resources _1 I lr I ¦ J rz Alan Klimek, P.E., Director > V =-I Division of Water Quality O '< May 23, 2003 DWQ # 03-0489 Wake County CERTIFIED MAIL-RETURN RECEIPT REQUESTED Mr Glen and Ms. Lillian Partin 7607 Astoria Place Raleigh, NC 27624 Dear Mr. and Ms. Partin: The Division of Water Quality has reviewed your plans (received on April 16, 2003) for the discharge of fill material into 1,235 linear feet of streams and 0.183 acres of wetlands located at New Bern Avenue and New Hope Road in Raleigh in Wake County for commercial development at the Raleigh International Business Park site. Insufficient evidence is present in our files to conclude that your project must be built as planned in waters and/or wetlands in accordance with 15A NCAC 2H .0506. Therefore we must place your project on hold until the issues listed below are adequately addressed. Please provide us with information supporting your position that states your project must be constructed as planned and that you have no practicable alternative to the type and location of stormwater management that you have proposed on this site. Specifically the stormwater plans refer to both "wet ponds" and "wetland type detention basins" (presumably constructed wetlands). The General Certification for Nationwide Permit 39 requires installation of constructed wetlands in Nutrient Sensitive Waters (such as the Neuse River basin) since constructed wetlands do a much better job removing nutrients than wet ponds. In addition, it appears that the pond/wetlands and their fill slopes are within Zone 1 and Zone 2 of the protected stream buffers along "Stream C" although the scale of the map that was provided makes this difficult to confirm. Please revise and clarify your stormwater plan to 1) provide constructed wetlands with this facility and 2) relocate the structures so that they are outside the protected stream buffer along "Stream C". Any documentation such as maps and narrative that you can supply to address alternative designs for your project may be helpful in our review of your 401 Certification. Please respond within three weeks of the date of this letter by sending a copy of this information to me and, one copy to Steve Mitchell in our Raleigh Regional Office. If we do not hear from you in three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. If you have any questions, please telephone John Dorney at 919-733-1786 or Steve Mitchell in our Raleigh Regional Office at 919-571-4700. ertification Program cc: Raleigh DWQ Regional Office Raleigh Field Office Corps of Engineers Central Files File Copy Brad Suther; Soil and Environmental Consultants David Lasley; Piedmont Land Design N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetlands +JGDENR NC Division of Water Quality Wetlands/401 Unit May 22, 2003 Memorandum To: John Dorney From: Larry Eaton Subject: I/P Call on Raleigh International Business Park 03-0489 On 20 May 2003, it came to the attention of the Wetlands Unit that DWQ may not have verified the I/P point on the UTs paralleling US 64 proposed to be impacted for the Raleigh International Buisness Park. On 21 May 2003, Dave Penrose and Larry Eaton visited the site off New Hope Church Road. Our findings were the same as those of Steve Mitchell who make the stream calls and delineated buffers on May 21, 2002. Streams "B" and "C" were perennial for their length on the property, Feature "D" on the Wake County Soils Map, was Ephemeral to Intermittent for its entire length and stream "A", the stream closest to US 64, was perennial up to the fence and a flag marked 236A. At this site, the DWQ Stream Classification form rated the site at 36.5 points with fauna of amphipods, beetle larvae and a crayfish. The stream was heavily incised, with stream banks 3-7 feet high and the bed was filled with tons of coarse sand. The E/I point was located at a flag marked 225A. The stream was given a rating of 20.5 points in the series of pools below the 3 foot head cut at this location. Our field sheets are attached. cc: Dave Penrose File Attachments North Carolina Division of Water Quality; Wetlands/401 Unit 1650 Mail Service Center; Raleigh, NC 27699-1650 2321 Crabtree Blvd., Raleigh, NC 27604-2260 Telephone: (919) 733-1786; Fax: (919) 733-9959 http://h2o.enr.state.nc.us/ncwetlands Triage Check List Date: Project Name: fole_161?1 I'??P/vl? ? 3GJ1 elf G DWQ#: County: To: ? ARO Mike Parker ? WaRO Tom Steffens ? FRO Ken Averitte ? WiRO Noelle Lutheran ,? O Alan Johnson ? WSRO Cyndi Karoly (Central Office) Lld RRO Steve Mitchell From: Telephone : (919) The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps "p " issues B "buffer Rules eus ar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: VI-A e_ . 1p4cje_ SaW a/ e _/? e__ fel_? r <?'f ' e- v(' S; `f-, [Fwd: 401 certification question] Subject: [Fwd: 401 certification question] Date: Tue, 20 May 2003 08:11:14 -0400 From: Alan Klimek <alan.klimek@ncmail.net> Organization: NC DENR DWQ To: John Domey <John.Domey@ncmail.net> Please let me know our response. Alan Subject: 401 certification question Date: Mon, 19 May, 2003_16:01:39 -0400 From: Dempsey Benton <dempsey.benton@ncmail.net> Organization: NC DENR To: alan.klimek@ncmail.net I have an inquiry about a 401 certification for Raleigh International Park, which is located in Raleigh on Us 64 east. I believe the applicant is Raleigh Associates or Max Barbour. Apparently, this application has been pending for some time. Plesae let me know what needs to be done for this application to be processed for approval. Iof I [Fwd: [Fwd: [Fwd: 401 certification qucstion]l] Subject: [Fwd: [Fwd: [Fwd: 401 certification question]]] Date: Thu, 22 May 2003 08:00:40 -0400 From: Lawrence Eaton <larry.eaton@ncmail.net> To: Steve Mitchell <Steve.Mitchell@ncmail.net> CC: john.domey@ncmail.net Hey Mitchell, According to Sean Clark, you made the stream calls at the Raleigh, International Business Park (03-04898) when you flagged the buffers a year ago (May 21, 2002). If it makes you feel good, Dave and I went out yesterday and agreed with your calls. Attached (I hope) is the memo I wrote yesterday saying that. I'm still not sure how they got 1000+' of intermittent stream. We only found about 100' or less. Lots of Ephemeral channel, though. Does that mean we should issue and they don't have to mitigate? Larry Subject: [Fwd: [Fwd: 401 certification question]] Date: Wed, 21 May 2003 15:20:25 -0400 From: John Dorney <john.dorney@ncmail.net> To: Lawrence Eaton <larry.eaton@ncmail.net> CC: "steve.mitchell" <steve.mitchell@ncmail.net> please relay to steve what you found. thankx Subject: Re: [Fwd: 401 certification question] Date: Wed, 21 May 2003 14:43:40 -0400 From: Steve Mitchell <steve.mitchell@ncmail.net> To: John Dorney <john.dorney@ncmail.net> I will have to look at the new road alignment. The old proposal clobbered a perrennia Do not know about the new. I can go with the bug heads if needed. John Dorney wrote: > mitigate maybe. they claim that the streams are intermittent. did you have a chanc > to visit the site and make a call? if not, larry and/or dave will need to do so thi > week. please advise. thankx > Steve Mitchell wrote: > > JD, > > It depends on what portion of Ral. Int. Bus Park we are talking about. The park > > itself has vested rights. This allows construction of the entire site and a true > > hammering of the stream at the northeast. Max did not wat to have to build the > > parkway road based on the vested alignment and redesigned it. This is a lot less > > impact than it could have been but is over threshold and requires $$$$. > > The Ind. pk is 03-0489 (vested) and Corporation Parkway is 03-0434 (mitigate) > > John Dorney wrote: > > > application received april 22 and sent to RRO on april 23. steve mitchell 1 of 2 [Fwd: [Fwd: [Fwd: 401 certification question]]] > > > sent recommendation on may 1 but (apparently) did not notify us that his > > > recommendation was on the computer. steve recommended issue but with stream > > > mitigation condition. applicant contends that streams are all intermittent > > > and therefore not need mitigation. however there are 1,235 feet of stream > > > impact. it is not clear from steve's recommendation if anyone has checked to > > > see if these streams are really intermittent. i'll have larry eaton or dave > > > penrose check with Steve mitchell and visit them asap if needed (likely). > > > Alan Klimek wrote: > > > > Please let me know our response. Alan > > > > ------------------------------------------------------------------------ > > > > Subject: 401 certification question > > > > Date: Mon, 19 May 2003 16:01:39 -0400 > > > > From: Dempsey Benton <dempsey.benton@ncmail.net> > > > > Organization: NC DENR > > > > To: alan.klimek@ncmail.net > > > > I have an inquiry about a 401 certification for Raleigh international > > > > Park, which is located in Raleigh on Us 64 east. I believe the applicant > > > > is Raleigh Associates or Max Barbour. Apparently, this application has > > > > been pending for some time. Plesae let me know what needs to be done > > > > for this application to be processed for approval. Name: Ral Intl Bus Park I-P call.doc DRai Intl Bus Park I-P call.doc Type: Microsoft Word Document (application/msword) Encoding: base64 Download Status: Not downloaded with message 2of2 [Fwd: [Fwd: [Fwd: [Fwd: 401 certification question]]]] > > > JD, > > > it depends on what portion of Ral. Int. Bus Park we are talking about. The part. > > > itself has vested rights. This allows construction of the entire site and a tru > > > hammering of the stream at the northeast. Max did not wat to have to build the > > > parkway road based on the vested alignment and redesigned it. This is a lot less, > > > impact than it could have been but is over threshold and requires $$$$. > > > mho T-A -L, ,n n7_nnRO /,ro ..h?.71 .-A n7-nn1A /m;4-;-f-„I [Fwd: [Fwd: [Fwd: [Fwd: 401 certification question]]]] Subject: [Fwd: [Fwd: [Fwd: [Fwd: 401 certification question]]]] Date: Thu, 22 May 2003 08:48:10 -0400 From: Lawrence Eaton <larry.eaton@ncmail.net> To: john.dorney@ncmail.net Is it to late for Mitchell to jump back in? Subject: Re: [Fwd: [Fwd: [Fwd: 401 certification question]]] Date: Thu, 22 May 2003 08:22:35 -0400 From: Steve Mitchell <steve.mitchell@ncmail.net> To: Lawrence Eaton <larry.eaton@ncmail.net> It seems that I will have to look closely at this one. There is the issue of vesting required mitigation for the road alignment. If this is a rush, someone could check wi the the Hills this after noon so Tuesday will be the soonest for me. I have a meeting Lawrence Eaton wrote: > Hey Mitchell, > According to Sean Clark, you made the stream calls at the Raleigh, > International Business Park (03-04898) when you flagged the buffers a > year ago (May 21, 2002). If it makes you feel good, Dave and I went out > yesterday and agreed with your calls. Attached (I hope) is the memo I > wrote yesterday saying that. I'm still not sure how they got 1000+' of > intermittent stream. We only found about 100' or less. Lots of > Ephemeral channel, though. Does that mean we should issue and they > don't have to mitigate? > Larry > ------------------------------------------------------------------------ > Subject: [Fwd: [Fwd: 401 certification question]] > Date: Wed, 21 May 2003 15:20:25 -0400 > From: John Dorney <john.dorney@ncmail.net> > To: Lawrence Eaton <larry.eaton@ncmail.net> > CC: "steve.mitchell" <steve.mitchell@ncmail.net> > please relay to steve what you found. thankx > > ------------------------------------------------------------------------ > Subject: Re: [Fwd: 401 certification question] > Date: Wed, 21 May 2003 14:43:40 -0400 > From: Steve Mitchell <steve.mitchell@ncmail.net> > To: John Dorney <john.dorney@ncmail.net> > References: <3ECAlB62.EBDB1361@ncmail.net> <3ECA3EF4.DBCF2783@ncmail.net> <3ECA4693. > I will have to look at the new road alignment. The old proposal clobbered a perrenn > Do not know about the new. I can go with the bug heads if needed. > John Dorney wrote: > > mitigate maybe. they claim that the streams are intermittent. did you have a cha. > > to visit the site and make a call? if not, larry and/or dave will need to do so L. > > week. please advise. thankx > > Steve Mitchell wrote: 1 of 2 5/2210 3 9 4 5 6 7 g g 5 1 2 3 \ ~ ~ I AINAGE STRUCTURE SCHEDULE STORM DR ~ ~ ; ~ ~ ~ ~ ! i ZE LENGTH SLOPE TOP ELEV REMARKS MARK INV IN IMF OUf SIZE LENGTH SLOPE TOP ELEV REMARKS MARK INV IN INV OUT SIZE LENGTH SLOPE TOP EIEV REMARKS MARK INV IN INV OUT SI ~ ~ , iSE BASI~J NOTE - - ~ X NEUSE BASI~J c~> cX~ cm cX~ cm c ) y EXlsr. wETLANOS ~ ~ 1 PROPERTY IS VESTED FROM THE ~ (TYp.) 3' 250.00 245.31 253.2 JB THIS PROPERTY IS VI 1 275A 278.01 RTCB 58 (57) 256.82 256.62 270.1 t JB/MH 63 ( ) REQUIREMENTS OF TF '~REMENTS OF'.THE NEUSE BUFFER ~ ~ ~ ~ - 15' RCP 22 3.OX 63-64 12' RCP 162 0.5X RULES AS INDICATED 12 7H V STEO 1 i AS INDICATED IN E E ~ - - S LETTER FROM NCDENR DATED ~ 44 PIPE END RIGHTS LETTER FROM 2 274.33 274.13 278.1t(TC) CI 58-59 42' RCP 97 1.OX ~ 2 ~E91RLshRY T4, 20G3. ,S~t't 14, 20G3. ~ ~ \ .45 ~ 27).91 C CI 65 241.56 253.8 (T'S) R1WI 2-3 18' RCP 46 1.OX 59 255.65 255 (T ) 3 273.67 273.47 278.5t(TC) CI 59-60 42' RCP 140 1.OX 65-66 42' RCP 8 2.OX ~ ~ ~ _ , y.. ~ I ! ~ \ A 3-4 18' RCP 3s 1.59. 60 254.05 253.85 1270.9t(TC) CI 66 241.40 241.20 253.6 (TS) RTWI i I ~ v A A 4 272.90 272.70 276.4t(TC) CI 46-61 48' RCP 140 1.Of. 66-67 60' RCP 34 1.OX 4-5 18' RCP 70 1.15X 47-61 15' RCP 66 3.OX 67 240.86 ENDWALL w 5 271.90 271.70 275.51 JB/MH 60-61 42' RCP 244 1. X ' \ `1 1 \ 1• 71. 275.01 CB 61 46 248.76 242.80 266.9t(TC) CI ' ' 6 2 5 ( ) ~ ~ , , A., r . , I ' I ~ _ ~ ~ ~~I, - / ~ / 6-6A 15' RCP 133 3.257. (47) 260.45 ~ , ' ~ ~ ; I f, i FER TO SHEET C-8.1 AND ~ ~ ~ , .1. ; , ry ~ , ,NEW PRNATE -7 18' RCP 147 3.OX (60) 251.41 A ~ ~ ~ ~ ~ ~ l t 1 ! ~ ~ ` I ` !DRAT AGE EAS PENT i ~ 2 FOR IMPROVEMENTS IN ; ~ ~ ~ ~ ~ ' ~ ~ ~ i 6A-7 15' RCP 90 1.OX ~ RPORATION PARKWAY ; , ~ ~ ~ n 7 (5) 267.28 265.88 271.4(TC) DI 61-62 48` RCP 33 1.07. ~ ~ , , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - ~ - 1 I r _ ~ 1~ , [ 62 242.47 ENDWALL \ ~ • , ~ ~ 1 - _ - - - - - - - - - " - - - _ (6A) 266.08 ~ . PRIVAif•- BRAMIA6E ' ~ , C ~ ~ ~ . _ ENT TYP. I - " 8 261.5 265.01 B \ ~ ~ _ ) ~ . ~ •i- _ - - - _ , W _p B-9 15 RCP 117 1.OR i l ~ ro ~ I ~ . . ~ ~ ~ / ~ r ~ - - 1 I _ _ _ _ _ , i O AIL 9 260.33 260.13 265.51 CB ~ I I \ -T....~~ _ z-,-~_ ' - _ _ _ _ = ~ • _ 7-10 18' RCP 191 3.3X --~-y' ~ SS ~ r ~ ~i ~ ~ X}~ O A I ' W~ 0 1 - r n 9-t0 15' RCP 70 1.OX 1 i _ ; _ 1 ~ - 7 59.58 259.23 267.8t(TC) CI ~ - , ~ I . ~ _ ~ 15' II~P r 10 ()2 , r-- ~ If , ..i~i ~ ~ 1 - I I zeo ; ~ 2so 5' RC ~ ~ . (9) 259.43 ~ ~ - - 10-11 24' RCP 7 1.OX ~ _ - RCP \ ~ ti ~ _ 11 259.16 258.96 267.8t(TC) CI - • 1 ~ ~ 11-12 24' RCP 40 1.27. ` ~ ~ ~ ~ ~ ~ ~ - ' 270.95 - - R AWING WAL ~ ` m RoP _ NEB ~ - NEW CL. B EROSION :15 r NEW ~ATE-BRAINAGE TOP OF WALL V~RiES ~ as , 12 258.56 258.36 267.7t(TC) CI ~ ~ + , - _ ~ F R - - ' r ! c. \ B ~ ~ - o o ; ONTROL STONE APRON i ~ ~ ' ~ ''EASEMENT (TYP.) ~ ' ~ ~ ~ 5~ MAX. ~ • - C r ~ 1 ~ ` , 1 ~ ~ i~(MIN. 32'Lx12'Wx22'iH) 12-13 24' RCP 168 1.57. - - ~ 6' ~ ~ PRIVA~~ ~ 1 ~ SLQ~E - _ ~ _ ~ ` c,DN GEOTEXTILE FABRIC ~ ~ ~ 13 255.84 255.64 267.2t(TC) CI ~ ~ ~ ' 1 ~ ~ ~ .f ~ ~ ~ „Fc~ DRAINAGF~/~EASEMENT ~ 1 ~ ~ s. TRAM 1 r i . ~i ~ - - ~ \ • 14 257.33 262.Ot(TC) CI \ \ i r ~ ~ P . 1 • ~ 271.0' 971.5~~ \ ~ ~ ~ 1 , , ~ - ~ - , } ~ ~ ' ~ : ~ "f..' j c ~ f' LINE ENBANKMENT WITH 14-15 15' RCP 39 1.07. ~ ~ I ~ ~ % . ~ ~ i I ~ ` 1 i ~ ~ " - `U ' i, , ~ ~ ii ~ - -1 ~ ; ~ CLASS i RIP RAP (MIN 22' - 15 256.94 256.74 262.Ot(TC) CI , \ ' ~ , \ I ! r~ - I j ~ - • ~ _ r ~ ; , ~ ~ ~ THICK) ON GEOTEXTILE 0 ~ ~ -y,~ ~ ~ ~ A 15-16 15' RCP 59 1.07. \ \ \ - ~ ~ \ - Z ~ 1 ~ ~ + s ' ~ ~ FABRIC TO ELEVATION 246.0 + X70.54 ~ 16 256.15 255.95 265.4f(TC) CI \ ~ ~ ~ I _ 268.83 ~ • ,A ~ i , •l. Se ~ ' 'LP 1 : 42 RCP 1. ~ I , ~ r D S01 ~ ~ i OR eo t,n \ WO FLOOD HAZAR LS 16-17 15' RCP 33 1.07. ~ ~ ~ i 17 255.62 255.42 263.Of JB/MH ~ _ 'b • b _ , ~ ' ~ 42' ( BM 1988, PG 1363 sa ~ 18 255.23 259.5t(TC) CI ~ 'y ~ • ~ a ~ ~ J~a ~ ~ , TYP. EA. SIDE - r \ , \ , \ ~ t +n 48" RCP • ~ ( 1 18-19 15 RCP 67 1.OX / • ' I i ! ~ \ ~ I 2x1.92 271.9 5p 1" ` ~ ~ ~ I z- - I I I g - \ ~ ~ 19 254.56 254.36 261.9t(TC) CI / , I ~ ~ ~ ' I ~ ~ ~ \ , 272.0 271.5 ~ 271.9? ,i - - \ ' ~ 1271.5 272.0 ' 271.5 271.92 ~ e~ , I i K - 1 7 ~ .N. R ~:.i, 19 20 15 RCP 184 .0 , 1 ! 272.0 ~ 271.5 n 269.5 p 272.0 - BERM - 254.3 20 252.52 252.32 261.3f(TC) CI ~ ~ - - - i , ~ ~ r i 1 O ~ I': ~ , - ~ - \ ~ ~ I I I 267. ~ - ~ i ~ ~ 36" RCP ~ N J • ~ 11~ 20-21 15' RCP 183 1.OX \ j ~ ~ t~ rl ~ 269.5 A ~ .r, _ ~ hid ' I • ~ 60" RCP t~ ~RQ ~~i ~5, I ~ CI ~ ~ ~ f j • 21 250.49 250.29 261.6f(TC) 5.~ 1 , ' ~ I ' ' 27.1.33 : ~iNEW CL B EROSION , / ~ I , ' i ~ ~ • ~ .I 9 17-22 15" RCP 233 1.SX \ ~ i ; ' 27 L3 - • 1 , ; ~ , 271 s2 ~ © 1 ` ~ CONTROL STONE APRON ~f Q ' ~ ~ ~ / ~ ~ ~ ~ a ~ ~ ~ MIN. 40'Lx15'Wx22"fH 4 ' 22.0 1 ~ 1 • ( ) y MAX. SCOPE ON ~ ` ' 5 ! v ~ • 21-22 18' RCP 10 1.07. IDEWALK ; ; 271 2 ` ~ , ; ; I ~ ` i , ~ BERM: 249.0 'ON GEOTEXTILE FABRIC / ~ 1 I , , _ _ _ _ 271.8 22 (17) 251.93 250.00 261.5t(TC) DBL CI r~ ~ ; ~ ' ~,I ' ' I ~ ~ NOTE: REFER TO LANDSCAPE I ~ 272.0 I (21) 250.20 ~ I ??.g~ ~ ~ ,r~r~. • ~ ,p 'PLAN FOR SLOPE t•' . ~ ! 271.6 ~ STABILIZATION AT DETENTION 0 ~G r' C ~ PR i ~ ~ ~ 1 271.8 ~ 71.5 22-23 24' RCP 125 1.OX ~ j ~ ' ~ ~ \ - ~ ~ ~ , ' ,I I 1, ~ , ~ t° ~ t~ 1 PONDS AND LEVEL '•.,P. N~0.~~`' 271.62 , 1 _ ~ I ~ wET aOND 2 ~ • ~ j ' ' i , I ~ ~ /.r.. , 1 , .-SPREADERS 23 13 251.00 248.50 262.61 JB MH y-' ~ ' ' ~ I ~ W~ . ' i ~ ` ' l w.E.~ 250. ~ ~ Lt ~ I' r I ' (22) 248.70 ~ 1 ; ' 1 \ \ gin' ' si Z7 271.92 f I I ~ ~ ~ NEW CL B EROSION i ' ~ ' , I I LEVEL- CONTROL STONE APRON' ~ sz / I 23-23A 30" RCP 55 1.5X ~ r 272.0 ~ ; i ! ! , ' I I S ~ EADE ~ ~ .'r , . (MIN. 21'Lx12'Wx22"TH) 247.68 47.48 262.78f TC CI \ / - ~ I I i ' ' . 23A 2 ( ) ~ I ' SUPE~CEN~E~ JL92 ~1 .':'.'.I:'. ' N OT XTILE FABRIC _ 0 GE E - 4 30" RCP 120 1.57. ~ ~ ' ~ ~ - / + I I 23A 2 i I ; f, i - ~ 1~ ~;C='f~g2--~GL OL ~ j , • NEw LEVEL sRREAD~R ~1 24 (23A)245.68 243.82 256.01 JB/MH \ ,,~p ! ~ I,' I ~ ~ • i ' , I ~ I ' - ~ rti. i ~ . i ';r'; ~ ® ~ i / _ SEED ANY BAR AREAS ~ .9 c • 1 ° 272.0 I ~ 203,942 , S.F. a ~ ~ ~ ~ , , ; I ~ r~ , t n ~ ~ , • ~ . • j . ~ - IN LEVEL SPREADERS ~ ~ 24-25 30' RCP 91 2.OX NEW RETAINING WAtL ` , I `il"I I k TOP OF WALL VARIES I ~i~, ~ I ~ ,~I~; I I ' I I f.F.E. = 27L.O 7 ~ I ~ 12' RCP WITH WEEPING LpvE ! ~ ~ 25 243.78 FES ~ I 27 ~ I i , I ' ' ; I ; i , ,'i;, I i i ~ 271.6 i / ~ / , -~6F_'~,S$ I I , ; I 1 271.92 O fj!~ ~ • 12' RCP ` ~ ~ y. 25A 2' 247.3 242.33 249.8 JB ; I ~ ' I • ' ~ ' ~ ' ~ ( ) \ °,~,i I ~ Q / 272.0 I;,`. 1; V J ..i . ~ ' ~:42• RCP r ~ °T~ ' ~ 1 ~ 25A-25 12' RCP ss osr. , ~ I I ~ ! + ~ ~ ' v2.o ~ ~ I , i I ~ ~ ~ ~ ~ ) L` f~ ~ 1 % ~ 258 242.00 PIPE END ~ 24 ~ ' } ~ ~ , I , . , ~ , ~ , / ~:F1~ -i--~/- . i ~ ~ ~.,i ~ i / ~ NEW CL. B EROSION 25C 242.00 250.31 (TS) RTWI ~ ~ ' , I ' ~ ~ ~ ~ u ' , , ; : i N CL B EROSION , , " _ _ ~ ~ I I ~ ~ _ > ~ ~ t ,CONTROL STONE APRON ~ ~ i 25C-25 42' RCP 31 O.SX ~ I ! ~ ~ ~ 27 .D ! ~ 1 1 , ~ , ' ' CO TROL STONE APRON j _ ~/~i ~ V V~ MIN. 20'Lx7.5'Wx22fiH tt,f (MI . 32Lx12'Wx22"TH) :a'i i ON GEOTEXTILE FABRIC 25D 241.85 ENDWALL ~ ~ ~ + 'I 2 1. ~ ~ ~ ~ , . I ' ' ' i ~ . . ' 1 ~ I i i 4 ' ; I ' ' ! ~ ON GEOTEXTILE FABRIC © ; `,i' 1 ~ I 26 (15')279.06 278.86 296.01 JB/MH ~ • ~ i I ~ ~ ~ ' ~ ; ~ ; , ' ~ ~ ~ .I. I I ~ i ~ - ~ ~ ,PROPOSED ~ ~ ~ ~ • , , ~ ~ ; , ~ ~ N - °J BERM 250.8 Q (2)2 950 ~ ; 'I• ~ 271.7 272.0 ~ / 1~:.:-, i I ~ j yowET POND d ~ ~ ~ ~ ~ 7 ~ - - . - a W.E. 24Z. ~ \ r l i 27 .p 27 280.30 288.3f RTCB 1 ~ ~ ~ I " •o i , R •P' ~ - ~ ~ Z 1~ ~I I 72.0 ; I, 6-27A 42" R P 172 2.OX + VP 4ii h ! ~ 2 C 1 ~ 2 .2 ti ~ i; ' 272 + } I, - 272.00. ~ ~ ?~ir•f' ~ _ i \ ,NEW RETAINING WALL i J r •272'0'- ao i"` ` ~ i . 272.0 - _ 4 ~ ~ TOP OF WALL VARIES . D 27-27A 15" RCP 23 10.07. ~ G ~ ~ ~ p GUY ~ ~ ~ ~ 271.Tb I 271.75 ~ ~ - _ - ~ , 27A (26) 275.42 271.40 283:Of CB ~ ' _ , c, , - - ro 272.0 272.Q 1 _ r , ` i 271.7 ~ ~ ~ i ~ .~"2yC- ~ i I~~•o'~ ~ . • (27) 278.00 ~ , ' ~ ~ ` ~ ~ ~ ~ to Z f' 6 OC 1 4 83.01 RTCB ~ ~ r-•.,,v, ( ~ ~ 27~.8~- .271.85 I' ~.--,-y--.~ 28 27 .2 2 ~ -f MlN ~ ' 7 f - I . ~ ~ 19 71.75 PI ~ 1 i a 2 14 ? 261.1 15" - ~ 29 275.93 279.7t(TC) CI 7 ~ ~ ~ - ' / , ' ` D IN (TYP,) 271.7 ' ~ ' • r r ~ 6 c U d 271.75 27.75 ' •'I I ~ ~~263.J 263.3 / \ S W W Z Wa 29-30 15' RCP 53 1.OX 1 \ : , ti ~ 46 RCP 1 n l~E 262.8 r k ` _ ~ r~ - 2 9m 30 275.40 275.20 279.8f (TC) CI ~ , , ~ " ~ - - - - 1 ~ _ - ~ 271-8 - ,.-~~•J_ 27o.a ~ `rr s ez. ~ ~ 0 OW t ~8" RCP 63.5 ~ . ~ ~ Q ~m 1 , oW - (D 30-31 15' RCP 24 1.OX _ ~ - = _ - ~ - _ - ~ ~tpp - ~ .270.3 ~ ~ _ _ - - .~E I' W - ~ U ~ a. 770.22 ~ , +r 262.75 . •263.5 ~ Z e ~ 1 ' - -'RROPOSED , ' 262.8 V - f3: 31 274.96 274.76 285.St(APRON) RTCB ; ~ a P r l - N.. . I , 270.22 `f~ 265.0 - RETNL ~ U 26 5 ~ '°o, Z ~ ~ W A ~ ~ ~ a ~e 0 t - . PROPOSED' . _ . ~ ~ , " lLl Z } W 1-32 15' RCP 66 4.4X - ~ A 3 ~ _ a ~ " ~ ~ o . s s FFE 263.5 - - ~ ~ W J a ~ ~ r ~ ~ ° 4 . RCP ~ „ OFFICE." ~ - - a m W W 32 271.86 271.66 275.8t(TC) CI _ - _ ~ ~ a ~ ~ ~ i r a _ 15' RCP _ ~ • ~ ' _ 1 36 ~ ® ~ ~'0 3 W ~ , ~ ; g, a ~ =263.5 ~ ~ ~ ~ ~ _ ~ P ~ ~ • RCR ~ ,j• r 263.5 ` ~ ~ ~ 3 J LU -J 27A 33 48' RCP 128 2.OX . ~ _ - ~ ~ i R 263.6 ~ m W l • 1 r ~ 262.84 ~ - 1 1 ~ ~ . ~ ~ ~ - ~ ~ LIJ C< 28-33 15' RCP 60 4.OX - _ = J : lP - ~ ~ ~ _ _ ~ , ~ - ~ } J. + ~ i ~ ~ ~ 41 ~ ' ~ 262.86 i~ ~ \ , o i ~ 62.68 _ - ~ Z . 32-33 18' RCP 146 1.OX ~ ,1_ - 262.6 I 1 1 - - W 33 (27A)268.84 268.64 275.8t(TC) CI - ~ ~ g,5 % , i 'r ~ 1 ' 262.84 ~ : 1 ' 262.84 ' 3 i . Z 48" FCP 6~' I _ L 3 ~ (28} 268.84 - 5 RCP " _ 32 2/0.20 f? - ~ _ - _ _ - 1 ~ ' ' f.. - - ~ ~-262.48 I I ' ~ ~ I 262 48 ~ - ~ ~ MI ~ - ?4• K ~ ~ ~ ~ RCPT I ~ j 1 ! ~ CP~ - 15' RCP , ~ 262.84 ~ ~ Q II - . - y ' - _ - - - - _ i ~ , - ~ V u_ x ~ o 34 266.63 270.5t(TC) CI I L - _ - _ as _ _ ~ ~ ~ • 260.98 1 - ,4 a 33-35 48' RCP 263 2.59. ` 2FiR.1 . , ~ • 4' ~ 15 ~ r' I M ~ ' r~, 2 O _ 61..Y 34-35 15' RCP 123 2.5X , , - _ _ - " - ~ - - - - 9iV - - I 1 ~ ~ i 4 l/ ~ , 40 21 35 (33) 262.07 260.28 268.6t(TC) DBL CI ` f ^ - - p~ _ - - - , r. % fj ~ ~ ' E (34) 263.85 ~ 4 II a si !s - - ~ ~ 15' RCP ~ - ~ ' 1 ~ '.•I ~ ~ ~ 35-36 48 RCP 18 1.2X ~ i ~ ~I r~ ~ ~ i ~ I r l i 36 260.06 259.90 268.6t(TC) DBL CI _ ~ - Q ~ ~ ~ NEW RETAINING W ~ ~ ~ ~ r i'I ' 1 ' i. ! ' w ~ ~ ; ~ , 36-37 48' RCP 245 1.2X ~ _ _ _ TOP OF WALL IE _ - ~ , 37 256.92 256.72 268.9t(TC) DBL CI BENCH MARK ~~~'a I ~ ~ ~ i ~ ~ ~ , r FlR H RANT \ I ~ ~ ~ Iii _ _ ! - ~c , 37-38 54' RCP 130 1.OX E YD ~ _ _ ! i ~ ~v ~ ~o ~ i ~ i a ~I ~ , TOP PAINTED FLANGE BOLT \ ` - _ ~ ~ _ - - - ~ . 38 255.42 (39) 255.22 268.31 JB/MH ELEV-297.53 ~ ~ - r- _ - ' 1 ~ + 42 255.22 SPUTTER (NEW BENCHMARK WILL NEED o \ - _ ~ oq ~ ~ , y74,7:: _ _ ~ ( ) ( ) TO BE ESTABLISHED) yq4 - _ ~ - 275.7 - 1 - _ - , 38-39 48' RCP 75 S.OX - _ ~ _ _ _ - ~ ~ 39 251.47 247.87 266.31 JB 5'X5' ~ - _ _ - 1 ~ ii I ~ ~ ~ ~ - y r r 39-40 48' RCP 47 1.07. - / - - ' _ I ' ~ ~ `273.5 ~-"e 40 247.40 ENDWALL 41 260.96 265.2±(TC) DBL CI a s 8.0% _ ' 38-42 48' RCP 64 1.0% .274. 2 9 - - } i 4 RCP 41-42 18" RCP 129 3.0% 1 \ \ 15' RCP _ i 269.4 267.3 263.1 47± JB MH 15' RCP 42 (38) 254.58 25.38 268 / _ 41 257.09 s > • a > - - REVISIONS BY 12 Y -43 48" RCP 32 1.0% - - 42 • • A w APR LW V 8KO 43 254.06 253.86 269.4±(TC) CI i . • ' - - - _ ~-OM D 18' RCP (DE" CIM SKO 1 s 76,8 24' RCP n n 43-44 48" RCP 105 1.0% - 76.34 0 15' RCP . 06 JIM 2005 66.34 00 44 252.81 252.61 270.3± MH QpW mWQ REVEWI ttt aww 44-45 48' RCP 105 1.0% 6.1 274 2 i 270.5 to - - 264.8 / _ fl JUN 2005 - P ~ - - ~ 1(F. n I 2 1.46 I ~ 265.4 15' RC 3 _ t p 4 (90% CD) DLH 45 251.56 251.36 268.5±(TC) CI - 8 C- 270.92 270.4 s 267.0 DLH 45-46 48' RCP 100 1.0% a ; 1 0~ 12"X12" PRE--FABRIC 2" PRE--FABRICATED - .277.0 - i I I 21 AL 2005 1 tr t l o 46 250.36 250-16 268.8±(TC) CI REFER TO SHEET C-8.5 PVC-AREA DRAIN Vk=l ~ RAIN I 271.04 15' RCP QPW 1REA D _ t l o i ~ II fq3w$} ~ q OPw FOR IMPROVEMENTS IN TOP=2'76:8 a0 47 262.43 265.9±(TC) Cl NEW HOPE ROAD INV=274.8 276:8 276.84 70.7 - ° 15' RCP t i !74.8 _ - 1, r 49 266.48 283.0± CB M p a ~ 277.0 I 2 .34 271.56 271.06 ( I 267 is v 49-50 24" RCP 52 .0% i j NEW RETA N1NP WALL •TOP_OF WALL VARIES _ ~zec- 6\ 27 .98 265.98, - l 50 264.92 264,72 269.5±(TC) DBL Cl Z 1 _ I m 70.9 ~ PROPOSED Q. 51 268.00 272.0±(TC) Cl ~ - _ . _ 1 , ~ _ e RETAIL _ NEW RETAINING .WALL ~ 50-52 30' RCP 97 TRACT ID ' 1.07. - - - ~ - ! - - - - ~--zea-~ Q - ..SIGN " " - - T00 -Of WALL VARIES RETAINING .WALL - 277.0 FPE - 271.7 2 0.0 h ' 'PROPOS WALL VARIES 270. 271.56 271.06 2 .5 a I 266.34 PROPOSED; 8' PVC 0 )F I T0P-276.8 RETAIL 5.7 266. 4 w 51-52 15" RCP 25 9.0% RtaniL : 1% MIN I i FFE - 277.0 I FFE - 267.0' , 52 (50) 263.75 263.55 270.4±(TC) Cl 8 8 ,.PVC: 0 t.0•% -MIN. 'C 0 t:o-% -MIN. 0P=276.84 I (51) 265.75ppu V •w 8' PVC \ ® -1-.09. MIN. 27 w 'C.® -1-.09. MIN. - %or 266.84 U 52-53 30" RCP 120 1.0% - r ` ` - - - - • RC w 6' PVC 0 267.0 5.0% MAX. , e I 1% MIN 8 266.58 SLOPE 6 i 53 262.35 262.15 269.81(TC) Cl 3 8 79.1 - - - - - 3 54 266.80 270.8±(TC) Cl v 9 pp P MH PP UGFOC _ PP OHPkPH P P DRAWN • 54A 278.00 281.5± Cs pp I - N 53-55 30" RCP 155 1.07. ! on-on -0 A CFECKED - -----x - a w w w w w wp r w--w w y 54-55 15" RCP 93 5.07. w w w w w w w w w~~ w w -_____~--_H -55 15" RCP 155 10.0% a U'GFOCM~ 4 gOUTHERN BELL 54A 1 F18ER OPTIC CABLE MARKER ! NOSE: DO NOT EXCEED 2% SLOPE, , I UGFOCMJ ~ DATE ILE MARKER EACH WAY ACROSS HANDICAP ! 55 (53) 260.60 260.40 270.4±(TC) Cl - ra 3 0 PARKING SPACES NORTH 31 MAR 2005 Id z U (54) 262.15 - ' s ~ SCALE c -UGGL Q7 (54A)262.50 1 - - _ ~ TV x 1 •80' 0 56 262.53 266.3± TC Cl -------Z(A 0 60 120 180 ,pg No. 55-57 36" RCP 239 1.07. a 1 a / 56-57 15' RCP 80 5.0% yA~ ~ REFER TO' SHEET C-8.3 AND RBPCW r 3 ~ EW' BERN' AVE. ,(U. S. HIGHW U 57 (55) 258.01 257.81 269.3±(TC) CI o S. HIGHW, Y 64), 8.4 FOR IMPROVEMENTS IN SHEET NEW BERN AVENUE SCALE IN FEET i 11 m (56) 258.53 s a PP PP D: 57-58 36" RCP 99 1.0% / I a DD Pp,- I U N GRADING PLAN. 0 L_ C OF SHEETS 's L~ f 6 7 g g 4 5 3 1 2 5 \ \ \ ~ ~ y \ i ; ~ RAL NOTES GENE \ t\ \ ~ ~ \ ~ \ 1. ALL MATERU~LS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE \ ' ~ / ' , WITH CITY OF RALEIGH AND THE STATE OF NORTH CAROLINA STANDARDS AND ' I ~ \ ~ \ \ SPECIFICATIONS. ~ \ \ _ \ ~ ~ \ r.~~ 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (1-800-632-4949) ' - 1, 1 ~ LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. \ _ GRAVEL AND RIP RAP 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING A UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS , c i l', .I MPORARY i ~ , 'i ~ a~ ~ ~ FILTER BASIN ~5 j 'o I \ PRIOR TO BEGINNING CONSTRUCTION. ! ! I \ ~ 1 j ` i \ i I ~ ,A ~ ~ A - ~ / Y REFER TO SHEET C-8.1 AND ~ INST SILT FENCE ' Cb CT~2 S ROVIDE \ ~ ,CRAVEC\ D RIP~•RAf? ~ NEW SILT FENCE WITH ~ \ SILT FENCE AthDITI NAL SONS U IONS, ENTRAN S / ' ~ ~ ~ / ? \ ~ TREE PROTECTION SIGNAGE , 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY 8 GRAVEL ~ RIPRAP HORSESHOE R BASIN 2 8.2 FOR IMPROVEMENTS IN , _ _ACROS PIPE ONCE KEN CLOSE, INC. GRAVEL do RIPRAP FlITE ~ FlLTER BASIN ~3 OS PIPE ONCE AS CO PORATION PAR AY',IS ' FlL~tER N ~4 ~ / ~ , I INSTALLED AND ` ~ ' (TYPICAL) 1 ~ \ A D AREA ~ 2.4 AC CORPORATION PARKWAY PIPE I INSTALLED ~ ~;DISTURBE DISTURBED AREA = .92 AC BACKFl BEGINS COMP D AND EXIST. \ ~ ~ti ~ - ~ i / \ KFI BEGINS RNE IS MOtlED AS \ ~ / ~ / CRbSS-1~CCES9, 0 ~ ~ ~ ~ ~ o 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. ~ ~..pRAINAGE AREA ~ 2.4 AC DRAJNAGE AREA = .92 AC MIN, VOL. = 2.4(1815) ~ 4,368 CF ~ MIN. VOL. _.92(1815} = 1,670 CF t ; ' R UIRED`TO PREVENT~MU AND~~ ~ ~ - -1 \ ~ / NEW TEMPORARY GRAVEL \ A J ~ EO ~ \ / ~ ~ r ~ ~ FUSE 2Tx 54'x 3' DEEP PIT ~ i ~ ~ USE 1Tx 34'x 3' DEEP PIT ~ ~ ~ DEBRIS FROM BEING DEPr~S ON \ ; r \ \ ~ ' ~ CONSTRUCTION ENTRANCE ~ r / \ n j THE PUBLIC' STRElrT. \ Z , - ~ ~ I~ ~ (BEGIN AT EDGE OF EXIST. / ' \ \ ~ \ ~ BERM ELEVATION = 288.0 _ - _ _ _ _ _ _ _BERM ELEVATION = 264.5 ~ ; 1 ' ~ ~ \ 1 ENT) ~ ' s \ ~y r \ ;G CK DAM, ----------.+v_ _ ~1, i 1 _ ~ i , f ~ ..~e~ - A ~ ~ j ~ ~ ~ ~ / \ \ ~ / ~ _ J ~ _ _ , 1 ~ FEN ONCE' ~ _ _ _ - _ _ _ ~ _ _ _ _ ' ~ , - ~ ; - ; - 1 _ - - ' ~ ~ , u ~ ~ r _ r^ ' 260 / / ' ~ ~ m \ DITCH 15 REMOVE - . - - - ~ - - - - - ~ _ , . - _ ~ ~ _ ~ ss ~ N Q. _ - ~ _ _ - _ , L ~ 1 i _ ~ / ~ I I T \ ~ 4 ~ ~ _ 1 ; 1 r r ~ 1 . r• a'r i~~ "~6 ' I: r ~ / ~ r . r• o , ~ ~ r ~ ~ ~ i X .I ~ , I ~ ~ • ~ A , ~ ~ II ~ 290...~~,\~ 260 X15' RCIZ I ~ "Rrw 1 ~ . ~ .1 • , = . a ~ CONSTRUCTION SE UENCE r ~ ~ 1 _ . , f ~ I T NCE WITH TREE I ' _ (tCP ' ~ - ® i ' ~ - .L ' NEW SIL FE ~ ~ - ~ \ ~ ~ j I ~ - > r i__ ~ , 1. INSTALL TREE PROTECTION FENCE AND SILT FENCE WITH TREE PROTECTION ~ as - ~ ~ ~ F R N- IT IN P TIN Y NIN IN P TOR. ~ b as r , _ , ~ ~ ~ \ SIGNAGE. CALL 0 0 S E SEC 0 B ZO G SEC PROTECTION SIGNAGE ~ ~ ' ' ° l _ _ ~ ~ V ` , ~ ~ ~ . ~ ~ ~ ~ "I RGP ~ . , ~ ~ - ~ 5 ~r I _ EYI TEMPORAL ~ \ 2. IF APPROVED, OBTAIN GRADING PERMft. -`A€IN TEMPORARY R6CK ~ ~ NEW CL. B EROSION r j ~ ! 4' CHECK DAM 15 r \ i + CHECK DAM ~ ~ ~ ~ ,j' ~ ! `CONTROL STONE APRON _ ' ` ' ~ ~ ~ ' 1 l \ IN. 32'Lx12'Wx22"TH 3. INSTALL INITIAL EROSION CONTROL MEASURES INCLUDING GRAVEL CONST. ~ ~ ~ ~ ~ .1 'IRAN i ' 7 /'f ~~-~Y..~. ~ \ , / , , ~ r ~ ) ENTRANCES, GRAVEL AND RIP-RAP FILTER BASIN ~1,~2,{(R3,~4 AND ~'5 _ ? ON''GEOTEXTILE FABRIC RISER BASIN 6, 7 AND 8, ROCK CHECK DAM, INLET PROTECTION " , r ~ ~ _ ~ / ~ , \ ~ - SEDIMENT PIT, SILT FENCE AND TEMPORARY DNERSION SWALES. INSTALL ~ - ~ , / RISER BASIN FILTETt ~fi PERMANENT STORM DRAINAGE AS SHOWN ON DETAIL AT RISER BASIN ~6, ~1 ~ / ~ 7 AND 8. ~ f \ 1. ;'~,I a 1 J, \ (REFER TO DETAIL FOR IY ill / ~ ELEVATIONS ON DWG. \ - 7 ~ ~ ~ i / ~ r 'I 6 ~ ~ ~ ' " - ` ~ ~ ~ + , 4. CALL 890-3453 FOR ON-SITE INSPECTION BY CONSERVATION INSPECTOR. I_~. 1 \ IF APPROVED, BEGIN CLEARING AND GRUBBING. ~ I , ' b ~ ~ 1 - 1 ~ \ - - I - 1 I ____J \ ~ ~ ~ o - \ ~ ` ` ' `~a . , ~ ~ / ~ , ~ I _ _ f , ; ~ 42 RCP . ~ ' WO FLOOD HAZARD SOILS 5. MAINTAIN DEVICES AS NEEDED. GRADE SffE. INSTALL STORM DRANAGE AS / _ _ , 1, I III r f ~ _I I b _ ~ ~ ~ ~ \ BM 1988, PG 1363 SfTE IS BROUGHT UP TO GRADE. PROVIDE INLET PROTECTION AS SHOWN Iy ' ~ ` \ RT RMWA T PR I RM- ~ ` ~ ~ , \ TYP. EA SIDE ON THE PLAN. DNE STO TER 0 OTECTED NLETS. NO STO 1 \ i l ~ ~ I ` t p . ~ ~ , ~ - ~ ~ \ 48• RCP ' \ ~ \ ~ ( ) WATER SHALL BE ALLOWED TO PASS FROM INLET ~ 38 TO INLET ~ 39 ` ~ - - ~ \ UNTIL ALL UP STREAM AREAS ARE STABIUZED AND SEDIMENT PIT AT . ~ _ ~ \ ~ RISER 6 HAS BEEN APPROVED FOR REMOVAL. PROVIDE SOUR WATER- GRAVEL ~ RIPRAP FILTER \BASIN ~ 1 ; { ! ~ ' ~ ~ ~ I 1 I ~ . a ~ ~ 61 - 1 \ ~ f. TIGHT LATE AT INLET ~ 38 SO THAT NO FLOW IS ALLOWED TO GO TO \ n ~ p , ~ INLET ~ 39. FILTER BASIN ~1,#2, AND ~`3 AND RISER BASIN {~8 SHALL STURBED AREA = 1.25 AC , { I ! I ~ ,i ' ' l ~ ; ( ' ` , D. NAGE (AREA ~ 4.19 AC . ' { I I I ~ A ~ ~ I tl NEW TEMPORARY (DIVERSION , RSION p • ' ~ ~ \ t \ ~ BE REMOVED ONCE ALL STORMWATER IS DIRECTED TO RISER BASIN ~6 _ 1 I r - _ , ~ I MdJ. VOL. ~ 1.25(1815) - 2,269 CF ~ l ~'I ~ j; l'•. J SWALE. ADJUST OCATION AS , 'ION AS ~ i A 'ti 36' RCP V ' o ~ AND {(17. ~ ' 9'x 4b'x 3' ` EEP PIT I ~ ~ ~ ~ ~ ' ' I ~ ( ~ . ti REQUIRED AS S E IS ; ' ~ ~ ~ USE 1 D ! ~ I , I _ j ~ I ' P GRADE BERM ELEVATION ='.284.0 ~ I ~ ' ~ \ ` ~ ~ . i ; , ; I A ~ ~ I BROUGHT U j ~ \ ' ~ , 60' RCP ' ' ~ ~ ~ 6. BEGIN BUILDING CONSTRUCTION. / , i , . I , l \ ' f I', I r ' ~ 1 ~ ~ - i l~ ' ' ,NEW CL. B EROSION ~ ~ ~ ~ ~ 7. STABILIZE SRE AS AREAS ARE BROUGHT UP TO FINISHED GRADE WITH ~ ~ CARO(~ •y~ ~ ~ _ ' ; I , ~ ! I ~ , j ~Nj , A i A i ~ , ~ \ CONTROL STONE APRON VEGETATION, PAVING, ETC. Nq ~ r ~ ~ ~ ~ ~ ' I ' , ! ` ~ NEW SILT] FENCE W TREE ~TEMPORAf~I' DIVERSION ~ ' ~ ~ I ~ I ' ' ~ , ~ ~ ~ ~ I--- ~ ~ 1 ; 1 - - ~ " ` I ' ~ PROTECT(@N SIGNAGE TYP \ ' BERM: 249.0 I \ MIN. 40'Lx15'Wx22•TH} E$$ TREE ~ 1 . - ~ ( F H TYp `,1 \ \ ON GEOTEXTILE FABRIC 8. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABIUZED f. ) f.) \ _ ~ \ - \ ~ ~ \ ~ - , , \ COMPLETELY, CALL FOR INSPECTION BY CONSERVATION INSPECTOR. i ,i ~ ~ TEMPO Y~'GRAVEL ~ ~ i ~ ~ I I ~ ; 8• DI IF IS APPROVED REMOVE TEMPORARY ER SION ONTR MEASURES ~ ~ N CTION ENTRANCE ~ I ~ i i ~F ~ 1 i ' ' ~ ' . 1 \ CO ~ , ~ ~ , ' ' REMAIN ~ ~ ~ , ~ ~ ~ ~ ~XIST. DRIVE 0 \ i ; i r ~ 9 SITE 0 C OL y UN \ ~ ~ ~ 1 AND SEED OUT OR PAVE ANY BARE AREAS. ALL SEDIMENT SHALL BE L P TI N ~ i~ I I , i ~ ~ - _ _ ~ ( ~ ~ ~NTIL COR 0 0 \ ,cS- i' / I ~ 1 i ARKWAY ~EN TO SERVE ~ / /'•r• • ~ ~ ~ REMOVED FROM THE WET PONDS AND THEY SHALL BE GRADED AS SHOWN \C~~•' SERVE ~ ~ , ` , AND SEEDED. ONCE SITE IS STABILIZED ANO EROSION CONTROL MEASURES p. EN • ~ I ~ t ~ , 1 cn , , ' ~ / ,ADJACE PRO ~ \ , ~ ~ ~ , ~ ~ ~ • " ~ ARE APPROVED TO BE REMOVED THE SOUD PLATE SHALL BE REMOVED. ~ J 1 ; , t 1 S 7 i I ' THE FINAL ORIFICE PLATE SHALL BE INSTALLED IN STORM BOX yy38 ON ? / c r 1 . ~ R ~ ~ ~ ~ I ' I.. I ~ _ - • ;.•r ;i:• OUTLET TO STORM BOX 42 SO THAT STORMWATER OUTLETS TO WET ~ -N CL. B EROSION POND 2 AND EXISTING STREAM. / •~o' 4• EW i~ ~ I I ~ i i • ~ J J • CONTROLS NE APRON ~ 15' RCP ~~I 1 ~ ~ ~ ~ ~ I I A I T ~ I , _ ~ OSED ~ I / ~ ~ ~ ' ' (MIN. 21'Lx12 x227H) 10. WHEN VEGETATION HAS BECOME ESTABUSHEO, CALL FOR FINAL INSPECTION a ~ ~ % ~ UN GEOTEXTI FABRIC BY CONSERVATION INSPECTOR. ~ ~ \ I I ~ ~ I ; , I . ~ ; ~ ' ' 'I~ p,~,~~,,,a WAL-~IART NEW CL B EROSION ' - A`II `d ~ ~ \ '1' SUPERCENTER NTROL STONE APR ~L. B EROSION - ~ i ~ ~ ~ \ ~ ~ ~ i ~ , REMOVE CO ~ I ~ I , m j ; I I - ~ FFE =2'72.0 MIN. 20'Lx7.5'Wx22" tOL STONE APRON ,,o ~ • f ~ 1 TOTAL DISTURBED AREA: 38.8 AC t 20'Lx7.5'Wx22"fH) ~ • ~ ~ ~ ` , I ' 1 I ~ , ~ N GEOTEXTILE FABR 1 ~ A 1 li ~ f i ! ~ I!,~ ~ , O I` ~ I ~ . EOTEXTILE FABRIC i ` , ~ ~ 1~~ ~ / .^.;~,.y. P ~ ra NEUSE BASIN NOTE . I. ~ I~ ~ ~ ~~v PROVIDE BLOCK AND G L ~ ~ ; ! I' . , ~ ~ ` r , N TEMPORARY ~IVE. P RAR RSION / 42 RC 1 ~ ~ o- fEM 0 Y ~NE ; + ~ 4 »1~~9 FR M ~ ~ • pl ~ THIS PROPERTY IS VESTED 0 THE ` ~ ~ ~ INLET PROTECTION FOR L " I I ~ ~ ~ i~ I I ' ~ A ~ SW .ADJUST LdCAI I ~ ~ ~ ~ INLETS UNDER CONSTRUC, ION ~ REQ (RED AS SITE IS , iAll II - II I , . ADJUST CATION AS r'~ . - Ld / ~ ' ' , - / RISER BASIN FILTER 7 REQUIREMENTS OF THE NEUSE BUFFER RED AS SITE IS + ' ~ / ` ~ ~ ' ~o' ~ ~i' I.; ~ ! ~ 1 ~ BRO HT UP TO GRA t A I , i I, , ~ ,HT UP TO GRADE I ~ Q ~ • iy' ~ ~ i ~ \ a° (REFER TO DETAL FOR RULES AS INDICATED IN THE VESTED ~ ro c NR ~ ~ ELEVATIONS ON DWG. RIGHTS LETTER FROM NCDE DATED ' I I i t ~ ~ ii 'l I L~A ~ ~ I / ~ I ~ , { ~ ~ r ~ + ' ' \ ` ~ RUARY 14 2003. ~ ~ rArar e+s~'+ ' 1 I ' ' ~ t ~ ! ; ~ , ~ - DO NO DISTURB' STR DISTURB STREAM K ; / ~ ~ , 1iJ.4t A I 111 ~ ~ ~ 1 1 ~ I ` I. ~ ~ ~ ~ ~v n+ zee.>ar ~ % ~ 1 ! + ~ I ! i ~ , ~ I A , AREA P T THIS POIN P T THIS POINT ~ •'~,i'" ~ ~ ~ . , , \ , r - J,. ~ ~ . 1 „ ~ I 1 ~ I I!' % ~ i ~ i. I rd l j ~ , I, I t. A ',j 1 {'i, I 'A, I ~ NEW CL B EROSION ~ ~ ! I 1 ~ I - ~ - ~ ' " ! II ~ ( ROL STONE APRdIy - ~ ~ ' \ FlNANCIALLY RESPONSIBLE PERSON AGENT 1 v I I I I 64NT ; 1 ~ ~ i ' . ~ 1 ' ' I (MIN. 32'Lxt2 Wx22"TH) ) - % ~ PP _ ~ A.' I,j ~ ~ ~ 7 . ' ` i I ~ ON G~OTEXTiLE FABRIC .A ~ .J g ~ ~ ~ ~ GUY / + ~ ~ ~ , ~ ~ I I ~ ~ ' ' ' / + / 4 h I invent control i sue ri rin I n - ' in ivi . 1 , 1 ~Sl • . v ; ~ , ,I o, , ~ 1. Peroon to contact s ou d aed s s a se du q a d disturb g oct ty N ~ zD,.~ P IV T A ESS EASEME 1 ~ ~ - a+ za~.as R A,E CC _ ,NT ~ ^ ~ I our zea.as _ 2 r---1-A-.1 t ~ ; + r j..r / ~ re 4_ ~ ~•••I{ ~ ~ " Name: GUY SCOGGIN Telephone: 865-522-7785 ~ M / li ~ eQa+DB 4425 P~G~ 499 a ~ A. ~ ~ ~ ~ tN our z DB 4365, PG 639 ~ ~ 1 '~~`i,, t ' / , i ~ , i i~ ~ c ~ 1 1 ~ .r 6 i - \ ~ Z ~ a ~ - Q Q 77 296 A t ~ 1 ~ ~ ~ D 96, . ~ ~ ~ % \ ~ . 6 '•'15• 2. Peroon s firm s financial res onsible for the ksnd-disturbin octivi W a~ ~ ~ O O IY P 9 tY 0 ® ; 't BM~19813, PG 1509 _ ~ .r; . -j. ~ ~ ~ I ~ - ~ , ~ 4. ~ ~ RCP 1 ` " COMMONWEALTH NEW BERN PARTNERS LLP ~ Z 1 - ~ W W _ ~ J"~ , ~ Name of Peroon (s) Firm (s) • ~ ~ ~ / ' ~8' RCP ~ , ~ ! W L ~ O ti 1 - - _ _ ~ ~ ~ vii ~ - ~ P 4 - 1 / 500 HENLEY STREET, SUITE 200 -SAME- W ~ I, ~ _ - - ~AII ~1 , . ~ , ~ ~ • \ Moiling Address Street Address V Z M , v, ~ LL ~ i _ ~c~ •263.0 _ PROF'0$ED- - . ~ Z (r ~ W ~ ` o ROP ,fir . ~ - KNOXVILLE TN 37902 -SAME- ~ VJ W JZ I ~ OFI'ICE, I I ~ FFE . 4 ~ Cit State Zi Cit State Zi m ' u~ ~ ~ . ~ { / ~ 15' RCP ~ : f._ ~ _ ~ ~SYV t -r. ~ ' 1 ~ Q ; 263.0 Y P Y P a W , ~ Z > ~ - I~ ~ I / ~ ' ' ~ m WJ - - \ V) t. 1 ; ~ ~ ~ _ , A ' 3. Appointed Agent to receive orry notices, process, or pleading m any action or legal W ~ O 1 _ _ - .t _ ~ i NEW, TEMPORARY G Vf~- I ' 1 ! J r C-J C=~ C=] t_] _ proceeding analog out of any mutter relating to Raleigh Cdy Code Chapter 5 Port 10. I - ' - s _ ~ ~ ~ CONST UCTION E p' ! ' ~ i ~ ~ ~G , p' I e . l it I' + s I A W , I - ~ - - i 1 - -1-- - p ~ , - 4E' RCP y j1 - _ _ AI ELIZABETH W. VOLTZ _ Z 111 ,I - - ` t s ~ , 1; Nome of Individual Si na ure of nt ~ ! i ~ I • r rl . 23 y4• CP' ~ 15' RCP \ ~ 9 ~ W ~ ~ - I i ` - - _ - _ I 1 II ~ ~ ~ ~ i / ~ ~ Jjll ( ~~o ~ , ~ ; ~ I ~ ~ ~ KILPATRICK STACKTON, LLP 919-420-1700 ~ V ' ! 1 II. x - - ti / / ~ ~ f ,f (J/ ~ pc, ~ e 15' RCP I Place of Business inside the City of Raleigh Business Telphone ~ o Q I - 1 ~ I 290 ~ 1 t /I SER IN' 8 -1 / ~ : r- - sr - ; ~ 3737 GLENWOOD AVE, SUITE 400 RALEIGH, NC 27612 ~ f :R IN' /8 %f ~ ~ so ~ > > - > - > - > Address 6ER T ETAIL F~'. - ~ ~ ( 6E ~+L ~ ~ i i _ EL~EVATI,ONS DW ~ ' ~ D VATtoNs . DWG I ; ' ~ 15' RCP s / ~ - - - ~ 1 ~ : ~ / ~ ' / C=3.2 ' _ ~ ~ ~ , , C=3.2),' i NEW MPORARY DPV~RSION Complete the above and adhere to cover sheet of erosion control pions. This does not ~ , - . ~ i 1 ~ / lh / i J ~ ~ ~ " take the ace of a cum ete financial res nsibili form. A cum leted form must be l ; ~ / SW .ADJUST l6CATI0N AS i a ~ p° P } l f i / filed with the Raleigh Inspections Deportment prior to issuance of permit. ~ - REr UIRED AS $ffE IS _ ~ - ~ I - ~ r i ~ / / ~ c ~ 26`> OUGHT UP%TO F. ' , ' a ~1,~ ~I - - / / l r ~ ~ ~ l~ 1 r i ~ ~ I , f , BENCH MARK ~ oQ ~ ~ . ~ ~ ~ ~ FIRE HYDRANT ~ ~ ~ . ~ - - f l . t- ; ~ ~ ~ / , ` ry 24' RCP 'i ~ N I T CFJ '1iREE ~I ; ~ EW S L FEN , i ` - ~ PROTE~,''tION SIG ~ I \ ~ \ ~ J / / ~ TOP PAINTED FLANGE BOLT ~ , d ' ~ ~ - i ti ELEV 297.53 ~ / ''fH6SE OPO.SED ENTRANCES. ~ ~ _ • r J i' NEW BENCHMARK WILL NEED \ y ~ SSE AS ~ ~ - _ _ - - - / SURVFY LEGEND _ _ A J / 'l`am`' ~'O TO BE ESTABLISHED ~o ~ ` ` -£ONSTDD 'TI6N• - - - - - - ~ / - OHSUPL -0 HEAD SUPPORT LINE _ i, ) / I I i~ ~ , , SUS)-SUPPORT POLE ~ i ~ AT ANY OMT BUBING-- _ ' ~ ~ ~ ~ ~ - f ; - - ' / ~ 1G' - ~ ~ 1` - - - ~ CONSTf~U TION--• ~ ~ _ ~ ' i' ~ _ ~ . ! 1 ~ , ' ` WM -wA'TER METER - - , ~ ~ , , / r , - •~ti STTF~SFORfaEI~ / i PHBX -PHONE BOX ~ ) - t UGFOCM)-UNDERGROUND FIBER OPTIC CABLE MARKER NEW SILT FENCE ALONG ~ ' ~ . - - - ` - - = - ' - - _ _ . _ _ _ . _ ?I 1 r . I' ~ ~ UGPHM)-UNDERGROUND PHONE MARKER BACK OF EXISTING CURB i sl~ _ _ _ FES)-FLARED END SECTION r PHMH -PHONE MANHOLE I ~ FH)-FIRE HYDRANT cp 14 UGPHL)-UNDERGROUND PHONE LINE I r f 1 ` J 15' RCP n', ! WV)-WATER VALVE - . EOP -EDGE OF PAVEMENT Y CMP -CORRUGATED METAL PIPE REVISIONS B = I 18 RCP ` i . ! - - - - - 'I 4Q# ; - RCP -REINFORCED CONCRETE PIPE 21 JILL 2009 ' BC -BACK Of CURB 8K0 1 Z24. I PF -IRON PIPE FOUND IPERMITB 15' RCP 1 IPS -IRON PIPE SET _ I u RWMF -RIGHT OF WAY MONUMENT FOUND I 10 - ! OHPL -OVERHEAD POWER LINES ^ I I J 15* RCP ~ LP -LIGHT POLE 1 \ .RCP PROPOSED' I _ SP -SIGNAL POLE PROVIDE -BLACK do GRAVE~~' RCP ~s o RETAIL I e r OHSL)-OVERHEAD SIGNAL LINE ' el 2 1 INLET PROTECTION_,FO6 ALL - - - ~e FFE - 267.0' i OHPHL)-OVERHEAD PHONE LINES ,i i 16" RqP OHP&PHL)-OVERHEAD POWER AND PHONE LINES 1 REFER TO SHEET C-8.5 INIEiS. UNDER ' ! \ N q 270 i . I } I UGWL -UNDERGROUND WATER LINE FOR IMPROVEMENTS IN CONSTRUCTIO e - 4 NEW HOPE ROAD - \ G UGGL -UNDERGROUND GAS LINE ! ! GTV)-GAS TEST VALVE PROPOSED PRbPOSED i I 's a , HICS)-HOLE IN CONCRETE SET RETAIL I _ _ zeo FFE - 277.0 ` I - _ WAIL > I NSIC -NAIL SET IN CONCRETE I n - _ - FFE 267.0 ) 'rte-+?. ' _ _ ~ \4 I • 1 o r EOG)-EDGE Of GRAVEL _ PROPOSED v ' 1' J ~f RETAIL CLF)-CHAINUNK FENCE WPf)-WOOD PRIVACY FENCE 21 Pv FFE ¦ 271.7 PROPOSED \ 290- CIE PROPOSED; 6' PVC ON ROCK CHECK BW)-BARB WIRE RETAIL I" MIN DAM lWVMH)-WATER VALVE MANHOLE \ \ FFE 277,0 \ UO NOT USSE- THIS DRIVE FFE - 267.0 I j GP)-GATE POST - ' I 1 UGIB)-UNDERGROUND JUNCTION BOX I If S - - - - - - - \ AS'\CONSTRUCTION s - v . ® ® ! FINAL CONSTRUCTION a i SB -TRAFFIC SIGNAL BOX ENTRANCE ' . - \ RC ~ 6 PVC ENTRANCE LOCATION AFTER ) • RC Q 6" PVC m 7 EXISTING DRIVE IS REMOVED. ; 1% MIN j e _ e PHMH PP _ • i OHP&PHLp p ' p p PP DRAWN PIP Z r - _ pP o _ ' ` - _ 4rx OPW PHMH w w _ w IN w- - w - - w - - CHECKED w vP-w , - - - - w JDURPH o ~OUTHERN BELL \ TEMPORARY G VEL a I~GfOCM _j FIBER OPTIC CABLE MARKER CONSTRUCTION ENTRANCE •o } uc~FOC `1 DATE a y (BEGIN AT D0 . EDGE OF r F >h Jl~l 2009 IW% CD) NORTH a zd' PAVEME i J - SCALE - - _ _ _ r,W i NEW BLOCK &cc GRAVEL INLET REFER TO`, SHEET C-8.3 AND 0 60 120 180 JOB No. ~PROTECTI0N W ° EDIMENT PIT 8.4 FOR IMPROVEMENTS IN RBPCW b / VENUE •a, N 4 r~ re SERVES 0.55 AC. ))ISTURBED AREA NEW BERN A i !USE 13'x26'x3' EEP PIT SHEET SCALE IN FEET 3 pr- T PP EROSION CONTROL PLAN. C-3ml OF SHEETS 1 2 3 4 5 5 6 7 8 9 5 FT MIN- TOP ELEVATION OF STORMWATER ~ 1.5 FT YYIIdEASDMFlC1EDNTNEENIO~aER 0.5'-1' I 1800 CU FF/ACRE /57 WASHED ' STONE 1 ,*~l>:5: 12' MIN. S FT ~7 ~ STANDARD METAL POSTS 2'-0" M GROUND x)ND 1. USE FOR DRAN~IM'E AREAS NOT EXCEEDING S (FNE) ACRE . RESIGN OF SPILLWAYS ~ ATE 1 SLOPE rFL to a TwES GALVINIZED ~ DRAWIGE AREA WEIR LENGTH ~ ~ rr[s (ACRES) (F7) CLASS 1 RIP-RAP flITER FABRIC 2. EARTH BERM SHALL BE STABILRED w/ SEEDING HARDWARD WIRE AfxfNtDING TO TRIANGLE SPEgFICATTONS. FILTER EXTENDS TO m 1 4.0 I CROSS SECTION FABRIC TOP QF BOX 3. USE CLEAN f~MPACTOR FlLL MATERIAL FOR EARTH BERM. 2 6.0 ^ 3 8.0 CIGDE 4 10.0 5 12.0 I W A OVERFILL 6" DESIGN FOR SETTLEMENT i SETTLED i DIMENSIONS SHOWN ARE MINIMUM TOP 21' 1' FREEBOARD b MIN ~ EXISTING SLOPES ~ ~ Q w HEIGHT do WIDTH DETERMINED BY EXISTING TOPOC~tAPHY AND FRONT VIEW A 1.5 fT t0 FT MIN ~M b 1 ° ~ 2:1 SIDE SEDIMENT STORAGE REQUIRED. VARIES 5 FT ~ ° SLOPE MAX _ O MAX FILL ° ° ' 9~ ~ KEY RIP RAP MRO THE DAM A ' FOR STAETILIZATKNI. s1m FoST ° ~ O M1NE11 MRE FABRIC ~ FLTER od' ~ 1:1 SIDE SLOPE ' 0 "-'1 FABRIC ° MAX NATURAL o O . 6•-1' SLT FENCE OEOTEXTRE fABRIC ~ m ~ N 3 ~ GROUND ~ ~ ~ WE ~';i ~ KEYED RIP RAP -USE flT FEIICE ONIr MEN OFAWIGE AREA q MRJ ~ v ° 006 NOT E>I~ID T/t ACRE AIO YEYER N . Fu SLOPE ::~»::tin.. _:ti;•*+•'~'i' ::~n::0 AREAS a OONCB11114RD nAM ~ ~ • FOR IEIMdt a SLT > 4 ~i~d? € 1ETICE iARAR16, VSE ~ C CO"°'OCb p o. - -ENO a SILT faCE IEE06 10 K TIaIED anal. N°. r IEtiS1ED STONE W P r FOR ANCHOR MEN SRT Z MAINTENANCE . 57 WASHED STONE " oR~E a F1ld1ECRNG ~ FENCE o ~ ~PECr TEMP'ORANr tEO~Errt TRAPS AT1ER FACN PEnao a sas>cMrr RAwFAU. REMOrF stEnrlDlr AIn RESIOIK TRAP ro ns oRwnAL onENSaIa w+IEN TI1E >>E»r~Irt NAS AOgMM1ED TO ONE-IMIF TI[ DESKatI DEPTH a tNE mAr. PLACE 111E emwENr THAT ~ REMOVED M ~ 57 WASHED STONE PLACED TO A O - • S' YIN. OWER FRONT VIEW - A OESRi1N1ED DWP06Al AREA AND Rp1ACE THE CONTAM~MIED ?ART a TIE ORNfEI FACNG. HEIGHT OF 12'-18' MIN. ABOVE q o~ER sxwT - - REVISIONS pj M R SbNS CNECIf M tiRlICIIRR FOR OAWOC FIIOM [ROSgN 011 FLING. POAODIGLLY CNECI( 11[ OEPM a M lSLRAY TO 01lIAIE R S A IRNIIAf NS TOP OF BOX a 1.6 FT EtAw THE U)rl POfO a 11E EHANO~Nf• SRFLIIiE1Y Fu ANY SETTIEIIENT a THE E1iAN(IOR TO SUOMIY MOVE DESIOIi REVISK)PiS - DATE ANC410R start AS ~ Z a?SflNG - oaElcrED m ENOSEE>e A E ORAOE Mfr RI RAP OOPIACED FROM M YS1wAY MIST t RElIAC[O YImIpEIY. TE IPTION RIPTI SLOPE To Non: ADDITION Y.lLD ~ _ P w. STASRI2E THE EMi1N0lTrt AND ALL dS11111AED AREAL AlOVE THE SED1Af111 POOL MD DOwNSRI6W FROY iNE TRAP IIMEDIIIELY AFTEA 10 OOIb1RUCIlON MM SEEDIIIC. ~ ~ sfe ~ ADD sulrAr awrT GYx ( W n m a ~ GRAVEL & RIP RAP BASIN OUTLET STANDARD CATCH BASIN YAR IN ET PROTECTION A D L 14 3 4 6 STANDARD TEMPORARY SILT FENCE 1 1 CHECK DAM B • c+Y~a ~4~ e' YA1L F 50' MIN. NOTES. FAR>H eEwr t YIN r rN a1TwsE As oRTECiED BY THE ENGINEER BUi SUFFlCIENT TO KEEP 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP OOIIPACIED RNRNIIC S+aN SEDIMENT ON SITE TO ENSURE CONSTRUCTION ENTRANCE IS USED. ~ ~ 2. IF CONSTRUCTION ON THE SRES ARE SUCH THAT 1'':+:: , THE MUD IS NOT REMOVED BY THE VEHICLE TRAVEL- W' _ L ~ YM. 12-1/2 fi•. SEEEP CUT OR FILL SLOPE - - - - - ~ LNG OVER THE STONE. THEN THE TIRES OF THE . 2'-3' STONE TO BE USED 25' OR WIDTH OF YM. to cti _ L ~ L_ MR6 uE wRES , i EXISTING URGE STONE OR RAIIRGAD ` VEHICLES MUST BE WASHED BEFORE ENTERING THE .,:,•.,(S PROPOSED STREET, PUBLIC ROAD. ROADWAY .BALLAST) WHICHEVER IS L 't_ • GREATER• 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS 2:1 SLOPE MAX ( ) I L L I - - - - oRA~ ON TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL CLEAN THE AREA AND INVOICE THE FlNANCUiLLY p~ pp~ ~ Y1001P ' ° ~ RESPONSIBLE PERSON AS INDICATED ON THE FlNANCIAL ~ w~ AIIApIED a avEwrlc - srAeE>zE DRERSIOn DrtcN s,1 - - , ~ - . wTRI TElpaRwn sEmNC = _ ' AND EROSION CONTROL I RESPONSIBILITY FORM. TD POSE ~ a R""E NDR¢aNTa wEra vosr Sfo~r ~ CROSS SECTION NE,T~D oRANCC W RESSTAIrt, WIRED SECURaY ro vERncx P051S Nxxl - TENSAE sTRENCnr, - POLY 9AR4KADE FABRIC (TYPKAL) - P~ @AFFLE INSTALLATION -STEP 1 aASS iI ~ - - FRONT VIEW INIII/1 STEEL POST 40' CAR MTVEN wRE FABRIC ~t" O~ l~.5: FABRIC cvI AND FOLDED FASRIC FOLDED POSITIVE GRADE 1.0% MAX. UPSLOPE TOE z oRN+~. w EE 9 NEW CONSTRUCTION SO~tJO ~ ~ ~ AT IFJ51 18~ Mf0 ~ ~ ~~K ~ NDRQONrIL 35' MIN. 15' MIN. F61tL ~ o y „q„ _ ,E„~ S„~„a,,,, M TREE PROTECnoN AREA q N p IDLY BMMBiIOE FA/AC fTTFIGt) 18• EXISTING ROADWAY t wood POSTS ARE N0I ACCEPTABLE SIDE SLOPES ~ ~ R DO NOT ENTER 61 HOIIRONTAL POST a usE srAPLES 1' APIRT To ATTACN FABRIC PERSPECTIVE VIEW TO 1pO wRE' FENCE AND FABRIC 1 1 MAX. 2 ( ) 7f' ~ 1 . C ~ . „ 12" M N Buweo R+ s" MIN. . , • , , ` ' ~ . , : 4. BAFFLE SPACED AS PER APPROVED PWI. TOP a BAFIIE SHOULD BE B' ` ~ ~ ` ~ ~ ` ~ ` ~ ~ ` ~ ` • ' ~ a~DE WARNING IGN a s, y N~ >i~.r IRCIER 1l WI THE BOfTOiI a 1I[ SPELwAY ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - wveLwc saws ro eE VIDE a OuRAeLL NFATlIEIO°ROOf wiERNL HE BDrtDM a 9AFRE MI B'rB' TRENCH, I ~ ~ ~ ~ ` ~ ~ ~ ~ ~ ~ ~ R tatrfxs m eE r NET/ Ir~aR,~r, afAacr AND sFNaD AS DErAEm. ~~y ~ " _ s+aas sNtu eE vtAaE~ Ar so• w>aA,w ?~LS. ~ TRENCH AND TRENCH BApfFILLED AND FABRIC UNDER STONE fk1E0 wTRi SOR• µp COMPACTED P T R F OPE PLACE A SICK AT FACN END a HEAR TREE FROlEC110N AND s0' GM C~MFR ThEnFAFiER. STEE CU 0 ILL SL FOR TRa FROTESraN AREAS 1ESS Tnw Lao. m vf~B1ETER, vRw1oE No ass T11w arE sA~r PER vROTE>;TaN aI~ coMPAC1ED I REVISIONS REVISIONS I REVISIONS ATTACH SA'IJS St~Elr iD FENCE POSTS AND FABRIC. A CRIPTI CROSS SECTION scRl N SECTION AT OPENING /ww?w nEa nlorECnav FENCE nRanlAU/OUF pUbU10N a PRQECT. I~ RIPTI I VI W sRws wr BE REaurIED er cm a RAiE1OH Ba•PECno/s OEPARnENi' BASED oN ACRML FEID oolarnoNS. BAFFLE INSTALLATION -STEP 2 S DE E IuaE A srA+ AT EACH ETO a HEAR TREE PROTECTpM AID so' oN CENTER 1?EREIFTER. PANVIW NOTE: FOR TREE PROTECTION ONLY CONSTRUCTION NTR E ANCE 7 RA RI G VEL & P RAP FI T L ER BASIN 3B 3B I R I N IT H 9 STANDARD TREE PROTECTION DETAIL 1 B D VE S 0 D C DEWATERING DIMENSIONS ELEV DIMENSIONS ELEV CONCRETE BLOCK EMERGENCY SPILLWAY INLET 66 247.65 ~ EMERGENCY SPILLWAY INLET 25C 246.25 ~ BEDRIENT TRAP TOP OF DAM WIDTH 10 254.3 ~ ~ _ _ - TOP OF DAM WIDTH 8' 250.8 ~ ~ ~Dp1°" T"AP _ _ - i-.--~-~ ANTI-SEEP COLLAR 7' X 7' - ~ ~ ANTI-SEEP COLLAR 5.5' X 5.5' - ~ ' \ CLASS t Ri MP(SFf SECTION TNRU BASIN ~ - ¦ ¦ _ ~ \ ~ RIP RAP DISSIPATOR PAD SEE DWG C-3 ` ' ~ ~ ' ; ~ ••x>":• • • RIP RAP DISSIPATOR PAD SEE DWG C-3 - . IfSSIPATOR PAO ~ ANTI-FLOATATION DEVICE 4'X4 X1' THICK - , . ~ ~ ANTI-FLOATATION DEVICE 3.5'X3.5'X9" THICK - 1°" PAD wATOR PAD ~ ~ . TOP OF RISER 24" CMP 246.65 ~ " TOP OF RISER 18 CMP 247.25 ' ~ : I~ ~ °a • - b CLASS 1.IUP FSAP NFADwNl ' ¦ ¦ ~ OUTLET PIPE INVERT IN 25't 1 B"CMP 196 241.65 1 ' , ~ ~ ~ • • ' OUTLET PIPE INVERT IN 25 t25 CMPO tf: 242.25 - ~o ~ Q OUTLET PIPE INVERT OUT - 41.4 ~ J' + ~ ' ' 2 ~y`Y: a~•~ OUTLET PIPE INVERT OUT - 4 yti ,r + i Mkt.' . ~ ° Z _ o lllllllll111111 i SEDIMENT STORAGE AREA 129 X64'XS DEEP 241.65 SEDIMENT STORAGE AREA 68 X44'X5' DEEP 242..25 ~ ~ • ~ • r~ ~ i~Rl+urENr ~p PERMINENT RCP ~S P 11RCK x J' FIGH YIN. g YN~T ItCP ° ? /i 0 A~ . OIrtIET PEKE Dunn PTE 1. ~ CONSTRUCTION SPECIFICATIONS ~j 0~ ao e ~ V1 1. ui - 1 a 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE V, w ON fTS SIDE IN THE BOTTOM ROW TO ALLOW POOL - ~CQ's00~ o - Li. FARrHaw ON DPo Z H DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED ~ ~ Z H AT DfL AT LEAST 2 INCHES BELOW THE CREST OF THE STORM O W DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST PERSPECTIVE VIEW c ~ TE?PORARr CMP RE,'ER-PERF'OM,EO AN VI W IEYPOMRI' pIP RISER-PEIIFOIGTED P N W TMI THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT ` d 2:1 SLOPE, GRAVEL FlLTER NO SCALE Z °G a ANI WATER LEVEL OURRIG STORM TRASH RAON I' MN. FREEBOARD T+>P a ~ WATER LEVEL DIA'WG STORM RNpt t' MNL FRLmOARD ~ a ~ IF i MID TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GNE LATERAL SUPPORT TO SUBSEQUEM W W Z azc RO BLf ROWS BY PLACING 2 X 4 WOOD SNDS THROUGH ~ 2 ~ Q OW BLOCK OPENINGS. WIRE SCREEN Z Q ~m OW m . SEDB/ENf STORAGE " SEOwENT sroRACE 2. GU W ~ 2. CAREFULLY FR HARDWARE CLOTH OR COMPARABLE TEMPORARY SEDIMENT AREAS TO BE DEi1tIABED SEOIIETIT SFORAGE PIPE RI+ERT IIQIE: Z OR/NEl FILLER G MNMUY SLOPES 2 1 2 : 1 .GRAVEL FnTER C ~ ~ WIP •p~ / YNIMW SLOPES Z 1/Z : 1 BLf WRE MESH WRH 1 2-INCH OPENINGS OVER ALL POOL 1~?. GRNrtt ~ R1P RAP FILTER EERY BASRI oETNL I.L / DEWATERING F1000 STORAfE TONE RP RAP NFA0IYALL 6 DESICIED TO FIIOIECT EIILSTNC PIPE MIERIS ~ ~ ~ W 3 W (1• qa' BLAC1, OPENINGS TO HOLD GRAVEL IN PLACE. 11 Z - - - - - - - - t~f ~i TINT aYw TO ACIl6 aR LESS. Ily W J z PANTED RED CIFMpUT InIBC • I ENn11 OAM PABIIFD RED CLEANOUT LLARIt I cARrN t?AM 3. USI LOCATED NA)„Fw,1Y TIP R14ER PB'E LOCATED NiVFwAY TIP R6ER PIPE • Dq 3. USE CLEAN GRAVEL, 3/4- TO 1/2-INCH IN ~ ~ a m W - W DWIIEEER, PLACED 2 INCHES BELOW THE TOP ~ ~ ' • • ~ • ' ~ lEi' - ~ - _ , ~ ~ u~ ~ J ANR-smP ooww µn-SEEP tauAR OF ANTI-FL41TA110N DEVICE ANR-f1.QATATgN DEMCE ~ OF 11iE BLOCK ON A 2:1 SLOPE OR PUTTER AND 1 MIN' - 1 m ~ J SMOOTH R TO AN EVEN GRADE. DOT X57 WASHED 2 - 1 ~ uASS , FTi.TER FABRIC ~ t DEiSPATOR PAD ~ ~ ORATOR PAD STf RIP RAP STONE: IS RECOMMENDED. ' T RYSIED STOLE W • 6 IRlESS OBERRISE a ~ 1~ TFAPORKr CMP Y X Y YN. ' TEYPORART CMP y X y TRENCH w/ t:i 9DE SIDPE TRENCH w/ III SLOE SLOPE MAX. SEDNENT DEP1H(CIEAN OVF FOBrt) I h • • NotEn. REVISIONS REVISIONS PATE DESCRIPTION PERMANEIR RCP CMP OURET PIPE CRI N PERMI~NT RCP CMP OUnFT PpE DATE Rf1ASI0NS REVISIONS t0 NOTE ADOBION t0 N01E AOORIOII DATE DESCRIPTION SEDIMENT ~ PTION SECTION THRU BASIN. FILTER AND CULVERT PIPE W • ~ TABLE ~ N~ CROSS SECTION A AOD TABLE t NOTES G.M R TI N COSSSC 0 No scALE p • J ~ v Q (EXISTING PIPE INVERTS) RISER BASIN 6 RISER BASIN 7 K AN RA R P IN T PROT TION 13 4 ~ BLOC D G VELD 0 LE EC GRAVEL & RIP RAP HORSESHOE INLET BASIN E UPSTREAM END OF a, • FOR REPNR OF SILT STORM DRAIN OVERFLOW ~w (3' - 10') DIMENSIONS ELEV 1MRMBLE AS ORECIED BY THE EHON[FR FENCE FNLURES, USE No. 37 WANED STONE. MATERIAL VARIABLE EMERGENCY SPILLWAY INLET 39 25x.45 4 I FOR ANCHOR WHEN SLIT FENCE IS ~3TECTING A i/3 PIPE 3 EMPE STAPLED IN 2~~ -I TOP OF DAM WIDTH 10' 259.0 ~ ~D"°'T _ f CATCH BASIN. . • ~ ~ • ? RRRMIC SIGN p . A e JESTER PLACE - - - =1 I ANTI-SEEP COLLAR 6'X6' - \ ~ - ~ _I = i ?A • - _ _ - + ~ (--I, RIP RAP DISSIPATOR PAD SEE DWG C-3 - ~ -I i~ _ - 6 MIN. - I - ` I 1 ~~r::;.•:., , ' YN. 10 CA WIRES h ~ . L!ff wRIEs I I-I ~ _I i t=III-III- I-1 I I~I , 11-I f I~ A N 4 oERPATOR PAO _ = 1= - _ _ _ _ _ 1= - 11= ANTI-PLO TATIO DEVICE X4 X1 THICK - ~ ~ ~ TO D BURY BOTTOM ~ A I ,III-III; 11-1 I I-1 I I-III; I-III-I ~ I-I !-III-I I ~I I T P F RI ER 4" MP .4 • - - - - - - - -III- _I , 0 0 S 2 C 253 5 - .1 I I=1 I I=~ I I=1 I I=1 i I. .I I ~=11 I:I I I=1 I ~I I . I-I I i_ ~ ' , ~o I OUTLET PIPE INVERT IN 25 ti8 CMP® 1% 248.45 1-~ ~1 I I-11 I-11 1-~I I i t 1~-I 1 1-I 1 I-11 I--I 11-1 : I-III- LEVEL LIP' .III ;III=1 I l i l ! OUTLET PIPE INVERT OUT - 248.2v A4• Lid MLI OF PLYWOOD LJ~ _ CRAM ( I OF SPREADER {=i 1=I I I 11=1 11=1 I I-1 11=1 11=1 I STEEL - POST FABRIC NOTE: ALL PARTIALLY COMPLETED STORM DRAINS 3/4- EXTERIOR BURIED -I SEDIMENT STORAGE AREA 98 X49 X5 DEEP 248.45 Ptwr,r ~_I! _I I I_I 1 i_i I_ - . -III-I I I ~ ~ I SHALL BE PROTECTED AT THE END OF PLYWOOD WARNING SIGN 6 MIN. Ii SLT FENCE A1EAlEXiLF FABRIC EACH DAY IN ACCORDANCE WITH THESE = DETAILS. STEEL FENCE PLYWOOD INLET PROTECTION FAM Ow L J POST CROSS-SECTION Q FILL RAPE C FRONT VIEW A UPSTREAM END OF OVERFLOW W , STORM DRAIN TEMPOM Y CW R'SER-PtVM= PAN VI W Tw Of mm REVISIONS BY n GRADE I II I _ I . 11 II BY I n n a 1/3 PIPE 6' M. COVER ~ ~ I II II p TREE PROTECTION AREA ? ? DIAMETER 21 AX 2003 - OVER SKIRT • TS. I I I D . n o a A. D: . SED1&M STOP44E fERMTS? SKO 8KO I - EXTEND WOW C INN. INTO TRENCH + DO NOT ENTER ~A• AND ANCHOR SKIRT AS Low POI oRNA<L NT ~ w,SAKw StDPES 2 1/2 : , ORECTED BY ENpItER WASHED STONE BITER / p NOTES: WARNING SIGN DETAIL ACROSS PIPE INLET ~ MOM MOMS TO E F WOE Of DuOA" NEAn1E1wRODF wmwl 10' 3' pmm Rto CLEDN"M YARX EARTH DAM WCATM PALMY W PW Pit ANn-SEEP COLLAR LEMRS TO AL r NON ANIMAL CLEARLY LMNLE AAN VAM AS DEFAM.EO. I I I I I I I k I SIM SMALL NE /LACD AT SC' MA' W MRERWLS ANn-FL0QA7M COME ORSIPAIOR PAD ~I NOTE: PLACE A SM AT EACH flO OF L#" TREE PRCTECWN ANC SO' ON CFN 1M THEME nElt ` 1 ` 1 l , Ri ow FOR TREE wlo1Er11aH AREAS LESS THAN 200' IN PERrYETER PROVIDE No LESS THAN ONE SIGN PER PROTECRO G AREA HARDWARE CLOTH -USE SILT FENCE ONLY WHEN DRAINAGE AREA ATTACH S06 SECURELY TD FENCE POSTS AND FABRIC. REVISIONS 1 1 ( l ( I OF SPREADER REVISIONS TIND" M/ SM $UWE E DOES NOT EXCEED 1/4 ACRE AND NEVER IN AnN?AIN TREE PRCIECTICIN FENCE TMIOIlaOUF DURATION OF PROUECT. DATE DESCRIPTION fI AREAS OF CONCENTRATED FLOW 206 ~ AME AW~ ~ CDAMMEIONS U LI U L LEVEL LIP TEW4XVRf CMP V X 2'M. DESCRIPTION DATE pemimAm RCP CNP ounrr PPE ~I -END OF SILT FENCE NEEDS TO BE TURNED UPHILL PLACE Asa AT EACH END OF LMrAR TREE PR0IEr910N AND SO' ON C04W THEIW1FEER. STONE FILTER INLET PROTECTION PLAN io/as NOTE Ao0 nm 4 ADD TABLE t NOTES QM CROSS SECTION STANDARD TEMPORARY SILT TREE PROTECTION FENCE 1A PIPE INLET PROTECTION (PLYWOOD AN AND 12 12 i LEVEL SPREADER DETAIL RISER BASIN 8 17 N.T.S. Mold DRAWN SKO CHECKED RPH DATE S 11 JUN 2003 (90X CD) CD) SCALE JOB No. FUMW STORM DRAINAGE & EROSION SHEET i CA>a, 2 CONTROL DETAILS 302 Mod E I 6 7 1 2 3 4 5 5 8 9 • PROVIDE MANHOLE RING. COVER do A MANHOLE STEPS PER OETAII ~ . ~y -I.. - 15" OPENINGS REFER TO STANDARD RTCB DETAIL -~i. t/1 2 - - ALL 4 SIDES FOR WALL dt SLAB CONSTRUCTION - ~ w I e = E - - _ A - - 250.3 TOP OF STAB ~ .a ? ,d • - 249.8 -MAX. WATER SURFACE ELEVATION FOR 100-YR STORM A SLOP _ 250.8 -BERM = 250.8 ~,g F 3, a 1 n 2.5 - 3 3 - ~ - - - 1 - - o^ - 248.7 -TEMPORARY STORAGE Of 1" RAINFALL EVENT pj . 1~~ - - - I- ~ - 6 247.3 -P.W.E. 6 . r. _ -I - ~ i - - 1 1 _ . \ _ _ _ _ - - - - 247.3 -PERMANENT WATER ELEVATION ~ - I 245.3 -SHED' - I - 2.5 •i~- _ 'S _ - j-- • © v. 42" RCP 5'-0" ' VEGETATED SHELF-,_ - 242.0 -BOTTOM i = - - - - - - - - - - - - I I COMPACTED STRUCNRAL - _ _ - _ _ _ _ _ ~ i MATERWL AL • , . A ~ ' w -iii-iii-i i ~-iii-iii-i i ~-iii-iii-i ' AA ' A a SECTION THROUGH POND 1 ~ . a ~ 'd B NOT TO SCALE • , ,d . . , ; ~ 1' MIN. ICAL I I I I ~ 8" DI PIPE I ANCHOR BASE SECURELY a' W/ VALVE ASSEMBLY To wALls ~ ' POND BOTTOM I f I ~ !I 242.0 I III I~• I III 242.0 KEYSTONE ' _.TfL-_ •-7._~~~.• RETAINING • • ~ • • . • ' • ' • ANCHOR BASE SECURELY • ' • ° ' • • ' ~ TO WALLS WALL 10' _ 254.3 -BERM CONCRETE BASE. MIN. 1' THICK BERM 3 - 1~~aunu~,~~ f 1 - - T P AT H BASIN 25C ca RAISED 0 C C R Q~H Ot ~y EE ~ 9 250.0 -P.W.E. - - 1 1 - _ 2.25 4 - _ 248.0 -VEGETATED 1 (-1 1-1 ~ I SHELF -I - _ i_~-i ~-i _i -I 2 - I I- ~ - PROVIDE MANHOLE RING, COVER do ~H ~ •9 ~ - 2 I i- - 1- 1 1 I MANHOLE STEPS PER DETAIL l ~ NE.~'~ VEGETATED SHELF % I = I' COMPACTED STRUCTURAL -I - 15" OPENINGS REFER TO STANDARD RTCB DETAIL - - ~ (TYP.} _ - i MATERIAL. FOR WALL do SLAB CONSTRUCTION ~~r c ALL 4 SIDES •E - 241.2 -BOTTOM I i,l - -I ~ _ _ _ _ _ . 1- - i -I - - - - - -I ; + ~ d , . . - - - 253.9 -TOP OF SLAB i -I -I ~ - - - - - -I 1- -I I 1= _ = 1= _ =I i = 1= M •e. . , . Ak $ - 253.3 -MAX. WATER SURFACE ELEVATION FOR 100-YR STORM ~Op f 3, ~ n S CTION THROUGH POND 2 E • - 252.3 -TEMPORARY STORAGE OF 1" RAINFALL EVENT NOT TO SCALE - - - - 250.0 -PERMANENT WATER ELEVATION '.a ' 42 RCP 7'-0" ' (60" RCP FOR X66) ' ' MANHOLE UD ' 'd. 250.8 -TOP OF BERM Q 249.8 -TOP '~X ~Op d• f 3.1 t . • g J 2" PVC DRAWDOWN PIPE. D EXTEND 6" BELOW PERMANENT d •e ~ WATER ELEV. 1 MIN. (TYPICAL) 247.3 -P.W.E. I i Z I ~ Q 8 DI PIPE O I ANCHOR BASE SECURELY a W/ VALVE ASSEMBLY MAX SLOPE . 6.1 To WALLS ~ • . POND BOTTOM ~ a I I~. OCZ 281.2 ~ W W III f- > T I 241.20 66 Z ~ O III 241.56 65 z ~ ~m I V W ~ II .If Z S~~ . ~ f ?7 ~ ANCHOR BASE SECURELY m TO WALLS ~ 1.0 242.0 -BOTTOM CONCRETE BASE. MIN. 1' THICK d i - W Z r T P ATCH BASIN 65 & 66 RAISED 0 C W J ~ Q N TIN X A - DRAW-DOWN BOX JU 0 60 25 C E NOT TO SCALE MANHOLE FRAME do MANHOIE FRAME do COVER W/ RISER COVER W/ RISER - 268.31 ASPHALT SURFACE ASPFWLT SURFACE TOP n MANHOLE UD • 254.3 -TOP OF BERM ~ 253.2 -TOP ~k ' S~Op F ~,1 ~ ~ ' '1y PVC DRAWDOWN PIPE. 100-YR - 265.30 • AUU 6 UtLV WKVUi iu s EXTEND 6" BELOW PERMANENT WATER ELEV. BOTTOM OF BOX AFTER ° WATER ELEVATION / RESTRICTOR PUTS HAS 12'x6 PRE-CAST CONCRETE 250.0 - P.W.E. BEEN MISTALLED + SPUTTER BOX g 1.00 PE N 77 w 00 54 RCP 0 1.OX ' 48• RCP 0 1.OX STEEL STEP 48" RCP OFF-BYTE (INLET FROM G X37) REVISIONS BY (OUTLET TO G #42) • OUTFLOW PIPE • ' (IYP. OF 6) 11 JUN 2009 GKO 10-YR - 261.23 48 RCP 0 5.OX IM CD) S~OA WATER ELEVATION 2.50 2.50 (OUTLET TO JB /39) ' 21 ~ 2009 STEEL STEP DlH OF 6IT$) F g O 01 1.0, 241.2 - BOTTOM M 5'x5' RESTRICTOR PLATE F-L a T , . 255.42 25522 255.22 . , JUNCTION BOX 63 - (DRAW-DOWN BOX BOTTOM - 254.72 . NOT TO SCALE : ,!•1:. . a 48' RCP ON-SITE OUTFLOW PIPE W/ 5'x5' RESTRICTOR PLATE (ORIFICE DIAMETER - 26) 1.00' 3.00' 6.00' 3.00' 1.00' 1.00' 6.00' 1,00' 12.00' DRAWN VKQ CHECKED SPUTTER BOX #38 RPN / DATE SCALE: 1 = 3/8 08 JLN 09 ®WQ REVIEW) SCALE JOB Na FOMW STORM DRAINAGE & EROSION MET CONTROL DETAILS ¦ i 1 2 3 4 5 5 6 7 •Q 8 g i x ICS-6 ' WR-2 ti i ' SEASONAL COLOR t ~ ~ ~ o ~ ~ ~ . , BT-12 ~ y ~ C ~ ' LM-250 WIN e I 0 12" O.C. •4 N/F THE BODY, LLC ~I \ r \ A Z G L''3 a. Z.9r I ~ O \ ~ w _ _ ,I \ ` _ 1 a - _ - - - ~ I 1 ~ ~ 9 A ~ a _ _ - - - - D.ST ~ 1° .n , : - _ S 84'33'18 E 1131.92' ' ' - ' ° 12.18' ~ ~f ~~~~~~~~~~~~~~~~~~~~~r~~ O n \ N I ' ~ ~ TD-1 LS-3 TD-4 Ls- . TD 3 Ls-3 - PROPOSED C BP-0~ TD 1 _ ~ ~ 0.7T c C BP,~OR>acTtON~~ARKWAY 9 - ~ (fJ Z P ~Y O . s s I C ~9 O ~~4 SG1LE: 1`20' _ - 877. 1' . . . G N/F PEGGY W. JOHNSTON AND i JAMES MARION WILBURN ~ ' • ~ I ~ o 6.77' , ' ~ ~ +Zn E I ° \ ' w, EXISTING WOODED ~ Icy n \ JCP-46 ~ , ~ BN-2 i i AREA TO REMAIN TREE PROTE ON ~ ~ FENCE ~ ~..r ~ i ~ I-3 ~ ? " i b Ww PT-20 EP-45 0 ~ / B \ 5' O.C. PR OSED FENCE N/F HEDINGHAM PROPERTIES, LLC I ZONED:I-1 \ ~ i ~ ARF-5 ~ QPA-6 ~ USE: VACANT I LI-3 i ' 22 ~ i QL-9 8 WO FLOOD HAZARD SOILS. ~ BM 1988, PG 1363 CJ-42 ' • • • • • • • • • • • \ JE-280 (TYP. EA. SIDE) AR-3 i SV-438 ~ :•r. PC-496 i i i GRASS ALL I ~ / ~ DISTURBED AREAS 1 \ ~ PROVIDE 4' DIAMETER BY ~ i \ ~ 3" DEEP MULCH RING ~ AROUND ALL TREES IN I ~ , LAWN AREAS ~ ~ AR-i ~ ; ~ ~ ~ \ - i ~ ~ JUN-16 rtamnmm~pq 7 8 9 6 ~ 2 3 4 5 T S: NO E z ~ 1. ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF Q J ~ 0 PESTS AND DISEASE. ~ Q ~ MUST BE CONTAINER GROWN OR BALLED AND BUR 2. ~ o~ v = ~ REMARKS LAPPED As INDICATED IN THE PLANT UST. Y MMON NAME AME CO TANICAL N BO 3. All TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS SPECIFlED. AR r m' r I r I M le 1 -1 ' H P ARE SUBJECT TO THE APPROVAL OF THE r I M le 14- H 4 4• ~ LANTS AR1 r m r I LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER INSTALLUTION. F - M~1 A 5. ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE - M , DETAILS. n ' r 'min H 6. ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS 1 i n n i 'F P n F R SPECIFlED. r r r 1 x in A 7. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE F fl FI w 'n wo d 9 RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND ' ' A SHALL AVOID DAMAGE TO ALL U11UT1ES AND SHALL AVOID DAMAGE TO , ~ ALL UTILITIES DURING THE COURSE OF THE WORK. THE - CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY AND ALL DAMAGE - o • r TO UilUT1ES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH - " N 000URS AS A RESULT OF THE LANDSCAPE CONSTRUCTION. ' 11 2" 8' BdcB VSA 8. THE CONTRACTOR IS RESPONSIBLE FOR VERIFIING ALL PK Prunus serrulata Kwanzon ~ Kwanzon C lIAN1TTIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK. pT pin III Pin 40 min SHOD 3 VSA E....f Q 4 3.5 14 min BdcB SHOD 4 a 9. THE CONTRACTOR IS RESPONSIBLE FOR FULLY MAINTAINING ALL PTt Pin edo Lobloll Pine T MITED T0: WATERING SPRAYING, rff li rlin n rlin ton k 1 1 -1 TPY 0 POINTING (INCLUDING BUT NO U , I Will w ak 1 1 -1 ~ MULCHING FERTILIZING ETC. OF THE PLATING AREAS AND UWN P - ~ ~ ' ) Willow Oak 7 3.5 14 16 BdcB SHOD 4 $ UNTIL THE WORK IS ACCEPTED IN TOTAL BY THE OWNER. OP1 uercue hellos ALL PUNT A roue luatris Pin Oak 46 2 10-12 8dc8 SHOD 3 x 10. THE CONTRACTOR SHALL COMPLETELY GUARANTEE QP Ous yl NNING ON THE DATE Al uercus lustris Pin Oak 28 3.5 14-16 BdcB D D MATERIAL FOR A PERIOD OF ONE 1 YEAR BEGI ) Bold re s 9 2 10-12 Bdc6 VSA STREETYARD A + ~ E OF TOTAL ACCEPTANCE. THE CO R SHALL PROMPTLY MAKE T x i m istichum dl r n Vill n el va 1 1 -1 ~ ' ~ ~ $ ALL REPLACEMENTS BEFORE OR AT THE END OF THE GUARANTEE .~7~ I x N~ ~ 3 PERIOD. APPROVE THE STAKING LOCATION OF ALL ~ a 11. THE ARCHTECT SHALL ~ ~ ~ PLANT MATERIAL PRIOR TO INSTALLATION. Shrubs 12. AFTER BEING DUG AT THE NURSERY SOURCE, ALL TREES IN T i r T ACCLIMATED FOR TWO 2 WEEKS UNDER A MIST 42 24" TPY LEAF SHALL BE O CJ le ra Ja onico Cle ra SYSTEM PRIOR TO INSTALLUTION. EP Eloeo nus Pun ens Thom Elea nus 264 18 SHOD TI>1' 13. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR P B DffOLIATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE ICC II x rn to ri ri a H II 7 18 H MA RIAL 158 18 VSA I4 PROMPTLY REMOVED FROM THE SITE AND REPLACED WIT TE ICR Ilex comuto Rotunda Dwarf Homed Holl OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL ICS Ilex crenata Stokes Stokes Jo anese Holl 6 12 n ACCENT PLANT UST SPECIFlCATIONS. r r n T 14. STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL ' CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL. " n ' n 15. ALL SHRUB, GROUND COVER AND SEASONAL COLOR ANNUAL 0 1 H A PLANTING BEDS ARE TO BE COMPLETELY COVERED WITH HARDWOOD R m rvifolium R c rv tr m 41 4" n HOD Y MULCH TO A MINIMUM DEPTH OF FOUR INCHES. 1 m rvifolium R rv m 16. LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE • PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. R SHALL BE THE RESPONSIBILITY OF " THE CONTRACTOR TO VERIFY THE LOCATIONS OF UTILITY ONES AND ADJACENT TO THE WORK AREA. THE CONTRACTOR IS RESPONSIBLE N FALL UTILITY LINES DURING THE ver Peren~als FOR THE PROTECTIO o Groundco CONSTRUCTION PERIOD. r' ' ' I it 4" 1 o.c. ~,~,N~"""'"'Na, 17. SAFE, CLEARLY MARKED PEDESTRIAN AND VEHICULAR ACCESS N R11ES MUST BE MAINTAINED THROUGHOUT x TO ALL ADJACENT PROPE ~ 0~ 1. THE CONSTRUCTION PROCESS. ; ~ D q ~s, ~ n Pond Plants Detent o 18. DURING THE GROWING SEASON ALL ANNUALS SHALL REMAIN IN r ~ N mON THROUGHOUT THE CONSTRUCTION h 2 o.c. ~ ~ A HEALTHY, VITAL COD ff 2' o.c. ~ X a PERIOD. P n eri r ato P' k r Twee 7 1 Pr I 82~ a HOWN ARE APPROXIMATE. PC to 19. ALL PLANT MATERIALS QUAN1111ES S Bullrush 74 P I 2' o.c. r ~ _ SV ci s vali u P N I LE FOR COMPLETE COVERAGE OF '~i _ CONTRACTOR SHALL BE RES 0 S B `~~t! 10''y 0~ ALL PLANTING BEDS AT SPACING SHOWN. ~ I D AREAS ARE TO RECEIVE 4" OF TOP SOIL, f' 5,~~' 20. ALL D STURBE P, W P~~~~ MULCH, AND WATER UNTIL A HEALTHY STAND OF GRASS IS NIWM~g1~ OBTAINED. THIS IS EXCLUDING ALL LANDSCAPED ISLANDS AND ENTRANCE AREAS. 6'' C I Al10NS FOR ALL INFORMATION 7 21. REFER TO WALMART SPEC FlC NEEDED FOR IMPLEMENTATION OF PLANTING PLANS. DETENTION POND PLANTING SPECIFICATIONS 1. PLANTS WILL BE INSTALLED OVER THE SHALLOW PORTIONS <8" IN DEP1H (NORMAL POOL) OF THE WET POND. 2. PLANT MATERIAL IS TO BE MAINTAINED IN COOL, MOIST ENVIRONMENT UNTIL PLANT1NG. 3. LIVE PLANTS ARE TO BE INSTALLED BY HAND USING TREE PLANTING BARS (DIBBLE BARS). 4. LIVE PLANTS ARE TO BE INSTALLED SO THAT R00T COLLAR IS PLAN AT OR SLIGHTLY BELOW) SOIL SURFACE (NOT SIGNIFICAN1lY ABOVE ( ~I OR BELOW GRADE). EX1S11NG GROUND B" 2-PLY RUBBER HOSE 5. PLANTING HOLE WILL BE OPENED BY THE DIBBLE BAR, PLANT DOUBLE STRAND 12 GAUGE WIRE PR PRIME PROPERLY PLACED (VERTICALLY, WITH ROOT COLLAR AT AP 0 COVERED W/2-PLY RUBBER HOSE ELEVAl10N) AND THE HOLE WILL BE CLOSED COMPLETELY (NO AIR \ PLANTED FLUORESCENT ORANGE a I SPACE AROUND ROOTS) WITH DIBBLE BAR AND FOOT PRESSURE. ~ ~ WHITE FLAGGING (TYP.} Z 6. LIVE PLANTS SHOULD NOT LEAN MORE THAN 10 DEGREES FROM ClR BACK SLOPE ~ ~ TREE WRAP a PROVID ` J VERTICAL. TO „ L ~ - J A FLAT ,~Uf~FACE Q\\~~~ 4 INCHES MULCH • N , FOR PLANING 4 INCH DEEP SAUCER N 7. ALL ROOT PARTS MUST BE IN GROU D 1 ~ D 8' STEEL TEE POST U~ 8. PROPAGULES (DORMANT RHIZOMES, ETC.) WILL BE PLANTED BY z Z I " TIVE POR110NS OR ~ BACKFlLL MIX Q ~ HAND 1 -2 INTO SOIL SURFACE WITH VEGETA ( O W BUDS) FACING UPWARDS. N ~ ` ~ ~ Z W d' UNDISTURBED SUBSO L 9. PLANTING WILL NOT OCCUR WHEN SOIL CONDITIONS ARE NOT ~ W W CONDUCIVE TO PROPER INSTALLATION (E.G. FROZEN GROUND). ~ ~ REMOVE BURLAP do ROPE ~ ~ W O Z o FROM TOP 1/3 OF THE BALL ~ ~m W 10. PLANTING SHOULD OCCUR DURING THE PERIOD FROM MARCH UZ 3 1ST THROUGH APRIL 30TH. NOTE; SEE UWDSCAPE NOTES FOR 11~E TYPE OF MULCH MATERIAL TO USE. Z ~ ~ IW ~ WW z am W ~ Z m W~ Al WNS, PE w SO N L NTING PA THE t= LAWN SEEDING SHALL BE AT THE N.T.S. IN RATES: W FOLLOW G Z PER 1000 S.F. OF LAWN AREA: W J ~ 3 LBS. TURF TYPE FESCUE "TYPE A 'TYPE B' 3 LBS. TURF TYPE FESCUE ° (TWO DIFFERENT FESCUES TO BE SELECTED FROM ~ . 0 ~ VARIETIES RECOMMENDED FOR PROJECT AREA) •0 D 00 ° Use 2" x 2" x 6' hardwood stakes and {~9 1 LB. KENTUCKY BLUE GRASS a0 wire encased in rubber hose for staking Ur 0~ 00 ~ when needed or as directed by architect. E Use tree wrap up to first whirl of branches i ~ p on trees above 1-1/2" caliper to prevent o~ scalding. 0 00 ~ , To promote aeration and percolation in o• 0 o heavy soils, plant rootbcll above existing grade as shown. 0 • 0 Backfill with 80% parent material and 20% aecomposea organic maaer Uy vowme well mixed. Provide 6" minimum of bockfill on each i side of rootball to promote rapid re- establishment. l Provide an earth saucer for water retention. REVISIONS Minimum 4 thick pine straw in 5' BY diameter circle or as shown on plans. 21 JUL 2008 OPW ~EtO11T8? PLANTING TREE F ~ ~ To promote aeration and percolation in heavy soil, plant rootball above existing • grade as shown. Provide an earth saucer for water retention. Backfill with BOX parent material and 20X decomposed organic material by volume well mixed as approved by the architect. Provide 6" minimum of backfill on each tide of rootball to promote rapid reestablishment. Provide minimum 3" thick pine straw in 5' wide planting beds or as directed on plans. DRAWN SKO GPW CHECKED SHRUB PLANTING GPW DATE 11 JUN 2003 (90% CD) SCALE G JOB No. RWCW SHEET LANDSCAPE DETAILS. ¦ r 9 7 8 6 ~ 2 3 4 5 T S: NO ~ z YVIGOROUS MATERIAL, FREE OF Q O 1. ALL PLANTS MUST BE HEALTH , J PESTS AND DISEASE. ~ Q 2. ALL PLANTS MUST BE CONTAINER GROWN OR BALLED AND BUR _ ~ REMARKS d I ATED IN THE PLANT LIST. Y N NAM E LAPPED AS INDC COMMO AL NAME OTANIC B LL HEADED AND 3. ALL TREES MUST BE STRAIGHT TRUNKED AND FU PECIFIED. ctober Glo 0 tober Glo Ma le 33 2" " 10-12~ B&8 SHOD 3 MEET ALL REQUIREMENTS S AR Ac r rubrum 0 14-16 B&B SHOD4 4. ALL PLANTS ARE SUBJECT TO THE APPROVAL OF THE AR1 Acer rubrum October Glo October Glo Ma le 3 3.5 AND A~TEp IhlcTp,LLArION, ~ m ' A n FI I 1 -1 M~1 ~ANu"SC~iPE AFc~Ni`~,,7 BEFORE, DURING, ARF A,c r r ° r A umr ~ _ ~f1 A 5. ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE i n i 'F r P For P n R DETAILS. r ST BE COMPLETELY MULCHED AS canadensis 'Forest Pans ' Forest Pans Redbud 30 X 6 min 8&B SHOD 6. ALL PLANTING AREAS MU CC1 Cercis A deodora Deodora Cedar 13 x 8 min B&B VSA SPECIFIED. CD Cedrus g 2 8 6&B VSA . 7. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE CF Cornus florido Flowerin Do wood , UTILITIES AND RESPONSIBLE FOR LOCATING ALL UNDERGROUND SHALL AVOID DAMAGE TO ALL UTILmES AND SHALL AVOID DAMAGE TO ~ I ~ _ ALL UTILmES DURING THE COURSE OF THE WORK. THE ' ' ' ' _ 4 CONTRACTOR 15 RESPONSIBLE FOR REPAIRING ANY AND ALL DAMAGE _ " ' TO UT1LmES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH r E OCCURS AS A RESULT OF THE LANDSCAPE CONSTRUCTION. 11 2" 8' B&B VSA P NSIBLE FOR VERIFYING ALL pK Prunus serrulata 'Kwanzan' Kwanzan Cher 8. THE CONTRACTOR IS RES 0 40 2 8 min B&B SHOD 3 VSA S BEFORE PRICING THE WORK. Pinus taeda Lobloll Pine ~w ~ QUANTmES SHOWN ON THESE PLAN 4 3.5 14 min B&B SHOD 4 O RA TOR IS RESPONSIBLE FOR FULLY MAINTAINING ALL pTt Pinus taeda Lobloll Pine TPY ~ Z NT C ~ O 9. THE CO 13 2 10-12 B&B INCLUDING BUT NOT LIMITED T0: WATERING, SPRAYING, L uercus lourifolia Darlin ton' Darlin ton Oak 10-12 B&B VSA O PLANTING ( Willow Oak 10 2 G v. o. v_ c MULCHING, FERTILIZING, ETC.) OF THE PLATING AREAS AND LAWN P uercus hellos Wi11ow Oak 7 3.5 14-16 B&B SHOD 4 WORK IS ACCEPTED IN TOTAL BY THE OWNER. OP1 Quercus hellos 4 2 10-12 B&B SHOD 3 VSA x M~ UNTIL THE 8 10. THE CONTRACTOR SHALL COMPLETELY GUARANTEE ALL PLANT QPA Quercus alustris P';i Oak 30 3.5 14-16 B&B SHOD 4 STREETYARD NO o c N 1 YEAR BEGINNING ON THE DATE QPA1 Quercus alustris Pin Oak 2 10-12 B&B VSA STREETYARD A t Z ~ r` E MATERIAL FOR A PERIOD OF 0 E 9 CONTRACTOR SHALL PROMPTLY MAKE TD Taxodium distichum Bald C ress 2 10-12 B&B VSA OF TOTAL ACCEPTANCE. THE Villa a Green Villa a Green Zelkova 16 1O~~•- ALL REPLACEMENTS BEFORE OR AT THE END OF THE GUARANTEE ZV Zelkova serrata x Icy m _ ~ ~ a PERIOD. M ~ 3 AKING LOCATION OF ALL ~ ao a a, ; 11. THE ARCHITECT SHALL APPROVE THE ST INSTALLATION, Sh rU bS PLANT MATERIAL PRIOR TO 12, AFTER BEING DUG AT THE NURSERY SOURCE, ALL TREES IN hunb r ii 'n n ' Crim n P m ar er 36 12" out ACCENT WEEKS UNDER A MIST T rb ris 42 24" nt TPY LEAF SHALL BE ACCLIMATED FOR TWO (2) CJ Cle era Ja onica Ch, era TALlATION. Pun ens Thorn Elea nus 264 18 out SHOD TPY SYSTEM PRIOR TO INS EP Elaea nus 13. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR I n s P n en Thorn le n s 41 24 nt H B F THE WORK SHALL BE P1 527 18 nt VSA DEFOLIATES (PRIOR TO TOTAL ACCEPTANCE 0 ) ICC Ilex cornuta Larissa Corissa Holl 158 18 ant ~ PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL ICR Ilex cornuta Rotunda Dwarf Horned Holl 12 nt ACCENT OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL ICS Ilex crenata Stokes Stokes Ja anese Holl 6 NT IFICATIONS. ni r s mm nis r s Pro tr ni er 1 4 1 out A PLANT LIST SPEC nt 14. STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY i out STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL cont CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL. ~ cont 15. ALL SHRUB, GROUND COVER AND SEASONAL COLOR ANNUAL 18" out SHOD SA MPLETELY COVERED WITH HARDWOOD LR Li ustrum recurvifolium Recurve Li ustrum 300 „ PY PLANTING BEDS ARE TO BE CO 41 24 out SHOD MULCH TO A MINIMUM DEPTH OF FOUR INCHES. LR1 Li ustrum recurvifolium Recurve Li ustrum 16, LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE out PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO 1 1 nt BE CONSIDERED APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATIONS OF UTILITY LINES AND ADJACENT TO THE WORK AREA. THE CONTRACTOR IS RESPONSIBLE Peren~als ILITY LINES DURING THE Groundcover FOR THE PROTECTION OF ALL UT CONSTRUCTION PERIOD. m r i ' i I it urf 250 4" 0 12 o.c. ee„„„ ~~n! PEDESTRIAN AND VEHICULAR ACCESS M iri x 17. SAFE, CLEARLY MARKED x TO ALL ADJACENT PROPERTIES MUST BE MAINTAINED THROUGHOUT tit TI N PROCESS. ~ D THE CONSTRUC 0 and Plants : ~ noon P 9 Dete 4 A 1B. DURING THE GROWING SEASON ALL ANNUALS SHALL REMAIN IN r O , THROUGHOUT THE CONSTRUCTION ffu Soft R sh 5 8 2 o.c. F A HEALTHY, VITAL CONDITION n 2' o.c. a eria cordata Pickerelweed 781 Pr ul $~rr~~ ~ X PERIOD. PC Pouted iE a UANTITIES SHOWN ARE APPROXIMATE. i us validus Bullrush 745 Pr le 2 o.c. ~ 19. ALL PLANT MATERIALS O SV Sc ~ ~ RESPONSIBLE FOR COMPLETE COVERAGE OF 'P/ L~ ~a CONTRACTOR SHALL BE ~ jp~, p; ALL PLANTING BEDS AT SPACING SHOWN. 20, ALL DISTURBED AREAS ARE TO RECEIVE 4 OF TOP SOIL, P, t~d'~'`;,a`'`~ MULCH, AND WATER UNTIL A HEALTHY STAND OF GRASS IS I DS AND N'"unuu~ia+~u~a OBTAINED. THIS IS EXCLUDING ALL LANDSCAPED SLAN ENTRANCE AREAS. ~.I t~1 e3 C n.+r n, rtLL ~Yi ~iJf~lli~Tl/~Yr~ 'tl , R'Li Ltt i v ~1r~..~~i~, Jt' Cvd ~1~.}~ i ~l`~ ~ ~ NEEDED FOR IMPLEMENTATION OF PLANTING PLANS. DETENTION POND PLANTING SPECIFICATIONS 1. PLANTS WILL BE INSTALLED OVER THE SHALLOW PORTIONS <6" IN DEPTH (NORMAL POOL) OF THE WET POND. PLANT MATERIAL IS TO BE MAINTAINED IN COOL, MOIST 2 ENVIRONMENT UNTIL PLANTING. 3. LIVE PLANTS ARE TO BE INSTALLED BY HAND USING TREE PLANTING BARS (DIBBLE BARS). PLAN 4. LIVE PLANTS ARE TO BE INSTALLED SO THAT ROOT COLLAR IS AT (OR SLIGHTLY BELOW) SOIL SURFACE (NOT SIGNIFICANTLY ABOVE OR BELOW GRADE). EXISTING GROUND 8" 2-PLY RUBBER HOSE 5, PLANTING HOLE WILL BE OPENED BY THE DIBBLE BAR, PLANT DOUBLE STRAND 12 GAUGE WIRE W 2-PLY RUBBER HOSE PROPERLY PLACED VERTICALLY, WITH ROOT COLLAR AT APPROPRIATE COVERED ( PLANTED FL ORESCENT ORANGE COMPLETELY NO AIR ~ Q ELEVATION) AND THE HOLE WILL BE CLOSED ( ~ SPACE AROUND ROOTS) WITH DIBBLE BAR AND FOOT PRESSURE. ~ WHITE FLAGGING (TYP.) ~ Z CUT BACK SLOPE ` \ TREE WRAP d 6. LIVE PLANTS SHOULD NOT LEAN MORE THAN 10 DEGREES FROM `0 ~ J TO PROVIDE J VERTICAL. - ~~U j 4 INCHES MULCH A FLAT SURFACE (n N FOR PLANTING 4 INCH DEEP SAUCER ~ 7. ALL ROOT PARTS MUST BE IN GROU D 1 ~ W 8' STEEL TEE POST D Z C. WILL BE PLANTED BY ~ a~~~,,~~a~ Z F' 8. PROPAGULES (DORMANT RHIZOMES, ET } - BACKFILL MIX Q ~ „ ATNE PORTIONS OR ~ O W HAND 1 -2 INTO SOIL SURFACE WITH VEGET ( ~ N a BUDS FACING UPWARDS. ` ~ Z W ) UNDISTURBED SUBSOIL Z iii i ~ W W Z 9. PLANTING WILL NOT OCCUR WHEN SOIL CONDITIONS ARE NOT , ~ f- ~ 3~ ROPE I W TION E.G. FROZEN GROUND . REMOVE BURLAP do Q Z Q CONDUCIVE TO PROPER INSTALLA ( ) Q ~m FROM TOP 1 /3 OF THE BALL ' ? W I... ~ 10. PLANTING SHOULD OCCUR DURING THE PERIOD FROM MARCH V Z W3 ~a 1ST THROUGH APRIL 30TH. THE TYPE OF MULCH MATERIAL TO USE. Z ~ ~ W NOTE: SEE LANDSCAPE NOTES FOR W W QZ J 4. m wt W ~F ~ Z . m N 3 w~ I LAWNS. . c~ PE w W SLO ON TING AN PL RE T Z= 3 LAWN SEEDING SHALL BE AT THE N.T.S. W Z FOLLOWING RATES: ~ Z ~ W~ . PAR ..1000 S.F. OF LAWN AREA:.-- D _ J 3 LBS. TURF TYPE FESCUE "TYPE A" Q 3 LBS. TURF TYPE FESCUE `TYPE B a (TWO DIFFERENT FESCUES TO BE SELECTED FROM pq 00 VARIETIES RECOMMENDED FOR PROJECT AREA) p~0 Oo Use 2" x 2" x 6' hardwood stakes and #9 1 LB. KENTUCKY BLUE GRASS a0 wire encased in rubber hose for staking u b architect. ~0 0 p o when needed or as directed y E 0 0 ~ o Use tree wrap up to first whirl of branches o , 0 0 on trees above 1-1/2" caliper to prevent ~ scalding. op o ,oo ~ , To promote aeration and percolation in o ' 0 0 , heavy sods, plant rootball above existing 0 0 o grade as shown. p o a e p Backfill with 80~ parent material and 20~ ° decomposed organic matter by volume e well mixed. Provide 6" minimum of backfill on each side of rootball to promote rapid re- establishment. Provide an earth saucer for water retention. - REVISIONS BY _ Minimum 4" thick pine straw in 5' diameter circle or as shown on plans. 29 JUL 2003 SKO I_ r = - EXPRESS REVIEW 23 SEP 2003 SKO TREE PLANTING WAL-MART F To promote aeration and percolation in heavy soil, plant rootball above existing grade as shown. e ~ Provide on earth saucer for water retention. 0 Backfill with 80% parent material and 20% o decomposed organic material by volume well mixed as approved by the architect. Provide 6" minimum of backfill on each side I II of rootball to promote rapid reestablishment. I I I'- I- Provide minimum 3" thick pine straw in 5' II 11= wide planting beds or as directed on plans. II- il~ DRAWN SKO GPW CHECKED SHRUB PLANTING GPW DATE 11 JUN 2003 (90% CD) SCALE JOB No. G RIBPCW SHEET ¦ LANDSCAPE DETAILS. 4 5 6 7 g g 5 1 2 3 \ ~ ~ I AINAGE STRUCTURE SCHEDULE STORM DR ~ ~ ; ~ ~ ~ ~ ! i ZE LENGTH SLOPE TOP ELEV REMARKS MARK INV IN IMF OUf SIZE LENGTH SLOPE TOP ELEV REMARKS MARK INV IN INV OUT SIZE LENGTH SLOPE TOP EIEV REMARKS MARK INV IN INV OUT SI ~ ~ , iSE BASI~J NOTE - - ~ X NEUSE BASI~J c~> cX~ cm cX~ cm c ) y EXlsr. wETLANOS ~ ~ 1 PROPERTY IS VESTED FROM THE ~ (TYp.) 3' 250.00 245.31 253.2 JB THIS PROPERTY IS VI 1 275A 278.01 RTCB 58 (57) 256.82 256.62 270.1 t JB/MH 63 ( ) REQUIREMENTS OF TF '~REMENTS OF'.THE NEUSE BUFFER ~ ~ ~ ~ - 15' RCP 22 3.OX 63-64 12' RCP 162 0.5X RULES AS INDICATED 12 7H V STEO 1 i AS INDICATED IN E E ~ - - S LETTER FROM NCDENR DATED ~ 44 PIPE END RIGHTS LETTER FROM 2 274.33 274.13 278.1t(TC) CI 58-59 42' RCP 97 1.OX ~ 2 ~E91RLshRY T4, 20G3. ,S~t't 14, 20G3. ~ ~ \ .45 ~ 27).91 C CI 65 241.56 253.8 (T'S) R1WI 2-3 18' RCP 46 1.OX 59 255.65 255 (T ) 3 273.67 273.47 278.5t(TC) CI 59-60 42' RCP 140 1.OX 65-66 42' RCP 8 2.OX ~ ~ ~ _ , y.. ~ I ! ~ \ A 3-4 18' RCP 3s 1.59. 60 254.05 253.85 1270.9t(TC) CI 66 241.40 241.20 253.6 (TS) RTWI i I ~ v A A 4 272.90 272.70 276.4t(TC) CI 46-61 48' RCP 140 1.Of. 66-67 60' RCP 34 1.OX 4-5 18' RCP 70 1.15X 47-61 15' RCP 66 3.OX 67 240.86 ENDWALL w 5 271.90 271.70 275.51 JB/MH 60-61 42' RCP 244 1. X ' \ `1 1 \ 1• 71. 275.01 CB 61 46 248.76 242.80 266.9t(TC) CI ' ' 6 2 5 ( ) ~ ~ , , A., r . , I ' I ~ _ ~ ~ ~~I, - / ~ / 6-6A 15' RCP 133 3.257. (47) 260.45 ~ , ' ~ ~ ; I f, i FER TO SHEET C-8.1 AND ~ ~ ~ , .1. ; , ry ~ , ,NEW PRNATE -7 18' RCP 147 3.OX (60) 251.41 A ~ ~ ~ ~ ~ ~ l t 1 ! ~ ~ ` I ` !DRAT AGE EAS PENT i ~ 2 FOR IMPROVEMENTS IN ; ~ ~ ~ ~ ~ ' ~ ~ ~ i 6A-7 15' RCP 90 1.OX ~ RPORATION PARKWAY ; , ~ ~ ~ n 7 (5) 267.28 265.88 271.4(TC) DI 61-62 48` RCP 33 1.07. ~ ~ , , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - ~ - 1 I r _ ~ 1~ , [ 62 242.47 ENDWALL \ ~ • , ~ ~ 1 - _ - - - - - - - - - " - - - _ (6A) 266.08 ~ . PRIVAif•- BRAMIA6E ' ~ , C ~ ~ ~ . _ ENT TYP. I - " 8 261.5 265.01 B \ ~ ~ _ ) ~ . ~ •i- _ - - - _ , W _p B-9 15 RCP 117 1.OR i l ~ ro ~ I ~ . . ~ ~ ~ / ~ r ~ - - 1 I _ _ _ _ _ , i O AIL 9 260.33 260.13 265.51 CB ~ I I \ -T....~~ _ z-,-~_ ' - _ _ _ _ = ~ • _ 7-10 18' RCP 191 3.3X --~-y' ~ SS ~ r ~ ~i ~ ~ X}~ O A I ' W~ 0 1 - r n 9-t0 15' RCP 70 1.OX 1 i _ ; _ 1 ~ - 7 59.58 259.23 267.8t(TC) CI ~ - , ~ I . ~ _ ~ 15' II~P r 10 ()2 , r-- ~ If , ..i~i ~ ~ 1 - I I zeo ; ~ 2so 5' RC ~ ~ . (9) 259.43 ~ ~ - - 10-11 24' RCP 7 1.OX ~ _ - RCP \ ~ ti ~ _ 11 259.16 258.96 267.8t(TC) CI - • 1 ~ ~ 11-12 24' RCP 40 1.27. ` ~ ~ ~ ~ ~ ~ ~ - ' 270.95 - - R AWING WAL ~ ` m RoP _ NEB ~ - NEW CL. B EROSION :15 r NEW ~ATE-BRAINAGE TOP OF WALL V~RiES ~ as , 12 258.56 258.36 267.7t(TC) CI ~ ~ + , - _ ~ F R - - ' r ! c. \ B ~ ~ - o o ; ONTROL STONE APRON i ~ ~ ' ~ ''EASEMENT (TYP.) ~ ' ~ ~ ~ 5~ MAX. ~ • - C r ~ 1 ~ ` , 1 ~ ~ i~(MIN. 32'Lx12'Wx22'iH) 12-13 24' RCP 168 1.57. - - ~ 6' ~ ~ PRIVA~~ ~ 1 ~ SLQ~E - _ ~ _ ~ ` c,DN GEOTEXTILE FABRIC ~ ~ ~ 13 255.84 255.64 267.2t(TC) CI ~ ~ ~ ' 1 ~ ~ ~ .f ~ ~ ~ „Fc~ DRAINAGF~/~EASEMENT ~ 1 ~ ~ s. TRAM 1 r i . ~i ~ - - ~ \ • 14 257.33 262.Ot(TC) CI \ \ i r ~ ~ P . 1 • ~ 271.0' 971.5~~ \ ~ ~ ~ 1 , , ~ - ~ - , } ~ ~ ' ~ : ~ "f..' j c ~ f' LINE ENBANKMENT WITH 14-15 15' RCP 39 1.07. ~ ~ I ~ ~ % . ~ ~ i I ~ ` 1 i ~ ~ " - `U ' i, , ~ ~ ii ~ - -1 ~ ; ~ CLASS i RIP RAP (MIN 22' - 15 256.94 256.74 262.Ot(TC) CI , \ ' ~ , \ I ! r~ - I j ~ - • ~ _ r ~ ; , ~ ~ ~ THICK) ON GEOTEXTILE 0 ~ ~ -y,~ ~ ~ ~ A 15-16 15' RCP 59 1.07. \ \ \ - ~ ~ \ - Z ~ 1 ~ ~ + s ' ~ ~ FABRIC TO ELEVATION 246.0 + X70.54 ~ 16 256.15 255.95 265.4f(TC) CI \ ~ ~ ~ I _ 268.83 ~ • ,A ~ i , •l. Se ~ ' 'LP 1 : 42 RCP 1. ~ I , ~ r D S01 ~ ~ i OR eo t,n \ WO FLOOD HAZAR LS 16-17 15' RCP 33 1.07. ~ ~ ~ i 17 255.62 255.42 263.Of JB/MH ~ _ 'b • b _ , ~ ' ~ 42' ( BM 1988, PG 1363 sa ~ 18 255.23 259.5t(TC) CI ~ 'y ~ • ~ a ~ ~ J~a ~ ~ , TYP. EA. SIDE - r \ , \ , \ ~ t +n 48" RCP • ~ ( 1 18-19 15 RCP 67 1.OX / • ' I i ! ~ \ ~ I 2x1.92 271.9 5p 1" ` ~ ~ ~ I z- - I I I g - \ ~ ~ 19 254.56 254.36 261.9t(TC) CI / , I ~ ~ ~ ' I ~ ~ ~ \ , 272.0 271.5 ~ 271.9? ,i - - \ ' ~ 1271.5 272.0 ' 271.5 271.92 ~ e~ , I i K - 1 7 ~ .N. R ~:.i, 19 20 15 RCP 184 .0 , 1 ! 272.0 ~ 271.5 n 269.5 p 272.0 - BERM - 254.3 20 252.52 252.32 261.3f(TC) CI ~ ~ - - - i , ~ ~ r i 1 O ~ I': ~ , - ~ - \ ~ ~ I I I 267. ~ - ~ i ~ ~ 36" RCP ~ N J • ~ 11~ 20-21 15' RCP 183 1.OX \ j ~ ~ t~ rl ~ 269.5 A ~ .r, _ ~ hid ' I • ~ 60" RCP t~ ~RQ ~~i ~5, I ~ CI ~ ~ ~ f j • 21 250.49 250.29 261.6f(TC) 5.~ 1 , ' ~ I ' ' 27.1.33 : ~iNEW CL B EROSION , / ~ I , ' i ~ ~ • ~ .I 9 17-22 15" RCP 233 1.SX \ ~ i ; ' 27 L3 - • 1 , ; ~ , 271 s2 ~ © 1 ` ~ CONTROL STONE APRON ~f Q ' ~ ~ ~ / ~ ~ ~ ~ a ~ ~ ~ MIN. 40'Lx15'Wx22"fH 4 ' 22.0 1 ~ 1 • ( ) y MAX. SCOPE ON ~ ` ' 5 ! v ~ • 21-22 18' RCP 10 1.07. IDEWALK ; ; 271 2 ` ~ , ; ; I ~ ` i , ~ BERM: 249.0 'ON GEOTEXTILE FABRIC / ~ 1 I , , _ _ _ _ 271.8 22 (17) 251.93 250.00 261.5t(TC) DBL CI r~ ~ ; ~ ' ~,I ' ' I ~ ~ NOTE: REFER TO LANDSCAPE I ~ 272.0 I (21) 250.20 ~ I ??.g~ ~ ~ ,r~r~. • ~ ,p 'PLAN FOR SLOPE t•' . ~ ! 271.6 ~ STABILIZATION AT DETENTION 0 ~G r' C ~ PR i ~ ~ ~ 1 271.8 ~ 71.5 22-23 24' RCP 125 1.OX ~ j ~ ' ~ ~ \ - ~ ~ ~ , ' ,I I 1, ~ , ~ t° ~ t~ 1 PONDS AND LEVEL '•.,P. N~0.~~`' 271.62 , 1 _ ~ I ~ wET aOND 2 ~ • ~ j ' ' i , I ~ ~ /.r.. , 1 , .-SPREADERS 23 13 251.00 248.50 262.61 JB MH y-' ~ ' ' ~ I ~ W~ . ' i ~ ` ' l w.E.~ 250. ~ ~ Lt ~ I' r I ' (22) 248.70 ~ 1 ; ' 1 \ \ gin' ' si Z7 271.92 f I I ~ ~ ~ NEW CL B EROSION i ' ~ ' , I I LEVEL- CONTROL STONE APRON' ~ sz / I 23-23A 30" RCP 55 1.5X ~ r 272.0 ~ ; i ! ! , ' I I S ~ EADE ~ ~ .'r , . (MIN. 21'Lx12'Wx22"TH) 247.68 47.48 262.78f TC CI \ / - ~ I I i ' ' . 23A 2 ( ) ~ I ' SUPE~CEN~E~ JL92 ~1 .':'.'.I:'. ' N OT XTILE FABRIC _ 0 GE E - 4 30" RCP 120 1.57. ~ ~ ' ~ ~ - / + I I 23A 2 i I ; f, i - ~ 1~ ~;C='f~g2--~GL OL ~ j , • NEw LEVEL sRREAD~R ~1 24 (23A)245.68 243.82 256.01 JB/MH \ ,,~p ! ~ I,' I ~ ~ • i ' , I ~ I ' - ~ rti. i ~ . i ';r'; ~ ® ~ i / _ SEED ANY BAR AREAS ~ .9 c • 1 ° 272.0 I ~ 203,942 , S.F. a ~ ~ ~ ~ , , ; I ~ r~ , t n ~ ~ , • ~ . • j . ~ - IN LEVEL SPREADERS ~ ~ 24-25 30' RCP 91 2.OX NEW RETAINING WAtL ` , I `il"I I k TOP OF WALL VARIES I ~i~, ~ I ~ ,~I~; I I ' I I f.F.E. = 27L.O 7 ~ I ~ 12' RCP WITH WEEPING LpvE ! ~ ~ 25 243.78 FES ~ I 27 ~ I i , I ' ' ; I ; i , ,'i;, I i i ~ 271.6 i / ~ / , -~6F_'~,S$ I I , ; I 1 271.92 O fj!~ ~ • 12' RCP ` ~ ~ y. 25A 2' 247.3 242.33 249.8 JB ; I ~ ' I • ' ~ ' ~ ' ~ ( ) \ °,~,i I ~ Q / 272.0 I;,`. 1; V J ..i . ~ ' ~:42• RCP r ~ °T~ ' ~ 1 ~ 25A-25 12' RCP ss osr. , ~ I I ~ ! + ~ ~ ' v2.o ~ ~ I , i I ~ ~ ~ ~ ~ ) L` f~ ~ 1 % ~ 258 242.00 PIPE END ~ 24 ~ ' } ~ ~ , I , . , ~ , ~ , / ~:F1~ -i--~/- . i ~ ~ ~.,i ~ i / ~ NEW CL. B EROSION 25C 242.00 250.31 (TS) RTWI ~ ~ ' , I ' ~ ~ ~ ~ u ' , , ; : i N CL B EROSION , , " _ _ ~ ~ I I ~ ~ _ > ~ ~ t ,CONTROL STONE APRON ~ ~ i 25C-25 42' RCP 31 O.SX ~ I ! ~ ~ ~ 27 .D ! ~ 1 1 , ~ , ' ' CO TROL STONE APRON j _ ~/~i ~ V V~ MIN. 20'Lx7.5'Wx22fiH tt,f (MI . 32Lx12'Wx22"TH) :a'i i ON GEOTEXTILE FABRIC 25D 241.85 ENDWALL ~ ~ ~ + 'I 2 1. ~ ~ ~ ~ , . I ' ' ' i ~ . . ' 1 ~ I i i 4 ' ; I ' ' ! ~ ON GEOTEXTILE FABRIC © ; `,i' 1 ~ I 26 (15')279.06 278.86 296.01 JB/MH ~ • ~ i I ~ ~ ~ ' ~ ; ~ ; , ' ~ ~ ~ .I. I I ~ i ~ - ~ ~ ,PROPOSED ~ ~ ~ ~ • , , ~ ~ ; , ~ ~ N - °J BERM 250.8 Q (2)2 950 ~ ; 'I• ~ 271.7 272.0 ~ / 1~:.:-, i I ~ j yowET POND d ~ ~ ~ ~ ~ 7 ~ - - . - a W.E. 24Z. ~ \ r l i 27 .p 27 280.30 288.3f RTCB 1 ~ ~ ~ I " •o i , R •P' ~ - ~ ~ Z 1~ ~I I 72.0 ; I, 6-27A 42" R P 172 2.OX + VP 4ii h ! ~ 2 C 1 ~ 2 .2 ti ~ i; ' 272 + } I, - 272.00. ~ ~ ?~ir•f' ~ _ i \ ,NEW RETAINING WALL i J r •272'0'- ao i"` ` ~ i . 272.0 - _ 4 ~ ~ TOP OF WALL VARIES . D 27-27A 15" RCP 23 10.07. ~ G ~ ~ ~ p GUY ~ ~ ~ ~ 271.Tb I 271.75 ~ ~ - _ - ~ , 27A (26) 275.42 271.40 283:Of CB ~ ' _ , c, , - - ro 272.0 272.Q 1 _ r , ` i 271.7 ~ ~ ~ i ~ .~"2yC- ~ i I~~•o'~ ~ . • (27) 278.00 ~ , ' ~ ~ ` ~ ~ ~ ~ to Z f' 6 OC 1 4 83.01 RTCB ~ ~ r-•.,,v, ( ~ ~ 27~.8~- .271.85 I' ~.--,-y--.~ 28 27 .2 2 ~ -f MlN ~ ' 7 f - I . ~ ~ 19 71.75 PI ~ 1 i a 2 14 ? 261.1 15" - ~ 29 275.93 279.7t(TC) CI 7 ~ ~ ~ - ' / , ' ` D IN (TYP,) 271.7 ' ~ ' • r r ~ 6 c U d 271.75 27.75 ' •'I I ~ ~~263.J 263.3 / \ S W W Z Wa 29-30 15' RCP 53 1.OX 1 \ : , ti ~ 46 RCP 1 n l~E 262.8 r k ` _ ~ r~ - 2 9m 30 275.40 275.20 279.8f (TC) CI ~ , , ~ " ~ - - - - 1 ~ _ - ~ 271-8 - ,.-~~•J_ 27o.a ~ `rr s ez. ~ ~ 0 OW t ~8" RCP 63.5 ~ . ~ ~ Q ~m 1 , oW - (D 30-31 15' RCP 24 1.OX _ ~ - = _ - ~ - _ - ~ ~tpp - ~ .270.3 ~ ~ _ _ - - .~E I' W - ~ U ~ a. 770.22 ~ , +r 262.75 . •263.5 ~ Z e ~ 1 ' - -'RROPOSED , ' 262.8 V - f3: 31 274.96 274.76 285.St(APRON) RTCB ; ~ a P r l - N.. . I , 270.22 `f~ 265.0 - RETNL ~ U 26 5 ~ '°o, Z ~ ~ W A ~ ~ ~ a ~e 0 t - . PROPOSED' . _ . ~ ~ , " lLl Z } W 1-32 15' RCP 66 4.4X - ~ A 3 ~ _ a ~ " ~ ~ o . s s FFE 263.5 - - ~ ~ W J a ~ ~ r ~ ~ ° 4 . RCP ~ „ OFFICE." ~ - - a m W W 32 271.86 271.66 275.8t(TC) CI _ - _ ~ ~ a ~ ~ ~ i r a _ 15' RCP _ ~ • ~ ' _ 1 36 ~ ® ~ ~'0 3 W ~ , ~ ; g, a ~ =263.5 ~ ~ ~ ~ ~ _ ~ P ~ ~ • RCR ~ ,j• r 263.5 ` ~ ~ ~ 3 J LU -J 27A 33 48' RCP 128 2.OX . ~ _ - ~ ~ i R 263.6 ~ m W l • 1 r ~ 262.84 ~ - 1 1 ~ ~ . ~ ~ ~ - ~ ~ LIJ C< 28-33 15' RCP 60 4.OX - _ = J : lP - ~ ~ ~ _ _ ~ , ~ - ~ } J. + ~ i ~ ~ ~ 41 ~ ' ~ 262.86 i~ ~ \ , o i ~ 62.68 _ - ~ Z . 32-33 18' RCP 146 1.OX ~ ,1_ - 262.6 I 1 1 - - W 33 (27A)268.84 268.64 275.8t(TC) CI - ~ ~ g,5 % , i 'r ~ 1 ' 262.84 ~ : 1 ' 262.84 ' 3 i . Z 48" FCP 6~' I _ L 3 ~ (28} 268.84 - 5 RCP " _ 32 2/0.20 f? - ~ _ - _ _ - 1 ~ ' ' f.. - - ~ ~-262.48 I I ' ~ ~ I 262 48 ~ - ~ ~ MI ~ - ?4• K ~ ~ ~ ~ RCPT I ~ j 1 ! ~ CP~ - 15' RCP , ~ 262.84 ~ ~ Q II - . - y ' - _ - - - - _ i ~ , - ~ V u_ x ~ o 34 266.63 270.5t(TC) CI I L - _ - _ as _ _ ~ ~ ~ • 260.98 1 - ,4 a 33-35 48' RCP 263 2.59. ` 2FiR.1 . , ~ • 4' ~ 15 ~ r' I M ~ ' r~, 2 O _ 61..Y 34-35 15' RCP 123 2.5X , , - _ _ - " - ~ - - - - 9iV - - I 1 ~ ~ i 4 l/ ~ , 40 21 35 (33) 262.07 260.28 268.6t(TC) DBL CI ` f ^ - - p~ _ - - - , r. % fj ~ ~ ' E (34) 263.85 ~ 4 II a si !s - - ~ ~ 15' RCP ~ - ~ ' 1 ~ '.•I ~ ~ ~ 35-36 48 RCP 18 1.2X ~ i ~ ~I r~ ~ ~ i ~ I r l i 36 260.06 259.90 268.6t(TC) DBL CI _ ~ - Q ~ ~ ~ NEW RETAINING W ~ ~ ~ ~ r i'I ' 1 ' i. ! ' w ~ ~ ; ~ , 36-37 48' RCP 245 1.2X ~ _ _ _ TOP OF WALL IE _ - ~ , 37 256.92 256.72 268.9t(TC) DBL CI BENCH MARK ~~~'a I ~ ~ ~ i ~ ~ ~ , r FlR H RANT \ I ~ ~ ~ Iii _ _ ! - ~c , 37-38 54' RCP 130 1.OX E YD ~ _ _ ! i ~ ~v ~ ~o ~ i ~ i a ~I ~ , TOP PAINTED FLANGE BOLT \ ` - _ ~ ~ _ - - - ~ . 38 255.42 (39) 255.22 268.31 JB/MH ELEV-297.53 ~ ~ - r- _ - ' 1 ~ + 42 255.22 SPUTTER (NEW BENCHMARK WILL NEED o \ - _ ~ oq ~ ~ , y74,7:: _ _ ~ ( ) ( ) TO BE ESTABLISHED) yq4 - _ ~ - 275.7 - 1 - _ - , 38-39 48' RCP 75 S.OX - _ ~ _ _ _ - ~ ~ 39 251.47 247.87 266.31 JB 5'X5' ~ - _ _ - 1 ~ ii I ~ ~ ~ ~ - y r r 39-40 48' RCP 47 1.07. - / - - ' _ I ' ~ ~ `273.5 ~-"e 40 247.40 ENDWALL 41 260.96 265.2±(TC) DBL CI a s 8.0% _ ' 38-42 48' RCP 64 1.0% .274. 2 9 - - } i 4 RCP 41-42 18" RCP 129 3.0% 1 \ \ 15' RCP _ i 269.4 267.3 263.1 47± JB MH 15' RCP 42 (38) 254.58 25.38 268 / _ 41 257.09 s > • a > - - REVISIONS BY 12 Y -43 48" RCP 32 1.0% - - 42 • • A w APR LW V 8KO 43 254.06 253.86 269.4±(TC) CI i . • ' - - - _ ~-OM D 18' RCP (DE" CIM SKO 1 s 76,8 24' RCP n n 43-44 48" RCP 105 1.0% - 76.34 0 15' RCP . 06 JIM 2005 66.34 00 44 252.81 252.61 270.3± MH QpW mWQ REVEWI ttt aww 44-45 48' RCP 105 1.0% 6.1 274 2 i 270.5 to - - 264.8 / _ fl JUN 2005 - P ~ - - ~ 1(F. n I 2 1.46 I ~ 265.4 15' RC 3 _ t p 4 (90% CD) DLH 45 251.56 251.36 268.5±(TC) CI - 8 C- 270.92 270.4 s 267.0 DLH 45-46 48' RCP 100 1.0% a ; 1 0~ 12"X12" PRE--FABRIC 2" PRE--FABRICATED - .277.0 - i I I 21 AL 2005 1 tr t l o 46 250.36 250-16 268.8±(TC) CI REFER TO SHEET C-8.5 PVC-AREA DRAIN Vk=l ~ RAIN I 271.04 15' RCP QPW 1REA D _ t l o i ~ II fq3w$} ~ q OPw FOR IMPROVEMENTS IN TOP=2'76:8 a0 47 262.43 265.9±(TC) Cl NEW HOPE ROAD INV=274.8 276:8 276.84 70.7 - ° 15' RCP t i !74.8 _ - 1, r 49 266.48 283.0± CB M p a ~ 277.0 I 2 .34 271.56 271.06 ( I 267 is v 49-50 24" RCP 52 .0% i j NEW RETA N1NP WALL •TOP_OF WALL VARIES _ ~zec- 6\ 27 .98 265.98, - l 50 264.92 264,72 269.5±(TC) DBL Cl Z 1 _ I m 70.9 ~ PROPOSED Q. 51 268.00 272.0±(TC) Cl ~ - _ . _ 1 , ~ _ e RETAIL _ NEW RETAINING .WALL ~ 50-52 30' RCP 97 TRACT ID ' 1.07. - - - ~ - ! - - - - ~--zea-~ Q - ..SIGN " " - - T00 -Of WALL VARIES RETAINING .WALL - 277.0 FPE - 271.7 2 0.0 h ' 'PROPOS WALL VARIES 270. 271.56 271.06 2 .5 a I 266.34 PROPOSED; 8' PVC 0 )F I T0P-276.8 RETAIL 5.7 266. 4 w 51-52 15" RCP 25 9.0% RtaniL : 1% MIN I i FFE - 277.0 I FFE - 267.0' , 52 (50) 263.75 263.55 270.4±(TC) Cl 8 8 ,.PVC: 0 t.0•% -MIN. 'C 0 t:o-% -MIN. 0P=276.84 I (51) 265.75ppu V •w 8' PVC \ ® -1-.09. MIN. 27 w 'C.® -1-.09. MIN. - %or 266.84 U 52-53 30" RCP 120 1.0% - r ` ` - - - - • RC w 6' PVC 0 267.0 5.0% MAX. , e I 1% MIN 8 266.58 SLOPE 6 i 53 262.35 262.15 269.81(TC) Cl 3 8 79.1 - - - - - 3 54 266.80 270.8±(TC) Cl v 9 pp P MH PP UGFOC _ PP OHPkPH P P DRAWN • 54A 278.00 281.5± Cs pp I - N 53-55 30" RCP 155 1.07. ! on-on -0 A CFECKED - -----x - a w w w w w wp r w--w w y 54-55 15" RCP 93 5.07. w w w w w w w w w~~ w w -_____~--_H -55 15" RCP 155 10.0% a U'GFOCM~ 4 gOUTHERN BELL 54A 1 F18ER OPTIC CABLE MARKER ! NOSE: DO NOT EXCEED 2% SLOPE, , I UGFOCMJ ~ DATE ILE MARKER EACH WAY ACROSS HANDICAP ! 55 (53) 260.60 260.40 270.4±(TC) Cl - ra 3 0 PARKING SPACES NORTH 31 MAR 2005 Id z U (54) 262.15 - ' s ~ SCALE c -UGGL Q7 (54A)262.50 1 - - _ ~ TV x 1 •80' 0 56 262.53 266.3± TC Cl -------Z(A 0 60 120 180 ,pg No. 55-57 36" RCP 239 1.07. a 1 a / 56-57 15' RCP 80 5.0% yA~ ~ REFER TO' SHEET C-8.3 AND RBPCW r 3 ~ EW' BERN' AVE. ,(U. S. HIGHW U 57 (55) 258.01 257.81 269.3±(TC) CI o S. HIGHW, Y 64), 8.4 FOR IMPROVEMENTS IN SHEET NEW BERN AVENUE SCALE IN FEET i 11 m (56) 258.53 s a PP PP D: 57-58 36" RCP 99 1.0% / I a DD Pp,- I U N GRADING PLAN. 0 L_ C OF SHEETS 's L~ f 6 7 g g 4 5 3 1 2 5 \ \ \ ~ ~ y \ i ; ~ RAL NOTES GENE \ t\ \ ~ ~ \ ~ \ 1. ALL MATERU~LS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE \ ' ~ / ' , WITH CITY OF RALEIGH AND THE STATE OF NORTH CAROLINA STANDARDS AND ' I ~ \ ~ \ \ SPECIFICATIONS. ~ \ \ _ \ ~ ~ \ r.~~ 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (1-800-632-4949) ' - 1, 1 ~ LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. \ _ GRAVEL AND RIP RAP 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING A UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS , c i l', .I MPORARY i ~ , 'i ~ a~ ~ ~ FILTER BASIN ~5 j 'o I \ PRIOR TO BEGINNING CONSTRUCTION. ! ! I \ ~ 1 j ` i \ i I ~ ,A ~ ~ A - ~ / Y REFER TO SHEET C-8.1 AND ~ INST SILT FENCE ' Cb CT~2 S ROVIDE \ ~ ,CRAVEC\ D RIP~•RAf? ~ NEW SILT FENCE WITH ~ \ SILT FENCE AthDITI NAL SONS U IONS, ENTRAN S / ' ~ ~ ~ / ? \ ~ TREE PROTECTION SIGNAGE , 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY 8 GRAVEL ~ RIPRAP HORSESHOE R BASIN 2 8.2 FOR IMPROVEMENTS IN , _ _ACROS PIPE ONCE KEN CLOSE, INC. GRAVEL do RIPRAP FlITE ~ FlLTER BASIN ~3 OS PIPE ONCE AS CO PORATION PAR AY',IS ' FlL~tER N ~4 ~ / ~ , I INSTALLED AND ` ~ ' (TYPICAL) 1 ~ \ A D AREA ~ 2.4 AC CORPORATION PARKWAY PIPE I INSTALLED ~ ~;DISTURBE DISTURBED AREA = .92 AC BACKFl BEGINS COMP D AND EXIST. \ ~ ~ti ~ - ~ i / \ KFI BEGINS RNE IS MOtlED AS \ ~ / ~ / CRbSS-1~CCES9, 0 ~ ~ ~ ~ ~ o 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. ~ ~..pRAINAGE AREA ~ 2.4 AC DRAJNAGE AREA = .92 AC MIN, VOL. = 2.4(1815) ~ 4,368 CF ~ MIN. VOL. _.92(1815} = 1,670 CF t ; ' R UIRED`TO PREVENT~MU AND~~ ~ ~ - -1 \ ~ / NEW TEMPORARY GRAVEL \ A J ~ EO ~ \ / ~ ~ r ~ ~ FUSE 2Tx 54'x 3' DEEP PIT ~ i ~ ~ USE 1Tx 34'x 3' DEEP PIT ~ ~ ~ DEBRIS FROM BEING DEPr~S ON \ ; r \ \ ~ ' ~ CONSTRUCTION ENTRANCE ~ r / \ n j THE PUBLIC' STRElrT. \ Z , - ~ ~ I~ ~ (BEGIN AT EDGE OF EXIST. / ' \ \ ~ \ ~ BERM ELEVATION = 288.0 _ - _ _ _ _ _ _ _BERM ELEVATION = 264.5 ~ ; 1 ' ~ ~ \ 1 ENT) ~ ' s \ ~y r \ ;G CK DAM, ----------.+v_ _ ~1, i 1 _ ~ i , f ~ ..~e~ - A ~ ~ j ~ ~ ~ ~ / \ \ ~ / ~ _ J ~ _ _ , 1 ~ FEN ONCE' ~ _ _ _ - _ _ _ ~ _ _ _ _ ' ~ , - ~ ; - ; - 1 _ - - ' ~ ~ , u ~ ~ r _ r^ ' 260 / / ' ~ ~ m \ DITCH 15 REMOVE - . - - - ~ - - - - - ~ _ , . - _ ~ ~ _ ~ ss ~ N Q. _ - ~ _ _ - _ , L ~ 1 i _ ~ / ~ I I T \ ~ 4 ~ ~ _ 1 ; 1 r r ~ 1 . r• a'r i~~ "~6 ' I: r ~ / ~ r . r• o , ~ ~ r ~ ~ ~ i X .I ~ , I ~ ~ • ~ A , ~ ~ II ~ 290...~~,\~ 260 X15' RCIZ I ~ "Rrw 1 ~ . ~ .1 • , = . a ~ CONSTRUCTION SE UENCE r ~ ~ 1 _ . , f ~ I T NCE WITH TREE I ' _ (tCP ' ~ - ® i ' ~ - .L ' NEW SIL FE ~ ~ - ~ \ ~ ~ j I ~ - > r i__ ~ , 1. INSTALL TREE PROTECTION FENCE AND SILT FENCE WITH TREE PROTECTION ~ as - ~ ~ ~ F R N- IT IN P TIN Y NIN IN P TOR. ~ b as r , _ , ~ ~ ~ \ SIGNAGE. CALL 0 0 S E SEC 0 B ZO G SEC PROTECTION SIGNAGE ~ ~ ' ' ° l _ _ ~ ~ V ` , ~ ~ ~ . ~ ~ ~ ~ "I RGP ~ . , ~ ~ - ~ 5 ~r I _ EYI TEMPORAL ~ \ 2. IF APPROVED, OBTAIN GRADING PERMft. -`A€IN TEMPORARY R6CK ~ ~ NEW CL. B EROSION r j ~ ! 4' CHECK DAM 15 r \ i + CHECK DAM ~ ~ ~ ~ ,j' ~ ! `CONTROL STONE APRON _ ' ` ' ~ ~ ~ ' 1 l \ IN. 32'Lx12'Wx22"TH 3. INSTALL INITIAL EROSION CONTROL MEASURES INCLUDING GRAVEL CONST. ~ ~ ~ ~ ~ .1 'IRAN i ' 7 /'f ~~-~Y..~. ~ \ , / , , ~ r ~ ) ENTRANCES, GRAVEL AND RIP-RAP FILTER BASIN ~1,~2,{(R3,~4 AND ~'5 _ ? ON''GEOTEXTILE FABRIC RISER BASIN 6, 7 AND 8, ROCK CHECK DAM, INLET PROTECTION " , r ~ ~ _ ~ / ~ , \ ~ - SEDIMENT PIT, SILT FENCE AND TEMPORARY DNERSION SWALES. INSTALL ~ - ~ , / RISER BASIN FILTETt ~fi PERMANENT STORM DRAINAGE AS SHOWN ON DETAIL AT RISER BASIN ~6, ~1 ~ / ~ 7 AND 8. ~ f \ 1. ;'~,I a 1 J, \ (REFER TO DETAIL FOR IY ill / ~ ELEVATIONS ON DWG. \ - 7 ~ ~ ~ i / ~ r 'I 6 ~ ~ ~ ' " - ` ~ ~ ~ + , 4. CALL 890-3453 FOR ON-SITE INSPECTION BY CONSERVATION INSPECTOR. I_~. 1 \ IF APPROVED, BEGIN CLEARING AND GRUBBING. ~ I , ' b ~ ~ 1 - 1 ~ \ - - I - 1 I ____J \ ~ ~ ~ o - \ ~ ` ` ' `~a . , ~ ~ / ~ , ~ I _ _ f , ; ~ 42 RCP . ~ ' WO FLOOD HAZARD SOILS 5. MAINTAIN DEVICES AS NEEDED. GRADE SffE. INSTALL STORM DRANAGE AS / _ _ , 1, I III r f ~ _I I b _ ~ ~ ~ ~ \ BM 1988, PG 1363 SfTE IS BROUGHT UP TO GRADE. PROVIDE INLET PROTECTION AS SHOWN Iy ' ~ ` \ RT RMWA T PR I RM- ~ ` ~ ~ , \ TYP. EA SIDE ON THE PLAN. DNE STO TER 0 OTECTED NLETS. NO STO 1 \ i l ~ ~ I ` t p . ~ ~ , ~ - ~ ~ \ 48• RCP ' \ ~ \ ~ ( ) WATER SHALL BE ALLOWED TO PASS FROM INLET ~ 38 TO INLET ~ 39 ` ~ - - ~ \ UNTIL ALL UP STREAM AREAS ARE STABIUZED AND SEDIMENT PIT AT . ~ _ ~ \ ~ RISER 6 HAS BEEN APPROVED FOR REMOVAL. PROVIDE SOUR WATER- GRAVEL ~ RIPRAP FILTER \BASIN ~ 1 ; { ! ~ ' ~ ~ ~ I 1 I ~ . a ~ ~ 61 - 1 \ ~ f. TIGHT LATE AT INLET ~ 38 SO THAT NO FLOW IS ALLOWED TO GO TO \ n ~ p , ~ INLET ~ 39. FILTER BASIN ~1,#2, AND ~`3 AND RISER BASIN {~8 SHALL STURBED AREA = 1.25 AC , { I ! I ~ ,i ' ' l ~ ; ( ' ` , D. NAGE (AREA ~ 4.19 AC . ' { I I I ~ A ~ ~ I tl NEW TEMPORARY (DIVERSION , RSION p • ' ~ ~ \ t \ ~ BE REMOVED ONCE ALL STORMWATER IS DIRECTED TO RISER BASIN ~6 _ 1 I r - _ , ~ I MdJ. VOL. ~ 1.25(1815) - 2,269 CF ~ l ~'I ~ j; l'•. J SWALE. ADJUST OCATION AS , 'ION AS ~ i A 'ti 36' RCP V ' o ~ AND {(17. ~ ' 9'x 4b'x 3' ` EEP PIT I ~ ~ ~ ~ ~ ' ' I ~ ( ~ . ti REQUIRED AS S E IS ; ' ~ ~ ~ USE 1 D ! ~ I , I _ j ~ I ' P GRADE BERM ELEVATION ='.284.0 ~ I ~ ' ~ \ ` ~ ~ . i ; , ; I A ~ ~ I BROUGHT U j ~ \ ' ~ , 60' RCP ' ' ~ ~ ~ 6. BEGIN BUILDING CONSTRUCTION. / , i , . I , l \ ' f I', I r ' ~ 1 ~ ~ - i l~ ' ' ,NEW CL. B EROSION ~ ~ ~ ~ ~ 7. STABILIZE SRE AS AREAS ARE BROUGHT UP TO FINISHED GRADE WITH ~ ~ CARO(~ •y~ ~ ~ _ ' ; I , ~ ! I ~ , j ~Nj , A i A i ~ , ~ \ CONTROL STONE APRON VEGETATION, PAVING, ETC. Nq ~ r ~ ~ ~ ~ ~ ' I ' , ! ` ~ NEW SILT] FENCE W TREE ~TEMPORAf~I' DIVERSION ~ ' ~ ~ I ~ I ' ' ~ , ~ ~ ~ ~ I--- ~ ~ 1 ; 1 - - ~ " ` I ' ~ PROTECT(@N SIGNAGE TYP \ ' BERM: 249.0 I \ MIN. 40'Lx15'Wx22•TH} E$$ TREE ~ 1 . - ~ ( F H TYp `,1 \ \ ON GEOTEXTILE FABRIC 8. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABIUZED f. ) f.) \ _ ~ \ - \ ~ ~ \ ~ - , , \ COMPLETELY, CALL FOR INSPECTION BY CONSERVATION INSPECTOR. i ,i ~ ~ TEMPO Y~'GRAVEL ~ ~ i ~ ~ I I ~ ; 8• DI IF IS APPROVED REMOVE TEMPORARY ER SION ONTR MEASURES ~ ~ N CTION ENTRANCE ~ I ~ i i ~F ~ 1 i ' ' ~ ' . 1 \ CO ~ , ~ ~ , ' ' REMAIN ~ ~ ~ , ~ ~ ~ ~ ~XIST. DRIVE 0 \ i ; i r ~ 9 SITE 0 C OL y UN \ ~ ~ ~ 1 AND SEED OUT OR PAVE ANY BARE AREAS. ALL SEDIMENT SHALL BE L P TI N ~ i~ I I , i ~ ~ - _ _ ~ ( ~ ~ ~NTIL COR 0 0 \ ,cS- i' / I ~ 1 i ARKWAY ~EN TO SERVE ~ / /'•r• • ~ ~ ~ REMOVED FROM THE WET PONDS AND THEY SHALL BE GRADED AS SHOWN \C~~•' SERVE ~ ~ , ` , AND SEEDED. ONCE SITE IS STABILIZED ANO EROSION CONTROL MEASURES p. EN • ~ I ~ t ~ , 1 cn , , ' ~ / ,ADJACE PRO ~ \ , ~ ~ ~ , ~ ~ ~ • " ~ ARE APPROVED TO BE REMOVED THE SOUD PLATE SHALL BE REMOVED. ~ J 1 ; , t 1 S 7 i I ' THE FINAL ORIFICE PLATE SHALL BE INSTALLED IN STORM BOX yy38 ON ? / c r 1 . ~ R ~ ~ ~ ~ I ' I.. I ~ _ - • ;.•r ;i:• OUTLET TO STORM BOX 42 SO THAT STORMWATER OUTLETS TO WET ~ -N CL. B EROSION POND 2 AND EXISTING STREAM. / •~o' 4• EW i~ ~ I I ~ i i • ~ J J • CONTROLS NE APRON ~ 15' RCP ~~I 1 ~ ~ ~ ~ ~ I I A I T ~ I , _ ~ OSED ~ I / ~ ~ ~ ' ' (MIN. 21'Lx12 x227H) 10. WHEN VEGETATION HAS BECOME ESTABUSHEO, CALL FOR FINAL INSPECTION a ~ ~ % ~ UN GEOTEXTI FABRIC BY CONSERVATION INSPECTOR. ~ ~ \ I I ~ ~ I ; , I . ~ ; ~ ' ' 'I~ p,~,~~,,,a WAL-~IART NEW CL B EROSION ' - A`II `d ~ ~ \ '1' SUPERCENTER NTROL STONE APR ~L. B EROSION - ~ i ~ ~ ~ \ ~ ~ ~ i ~ , REMOVE CO ~ I ~ I , m j ; I I - ~ FFE =2'72.0 MIN. 20'Lx7.5'Wx22" tOL STONE APRON ,,o ~ • f ~ 1 TOTAL DISTURBED AREA: 38.8 AC t 20'Lx7.5'Wx22"fH) ~ • ~ ~ ~ ` , I ' 1 I ~ , ~ N GEOTEXTILE FABR 1 ~ A 1 li ~ f i ! ~ I!,~ ~ , O I` ~ I ~ . EOTEXTILE FABRIC i ` , ~ ~ 1~~ ~ / .^.;~,.y. P ~ ra NEUSE BASIN NOTE . I. ~ I~ ~ ~ ~~v PROVIDE BLOCK AND G L ~ ~ ; ! I' . , ~ ~ ` r , N TEMPORARY ~IVE. P RAR RSION / 42 RC 1 ~ ~ o- fEM 0 Y ~NE ; + ~ 4 »1~~9 FR M ~ ~ • pl ~ THIS PROPERTY IS VESTED 0 THE ` ~ ~ ~ INLET PROTECTION FOR L " I I ~ ~ ~ i~ I I ' ~ A ~ SW .ADJUST LdCAI I ~ ~ ~ ~ INLETS UNDER CONSTRUC, ION ~ REQ (RED AS SITE IS , iAll II - II I , . ADJUST CATION AS r'~ . - Ld / ~ ' ' , - / RISER BASIN FILTER 7 REQUIREMENTS OF THE NEUSE BUFFER RED AS SITE IS + ' ~ / ` ~ ~ ' ~o' ~ ~i' I.; ~ ! ~ 1 ~ BRO HT UP TO GRA t A I , i I, , ~ ,HT UP TO GRADE I ~ Q ~ • iy' ~ ~ i ~ \ a° (REFER TO DETAL FOR RULES AS INDICATED IN THE VESTED ~ ro c NR ~ ~ ELEVATIONS ON DWG. RIGHTS LETTER FROM NCDE DATED ' I I i t ~ ~ ii 'l I L~A ~ ~ I / ~ I ~ , { ~ ~ r ~ + ' ' \ ` ~ RUARY 14 2003. ~ ~ rArar e+s~'+ ' 1 I ' ' ~ t ~ ! ; ~ , ~ - DO NO DISTURB' STR DISTURB STREAM K ; / ~ ~ , 1iJ.4t A I 111 ~ ~ ~ 1 1 ~ I ` I. ~ ~ ~ ~ ~v n+ zee.>ar ~ % ~ 1 ! + ~ I ! i ~ , ~ I A , AREA P T THIS POIN P T THIS POINT ~ •'~,i'" ~ ~ ~ . , , \ , r - J,. ~ ~ . 1 „ ~ I 1 ~ I I!' % ~ i ~ i. I rd l j ~ , I, I t. A ',j 1 {'i, I 'A, I ~ NEW CL B EROSION ~ ~ ! I 1 ~ I - ~ - ~ ' " ! II ~ ( ROL STONE APRdIy - ~ ~ ' \ FlNANCIALLY RESPONSIBLE PERSON AGENT 1 v I I I I 64NT ; 1 ~ ~ i ' . ~ 1 ' ' I (MIN. 32'Lxt2 Wx22"TH) ) - % ~ PP _ ~ A.' I,j ~ ~ ~ 7 . ' ` i I ~ ON G~OTEXTiLE FABRIC .A ~ .J g ~ ~ ~ ~ GUY / + ~ ~ ~ , ~ ~ I I ~ ~ ' ' ' / + / 4 h I invent control i sue ri rin I n - ' in ivi . 1 , 1 ~Sl • . v ; ~ , ,I o, , ~ 1. Peroon to contact s ou d aed s s a se du q a d disturb g oct ty N ~ zD,.~ P IV T A ESS EASEME 1 ~ ~ - a+ za~.as R A,E CC _ ,NT ~ ^ ~ I our zea.as _ 2 r---1-A-.1 t ~ ; + r j..r / ~ re 4_ ~ ~•••I{ ~ ~ " Name: GUY SCOGGIN Telephone: 865-522-7785 ~ M / li ~ eQa+DB 4425 P~G~ 499 a ~ A. ~ ~ ~ ~ tN our z DB 4365, PG 639 ~ ~ 1 '~~`i,, t ' / , i ~ , i i~ ~ c ~ 1 1 ~ .r 6 i - \ ~ Z ~ a ~ - Q Q 77 296 A t ~ 1 ~ ~ ~ D 96, . ~ ~ ~ % \ ~ . 6 '•'15• 2. Peroon s firm s financial res onsible for the ksnd-disturbin octivi W a~ ~ ~ O O IY P 9 tY 0 ® ; 't BM~19813, PG 1509 _ ~ .r; . -j. ~ ~ ~ I ~ - ~ , ~ 4. ~ ~ RCP 1 ` " COMMONWEALTH NEW BERN PARTNERS LLP ~ Z 1 - ~ W W _ ~ J"~ , ~ Name of Peroon (s) Firm (s) • ~ ~ ~ / ' ~8' RCP ~ , ~ ! W L ~ O ti 1 - - _ _ ~ ~ ~ vii ~ - ~ P 4 - 1 / 500 HENLEY STREET, SUITE 200 -SAME- W ~ I, ~ _ - - ~AII ~1 , . ~ , ~ ~ • \ Moiling Address Street Address V Z M , v, ~ LL ~ i _ ~c~ •263.0 _ PROF'0$ED- - . ~ Z (r ~ W ~ ` o ROP ,fir . ~ - KNOXVILLE TN 37902 -SAME- ~ VJ W JZ I ~ OFI'ICE, I I ~ FFE . 4 ~ Cit State Zi Cit State Zi m ' u~ ~ ~ . ~ { / ~ 15' RCP ~ : f._ ~ _ ~ ~SYV t -r. ~ ' 1 ~ Q ; 263.0 Y P Y P a W , ~ Z > ~ - I~ ~ I / ~ ' ' ~ m WJ - - \ V) t. 1 ; ~ ~ ~ _ , A ' 3. Appointed Agent to receive orry notices, process, or pleading m any action or legal W ~ O 1 _ _ - .t _ ~ i NEW, TEMPORARY G Vf~- I ' 1 ! J r C-J C=~ C=] t_] _ proceeding analog out of any mutter relating to Raleigh Cdy Code Chapter 5 Port 10. I - ' - s _ ~ ~ ~ CONST UCTION E p' ! ' ~ i ~ ~ ~G , p' I e . l it I' + s I A W , I - ~ - - i 1 - -1-- - p ~ , - 4E' RCP y j1 - _ _ AI ELIZABETH W. VOLTZ _ Z 111 ,I - - ` t s ~ , 1; Nome of Individual Si na ure of nt ~ ! i ~ I • r rl . 23 y4• CP' ~ 15' RCP \ ~ 9 ~ W ~ ~ - I i ` - - _ - _ I 1 II ~ ~ ~ ~ i / ~ ~ Jjll ( ~~o ~ , ~ ; ~ I ~ ~ ~ KILPATRICK STACKTON, LLP 919-420-1700 ~ V ' ! 1 II. x - - ti / / ~ ~ f ,f (J/ ~ pc, ~ e 15' RCP I Place of Business inside the City of Raleigh Business Telphone ~ o Q I - 1 ~ I 290 ~ 1 t /I SER IN' 8 -1 / ~ : r- - sr - ; ~ 3737 GLENWOOD AVE, SUITE 400 RALEIGH, NC 27612 ~ f :R IN' /8 %f ~ ~ so ~ > > - > - > - > Address 6ER T ETAIL F~'. - ~ ~ ( 6E ~+L ~ ~ i i _ EL~EVATI,ONS DW ~ ' ~ D VATtoNs . DWG I ; ' ~ 15' RCP s / ~ - - - ~ 1 ~ : ~ / ~ ' / C=3.2 ' _ ~ ~ ~ , , C=3.2),' i NEW MPORARY DPV~RSION Complete the above and adhere to cover sheet of erosion control pions. This does not ~ , - . ~ i 1 ~ / lh / i J ~ ~ ~ " take the ace of a cum ete financial res nsibili form. A cum leted form must be l ; ~ / SW .ADJUST l6CATI0N AS i a ~ p° P } l f i / filed with the Raleigh Inspections Deportment prior to issuance of permit. ~ - REr UIRED AS $ffE IS _ ~ - ~ I - ~ r i ~ / / ~ c ~ 26`> OUGHT UP%TO F. ' , ' a ~1,~ ~I - - / / l r ~ ~ ~ l~ 1 r i ~ ~ I , f , BENCH MARK ~ oQ ~ ~ . ~ ~ ~ ~ FIRE HYDRANT ~ ~ ~ . ~ - - f l . t- ; ~ ~ ~ / , ` ry 24' RCP 'i ~ N I T CFJ '1iREE ~I ; ~ EW S L FEN , i ` - ~ PROTE~,''tION SIG ~ I \ ~ \ ~ J / / ~ TOP PAINTED FLANGE BOLT ~ , d ' ~ ~ - i ti ELEV 297.53 ~ / ''fH6SE OPO.SED ENTRANCES. ~ ~ _ • r J i' NEW BENCHMARK WILL NEED \ y ~ SSE AS ~ ~ - _ _ - - - / SURVFY LEGEND _ _ A J / 'l`am`' ~'O TO BE ESTABLISHED ~o ~ ` ` -£ONSTDD 'TI6N• - - - - - - ~ / - OHSUPL -0 HEAD SUPPORT LINE _ i, ) / I I i~ ~ , , SUS)-SUPPORT POLE ~ i ~ AT ANY OMT BUBING-- _ ' ~ ~ ~ ~ ~ - f ; - - ' / ~ 1G' - ~ ~ 1` - - - ~ CONSTf~U TION--• ~ ~ _ ~ ' i' ~ _ ~ . ! 1 ~ , ' ` WM -wA'TER METER - - , ~ ~ , , / r , - •~ti STTF~SFORfaEI~ / i PHBX -PHONE BOX ~ ) - t UGFOCM)-UNDERGROUND FIBER OPTIC CABLE MARKER NEW SILT FENCE ALONG ~ ' ~ . - - - ` - - = - ' - - _ _ . _ _ _ . _ ?I 1 r . I' ~ ~ UGPHM)-UNDERGROUND PHONE MARKER BACK OF EXISTING CURB i sl~ _ _ _ FES)-FLARED END SECTION r PHMH -PHONE MANHOLE I ~ FH)-FIRE HYDRANT cp 14 UGPHL)-UNDERGROUND PHONE LINE I r f 1 ` J 15' RCP n', ! WV)-WATER VALVE - . EOP -EDGE OF PAVEMENT Y CMP -CORRUGATED METAL PIPE REVISIONS B = I 18 RCP ` i . ! - - - - - 'I 4Q# ; - RCP -REINFORCED CONCRETE PIPE 21 JILL 2009 ' BC -BACK Of CURB 8K0 1 Z24. I PF -IRON PIPE FOUND IPERMITB 15' RCP 1 IPS -IRON PIPE SET _ I u RWMF -RIGHT OF WAY MONUMENT FOUND I 10 - ! OHPL -OVERHEAD POWER LINES ^ I I J 15* RCP ~ LP -LIGHT POLE 1 \ .RCP PROPOSED' I _ SP -SIGNAL POLE PROVIDE -BLACK do GRAVE~~' RCP ~s o RETAIL I e r OHSL)-OVERHEAD SIGNAL LINE ' el 2 1 INLET PROTECTION_,FO6 ALL - - - ~e FFE - 267.0' i OHPHL)-OVERHEAD PHONE LINES ,i i 16" RqP OHP&PHL)-OVERHEAD POWER AND PHONE LINES 1 REFER TO SHEET C-8.5 INIEiS. UNDER ' ! \ N q 270 i . I } I UGWL -UNDERGROUND WATER LINE FOR IMPROVEMENTS IN CONSTRUCTIO e - 4 NEW HOPE ROAD - \ G UGGL -UNDERGROUND GAS LINE ! ! GTV)-GAS TEST VALVE PROPOSED PRbPOSED i I 's a , HICS)-HOLE IN CONCRETE SET RETAIL I _ _ zeo FFE - 277.0 ` I - _ WAIL > I NSIC -NAIL SET IN CONCRETE I n - _ - FFE 267.0 ) 'rte-+?. ' _ _ ~ \4 I • 1 o r EOG)-EDGE Of GRAVEL _ PROPOSED v ' 1' J ~f RETAIL CLF)-CHAINUNK FENCE WPf)-WOOD PRIVACY FENCE 21 Pv FFE ¦ 271.7 PROPOSED \ 290- CIE PROPOSED; 6' PVC ON ROCK CHECK BW)-BARB WIRE RETAIL I" MIN DAM lWVMH)-WATER VALVE MANHOLE \ \ FFE 277,0 \ UO NOT USSE- THIS DRIVE FFE - 267.0 I j GP)-GATE POST - ' I 1 UGIB)-UNDERGROUND JUNCTION BOX I If S - - - - - - - \ AS'\CONSTRUCTION s - v . ® ® ! FINAL CONSTRUCTION a i SB -TRAFFIC SIGNAL BOX ENTRANCE ' . - \ RC ~ 6 PVC ENTRANCE LOCATION AFTER ) • RC Q 6" PVC m 7 EXISTING DRIVE IS REMOVED. ; 1% MIN j e _ e PHMH PP _ • i OHP&PHLp p ' p p PP DRAWN PIP Z r - _ pP o _ ' ` - _ 4rx OPW PHMH w w _ w IN w- - w - - w - - CHECKED w vP-w , - - - - w JDURPH o ~OUTHERN BELL \ TEMPORARY G VEL a I~GfOCM _j FIBER OPTIC CABLE MARKER CONSTRUCTION ENTRANCE •o } uc~FOC `1 DATE a y (BEGIN AT D0 . EDGE OF r F >h Jl~l 2009 IW% CD) NORTH a zd' PAVEME i J - SCALE - - _ _ _ r,W i NEW BLOCK &cc GRAVEL INLET REFER TO`, SHEET C-8.3 AND 0 60 120 180 JOB No. ~PROTECTI0N W ° EDIMENT PIT 8.4 FOR IMPROVEMENTS IN RBPCW b / VENUE •a, N 4 r~ re SERVES 0.55 AC. ))ISTURBED AREA NEW BERN A i !USE 13'x26'x3' EEP PIT SHEET SCALE IN FEET 3 pr- T PP EROSION CONTROL PLAN. C-3ml OF SHEETS 1 2 3 4 5 5 6 7 8 9 5 FT MIN- TOP ELEVATION OF STORMWATER ~ 1.5 FT YYIIdEASDMFlC1EDNTNEENIO~aER 0.5'-1' I 1800 CU FF/ACRE /57 WASHED ' STONE 1 ,*~l>:5: 12' MIN. S FT ~7 ~ STANDARD METAL POSTS 2'-0" M GROUND x)ND 1. USE FOR DRAN~IM'E AREAS NOT EXCEEDING S (FNE) ACRE . RESIGN OF SPILLWAYS ~ ATE 1 SLOPE rFL to a TwES GALVINIZED ~ DRAWIGE AREA WEIR LENGTH ~ ~ rr[s (ACRES) (F7) CLASS 1 RIP-RAP flITER FABRIC 2. EARTH BERM SHALL BE STABILRED w/ SEEDING HARDWARD WIRE AfxfNtDING TO TRIANGLE SPEgFICATTONS. FILTER EXTENDS TO m 1 4.0 I CROSS SECTION FABRIC TOP QF BOX 3. USE CLEAN f~MPACTOR FlLL MATERIAL FOR EARTH BERM. 2 6.0 ^ 3 8.0 CIGDE 4 10.0 5 12.0 I W A OVERFILL 6" DESIGN FOR SETTLEMENT i SETTLED i DIMENSIONS SHOWN ARE MINIMUM TOP 21' 1' FREEBOARD b MIN ~ EXISTING SLOPES ~ ~ Q w HEIGHT do WIDTH DETERMINED BY EXISTING TOPOC~tAPHY AND FRONT VIEW A 1.5 fT t0 FT MIN ~M b 1 ° ~ 2:1 SIDE SEDIMENT STORAGE REQUIRED. VARIES 5 FT ~ ° SLOPE MAX _ O MAX FILL ° ° ' 9~ ~ KEY RIP RAP MRO THE DAM A ' FOR STAETILIZATKNI. s1m FoST ° ~ O M1NE11 MRE FABRIC ~ FLTER od' ~ 1:1 SIDE SLOPE ' 0 "-'1 FABRIC ° MAX NATURAL o O . 6•-1' SLT FENCE OEOTEXTRE fABRIC ~ m ~ N 3 ~ GROUND ~ ~ ~ WE ~';i ~ KEYED RIP RAP -USE flT FEIICE ONIr MEN OFAWIGE AREA q MRJ ~ v ° 006 NOT E>I~ID T/t ACRE AIO YEYER N . Fu SLOPE ::~»::tin.. _:ti;•*+•'~'i' ::~n::0 AREAS a OONCB11114RD nAM ~ ~ • FOR IEIMdt a SLT > 4 ~i~d? € 1ETICE iARAR16, VSE ~ C CO"°'OCb p o. - -ENO a SILT faCE IEE06 10 K TIaIED anal. N°. r IEtiS1ED STONE W P r FOR ANCHOR MEN SRT Z MAINTENANCE . 57 WASHED STONE " oR~E a F1ld1ECRNG ~ FENCE o ~ ~PECr TEMP'ORANr tEO~Errt TRAPS AT1ER FACN PEnao a sas>cMrr RAwFAU. REMOrF stEnrlDlr AIn RESIOIK TRAP ro ns oRwnAL onENSaIa w+IEN TI1E >>E»r~Irt NAS AOgMM1ED TO ONE-IMIF TI[ DESKatI DEPTH a tNE mAr. PLACE 111E emwENr THAT ~ REMOVED M ~ 57 WASHED STONE PLACED TO A O - • S' YIN. OWER FRONT VIEW - A OESRi1N1ED DWP06Al AREA AND Rp1ACE THE CONTAM~MIED ?ART a TIE ORNfEI FACNG. HEIGHT OF 12'-18' MIN. ABOVE q o~ER sxwT - - REVISIONS pj M R SbNS CNECIf M tiRlICIIRR FOR OAWOC FIIOM [ROSgN 011 FLING. POAODIGLLY CNECI( 11[ OEPM a M lSLRAY TO 01lIAIE R S A IRNIIAf NS TOP OF BOX a 1.6 FT EtAw THE U)rl POfO a 11E EHANO~Nf• SRFLIIiE1Y Fu ANY SETTIEIIENT a THE E1iAN(IOR TO SUOMIY MOVE DESIOIi REVISK)PiS - DATE ANC410R start AS ~ Z a?SflNG - oaElcrED m ENOSEE>e A E ORAOE Mfr RI RAP OOPIACED FROM M YS1wAY MIST t RElIAC[O YImIpEIY. TE IPTION RIPTI SLOPE To Non: ADDITION Y.lLD ~ _ P w. STASRI2E THE EMi1N0lTrt AND ALL dS11111AED AREAL AlOVE THE SED1Af111 POOL MD DOwNSRI6W FROY iNE TRAP IIMEDIIIELY AFTEA 10 OOIb1RUCIlON MM SEEDIIIC. ~ ~ sfe ~ ADD sulrAr awrT GYx ( W n m a ~ GRAVEL & RIP RAP BASIN OUTLET STANDARD CATCH BASIN YAR IN ET PROTECTION A D L 14 3 4 6 STANDARD TEMPORARY SILT FENCE 1 1 CHECK DAM B • c+Y~a ~4~ e' YA1L F 50' MIN. NOTES. FAR>H eEwr t YIN r rN a1TwsE As oRTECiED BY THE ENGINEER BUi SUFFlCIENT TO KEEP 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP OOIIPACIED RNRNIIC S+aN SEDIMENT ON SITE TO ENSURE CONSTRUCTION ENTRANCE IS USED. ~ ~ 2. IF CONSTRUCTION ON THE SRES ARE SUCH THAT 1'':+:: , THE MUD IS NOT REMOVED BY THE VEHICLE TRAVEL- W' _ L ~ YM. 12-1/2 fi•. SEEEP CUT OR FILL SLOPE - - - - - ~ LNG OVER THE STONE. THEN THE TIRES OF THE . 2'-3' STONE TO BE USED 25' OR WIDTH OF YM. to cti _ L ~ L_ MR6 uE wRES , i EXISTING URGE STONE OR RAIIRGAD ` VEHICLES MUST BE WASHED BEFORE ENTERING THE .,:,•.,(S PROPOSED STREET, PUBLIC ROAD. ROADWAY .BALLAST) WHICHEVER IS L 't_ • GREATER• 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS 2:1 SLOPE MAX ( ) I L L I - - - - oRA~ ON TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL CLEAN THE AREA AND INVOICE THE FlNANCUiLLY p~ pp~ ~ Y1001P ' ° ~ RESPONSIBLE PERSON AS INDICATED ON THE FlNANCIAL ~ w~ AIIApIED a avEwrlc - srAeE>zE DRERSIOn DrtcN s,1 - - , ~ - . wTRI TElpaRwn sEmNC = _ ' AND EROSION CONTROL I RESPONSIBILITY FORM. TD POSE ~ a R""E NDR¢aNTa wEra vosr Sfo~r ~ CROSS SECTION NE,T~D oRANCC W RESSTAIrt, WIRED SECURaY ro vERncx P051S Nxxl - TENSAE sTRENCnr, - POLY 9AR4KADE FABRIC (TYPKAL) - P~ @AFFLE INSTALLATION -STEP 1 aASS iI ~ - - FRONT VIEW INIII/1 STEEL POST 40' CAR MTVEN wRE FABRIC ~t" O~ l~.5: FABRIC cvI AND FOLDED FASRIC FOLDED POSITIVE GRADE 1.0% MAX. UPSLOPE TOE z oRN+~. w EE 9 NEW CONSTRUCTION SO~tJO ~ ~ ~ AT IFJ51 18~ Mf0 ~ ~ ~~K ~ NDRQONrIL 35' MIN. 15' MIN. F61tL ~ o y „q„ _ ,E„~ S„~„a,,,, M TREE PROTECnoN AREA q N p IDLY BMMBiIOE FA/AC fTTFIGt) 18• EXISTING ROADWAY t wood POSTS ARE N0I ACCEPTABLE SIDE SLOPES ~ ~ R DO NOT ENTER 61 HOIIRONTAL POST a usE srAPLES 1' APIRT To ATTACN FABRIC PERSPECTIVE VIEW TO 1pO wRE' FENCE AND FABRIC 1 1 MAX. 2 ( ) 7f' ~ 1 . C ~ . „ 12" M N Buweo R+ s" MIN. . , • , , ` ' ~ . , : 4. BAFFLE SPACED AS PER APPROVED PWI. TOP a BAFIIE SHOULD BE B' ` ~ ~ ` ~ ~ ` ~ ` ~ ~ ` ~ ` • ' ~ a~DE WARNING IGN a s, y N~ >i~.r IRCIER 1l WI THE BOfTOiI a 1I[ SPELwAY ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - wveLwc saws ro eE VIDE a OuRAeLL NFATlIEIO°ROOf wiERNL HE BDrtDM a 9AFRE MI B'rB' TRENCH, I ~ ~ ~ ~ ` ~ ~ ~ ~ ~ ~ ~ R tatrfxs m eE r NET/ Ir~aR,~r, afAacr AND sFNaD AS DErAEm. ~~y ~ " _ s+aas sNtu eE vtAaE~ Ar so• w>aA,w ?~LS. ~ TRENCH AND TRENCH BApfFILLED AND FABRIC UNDER STONE fk1E0 wTRi SOR• µp COMPACTED P T R F OPE PLACE A SICK AT FACN END a HEAR TREE FROlEC110N AND s0' GM C~MFR ThEnFAFiER. STEE CU 0 ILL SL FOR TRa FROTESraN AREAS 1ESS Tnw Lao. m vf~B1ETER, vRw1oE No ass T11w arE sA~r PER vROTE>;TaN aI~ coMPAC1ED I REVISIONS REVISIONS I REVISIONS ATTACH SA'IJS St~Elr iD FENCE POSTS AND FABRIC. A CRIPTI CROSS SECTION scRl N SECTION AT OPENING /ww?w nEa nlorECnav FENCE nRanlAU/OUF pUbU10N a PRQECT. I~ RIPTI I VI W sRws wr BE REaurIED er cm a RAiE1OH Ba•PECno/s OEPARnENi' BASED oN ACRML FEID oolarnoNS. BAFFLE INSTALLATION -STEP 2 S DE E IuaE A srA+ AT EACH ETO a HEAR TREE PROTECTpM AID so' oN CENTER 1?EREIFTER. PANVIW NOTE: FOR TREE PROTECTION ONLY CONSTRUCTION NTR E ANCE 7 RA RI G VEL & P RAP FI T L ER BASIN 3B 3B I R I N IT H 9 STANDARD TREE PROTECTION DETAIL 1 B D VE S 0 D C DEWATERING DIMENSIONS ELEV DIMENSIONS ELEV CONCRETE BLOCK EMERGENCY SPILLWAY INLET 66 247.65 ~ EMERGENCY SPILLWAY INLET 25C 246.25 ~ BEDRIENT TRAP TOP OF DAM WIDTH 10 254.3 ~ ~ _ _ - TOP OF DAM WIDTH 8' 250.8 ~ ~ ~Dp1°" T"AP _ _ - i-.--~-~ ANTI-SEEP COLLAR 7' X 7' - ~ ~ ANTI-SEEP COLLAR 5.5' X 5.5' - ~ ' \ CLASS t Ri MP(SFf SECTION TNRU BASIN ~ - ¦ ¦ _ ~ \ ~ RIP RAP DISSIPATOR PAD SEE DWG C-3 ` ' ~ ~ ' ; ~ ••x>":• • • RIP RAP DISSIPATOR PAD SEE DWG C-3 - . IfSSIPATOR PAO ~ ANTI-FLOATATION DEVICE 4'X4 X1' THICK - , . ~ ~ ANTI-FLOATATION DEVICE 3.5'X3.5'X9" THICK - 1°" PAD wATOR PAD ~ ~ . TOP OF RISER 24" CMP 246.65 ~ " TOP OF RISER 18 CMP 247.25 ' ~ : I~ ~ °a • - b CLASS 1.IUP FSAP NFADwNl ' ¦ ¦ ~ OUTLET PIPE INVERT IN 25't 1 B"CMP 196 241.65 1 ' , ~ ~ ~ • • ' OUTLET PIPE INVERT IN 25 t25 CMPO tf: 242.25 - ~o ~ Q OUTLET PIPE INVERT OUT - 41.4 ~ J' + ~ ' ' 2 ~y`Y: a~•~ OUTLET PIPE INVERT OUT - 4 yti ,r + i Mkt.' . ~ ° Z _ o lllllllll111111 i SEDIMENT STORAGE AREA 129 X64'XS DEEP 241.65 SEDIMENT STORAGE AREA 68 X44'X5' DEEP 242..25 ~ ~ • ~ • r~ ~ i~Rl+urENr ~p PERMINENT RCP ~S P 11RCK x J' FIGH YIN. g YN~T ItCP ° ? /i 0 A~ . OIrtIET PEKE Dunn PTE 1. ~ CONSTRUCTION SPECIFICATIONS ~j 0~ ao e ~ V1 1. ui - 1 a 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE V, w ON fTS SIDE IN THE BOTTOM ROW TO ALLOW POOL - ~CQ's00~ o - Li. FARrHaw ON DPo Z H DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED ~ ~ Z H AT DfL AT LEAST 2 INCHES BELOW THE CREST OF THE STORM O W DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST PERSPECTIVE VIEW c ~ TE?PORARr CMP RE,'ER-PERF'OM,EO AN VI W IEYPOMRI' pIP RISER-PEIIFOIGTED P N W TMI THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT ` d 2:1 SLOPE, GRAVEL FlLTER NO SCALE Z °G a ANI WATER LEVEL OURRIG STORM TRASH RAON I' MN. FREEBOARD T+>P a ~ WATER LEVEL DIA'WG STORM RNpt t' MNL FRLmOARD ~ a ~ IF i MID TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GNE LATERAL SUPPORT TO SUBSEQUEM W W Z azc RO BLf ROWS BY PLACING 2 X 4 WOOD SNDS THROUGH ~ 2 ~ Q OW BLOCK OPENINGS. WIRE SCREEN Z Q ~m OW m . SEDB/ENf STORAGE " SEOwENT sroRACE 2. GU W ~ 2. CAREFULLY FR HARDWARE CLOTH OR COMPARABLE TEMPORARY SEDIMENT AREAS TO BE DEi1tIABED SEOIIETIT SFORAGE PIPE RI+ERT IIQIE: Z OR/NEl FILLER G MNMUY SLOPES 2 1 2 : 1 .GRAVEL FnTER C ~ ~ WIP •p~ / YNIMW SLOPES Z 1/Z : 1 BLf WRE MESH WRH 1 2-INCH OPENINGS OVER ALL POOL 1~?. GRNrtt ~ R1P RAP FILTER EERY BASRI oETNL I.L / DEWATERING F1000 STORAfE TONE RP RAP NFA0IYALL 6 DESICIED TO FIIOIECT EIILSTNC PIPE MIERIS ~ ~ ~ W 3 W (1• qa' BLAC1, OPENINGS TO HOLD GRAVEL IN PLACE. 11 Z - - - - - - - - t~f ~i TINT aYw TO ACIl6 aR LESS. Ily W J z PANTED RED CIFMpUT InIBC • I ENn11 OAM PABIIFD RED CLEANOUT LLARIt I cARrN t?AM 3. USI LOCATED NA)„Fw,1Y TIP R14ER PB'E LOCATED NiVFwAY TIP R6ER PIPE • Dq 3. USE CLEAN GRAVEL, 3/4- TO 1/2-INCH IN ~ ~ a m W - W DWIIEEER, PLACED 2 INCHES BELOW THE TOP ~ ~ ' • • ~ • ' ~ lEi' - ~ - _ , ~ ~ u~ ~ J ANR-smP ooww µn-SEEP tauAR OF ANTI-FL41TA110N DEVICE ANR-f1.QATATgN DEMCE ~ OF 11iE BLOCK ON A 2:1 SLOPE OR PUTTER AND 1 MIN' - 1 m ~ J SMOOTH R TO AN EVEN GRADE. DOT X57 WASHED 2 - 1 ~ uASS , FTi.TER FABRIC ~ t DEiSPATOR PAD ~ ~ ORATOR PAD STf RIP RAP STONE: IS RECOMMENDED. ' T RYSIED STOLE W • 6 IRlESS OBERRISE a ~ 1~ TFAPORKr CMP Y X Y YN. ' TEYPORART CMP y X y TRENCH w/ t:i 9DE SIDPE TRENCH w/ III SLOE SLOPE MAX. SEDNENT DEP1H(CIEAN OVF FOBrt) I h • • NotEn. REVISIONS REVISIONS PATE DESCRIPTION PERMANEIR RCP CMP OURET PIPE CRI N PERMI~NT RCP CMP OUnFT PpE DATE Rf1ASI0NS REVISIONS t0 NOTE ADOBION t0 N01E AOORIOII DATE DESCRIPTION SEDIMENT ~ PTION SECTION THRU BASIN. FILTER AND CULVERT PIPE W • ~ TABLE ~ N~ CROSS SECTION A AOD TABLE t NOTES G.M R TI N COSSSC 0 No scALE p • J ~ v Q (EXISTING PIPE INVERTS) RISER BASIN 6 RISER BASIN 7 K AN RA R P IN T PROT TION 13 4 ~ BLOC D G VELD 0 LE EC GRAVEL & RIP RAP HORSESHOE INLET BASIN E UPSTREAM END OF a, • FOR REPNR OF SILT STORM DRAIN OVERFLOW ~w (3' - 10') DIMENSIONS ELEV 1MRMBLE AS ORECIED BY THE EHON[FR FENCE FNLURES, USE No. 37 WANED STONE. MATERIAL VARIABLE EMERGENCY SPILLWAY INLET 39 25x.45 4 I FOR ANCHOR WHEN SLIT FENCE IS ~3TECTING A i/3 PIPE 3 EMPE STAPLED IN 2~~ -I TOP OF DAM WIDTH 10' 259.0 ~ ~D"°'T _ f CATCH BASIN. . • ~ ~ • ? RRRMIC SIGN p . A e JESTER PLACE - - - =1 I ANTI-SEEP COLLAR 6'X6' - \ ~ - ~ _I = i ?A • - _ _ - + ~ (--I, RIP RAP DISSIPATOR PAD SEE DWG C-3 - ~ -I i~ _ - 6 MIN. - I - ` I 1 ~~r::;.•:., , ' YN. 10 CA WIRES h ~ . L!ff wRIEs I I-I ~ _I i t=III-III- I-1 I I~I , 11-I f I~ A N 4 oERPATOR PAO _ = 1= - _ _ _ _ _ 1= - 11= ANTI-PLO TATIO DEVICE X4 X1 THICK - ~ ~ ~ TO D BURY BOTTOM ~ A I ,III-III; 11-1 I I-1 I I-III; I-III-I ~ I-I !-III-I I ~I I T P F RI ER 4" MP .4 • - - - - - - - -III- _I , 0 0 S 2 C 253 5 - .1 I I=1 I I=~ I I=1 I I=1 i I. .I I ~=11 I:I I I=1 I ~I I . I-I I i_ ~ ' , ~o I OUTLET PIPE INVERT IN 25 ti8 CMP® 1% 248.45 1-~ ~1 I I-11 I-11 1-~I I i t 1~-I 1 1-I 1 I-11 I--I 11-1 : I-III- LEVEL LIP' .III ;III=1 I l i l ! OUTLET PIPE INVERT OUT - 248.2v A4• Lid MLI OF PLYWOOD LJ~ _ CRAM ( I OF SPREADER {=i 1=I I I 11=1 11=1 I I-1 11=1 11=1 I STEEL - POST FABRIC NOTE: ALL PARTIALLY COMPLETED STORM DRAINS 3/4- EXTERIOR BURIED -I SEDIMENT STORAGE AREA 98 X49 X5 DEEP 248.45 Ptwr,r ~_I! _I I I_I 1 i_i I_ - . -III-I I I ~ ~ I SHALL BE PROTECTED AT THE END OF PLYWOOD WARNING SIGN 6 MIN. Ii SLT FENCE A1EAlEXiLF FABRIC EACH DAY IN ACCORDANCE WITH THESE = DETAILS. STEEL FENCE PLYWOOD INLET PROTECTION FAM Ow L J POST CROSS-SECTION Q FILL RAPE C FRONT VIEW A UPSTREAM END OF OVERFLOW W , STORM DRAIN TEMPOM Y CW R'SER-PtVM= PAN VI W Tw Of mm REVISIONS BY n GRADE I II I _ I . 11 II BY I n n a 1/3 PIPE 6' M. COVER ~ ~ I II II p TREE PROTECTION AREA ? ? DIAMETER 21 AX 2003 - OVER SKIRT • TS. I I I D . n o a A. D: . SED1&M STOP44E fERMTS? SKO 8KO I - EXTEND WOW C INN. INTO TRENCH + DO NOT ENTER ~A• AND ANCHOR SKIRT AS Low POI oRNA<L NT ~ w,SAKw StDPES 2 1/2 : , ORECTED BY ENpItER WASHED STONE BITER / p NOTES: WARNING SIGN DETAIL ACROSS PIPE INLET ~ MOM MOMS TO E F WOE Of DuOA" NEAn1E1wRODF wmwl 10' 3' pmm Rto CLEDN"M YARX EARTH DAM WCATM PALMY W PW Pit ANn-SEEP COLLAR LEMRS TO AL r NON ANIMAL CLEARLY LMNLE AAN VAM AS DEFAM.EO. I I I I I I I k I SIM SMALL NE /LACD AT SC' MA' W MRERWLS ANn-FL0QA7M COME ORSIPAIOR PAD ~I NOTE: PLACE A SM AT EACH flO OF L#" TREE PRCTECWN ANC SO' ON CFN 1M THEME nElt ` 1 ` 1 l , Ri ow FOR TREE wlo1Er11aH AREAS LESS THAN 200' IN PERrYETER PROVIDE No LESS THAN ONE SIGN PER PROTECRO G AREA HARDWARE CLOTH -USE SILT FENCE ONLY WHEN DRAINAGE AREA ATTACH S06 SECURELY TD FENCE POSTS AND FABRIC. REVISIONS 1 1 ( l ( I OF SPREADER REVISIONS TIND" M/ SM $UWE E DOES NOT EXCEED 1/4 ACRE AND NEVER IN AnN?AIN TREE PRCIECTICIN FENCE TMIOIlaOUF DURATION OF PROUECT. DATE DESCRIPTION fI AREAS OF CONCENTRATED FLOW 206 ~ AME AW~ ~ CDAMMEIONS U LI U L LEVEL LIP TEW4XVRf CMP V X 2'M. DESCRIPTION DATE pemimAm RCP CNP ounrr PPE ~I -END OF SILT FENCE NEEDS TO BE TURNED UPHILL PLACE Asa AT EACH END OF LMrAR TREE PR0IEr910N AND SO' ON C04W THEIW1FEER. STONE FILTER INLET PROTECTION PLAN io/as NOTE Ao0 nm 4 ADD TABLE t NOTES QM CROSS SECTION STANDARD TEMPORARY SILT TREE PROTECTION FENCE 1A PIPE INLET PROTECTION (PLYWOOD AN AND 12 12 i LEVEL SPREADER DETAIL RISER BASIN 8 17 N.T.S. Mold DRAWN SKO CHECKED RPH DATE S 11 JUN 2003 (90X CD) CD) SCALE JOB No. FUMW STORM DRAINAGE & EROSION SHEET i CA>a, 2 CONTROL DETAILS 302 Mod E I 6 7 1 2 3 4 5 5 8 9 • PROVIDE MANHOLE RING. COVER do A MANHOLE STEPS PER OETAII ~ . ~y -I.. - 15" OPENINGS REFER TO STANDARD RTCB DETAIL -~i. t/1 2 - - ALL 4 SIDES FOR WALL dt SLAB CONSTRUCTION - ~ w I e = E - - _ A - - 250.3 TOP OF STAB ~ .a ? ,d • - 249.8 -MAX. WATER SURFACE ELEVATION FOR 100-YR STORM A SLOP _ 250.8 -BERM = 250.8 ~,g F 3, a 1 n 2.5 - 3 3 - ~ - - - 1 - - o^ - 248.7 -TEMPORARY STORAGE Of 1" RAINFALL EVENT pj . 1~~ - - - I- ~ - 6 247.3 -P.W.E. 6 . r. _ -I - ~ i - - 1 1 _ . \ _ _ _ _ - - - - 247.3 -PERMANENT WATER ELEVATION ~ - I 245.3 -SHED' - I - 2.5 •i~- _ 'S _ - j-- • © v. 42" RCP 5'-0" ' VEGETATED SHELF-,_ - 242.0 -BOTTOM i = - - - - - - - - - - - - I I COMPACTED STRUCNRAL - _ _ - _ _ _ _ _ ~ i MATERWL AL • , . A ~ ' w -iii-iii-i i ~-iii-iii-i i ~-iii-iii-i ' AA ' A a SECTION THROUGH POND 1 ~ . a ~ 'd B NOT TO SCALE • , ,d . . , ; ~ 1' MIN. ICAL I I I I ~ 8" DI PIPE I ANCHOR BASE SECURELY a' W/ VALVE ASSEMBLY To wALls ~ ' POND BOTTOM I f I ~ !I 242.0 I III I~• I III 242.0 KEYSTONE ' _.TfL-_ •-7._~~~.• RETAINING • • ~ • • . • ' • ' • ANCHOR BASE SECURELY • ' • ° ' • • ' ~ TO WALLS WALL 10' _ 254.3 -BERM CONCRETE BASE. MIN. 1' THICK BERM 3 - 1~~aunu~,~~ f 1 - - T P AT H BASIN 25C ca RAISED 0 C C R Q~H Ot ~y EE ~ 9 250.0 -P.W.E. - - 1 1 - _ 2.25 4 - _ 248.0 -VEGETATED 1 (-1 1-1 ~ I SHELF -I - _ i_~-i ~-i _i -I 2 - I I- ~ - PROVIDE MANHOLE RING, COVER do ~H ~ •9 ~ - 2 I i- - 1- 1 1 I MANHOLE STEPS PER DETAIL l ~ NE.~'~ VEGETATED SHELF % I = I' COMPACTED STRUCTURAL -I - 15" OPENINGS REFER TO STANDARD RTCB DETAIL - - ~ (TYP.} _ - i MATERIAL. FOR WALL do SLAB CONSTRUCTION ~~r c ALL 4 SIDES •E - 241.2 -BOTTOM I i,l - -I ~ _ _ _ _ _ . 1- - i -I - - - - - -I ; + ~ d , . . - - - 253.9 -TOP OF SLAB i -I -I ~ - - - - - -I 1- -I I 1= _ = 1= _ =I i = 1= M •e. . , . Ak $ - 253.3 -MAX. WATER SURFACE ELEVATION FOR 100-YR STORM ~Op f 3, ~ n S CTION THROUGH POND 2 E • - 252.3 -TEMPORARY STORAGE OF 1" RAINFALL EVENT NOT TO SCALE - - - - 250.0 -PERMANENT WATER ELEVATION '.a ' 42 RCP 7'-0" ' (60" RCP FOR X66) ' ' MANHOLE UD ' 'd. 250.8 -TOP OF BERM Q 249.8 -TOP '~X ~Op d• f 3.1 t . • g J 2" PVC DRAWDOWN PIPE. D EXTEND 6" BELOW PERMANENT d •e ~ WATER ELEV. 1 MIN. (TYPICAL) 247.3 -P.W.E. I i Z I ~ Q 8 DI PIPE O I ANCHOR BASE SECURELY a W/ VALVE ASSEMBLY MAX SLOPE . 6.1 To WALLS ~ • . POND BOTTOM ~ a I I~. OCZ 281.2 ~ W W III f- > T I 241.20 66 Z ~ O III 241.56 65 z ~ ~m I V W ~ II .If Z S~~ . ~ f ?7 ~ ANCHOR BASE SECURELY m TO WALLS ~ 1.0 242.0 -BOTTOM CONCRETE BASE. MIN. 1' THICK d i - W Z r T P ATCH BASIN 65 & 66 RAISED 0 C W J ~ Q N TIN X A - DRAW-DOWN BOX JU 0 60 25 C E NOT TO SCALE MANHOLE FRAME do MANHOIE FRAME do COVER W/ RISER COVER W/ RISER - 268.31 ASPHALT SURFACE ASPFWLT SURFACE TOP n MANHOLE UD • 254.3 -TOP OF BERM ~ 253.2 -TOP ~k ' S~Op F ~,1 ~ ~ ' '1y PVC DRAWDOWN PIPE. 100-YR - 265.30 • AUU 6 UtLV WKVUi iu s EXTEND 6" BELOW PERMANENT WATER ELEV. BOTTOM OF BOX AFTER ° WATER ELEVATION / RESTRICTOR PUTS HAS 12'x6 PRE-CAST CONCRETE 250.0 - P.W.E. BEEN MISTALLED + SPUTTER BOX g 1.00 PE N 77 w 00 54 RCP 0 1.OX ' 48• RCP 0 1.OX STEEL STEP 48" RCP OFF-BYTE (INLET FROM G X37) REVISIONS BY (OUTLET TO G #42) • OUTFLOW PIPE • ' (IYP. OF 6) 11 JUN 2009 GKO 10-YR - 261.23 48 RCP 0 5.OX IM CD) S~OA WATER ELEVATION 2.50 2.50 (OUTLET TO JB /39) ' 21 ~ 2009 STEEL STEP DlH OF 6IT$) F g O 01 1.0, 241.2 - BOTTOM M 5'x5' RESTRICTOR PLATE F-L a T , . 255.42 25522 255.22 . , JUNCTION BOX 63 - (DRAW-DOWN BOX BOTTOM - 254.72 . NOT TO SCALE : ,!•1:. . a 48' RCP ON-SITE OUTFLOW PIPE W/ 5'x5' RESTRICTOR PLATE (ORIFICE DIAMETER - 26) 1.00' 3.00' 6.00' 3.00' 1.00' 1.00' 6.00' 1,00' 12.00' DRAWN VKQ CHECKED SPUTTER BOX #38 RPN / DATE SCALE: 1 = 3/8 08 JLN 09 ®WQ REVIEW) SCALE JOB Na FOMW STORM DRAINAGE & EROSION MET CONTROL DETAILS ¦ 1 2 3 4 5 5 6 7 •Q 8 g x i ICS-6 ' WR-2 ti ' SEASONAL COLOR t ~ ~ o ~ ~ ~ . , BT-12 ~ y ~ C ~ ' LM-250 WIN e I 0 12" O.C. •4 N/F THE BODY, LLC ~I \ r \ O A Z G L''3 a• 2.s2' I ~ O \ ~ w _ _ ,I \ ` _ 1 a - _ - - - ~ I 1 ~ ~ 9 A ~ a _ _ - - - - D.ST ~ 1° .n , : - _ S 84'33'18 E 1131.92' ' ' - ' ° 12.18' ~ ~f w~~~~~~~~~~~~~~~~~~~~r~~ O n \ N I ' ~ ~ TD-1 LS-3 TD-4 Ls- . TD 3 Ls-3 - PROPOSED C BP-0~ TD 1 _ ~ ~ 0.7T c C BP,~OR~cTtON~~ARKWAY 9 - ~ (fJ Z P ~Y O s s I ~ ~9 O ~~4 SG1LE: 1`20' _ - 877. 1' . . . G N/F PEGGY W. JOHNSTON AND i JAMES MARION WILBURN ~ ' • ~ I o 6.77' , ' ~ ~ +Zn E I ° \ ' w, EXISTING WOODED ~ Icy n \ JCP-46 ~ , ~ BN-2 i i AREA TO REMAIN TREE PROTE ON ~ ~ FENCE ~ ~..r ~ i ~ I-3 ~ ? " i b Ww PT-20 EP-45 0 ~ / B \ 5' O.C. PR OSED FENCE N/F HEDINGHAM PROPERTIES, LLC I ZONED:I-1 \ ~ i ~ ARF-5 ~ QPA-6 \ USE: VACANT I LI-3 i ' 22 \ ~ i QL-9 8 WO FLOOD HAZARD SOILS. ~ BM 1988, PG 1363 CJ-42 ' • • • • • . • • . • \ JE-280 (TYP. EA. SIDE) AR-3 i SV-438 \ :•r. PC-496 i i i GRASS ALL I ~ / ~ DISTURBED AREAS 1 \ ~ \ ~ PROVIDE 4' DIAMETER BY \ ~ i \ ~ 3" DEEP MULCH RING ~ AROUND ALL TREES IN I ~ , LAWN AREAS ~ ~ AR-i ~ ; ~ ~ i ~ ~ JUN-16 \ ,~`pramnmm~ngrr'i ,r r - PK-4 P~ V 1~ +S \ \ r it OPA-1 ~I =o~ G•- \ ~ r ~ 7p ss s~ \ ~ CD-1 s \ 1 tC ~ r ~ \ s s ys yi \ , a \ > y a ~ a X~ ro n ~ I Tar f 1 I 1 ~ d? .1; s r ~i~ l i 9 i ~ Z~ ~ did 1'~~y O ~ ~ 5 3 r ,~-1 P. WP ~ SUPERCENTER 529 vJ-lo _ 2s ~ ~ ~ cD-1- _ C-192-EGL-OL ~ SEED ALL SLOPES ON DETENTION 7 ~ 63 4 '--1- 2p PONDS THAT EXCEED 2.5:1 WITH 3 ~ ~ ~ WEEPING LOVE GRASS. REFER TO 203,942 S.F. N/F PEGGY W. JOHNSTON AND F.F.E. = 272.0 JUN-24 ~ GRADING PLAN FOR CONTOURS ~ ~ JAMES MARION WILBURN 1 ~ !Z ~ ZONED: I-1 C.U.D. ~ AR-1 • JE-318 I I USE: VACANT ' SV-307 i s ~ ~ PC-285 ~ PR01fl I~ ~ .Q DE 3 DEEP 1 PINE STRAW MULCH ICR-10 IN ALL SHRUB BEDS I ~ ~ ~ f ~ '"•r, \ \ • ~ AND GROUPINGS ~ PK-; QPA-4 ~ ~ JCD- PK-3 ~ \ JCD-30 ~ ~ I ~ ~ T CD-2 1 ~ ~ ~ I I STORMWATER POND \ VJ-12 ~ LT-8 I \ I lye 1 KP-4 ~ ~ ~ _ i ~ l - ~ • EP 15 ~ I _ 8 PA 5 ~ _ _ P- ~ . ....5 ~ LANDSCAPE RE UIR M NT E E S LS-3 ~ LS-1 _ , TPY f 2 LS 1 / - - ~ _ _ R~ 4 _ ~ Q AR 1 ~ CC-18 CC-1 ~ C-18 ~-1 LS-1 B Z QPA1-1 LI-2 ICC-18 LS-~ CC-18 CC-18 _ ~ STREETYARD SHO / D REQUIREMENTS a LS-, 7 7 LR-30 ~ ~ • / J ICC-18 I I I I CD-3 CORPORATION PARKWAY: 945 L.F. QL-4 ~ a ~ + I CF- I-' ~ ~ ~ 6" TREE DIA. PER 50 LF REQUIRED N LS-2 I ~ I I c MC-1 ~ 3 2 r+ e r e VJ-12 e I VJ-7 945 L.F./50x6 =114 TOTAL TREE CALIPER REQUIRED (f~ e I I XI TIN I I I I n PT-5 E S G TREES EXCEED REQUIREMENTS FOR TOTAL CALIPER Z QPA-3 ~ r r + e • • CC-23 CC-18 + RE? I I I ~ 5 TREES PROVIDED TO MEET MIN. SPACING REQUIREMENTS Q ~ a I I JF-7 O ~I,I JF-B ? + e r e 1 e i+ e I ~,oool SF I I I ~ ac< i } I OF~iCE I I CD-3 NEW HOPE ROAD: 398 L.F. ~ p" 4• LT-1 58 r 8 1 ARF- r + e + } I I I 9 ~Z + e L1_2 + I I I I ,80'D SFI 6 TREE DIA. PER 50 LF REQUIRED c W W ~ CF- ZV-1 r ICC-12 o A _ I VJ-7 _ ARF 13 ARF-12 I I I I I 26 398 L.F.~50x6 48" TOTAL TREE CALIPER REQUIRED ~ I I I I I 14 3.5 TREES PR VI I W 0 DED O Q ~ ~ JUN-20 N_1 r IC LT-2 Z Q ~m + ICC-12 ICC-1 - - - - V W 0111 62 + 27 VJ-6 CC JUN-20 _ - - - - - - PT-2. NEW BERN AVE: 255 L.F. (SHOD 3 PLANTING) V Z 3 CC + ' LT- i 32 3 CC + + 10 SHADE TREES & 6 UNDERSTORY TREES 100 R I ~ s e 2 / LF EQU RED Z ~ CC W + , ~ s a ;~,r, 32 SHRUBS PER 100 LF REQUIRED ~ LLJ Z W Z 3 CC 68 58 ZV-1 I-3 LI-i ~ LI_ 255 L.F./100x10 = 26 SHADE TREES REQ'D. p. m ? + JF- ~ 66 • 68 68 33 • 2 CC-3 255 L.F. 100x6 = 15 UNDERSTORY TREES REQ'D. W UN-2 ICC-18 n _ / ~ Z ZV-5 JF 8 255 L.F./100x32 = 62 SHRUBS REQ'D m (n ~ J J"L ~ • 34 _ VJ-12 + 34 CC + + } QP-Z W w G J + 19 NEW BERN AVE: 546 L.F. (SHOD 4 PLANITNG) Z cc 3 SHADE TREES do 4 UNDERSTORY TREES/100 LF REQUIRED CF- JF 6 + ICR-23 ~ - - + 28 + + + 50 SHRUBS PER 100 LF REQUIRED 546L.F./100x3= 17 SHADE TREES REQ'D. Z RASS 19 ' 4 546L.F. 100x4= 22 UNDERSTORY TREES RE 'D. PK-4 ZV 1 ZV 1 + a 62 / Q 31 + RIP PT-2 CARL R. GUTTMAN 546L.F./100x50= 273 SHRUBS REQ'D ~ O BT-12 JUN-2 UN-2 + GRASS ZV-1 QPA-9 BASS RASS i VJ-7 ~ ZONED: I-1 V SEASONAL STRIP UN-2 TRIP PLANTINGS ,I l + TRIP ~ + 31 44 23 JF-8 USE: COI~MERCWL NEW BERN AYE: 354 L.F. (SHOD 4 PLANI'MG) Q + -3 3 SHADE TREES do 4 UNDERSTORY TREES/100 LF REQUIRED ~ + • CC-3 50 SHRUBS PER 100 LF R ZV-1 LT_2 EQUIRED E QPA1-5 ~ + + UN-20 + 354L.F./100x3= 11 SHADE TREES REQ'D. - cc , ~-3 354L.F./100x4= 15 UNDERSTORY TREES REQ'D. - VJ-7 354L.F./100x50= 177 SHRUBS REQ'D + 4 LS-1 ' JF-9 TRANSmoNAL PROTECTNE YARD ~ LS-5 _ . + ICR-9 LS 1 + QP-2 582 LINEAR FEET (1 /2 TYPE D TPY 18' A + VERAGE WIDTH) ~ I ~ ~ ICR-9 ' - _ . 2.5 TREES & 15 SHRUBS/100 L.F. REQUIRED ~ ~ • LS-1 - ~ ` LS-1 ~ ~ 4 ~ • ~ ' ` ICR-9 LS-1 - • 15 TREES 87 SHRUBS REQUIRED/ PROVIDED - - - ~ ~ T ICR-9 + - ~ ~ ` + LI-2 ICR- - + LS-t LS-1 LS-1 + - _ _ _ TRANSITIONAL PROT TIV \ T ICR-9 I R- ~-1 ~ 1 EC E YARD #2 C 9 ICR-9 ICR-9 ICR-9 _ 190 LINEAR FEET (TYPE D TPY, 35 AVERAGE WIDTH) ~ ~ ~ T + U-2 U-2 + LI-2 U-1 ~ BN-1 4 TREES & 19 SHRUBS/100 LF. REQUIRED a ~ i} i}..... it d ~ CC-3 8 TREES & 36 SHRUBS PROVIDED _ - i f i ~ ~ . TRI-ARC FOOD SYSTEMS VSA SCREENING BN-2 ZONED: 1-1 CORPORATION PARKWAY AR-3 USE: COMMERCIAL 1 SHRUB 6LF OF VSA WITHIN 50' OF RIGHT OF WAY J PC-3 BOJANGLES RESTAURANT 270 L.F 6 = 45 SHRUBS REQUIRED/PROVIDED ? + 1 SP-41-02 NEW BERN AVENUE i E pRppOSD i 1 1 SHRUB 6LF OF VSA WITHIN 50' F RIGHT OF AR-8 0 GHT 0 WAY REVISIONS BY 3Y VJ-23 JCD-94 GRASS LI-1 BN-3 AR-3 2 .F JCD 94 PROPOSED 18 L 6 30 SHRUBS REQUIRED/PROVIDED PL-1 36 LI-1 L-18 RETAIL 2.000 i PL-1 QPA1-8 PC-3 - - - - - PL-16 GRASS I U A2003 2,000 SIF + VJ-35 V.SA: 604,860 S.F. 0E810F1 CW SKO I ----GRASS BRASS I I 1 TREE/2000 SF do t SHRUB 500 SF R 11~ 2003 UN-18 - - - BT-6 / EQ D -JUN-18 -18 N-18 - - - - - ? ( 604,860 S.F. /2000 = 303 TREES REQUIRED (W% CD) I PROPOSED F J I LT-1 GRASS I PROPOSED * 604,860 S.F./500 = 1,210 SHRUBS REQUIRED BT-6 _ RETAIL _ ow3' N-4 PROP06ED~PROP06ED JUN-18 _ SAIL IC 100 UNDERSTORY TREES ALLOWED FOR VSA 21 JUL 2003 ZV-4 RETAIL RETAL a REQUIREMENTS IN LIEU OF CREDIT FOR EXISTING 8K0 PK-3 LT-1 ~ ~fT8H 3,200 SF 3AW SF ' i PK-3 TREES ALONG STREAM PER AGREEMENT WITH THE TRACT ID - - - - - • - - - - - - - CITY OF RALEIGH ZONING NSPECTIONS PT. Z2 2' WIDE GRAS RIP /I DE SIGN ICR-10 pRppOSm • MAIL J SEASONAL 4000 SF 41 I -1 1 P I 37 TYPICAL PROPOSED COLOR ~ PT-3 fP 7 2 I RETAIL AR-t ''`a} •,y I NOTE: SEASO o I IF P - COLOR • REFER TO DRAWING NO. C-7.1 FOR LANDSCAPE PLANT LIST AND DETAILS. J ~ • s 0 i-- LR-88 EP-115 LR-158 OPA1-2 KP1-4 QPA1-3 QPA-6 KP1-4 CC1-3 GRAS mild _ CC1-3 CC1-2 CC1-3 PT1-2 KP1-4 PT1-2 QPA1-4 AR1-3 KP1-3 - OP1-2 CC1-3 QP1-2 KP1-3 CC1-3 CC1-4 CC1-3 KP1-4 QP-6 QPA1-5 DRAWN AR-4 0 CC1-3 EP-89 EP1-41 CHECKED QP1-3 LR1-41 OPW/RPH CC1-3 -J 14EW BERN AVE. U.S. HIGHWAY 6 G NORTH DATE 31 mm 2003 8CALE - - - - - - - - - - - - - r • 80' 546 L.F. 25' AV. WIDTH SHOD 4 PLANTINGS 255 L.F. 50' AV. WIDTH SHOD 3 PLANTINGS 0 60 120 180 JOB No. 1 3 PLANTINGS 354 L.F. 25' AV. WIDTH SHOD 4 PLANTINGS (EXCLUDING DRIVE) RBPCW (EXCLUDING DRIVE) SCALE IN FEET SHEET LANDSCAPE PLAN. c ~7 OF SWEETS old 7 8 9 6 ~ 2 3 4 5 T S: NO E z ~ 1. ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF Q J ~ 0 PESTS AND DISEASE. ~ Q ~ MUST BE CONTAINER GROWN OR BALLED AND BUR 2. ~ o~ v = ~ REMARKS LAPPED As INDICATED IN THE PLANT UST. Y MMON NAME AME CO TANICAL N BO 3. All TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS SPECIFlED. AR r m' r I r I M le 1 -1 ' H P ARE SUBJECT TO THE APPROVAL OF THE r I M le 14- H 4 4• ~ LANTS AR1 r m r I LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER INSTALLUTION. F - M~1 A 5. ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE - M , DETAILS. n ' r 'min H 6. ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS 1 i n n i 'F P n F R SPECIFlED. r r r 1 x in A 7. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE F fl FI w 'n wo d 9 RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND ' ' A SHALL AVOID DAMAGE TO ALL U11UT1ES AND SHALL AVOID DAMAGE TO , ~ ALL UTILITIES DURING THE COURSE OF THE WORK. THE - CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY AND ALL DAMAGE - o • r TO UilUT1ES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH - " N 000URS AS A RESULT OF THE LANDSCAPE CONSTRUCTION. ' 11 2" 8' BdcB VSA 8. THE CONTRACTOR IS RESPONSIBLE FOR VERIFIING ALL PK Prunus serrulata Kwanzon ~ Kwanzon C lIAN1TTIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK. pT pin III Pin 40 min SHOD 3 VSA E....f Q 4 3.5 14 min BdcB SHOD 4 a 9. THE CONTRACTOR IS RESPONSIBLE FOR FULLY MAINTAINING ALL PTt Pin edo Lobloll Pine T MITED T0: WATERING SPRAYING, rff li rlin n rlin ton k 1 1 -1 TPY 0 POINTING (INCLUDING BUT NO U , I Will w ak 1 1 -1 ~ MULCHING FERTILIZING ETC. OF THE PLATING AREAS AND UWN P - ~ ~ ' ) Willow Oak 7 3.5 14 16 BdcB SHOD 4 $ UNTIL THE WORK IS ACCEPTED IN TOTAL BY THE OWNER. OP1 uercue hellos ALL PUNT A roue luatris Pin Oak 46 2 10-12 8dc8 SHOD 3 x 10. THE CONTRACTOR SHALL COMPLETELY GUARANTEE QP Ous yl NNING ON THE DATE Al uercus lustris Pin Oak 28 3.5 14-16 BdcB D D MATERIAL FOR A PERIOD OF ONE 1 YEAR BEGI ) Bold re s 9 2 10-12 Bdc6 VSA STREETYARD A + ~ E OF TOTAL ACCEPTANCE. THE CO R SHALL PROMPTLY MAKE T x i m istichum dl r n Vill n el va 1 1 -1 ~ ' ~ ~ $ ALL REPLACEMENTS BEFORE OR AT THE END OF THE GUARANTEE .~7~ I x N~ ~ 3 PERIOD. APPROVE THE STAKING LOCATION OF ALL ~ a 11. THE ARCHTECT SHALL ~ ~ ~ PLANT MATERIAL PRIOR TO INSTALLATION. Shrubs 12. AFTER BEING DUG AT THE NURSERY SOURCE, ALL TREES IN T i r T ACCLIMATED FOR TWO 2 WEEKS UNDER A MIST 42 24" TPY LEAF SHALL BE O CJ le ra Ja onico Cle ra SYSTEM PRIOR TO INSTALLUTION. EP Eloeo nus Pun ens Thom Elea nus 264 18 SHOD TI>1' 13. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR P B DffOLIATES (PRIOR TO TOTAL ACCEPTANCE OF THE WORK) SHALL BE ICC II x rn to ri ri a H II 7 18 H MA RIAL 158 18 VSA I4 PROMPTLY REMOVED FROM THE SITE AND REPLACED WIT TE ICR Ilex comuto Rotunda Dwarf Homed Holl OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL ICS Ilex crenata Stokes Stokes Jo anese Holl 6 12 n ACCENT PLANT UST SPECIFlCATIONS. r r n T 14. STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL ' CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL. " n ' n 15. ALL SHRUB, GROUND COVER AND SEASONAL COLOR ANNUAL 0 1 H A PLANTING BEDS ARE TO BE COMPLETELY COVERED WITH HARDWOOD R m rvifolium R c rv tr m 41 4" n HOD Y MULCH TO A MINIMUM DEPTH OF FOUR INCHES. 1 m rvifolium R rv m 16. LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE • PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. R SHALL BE THE RESPONSIBILITY OF " THE CONTRACTOR TO VERIFY THE LOCATIONS OF UTILITY ONES AND ADJACENT TO THE WORK AREA. THE CONTRACTOR IS RESPONSIBLE N FALL UTILITY LINES DURING THE ver Peren~als FOR THE PROTECTIO o Groundco CONSTRUCTION PERIOD. r' ' ' I it 4" 1 o.c. ~,~,N~"""'"'Na, 17. SAFE, CLEARLY MARKED PEDESTRIAN AND VEHICULAR ACCESS N R11ES MUST BE MAINTAINED THROUGHOUT x TO ALL ADJACENT PROPE ~ 0~ 1. THE CONSTRUCTION PROCESS. ; ~ D q ~s, ~ n Pond Plants Detent o 18. DURING THE GROWING SEASON ALL ANNUALS SHALL REMAIN IN r ~ N mON THROUGHOUT THE CONSTRUCTION h 2 o.c. ~ ~ A HEALTHY, VITAL COD ff 2' o.c. ~ X a PERIOD. P n eri r ato P' k r Twee 7 1 Pr I 82~ a HOWN ARE APPROXIMATE. PC to 19. ALL PLANT MATERIALS QUAN1111ES S Bullrush 74 P I 2' o.c. r ~ _ SV ci s vali u P N I LE FOR COMPLETE COVERAGE OF '~i _ CONTRACTOR SHALL BE RES 0 S B `~~t! 10''y 0~ ALL PLANTING BEDS AT SPACING SHOWN. ~ I D AREAS ARE TO RECEIVE 4" OF TOP SOIL, f' 5,~~' 20. ALL D STURBE P, W P~~~~ MULCH, AND WATER UNTIL A HEALTHY STAND OF GRASS IS NIWM~g1~ OBTAINED. THIS IS EXCLUDING ALL LANDSCAPED ISLANDS AND ENTRANCE AREAS. 6'' C I Al10NS FOR ALL INFORMATION 7 21. REFER TO WALMART SPEC FlC NEEDED FOR IMPLEMENTATION OF PLANTING PLANS. DETENTION POND PLANTING SPECIFICATIONS 1. PLANTS WILL BE INSTALLED OVER THE SHALLOW PORTIONS <8" IN DEP1H (NORMAL POOL) OF THE WET POND. 2. PLANT MATERIAL IS TO BE MAINTAINED IN COOL, MOIST ENVIRONMENT UNTIL PLANT1NG. 3. LIVE PLANTS ARE TO BE INSTALLED BY HAND USING TREE PLANTING BARS (DIBBLE BARS). 4. LIVE PLANTS ARE TO BE INSTALLED SO THAT R00T COLLAR IS PLAN AT OR SLIGHTLY BELOW) SOIL SURFACE (NOT SIGNIFICAN1lY ABOVE ( ~I OR BELOW GRADE). EX1S11NG GROUND B" 2-PLY RUBBER HOSE 5. PLANTING HOLE WILL BE OPENED BY THE DIBBLE BAR, PLANT DOUBLE STRAND 12 GAUGE WIRE PR PRIME PROPERLY PLACED (VERTICALLY, WITH ROOT COLLAR AT AP 0 COVERED W/2-PLY RUBBER HOSE ELEVAl10N) AND THE HOLE WILL BE CLOSED COMPLETELY (NO AIR \ PLANTED FLUORESCENT ORANGE a SPACE AROUND ROOTS) WITH DIBBLE BAR AND FOOT PRESSURE. ~ ~ WHITE FLAGGING (TYP.} Z 6. LIVE PLANTS SHOULD NOT LEAN MORE THAN 10 DEGREES FROM ClR BACK SLOPE ~ ~ TREE WRAP a PROVID ` J VERTICAL. TO „ L ~ - J A FLAT ,~Uf~FACE Q\\~~~ 4 INCHES MULCH • N , FOR PLANING 4 INCH DEEP SAUCER N 7. ALL ROOT PARTS MUST BE IN GROU D 1 ~ D 8' STEEL TEE POST U~ 8. PROPAGULES (DORMANT RHIZOMES, ETC.) WILL BE PLANTED BY z Z I " TIVE POR110NS OR ~ BACKFlLL MIX Q ~ HAND 1 -2 INTO SOIL SURFACE WITH VEGETA ( O W BUDS) FACING UPWARDS. N ~ ` ~ ~ Z W d' UNDISTURBED SUBSO L 9. PLANTING WILL NOT OCCUR WHEN SOIL CONDITIONS ARE NOT ~ W W CONDUCIVE TO PROPER INSTALLATION (E.G. FROZEN GROUND). ~ ~ REMOVE BURLAP do ROPE ~ ~ W O Z o FROM TOP 1/3 OF THE BALL ~ ~m W 10. PLANTING SHOULD OCCUR DURING THE PERIOD FROM MARCH UZ 3 1ST THROUGH APRIL 30TH. NOTE; SEE UWDSCAPE NOTES FOR 11~E TYPE OF MULCH MATERIAL TO USE. Z ~ ~ IW ~ WW z am W ~ Z m W~ Al WNS, PE w SO N L NTING PA THE t= LAWN SEEDING SHALL BE AT THE N.T.S. IN RATES: W FOLLOW G Z PER 1000 S.F. OF LAWN AREA: W J ~ 3 LBS. TURF TYPE FESCUE "TYPE A 'TYPE B' 3 LBS. TURF TYPE FESCUE ° (TWO DIFFERENT FESCUES TO BE SELECTED FROM ~ . 0 ~ VARIETIES RECOMMENDED FOR PROJECT AREA) •0 D 00 ° Use 2" x 2" x 6' hardwood stakes and {~9 1 LB. KENTUCKY BLUE GRASS a0 wire encased in rubber hose for staking Ur 0~ 00 ~ when needed or as directed by architect. E Use tree wrap up to first whirl of branches i ~ p on trees above 1-1/2" caliper to prevent o~ scalding. 0 00 ~ , To promote aeration and percolation in o• 0 o heavy soils, plant rootbcll above existing grade as shown. 0 • 0 Backfill with 80% parent material and 20% aecomposea organic maaer Uy vowme well mixed. Provide 6" minimum of bockfill on each i side of rootball to promote rapid re- establishment. l Provide an earth saucer for water retention. REVISIONS Minimum 4 thick pine straw in 5' BY diameter circle or as shown on plans. 21 JUL 2008 OPW ~EtO11T8? PLANTING TREE F ~ ~ To promote aeration and percolation in heavy soil, plant rootball above existing • grade as shown. Provide an earth saucer for water retention. Backfill with BOX parent material and 20X decomposed organic material by volume well mixed as approved by the architect. Provide 6" minimum of backfill on each tide of rootball to promote rapid reestablishment. Provide minimum 3" thick pine straw in 5' wide planting beds or as directed on plans. DRAWN SKO GPW CHECKED SHRUB PLANTING GPW DATE 11 JUN 2003 (90% CD) SCALE G JOB No. RWCW SHEET LANDSCAPE DETAILS. ¦ r 1 2 3 4 5 6 7 STORM DRAINAGE STRUCTURE SCHE DULE 8 9 vv v ~ ,y I MARK INV IN INV OUT SIZE LENGTH SLOPE TOP ELEV REMARKS MARK INV IN INV OUT SIZE LENGTH SLOPE TOP ELEV REMARKS _ \ \ \ \ \ v \ 260 \ \ I \ \ \ \ I NEUSE BASIN NOTE 275.0 279.Ot(SLAB) RTCB 60-61 36" RCP 140 1.0% THIS PROPERLY IS VESTED BASIN NOTE \ \ - v v v \ \ I f, 1-2 15" RCP 22 3.09 61 254.05 253.85 27ost(TC) cl REQUIREMENTS OF THE NEU R1Y IS VESTED FROM THE _ I \ \ v, \ ITS OF THEN A EXIST. - _ EUSE BUFFER \ \ ~ WETLANDS ~ \ ~ ~ \ RULES AS INDICATED IN THE 2 274.33 274.13 278.11 TC CI - ( 50 62 4"R P ) 2 C 140 1.0% VDICATED IN THE VESTED ~ (TYP.) ~ \ \ i ,1~• RIGHTS LETTER FROM NCDEI 2-3 18" RCP 46 1.0% 50A-62 15' RCP 66 1.09 FEBRUARY 14, 2003. 'ER FROM NCDENR DATED \ \ 4, 2003. \ \ / ~ ~ \ 1 \ 3 273.67 273.47 278.5f(TC) CI 61-62 36" RCP 244 1.09 ~V ~ - ' ~ \ ~ \ ~ 1 ~ - \ 1 ~v ~v A \ A 3-4 1 " 8 RCP 38 1.5% 62 (50) 250.08 242.87 266.9f(TC) CI \ ~ V 1 \ \ 4 272.90 272.70 276.4t(TC) CI (50A)261.77 A ~ A - \ 1 \ \ ~ \ } V / - 4-5 18' RGP 7G 1.15% (61) 251.41 i \ ~ t' ~ - ~ ~ I J \ ~ ~ ~ 5 271.90 271.70 275.51 JB/MH 62-62A 48" RCP 33 1.29 ' I \ 1 A\ V A ~ i j i I ~ / / , a , ti 6 271.5 275.01 CB 62A 242.47 ENDWALL \1 j ; I I v ~ v v ~ ~ I ~ j ~••y } ~ II I 6-6A 15" RCP 133 3.25% 63 (3") 250.00 245.31 253.21 JB 1, ~ ~ \ I I ~ / I I ~ / 1 ~ *1 I \ \ / l v ~ / ~ \ ~ ~ \ \ \ ~ 71 , 5-7 18° RCP 147 3.09 63-64 12" RCP 162 0.5% REFER TO SHEET C-8.1 AND fi \ ~ \ ~1~ r _ \ \ / I ~ ~ ~ \ 1111 6A-7 15" RCP 90 1.0% 64 244.50 PIPE END ~ \ \ \ r~ i A I I ~ \ \ ~ ~ ~1~ /r~ v / / / r I i ~j r 8.2 FOR IMPROVEMENT IN ~ A 1 ~ / / i v \ ~0 v1 v ~ ~ / / \ \ `l I 7 (5) 267.28 265.88 271.4(TC) DI 65 241.56 253.8t(SLAB) RTWI \ \ \ \ ~ _ _ _ _ ~ " - _ l - _ _ - _ _ _ _ - - _ / _ CORPORATION PARKWAY i 1 \ \ ` / ~ ~ o, \ ~ o / < / I ` ~ / NEW PRIVATE / (6A) 266.08 65-66 \ \ \ _ - / 42" RCP 8 2.09 \ \ \ \ I. I _ / / ( I V v ~ V AZ__,~'r A ~ v / / l 1 DRAT AGE EAS MENT 8 261.5 265.01 CB 66 241.40 241.20 253.81 \ 1 ~ \ ~ ~ ~ w : ~ ~ ` 6R~AINA6E--'~- 1yl I ) / SLAB RTWI \ - a- ( ( ) \ ~ \ \ ~ ' ~ ~ ~ ~ ~ - _ ---E9SEMENT TYP. ~ rL I f 8-9 15 RCP 117 1.07. ~ ~ ~ ~ I ~ / 66-67 60" RCP 34 1.0% I \ , ~ ~ ~ ~ . " _ - - _ ~ - _ ~ r ' ~ ~ . 9 260.33 260.13 265.51 CB 67 240.86 ENDWALL I N \ ~ , ~ ~ ~ . _ _ , _ ~ ~ - _ _ _ _ _ _ / I ~ ` , _ ~ 7-10 18" RCP 191 3.3% \ i r _ _ - l v ~ ~ ~ ~ V - ~ \ \ / \ I ~ ~ 1'RC ~W ~ 9-10 15' RCP 70 1.09 ~l I I ~ - ~ - ( I I A ~ ~ ~ r _ I 260 ~ O ~ i 10 (7) 259.58 259.23 267.8E TC CI \ ~ I i , ~ - ~ - - _ ~ t6 18 ~ ~ ~ / i ~ ~ ~ I / ~ d~~ o \ I 1 C (9) 259.43 ~ ~ ~ \ V I ( o ' ~ 2s ~ ~ \ ~ ( o- 2B ~ 0 5' ROP \ i ~4" f h v~ I ~ X ~ 10-11 24" RCP 7 1.0% \ \ I \ I I I ; ; I I'i' } ~ } ~ ~ ~ / < 1 I r~ ~ I I ~ / ~ 1 2 ~ ~ I OS A1~ON ~ - ~ ~ N .r 11 259.16 258.96 267.8t(TC) CI ~ ~ V \ ~ ~ 0 ) ~%RCP v ~ v ~ I ~ 1 ~ RKWAx ~ ,1 / ~ ~d ~ A n n E °J I r VAS ~ / h / won /I \ I I ~ o I y ~ ` / e 1 I 11-12 24" RCP 40 1.2% ~ ~ ~ y I yss - - 1 l 12 258.56 258.36 267.71 TC CI v _ ~ `v • { ~ ' B ( ) . ~ ` v v v ~ ~ C - - - - - 270.95 , / 1 . q - 7 I l V v f0 OiCi I RCP , ~.a-.~.~,~ - ~ ~ _ A \ V ~ M 12-13 24" RCP 168 1.5% ~"~'p \ ~5 ~ ~ ~ o ~ I15 ! 55. ~ f11~~ ` \ ~ W W 1 i ( \ N _ SATE- DRAINAGE , , ` \ \ \ m \ TOP OF WALL V S I \ J 13 255.84 255.64 267.2f(TC) CI I ~ A ~~Q ~ ~ y , } I 59~ \ BASEMENT (TYP.) , ~ ~ ' ` \ a ~ NEW CL. B EROSION eg SLOE ~ r J~ NE~ \ ~ ' I ~ \ \ S° ~ \ \ 1 3 ONTROL STONE APRON 14 257,33 262At(TC) CI ~ \ 1 e . / ~ \ \ -,apt ~ _ ~ I , n { ~ v r ~ } ~ N 1 v. A i1= MIN 14-15 1 " R P 1\ \ \ \ ~ ! 1 ~ i ~6 1\\\\ ~ 2 1.5 ~ ~o o \ 1 , 5 C 39 1.09 P\ \ ~ A 11 V 1 v 2 \ i \ } ~ TRAN , / - ~ ~ o DRAINAG EMENT / ~ N ~ \ ~ ( . 32 Lx 12 Wx22"TH) } A ~ 25 / ~ / ~ _ ~ \ A \ V A ~ \ 1 } , J RSA J 1 / + ; ~ / 1 , \ \ ~ \ \ ~b~ GEOTEXTILE FABRIC ~ ~ ~ . ~ \ \ \ 1 tit, / ^ \ ~ \ } I 15 256.94 256.74 262.Ot(TC) CI ~ ~ \ \ 1 ~ ~~o ~ \ ti \ \ 2ep ~ ~ \ 1 I j 27. ~ ~ ~ ly, 15-16 15" RCP 59 1.09 \ \ ~ I ! ~ ~ ~ \ ~ ~ 1, I ~I >p \ \ t ! i II ~ 5 5 \1 \\~~I ~ I / \ \ LINE ENBANKMENT 1•AltFl- 16 256.15 255.95 265.41 TC CI ~ \ ~ ~ 0 ~ ! ~ _ \ ~ ~ A \ + i I ICI ( ) m ~ tie - ~ 1 I ~ i z ' i , ; , ~ vv.r , _ v y A 1 \ v ~ 1 16-17 1 R \ , i - _ I V I 870.54 5 CP 33 1.07. \ 1 I I ° ~ ~ ~ t zs7.63 I ~ a< ~ c ~ ~ I r ' f ' ~ ' 70.54 2sa ~ s ~ , ~ \ \ ' \ ~ ~ \ I \ \ I ~ 1 1 CLASS 1 RIP RAP (MIN 22 59 I ~ ~ ~ i + Rc ~ ~ I ~ ~ • ~ lr \ + v~ } ~ I THICK) ON GEOTEXTILE 17 255.62 255.42 263.0E JB/MH \ + I a 4 ` = ~ ~ r ~ \ I v.o ~ 3s RcP - \ ~ 1 FABRI } -(7~- \ t ~ . r C TO ELEVATION 246.0 V v \ ,III _ . ~ ` \ I 1 1 18 255.23 259.5t(TC) CI ~ \ \ y I I r \ ~ _ \ \ ~ 1 I I ro \ i ~ 18-19 15" RCP 67 1.09 1 ° \ \ \ I 1 ~ I - \ ~ a 90 \ \ ~ I V A ~ ~ vv / v 1 III I ~ ~ 12" PVC A I I \ \ ~ \ ( WO FLOOD HAZARD SOILS I ? s ~ / \ \ I 127ts2 ° ~ ~ @ 2.0%1 MIN. 4e' RcP ~ \ BM 1988, PG 1363 19 254.56 254.36 261.9t(TC) CI , \ ~ \ + I ,III 1 I ~ _ ~ \ ~ I I 27ts2 i \ V , I I I ~ V 1 1 1 I I I I I z72.o ~ \ \ \ (TYP. EA. SIDE IIII I z72.o } 271sa, ~ I A \ V ) 19-20 15" RCP 184 1.0% ~ \ } ~ 1 I ~ \ ~ 1 III I I I 271.5 \ , ~ y A ,I~ I ( ~ v \ I . I t 1 11 l ~ 1 ~ \ 271.92 p ~ . ' \ \ I I 271.5 272.0 \ ~ ~ 271.5 ~ E ~ - ~ • A A / 20 252.52 252.32 261.3t(TC) CI V A \ r A 11 ` 11 I \ ~ - _ _ _ A 1 C'. 1 1 I ' J III 1 I 1 i 12" PVC 1~ + IN = 265.18 272.0 0 2ss. W ~ \ _ v I I QA \ 1 I11'I illl I 20 21 15' RCP 183 1.0% V \ V / ~ ~ ! ~ A \ - I III ~ I I I I + I ~ 1 ®2.09 M i I' I ~o ~ \ \ \ s , I I I 1 I j 2s7s \ z BERM - 254.3 21 250.49 250.29 261.61 TC CI / / ~ ~ ~ j'II I1 / 1 ` lCN - 6~ 0 IIII I 1 I I I I, f O ~v / I ~i lil I ~ v 11 I I I I II II, ! ~ I 1 ~ i / ~ \ } ~ v v 'v vv A 1 I I J I ~ \ INV = 264.8, i 2ss / \ 0 3s" RCP \ ° 1 l ~ 17-22 15" RCP 233 1.5% y \ / I ~ ~ ~ i I - ~ A ! A I ~ I I I ~ I ~ MAX. ,SCOPE ON ~ i I ~ z7 - - A 12"~ PVC A ! I I ; I III 1 I I it ~ { ! 1 \ . ~ ~ 1A i / ~ \ r 60' RCP V ~ ~ ~ ~ IIII I I I I l VV ~ 2~1 s2 ~ \ c ~ V A A ~ v ~ NEW CL. B EROSION 21-22 18" RCP t0 1.09 ~ IDEWALI~ 1 I~ ~ I I ~ ~ ®2 % M N. ~ I III l ! I I I I 1 1 ? _ 271. 271. A\ ~ I I I j 1 1 1 1 I I ~ { ~ / z .o ~V I ~ k ® r f 11 I ~ P ~ \ \ ~ \CONT •i ~4t~ia~c4.~,~ 22 (17) 251.93 250.00 261.5t(TC) DBL CI ~ ~ 1 / ~ I I I w ~ v, A 1 1 I I ~ I ~ , 1~ ROL STONE APRON ~ IIII ~ I i NOTE; REFER TO STORM V A ~ ~ v y~ G~ , } I DRAINAGE DETAIL SHEET I ~ p% 1 BERM: 24.0 ~ (MIN. 40 Lx15 Wx22"TH) Q• . ~ . ~ 21 250.20 ~ ~ t` l III . ) I ~ V ~V ~ I f . ~ I I I l ~ I O ~ ~ % I I, I t 27z.o ~ 1 } ,III I{ i I I I I I I I I I SIT \ \ ~ ~ r ~ ~ I ~ 'ON GEOTEXTILE FA ~ • ~ I I I E 3.4 FOR PAD PREP \ ~ ~ ~ ~ A, \ ERIC FE 13-23 a° \ ~ / / I I I i 27.66 \ I \ \ I I I IIII ~ 2 RCP 115 4.0% / / ~ ~ I / I I ~ ~ ~ 1~ I I I y ~ i I , l I I I f NOTES Tc 271.7s \ \ ~ } \ y ~ \ ~ I { . I I ' \ ~ TP 271.25 1 \ ~ NOTE: REF R 22-23 24" RCP 125 1.0% / 1 / ~ I ~ ' i I ~ 27i.B5 ~ / ! 1• I I 1 I I I { ) \ Boa ~ ~ i I. zt.5 I/ ~ 111 II1', I I I I I I ~i I I r. \ \ \ \ E TO LANDSCAPE ~ l \ e" a l ~ PLAN FOR I ~ / I \ \ \ r SLOPE 1~ ~ 23 (13) 251.00 248.50 262.6E JB/MH ? / j~ ~ / I( I 1 A ` I N I ~ I i I 1 III 1 1 1 1 \ ~ r ;IIII (I 271. I A l '1 $ .II III Il,+j ;f I I 11 1 / TC 271.92 P POSED l ~ ~--f 1 , { ~ ; ; ( 1 / - v TP 271.42 \ J ~ a ~ STABILIZATION AT DETENTION ~ ; (22) 248.70 ~ I . • I ~ ~ \ ' i 0~ ~ 1 6 1 7 V~, ~'.I ~I~I IIII~i ~ ~ ~ ~ ~ ~ WEf BOND 2 V 1 PONDS AND LEVEL : t i ~ ; ( l I ® ,250. a \ „ , ~ \ 2 -SPREADERS 4, \G 23-23A 30" RCP 55 1.59 ~ ' 2 r / I Q ss I ~ 271.92 \ \ ~ ~ ~ \ v \ ~ i ~ I i 272.0 V Al L) III) I~I~ 'I~ III; / \ ~N a 23A 247.68 247.48 262.78t(TC) CI ~ ~ I I I I \ ~ l A ~ . 1 i I I I I I ~ + I , : ~ ~ ; E LEVEL ~ NEW CL. B EROSION ~ ~ 3 I 11 ' j SUP i 1 E C E ~ - SEA • ~ , 23A-24 30° RCP 120 1.5% ~ , , ~ ! ; ; I _ i/ v!/\ i ~ ~ ; I, III 1 \ ~ i I~i is RcP + l 'I I I ~ l i i I I I I, I ~ 2 I DE CONTROL ST l a. ONE APRON 1 2 MIN. 21'Lx12 Wx 24 (23A)245.68 243.82 256.01 JB/MH ~ \ III ' I' I I o 11'' `I IIII IIII I ~ I ~ V 111 I l ll, I I -"27t.e2 ~ + V I I I 1 III i I '~l 1 ~ ~ , ON GEOTEXTILE FABRI f i l l I I ~ ; J ~ / C \ v / / ~ o o I' I i;I~III 1 ~ o \ II \ ~ , '11 I ii ~ I t \ \ NEW RETAIEdIN ' ~o. ~ I ~ ! ~ I I ~ , I n I r' / 5 ~M, - I I i ; , ~ i~ 203,942' S.F. { a ~ ~ sp, % , 1 1 I ~ ~9~ NEW LEVELS R 24-25 30" RCP 91 2.09 G WALL , I~ , V , 272.a I I 1 I l~~ l i l IIII I, i V A TOP OF NfgLL VAdIES ~I I , , ; ~ I ~ I I I I I I I, i 1 j ~ I ~ i' ~ EADIER ~ 1 25 243.78 FES l ~ I ~ I l I, ~ r .III I I I l i ~ I l;t ! z7t. I I I X1,11 j„~ I ll I II ~ ~:~.E. = 22.0 I ~ / 1 v I I I i \ ~ / ~ ~ ~ I f I i TC 271.75 11 ~ / ~ w t \ \ I I I~ } } I TP 271. ( ~ 1 P ~ ~ ~ A 25A (2°) 247.3 243.89 249.8 JB A ~ I ( I I ~ I ! ~I I , ! ~ , I i I , \ I I 1 1' 1 i i I ~ ,I j l 1 III ' IIII III I ~ I, Il I I I I ,i I' 25 I / / I I I 4 I I I } '1 I / 49 ~ ~ ~ l V A 25A-25 12" RCP 38 0.59 ` I l I I I 272.0 , ' ~ 1 I I III I 1 I, ; I ~I I IIII 1111 I 1 I I I i i ~ , rc 271,x8 / ~ J• • " ~ / ` 1~,. I \ \ TP 271.38 r / y . ~ i 12" RCP \ r'~ \ ~ 25B 243.70 PIPE END \ { l 1 I ~ I i 1 1 1 ,Ill I I I I bt ~ 'vv ~ I 111 l II II ~ v?~ II'II' ill! I 25C 242.00 250.3t(SLAB) RTCB ~ 1 l i l t, / z72.o 1 + 1 1 1 I I I, ~ I n I 1 ` I TC 271.88 / t% \ " ~ v 0A ~1 I v 1 - 272.0 I I I! I I I 1 I 25C-25 42 RCP 31 0.59 V A ~ ~ III 1) 1 I III I J ~ f ~ i I TP 271.38 I ~ ~ ~ - _ / ' 01 \ ~ ~ III I / ~ ~ ~ ~ '0 ~ ~ ~ 1 1 V I I, I I I I 250 241.85 \ ~ ( III ' i 1 I II III I l { / I I J I ~ I~~W CL. B EROSION CONT L STONE 7APRON ~P ~ ' ~ r' \ ~ \ /fi ,2 j I I { / r fMIN. 32'Lx12'N~x22"TH ON EOTEXTI F ~ - ENDWALL ~ ~ V~ 1 / > I I 2715 I I I J I - + ~ ; ~ ~ I ! / I I III IIII I f 26 15" 279.06 278.86 291.01 JB MH 1 I ~ , I 1 I I • I , I ) L ABRIC r "ti / '~'.y/ \ NEW CL. B EROSION IIII I f I _ _ ~ \ ~9Q,NOT DISTfJR~B STREAM C ANNEL PAST m ~ 1 CONTROL STONE APRON ( ) / ~ ~ ~ I I ~ ~ I I i 'i 1 11 l Ir~,I 'i I ' 42" 279.50 \ 110 LFt B" PVC , ~ ' i I' I I ; i I 1 1 THIS POINT ~ ® _ \ \ \v MIN. 20'Lx7. ' ~ \ A ' ` ®2.0% h~IN. I i i ~I 111 ~i I' I I ~ i 26-27 42" RCP 177 3.2% ~ I ~ I , i II ~ + ~ I, ~ ~ ; 1 ~ 1 y o I 7 - .'.,j(.~° - / ~ v v ON GEOTEXTILE FABRIC I ' I I ~ 7 1 1 1 272.0 .n l rc 271.ea r ! • • . ' ~ ' ~ V • y L ~ ~l < v , ~ y ' \ ~ , II' iii; till I! 27 273.20 768.45 279.11 JB/MH 1 ~ pp NE:W TWO-VPA~ CL ~ 1 •r 271. ~ ,1 I I i I 1 { l I ! 1 v 1 271.38 t ( i ~ / s~ ~ • ROPOSED \ 'v ` v~ \ I I l v I ET - ~ ~ EAN6UT ~ ~ , 1 ~ Tc 271.66 ~ 11 I I I I I ~ I J rP 7t. rn vt.es \ 1 I I I D 28 '266.18 283.0E CB ~ , ~ \ \ ; cur (REFER TO ARCHJMEP DRAWING}., . ~ I I I J I I I ~ ~ / / ~ yo POND ~1 v BERM 250.8 2 \ \ ~ / l J 1 ~ l ~r 1 W.E. 247. \ \ ~ \ \ s I I I I 11 ,I \ ~ ~ I"'~~~ / I \ l \ \ \ \ ` 1 z7 s / 'r lzhi.~s I I I I 1 ~ ~ _ 1 TOP 271.55E ~ ~2> 2' ~ ~j ~f•~6 I , I I 28-29 24" RCP 328 1.51% ~ ~ I TC 271.75 TC 2.95 \ \ ` ( ~ f ~ I ,RCP 4 / \ II\ \ \ ~ TP 271.75 \ TP 271.75~~ \ i r iv °.l i~ \ 42 S° \ 1 'I~'i' 29 261.23 261.03 271.8E MH JB I + I I I ~ , I I / ~ ~ ~ y ~--29a I I 7. I I ' 271 s2 ~ ` w J i ~ 24s ~ ~ ,NEW RETAINING WAL ~ ~ • • /i / ~ 24 L ti li - / - E~ • / TOP I OF P s A~ ~ ~ ~p ,,p , + i 27-30 42 RC 229 3 067 j I MAN TC ~88 ~ ~ / ~ I v i 1 27~ ~ ~ ~ / hk _ _ WALL VARIES ~ ~ f _ lr \ I ~ ~ ( A - 29-30 24" RCP 150 1.5% y~ - i ~ C 2Z~1.3' ~ r ! / % ~ I TP 71.751 6 ~ t b':%'t { \ \ r ~ y p 258 1 ~ \ l I ~ ~ ' - 1.3 . / i i ~ / I I C 2' 30 (27) 261.44 258.58 272.31 MH/JB 1 -F ~ ? _ ~7C.66 -~7&7g65 ; , i I TP 2' 1 1 1 c 271.7s P c v 1 1 f,'.' ~ 6 a_ +d v ~ I D IN TYP. A \ \ 2E~ _ o A ~ ~ Z TP 271.75 t ~ TC 271.55.._ I 4 y0 ~ , 19 \ _ _ F. 1 , ,270,65 \ \ \ - ~ ~ 1 I 270.65- . (29) 258.78 ` r ~ \ I \ ~ ~ - _ " TP 271.75 I / ~ 281.12 6 \ 15. R p w ~ 1 I 270.65 0.65 \ 42' IZCP I / ~ c ~ - / ~ ~ ~ ~ ~ C 1 1 _ _ ~ - - ' \ 31.8' - - ~ / 30-31 42° RCP 400 1.75% , - \ \ - - i ~9'` , - i' \ / r 2065 274:6 ` \ 1 n 263.3 283.3 ~ \ ` ~a 31 251.58 251.38 270.31 MH/JB i \ ~ _ - , ' sSf~Oj~.- 270.3 27 2~ \ ` 27c.a \ ~ 4s ' ~ e' Pvc o x st. 26z.e I , \ ~ k \ • \ ~ Z W ti \ ~ \ \ 1 S MIN. 1.5 / / I ~ \ ~ \ \ ~ ` W W 27~.2~ \ I \ 1 ~ 63,5 \ 8 2 \ a - _ / 31-32 42" RCP 178 1.829 ~ ! i ' 7 / P ~ 32 248.14 247.87 266.31 MH/JB I ~ - - ' ~ ~ o,~ ~ / , % , ~ o Ij \ I \ \ 270.22 -0 V ~ ~ VA . _ J 262.75 _ , ` 263.5 / ~ \ \ \ ~ Q -0 ~ U w F- { \ 1 ~ I } } / 265.0 ~ RROPOSkD \ / / ~ 82,88 \ ` \ \ ~ m 32-33 48" RCP 47 1.0% 1 1 1 i~ \ t5" RCP ~ ~ ~ p -0 I o I r ~ FFE'1 ~ r, 261.5 ~ 3 \ 2S ~~yy~.+~ 10 263.5 \ ~ ~ o LL ~ { ~ • RCf~ aoPOSED~,- - - - _ 1 Z ~ 0[ a 33 247.40 ENDWALL = 1 P ~ ~ j , - - ~ - ~ - ` ~ _ ~ r ~ - - 34 280.36 289.3t(SLAB) RTCB I t4 2s 9 ~ _ _ 1 ) I \ I I I I \ / , ( Rp a 283.5 / ~ ~ =163.5 3 m \ \ } \ ~ \ ? \ / ( / 26J.9 ~ 282.84 y / / \ ~ ~ W ~ W 34-35 15" RCP 120 4.25% ~ " ~ ~ ~ / I \ I _ I \ \ \ r ~ ~ ! u o \ ~ I J \ \ m r^ WJ J I / \ . U v, I O 2.68 / 262.88 m \ 1 6.5 / , I ~ 35 275.20 273.30 284.Ot(SLAB) RTCB ~ i ~ 41 so ~ I 1 I I I II~~J/ ~ - - ~ ~ \ w II I 1 ; - / ~ ~ ~ 30 36" RCP ~ 35-36 18" RCP 60 3.0% 1 ~ 1 ~i 29 t!o 36" RCP \ IN I \ I J i }I I - _ _ - 262.6 \ T 1lOx 1 ~ RCP I r 11 I ~ _ 282.84 ~ ~ b I \ W Z \ i ~ \ i 477 1 / ( . - 282.84 36 271.70 271.50 275.Bt(TC) CI II ~ ~ ~ • - ~ 36" RCP j MIN I I ~ I _ 282.4E ' 282.48 ~ ~ \ ~ ~ 37 275.93 279Jt(TC) CI II I a ~ n _ ~ , 43 ~ i f ~ I I~ I/ ~ i~ 23 ~4 i ti I \ / , I Cr / 1 x ~ ~ j ~ i i N / / I ^I I ~ ~ 5 RCP - 262.84 I ~ 37-38 15" RCP 53 1.09 $ ~ `0 J - \ _ ~ ~ 126` t II ~ ~ 126~r1 / ~ ~ / / ~ II' i~f i~ p I i 38 275.40 275.20 279.8E C CI ~ - ' _ 9p ~ , \ 1 3t / ~~~/'7 / ~4Q~ 280.98 I ~ ~ V 1 j t/I / )p r'~ ' / ~_~~lr, ~ 61.47 lg" RCP - 15" RCP 24 1.09 II \ 0'~ 1 ~ 1 E 38 39 I _ / / t / / ~ 60 261. o ( \ \ P ; ~ 16" RCP /s / _ \ \ 1 39 274.96 273.10 284.8f(SLAB) RTCB ~ ~ , , ~ - , \ 1~ ~ III; /i / / / / ~ ~ / \ 1. /~i ~ I , ~ 1 1 1 I~' 36-40 24" RCP 146 1.0% _ - - ~ ~ ~ y I I II 7 ~ / / ~ / I~ ~ ~ r l(I - i~ / ~l~ll;-~ 13 - R l I NEW RETAINING W ~ I / I ~ ~ 39-40 15" RCP 66 2.57. ~ ~ / / / / / / / ~ ! I ~ \ I ~ _ _ TOP OF WALL IE ~ ~ ' / 4 ~A ~ \ - - I 40 (36) 270.04 269.84 275.Bt(TC) CI BENCH MARK ~ 1 ~ ~ - - / / ~ 1 / ~ ( ~ / ~ / / 6~ / ~ 26 / l 39 271.45 FIRE HYDRANT / \ I ~ / ~ i~ ~ ~ I l ( ) TOP PAINTED FLANGE BOLT \ / i ~ ~ ~ ~ _ ~ ; ! ~ a / ~ I / / 4 -41 24" RCP 174 1.75% - ~ ~ / ~ ~ ~ - ~ / 2 / r , 0 ELEV-297.53 , ~ ~ / / t II ~ / t ~ s ~ / _ ~ : , i " 24" RCP / / ~ \ N l ~ - - ~ ~ ~ ~ ~ ~ ' / 41 266.80 266.60 270.Sf(TC) CI (EW BENCHMARK WILL NEED a \ ~ ' ' ~ , . _ ~ TO BE ESTABLISHED) do - - - 41-42 30" RCP 123 2.57. ce~ / ~ _ ' - 75.7 y AC i ~ , / ~ 1 ~ , / , ~ ~ 110 I N / ,l } f~~ I . I 1 42 263.53 263.33 268.6t(TC) DBL CI ~ ~ / 1' - , r i ~ } 1 ~ ti / r . ~ j ; ~ / 1 ~ 4 -43 36" RCP 18 3.25 ss - " - ~ . - - , , ~ , ,'jlJ ~ _ _ , L. I I 27 A \ ~ " 43 262.75 262.55 268.6t(TC) DBL CI ! ~ ~ \ ~ \ , • 273 6 ~~-2T - - _ ~ _ - 36" RCP 245 1.0% ~ I ' + li 8.0% _ - v ~ ~ , - ~ 43 44 _ ~ A , ~ o _ - ; i I / i" -'i._- / Ate, / ~ r ~N ~ i ~ `ti~ ~ ~ ~ , I ! ~ i 44 260.10 259.90 268.91 DBL CI \ 1 I I ~ / . _ Y-. - ~ ~ ~ h \ -4701 r27 _ ~ ~ _ _ i~ 45 160.96 1oo.12(IG) VOL ll 44-46 36" RCP 200 2.0% 15' R6P - \ . 269,4 \2 267.3 45-46 18" RCP 129 3.07. 3.1 I ! I 1 46 (44) 255.90 255.70 268.7± JB/MH I„ / I 11_ Pill (45) 257.0 9 I I I l \ . ~ ~ss_-~-! --7 / • - ~ - o - s 11 r r~ , REVISIONS B 18'RCP DI a 46-47 42" RCP 32 1.0% Q I / f ` \ ~ • ~ / I ~ \ may.... / 1 1 r I / I I U APR 2003 7 34 \ 24 RCP At, N i• ~0 1 \ I 47 255.38 255.18 269.4±(TC CI i I I / _ > ) ~ I I f l l l l ~ ~ -•E+3 t 7 I r r I !DESIGN CIVLI SKO E9 I \ 66,34 r. 15" RCP I I -E9 Q) e,, v4. z ` 270.5 08 JUN 2003 47-48 42" RCP 105 1.0% / I I II I 11,111 _ I r 4e 254.13 253.93 270,31 MH I I I - 15 RCP C I I Ill ,s RCP 3 1z .4e 264,8 I r lDW GPW 18' RCP 18 RCP ° - 0 1 I I Q REVEWI r 1 48-49 42" RCP 105 1.0% I Q . \ / I J l 11 \ sec _ _ o Of I _ I , 112"X 12 PR~E~fA~RICAT~O - - - ~ I 265.4 ,ICAT~O - - - ~11izo ' 1 1 270.92 s~ 11 1 I \ ` 11 JUN 2003 268.5±(TC) Cl REFER TO SHEET C-8.5 49 252.88 252.68 I / I • \ EVE EA DRAIN I 27o.a DLH 7 ~ I I 217.0 180% CD) N 4 "RCP 100 1.0% FOR IMPROVEMENTS IN I I - o / I I I TOP--M27 49-50 2 NEW HOPE ROAD a I I ( I 8 N INV.274.8 276..64 .70 O 27L04 I ,6' RC I 21 JUL . ~ p / I I 2003 270 a 50 251.68 251.48 268.8t(TC) CI c0; I l I I l _ a I I I III IPERMT8) QPW 50A 262.43 265.9t(TC) CI NEW RETAIFItbG'YVVILL _ _ _ I I \ cn 10P,OF WALL _ _ VARIES I I I I \ u \ \ I 16• RCP I \ I 277,0 I 27 .34 271.56 271.06 \ l ( I I 20 JUL 2003 1 I 1\ 27 .96 I I (EXPRESS REVEWI 51 264.72 269.5±(TC) DBL Cl , ~ 1 J I \ \ ~ _ 280 _ _ ` l \ \ I 1 \ I 6 - - - 2es.ce ( 267.b QPW 268.00 272.0± TC Cl Z 52 ( ) I TRACT ID-_ ~ ~ ? \ PMPOSEf I 1 I I I r I e 70.9 ( ] a I 8 I I I OS AUG 2003 Es 51-53 18" RCP 97 1.0% RETAINING WALL t SIGN _ - } --290 TO O!; WALL VARIEg Q 15" RCP 25 9.0% 277.0 AIL ¢ I \ i iDWQ REVEWI DLH E~ pROPO$ED FFE 271.7 2 a.0 '6" ~ 52-53 I ~ ~ c~ TOP-276.e \ (~jpE 5.7 ~ 210.5 271.56 271.06 26 .5 I a r X MIN ®1 \ \ / FFE = 277.0 , 666, 66.34 F~M EDI r 23 SEP 2003 53 51 263.75 263.55 270.4±(TC) Cl 11 \ \ P•278.84 I 1 r' - \ I RETAIL I I \ i (WAL-MART) 1,~W I (52) 265.75 U 53-54 24" RCP 120 1.0% \ _ - - _ - • _ 8" PVC h.8%v MIN. \ & 1 I - 267.01 I 1 ® 76.6 V I V r l \ ^ RCP 8" PVC ®I 70 ' 167.0 I 1 \ 54 262.35 262.15 269.8±(TC) Cl 55 263.28 270.8±(TC) CI - 3 \ 9 28 \ 27 7 \ 6 I I X MIN g 286.641 5.0% MAX. \ > > , ' 166.5 sLOPe I \ \ 24" RCP 155 1.0% PPS 290 ~?P I 79,1 - ~ - - - I _ ~ ~ ~ 54-56 - - moor/ ai J H PP UOFOCM PP 4-1 N 55-56 15" RCP 93 2.6% o ~ PRMH r OHP&PHL - DRAWN 56 (54) 260.60 260.40 270.4±(TC) Cl w w w w w \ w rP~ w w w (55) 260.86 UGFOCM a \ 4 W W - - - W \ W W - . _ GPW OUTHERN BEb 57 L ~ 262.53 266.3±(TC) CI -j \ 4 a 1 F PER OPTIC CABLE MARKER W~ w NOSE: DO NOT EXCEED SLOPE \ ` \ W so CHECKED 3 ~ ~ / ~ ~ I J U 56-58 30" RCP 239 1.0% EAC WAY 7 \ % I r ACROSS FLAN CAP I \ 1 JDL/RPH PA KING SPAQES 1 / 1 I ~ 1 NORTH DATE G i s a / / l 1 m V 57-58 15" RCP 80 5.0% - _ , 58 (56) 258.01 257.81 269.3±(TC) Cl N 57 258.53 \ y 31 MAR 2003 / i r l r SCALE N t / 58-59 30" RCP 99 1.0% o I ~ 1r , r 3 2 270.1± JB/MH I 5s 256.82 256.6 1 ; EW/ BERN" AVE. % U. S. HIGHW -Y 64 0 60 I ~ eo 120 180 U o ~ ~ 59-60 36" RCP 97 1.0% W Y 64 / q I REFER TO SHEET C-8.3 AN J06 No. 8.4 FOR IMPROVEMENTS IN , CW co a - - 60 255.65 255.45 270.9±(TC) CI n PP %pp NEW BERN AVENUE SCALE IN FEET SHEET OD ~ N . PFD G RADING PLAN C-3 U N 0 i d OF SHEETS 6 7 8 9 3 4 5 1 2 ~ \ ~ ~aa ~ 1 STORM DRAINAGE STRUCTURE SCHEDULE MARK INV IN INV OUT SIZE LENGTH SLOPE TOP ELEV REMARKS MARK INV IN INV OUT SIZE LENGTH SLOPE TOP ELEV REMARKS MARK INY IN INV OUT SIZE LENGTH SLOPE TOP ELEV REMARKS \ ~ ~ ' ~ \ - - ~ ~,4 (FT) EXIST. WETLANDS ~ ~ ~ V ~ ~ ~ y ~ , ~ TYP. ~ 1 275.0 278.01 RTCB 58 (57) 256.82 256.62 270.1 t JB/MH 63 (3") 250.00 244.82 253.2 JB ` ~ ~ A 1 1-2 15" RCP 22 3.09 63-64 12" RCP 163 0.5% V ' ~ \ 2 274.33 274.13 278.it(TC) CI 58-59 42` RCP 97 1.0% 64 244.00 PIPE END ~ l ~ ~ 2-3 18" RCP 46 1.07. 59 255.65 255.45 270.9t(TC) CI 65 242.36 253.8 (TS) RTWI ~ . 7 . 7 73.47 278.51 TC CI 59-60 42" RCP 140 1.0% 65-66 36" RCP 8 2.0% 3 2 36 2 ( ) - / i , ~ ~ ~ ~ - A 3-4 18" RCP 62 1.5% 60 254.05 253.85 270.9t(TC) CI 66 242.2 242.0 253.8 (TS) RTWI I " \ ~ • • y~, i ~ G, ~ s. J ~ ~ , 4 272.54 272.34 276.3t(TC) CI 46-61 48' RCP 140 1.0% 66-67 60' RCP X28 1.09 f, ~ \ ~ / u ~I ~ - • ' rv 4-5 18" RCP 44 1.09 47-61 15` RCP 66 3.0% 67 241.72 ENDWALL ~ ! ' 1 4 i _ r , I ~ i ~ A 5 . 271.90 271.70 275.51 JB/MH 60-61 42" RCP 244 1.0% 6 271.5 275.01 CB 61 (4fi) 248.76242.80 266.9t(TC) CI ~'1 ~ ~ I ' ~ ~ ~ ~ _ l ~ / k, ~ ~ ` ~ 41 ~ 1 / r ! i ~ ~ ~ 6-6A 15" RCP 133 3,25% (47) 260.45 V ~ I i ~ NT ~ ~ ~ 4 ~1 ~ ~ ~ ~ c ,NEW RftIVATE 5-7 18" RCP 147 3.0% (60) 251.41 ~ r~1~~~~ ~ 1 i I ` FER TO SHEET C-8.1 AND ~ °I4. ~ t DRAINAGE EAS,EME 2 FOR IMPROVEMENTS IN ~ ~ ~ ~ , " i l ~ ( , 6A-7 15" RCP 90 1.0% ~ ~ ' ~I A - , ~ ~i 1 ~ N RPORATION PARKWAY t ~ v ~ ~ ~ _ i' . • - _ 7 (5) 267.28 265.88 271.4(TC) CI 61-62 48 RCP 30 1.09 ~ - _ _ _ _ ~ i r ~ ~ ~ ~ M~~ E r ~ v \ i ~ ~ 1 ~ ~ r (6A) 266.08 62 242.50 JB/MH ~ s \ \ ~ < }'RIbkTE-pRp~,1A~_~---_.~__--_i~, ~ ; r \ `y' ~ ~ MENT TYP. , r~, j ' ~ r , / B 261.5 265.01 CB i V _ _ _ ----EA$E ) _ „ ~ ~ ~ . _ _ .r---- - ,r ~ ~ ~ r f + 1 W O+ _ 4 - , 1 RIP / y . ~ ; 1 ~ _ . _ - 8-9 15" RCP 117 1.0% - _ _ - ' _ ~ ~ - ~ - , - ~1- - _ _ ~ ss, ~ _ ~ I o ~ 9 260.33 260.13 265.81 CB \ ` ~ \ - - ~ _ _ _ _ - - ~ - \ ~ v - ss 1 "RCP 191 3.3% ( ' ~r' ~ - - 7-10 8 ~ _ _ - ' ' ~ ~ ~ ~ 4 rn ~ , o 0 ~rw~ : } o ~ ~ i ~ _ . - 9-10 15" RCP 70 1.09 \ ? ~ - - - - i - , ~ I A wZn~ E 1 1e N o 10 (7) 259.58 259.23 267.8t(TC) CI ~ ' ' ~ ~ ~ ` 15' R(;P ~ ~ ~ ~ i o~" ' ~ r a i - , a ~Z~~~ 4~ ~ ~ ~ v - ' - - I 1 ~ ~i , m ~ (9) 259.43 4 \ } ~--28G ~ ~ - - - - ` \ , I 10-11 24" RCP 7 1.07. RCP ~ r ~ ~ ~ 1 v ~ . ~ 11 259.16 258.96 267.81 TC CI ~ , ( ) f ~ I - - 1, ~ _ ~ ~ 3 11-12 24" RCP 40 1.2% ~ ~ ~ r ` ss r - C - 270.95' / 1 R dE-4V"RETAINING WALII • ~ ~ ` ~ 1 R ~ NEW P~INATE-6RAINAGE TOP OF WALL V S ~v ~s~ v v i 3 12 258.56 258.36 267.7 TC C ~ .4 R / \ R~ ( ) ~ , 15 I \ EASEMENT (TYP.) ~ ~ ~ ~ ; `r ~ ~ ~ P 12-13 24" RCP 168 1.5% \ ~ _ - 6" , . ~ - - ~ - ~ DRAINAG EMENT ` 1 ~ ~ , 13 255.84 255.64 267.2t(TC) CI ~ ~o " _ ~ ~ _ 1 • - A 1.5 .,,,232 0 ~s. 14 257,33 262.Ot(TC) CI ~ " 2 ~ 271.0 s7t5~ ~1 ~ '~c V c \ 1, ,o / i~~~?' ~1` I ~ ~ i NEW CL. B EROSION 14-15 15" RCP 39 1.07. ti ~ 1'`;~ ~ ~ I l \ / ~ ~~p U ry ~ i I' ~ 4 ~t~. 1 ~~r'l 7 ~ ~ _ ~ i--_ /1j , A ~ li , ~ - ~v A r t ~ ~ ~ CONTROL STONE APRON 15 256.94 256.74 262.Ot(TC) CI ~ ~ ~ , ~ ~ ,27 • ~ ~ ~ ~ ~ I ; ; ~o _ . ~ , I i o MIN. 32'L 2 5 r ~ r ~ ~ 15-16 15" RCP 59 1.0% ~ , ~ I ~ ~ ' ,~'~~A ~ ~ ~ r' ON GEOTEXTILE FABRIC 6 ~ , ~ \ ~ / ~ i ' f ` ~ \ ~ - ` ~ I X70.54 16 256.15 255.95 265.Ot(TC) CI , \ ~ ~ , ~ , 26883 I ' I ; X70.54 ~ PROPOSED •LP 2 4 ,4 ~ ; 42 RCP WET POND ~ `..A~ ; ' 1 I . ~ ~ 16-17 15" RCP 33 1.0% o ~ ~ I I I ~ ~ aD I~ ' o . ~ - - l \ S~' ~m i " ~ LOR so 1.0 \ WO ~OOD HAZARD SOILS I i i 4. ~ , I W.E. 250.0 ~ d 17 255.62 255.42 263.01 JB/MH ~ ~ i i ; I , ~ _ - • d'~ + p ` , ? RCr? f%'~~~,/fr~~:rr%~r r ;rr;, „rrr tI~ \ ~ BM 19BB, PG 1363 \ ~ ~ ~ o~ b b 48° RCP ~ ''~/i \ ~ (TYP.r~A. SID :'y:+~"` 18 255.23 259.5t(TC) CI ~ ~ ~ ~o I ~ ~ ~ ~ ~ ~ ' I, ! ~ ~ ~ " ~ v 1 ( ~ \ A I ~ ~ 271.92 l 271.92 271, f~-, ~ r r A ~ ~ ~ ~ I ~,,i..., 18-19 15 RCP 67 1.0% \ ~ ~ ~ \ i~ ~ ~ i " I ~ I I 272.0 ~ - - ~ A I"~ ~ ~ _ ~ I~i~ i ,I ~ .272.0 271.9 . - t iii ~ ~ ~ 4 ~ r~ ~ ¦ 271.5 ~ l .0 271.92 / et 272 7 5 2 1. 261.9f TC CI I ~ \ ~ , 4.6 254.36 ~ 19 25 5 ) ( ~ , ~ ~ t ~ 271.5 , \ 271.5 272.01 ' ~ .0 0 ~ ~ 4.2 ' ~ ~ A ~ 27~~t.5 272.0 2695 ~ ~i A BERM 5 ~ ~ r ri,, A A ~ ~ ~ ~ 5'0 I + 19-20 15" RCP 184 1.09 _ ~ _ `tip ~I~ i' ~ ' I' ~ , ' ~ i \ \ f I 267. ~ ip 38" RCP ~ ~ ~ ` 4 20 252.52 252.32 ( ) ` ~ r s; `t ; I ~ I I / 261.31 TC CI ~ ~ ~ ~ ~ - I ~ S' i I I ~ P r~i . o ~ S~ ° ~ ~ ~ ~ 1 A i \ ~ 1 1 +I ? j 26 .5 A 4 %ir \ \ ~ 60" RCP \ ~ ~ 14 4 11Ylili~y~ - 1 15" RCP 183 1.09 ~ V~~ ' / ~ ~ ~ i. 1 + ~ , \ ~ ~ ~ 27:.33 'i ~ 4 ~ ~ ~AR~ ~i ~ ~ 1 ~ ~ i 21 250.49 250.29 261.6t(TC) CI ~ r ; / ~ - \ ~ ~ I O ~ ~ ~ ~Y '7 t i ~ . ~ ~ A~ 21.92 ~ I ~~i i ~ ~i~' 'I 271.E \ ~ i i 17-22 15" RCP 233 1.5% ~ ~ ~ ; i r ~ 1 ~ , + ' i , ~ ! , 22.0 4 I ~ rr I ~ BERtrI: 249.0 'ii ~ \ ~(NH 0 Lxl~. ~2~Ij) ~ Q 18" RCP 10 1.0% ~ ~ ~ ' ' ~ 271.2 , I f 21-22 ~ ~ ~ ' ~ ~ 1 ~ I ; 271.8 ~ j + A ~ i ` ~ 0% ~ 1 ~ ~ 01~` XTILE~,FABR~IC I ~ i ~ , I , , 2~ ~ ~ 22 (17) 251.93 250.00 261.5t(TC) DBL CI ~ ! ; ; , ~ ~ I ~ I , I I ~ ~ i j 27 .66 ~ 272.0 I I ~ ~ I i ~I ! i ~ I i ~V ~ ~ ~ ' ~ A V~\ i' 1 ~ \ ri \ ` ~ , 1. • ~ ~ ~ ti ' (21) 250.20 ~ ~ , I I i ~ A rr~ G~ \ • ~ 1 271 s y ~ rr i V ~ ~ 9 CI N~ L~ r ~ + ~ / r-~ V .r. ~ EL SPREAD ~i CQ~..a~ ~ ~J 13-23 24" RCP 115 4.0% , ~ ~ ~ ~ / j r ~ . ' I ~ 271.8 ~ i 'I ~i I ~ 1 I ~ ~ . i , ',j.; 71.5- _ •11`~t 'i ~ i i ? 27162 I ~ ~ 4 1 \ , \ -y""NEW LEV ~ Np t \ ~ 22-23 24" RCP 125 1.07. ~ A r. o/ I ~ ~ ( ~ ~ ~ I i ~ ` ''I N li f ~ t ~ ~i ~ ~ \ 1 i 48 yr ' ~ ~ ~ V' . ` , . 6~ ~ ~ r, ~ ~ V 23 (13) 251.00 248.50 262.61 JB/MH ~ A / I 1 , ~~'i~ ~ A , ! 1 i ~ ~ ~ f 27 A ~ i~ 1 I I . 4 ~ ~ ~ - Q J.. (..2) 248.70 ~ ~ \ o , 5 s2 271.92. \ ~i ~ I , ~ ; I ; I " ~ v ~ ea ~ / ,.l. i v2.o ~ti ~u I I, I~ 14 ~ ~ / rv ~ /rr till , ~ 23-23A 30 RCP 55 1.5% ~ A ~ ~ ~ ~ 1 i I ~ i I / ~ ~ i ' ~'I , : ` s I f ~ ~ / i , i I ~ li'I I~'~I it I , ' ~ j~;r ~ , • NEW CL B EROSI N ` fi 592 ~ SUPERCEN~ ~ i ~ N A,RON P j CONTROLS E 23A 247.68 247.48 262.4t(TC) CI ` s ~ ~ ' ~ ~ ~ I ~ ~ A ` ~ i I I ~ ~ ~ ~ ~ 1 I ~ 4 1 t I f 4 1 xxx.00 ,/i/%r ~ 'i 1 jri~,%~ ~~N. ~ ~ \ (MIN. 21'Lx12 x22'TH) A-24 30 RCP 120 1.59 ~ ~ V ~ ~ ~ i I 1 , ! ; ( r ; { 23 ~ ~ ~ 15'RCP ~a~, '~,1i.1 I ~ i 1 ~ , , ~ ~ A V I' ~ ~i i~,il, i I! I lUj rr,/ t.~ ' ~ ' ~Ji t~ - ~t I a ~ r ~ ~ ON GEOTEXTI ,FABRIC ~ \ , 24 23A 245,68 243.82 256.01 JB/MH ~ / I t, i I ' I~h - .g ~ 1 I ~ I ! , , 1 ~ ~ ~ ~ ~ ( ) ~ ~ \ i ~ ~ ~ I I ~ ~ ~ . 1 , , I . ~ ; E 203,942 ~ S.F. o , i I ; 4 I ~ ~ ~ ~ \ 1 o , I 272.0 ~ ~ NEW RETAINING WALL ~ I ' I i I' I i t ! i P f - ~ r r 12' RC ~ f t I ; ~ ~ F.F.E. - 22,0 ~ ~ ,,;ii,,,ti~ , _ - ~ 1 I I ; ( , i ~ 1 ~4 271.6 ~ ! ~ nii;,riirrr - ~ 12 RCP v ~ ~ ~ 24-25 30" RCP 91 2.09 ~ ~ ~ ~ ` ~ TOP OF ALL VAdIES ~ I I ~ ' 1 i ~ ~ , ~ i I I ! ~ I ~ 1 i 27 ~ ~ i , I ~ ~ M I 1 ~ , ~1 271.92 r Q ~N'irr ~%I 1 ~ ~ ~ FES ~ i ~ 25 243.78 r i , :i 1 ~ ~ 'I " ~ ~ . 1 ' . 'i ; 'I I I ' ~ , ,.,:%ir/ ~ . ~ WET POND ~1 ~a ' ~ ,,;rirr,rrrrr ; ~ . ..'C~.,: ~ ,,~y ; 42" ~,cP W.E. 247.3 gyp, ~ 25A (2~ 247.3 242.33 249.8 JB ~ ~ ~ ; \ ; 'I ~ ' 1 ~ 1 ' ; ~ ~ V ~ ~ ~ i ~ i ~ Q ~ 272.0 I i ~ I ~ ' r { t rid ,ii DI ~ ' i ~ - / r 1: rail/r , ~ ~ 7 _ . - 1 / / r i/~i - ~ I I ~ I ~j/i I ~ /irir ri 4 ~ \ h e ro>z, d, 5 2" ~ I 7 p ii I - 1 RCP 66 0.59 ~ ;1~ 25A 2 ~ ~ ~ ~ 1 2 2 , ; I ~ , ~ s ~ ~ so; i. {.~i ; ~ ~ A ~ ~j ; "6~RM: 246.3 ';r ~ NEW CL. ~B EROSION PIPE END r 24 i I ~ I ~ I i 258 242.00 ~ ' ~ ~ ~ ~ w 'I , I ' ~ ~ , ~ r 'I I ~ ~ ~ _ ~~~r ~ w CONTROL STONE APRON u~ ~ ~ ~I ! / ~ 1 N CL B Eh2OSI0N ~ e~ r~ ~.l/;--~~' ' ~ ~%/r~r.,.ir~„~,;,~ ~~i,' ~ \ \ x "TH 25C 242.00 250.31 (TS) RTWI ' ~ ~ ~ ~ ~l ~ 1 , , , I ~ ~ , i ~ I ~ 1, ! ~ ~ I~t~~ j~ 'I " ~ i~ ' ~ t ~ 27 .0 i ~ j r I I , ~ i I ~ , I,~, ! i ~ ~ ~ .r \ MIN. 20'Lx7.5 W 22 ) ~ 1 CO TROL ST©NE APRON , ~ , . _ ;~,ir~ , ( 25C-25 42 RCP 22 0.57. ~ \ ~ I I ; I / ~ , , , , ~ , i I' + (MI . 32'Lxt~1'Wx22"TH) ;~r? ' iy;:r'%r ~ ~ - \L~ r ~ ON GEOTEXTILE FABRIC , i \ ~ M l ,ii V ~ ~ + 4 ~ y, . ,ir . , ri 1 + ON GEOTEXl'ILE FABRIC 1 - ;r- / 25D 241.89 ENDWALL ~ ~ ~ \ ~ , I , ~ ~ ~ ~ I . ; I R ~ ~ ~ I ' ~ ~ ~ ~ , ~ ' I , I ~ ~ o ~ - ri / - I ~ ~ ~ " BERM 250.8 26 15" 279.06 278.86 296.01 JB MH ~ ~ i i ~ , j ~ , f ~ ~ I ~ ~ ~INII' T u ~ I ~ I 1 4 ~ N 272.0 / .~`'f( SS ~/i ~ r~ ~ \ ~ \ (42")279.50 ~ ~ ~ _ I ; ~ ~ I I' ,i 271 J~ r 7 .0 ` "i ~ ~ , ~ ~ _y j~ ~ ii2, I , r ( ~ ~ ~ ~ + i ~ ~ ~ t ~ i r., . ,•~i~r,' . RCk~ ~ \ NEVI RETAINING `NALL',~' 27 280.30 288.31 RTCB ~ ~ ~ ~ 72.0 ' o~ ' ~ ' i ~ i i 'I i „ } ~t PP A- I 1 ~ p~W ~ ~ I I I ~ I ~ ~i i 2 ,2 i ~ ~ ~ 'J h'l 272.0 ~ , r , ~ ' !i~~IJ 3 4s ~ ~ ~ ~ TOP OF WALL VARIES 1 26-27A 42" RCP 172 2.09 ~ t ~ .1 1 1 GUY ~ , 271.x,6 ~ ~ ~ ~ ; i u2r.i_ 272.0 4 I ' ~ ~~r t ~ ~ ~ ~ ~ ~ D 27-27A 15" RCP 23 10.09 l ~ ~ , i, t ~ l ; ; ! Ili 271.75 ~~,,272.0 272.+ ~ 10 ~ `,,~Ib,il c ~ W 7A 26 275.42 271.40 283.01 CB ~ l r, ~ ` - ~ - ~ 1 / , 2 _ rn , I \ 27.7 ~ , ~ ~ Z ~ ~ t ~G' m g - _ Q ~ ~ h ea. ~ - ~ W (27) 278.00 ~ I ~ c~ tl 1. ~ y i ~ 283.Of RTCB ~ ~ i ~ ~ ~ ' ~ ~ 271.85 ; 2~}: ~ I ' I 2664 U 261.1' g 15' ~~k"~~~. ~ ~d Pit ~ ~ U 28 271.24 ~ ~ ~ ~ _ ~ 1 ~ I 1 271.7. 75.93 279.71 TC CI ~ I l - \ I ~ ~ Y ~ ' ~ ' 1 271.7 D~AIN NP.) 271.'11 r ~ , ~ \ , Z _ , i~ ~ ~I ~ i W W Z ~ 0 263.3 1 x ~ ~ _ _ - - + .4 I 27LA5 1 27 .75 48'~RCP i l 4i , M ~263.;i ' ~ i ~ S~E 2626 / ~ ~ ~ ~ 1 ~ t~l, t5 ~ i I~ ~ - ~ W 29-30 15" RCP 53 1.09 ~ ~ ~ 1 ' , _ ~'i _ _ _ _ I \ ~ r - - - _ ~ 6 8 ~ O Z 0 ~ \ 42 ~ A Q V m 270.4 RCP 63.5 ~ ~ ~ ~ \ V U W ~ ~ t ~ ~ ~ ~ / 30 275.40 275.20 279.81 TC) CI ~ ~ ~ ~ _ _ ~ ~ ~ \ ~ _ _ ~ I I ~ - - _ , 270.3 - 30-31 15" RCP 24 1.07. I ~ ~ _ _ - ~ ` - _ Y ~tp~E - 2~p.22 ` 1 ~ V ~ 1 ~ I ~V~ i 263.5 / ~ ` V Z W 2~p.~2 ~ j ~ ~A _ 262.75 .RR~PD$ X162.68 ~`~a„ ~ d. 4.76 285,51 APRON RTCB i I~ I , \ )t _ _ _ ~ ~ 7 P " ' J 31 274.96 27 ( ) ~ I ~ ~ ; l I 265.0 e - 270.22 ~ r W ~ W ~ 31-32 15" RCP 66 4.49 I ~ ~ II _ A ~ ~ ° • ? a '0 i FFE'` ~ 263.5 \ _ PROPOSED ~ _ ~ J ~ , o- g s ~ ~ m WZ ~ I I ~ - ~ I 32 271.86 271.66 275.8t(TC) CI ~ I I ~ - - ~ ~ i ~ i • / ~ ~ a8" RCP '1r ? OFFICE, ~ 3 ~ I o i ~ 4 FF s 1 - ~ Z~ ~ 10 , ~ 1 r , ; ~ ~ B+ ® 263.5 ~ i E 263.5 \ ~ W J \ N ~ 39 i ~ v! ~ I ~ 15" RCP ~ o , 27A-33 48" RCP 128 2.07. - - ~ P -0 ' ~ • RCR, O I "1 R 262.34 / ~ 263.0 ~ \ ~ ~ Q~ ~ i ~ I ~ ~ ~ a 263.9 ~ U - 1 ~ \ / r 262.64 ~ ~ W W V ; P ~ 1 , , ; r l ~ - - 262.88 ~ io T 28-33 15" RCP 60 4.09 _ i ,r ~ 41 , ~ i \ ! 4 ~ p , ~ I ~ 62.68 \ 262.6 ~ \ Z i _ - 9 1 A , 32-33 18" RCP 146 1.09 ~ i ~ I 1 _ s e • - / I ~ ~ i I ~ 4 ~ ~ ~ ~ . ~ 0 33 (27A)268.84 268.64 275.8t(TC) CI ~ I I, 11 li °i 6.5 1 ~ 1 - I / u ^8ry ~ 1 P I ~ l4 ~ ~ _ a b? 6 262.64 / Z i k R~ " ~ ~r . 1 ~1~ 262.84 / 262.84 ''ti',; ; ~ i 15 &6f'' 48" RCP (28) 268.84 Q ~ ~ 1 ~l a ~ ~ ~ ~ ' " ~ ~ 48" RCP r ?ht I i ! ` ~ - ~ ~ 262.48 ~ 262.46 / ~ ~ ~ I I I I - - _ - , ' I I ~ ~ (32) 270.20 - - ~ I I i I _ - _ - _ ~a ~ 8' RCP , ~ MAN ) ~ I 1 ' ; t ~ i m s3 9 R,;c' ~ 15' RCP ~ ~ ~ A 34 266.63 270.5t(TC) CI ~ti I I _ - ` _ ~ - ~ ~ ` ~ ~ ` ~ ~ ~ I ; I ' r ~ 260.98 { \ 4 ~ 3 0 ~ ~ ~'i 1~ B 61.47 p \ i ~ n 33-35 48" RCP 263 2.59 ~ I ~ ~ I ~ ~ ~ ~ ~ - - - 26lp.t I I r ~ J ~ / LL ' 26.1 ~ r I r ~ : ~ ,l a 4 261.,Y o ( ~ I ~ W 41 ~ ~ ~ I 34-35 15" RCP 123 2.59 ' I I I sa ~ ~ 1 ' I /l ~ ) ~ ~ ~ / ~ i , 21 \ 35 33 262.07 260.28 268.6f(TC) DBL CI ( I II ~ I ~ ' - ' `16 _ ~ ~ I I / ~ / ~ /mow ~ ~ - f , r i E (34) 263.85 ~ IG I ; P 3' 15 r ~ - - - , I p i 1 15' RC ~Op ,y i - 48" RCP 18 1.27. ~ ~ I ~ ~ ~ ~ I 35 36 ~ ~ I - i ,II ~ ~ ~ ~ i . I as Q 268.61 TC DBL CI - ~ ~ I ~ G ~ ~ ; ~ l . 36 260.06 259.90 ( ) _ ~ I I I NEW RETAINING W ~ " ~ l ~ ~ ~ ~ 36-37 48" RCP 245 1.2% ~ ~ VA~~/ I I TOP OF WALL IE - ~ / , ~ j 268.91 TC DBL CI BENCH MARK I A I i I ~ f i ~ / 1 ~ r 37 256.92 256.72 ( ) - if 7fi. ~ ~ c!1 24" RCP ;'I ~ i i ~ 37-38 54" RCP 130 1.09 FlRE HYDRANT I I/ ~ ~ I _ ~ ~ ~l l ~ /;~I !1 / / r / 1, ~ w o 1 TOP PAINTED FLANGE BOLT ~ I\ } , `Y ~ ~ 38 255.42 (39) 255.22 268.31 DBL JB ELEV=297.53 I ~ / ~ I ~ ~ _ , ~ , ~ ~ ~ ` : % ~ ~ ~ , l• : • gp~R (NEW BENCHMARK WILL NEED > > A I _ ~ I q - ~ i (42) 255.22 ( TO BE ESTABLISHED II I I ~ ~ - _ _ ~ ~ \ 75.7 ~ _ - . ~ - ' ~ f 1 ? ~ i- ~ ~ p3 ~ j ~ h`, v I VI ~ . _ A - - ~._i-• i J ~ . 38-39 42" RCP 75 5.0% I I \ I _ ' ~ • _ _ ~ ~ n ~ / ~ ~ Ili I I / 'l \ _ I / 39 251.47 247.87 266.31 JB I < \ _ - - - ~ , \ ~ 1 - - ~ ' ~ I~ I _ ~ ~ ~ /,'l," l - , _ Y - ~ VAS ~ ( i- r ~ _.~/~i 48" RCP 47 1 A% ~ ~ I ~ ~ • _ ~ _ - 39-40 I I y ~ \ I ~r i ~ A 273.5 _.-,2~~ 40 247.40 ENDWALL ~ ~I i \ . I - _ ~ ~ ~ _ _ Ili I I 1 - ~ ~ ' o _ i,- / A I ~ 1 . ~R P % X i l I' ~ R" C ~ i _ 41 260.96 265.2f(TC) D L CI ~ I 2 9 ~ - - ~ ,f~ ~ ~:9a --J -.rte-... ( ~ ! I 38-42 48" RCP 64 1.0% rte- - i r I 41 I l l I + .I 4 RCP 1 ~41-42 18" RCP 129 3.0% I • 8 7 V 15" .RCP i - 269.4 .3 263.1 \ f i 1. ({CP \ 1 xxx.00 BY REVISIONS 42 38 254.58 254.38 268.71 JB/MH CH - Ik - - - - 1 \ w , -V 14 APR 2003 (41) 257.09 -43 4^0" RCP 32 1.0% 27 " RCjt2 4 - m- (DESIGN CIVIL) - 18" R s 4" RCr7 2 116 RCP06JUN 03 43 254.06 253.86 269.4±(TC) Cl E 43-44 48" RCP 105 1.0% 2634 ' 6.34 - - (DWQ REVIEW) f r~ 44 252.61 252.61 270.3± MH 1 1 j I + I _ - 274 2", 270.5 ~0 - ~ 44-45 48" RCP 105 1.0% 15" RCP 1 + t 1.46 0 ? , 15" RCP 3 - RCP PROPOMS i F ! I 8" RCP-~ I 45 251.56 251.36 268.5±(TC) CI 1 RETAIL 2167.0 18" RCP `-RETA~ ~ • ° , ~ cS, ~ ~ 276.4-- FdE = 2~7-0 270.92 270.4 ~FFE = 267.0: M 45-46 48" RCP 100 1.0% 0 Q~ I t , I! I j 84 7 271.04 46 250.36 250.16 268.8±(TC) Cl REFER TO SH=-8.5 FOR I MPROVE( 47 262.43 265.9±(TC) CI NEW HOPE Ra I - 276.84 270.7 271 c / );xx.00'j I v I 15" RCP PROPOSED ° PROPOSED 1 i 266.48 283.0± CB I A e 49 - I NEW RETAINtt4G V~/iLL _ - ' o RETAIL 2 .34 I~ETAII. 49-50 24" RCP 52 3.0% F -Tur OF WALL VARIES FFE = 277.0 FFE t 267.0 eo- a 27 .98 a 266.1 267. I I 50 264.92 264.72 269.5±(TC) DBL Cl 70.9 - 00 e AIL 51 268.00 272.0±(TC) Cl TRACT ID tJEW RETAINING WALL FFE 271.7 270.5 m - ALL `PROPOSED 271.06 266.34 I RROF3L I 664xxx.00 50-52 30" RCP 97 1.0% - - TOP W. WALL VARIES 21ES 277.0 " RETAIL 5.7 RETAL 9~9 -11 FFE 277.0 FFE 267.01 00 1 xxx.00 D 51-52 15" RCP 25 9.0% 52 (50) 263.75 263.55 270.4±(TC) CI 8 ao 94 276.8 267.0! (51) 265.75 I (5) 265 5 I sr) U 30 RCP 120 1.0% _ n RC 27 266.84 52-53 \ 84 N 266.56 278 7 ) ) ) - I - - ` - - - I 53 262.35 262.15 269.8±(TC) CI ~ ~ I '71 - _ - - u 54 266.80 270.8±(TC) Cl 98 29 9 9 290 DRAWN - 8d { 79.1 _a OHP&PH P ~ 28 PHMH PP UGFOC _ - GPW PP - dr- 54A 278.00 281.5± CB PP ai \ m ~ _ - - CHECKED 53-55 30" RCP 155 1.0%' - - 0 PHMH T i w w w w w'' W1\ w w JDL q V w w V / 54-55 15" RCP 93 5.0% a e'~ A ~ UbFOCM ; - 54A-55 15 RCP 155 10.0% \ a UGFOCM \ Oy SOUTHERN BELL o FIBER OPTIC CABLE MARKER SY a 1 NORTH DATE 31 MAR 2003 aa Q~ ~o 3 U (54) 262.15 55 (53) 260.60 260.40 270.4±(TC) C C i ! / I i SCALE • i - M cl. o~ G i 1 601 m_ (54A)262.50 56 262.53 266.3±(TC) CI 0 60 120 180 JOB No. i• RIBPCW 55-57 36" RCP 239 1.0% \a I \ ti ? REFER TO SHEET C-8.3 AN A v SHEET 8.4 FOR IMPROVEMENTS IN / 56-57 15" RCP 80 5.0% EW~ BERN AVE..- U.S. HtGHWAY 64 3 57 (55) 258.01 257.81 269.3±(TC) CI z R° Y SCALE IN FEET HWI 64Y NEW BERN AVENUE 0 (56) 258.53 m - PP Q 57-58 36" RCP 99 1.0% a - - PP - - - - - - - - - - / ~ I a DD P7-, GRADING PLAN c 3 1 41 U 0 OF SHEETS L a i~ 3 4 5 6 7 8 9 1 2 ~•-a PROVIDE MANHOLE RING, COVER & MANHOLE STEPS PER DETAIL A I~~I I ~ 15" OPENINGS REFER TO STANDARD RTCB DETAIL 2 ALL 4 SIDES FOR WALL & SLAB CONSTRUCTION w i,_ - 1 E 8' _-I I - - - 250.3 -TOP OF SLAB e ~ ' Vii- •t • • a' A - ATION FOR 100-YR STORM - 4 . MAX. WATER SURFACE ELEV - - ks 298 - ~ ~ - 250.8 OpE 3• a _ 250.8 -BERM m 3 I- - ~ n 2.5 - - 3 -li i-'~ 1 - ' - 248.7 -TEMPORARY STORAGE OF 1" RAINFALL EVENT cv 1 - I- E _ ( 'Ii- ~ i~--- ,i- ~i I 1- ~ $ ~ _ ~ _ s I-~ - ~ ~ 247.3 P.W.E. - - 6 -I g --I a . ~ ~ i ~ i- I- ~ - - z c+ ~ I-i 1- - - - - - I i-, ~ ~ _ _ 247.3 PERMANENT WATER ELEVATION ~ ~C p ~ O O I it - - - - - - - I 2.5 _i_- 2.5 --I- I 245.3 -SHELF - _ _ _ - ~ ~I -~I _ -i- ~ I I - .d ~ ~ 42 RCP 5'_p" x_ M ~ V ETATED SHELF ~ i--- 242.0 -BOTTOM - ~ - EG - ~ ~ ~ I-- _ - ~_I ' yo o~ COMPACTED STRUCTURAL + A ~Zn~E TYP. - ~ i I- ~ ) - - ~ , _ - ~ i ~ ~I ~ ~ ~ ~ i- I ~ ~ - - _ - I-' _ I _ I i ~ MATERIAL ~ O - - - ~I - - - - - ~I~ da w. ; Icy ro ao ao a -ii!-ii~-iii--iii--iii-iii-iii-~i,--i~ n ao~ M 0 0? o? d. i ~d HROUGH POND 1 ' SECTION T n ° ° ° ~ 1' MIN. (TYPICAL} B NOT TO SCALE e • I, 8" DI PIPE ANCHOR BASE SECURELY d: W/ VALVE ASSEMBLY POND BOTTOM TO WALLS ' • I I I ~ li ' 242.0 IIII ~ ~ 242.0 ° . d d., ~ ~e e,e ~ ~ + ~ KEYSTONE - _ = - ~ ~ ~ ANCHOR BASE SECURELY ~ ~ < . d~ ~ ~ • RETAINING ~ 0' • ~ TO WALLS 1 O' ° • ~ ° a ~ d d ? ~ , WALL CONCRETE BASE. MIN. 1' THICK - ' i- 254.0 -BERM ~NnYnu'~rr4 3 -i i - ~ s ! CAR , e~tH Ot~ 1 - - I- I- =._l - ~ i - H ASIN 25C , - - I TOP CATC B RASED s _ I 250.0 P.W.E. - I ~ I ~ - I -I' ' s ~0 1 _II - _ 248.0 - VEI - i I'~ SHELF 248.0 -VEGETATED - I i ~ 1 I I - SHELF i ~ y _ ~ I I i, PROVIDE MANHOLE RING, COVER & ~L , i • I ~ 2.5 2.5 - T P PER DETAIL ~4 N R -III MANHOLE S E S rr E p C I ~ - I-_- -i I i- - VEGETATED SHELF i _i I i- ~ - I COMPACTED STRI 15" OPENINGS REFER TO STANDARD RTCB DETAIL OMPACTED STRUCTURAL ALL 4 SIDES FOR WALL & SLAB CONSTRUCTION TYP -i ~ -i ~ MATERIAL ~ ) - , - _ IATERIAL ` E _I I 242.0 BOTTOM - ~ ~ I . ~ a , . - - - 253.8 -TOP OF SLAB ~I li-i~ I~=I• -'I- _-1 i--~ -I ~-i - ~ - i i -I M qk S - 253.2 -MAX. WATER SURFACE ELEVATION FOR 100-YR STORM ~i - I~- ,~I-I - ~i- II-1~ ~i ~Op F 3, L , ~ i,-I i I-- I--- ; I----I, ~ ~i ~ ~ . ~ - Y STORAGE OF 1" RAINFALL EVENT - 252.17 TEMPORAR ROUGH POND 2 SECTION TH Q ° NOT TO SCALE - 250.0 -PERMANENT WATER ELEVATION - - - d 42" RCP 7'-0" (60" RCP FOR #66) • a + MANHOLE LID e da ..a 254.2 -TOP OF BERM • 253.2 -TOP d d ~ I M~4k S cope e 4 e + ~ ~J 3, ~ 3" PVC DRAWDOWN PIPE. ° ° a a e' d • e le ad I, EXTEND 6" BELOW PERMANENT TYPICAL W 1 MIN. ( ) (n D WATER ELEV. 2 Z F- 250.0 -P.W.E. Q ~ 8" DI PIPE 0 W MAx SLOPE 6: ANCHOR BASE SECURELY d; ~ W VALVE ASSEMBLY U d / POND BOTTOM ~ W 1 TO WALLS I Z I I ~ 242.0 ~ W W ZZ ~ ~ ~ 3~ = W 242.0 (#66) ~ O Z Q ~m ~ ~ 242.36 (~65) W +II ~ U w3 ""~t" S~Op e 2.5. d,. e, a a. ° W OZ . _ • a ~ W J _ --0. a a ~.y--- •d M . ~d-' ' ~ ` ° -ANCHOR BASE SECURELY W a1 W W= ' d' + . TO WALLS m W W W 1.0' Z = 42.0 -BOTTOM CONCRETE BASE. MIN. 1' THICK Z 2 W Z O W ~ I H ASIN 65&66 I TOP CATC B RASED 0 J ~ Q - RAW-DOWN BOX N BOX 63 D JUNCTIO NOT TO SCALE E MANHOLE LID - 250.8 -TOP OF BERM M 249.8 -TOP ~ S~ Ope 3. 2" PVC DRAWDOWN PIPE. FXTFNfI 6" BELOW PERMANENT WATER ELEV. maw 247.3 - P.W.E.- MAX SLOPE 6:1 REVISIONS BY SKO S(Op e zs. 07 242.0 - BOTTOM 00 JUNCTION BOX 25A (DRAW-DOWN BOX NOT TO SCALE DRAWN SKO CHECKED RPH ATE 06 JUN 03D (DWQ REVIEW) SCALE G JOB No. RBPCW SHEET STORM DRAINAGE & EROSION C-3.5 CONTROL DETAILS 1 2 3 4 5 6 7 8 STORM DRAINAGE STRUCTURE SCHEDULE 9 \ ; MARK INV IN INV QUT SIZE LENGTH SLOPE TOP ELEV REMARKS MARK INV IN INV OUT SIZE LENGTH SLOPE TOP EIEV REMARKS MARK INV IN INV OUT SIZE LENGTH SLOPE TOP ELEV REMARKS ~ 2b0 \ \ 1 ~ \ \ \ NEUSE BASIN NOTE c~> c%~ can c%~ _ can cz) ASIN NOTE \ \ ' i 1 275.0 278.01 RTCB 58 (57) 256.82 256.62 270.1 t JB/MH 63 (3") 250.00 245.31 253.2 JB THIS PROPERTY IS VESTED F rr I ~ vv y v I ~ S VESTED FROM THE \ \ \ ~ + 1 \ - REQUIREMENTS OF THE NEUS 1-2 15 RCP 22 3.07 63-64 12 RCP 162 0.57 RULES AS INDICATED IN THE ~ OF THE NEUSE BUFFER •1 \ y EXIST. WETLANDS ~ \ ~ ~ 1 )ICATED IN THE VESTED (TYP.) ~ ~ \ ~ \ 2 274.33 274.13 278.1t(TC) CI 58-59 42" RCP 97 1.OX 64 244.50 PIPE END RIGHTS LETTER FROM NCDENI R FROM NCDENR DATED ~ • ~ ~ 1 ~ ~ \ \ FEBRUARY 14, 2003. 2-3 18" RCP 46 1.07. 59 255.65 255.45 270.9t(TC} CI 65 241.56 253.8 (TS) RTWI 2003. v ~ ~ y ~ \ ' V ~~V v ' ~ \ 1 \ ! ~ h 3 273.67 273.47 278.5t(TC) CI 59-60 42" RCP 140 1.OX 65-66 42' RCP 8 2.07 \ \ \ \ \ \ ~ \ 3-4 i8' kGr 38 ;.SZ dG ~5*.~5 X53.85 ~iC.3s'•~, dd ~~+;.2G YS.;.d i 3j k1lMl ~ \ ~ ~ 1 1 A _1 ~ I A + \ V ~ 4 272.90 272.70 276.4t(TC) CI 46-61 48" RCP 140 1.09: 66-67 60" RCP 34 1.03: ' I o C \ ~ rti I 1 4-5 18" RCP 70 1.15% 47-61 15" RCP 66 3.OX 67 240.86 ENDWALL 0 V v. . ~ 5 271.90 271.70 275.51 JB/MH 60-61 42" RCP 244 1.07 I ~ \ ~ ~ / i r o I y 6 271.5 275.01 CB 61 (46) 248.76 242.80 266.9t(TC) CI ~ I i _ ~ I , ~ { \ I I ~ v A ~ ~ ` \ I l 1 ~ S 1 ~ t 6-6A 15" RCP 133 3.25% (47) 260.45 ` \ • ~ ~ ~ I ! ~ y o , r ~ w VA AV ~y~l ~/I ( 5-7 18" RCP 147 3.07 (60) 251.41 \ \ \ \ ~ / ~ l ! ' / ~ A FER TO SHEET C-8.1 AND I I ~ ~ ~ ~ A / r,~;. ` ~ A i~~• ~ / / / 1 r 6A-7 15" RCP 90 1.07 \ ~ I ' 7 _ ~ ~ 2 FOR IMPROVEMENTS IN ~ ~ V ~ \ A ~ 1 ~ ~ / / / / - - / ~ , V 1 r ; v , / , / NEW PRIVATE \ _ i 7 (5) 267.28 265.88 271.4(TC) DI 61-62 48" RCP 33 1.OR \ \ \ \ \ \ ` , ~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - / i RPORATION PARKWAY / I \ A v~ V ~~l ~ v v v l l DRAINAGE EAS MENT ~ J \ / / I 1 V V A~.~~ N 6A 266.08 62 242.47 ENDWALL \ \ \ \ \ c, - _ i 1 ( ) \ ~ \ \ v • ~ ~ ~ _ PRf'dAi~E BRANJA6E-..--- ~ 1 { 1 ~ / _ ~ - ~ 1 \ I / , m \ V ~ . ~ ~ ~ ~ r., 8 261.5 265.01 CB ~ ~ . ~ ~ - , _ M ~ TY • r~l s / - --'~I I ~ \ ~ _ \ / j 1 N 8-9 15" RCP 117 1.09 - _L ~c y ~ M..~ E 9 260.33 260.13 265.51 .,8 - _ _ _ 7-10 18" RCP 191 3.37 \ ~ I ~ ~ i r_'~' ~ P I ~ ~ r _ ~ z~ _ _ -->a~-~ - - r ~ i ; ~ ~ ~ 1 / 2ao / ~ O ~ 9-10 15" RCP 70 1.07 \ \ I I I _ - _ - _ C--, - - 10 (7) 259.58 259.23 267.Bt(TC) CI \ ~ ` ~ j ~ ~ . - _ - - ~ ~ t5` ROP I 54' / ~ ~ / x I i ` ~ 2BO 5" RC \ \ 1 (9) 259.43 ~ ~ \ 1 \ ~ , \ .i zeo ~ _ _ 10-11 24" RCP 7 1.07 ~ \ ~ ~r \ ~ \ ' ~ I ' ~ \ \ \ RGP \ \ \ 1 I 11 259.16 258.96 267.8t(TC) CI ~ \ r v V A A V 1 l 1 ~ ~ -f ~ i ~ ~5~~~ w ~ ss - - +1 ~ ~v m~~~ a 11-12 24" RCP 40 1.27< ~ ~ \ ~ ~ ~ V A S5 _ _ ~ 1 _ ~y II - _ ~ \ \ ao aooi 267.71 TC CI ~ ~ 270.95, / ~I { , • R 12 258.56 258.36 ( ) ~ ` ~ , ~ 5\• R _ ' - ~ / o ~ ~ 15 j~:: ~ RCP ~ r-' - - - \ V i v ~ 1q ~ ~ ! !~5 + ~1E~RETAINING WAL ! ~ ~ ~ f ~ OO + \ \ NEW PJ~IVATE DRAINAGE ~ TOP OF W - i ~ ~ ~ \ m t 12-13 24" RCP 168 1.57 00 ~ ~ \ ~ - ~ ~ ~ / \ ~ 6" P l 59~ ~ 'EASEMENT TYP. - AlL V S ~ ~ I ( , ~ ( ) ~ ~ { ,1 ~ ~ ~ NEW CL B EROSION 13 255.84 255.64 ,267.2t(TC) CI ' \ ~ SL E ~ ~ ~ / / I \ ov \v \ \ i ~ONTROL STONE APRON 14 257,33 262.01 TC CI ~ \ ~ ~ ~ ~ V A e ' I / ~ A\ 2 i .5 ~ ~ ~ ~ ~ ~ ~s, " ~ t ~ ~ 1 ~ ~A ~ ~ ~ 1 a ~ ~ ~ } , _ =.~i" ~ DRAINAG ~ l V I ~ v ~ i~ MIN. ( 32 Lx 12 Wx22"TH 1 s, TRAN . ~ r _--•-.r 5o EMENT / ~ \ l ~ \ ~ 1 ) 1 I ~ I l 1 r, _ _ / ~jh i _ _ ; . 1 \ ~ ~b~ GEOTEXTILE FABRIC 14-15 15 RCP 39 1.07 \ ~ ~ \ \ + ' ~ti \ ` ' I i V ~ ~ / V A ~ , 1~ ~ A ~ ~ i ~ ` I { { ~,o PHB~/ i ~:-~i ~ ,-.,r. it i i / l 1 V \ \ V ~ 15 256.94 256.74 262.Of(TC) CI \ a \ 27 .8 \ ~ 2ea i ! 1 1 1 l l i ~0 / ~ A~~ i A\ ~ A\~~.~ VA A ~ I _ il~ ~ v ti v ~I l l' ~ 15-16 15" RCP 59 1.07> ~ \ ~ ; - ~ ,m \ ~i \ ~ A ~ ~1 j I ; ~ - s . \ \ ~ j I I \ \ \ \ } \ LNE ENBANKMENT IVITti- ~ ~ \ 1 ~ ~ 1 CLASS 1 RIP RAP MIN 22 16 256.15 255.95 265.4t(TC) CI \ \ ~ ~ ( v , ~ i I ~ 70.54 i I I 70.54 264 ~ 6 \ - \ \ • ~ . l~ ~ I \ \ ~ \ I ~ 'R ; ~ 1v ~ s I y V { THICK) ON GEOTEXTILE \.A\ \ ~ ~V 1' 263 I, ~ i6-17 15" RCP 33 1.07 \ \ ~ i I i , a~ ~ c..~~---~ \ A ~ ~ o o \ _ v ~ + sa 42 RCP ~ ~v A ~ • I A i, ~ ~ ~ FABRIC T \ , 0 ELEVATION 246.0 17 255.62 255.42 263.Of JB/MH t x~ \ ~i \ ~ I ~ ~ ~ i!II! ~ ~ I- ~ \ \ a I _ I- ~ a\ \ 1 ~ ~ V ~~LP 18 255.23 259,St(TC) CI \ \ V .v y 1 ~ ~ Q 90--.~. ~ ~ ~ ~ - ~ i { \ .o + ~ 42. Rip I ~ ~ \ ~ \ ! WO FLOOD HAZARD I ~ \ \ \ SOILS 18-19 15" RCP 67 1.07 \ 1 I ~ / \ { j I ~ I 271.92 ~ ~ ~ ~ III I1 - ~ ti..i 11 1111 I ! a w ~ \ 1 \ \ BM 1988, PG 1363 271.92 ~ ~ RCP III 272.0 } 271. \ - - . _ , ~ \ \ \ \ (TYP. EA. SIDE) 19 254.56 254.36 261.9t(TC) CI ~A , V l I ~ ~ l I 1272.0 , ~ ~ i i A ~ ' ; i i { i I 271.5 i I I 271.5 ti, 272.0 \ ~ ` 271.92 1 l ? o ~ ~ ' \ \ ~ \ \ \ / 271.5 271.5 - 6 ) \ • \ , 19-20 15" RCP 184 1.07 _ ~ \ 1 I I , ~ o \ ~ ~ I { 1 III 1 { l I I 1 I ! t i \ 1 272.0 27 .5 l 271.x2 ~ , m \ ~ ' a, \ l Ill { t` ; \ ; I ~ 272.o zsss v p v ~ v 20 252.52 252.32 261.3t(TC) CI ~ \ ~ 1 ~ , { i / A V i 1, III , ~ I I 1 A\ 1 1 I ~ QQ V il{ III} l l l i I I{} I I l i I 1\ j i, I 267.8 ~ p ~ v \ \ ~ ' BERM - 254.3 20-21 15" RCP 183 1.07 \ ~ qy, V ~ 1 i • { I 1 1 ~ \ I I { { i j { I I I• ~ l,il I! I ! I 1`' ' i p ~ ~ \ ~ v v '~v v \ I I I ! A I / ~ ~ 269.5 \ A 1 38" RCP \ \ ~ ~ o 21 250.49 250.29 261,6t(TC) CI Gt V ~ ! I ~ ~ ~ j I I ~ / { V ~ ~ ~ i I IIII I { ~ / ~ V 1 ~ i I I I \ \ o \ l 11 ~ r ~ i / ~ 27,1.33 ~ : V l ~ ~ ~ ~ } V 1 i I ~ ~ VA r \ ~ ~ 60" RCP \v vv t ` ~ 44~41f~~1iY 17-22 15" RCP 233 1,57 ~ MAX.,SCOPE ON j 271,5 ~ I , . i I ~ v A II, i~Ii l? I I i I I i 1 2~t.92 47 A v NEW y~4 ~~b I \ ~ \ / ~ ~ k ~ \ \ CL. B EROSION s A q 21-22 18" RCP 10 1.07 / IDEWALK 1 I' I i 271.2 V V ~ I I ~ ~ i { ( i III I I I . 27,2.0 v ~ ~ ~coNT t~ G RO(~ I I I _ \ \ ~ ROL STONE APRON Q~ 22 17 251.93 250.00 261.Sf(TC) DBL CI 1 ~ ~ ~ I I _ ~ V ~ ~ ( , i f { , I ! J I ' ( ) / 1 t j~lli ~ v y , } I 'll illf l l I ! ! I I ti, I ( \ % BERM: 249.0 l • 1 \ •(MIN. 40'Lx15'Wx22"TH $ 0 ~ III I i l `v v ~ ',1 l v ~ ~ •o~ N l I j \ ~ 'ON GEOTEXTILE FABRIC ~ 21 250.20 , ~ ! 27 .ss , 272.0 ~ ~ v 1 I ~ , I ; I I I ~ l ~ \ v ~ I \ ~ ~ v v ~ Q 13-23 24" RCP 115 4.07 V0 / l / f ~I / ~ I ~ ~ ~ 1 ' i i 271.85 ~ ~ / i; 'lli I 1, I i ~ C / / ~ ~ / I ~~I 1 ' ! 1 \ \ \ \ ~ NOTE: REFER T 0 LANDSCAPE { I { I ~ 1 I l 1 1 ~ 271 s \ V 8' DI ~ PLAN FO 22-23 24" RCP 125 1.07. ~ A o f / / l ~ „ I ; ~ 71.5 _ ~ , ! , 1 ! I , I ~I I , ^4• v 262.61 JB MH ~ / ~ / ~ 1~ ~ I ~ ~ V l I ~ 1 I \ R SLOPE 2 32 - ~toPOSED l f t { ~ , , , _ _ ; ee ,G STABILIZATION AT DETENTION • 'L 23 (13) 251.00 248.50 / ~ ~ ! ill ! i 2 1 3 I ~ V 1 1 0 l. ~ I l l~ i I I 1 A ~ ~ ~ ~ 1 ~ <<I A 1 ~ ii ~ I• II I i 1 I , cab \ n \ I WET F?OND 2 1 PONDS AND LEVEL 49(~ \L i I l ~ ~ i ° \ j 0 W.E.1250, a ? 1 -SPREADERS ~4 ~ (22) 248.70 ~ \ a ~ ' 61 / Z \ \ \ i 1 } I I ~ ~ ~ . ! I I ~ ~ z71szv \ V v i~ Ill { III 1 1 1 1 II ~ i 1 ~ 1 1 a ~h~ ~ I ~l I 1 ~ ~ j , i ~ \ 23-23A 30" RCP 55 1.57. \ ~ f i X 1 1 1 j ~ / 272.0 \ t~ ~ l l+ l J l j t! 262,781 TC CI ~ , ~ I ~ i ~ ! ~ w~ ~ ~ ~ ~ 1 Il ! ~ ' I I ' ~ ; ! III( ~!l / ~ / ~ `v v.y\ I ~ I l ~ ~ / j LEVEL- ~ f NEW CL. B EROSION 23A 247.68 247.48 ( ) \ V ~ ~ ~ ~ { ~ { ~ ~ V A 1 ~ . , 1 1 ; ~ , I i ) i~ / A ~l I i i~ I i I~i I I , SUPE CET S ~ ~ \ t ~ EADE CO 2 I NTROL STONE AP ~I~I , I~1 ~ I ~ RON 23A-24 30" RCP 120 1.57 \ ~ ~ ~ 15" RCP ~ ~ ~ h ; I ~ I - I I ~ \ i i ~ t i ~ ; i ~ i ~ ~ ~ v III ~ l.~ ~ ;I ; Ilil l,li I.1, 24 (23A)245.68 243.82 256.Of JB/MH I I i _ ~ . I i ~ ~ ~ > > ' ; } / • ~ ~ (MIN. 21'Lx12'Wx22'TH u 'i .1 ) l - li I / fi g GL 6 ~ \ ON GEOTEXTILE F \ i l i i ~ I I A I t .ll l i l ! I I I I I i~°, ~ \ l ; j / ABRIC I' I I III ~r, 203,942~,S.F. + I ~ Q ~M,. s, j :rho ~ v ~ 10~ i~l , ° 7 I I ~ ii \ NEW RETAINING WALL z 2.0 ~ 1 i ~ I { l ! I ~ { I ~I ~ ~ 24-25 30" RCP 91 2.09. V ~ TOP OF WALL VAf~LES ~ `s I ! l , I I ' i I ? ~ i ~ I { 94 NEW LEVEL S I I ~i ' ~ ~ ~ i ~ ~ r`r ~ ~ ~ ~ e4 1 ~o / 4 ' READER #1 I, ~ .f.E. = 27 . v ~ , ~ 0 r ~ v 25 243.78 FES ~ ~ i i 1 { i 27 ~ { 'I i I j l ~ l i l i i l i l r ,2 0 / III I ~ I v v l I ? ~ / ~ , ~ . ~ ~ I III i i I i ;ill II~° I i Il 25A (2") 247.3 243.89 249.8 JB \ \ I ~ I j ; t ~ ~ l i , { ! l l i i ~ iili 11~ 1 l , I 1 271.6 / / i• 12'RCP / f- , ~ I I II I I } ' + l 271.92 ~ ~ ~ / l / - \ lil I I Q 272.0 iI { ll! I ;I i 25A-25 12" RCP 38 0.5R s V I I III I I 1 I ~ ' Ilil i ~ IJ 1 ~ ~ i 0 i ~ 1 s ~ I 272.0 I ; l I { I ~ ! 25B 243.70 PIPE END ~,y ~A I q4" 1 S0 I , 1 I 1 ~ ' ~ { ~ ~ i I I ~ I I I' I ! ~ ~ ~ r / ~ C ~ ~ 12' CP A ~~\v 5 III I ~ '1 1 ~ i I / s~:~ - , ~ i 42" t~CP 1 ~ ~~A~ a ~ i 1 ~ 1 IJ? II l l 1 25C 242.00 250.31 (TS) RTWI ~ ~V A I V ' I ! ~ ` • ! I ~ l ~ I ~ I ! l 1 { I i, I v ~ ~ ll~ t~l, - II ll'fl; ilil 25C-25 42" RCP 31 0.57 1 V A II ili i 2701 i I I. Ili Ili{ I I ; I ~ N CL B EROSION / . • ; o \ /,l 25D 241.85 ENDWALL \ V 1 I ~ ; ~ { 2 1:2 ~ ~ ~ i 1, i , l 1 ~ 1 i ! I ~ ~ ~ s ;;,(li ,1 1 I ; . f J CO TROL STf~NE APRON • rr•-- \ NEW CL. B EROSION t I I, J \ \ , ~ (MI 32'Lx12'Wx22"TH ~ iI I ~ ~ \ CONTROL STONE APRON ~ / ~ ~ I I , 26 (15")279.06 278.86 296.01 JB/MH ~ ~ / / I I ~ I ~ ! i i l ~ I ~ ; I ~ ~i I 1 ~ M ~1 ~ i I I ~ ~ ii ~ ~ 'I } f ~ \ ~ ~ ON GEOTEXI'ILE FABRIC 0 ~ , . . , . _ , \ \ \ \ (MIN, 20'Lx7.5'Wx22"TH) 42" 279.50 \ i, / ~ { { I i ' ~ ~ j j , 1 I I ~ ~ { , ( ) ~ III 1, I' i I i I ' ; I I 1 1 \ ~ ~ ~ ~ I • ~ - ~ v ' v ~ ON GEOTEXTILE F i i ~ . i I \ l ~ ~ . 1/ ~ \ ABRIC \ / ~ ~ I ' 271 a ! I I ~ i i II I ~ ~ i 27 280.30 288.3f RTCB , , 1 , ~ t ,o ~ , { R~ •Q i I i i i ~ \ 272.0 ~ ~ • z~ ~ \ \ 1 l ! ~ i v 1 I / l f~ • r'`~ i ss ROPOSED ~ v' v v~ v V v ~ f~ 1 72.0 f , 26-27A 42" RCP 172 2.07 ~ ~ V ~ PP ~ ~ ~ ~ ~ I , I ~ 1 ~ t 1 I ; ; l l { ~ I ' + f ) j ~ yc POND ,~1 BERM 250.8 Q I 1 , I / ~ ;.j 1 'r ( W.E. 247:3 \ \ \ \ ~ ~ ~~i1 ) ~ ~ 2 .2 .V i~ \ 0~ l ,rl iil,l;li~ ~i i ~ ~ GUY ~ ~ I I ~ ~ 1 1 ~ ~7~ , 27-27A 15" RCP 23 10.OX ~ A ~ ~ I ~ ~ ~ , ,~7 } ~+j ~ ~ 272.0 ~ / ~ ~ I \ V A ~ _ \ 272.0'..• 1 ~ ~ ( ~ C; • ~ » RCP 4 \ ~ \ ~ \ I 1 ~ 3 4 a. \ \ Z ~ _ 1 _ ~ ~ ~ 271.1,,5 ~ , ~ I 27A 26 275.42 271.40 263.01 CB A ' ~ ~ i I ~ i \ ' ' / ~ ~ ~ ~ ~ ^ 271.75 \ \ } ~ i;,•;• • • !y ~ l 4 \ `NEW RETAINING WALL~~\ d I \ / ~ + \ J ~ ~ ~ I 29 ~ ~ ti ii,p / / ~ ~ l ~ { (27) 278.00 ~ ; ~ ~ o VI I , ~x, ~ 3, / l t I ' X272.0 272. ~ - / TOP OF WALL VARIES 28 271.24 283.01 RTCB ~ti ~ ,---~~,J I~~ 1 A 'a~7 27~. 27~ 85 1~~~~/ ~ ' ' i ~ , 9 275.93 279.71 TC CI ~ V~ ~ ~ \ ~ 1 1 ~ _ ' ~ ~ k ~ / / i ~ I 71.7 ! Pi \ \ 1 ~ . l.'.' 1 e 1a 1 ~ 1 ~ ~ W I I I 71.75 / / 6 LL I D AIN (TYP.) v1~ \ \ 1 , ~ s - S \ ~ Z 29-30 15" RCP 53 1.09< ~ 1 r ~ ? - - - ~ ~ ~ /i / / ~ ` I F / ; 261.1 ~ ` c~ 271.)5' •1-27 J I 6 O W fx 79.81 T I ~ ~ ~ - . - ~ ~ 30 275.40 275.20 2 (C) C - - ~ 1 n 5 48'IRCP I ( ~ '263.3 ~ 15' ~ ~ v 1 j ~ 263.3 , j ~ ~ V a R P 4 1.07 ~J - \ - ~ - ~ _1, \ ~ y 30-31 15" C 2 \ _ _ - ~ ~ - '~rp~.-- " 270.3 27 .P2 ~ 270.4 ~ ~ 42 8• ~ S E 262,E \ x ~\y\ ~ Z W ~C 0 1 X MIN. 1.5 1 / I / \ ~ \ \ ~ W W Z z r" 8"~P 4. 74,76 285.51 APRON RTCB I / 27 .P2 \ ` \ \ ~ r 63.5 6 \ ~ \ ~ I 1 t 8R ~ ~ i ~ ~ ~ " 31-32 15" RCP 66 4.47 ~ ~ ~ ~ ~ , \ I \ 270.22 ~ 4 ~ 40 , 1\ _ i 262.75 ` 28J.5 11 \ ' \ \ ` ~ 2 Q ~ W ( \ f \ \ l \ I ( 265.0 RROPOSEp'\ / /262.8 l \ ~ V W ~ \ m 32 271.86 271.66 ( ) ~ / ~ ~ o- e E y~ o r ~ FFE'~ . ! ~ i ~ tr 28 5 \ ~S M - ~ 'i 283, \ 0 1i 27A-33 48" RCP 128 2.07 ~ I / \ 15" RCP ~ o- - _ i ` \ 1 I ~ 4 'RCP S ~ ~~~,rvaCW,~ _ _ _ _ \ \ ~ Z ~ ~ d W 28-33 15" RCP 60 4.07 1 ~ ~ ~ , J` J ~ ~ \ \ \ I I \ ` ~ a \ l I l ~ : l R p 263.9 ~ 263.5 ` FFE .883.5 ~ 3 \ W m W = 32-33 18" RCP 146 1.07 ~ e ~ l , I \ ~ 9 - / I I ~ / { A \ ~ j i ~ l~ J ~ 262.84 / ~ \ ~ Z ~F' 33 (27A)268.84 268.64 275.8t(TC) CI ~ 6.5 ! / ~ I ~ \ + ( i / O 62.68 ~ - 26 m U \ I I I ~ ~ ~ / - _ _ _ 2.88 S a r9 \ W " ~ ~ I ' 34 0~ ~ l (28) 268.84 ! 1 ; ~ / ~ ~ ~ ~ " 15 @p ' ' 48" RCP \ { ~ » ~~P I l l I I / / - - _ 262.6 A Z W 48 RCP µ1 A a ( I i11 _ - - V ~ (32) 270.20 ~ ~ ~ - ~ ~ ~ c ~ ` l - _ ~ / ~ ~ ~ I' ~ W ~ ~ i y \ 5 ~ I + 11 ' _ _ 282.84 ~ ~ 262.84 e A ' RCP MAN I ~ ~ ~ , / II j ~ - 282.46 ~ 262.48 A ~ 34 266.63 270.5t(TC) CI ~ ~ ' ~ ~~1 - ~ ~ \ 33-35 48" RCP 263 2.57. II r ~ ~ n _ ~ _ _ _ i j I ~ ~ ro ~ - _ ' 26.1 / / / / I ~ - 15` RCP 262.84 I \ W 34-35 15" RCP 123 2.5X ~ - ~ ~ I I / ~ ~ 9a ~ 1 ~ / ~ / , / l s 260,98 I ~ 1 I ) r ~ ~ / ~ ~ / ~ ~ ~ 81.47 15` RCP 268.61 TC DBL C! ~ 35 (33) 262.07 260 28 ( ) I' n - \ I 1 l ~ 1 i i / / /ice ~ ~i 60 261. o / M E (34) 263.85 ~ 1 ' ~ ~ - ~ ~ " P ~ ti 15" RCP a1 5 / ~ - \ ~ \ ! /I 35-36 48 RCP 18 1.29. ~ / / ~ , _ ~ ~ 1 ~ j ~ l 1 - i i I i J1 l / />fi jljj ~ ~ i / j!r ~ \ i i 36 260.06 259.90 268.6t(TC) DBL CI _ - - r ~ .i 3z ~ Q / 111 'fi x y ~ NEW RETAI ING W f~ ~ ~,o / / I 11 1 j t i ,j . jj 36-37 48" RCP 245 1.27 I ~ TOP OF W L ~~~?,([IE ~ ~ f / ~ Ij / / / / ~l~ I / r / l I / M, / / / ~o / ~ 26 ( ~ 37 256.92 256.72 268.9t(TC) DBL CI BENCH MARK O,p I Q _ ~ ~ r 1 RRE HYDRANT / \ ! L ~ ~ ~ ! o ~ / z it / t / 37-38 54" RCP 130 1.07 / ~ J ~V ~ l ti0 n TOP PAINTED FLANGE BOLT \ / ~ ~ ~ _ ~ ? / / / 1 !1 38 255.42 (39) 255.22 268.31 JB/MH ELEV 297.53 _ ~ ~ ~ ~ ~ ~ / / / ' / j r'' i / / / r - . ~ i % ~ ~ i 1 24' RCP / I I ~ / / 0 1 ~ l ~ / / I I / \ ~ ~ / / 1 ` ~ / / / ~r ~ - I II / ~ Iil / \ ' \ NEW BENCHMARK WI \ / i ~ 1 ~o ~ ~ i' (42) 255.22 (SPLIITER} ( LL NEED py _ ~ ~ ~ 27+.7_ _ _ _ _ _ TO BE ESTABLISHED ~ ~ _ i5. 1 _ _ ~ ~ / / I _ o / / I - 48" RCP 75 5,07 ~ a / ~ \ ~ i ~ i y V ~I - ~ / _ ~ 1r 39 251.47 247.87 266.31 JB(5'X5') < \ 1.1 1 _ ~ ~ ~ 1 ~ / I / t / ~ I ^ 39-40 48" RCP 47 1.07 ~ \ ~ \ \ ~ ~ ~ ~ ~ 8 ~ \ / " / I J ~ / wiG7,- - ~ l P ~ / / ~ ~ ,I i 1 I 273.5 40 247.40 ENDWALL \ , ~ ~ A - I i _ ` v , ~ ~ at 260.96 265.2f(TC1 DBL CI ~ i .e r~ ~ V 1A.ha GPI ~ ' 10. 70 38-42 48" RCP 64 1.0% - g \J lj~ r y - i \ X7$.0 27 9 41-42 18" RCP 129 3.0% I I 4 R P ` \ i _ / RCP 15" ICP 1 / 42 (38) 254.58 254.38 268.71 JB/MH Arm - / \ \ 269.4 \ 267.3 I I I (41) 257.09 283.1 1 1 I 1 42-43 48" RCP 32 1.0% 43 254.06 253.86 26 12 REVISIONS \ J BYJ a 43-44 48" RCP 105 1.0% 3° 1 \ ' ' ' • • • / I > 18* RCP s~ 1 / I \ 14 App 2009 i 00 N 44 252.81 252.61 270.3± MH + 1 \ • • I ~ I , l , ~ X6.34 24" RCP i ~ 17 I I / J I 4 t I (DESK Arai SKO 66. I 44-45 48" RCP 105 - 34 13" RCP I I _ I - I I 06 JUN 2009 274 2' 270.5 C 15" RCP F 45 251.56 251.36 268.51(TC) Cl ~ . 6.1 1 to _ f 15" RCP a - - 1 , • ' 264.8 I 1 / (DWQ REVIEW) OPW I 21.4fi I I " I ~ + X11 ~ ~ ~ I I 1 1111 18" RCP - 48" RCP 100 1.07. I I j 111 v zac _ „ 18 RCP p CQ I 265.4 \ _v o n g it O 45 46 a 4 I I 12 X12" PRPPE=F RICA T9D t 1 v _ 1 I A REFER TO SHEET C-8.5 46 250.36 250.16 268.8±(TC) Cl I I , . / I I I \ EVE AREA DRAIN ICA - 1 ° vos2 s \I` I I t ` / , 11 JUN 2003 _ TAD 2'77.0 1 270.4 I 2 (90% CD) 7.0 1 DLH FOR IMPROVEMENTS IN I 1 l co 9 TOP=2'7&. 47 262.43 265.9±(TC) Cl W HOPE ROAD INV_ 276.84 I i 271.04 ` 270.7 / m 15" P I I 21 J!~ 2009 - < l I I i \ p NEW I ' I 1 v 274.8 n 49 266.48 283.0± CB [7 I ( \ AI _ I I i c 1 NEW RETAII ALL I 11 A 8 49-50 24" RCP 52 310% - - \ 1 / 1 I 277.0 2 .34 a 15" RCP 271.56 271.06 I I I 1 \ I I ' 2A Ju 2009 I Q ~ `~MP.OF WALL VARIES I ~ _ 1 \ ~ _ _ 2eo-•-.~,+,_,~ 50 264.92 264.72 269.5±(TC) DBL Cl _J R M 27.98 257 b \ 265.981 I (EXPRESS REVEW) OPW i _ \ Z s1 268.00 272.0±(TC) cl I _ I , , , \ 01 a \ 70.9 - PMPOSED- 1 I i . ` t 1 , l 08 AUO 2003 I I TRACT ID fCW RETAIN' 50-52 30" RCP 97 1.0% WALL e RETAIL r \ L 277.0 F~ - I I I r / (DWO REVIEW) DLH Q _SIGIt ' - - X80 NC 0 51-52 15" RCP 25 9.07. 1 \ I \ - -l SOP PROPOSED 271.7 2 0.0 I s" Pvc m \ \ / I •0 ETAIL 5.7 270. 271.56 271.46 2 •5 1 r 266.34 F~OPOSEDJ I 1X MIN \ / I 52 50 263.75 263.55 270.4± TC Cl 1.0% MINA s 277.0 S ?66. 4 RETAIL I I I I (51) 265.75 \ \ \ OP=276.84 , I I - 267.01 1 I U 52-53 30" RCP 120 1.0% tij ` 7ss \ \ 53 262.35 262.15 269.8±(TC) Cl \ - \ 84 \ 6" 7 / 267.01 5.0% I ~ \ \ V 7, a 1 ~1X 266. SLOPE 1 ~v Q' 54 266.80 270.8±(TC) Cl \ - 3 ~ s e 8 8 I I 4A 278.00 281.5± CB PPS 8 79. - - - - 1 _ P I PP OC _ - - - \ - - - a 53-55 30 RCP 155 1.0% - - _ - / OHP&PHL 74-77-0-1 \ r 54-55 15" RCP 93 5.07 w w w w w \ w w°T T_w N n 00 DRAWN w - - ` - - - +J \ a ' 54A-55 15" RCP 155 10.0% I n CM y ~ N A OUTHERN BE\1,L IN OPW a \ ~ ` \w ` IN w w w~ w` w \ s - \ \ w CHECKED a a M R 55 (53) 260.60 260.40 270.4±(TC) CI r ~q ~E OPTIC CAB MARKER \ NO E: DO NOT EXCEED 49 SLOPE \ \ 1 EAC WAY ACROSS HANDICAP I 1 \ 1 / ` JDL/RPH U 54 262.15 / i 4 C V PA KING SPA¢ES J T 1 I I ~1 1 I i NORTH DATE m 3 G 54A 262.50 31 MAR 2003 56 262.53 266.3±(TC) Cl 55-57 36" RCP 239 1.0% \ a \ \ / 1 I I / SCALE } ` \ 1'•60? N n \ \ \ I \ \ \ \ / 56-57 15" RCP 80 5.0% \ ~o A V A ! y °tiA A 1 A v A v 0 60 120 180 57 (55) 258.01 257.81 269.3±(TC) Cl A EW' DER AVE. a ; A U.S.IIGHW Y 64 1 1 o, V ° REFER TO',SHEET C-8.3 AN ~JOB No. N Y 64 \ 0_ (56) 258.53 - s co 8.4 FOR IMPROVEMENTS IN 1 ( RIBPCW / i NEW BERN AVENUE i SCALE IN FEET 57-58 36" RCP 99 1.0% PP PP a SHEET N ' 41 PP- p- U N 0 i a GRADING PLAN c 3 LL_ OF SHEETS 1 2 3 4 5 5 6 7 8 GENERAL NOTES 9 \ \ 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE v ~ ~ ~ ~ t WITH CITY OF RALEIGH AND THE STATE OF NORTH CAROLINA STANDARDS AND ~ I1 SPECIFICATIONS. . ~ ~ " _ _ _ ~ • ~ ~ 1 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (1-800-632-4949) \ ~ ~ ~ i ~A \ ` i ~ \ LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. ~ ~ ~ ~ ~ ~ ~ ~ 1 ~ ~ ~ ~ ; _ - ,~'<GVICE „'IVERSiGN ~ Puri ~ iir~i; ~ uk ~hAL~ rEKlr r ~ nE ~UGAi ION ANG OEPTN OF ALA EXISTING W I \ JIVERSiGN , _ _ _ ~ ~ , ~ \ F +..y S ALE INITIALLY IF UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS R EQUIRED PRIOR TO BEGINNING CONSTRUCTION. INITIALLY IF ~~IA \ • • 1 y V A I i 1 0 h t l \ V ~ ~ I ~ A 1 ~ ~ ~ N 1 t ~ ~ MPO ~ - - ~ GRAVEL A _ ~ ~ \ ~ \ + 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY BY { . VA RARYb RSfON ND RIP RAP ~ \ KEN CLOSE, INC. GRAVEL &RIPRAP FLTER BASIN 2 GRAVEL &RIPRAP HORSESHOE REFER TO SHEET C-8,1 AND INSTALL SILT FENCE _ ~ FILTER BASIN 3 8.2 FOR IM ~ _ ~ CC`)NT CT \ V A ~ ~ ` LE ~ FILTER BASIN ~5 ~ ~ ~o j SILT FENCE ~ aR SH L ROVfpE \,1 ~ \ • • ~ r r ~ ~ \ A DITIONAL ONS ~ j ~ ~ ~ ~ % ~ I ~ DISTURBED AREA - 2.4 AC a~ I PROVEMENTS IN __.ACROSS PIPE ONCE 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. ~ ~ = DISTURBED AREA = .92 AC CORPORATION P DRAINAGE AREA 2,4 AC ARKWAY PIPE IS INSTALLED ANC PIPE ONCE ~ ~ RU ION ,ENTRAN S i ,GRAVED ND RIF=~ ~ _ • • ~ / \ AS CO~PORA• ION ~ ~ ~ ~ NEW SILT FEN ~ ~ ~ I INSTALLED AND Z ~4R AY' IS , ! FIL R N ~ < CE WITH ~ \ \ \ _ _ DRAINAGE AREA = .92 AC BACKFILL 6. SEDIMENT TO BE DISPOSED OFF-SITE. \ \ , \ • MIN. VOL. 2.4(1815) - 4,368 CF ~ MIN. VO . _ - BEGINS CdMPLE'TED A D EXI T. \ ~ ~ ~ #4 ~ TREE PROTECTION ~ I' ! \ L BEGINS N ~ v ' ~ ~1~ ~ SIGNAGE , ! ~ ~ 1~~ L 92(1815) - 1,670 CF ~ ~ , ~ ;USE 2Tx 54'x 3' DEEP PIT , \ \ \ USE 1 Tx 34'x 3' DEEP PIT i CROSS-ACCESS, DRIVE. IS EMOVED AS \ ~ r ~ ' (TYPICAL) ; ~ \ RECIUIRED`T ~ - ~ ~ '""~J, / 1 ~ ~ , 0 PREVENT MU AND ~ 1 ~ ~ ~ ; / / ~ \ 1 \ ~ ,BERM ELEVATION = 288.0 _ _ ` ~ I _ ~ ' ~ \ ~ ---BERM ELEVATION = 264.5 ~ / I \ \ \ \ i-- J DEBRIS FR ~ _ ~ ~ v o / i r_1 / M BENVG DE SIT ON 1 ~Q ~ \i +1 \ ~ r', h NEW TEMPORARY GRAVE / ~ \ I I ~ v v~q s~>:cx DAM;- ~ - - - v I 1 I f / THE PUBLI STREET. 1 \ ~ v ~ ~ r L V ~ _ ~ . ~ ~ ; ~ CONSTRUCTION ENTRANCE \ A v v ~ - ~ a / _ ~ f , 1, 7 \ R~PLA~:E ~I ~ - _ _ ~ FBI ; ~ ~ s I ~ I ~ - / ~ v ! } BEGIN r/ , i ~ ~ ~ li ~ ~ ~ ( AT EDGE OF EXIST. - ~ \ -'I 1 ~ ~ ~ ~ ~ ~ v 1 ENT fir, , \ \ I ) A / - I / 1 I I ~ \ \DITCH IS R~AO ~ ~ - _ ,1 - ~ - - r ~ - ~ n _ _ ~ ~ , . - - - i - - _ _ = - 1 a i ~ ~ ' , _ _ - _ _ r ' 1 T• ~ ~ U ~ ~...,..._„.,.ti.,..z, 1 ~ \ v + ~ ~ 200 ;t''~~-~~ 2B0 15~ f~f~ ~ 1 / " ` _ u, . . , _ _ NEW SILT FENCE W1 H TREE ~ - ~ ~ _ ~ ~ r ) t O / < r I ~ I ~ h ~ i ~ A\ ~ z ~ ) ~ ~ I d I ~ 1 ~ Qo ~ PROTECTION SIGNA ~ ~ I ; ° ~ ~ `l'ti~ ® o°' ~ h ~ ~ a ~ _ Y, 15 RCP - I ~ o ~ ' _ ..s ~ ~ ' . - T- ~ ' x ~ _ ~ - _ _ N _ _ y,. _ ~ - ~ _ , w___ \ P \ \ ~ V . ~ I ~ r i ~ ~ - - CTI Z - _ J . _ ON r UEN n C ~ nE - - _ E - _ ~ THEW TEMPORAR ! i - 1 i r TEMPO ~ ~ A ~ ~ v ? 1 • INSTALL T ~ z RARY ROCK y REE PR ~ ~ ~ - _ ~ , - ~ OTECTION FENCE A I \ ` . ~ ; ~ ~ ~ A e P ~ i 1 ~ CHECK 1~..;M~ `v 7 \ r I SIGNAGE. CALL FOR ON-S ND SILT FENCE WITH TREE PROTECTION °D °0 rA a ITE INSPECTI m to ~ % ~ ~ ~ ON BY ZONING INSPECT OD V v \ t ~ ~ ~ I ~ ~ I 1 1TRAN 111 \ ;l - ~--r -~.~%y ' ~ , - ~ ~ ? \ \ ~ NEW OR. M ~ CL. BEROSION 2• IF APPROVED, OBTAIN GRADING P ~ a, °i v I _ , 1 ~ 25 ~ r I ~ \ ~ \ CONTROL ST RMIT. ~ , _ _-~--1~ ~ ~ ~ \ ~ ~ ~ \ ~ ONE APRON r~ ~ rr-- 1 ~ \ i IN. 3• INST i 1 ~ / _ , - J r' ~ ~ \ ill. 32 Lx 12'Wx22"TH ALL INITIAL EROSION CONTROL MEASU \ ~ \ \ \ ~ I ~ 1; ~ U \ \ 290 \ i r 1 ~ \ , - ~ L,~ _ , ~ ~ R Q ~ \ _ ~ ~ ~ / ~ ~ ` ? i ~ J O ) ENTR RES INCLUDI r ~ / ~ ~ \ \ \ 1 N ~GEOTEXTILE FABRIC ANCES, GRAVEL AND RIP-RAP \\1 ! / ` r /'.',1 / \ 1 ~ FILTER BAS NG GRAVEL CONST. ti . _ ~ ~ - ~ - _ ~1 i I I I - ~ ~ ~ \ \ \ ~ RISER IN 1 /;r ~ \ , .1- ~ . , r f ~ ~ \ ~ 1 ~ ~ BASIN #6~~7 AND #8, ROCK t~ ~#2.#3~~4 AND #5 f ~ ? ~ \ SEDIMENT PIT, SILT FENCE AN CHECK DAM, INLET PROTECTION ,o ~ ~ f CY ,~+C ~ \ ~ ~ ~ A ~ ~ I I I I I I ~ I 64 6 \ ~ ,r _ ~ ~ \ , ~ 1 I \ ~ \ \ ~ 1 V ! RISER BASIN FILTER ~~6 pER D TEMPORARY DIVERSIO 1 MANENT STORM DRAINAGE AS SHOWN ON N SWALES. INSTALL ~ ~ r.^, ` I \ \ I ~ (nEFER TO DETAIL FOR 1 A s ~ ~ e C V ~ 4 CP ~ \ d ~ - ~ A ' , r ~ ~ VA _ ~ R . \ ND DETAIL AT I~ 8. RISER BASIN 6 ' ti ` ~r ~ \ ! 1 V 1 ELEVATIONS ON DWG. , • ~ ~ ) CALL 890- ,l ~ ~ /r 2 ~ ~ ~ ~ ~ } i I M „ ~ - ~ ~ A \ - I I t i ~ ~ --w ~ \ i , I'~ ~ ~ ~ ~ ; 1 N0. C-3.2 4. , , 3453 FOR ON-SI eo _ ~ V ~ \ ~ ' o ~ TE INSPECTION BY + r ,r"~ ~ 1 \ A + V rr A ~-v , i is , ro ~7 A~ \ \ ,A 19 I ~ V q v~ v \ ~ I i ~ i ~ b ~ ~ IF APPROVED, BEGIN CLEARING AND G CONSERVATION INSPECTOR. \ i \ I -y'`' ~ I ! s~ A. - ~ I ~ i ~ 1 1 c~ \ ~ j I \ V v ~ ! G. b aa' RcP ~ ~ \ \ \ ~ WO FLOOD HAZARD SOILS 5. MAINTAIN DEVICES AS N ~ ~ + RAVEL I& RIP P FILTERVBASIN ~1 s I 1 I i _ A \ I ~ I 1 - ~ ~ , I I I + , ~ i~: " y STURBE© AREA = 1.25 A~ I I I ~ ~ i ~ I + 'I I ~ - \ \ \ \ BM 1988, PG 1363 SIT EEDED. GRADE SITE. INSTAL ~ - _ \ \ \ EIS BROUGHT UP TO GRADE. P L STORM DRAINAGE AS \ 1 , : - _ \ \ \ \ \ \ (TYP. EA. SIDE) ON THE PLAN. DIVERT ST ROVIDE INLET PROTECTION AS SHOWN / 1 ~ \ , I , , I , ~ 7 + D NAGE (AREA 4.19 AC \ I I I ~ \ + \ ~ I ' f 1 ~ I , \ ' ~ ~ - es 1•~ \ \ / WATER ORMWATER TO PROTECTED INLET SHALL BE ALLOWED TO PASS FROM INLET S• NO STORM- M VOL. ~ 1.25 1815 - 2 269 CF ~ ~ I I I i r + \ ' 1 1 ;i - I ~ ~ + ~ ~ ~ ~ , ~ , ~ ~l ; \ ~ , - ~ ~ I I I I I + ! ~ ~ I 1 ,1 NEW TEMPORARY DIVERSION I I 1 \ m \ a 81 ~ \ ~ ~ \ \ \ / UNTIL ALL 38 TO j ,,m ~ \ ~ ~ UP STREAM AREAS ARE STA # INLET ~ 39 BILIZED AND SEDIMENT PIT AT i ~ ~ a , 5 ~ ~ I RISER 6 HAS BEEN APPROVED FO ,,r U E 19 x 4b'x 3' aEEP PIT + ~ ~ 1 I ' . , A ` ~ " ^ ~ 1 ! I ~ 1 1 I l I 1 1 SWALE. ADJUST OCATION AS ~ + - RM ELEV~TION 284.0 ~ ~ I I l 1 ~ \ I + I I I } I ; I I I ~ { i ~ REQUIRED AS S E IS ~ I 1 \ ~ ` \ \ \ \ \ ~ I TIGHT LATE AT INLET R REMOVAL. PROVIDE SOLID WATER- I i f \ ~I ~ ~ + \ \ 1. / / I ~ I 1 1' ~ f I ~ A l l I r l I ~ . ,V BROUGHT UP GRADE 1 , ~ I ~ 1° ` ~ o \ 1 ~ ~ \ \ \ \ ~ \ 1 ~ INLET 3 i~ 38 SO THAT NO FLOW IS ALLOWED 1 A s 36' RCP \ o ~ ~ 9. FILTER BASIN 1,#2, ,qNp TO GO TO \ '1 \ 1 a r} \ \ \ ~ I , ~ BE REMOVED ONCE ALL IIE3 AND RISER BASIN 8 SHAL / / I I~~. , 1 ~ - v v v "Ili ilil ~ I I f 1 ~ ,,,.,1 \ \ R p \ \ \ } \ ~ AN STO MWATER IS DIRECTED ~ L \ , u 4 } C ti D ~7. TO RISER BASIN ~6 TEMPORA DIVER ON I f i 111 ~ \ \ I I + I ' i ~ I ~ I I S ~ } l \ ~ \ \ ~ 6. BEGIN BUILDING CONSTRU ' 4 , SWALE ~ w'~ I ~ i I ' _ ~ ~ ~ V I ~ , I , I I I I I J A I NEW SILT FENCE W ~ ~ ~ i ~ I ~ , ~ ~ ~ ( i ~ I~ I 1 ~ ~ ' \ PROTECTI N SIGNAGE \ ~ ~ I ,NEW CL. B ~ER CTION• ~ BERM: 249.0 ` ; 1 \ \ ~ \ ~ ''ON OSION 7. TEMPORA GRAVEL / ~ ~ j ~ i , , I I , , ~ ! I ~ I I ~ \ 1 ! I I ~ y 1 ~ J ~ ~ \ i } ~ ~ TROL STONE APRON STABILIZE SITE AS AREAS ARE BROU a~m~iP~ . ~ ; A ~ CON CTION ENTKANCE / ~ i ' f I y ~ 1 u., ~ 1 1 I . + , + I I ~ I _ r- ~ A \ ~ , (MIN. 40 Lx15'Wx22"TH VEGETATION, PAVING, ETC• GHT UP TO FINISHED GRADE WITH ,~i'A~ ~''4 1 ; 'j oN c ~ R4 \ _ EOTEXTILE FABRIC g. W Q ~ h \ 1 ~ \ ! i, 1;1~ _ ~ i ~ I QI ~+1,11,11 I ~ I 1 ~ 'tlcT v \ ~ V / / I I I ~ I"~a:~ j ~ 'v ' ' ' ~I ~ ! I I ~ I 1 bpi ~ i ~NTIL CORPOR TION i~ ~ ~ \ ~ HEN CONSTRUCTIO U ~ ~ N IS COMPLETE AND ALL AR S t u. C EA ~ r,p , ,i ~ 5~ r~ ~ ~ , ~ \ OMPLETELY, CALL FOR INSP S ARE STABILIZED 0 \ i~ / ~ i ~ r I N~ I I / / / ~ ~ e I I 1 ~ I I ~ I ~ ~ V i ~lpi ! 1 l ~ I } , ti ol- I } } I i } , 1 I / ARKWAY EN TO SERV ~ _ , \ ~ I \ 1 ECTION BY CON 4 ~ :Y \ ~ ~ \ \ , ~ \ SERVATION INSPECTOR. y i ~ ' 11?, ~ I , , - ~ ` ti ~ ~'I ! I I I III ~ I I ~ E v \ , o ' , a ' I ~ ~ . \ ~ 1 } } I } I } I A I / IADJACE PERTY \ ~ ~ ~ 1 9. IF SITE IS APPROVED, REMOVE T I l••• ~ AND SEED OUT OR PAVE EMPORARY EROSION CONTROL MEASURE 0~ 1 ~ 1 '~...I%' ~ 1 1 1 ~ 1 \ ~ \ ANY BAR S ~ A ~ 2~ ~ l~ ~ I I I v ~ V I M I I! I ,III I I I / ~ ~ 1 / \ v II 'p~ ~ ~ >f lil; fill ;III I I t ' ~ ~ • • • \ \ ~ REMOVED FROM THE WET p E AREAS. ALL SEDIMENT SHALL BE ,ty~ \ \ ) I;,,, I A\ l i I I I I r ~ l' I I ~ ~ ~ I f ~~~~='.-':~t~"s.^`~ I % AND SEEDED, ONCE D THEY SHALL BE GRADED AS SH `ry ~ y / / I L L ! ~ ' \ SITE IS STABI OWN . 9 CI ~ LIZED AND EROSIO i ~ S EAD ~••i ~ ~ \ ARE AP N CONTRO y G \ \ 15 RCP r. l i I ' i ~ { 1 1 \ e i! I I 1 I I l ~ ~ ~ I V ~ 1 I I I 1 ~ l I I I I ~ i t i w: I, , a \ \ \ PROVED TO BE REMO L MEASURES y~ \ I / • y T VED THE SOLID PLAT ~ ~P• 0~ 1 ~ ~ / • • ~ \ HE FINAL ORIFICE PLATE SHALL BE E SHALL BE REMOVED. yip HEN ~ ~ \ ~ III I ~ o ,1.. I } A ~ r , ~ i I i i ~ I ! ~ , ~+"~c u,.~- WAE-SMART I ~ ~ ..o ~ ~ OUTL INSTALLED IN ST ~ r i / ~ • • NEW C ~ ET TO STORM BOX ORM BOX 38 ON / L. B EROSI N # 42 SO THAT STORM # \ ~ } o \ , ~ , , I I 'I } ; ~ NEW CL. B EROSION 1 / i, I ~ _ m I ~ I ~ I I ~ I I ~ I. + ~EMOV~ I suP 1 POND #2 AND EXISTING STREAM. WATER OUTLETS TO WET :ROSION 1 a ~ / / , > , / CC~1!TROL S NE A RON \ \ ~ 1 .a.,,} ~ I p CONTROL STONE APRON \ V 1 1 A, I I ~..j 9'^' I ~ I I I I I C I I ~ 11^\ ~ a ~L.Q , , \ \ / ~ ~ , I 1 ' I . I I 1 ' I i ~ , , I I II i I I ~ , (MIN. 20 Lx7,5 Wx22"TH) )NE APRON ! : ' ~ ~ ~ . ~R ~ \ MIN. , ,~o ! I 1 / ( 21 Lx12 x22'4'H) 10. WH 5 Wx22"TH) ~ ! • Oid GEOTEXTIL FABRIC EN VEGETATION HAS BECOME ESTABLISH I I I H i l l I W ~ ON GEOTEXTILE FAaRIC ~ v ' +I 5 1', III ~ + I l1 II I I I I ~ l v \ l e,; + ~I, I , I. 1 ~ ! ~ ~ / BY C ED, CALL F LE FABRIC ; i ~p r -r' \ ~ ONSERVATION INSPECTOR. OR FINAL INSPECTION ~ PROVIDE BLOCK D GRAVEL ~ x 1 1 1 1; I? I 1 1 i „1 ~ 11 I I I I { I ~ I ~ ~ \ ~ INLET PROTECTIO FOR A L " I I 1 I t l 1 I I I t l l ; I I I I I I, ~ ~ 1 ~ • /.27 ' r, TOTAL D / ~ . ~ / \ ~ - \ 15NRBED AREA. 38.8 AC f ~ ~ ~ , ; : I r, . + } ~ I I ~ I I ; } I I ~ V ~ N TEMPORARY NERSION- ~ \ INLETS UNDER C NSTRUC ION I ! ~ I~' I+ I I i I ~ }I ~ I ~ \ SW LE. ADJUST L CATION CRY VERSION ~ ~ r ~ s.,.. i ~3 \.v A ' I. I I I t I~ II Il I I L I I I A \ RE R ~ A I ~ ~ ,1'~ _ A i' i I I 1 I ~ i~ II I I i Q I ED AS SITE1 IS SITE1 IS ~ ~ _ 2 RCP ~ ? - r 1 I vv ~ NE ~ \ \ 1 Il ytr' ,,t II I ~ I1 ~ l ~ ~ } I ll } BRO HT UP TO GRADE \ , ~ I1111~I. I~. !II I!~i III I ~ ~ I D \ oo USE BASIN NOTE TO GRADE , ' i ~ f 1 ~ / ` DI \ ~ \ ~ ~ ~ I ! l „ Ii, ~ 1 \ A Gmr+~~ / g 111;.1 Q / i ~ ~,I II i I I I I` I I I , ~ ~ IN 28&91 / / t. A 1 ~ } I I ; I I. ' I ~ I I 1 i ; . ~ . / ~ THIS PROPERTY ~ / , , r ~ i , , \ 1 q Ri,ER BASIN FLTER ~7 REQUI IS VESTED FROM THE ~ A ~ our / I i I ' ~ I I l , I { ~ 1 „ 1 ~ ~ DO NO DISTUR STREAM ~ r ~ - ~ e ~ - ~ ~ \ ~ ~ \ (f'EFER TO DETAIL FOR REMENTS OF THE NEUSE BUFFER iR STREAM ~ ' • - ~ ~ ~ \ ELEVATIONS ON DWG. RULES AS INDICATED IN THE VESTED f ill I II l 1 ~ ~ i l " I I 1' ~ I "I ' I C J ~ I ~ 1 I ~ AREA P T THIS' POINT 1\ v / 11~". ~ ~ ~ti f~l 111 i 1111 I I 1 ~ A µ ' t ~r /1)...~~ ~ ~ ~ \ RIGHTS LETTER FRO IISj POINT r•• • y,~• • . - r , > . - ~ f \ • \ ~ \ NO. C-3.2) FEBRU M NCDENR DATED i r . _ ~ ~ ~ ~ \ ~ \ ARY 14, 2003. v ~ II I I III III I v v N ~ f y A + ~ ~ I I : , ~ _ ~ ~ ' J + ~ III !III I 1 ~ ~ I I v NEW CL. B EROSION ~ ,;~:,I ~ I~~, ~ I I I I, I I f l I t Sri' V A \ \ V ~ PP ~ ~ ~ I,~ I , ; ~ \ I I 1 1 I , I I } ~ r 6Q~ITROL STONE APR \ . cur i , \ ~ V ~~1 I ! ; I . ~ ; Il ~ (MINM 32'Lxt2~22"TH) ~ 1/~...... r\ areH a+sWr \ ~ ~ I ~ ~ ~ / ~ I) ~ ! ! ~ ; ) ( ~ J v ON GE~OTEXTILE F I ' _ _ _ ~ ~ I~ ~ ,~ae as PRIVATE ACCESS EASEMENT ~ ; ~ 2~` 1', ~ _ \ i i ' ' I L ` I I ' .,.I, 1 J ~ / "RCP / ~ ~ \ ~ ~ \ , r l• 3 ~ Aso v v v, v v v FINAN , DUI 2A8.65 ~ . ~ ~ / I I I ~ ~ v~ ~ m i , b- i" ~a _ ur 2ess+ DB 4425 PG 439. , a ~ ti + ~ ~ l I I , y, , I i ~ _ _ is ~ ,a:,~ , _I ,.,1 ~ I ....Jr 1 ~ \ \ CIALLY RESPONSI i J , ; i ~ / _ _ _ ~ , \ , 1 BLE PERSON AG ENT Q ~ ~ i~v D DB 4365 PG 639 ~ s°`", J v , r r 7 , - ~ + _ - _ . _ f l ~ ~ - ~ 6 4515, PG -^•J _ A ! 1 ~ ~ I ~ 1. i t ~ + D y7796,r 296 . ~ \ + / - ' ~ , / - i % i / ~ I I { 1 I ~ ~ ~ \ l ~ 0 ~ a / y a t 1 ' r • • o ~ ~ \ 11~vr \ 1 • Person to contact should sediment control issue . , J ' , ~ BM 'h988, PG 1549-.. \ ! ~ c_" - ~ ~ ~ , ~ / f } I I '~"1 \ . _ \ 1 1 - _ \ •(f•,•~) / y ~ 8 ie \ ,1 s arias Burin land-dis • • ~ 1 ~ ~ / a . . ' 9 turbmg actrvit . - ~ M ~ , , , _ b \ N , 1 - - V ~.r,- ~ ~ ~ I , . ' o ~ _ r..... / ~ \ T' ~ ame. GUY SCOGGIN y V3 ~ _ ~ ~ ~~t, ~ . ~ ~ ~ V j ~ \ _ ~ ~ Telephone: 865-522-1785 \ 4 . i ~ ; - i i - - '8~" 1 'r ' o ~ '4 i f, Jr y \ / r r.. J ~,w \ 2. Person (s) firm (s) flinancioll r 4 r~ ~ ~ I ~ Y e onsible f ~ _ y f ~ fir c _ ~ g" „ r ~ ~ ~ sP or the land-distu Z • I~CP ~ ~a ~ 0 1X MIN ~ r I / ~ x rbmq ocGvity. - ~ - ~ ~f I I \ \ A F~ 1 1 ~ 1 V ~ ,-.~f i ° ~ COMMON ~ W 1: I , \ ~ r. _ x ~ ~ ' ~ WEALTH NEW BERN P ARTNERS LLP 1A ~ ~ \ , ~ ~ ~V ~ ~ Name of Peroon I 1 h:,.., ~ , ~RROpOSEp r' / / I : L ~ (s) Flrn' (s) ~ z a e - \ / 1 ~ ~,I I ~ ~ ' _ ~ ~ a a I ~ I IN1% IN ~ o . e , ,'I ~ I l 1 15" RCP ' u~L i 1 ~ ~ ~ a ~ ~ ~Er r < < h ~ W W } a AIL „ ! ~ ~ 500 HENLEY STREET SUITE 2 I- I >a RCP l - Ff'E1 r 263.0 \ _ ~ rn~POSEp~~ ; : u'. ~ Mailin ~ -SAME- O _ \ g Address w _ • ~ ~ 1 / OFFICE ~ \ Street Address Q ~W i R a ~ r ~ 1 FF _ / n ~ ~ V W ~ m 1 ~ _ ~ _ _ _ 0 \ \ I ~ ~ 9 ar ~ Y 1 I ~ ~ \ \ ~ \ ' ! I / s ~ E -263.0 ( v \ KNOXVILLE M ~ ' , ~ ; ~ \ r \ ~ 37902 _ V Z W 3 + 5 ~m~~,~, - / o \ ~ NEW TEMP R ' ~ 1 l - .;:,..„,m - I ; I b ARY G VCS--,~ ' ~ ;i \ City SAME- Z L.L l ~ 1 ~l ~ r; ~Lh \ r~ a State ZiP Cit ~ ~ dW r ~ P I i I y . ~ ~ CONS i v~`' I \ T~iUCTION ENT P ~ 1 v ~ ! ~ ~ r_~,~.~~~.k ~ - , ~ ,I 1 y state zi ~ W W Oz ; j ,''I I~~~r ~ ~ 1:=7 LI' ~C~7"'C']r \ 3. ~ J I ! ! ~ ~ rated erve s _ ~ ~ 15 gp ~ 18' RCP f \ 5k I 1 APP Agent to rec 1 I ) j 1 ~ ~ i R J.. ~ r.'] d ~ ~ • , any notices, process, or leadin i Z } 1 _ A A r a 1 ~ ~ proceeding ansrng out of on m P •9 n any action or le of m J _ - _ ; ti y otter relatin t q ~ ~ W II + ~ ~ - act I _ ~ I ' '~I~ 1 - - ~ I J I II ~ - ~ ~ - ~ 1 I ? { ° : ?I ~ -G- - r ~ 9 o Ralei h Cr P C~ I ~ a s~:~.,~~~ ~ ~ ~ 9 tY Code Cha ter 5 Pon', 10. ~ Ih : . _ ~ v f I W i 1 I 11 I ~ m ~ 4' Cps ~ . ~ ii ELIZABETH Z / II ~ _ _ / 15" RCP 1 W. VOLTZ I ~ ~ ~ i~ y i ~ 37 'p /l , f , / / 7, / ~ Name of Individual W Z ~1 I!J 1 A / ~ ~ ~ ~ J~,r l " ~G e o \ Signature of Agent Z Q ~ i J ti~ ~ a 1i' ~t;w ~ K~PATRICK STOCKTON LLP II ~ - 6 , ~ 1 ~ ~ I I ; 1 >'S v v ! ~ ~ f 1 ~ f i~(RE}~R T ETAIL _ _ ~ ~ Place of Business i 919-420-1700 W ~ . , ~ \ ns~de the f r~ ~ so , M i 1 City of Ratei h Busin TAIL r , s~ ~ ,;y,w :i \ 9 ass Telphone E PP ~ ~ 15' RCP ~ _ \ ) - / F: , I I / CAl 'u - _ ~ ? ~ ~ ' 1 ~ ~ / ~EL~fVAT1fJ S D % r D ~r 3737 GLENW OOD AVE SUITE 400 RALEIGH NC 27612 z 1 I J 1 a, ~ ; ~ • ~C=3.2)i If , ~f ~ 1 ! ~ ~ \ Address Q ~ ~ i t "I i 11 i ~ " NEW MPORARY DPVt~RSION ~ 4 A / r ~ 90 ~ ~ ~ ' l fi ~ / ' ~ d BENCH MARK ~ ! ~ ~ ~ - - f a' Zy€~ i' i SW ADJUST LGCATION AS I ~mplete the above and adhere to cover I FIRE HYDRANT ! A V ~•vv } I', ' ~v~ , ~ f / 1! i!,~ I, ~ i Y i n- I ~ 7 ' ~ , R UIRED AS ~(fE IS ~ take the place of a complete financial r sheet of erosion control plans. This does not 1 i 1 es on ' p sibility form, A completed }arm must be I j ~ ~ ~ j OUGHT UP%70 ~ ~ ~ 1 ~ ~ / filed with the Raleigh Inspections Deportment ri TOP PAINTED FLANGE BOLT \ / ~ ~ ~ \ / ,,ze / i ~ ELEV=297.53 ~ ~ ~ ~ / ''*.,<< ~ I / I! ~ i ~ :I _ ~ ~j,; . j'%~ ~ P or to issuance of permit. 24' RCP I ~ f ~ \ ( \ I OPOSED ENTRANG ~ f ~ v. , ~ / / ii ~ / i NEW BENCHMARK WILL NEED I ES ~j,, - r ' / " I / ~ T ~ ~ - i : i I NEW SILY FENCFJ EE r ~ TO BE ESTABLISHED) ?oq ~ , - - ~ ~ ~ \ ? _ _ = ~ / I ~ - r ~ , J , ~ \ ~ 1 R S' - \ ~ ~ 'w; ' i j;/ i TEM Y SILT ~ / , " ~ - - o \ :1 \ 'l \ \ - ~ _ ter- f 1 - / , 1 _ " I ro PROTEG~fION SIGIJ ~ ~ ~ ~ _ _ ? , ~ ~ I \ _ a 1 y / \ AT ANY 01Nfi~~Ul~N6~. ~ ~ f ~ - _ ~ ~ N NG TOP-07` ~ i i. ' : - { / \ r } CONSTR_U 10N--- ~ ~ \ ` ~ ' TYP, SIDE i i / 11l ~ I j r 11 I I I i t ~ ' ` " } / , I SURVEY LE D ' / ~ 1 t_' OHSUP - ILT FENCE ALONG / ~ \ \ { - - ' x .r_-'` _ ' - _ _ _ - / ! / - L) 0 HEAD SUPPORT LINE aew nr rY+cT+ur_ r, raa-~1 ~ \ \ % _ ~ _ / _ _ 4 ~ ~ ~ ~ ~ ~ , i J ,l ~ ,1'~ ~1~~. Wupti S~,p.,~ .....POLE r - v _ _ o I u} I m nni Grt Mtl tK $.J SFOTMER" - PHBX)-PHONE BOX ~ RCP ~.r J \ UGFOPHCM)-UNDER _ GM -UNDER D FIBER OPTIC CABLE MARKER U 15" MCP \ 1 1 J 15 RCP 21 • - - f ~ I / l 1 ) GROUND PHONE MARKER I i 1 I FES)-FLARED END SECTION PHMH -PHONE ) MANHOLE v l I I I FH)-FIRE HYDRANT r UGPHL -UNDERGROUND PHONE LINE I t 1 18" RCP _ _ _ _ _ e ~8 I 1 I I \ WV -WATER VALVE 1 _ EO -EDGE OF PAVEMENT 2a" RCP ( I CMP -CORRUGATED METAL PIPE I ` ~ • a - ~ ~ 111 ~ I z . , RCP -REINFORCED CONCRETE PIPE REVISIONS T t ( BC )-BACK OF CUR BY y n. 5 RCP I ! IFP -IRON PIPE -IRON FOUND 21 JLL 2003 -Al P L.~ ' ~ r I ( 1 O 15" RCP 1 I - 1 ON PIPE SET ~ 1 ^T / RWMF -RIGHT OF WAY MONUMENT FOUND o RWM ~T8) a k 1 ! 11 \ yea _ PROVIDE -BLQCK & GRAVE RCP 1 ! I I INLET PROTEC119N,F9R- ALr - - a, " RC l 1 / - ~e s F I I / OVERHEAD POWER LINES 0HPQ 99 JUL gm REFER TO SHEET C_8.5 r L. t' / I i I i 11 UM,,UNDER " FOR IMPROVEMENTS IN IN 11 ( 1 LP)-LIGHT POLE SP)-SIGNAL POLE I a_ f 1 CONSTRUMON NEW HOPE ROAD - I I I I I 1 1 q y /"~'I 1 ; ) I L ts" I OHSL)-OVERHEAD SIGNAL LINE "29 JLL ~o 1 „ P I I_ OHPHL -OVERHEAD PHONE LINES 200$ ~X_~ ..F.1 [~1„ i I I I 1 !I OHP& HL)-OVERHEAD POWER (EXPRESS RE PROPOSED a' RETAIL v I € 1 RC 1 1 I UOWL -UND AND PHONE LINES) 1 i I 1 1 1 I 08 ERGROUND WATER LINE C FFE - 277.0 . (g f r" I : +s , 1 I UGGL -UNDERGROUND GAS LINE AUG jErA I I ! x1 I 1 I 1 / -GAS TEST VALVE OWO FMMM DLFI 'OSED PROPOSES _ - . a IIf 1 267.0 f j ? HIC )-HOLE IN CONCRETE SET 'j, J I > 4 .I b I r I 1 -290 8• Pb 1, . 1 1 RETAIL +e I J NSIC)-NAIL SET IN CONCRETE I Y I FFE - 271.7 P / EOG)-EDGE OF GRAVEL 1 C 0 OX Or ~ 6 PVC 0 \ .OX MIN. 1 I ~ 1 THIS DRIVE € ! "s'wco CF)- I, L CFWNLINK FENCE Dfl~ NOT U~i< ~ d AS \CONSTRUCtON t p , I ° I t x MIN _ f WPF)-WOOD PRIVACY FEN NEW ROCK CHECK I' BW -BARB WIRE CE ENTRAME V %L i DAM _ dK .5 R~; I , FINAL CONSTRUCTION WVMH WATER VALVE MANHOLE GP)_ GATE POST UG18) - " PVC o I ENTRANCE LOCAT ° UNDERGROUND JUNCTION BOX s" B)-TRAFFIC 1 1 MIN 8 I I ION AFTER EXISTING DRIVE I i SIGNAL BOX ~ S REMOVED. i a PPS R'P c PHMH PIP T _77 a ` Y ' ,...ors },A ~ i i o OHP&PHL JGFOCM - v v ~S~ SOUTHERN BELL \ TEMPORARY G VEL Q CABLE MARKER CONSTRUCTION - . W . ra \ 1 FIBER OPTIC 1 ENTRANCE ro DRAWN - _ OPW 1 (BEGIN AT EXI EDGE OF1 r ~IiCGL PAVEMENT / i = - - _ - N -tea.--- CHECKED I JD L/RPH - - - r _ d A I A A 1 NORTH DATE 11 JUN 2003 Wo% CD J j i 1 ~ NEW BLOCK &O-GRAVEL INLET REFER TO` H - 2 / / I ~ iO q 1 ~ ~ O~ I PROTECTION W/ SEDIMENT PIT S EET C 8.3 AND - SCALE 8.4 FOR IMPROVEMENTS IN SERVES 0.55 AC. ISTURBED AREA NEW BERN (AVENUE 0 PP PP 80f i/USE 13'x26'x3' EEP PIT 60 120 180 1' • JOB No. PP Pr- 6-p P RIBPCW - SCALE IN FEET SHEET EROSION CONTROL PLAN c 4~ ¦ OF SHEETS 1 2 3 4 5 5 Fi 5 6 MIN 7 1.5 Fi 1800 CU FT/ACRE 12" MIN. 5 FT 8 _ - - - - - TOP ELEVATION OF STORMWATER 1. USE FOR DRAINAGE AREAS ti's MAX NOT EXCEEDING 5 (FIVE) ACRE . STANDARD META g o p L POSTS 2'-0' IN GROUND D.5'-,' ROUND X57 WASHED ; 2. EARTH BERM SHALL BE STABILIZED w/ SEEDING ACCORDING TO TRIANGLE SPECIFICATIONS. DESIGN OF SPI LWAYS STONE • MAX. < e' YAx. 1 vAtaAet.E As aRECrm FC.L'T' wL:INIi ~"1 3. USE CLEAN COMPACTOR FILL MATERIAL FOR ~k~5~ ~E~'fIUN FABRIC HAROWARD WIRE _ THE ENaNEER ~%i:iiliVG ~LuPE ~ f~~ ui tRAINAGE AREA WEIR LENGTH 1 EARTH BERM. EXTENDS TO A (ACRES) 1 n n ~ TOP OF BOX DESIGN OVERFILL 8" SETTLED FOR SETTLEMENT 2 4.0 CLASS 1 RIP-RAP wN. to c~ 6.0 FILTER FABRIC TOP 21' 4 8.0 VARI S ~ w~ES YIN, t2-t/2 OA 10.0 ~ERA4DY4TE MIN ~ 1' FREEBOARD - ~ ~ tXYo~. 1 1 5 12.0 F DIMENSIONS SHOWN ARE MINIMUM ~ SID- E VIEW 1.5 FT CY° 10 FT MIN ~ , . ~ - EXISTING SLOPES 0 2:1 SIDE $ 5 FT I - ~ oo g, °~o° ~ SLOPE MAX ~ $ GRADE ~.QIE; ~ MAX FlLL ° ~ °F~`~"'~ o~ ~ o ~0~ f - $ o HEIGHT & WIDTH DETERMINED BY FlLTER o~~~p 1:1 SIDE SLOPE `~a O FABRIC ~ ~ e O VARIES EXISTING TOPOGRAPHY AND SEDIMENT STORAG d ~ o E REQUIRED. 3 FT GROUND o MIN / ~ 0 KEY RIP RAP INiO THE DAM FR NT VI W FOR STABILIUT - ^ o 1FdtLylf~1 0 6"-1' ION. rn QJC>7j~.o00(b 0 0. MAINTENANCE ~ - ~ EIR ~ NSPECT TEMPORARI' SEDMENi TRN~S AFTER EACH PERgp OF SIGNIFIGNf RNNFNI REMOVE SFDIMEM MID RESTORE TRAP TO ft5 ORIgNN. ~s; :a. KEYED srE~ ~ c :~}Q... .,,t„ RIP RAP ~"`•igt"~4 Q.:Cf~,•;i~' - 1~ wDVEN WRE FABRIC •4 +/~6s~m.+ 50.T TENCE GEOTENRLE F gMENSgNS M41EN THE SEDIAEM HAS ACCUMIgATED TO ONE-HUf THE DESIGN DEPTH OF THE TRAP. PLACE 1NE SEDIAENf THAT IS REMOVED kl A DESICHATED DISPOSAL AREA AND REPLACE THE COHTAMMNTED PART of nIE cRAVa fACWG. ~ SJ WASH -USE SILT FENCE ONLY WHEN DRAeMOE AREA ABC ED STONE PLACED TO A REVISIONS CHECK THE STRUCTURE FOR DMMADE FROM EROSION 011 PWING. PE18001f•ALLY CHECK THE pEpFl{ OF ~ SPKLYGAY TO ENSURER 5 A WNIWM HEIGHT OF 12"-18" MIN. ABO ' AREAS OFT CONCt7RRA4 ACRE AND NEVER W 4 ~ ~ /S7 WASHED STONE TED ~qe r OF 1.5 FT BELOW THE lAW POM OF THE EM&N01EM. WEDLATaY FILL NP! SETTLEMENT OF THE EIBIMIK1EHf TO SIKAiILY ABOVE DESIGN TOP OF BOX ~ DATE DESCRIPTION p~pE, ,wy gp ~ D~PIAf:FD FROIA ~ SPILLWAY MUST REVISIONS n rv FN.L SLOPE FROM-~ - -END of SILT FENCE NEEDS TO BE TIMtl1ED ~ N ~ R~ IMMEOLATEIY• DATE DESCRIPTION STN3IUZE THE EM84N!(AENT MD ALL gSNRBED AREAS ABOVE THE SEgIQIT POOL NID DOWNSTREAM FROM 1NE 1RAP IMIIEDNTELY AFTER R CONSTRUCTION NT1H SEEDING. ~4r ' ~ ` ~RE~Aet OF SILT REVISIONS n ~z No. ST wiAn(1511E~p'S~ DA DA oRADE RIPTi ~'~GR WHEN slLr i Tom N01 t0 rb NOTE EXISTING SL REVISIONS CAT~g1 W ~ '~pN Y.H.D QP - Q 6' YIN. {y~ A ~ ADD SPNIWAY CIKRr G,µA E DATE DESCRIPTION Y Z GRAVE L&RIP RAP BASIN OUT LET 3A S N OVER SKIRT o -TEP SFQUEN 0 o E STAN DAR D CA TCH B BAST NY ARD INL ET P ROT ECTI ON ANCNOR SKIRT As aRECrED Br ENpNEEp . 14 4' x • CH SIDE ~o EC vi K w D ~Z~. 50' MIN. NOTES: aMTtE ~,0~ BUT SUFFICIENT TO KEEP BED F 6 S' 1. PUT SILT FENCE OR TREE PROIECTIOra FENCE UP SEDIMENT ON SITE TO ENSURE CONSTRUCTION ENTRANCE. IS USED. rA N D ~ A R D r m E MP 0 R AR m ~ " Y SI LT F E N C E r ~ W~ YIN Y MIN 1 ' 2. IF CONSTRUCTION ON THE SITES ARE • , SUCH THAT GOYPACTEO " ' 2~_3~; ° . ' ~ . THE MUD IS NOT REMOVED BY THE VEHICLE TRAVEL- STONE TO BE USED LNG OVER THE STONE, THEN THE TIR ES OF THE EXISTING ~`•'I''~'.~,(SURGE STONE OR RAILROAD:?,. 25 OR WIDTH OF VEHICLES MUST BE WASHED BEFORE EWTERING THE - ~ 8' YA)L " PROPOSED STREET, ROADWAY ,,•BALLAST):•;,,,,,~,~ PUBLIC ROAD. WHICHEVER IS STEEP CUT OR FILL SLOPE I~ ~ vARtA~E As aRECtED 1HE ENaNEER GREATER, ~'.R 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS - - - - ' - ~ WAR+Wrrc sww +;i~„..,.;: ON TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL CLEAN THE AREA AND INVOICE THE FINANCUUlY ~ L RESPONSIBLE PERSON AS INDICATED ON THE FINANCW. W1tE ATTACHED ~A POST IN MIDDLE RESPONSIBILITY FORM. ~ P~OS~TS WITH LENGTHS of OPENR~G MIN. tD cA L i 2:1 SLOPE MAX uNE tMRES - _L HORIZONTAL METAL POST L - L rE WIRED sECURar ro VERrTICAI SED~IENi ~ PosTs - STABI i L L - L PLAN AFFLE INSTALL arlnnl - ST p 1 ROSS SF(`T,iN rp,,, UzTEMPE oRw~DnERSaNa+ L _ aASS RIP NErnNEO°~0H caNnroL L L ~ L i ;r ~ - _ r>~s w RESISTANT f ~ _ Narr _ ~rmN 35' MIN. 15' M NEW CONSTRUCTION 1' DRNE STEEL FENCE POST AT LEAST 18' IHfO FABRIC CUT AND FT7lDED EXISTING ROADWAY IN >olrD oRaL~IO OVER THE HORIZONTAL 0~ IOLDED f roLY e+R,vc"°E FABRIC 1 FENCE POSE POST IIORQONTN. 2. WOOD POSTS ARE NOT ACCEPTABLE UPSLOPE TO - ¶ E POSITIVE GRADE 1.0% MAX srEEL POST FR~NT ~ W _ I 1 D..~ SiYW:i. Ai1M'. TL ATTACH F'ABW; 1 wARNxtc 91GN ~ 6" MIN. ~ ` 12" MIN. To 'Hoc WIRE" PERSPECTIVE VI W H0R110NfAL P0~ ` • . ' ' ' • ' : : , • 4 BAFFLE SPACED AS PER APP ' ROVED PLMI. FENCE AND FABRIC SIDE SLOPES ~ oRANDE, uv RESISSrANr, 40°--__ TOP OF BAFFLE BURIED NI HIGHER n+M1 TNE~BOTTOM t~• 2 : 1 (MAX.) ~r P P"a"ar ~ Te"suE sr~NCrN, queTNee. \ ~ io BARRIOADE FA9tIC (7YpK•,,11) i y~Fi THE sPILLwAY N A~NCARO \ ~ M rnEEPROTECn FABRIC UNDER STONE QOM a' BAFFLE IN TRENCH AND TRENCH e'~8' TRENCH, FlUED WRH SOIL AND BACKFlILED AND I ~ ON AREA FE \ ~ D 18" ~ y 9 REVISIONS COMPACTED Cq,Ip,~ DATE DESCRIPTION CROSS SECTION REVISIONS I \ GRADE ~ ONOiENTER '17 ~ DATE DESCRIPTION ~ \ \ \ \ NOTES: q - s~ d1 SECTION AT OP NING T REVISE BAFFLE INSTALLATION -STEP 2 E• ~ ; ~ ~ DF amAeL~ WARNING SIGN REVISIONS STEEP CUT OR FILL SLOPE wArnpu, ~~AI~ • T ESCRIPTION ~ ~ sR4L aE vuaFp AT ~Y ' Mro ~ y tidy ~r PUCE A ~ ~MUNAI DEiAILED• i~ ~ C~ ~G'~• ~ saN Ar ucw EHD a- uraR p ,,,,N•,,,. J<- CONSTR UCTION PLA ~ w "e°'e>;,a" "SAS Lis ~Nw ~,~'iEa:n°N ""D so' oN ~ENrER TNEREA~TER• p NE R~ - N VIEW ~iAW sECY~ELY ro ~wcE pD~is AND °cR'"~TER' °RO~E ~o LEx~ ~ ~ ENTRAN CE 7 GRA VE L RIP RAP SIDE VIE ~ PRD>E~ ~E >+a1i FABRIC. nrur ONE sA;N A~NAC CIS ANY 6E RE ~ FILTE R BA SIN 36 P1ACE A SM,N Ai EACH END OUIRFD BY CRY OF RALEICFI ~ NEAR TREE I'RO1ECAq/ AND 30' aV &SED a4 ACTUAL FE1D CDAARIOALS DIMENSIONS ELEV DI V . ER SI ON DIT CH EMERGENCY SPILLWAY INLET 66 247.65 DIMENSIONS ELEV 9 NOTE: F EMER TOP OF DAM WIDTH 10 254.3 ~ SEgME~r TRAP _ _ GENCY SPILLWAY INLET 25C 248.25 ST OR TREE PROTECTION ON AND LY AR D EE pp TR DEWATERING I fj ANTI-SEEP COLLA ~ - - TOP OF DAM WIDTH R 7 X 7 - ~ ~ 8 250.8 ~ smIMENT TRAP OT EC TIO N CO DE NCRETE TA I BLOCK L RIP RAP DISSIPATOR PAD SEE DWG C-3 ANTI-SEEP COLLAR 5.5' X ~ l-- - - - ANTI-FLOATATION DEVICE 4'X4 X1' THICK - , ~ OISSIPATOR pAp RIP RAP DISSIPATOR PAD SEE DWG C-3 - ; 1B „ ~ . RIP IMP ANTI-FLOATATION DEVICE _ ~ ~;1w:,~,:..... , TOP OF RISER 24 CMP 3. ' . ~ . 246.65 5X3.5 X9 THICK ° ' DISSPATOR PAD OUTLET PIPE INVERT IN 25't18"CMP 19~ 241.65 ~ TOP OF RISER 18 CMP ' ' t., ; , 'r 247.25 RP wP - ~ a ¦ ~ ~ OUTLET PIPE INVERT OUT - `'~;4.z~""~" OUTLET PIPE INVERT IN 25't25"CMP ~ ' " , 241.4 ti~,,t,.,y ,.a•„•, 0 1 X 242.25 ~ ~ ~.,.r„ , . SEDIMENT STORAGE AREA 129 X64 XS DEEP 241.65 OUTLET PIPE INVERT OUT - 242.0 ,r' 'j ' ~ ~ ,rtr , ¦ . ~ ~ slxrloN rNRU nor, ~ b \ ~ D SEDIMENT STORAGE AREA 88'X44'X5' DEEP 242.25 "~'•~'y PERIAANENr RcP „1.:,' - a . ~ / , / • t.. 0 0 \ • ~ \ ;;.t OUTLET PIPE ,1,~,', ~ PERMANENT RCP - o . - ~ _ OUTLET PIPE EARTH DAN 11•~ "'t•. ti,: ~ ~ ` 1. LAY ONE B( ~q ~ 1. LAY ONE BLOCK ON EACH SI ' / R'f ~ - - • ~ ~.i • ' DE OF THE STRUCTURE ~ ~ ` ' - - EARTM °'N ON !TS SIDE TEMPORARY CMP RISER-PERFORITEO PLA_ N VIEW DrwNAGE. T ON !TS SIDE IN THE BOTTOM ROW TO ALLOW POOL lllllllll I i ~ o a DRAINAGE. THE FOUNDATION SHOULD B Oro •~Cb o. / s w AT LEAST 2 TEMPORARY CMP RISER-PERFORATED DRAIN. PLAC WATER LEVEL DUPoNG STORM T~ RACK 1' MB1. FREEBp1RD TOP of aAM FLA--~ TH AT LEAST 2 INCHES E EXCAVATED ~ ~ _ sro'_ucE ""FA t' TN~CK x s' BELOW THE CREST OF THE STORM MGH MN;. ---1- Z DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST ~ WATER ltVEl OLNlAVG SroRM E EDGE D~ TRASH RACN 1' MIN. FR[EDQARD 10P a DAM AND TO AVOI THE EDGE OF THE STORM DRAIN a FOR LITERAL SUPPORT J • ~ STORAGE ~ M IF NEEDED, f AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GNE LATERAL SUPPORT TO SUBSEQUENT 2:1 SLOPE, GRAVEL FI T ROWS BY PL ~ ,sEawENT sraace BLOCK OPEN. ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH L ER 'A v? BLOCK OPENINGS, P R PE TIV .;O~,p. MINAAUM SLOPES 2 1/2.1 .GRAVEL FlL 'D q,~dd, 1ER a • • y 2. CAREFULLY F VIEW z 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE NO SCALE F- p .0 MINIMUM SLOPES 2 1 p: 1 PNNTED RED CLEANOUf MARK I EAAtN ~ - ~ q.~, ; b_ / WIRE MESH M LOCATED HALFWAY UP RISER PIPE = PNNTEO RED _ 6 BLOCK OPENI WIRE SCREEN 0 ~ Q WIRE MESH WITH 1/2-INCH OPENINGS OVER ALL TEMPGRARY SEDIMENT ~ cxEANDLrr MARK I ANTI-SEEP COLWI LOCATED HALFWAY UP RISER PIPE . EARTH MM BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. POOL ~ ~ ~ Q U ANR-FLOATATION DEVICE 3. USE CLEAN G - DISSPATOR PAD ANTI-FLQ1TAl10N DEVICE NVR'SEEP COW1R DIAMETER, PL c OC a 3. USE CLEAN GRAVEL, 3/4- TO i/2-INCH IN - - - - - - - DEWATERING AREAS To BE ` W DIAMETER, PLACED 2 INCHES BELOW THE TOP (cur' flLL ETC~~D SEGME?rt STORAGE ~ , CuP 2' z 2' MIN. ~ ~ OF THE BLOC DISSIPATOR PAD SMOOTH IT T( FLaoD sr %PE INVERT ~ T OF THE BLOCK ON A 2:1 SLOPE OR FLATTER ~ GRAOE 2oN i AND 1' MIN. ~ E PoP ~ 2 O W SMOOTH IT TO AN EVEN GRADE. DOT }~57 WASHEp ~ NEADWALL U Q ~ 1RENCH W/ 1.1 SIDE SLOPE REVISIONS I _ ~ °M° 2' x 2' ?nN. CuFOFF PoP ~ STONE IS RE( PERMANENT RCP CMP OllILET PIPE TRENCH w/ 1;T MpE ~OpE STONE IS R 2' NAX, - 1 t' 2' GRAVEL +k ~P W m 6 1't'-I RAP FlLTER BERM ECOMMENDED. ~ \ ~ GESIGI~ED TO PROTECT ~N oEruL ~ DATE DESCRIPTION REVISIONS 10 88 NOTE ADDRION S.S.. TE PERMANENT RCP CMP OUTLET PpE 4 - . y 1 3' NATURAL THAT GRNN 10 ACRES ~ PIPE ervERrs v ~ (V -nr B 1 "iqw - - OROU ~ LESS. z ~ 1. -FLOW=_-~ - ND ri 4 96 ADD TABLE d NOTES G.M CROSS SECTION 10 88 NOTE ADORgN Sg, , R $IDN$ W 41 R SIGNS ~ Ii - - DAIE11SgNS ARE cuss t Rw-RAP FILTER r - 496 ADD TABLE ~ NOTES 0.W DATE ESCRIP SECTION DATE ESCRIPTION ~ Aeiac W m YMFMUY ACCEPUS~ d SEDIM _ ~ ' ' uNtESS MST sroNE ENT -~rn-m_*T•~ rmED. wtc s~orlEHr m z > G~ngCtEAN our ~ ~ W J '-I'i j i ' RISER A B SIN 6 W SECTI N THRU gq Z RIS ER BAST N 7 E IN FILTER AN D CULVERT PIPE LU g ~ NO SCALE OC KA ND GR z AV EL D ROP e' MAx. FOR REPNR OF SILT UP~REAM END OF VARM9IE AS DIRECTED BY THE ENOINETR FENCE FNLURES, USE STORM DRAIN IN LE TP RO TE CTI ON 13 No. 57 WASHED STONE, OVERFLOW FOR ANCHOR WHEN SILT ~ ~ (EXISTING PIPE GR INVERTS O A ) FENCE IS PROTECTING wARNMC SKIN CATCH BASIN. ~ L J R IP ~ R AP _ H 0 3 R S o E S H 1/3 PIPE MIN. 1a-1/2 a ~ DIAMETER ~ 0 E IN MAT Q L ERIA E L T B A SI VARI N 4 STAPLED IN 4 ABLE MN. 10 CA. BIIOIMEOLII[ D A UNE WIRES MMES y >n ~ A: D PLaC X. DIMENSIONS E _ MP EMERGENCY SPILLW ELEV _ _ 2. AY INLET 39 25 ^ - ~ TOP OF DAM WIDTH 10~ 4.45 '1\` TO D BURY BOTTOM o H I 6 MIN. .-I I ANTI-SEEP COLLAR 6' ~ 259.0 ~ sEaYENr TRAP ~ E_~ I I _i l I=1 I l.= 111_ X OPADE OF PLYWOOD _ III- I s \ =III=III= _ =1 I ` - =I I I_I I = RIP RAP DISSIPATO - - - - - I I_I I I-, I I = - I I hI I I= R PAD SEE _ ~ I.I_ i- - DWG C 3 _ ~S,L~' - - ;~~~'al -r - - I - i ~ I. AN I ~ I_I I I_ - 1- I -I I - I_ TI-FLOATATIO ~ ° - I---i I I-I - I I L= I I N DEVICE - ~I-.III_ III II ~ ~ 4X4'X1' ~ s • r- STEEL POST - - - - - I l FvFI ~ilo -I I I~I I L I 1 ~'-^I ~ ~T11~-rTl l~l I I~I 11---~---~--1 I_'_I ~ ' TOP nr DIC~e THICK , . . -L III I i I - I L L! L=~ =1I U1- „v°"` 24" CMP 1 OF SPREADER DISS - I' OUTLET p1p 253.45 " NIR SIGN K NOTE: ALL PARTIALLY COMPLETED STORM DRAINS 3/4" EXTERIOR SHALL BE PROTECTED AT THE END OF SILT FENCE GEOTEXTI E FABRIC EACH DAY IN ACCORDANCE WITH THESE PLYWOOD L E IN - PATOR i-.I I_ I I INVERT 25'f1 ~---1 I - I' I= =PAD aw 1I1 -11 OUT 8 CMPO 1X 248.45 RP I I LET BURIED 1-1I -11 PIPE INVERT OUT DETAILS. STEEL FENCE PLYW00 6" ( SEDIMENT 248.2 t MIN. =111--I I f=111,.1 I I_-- STORAGE AREA D INLET _PROTECTION ~ Fu SLOPE FRONT MFw POST (TYP.) X49 X5 DEEP 248.4 ~ • ' ~ UPSTREAM END OF CROSS- STORM DRAIN OVERFLOW n GRADE SECTION . ftP d . OLRLET PPE D I F I I I 6' MIN. COVER 11 Q - OVER SKIRT • n THE I 1 I I E PROTECITJIa AFcEA, a 10 ` - - EMT" QW " 18" II 1 I 1/3 PIPE r! EXTEND WIRE 6" MN. INTO TRENCH DO NOT ENTER vo II D > ? R TEMPOPAW C,P INSER-MIMOQ11m DIRECTED BY bo o D >n o WATER LEVEL DMW STORM P AN VI W TINpI Mdl 1 MOM. FIIEE9(µRp TOP or wM WASHED STONE FILTER SIDE VIEW NOTES: WARNING SIGN DETAIL ACROSS PIPE INLET F WWRHIND SIGNS TO DE MADE OF DUIM & W AINEIPMW #AMML LETTERS TO BE 3' HOW ASNAI , CLaftY UpWLE AND swam At DRMIp LOW P01 ` sE WENT tTORW SIGNS 96ALL BE PLACE AT So' uvato NNTERNLS, NOTE; PLACE A SON AT EACH EM DF LNOYT net ?RoTEC110R AID to' oN CV= FIOIeA?= 10' GRAVEL FILTQ O NS BY FOR TREE PROTECION AWS LESS THAN noo' AV Ft1MRTDR PROM E NO I= MW 0Nt SON PER PROTECTION ARFA -USE SILT FENCE ONLY WHEN DRAINAGE AREA ATTACH SONS SECURELY TO FENCE POSTS AND FAMIC 1 1 ,.,ww !f ANN. !00! 3 .aPp 2 ,p DOES NOT EXCEED 1/4 ACRE AND NEVER IN MA6NTAW TREE PROTECTION FENCE TNROUGH(W OURAWN OF PROJECT. REVISIONS 1 HARDWARE CLOTH AREAS OF CONCENTRATED FLOW ADDITFONAL SIGNS MAY BE RE DATE OU1RE0 BY CRY OF RALEIGH MISPECnONS DEPARTMENT BISED ON ACiWL FIELD CONORON3. DESCRIPTION ' I L1 tupp wMao°mo,w,w PIPE fates SKO ~L • EAM oAm -END Of SILT FENCE NEEDS TO BE TURNED UPHILL PLACE A S" AT EACH END OF 04W TREE PROTEC77ON AND 30' ON CEmmR n1ERFAFTER. u LI U I STONE FILTFR INLET T CTION L i LEVEL LIP A"-FLOADVION MV= An-SEEP COUAR OF SPREADER n1MO1Mw CMP r R oammn PAD P L.A N no,a, W/ 10 MR er aP BLoPc STANDARD TEMPORARY SILT TREE PROTECTION FENCE 1A PIPE INLET 10 88 NO,E ADOMON po"VO T Aa OW OUW ~ PROTECTION (PLYWOOD AND STONE) 12 C LEVEL SPREADER DETAIL 4/90 ADO TABLE t MOR2 0.Y N .T. S RISER BASIN 8 17 G DRAWN SKO CHECKED RPH DATE 11 JUN 2003 90X ~ CD SCALE JOB No. RlBPCW STORM DRAINAGE & EROSION SHEET CONTROL DETAILS, C-3.2 1 2 3 4 5 5 6 7 8 9 r 8 2 ' - _ 250.8 -BERM - 2.5 - 3 c 15" PROVIDE MANHO _ OPENINGS MANHOLE ST ~ RING, COVER - - ~ ~ ` 250.8 1 ~ 1-~ 1 3 - E 4 SIDES EPS PER p & i0.8 M ~ R ETAII Ak EFER TO STAN S~0 ' e, • • ~ FOR WALL ~4RD RTCB DET p~ & SCAB CONSTR AIL _s I ~ : i e -i _ - - - 247.3 -P.W.E. - ~ ~ UC 3.~ _ TION - i - 1 8 _ _ I - 250.3 -TOP ~1 OF SLAB _ _ ~ - f _ _ ~i,_ _ 2.5 2.5 -~I - 24 t~ 9.8 -MAX, WAT ~ - _ ~ - 245.3 SHEIF ER SURFACE E LEVATION FOR 1 _ VEGETATED SHELF ~ - 242. - 1 (-I ~ ~ 0 BOTTOM 00 YR STORM _ - - - _ - - - ~ ~ - C ' ~ 248.7 ~ -TEMPO ~ , ~ . RARY STORgGE " = - - , i - OMPACTED STRUCTURA! - - - I _ - _ _ - - I ~ MATERIAL . OF 1 RAINFq(,L 42" RC - EVENT a -iii--iii-iii-i i ~-iii-i ~ i-i i i-iii-i ' ~ ~ ~ _ - 247,3 _ p m • 5' 0• ~ ~ ERMANE ' NT WATER SECTION THR OUGH PON D 1 • . ~ ELEVATION ' 'a. B NOT TO SCALE , . 0 a .,a ~ ~ I I I I I Aq i' w ANCHOR MIN. (TYp~ a AA TO BASE SECURELY ) I I I wAlts KEYSTONE RETAINING I II ' a 8" pl PIP I .I., W E WALL I I .I /VALVE ASS I I 242.0 I EMBLY 10' fi . POND $0~ ~.:II.~ " . 242.0 . . 3 254.3 -BERM .M i - - • / f . • • d' 250.0 -P.W.E. ~ ~ ' ANCHOR t0 Q1SE SECURE I- 1 WALLS lY - i - - _ 2.25 I CONCRETE @AS _ _ 248.0 -VEGETATED - - - I SHELF - - 1 S E. . E D M T IN. OP C 1 THI ~ _ - - C Z AT CK C H B I N 2 5 I ~ ~ ---i - C VEGETATED H -J I l SELF -I (TYP.) - j ~ - - _ -I COMPACTED STR - UCTURAL -I - - 241.2 - BOTTOM - ~ MATERAL _ _____.I i~,~~~~~~~~o~~~,,w 2~~,, ESN CARP 1, i~ I - PRO -"~`'-.r ~E ~pE MANHOL ~ 9 9' ~ - - ~ 15~ OPENINGS MANN E RING, E ALL 4 SI a.E STEPS pER COVER ~ DES DETAIL Mq ~ REFER TO STAN k S FOR W DARD RTCB . SECTION THROUGH P OND 2 e. ALL ~ OE1 Q SLAe AIL AF . • • CONSTRUCTION 9 •.•H~ ~•r ~ 3. . _ lQ NEE . ~ 253.9 - ......••"1L r . NOT TO SCALE tOP OF SLAB 'b ND _ 253,3 _ MAX. r W ATER SURFACE ELEVATION FOR - • 100 YR STORM ' ~ ~ ~ ~ 252.3 _ MANHOLE LID ORARY STORA 42" RCP ` ~ - NFAI,I EVENT - 250.8 -TOP OF BERM (60" RCP '.a ' R /86) ~ , " - 250.0 - P M'~Y 249.8 -TOP 7 O ERMANENT yyq TER ELEVATION S~OA f 3'1 'a. , 2" PVC D RAWOOWN PIPE. EXTEND 8" BELOW PERMANENT WATER ELEV. A. 247.3 - P.W.E.- " . • . ~ SLOP E 6.1 I ' I I I I 1' MI ANCH N. Z OR BASE SECURELY (TYPIC,r,~) ~ I I I TO WALLS Q. g S~OA F II ~ • a• I~ DI PIPS y I II 241.20 6B I . w/ w~yE asSE V) I 241.56 g I• MBLY 5 POND . , I BOTTOM • • ~ ' f . 241 W a ~ ~ .J •Z q 1.0' " r • ~ ~ ~ _g __L_ 242.0 - 80TTOM " . '•a • , T~ I ANCHOR V ~ L O EASE SECURE W ~ ~m TO WALLS LY Z Z i 6F~, JUNCTION OX - - B 25A DRAW DOWN BOX CONCRETE 9~1SE. M R IN. 1' Tl~lc AIS K EDTPrT~ Q tr ar , , ~I I W V E NOT TO SCALE 66 ~G e s MANHOLE FRAME do ~ COVER W/ RISER MANHOLE UD J O TOP - 26a.3t ~ 254.3 -TOP OF BERM PHALT SURFACE ~ ~NNOIE C FRS ~ OVEp W/ RISEk '~k 253,2 -TOP SHOP . , f 3.>' AS>~HALT SURF ACE 3" PVC DRAWOOWN PIPE. ~ • , EXTEND 8" BELOW PERMANENT ~ wAt~a Fi Fv WATER ELEVATION zw 30 + ADO 6" DEEP GROUT TO SLOPE 6;1 250.0 - P.W.E.- BOTTOM OF ' R BOX AFTER ' ~ • • I c ESTRICTOR PLATE HAS y o BEEN INSTALLED ' 1.00' • . • ~4 PRE CAST CONCRETE SPUTTER Box STEEL STEP 48' 00 RCP OFF-SITE S~Op f Z1 10- m'P• OF 6) OUTFLOW PIPE 54 • 1,OS 261.23 . WATER ELEVATION (INLET MOM CA 37 2.50 2.50' 48„ RCP o 1,0Z F 1.4' ~ i ° (OUTLET TO Cl 042) R • NS 241.2 -BOTTOM b Y: 41r M • STEL up (Ouluff To o (tYP. OF 6) (W% cc)) 8K T 21 JEL J hii I' Dw JUNCTION BOX 6 - 3 (DRAW-DOWN 80X 5x5 RESTRICTO R PLATE 285.22 NOT TO SCALE BOTTOM - 254.72 ' 258,42 ' . ' ; ' . , 255.22 48 RCP ON-SITE OUTFLOW PIPE W • / 5'x5, RESTRICTOR PLATE (ORIFICE . ' ' . DIAMETER - 26 ' 1.00' 3,00 6.00' r 3.00 1,00' 12.00 1.00' 6.00' 1.00' G SPUTTER BOX #38 DRAWN SCALE: 1 a 3~8r CHECKED RPH DATE 08 JUN 03 MVQ f~yEyy) SCALE JOB STORh~~ g6pCW SHEET CONTR O-L DETA C -mm 3 1 2 3 4 5 5 6 7 8 9 , ~ , , ~ -;1',~' ''~L ~ C lli r1~ ; , r, ~ ~ ~ ~ ~ ~ i ~ ` ~ ~ r _ % A 1 r ~ n ! ~ - - - _ ~ 1 ~ ~ ~i I ~ i r i i ~ i ~i ~ ~ ~ ~ ~ ~ ! i \ i v ~ ~ j i i ~ ~ \ } ~ ~ I N r ~ ~ J ~ ~ ~ 1 \ ' ~ ' ~ ~ ~ i ' 1 \ ~ ~ ~ ~ ~ i V ~ 0 ~ \ 1 ~ ~ ~ i i ~ i ~ f ~ ~ ~ 1 A ~ t I 1 ~ ~ ~ ~ ~i ~ \ 1 i ~ ~ , ~ i ~ , 1 ~ ~ ~ ~ r ~ ~ I ~ ~ ~ ` 1 1 V i A I 1 1 i ~ 1 ~ ~i ~ ~ < 1 : A ~ 1 V ~ ~ ~ i V ~ ~ A ~ ~ ~ ~ - i ~i ~ ~ N ~ i ~ ~ ~ 1 ~ 'ti ~-t ~ A . ~ ~ r ~ ~ < ~ A i ~ , ~ A ~ ~ / - 0 ~ ~ x - - - - ~ ~ I i ~l ~ ~ , s I i I i ~ ~ ~ ~ \ m ~ ~ ~ ~ 1 ~ 1 V A r ~ ! ~ ,IC ~ i r}.- ~ 1 V ~ ~ ~ 1 \ ~ E ~ ` ' 1 10 ~ ~ ~ li ~ ~I 1 ID ~ \ ~ ~ ~ l v \ ~ ~ ~ W c , `G' ~ ~ ' ~ ,ter ~ ~ ~ Z ~ ~ ! 1\ ~ 1 - l i ~ d' 4 ' \ f ~ ~ ~ ~ ~ ~ - ~ ~ \ ~ ~,A ~ CO ' \ ~ ~ ~ \ V ~ li d!~ C ~ ~ i ~ ~ A ~ ~ ~ V ~ E ~ - M)+~ Q ~ ~ 1_ ~ i A. ~ ~ ~ 1 V V ~ 1 ~O O ~ B ~I ~ i ~ r ~ ,v A ~ ~ - ~ ~ ~ ~ ~ ~s c n E ~ ~t ~ r ~ ~ A ~ ~ A ~ A~ A m~ ~ ~ ~ ` ~ A r ~ ~ M _ ~ ~ ~ \ ~ A ~ I i ~ ~ CD Ol ~ N ~1 ~ r ~ I ~ 1 `J ~ A V ~ A N ~ I ~ ? ~ ~ ~ ~ ~ ~ 0~ I ~ r A { V ~ ~ \ \ A ~ s,?~ ~ ~ ~j, I i ~ i A A ~ 1 ~ ~M, i ~ ~ _ I ~ I ~ ~ ~ ~ / \ V ~ \ ~ \ } i ~ ~ ~ I ~ , L~ ;t ~ f j r~ V '1 ~t ~ ~ I ~ - i ~ ~-J-, ~ ~ ~ ~ ~ ~ ~ \ ~ , ~ - ~ I ~ ~ V' ~ ~ y ~ ! ! 1 ~ 1\ t \ I ~ ~ ~ ~y ' ' ~ ~ i ~ ~ ~ i ~ ' ! 1 J ~ ~ ~ i ~ ~ \ '1 ~ I ' ~ ~ ' \ ! 1 f i ~ ~ ~ \ ~ ~ ~ ~ ~ 1 ~ 1~ ~ ~ \ ~ ~ i ~ ~ A 1 ~ ' ~ ~ ~ ~ _ ~ ~ ~ I ~ I ~ ~ 7 C~J ~ ~ ~ - i ~ ~ ~ n ~ ~ ~ V ' ~ ~ ~ o C ~ ~ ~ ~ ~n ~ t~ \ ` ~ O s, i-~ ~ ~ ~ 1 NUUp N ~ ~ \ ~ ~ ~ 1 why 1 ~ i i'~ • GPI ~ ~ _ - ~ • i 1 i ~ 1 ~ I - ~ ~ S j 1 I ~ 1 j 1 / ! 1 ~ I ~ ~\A\ ~ V ~ ~ ~ 0 1 r ~ ~ ~ ~ 0 1 1 0 ~ A V ~ ~ ~ ~ ~ ~y~ / ~ i ~ \ ~ ~ A ~ A • ~l ~ ~ ~ ~ ~ ; 6s ' ~ ~ V ~ r 9 C~~ ~ ~ i / ~ ~ l i' ~ ~ i ~ ~ t ; - ~ ~ ~ 3 i ` i , ~ / ! ..V / ! t ~ ~ A ~ ~ I \ i . ! r ~ ~ 65 ~ I i i t I ~ 67 \ i i % _ r ~ ~ ; ~ \ / \ I ~ I \ , _ ~ YJ I ~ ~ ~ ~ ~ ~ ~ t ~ i r / ' ~ , ~ ~ ~ 1' ~ ~ r ~ , s i ~ / i r' ~ ~ ~ ' I i/ / f i / i ~ / . i t l i ~ . r i 'I ~ ~ ~ ~ 1 S ~i ~ A ~ ~ N ~ I j 1 J// I i~ / • ~ yz ~ ~ ~ r ~ I ~ l ~ ~ ~ ~ ~ I ~ ~ \ ' ; ~ ~ i ~ ~ ' ~ ~ ~ ~ 5 ~ . A ~ / ~ ~ ~ ~ 1 A A D ~ r' b ' ~ ~ , i / ~ ~ ~ / •1 ~ ' ~ ' 1, , i ! ~ ~ ~ / ~ A ~ A ~ 2441 - F~ / ~ F ~.-~y/~ + ~ A 63 ~ ~ i ~ 64 64 ~ ! ~ ~ ~ ~ ~ 1 ~ ~aW ~ ~ ~ i l ~ ~ d N ' ~ --~5 i~ V ' 1 i 1 ,i ~ P~ i. ~ ~ ~ i i ~ i ~ - , v I ~ Z ~ / ~ ~ ~ ~ .~;r . ~ ~ r~ o w Q • _ ~ ~ ~ ~ o~ ~ j ~ f - _ ~ ~ / / ~ ~ r ~ ~ Z d - - / i ~ ~ i ~A / ~ l , -r ~ ~ ~ o~ 2 ' ~ ~ / ~ I • Z Q Ow ; .rte y-..~ - - r / _ ~ ~ ,a . , ~ 1 ~ i~ ~ ~ ~ ~ w ~ ~ ~ l \ , r. 1 a ~ ~ a m - ~ ~ _ I Z > i . ~ ~ _ i i ~ , ~ ,r~'""~ _ ~ ~ ~ `_"ti-~ INV = 24 I ' i W ~ 3.70 ~ ~ ~ W i 5 ` Z ~ j ~ i - ~ i ~ , ~ \ ~ ~ -z ~ W y 5 i l ~ ~ Z 0 ~ { ~ ~ 1 ~ ~ E . _ _ i ~ ~ l~ r' - J , 1 _ ~ W ~ r ~ ~ 1 ~ ~ . _ ; 1 O t , - y- _ _ , ~ ~ ~ ~ J ~ ~ - 1 l ~ i r ~ 1 ~ ~ J r s ~ t/ ~ ~ ~ ~ _ - i ~ ~ ~ ELI ITS Of EXIS . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ! FOREST D VEG A ~ ' ~ ~ ~ ~ / ~ ~ ~ ~ TION TO RE AIN 1 v, i ~ . ~ ~ - ~ ~ ~ 5 ~ 1 ARTER C~NSTR CTION N ~ ~ ~ ~ ~C \ _ _ , . _ r , / - , ~ ~ ~ ~ A 1 ~ ~ i 1 0 ~ ~ ~ ~1' ~l~r ~ _ _ / i ~ , ~ / • 1, i , ? r,. . ~ , ~ ~ ss~ I 1 <tp r I I l I I 11 1' 1 v v v y. PoNa' # 1 1 1 1 \ REVISIONS BY I ~ ' Imo. \ \ ~ \ \ \ \ ~ 2 54 25 0 - 2 S ~ 8 2 6 2 + A + A .LL - \ cT I l _ A 31 262 5 m D~ 1 DRAWN DLH CHECKED d RPH NORTH N E 08 AUG 2003 SCALE 0 , 20 40 P 20 60 JOB No " - RIBPCW J, SCALE IN FEET L a- SHEET ENLARGED POND PLANS ¦ 1 2 3 4 5 6 7 8 g 0 X ICS-6 ti r ' LJR-2 SEASONAL COLOR o ~ ~ BT-12 ~ ~ ~ i ~ 2 ~ ' LM-250 WIC A-•r r ' ' ®12" O.C. r . I c N/F THE BODY, LLC i I~ O i G < A ~ 1 , i 1 ~ ~ ~ i ~ ~ 9 ~ \ 2.92' 'A i d ~ ~ I ~ ~ r, O w 11 - - - - A - ~ ~ i o, ~ d - c ~ / ~ ~ 1~~ ~ 7 ~ 0.5 / • S 84'33'18" E 1131.92' _ m ed ~ '.e e,~'.° ~ 12.18 . d o N ~i~ i I M ~ 0.77' i ~ c .OR~rTt01V"PARKWAY ~ ~ W TD-1 LS-3 TD-4 s- TD-3 - _ ROPOSED CnnBP-OR~T-fOnf~ L LS 3 TD 1 y i ~Z ~ o ~ - TRACT ID SIGN PLANTINGS - - c ~ a~ - - ~ sca~: ~ -20 _ n. 1 f N/F PEGGY W. JOHNSTON ANDS ~ I No o`o JAMES MARION WILBURN/ - • • • 1'r• A ~Z~n E APPROXIMATE LIMITS OF ~ _ 6.77 , ~ ~.T.v~ I EXISTING WOODED ~ EXIST. FORESTED VEGETATION ~y o ~ ao op a JCP-46 ~ BN-2 I ~ - ~ ~ =s % AREA REMA J TREE PROTE TION TO REMAIN (TYP,) M of of .r FENCE ' 1 ~ h I ~ J ~ ~ ~ LI-3 I . ~ ~ ~ 20 ~ r 1 v N F HEDINGHAM PROPERTIES LLC EP-45 B ~ R 0 F CE / ' ~ I ZONED: I-1 ~ ~ 5' O.C. ~ / , ARF-5 ~ USE: VACANT QPA-6 LI-3 \ I ~ 18 O QL-9 / !TM ~ ~ ~ JE-280 SV-438 ; CJ-42 ~ ' AR-3 i PC-496 ~ a~ I ~ i j - \ i i / \ ~ ~ GRASS ALL DISTURBED I I AREAS ~ ~ ~ ~ 1 i~ ~ ~ i PROVIDE 4' DIAMETER BY 3" DEEP MULCH RING ~ ~ ~ I AROUND ALL TREES IN a AR-i LAWN AREAS ~ JUN-16 „ I „aaun~n+~n,ap PK- 7 . ~ ~ S. ~ /j 1 ~ ,a pl1D QPA- \ ~ ~ ~ 9A ys ~ CD- ~ ~ 4 I n ~ W A = r X ~ % > X~ M ~Ly? 31 ~ / II ~ n ~ I I y. Z: ~ I l i 3 . d 1. ~ u AR-1 / ~ y C ~ T ~ - .~UPERLE~J I ER X292 ~ 25 W P ~a . ' r / ~ ~~4 11111111 /1NN1r~ vJ-to \ ~ cD-1 C-192-EGL-OL f I , • ~ 11 SEED ALL SLOPES ON DETENTION 11 ' ' ' ' ' ' ' ' / ~ PONDS THAT EXCEED 2.5:1 WITH ~J s II 20 ~ ~ ~ ~ WEEPING LOVE GRASS. REFER TO 203,942 S.F. _ it ' ' • ' ' ' ' ' GRADING PLAN FOR CONTOURS JUN-24 • • ' ' ' ' • ' N F PEGGY W. JOHNSTON AND ~I F.F.E. - 2720 LJ % / • AREA BELOW LEVEL SPREADER (MIN. 50' / ( 1 JAMES MARION WILBURN y •i AR-1 << JE-318 LONG x 23' WIDE TO BE SEEDED W ~ ZONED: I-1 C.U.D. USE: VACANT rr SV-307 ) / ~~J,. ~ • • WEEPING LOVE GRASS TO PROVIDE THICK . ~ \ s 4 r, - ' PC-285 GROUND COVER• OAK AND MAPLE o ,Q PROVIDE 3" DEEP ICR-10 ~ SAPLINGS (18" TALL) SHALL BE ADDED : ' ' \ AS REQUIRED TO PROVIDE DENSE 1 PINE STRAW MULCH ~ + r/ _ - 1~ FORESTED VEGETATION. ~ / IN ALL SHRUB BEDS ~ ~ } PK-3 ~ AND GROUPINGS I I ~ JCD-30 PK-3 1 (10 ON CENTER) QPA-4 . ,~.T,, .f~.. JCD-30 l \ 1 CD-2 i f ~ n STORMWATER POND \ \ 1 VJ-.12 I ; j ~ ~ \ \ LT-8 I ~ ~ 4 . . Il 1 EP-15 J r~ ~ . . KP-4 ~ ~ ~ I t PA-5 8 / 't , ~ KP-5 • ~ LANDSCAPE RE UIREMENTS _ - - LS-3 LS-1 LS-1 - ~ - - ~ ~4.' ~ ~ Q AR-1 ~ TPY ~ 2 CC-18 LS-1 / - - - B ICC-1 C-18 LS-1 LS-1 LS-~- LI-2 ICC-18 ICC-18 CC-18 ~ I~ ~ AR_ STREETfARD/ SHOD REQUIREMENTS - a LS-1 ~ QPA1-1 I ~ ~ D } ~ } I -16 I CD-3 CORPORATION PARKWAY: 945 L.F. N ICC it LR-30 ` ~-2 ~ a ~ ~ ` . ~ a ~ T I-2 6 TREE DIA. PER 50 LF REQUIRED ~ LS-2 VJ-7 945 L.F./50x6 -114" TOTAL TREE CALIPER REQUIRED (f) W QL-4 i ~ i r CF-3 _ ~ + • o- + a o- a PROPOSED PT-5 EXISTING TREES EXCEED REQUIREMENTS FOR TOTAL CALIPER Z ~ MC-12 -,,3 . • VJ-12 ¢ + ~ + } • CC-23 ICC-18 5 TREES PROVIDED TO MEET MIN. SPACING REQUIREMENTS RErAI~ ~ a PROP JF-7 0 W QPA-3 a a _ 12,000 SF OSED ~ ~ } } • • 8 OFFICE CD-3 NEW HOPE ROAD: 398 L.F. a U W ~ } OC Z ~ JF-8 a a o- a ' S8 ~ a a ~ • } 9,600 SF 6 TREE DIA. PER 50 LF REQUIRED Z LI-2 VJ-7 ~ ~ W W Z 1 3 4' 4 LT-1 QPA- + QPA-13 ICC-120 QPA-13 26 398 L.F.~50x6" = 48 TOTAL TREE CALIPER REQUIRED 3~ ~ QPA-12 14 ~ W 3.5 TREES PROVIDED ~ p ? CF- ZV-1 ~ P LT-2 Z Q ~m - / - _ _ V W H ICC-12 ICC-1 - _ _ _ NEW BERN AVE: 255 L.F. (SHOD 3 PLANTING) Z F JUN-20 N_1 + ICC-12 ~ 62 ( - - PT-2. V 10 SHADE TREES N R Y 47 VJ-6 CC + JUN-20 ~ cc - ' a a 2 ~ & 6 U DE STOR TREES/100 LF REQUIRED Z ~ ~ W ~ a e +,~,Y~, 32 SHRUBS PER 100 LF REQUIRED ~ W W Z 32 CC + I LT-1 33 CC 68 ZV-1 I-3 LI-1 255 L.F./100x10 = 26 SHADE TREES REQ D. a, m ~W 68 58 t LI-2 CC-3 255 L.F. 100x6 = 15 UNDERST RY W / 0 TREES REO D. ~ Z > + JF- 48 66 + 68 33 _ JUN-~ ICC-18 ZV-5 ~ JF-8 _ m ll~ ~0 255 L.F./100x32 - 82 SHRUBS REQ'D ~ W r ~ 68 • 34 CC ~I 1 } a QP-2 .0~ cc' + + } W W J I 1g NEW BERN AVE. 546 L.F. (SHOD 4 PLANITNG) Z = vJ-12 = + cc AR-1 3 SHADE TREES & 4 UNDERSTORY TREES/100 LF REQUIRED W Z ~ + cF- + / _ + • ~ + 50 SHRUBS PER 100 LF REQUIRED O JF 6 + 28 T ~ 546L.F./100x3= 17 SHADE TREES REQ'D. Z /i 19.4' ~ RASS 546L.F./100x4= 22 UNDERSTORY TREES REQ'D. W ~ ICR-23 N_1 ZV-i + PK-4 ~ ~ 62 31 + TRIP PT-2 CARL R. GUTTMAN 546L.F./t00x50= 273 SHRUBS REQ'D p JUN-2 JUN-2 + GRASS ZV-1 RASS / I BT-12 QPA-9 STRIP UN-2 TRIP - ~ vJ-7 v LOSS ZONED: I-1 SEASONAL + 44 JF-8 USE: COMMERCIAL NEW BERN AVE: 354 L.F• (SHOD 4 PLANITNG) Q 'RIP t 31 23 CD-3 3 SHADE TREES & 4 UNDERSTORY TREES/100 LF REQUIRED ~~ti~,~a~G~ ~ I + - 50 SHR P ~_I CC 3 LT-2 UBS ER 100 LF REQUIRED QPA1-5 ~ 354L.F./100x3= 11 SHADE TREES REQ'D. UN-20 cc i PT-3 354L.F./100x4= 15 UNDERSTORY TREES REQ'D. E + VJ-7 354L.F,/100x50= 177 SHRUBS REQ'D + • 4 LS-1 + ` JF-9 TRANSmONAL PROTECTNE YARD ~1 LS-5 LS-1 ~ ' + ICR-9 + + QP-2 582 LINEAR FEET (1 /2 TYPE D TPY, 18' AVERAGE WIDTH) ICR-9 2.5 TREES & 15 SHRUBS/100 L.F. REQUIRED ~ 15 TREES 87 SHRUBS REQUIRED/ PROVIDED I ~ ~ + LS-1 _ LS-1 7 ~ T C Ls-1 Ls-1 Ls-t ~ AR-1 -1 = ~ = TRANSITIONAL PROTECTIVE YARD ~2 _ ~ T • ICR- _ \ ICR-9 ICR-9 ICR-9 AR ICR-9 ICR-9 190 LINEAR FEET (TYPE D TPY, 35' AVERAGE WIDTH) + LI-2 LI-1 M BN-1 4 TREES & 19 SHRUBS/100 L.F. REQUIRED ~ ~ ff ~I~ LI-2 I 2 ~ CC-3 8 TREES & 36 SHRUBS PROVIDED } } + } ~ fi~ ~ ~ TRI-ARC FOOD SYSTEMS VSA SCREENING - - - 'l _ BN-2 ZONED: 1-1 CORPORATION PARKWAY - - - - - - - - - - - USE: COMMERCIAL 1 SHRUB 6LF OF VSA WITHIN 50' OF RIGHT OF WAY * AR-3 ANGLES RESTAURANT 270 L.F 6 = 45 SHRUBS REQUIRED/PROVIDED BOJ I PC-3 + + SP-41-02 NEW BERN AVENUE 1 SHRUB /61-F OF VSA WITHIN 50' OF RIGHT OF WAY 1 I AR-8 REVISIONS BY VJ-23 CD-94 GRASS- I J GRASS 1-I-1 BN-3 AR-3 182 L.F 6 = 30 SHRUBS REQUIRED/PROVIDED 36 LI-1 PL-18 14 APR 2003 i PL-14 I PL-16 GRASS + VJ-35 V.S.A.: 604,860 S.F. (DEEM CNL) 8K~ QPA1-8 PC-3 v v ~ i 1 TREE/2000 SF & 1 SHRUB/500 SF REQ D 11 JUN 2003 i ----GRASS UN-18 _ -18 -18 - - - - JUN-18 BT-6 604,860 S.F. /2000 = 303 TREES REQUIRED (90% CD) DLH + I i I LT-1 604,860 S.F./500 = 1,210 SHRUBS REQUIRED lT-1 GRASS I c JUL 2003 F BT-6 N-4 JUN-18 C 100 UNDERSTORY TREES ALLOWED FOR VSA REQUIREMENTS IN LIEU OF CREDIT FOR EXISTING (PERMTS) SKO PK-3 LT-1 PROPOSED i PK-3 TREES ALONG STREAM PER AGREEMENT WITH THE RETAIL a CITY OF RALEIGH ZONING/INSPECTIONS DEPT. 29 JUL 2003 a TRACT ID ICR-10 PROPOSED a 41 6,200 SIF 2' WIDE GRAS RIP (EXPRESS REVEW) $I(O + SIGN RETAIL 41 T-1 37 1 v i PROPOSED (TYPICAL RETAIL AR-1 NOTE: 08 AUG 2003 SEASONAL I 11,025 SF COLOR PT-3 J P 7 2 ~ 2 C 1 11,225 SF SEASON L CDLHI OLOR (DWO REVEWI ~o ,;r~, r~ •'I;;~`','~ 1. REFER TO DRAWING NO. C_7.1 FOR LANDSCAPE PLANT LIST AND DETAILS. I l~ + + + 2. ALL ABOVE GROUND UTILITIES SHALL BE SCREENED aasn FROM RIGHT OF WAY AND ADJACENT PROPERTY. -1-- 107 y J " 0 LR-88 EP-115 LR-158 QPA-6 KP1-4 CC1-3 GRAS QPA1-2 KP1-4 QPA1-3 CC1-3 CC1-2 AR1-3 J KP1-3 CC1-3 PT1-2 KP1-4 PT1-2 QPA1-4 CC1-4 CC1-3 QP1-2 CC1-3 QP1-2 KP1-3 CC1-3 QP-6 QPA1-5 DRAWN KP1-4 AR-4 CC1-3 EP-89 KO CHECKED i EP1-41 QP1-3 GPW/RPH LR1-41 cc 1-3 NEW BERN AVE. U.S. HIGHWAY 6 NORTH DATE 31 MAR 2003 G SCALE 1f,601 546 L.F. 25' AV. WIDTH SHOD 4 PLANTINGS 255 L.F. 50' AV. WIDTH SHOD 3 PLANTINGS ''INGS 354 L.F. 25' AV. WIDTH SHOD 4 PLANTINGS 0 60 120 180 JOB No. RIBPCW EXCLUDING DRIVE (EXCLUDING DRIVE) SCALE IN FEET SHEET LANDSCAPE PLAN. c 7 OF SHEETS 1 2 3 4 5 5 6 7 8 9 NOT ~S. 1 • ALL PLANTS MUST BE HEALTHY, VIGOROU PESTS AND DISEASE. S MATERIAL, FREE OF ++L~ ~'Lr+Nl~5 MUST dE CONTAINER GROWN 0 A LAPPED AS INDICATED IN THE PLANT LI R BALLED AND BUR Z 3. ALL TREES MUST BE STR ST. ~ F,., MEET ALL RE AIGHT TRUNKED AND FULL HEADED Y Q ._.I QUIREMENTS SPEGFlED. AND eo TA ~ 4. NI ~ ALL P CAI CANTS L ARE NA SUBJE M E Q CT TO THE APP CO RovAL M M OF TH ON IANDSCAPE E A ~ N ARCH T R AM C3~ I ECT Ac E BEFORE DUR er rubrum U ING, AND AFTER INSTALLATION. AR1 October Glo 0 ~ R 5. ALL TREES MUST ~ cto EM BE GUY Acer ru ber GI AR ED 0 brum o KS R STAKED AS SHOWN October Glo Mo le DETAILS. IN THE ARF r r r m m October Glo Ma le 33 2" 10-1 ' n FI m 3 2 8&B SHOD 3 ^ 6. ALL PLANTING AREAS MUST BE COMPLET mn F m I 3.5" 14-1 ' ELY MULCHED AS C 6 B&B SHOD4 SPECIFIED. r i n n is 'F r 1 -1 7. PRIOR TO CONSTRUCTION, THE CON CC1 Cercis canodensis ' t P n F r t P n R TRACTOR SHAL Forest Pon _ RESPONSIBLE FOR LOCATING ALL UNDERGROU L BE CD Cedrus deodora s Forest Pon Redbud ' ND UTILITIES AND CF Deodora C 30 X ~y SHALL AVOID DAMAGE TO ALL UTILIITES AND Cornus flarida der 6' min ALL UTILITIES DURING THE SHALL AVOID DAMAGE TO Flowerin po 13 x B&B SHOD COURSE OF THE WORK. THE wood g 8 mm B&B CONTRACTOR IS RESPO NSIBLE FOR REPAI 8 TO UTILITIES,. STRUCTURES SIT RING ANY AND ALL DAMAGE „ B&B VSA E APPURTENANCES, ETC. WHICH ~ OCCURS AS A R ESULT OF THE LANDSCAPE CONSTRU ~ ' 8. THE CONTRACTOR IS RESPONSIBLE FO CTION. R VERIFIING ALL „ , QUANTITIES SHOWN ON THESE PLANS BEFORE „ - 9. THE CONTRACTOR IS RESPONSIBL PRICING THE WORK. PK Prunus serrulata 'Kwa - ' E FOR FULLY MAINTAINING ALL nzan Kwanzan Cher o PLANTING (INCLUDING BUT NOT LIMITE PT Pinus taeda D T0. WATERING, SPRAYING, PT1 Pinus taeda Lobloll Pine 11 2" m MULCHING, FERTILIZING, ETC.) OF THE PLATT 8 BdcB VSA ~ NG AREAS ANp LAWN L uercus laurifoha Dorlin ton Lobloll Pine 40 2 8 min g& N UNTIL THE WORK IS ACCEPTED IN TOTAL BY TH P Da ' 4 B SHOD 3 10. THE CONTRACTOR SHALL COMP E OWNER. uercus hellos rlm ton Oak 3.5 14 min B&B VSA LETELY GUARANTEE ALL PLANT QP1 Quercus hellos Willow Oak 13 10-12 SHOD 4 MATERIAL FOR A PERIOD OF ONE 1 P 1 ~ TPY ()YEAR BEGINNING ON THE DATE Q A Quercus alustris willow Oak 0 t0_1 c OF TOTAL ACCEPTANCE. THE CONTRACTORS 7 & W HALL PROMPTLY MAKE QPA1 Quercus alustris Pm Oak 3.5 14-16 B&B ~ Z ALL REPLACEMENTS BEFORE OR AT THE END TD T Pin. 84 SHOD 4 O PERIOD. OF THE GUARANTEE axodium distichum ~°k 2 10-12 B&B SH 1 ZV Zelkova Bald C ress 28 3, OD 3 ~ ~ 1. THE ARCHITECT SHALL APPROVE THE serrate Villa a Green g 5 14-16 B&B SHO 4 e PLANT MATERIAL PRIOR TO IN STAKING LOCATION OF ALL villa a Green Z Ikova 2 10-12 B&B ST ETYARD x o STALLATION. 16 2 10-i ~ STREETYARD to M ~ 12. AFTER BEING DUG AT THE NURSERY SO B&B O o 0 B URCE, ALL TREES Shr LEAF SHALL IN u bs BE ACCLIMATED FOR TWO (2) WEEKS UND x ~ ^ ~ SYSTEM PRIOR TO INSTALLATION. ER A MIST T ris th n er ii 'n w 13. ANY PLANT MATERIAL WHICH DIES, TURN CJ Cle era Ja onica na ri n p M~+ S BROWN, OR Ep m r r a~ a DEFOLIATES (PRIOR TO TOTAL ACCEPTANCE Elaea nus Pun ens Cle era 1 " PROMPTLY REMOVED FROM THE OF THE WORK) SHALL BE P1 I n Thom Eleo nus 42 „ n A C NT ~ W SITE AND REPLACED WITH MATERIAL P n n 264 24 n TPY OF THE SAME SPECIES, QUANTITY, AND SIZE ICC Ilex rnuta Larissa I n 18 PLANT LIST SPECIFICATIONS. AND MEETING ALL ICR Ilex cornuto Rotund ri ° Holl 41 4 n SHOD TPY ICS Ilex crenate Stoke a Dwarf Horned Holl 527 18 °n H 14. STANDARDS SET FORTH IN "AMERICAN s n STANDARD FOR NURSERY Sto s Ja anese Holl 158 18 VSA STOCK" REPRESENT GUIDELINE SPECIFICATI r mmuni e r ssa n VSA CONSTITUTE MINIMUM QUALITY R ONS ONLY AND SHALL Pr r ni 6 12 EQUIREMENTS FOR PLANT MATERIAL, ri 1 4 ant ACCENT 15. ALL SHRUB, GROUND COVER AND SEASO ~ ~ 1 on q PLANTING BEDS ARE TO BE COMPL NAL COLOR ANNUAL „ NT ETELY COVERED WI n MULCH TO A MINIMUM DEPTH OF FOUR IN TH HARDWOOD " 16. CHES. R i u n rum recurvifoli m " LOCATIONS OF EXISTING BURIED UTILITY I R cant PLANS ARE BASED UPON BEST AVAI L NES SHOWN ON THE R1 i u r m r ecurve Li ustrum cant CABLE INFORMATION AND AR rvifoli m Recurve Liu 300 „ BE CONSIDERED APPROXIMATE. IT SHALL B E TO strum 18 n SHO E THE RESPONSIBILITY OF 41 24" D A THE CONTRACTOR TO VERIFY THE LOCATIONS n H ADJACENT TO THE WORK AREA. TH OF UTILITY LINES AND PY E CONTRACTOR IS RESPONSIBLE " FOR THE PROTECTION OF ALL UTILITY LINES " CONSTRUCTION PERIOD. DURING THE 17. SA Gro FE, CLEARLY MAR undco KED PEDESTRIAN vier Per To AND VEHICU en~als ALL ADJACENT PROPERTIES MUST BEM ~ ACCESS , , THE CONSTRUCTION PROCESS. AINTAINED THROUGHOUT ru ~ I 18. DURING THE GROWING SEASON ALL ANN „ A HEALTHY, VITAL CONDITION THROU UALS SHALL REMAIN IN 4 12 o.c. GHO De UT TH ten E CONST tIO PERIOD. RUCTION n Po nd P x Ian is 1 g• ALL PLANT MATERIALS QUANTITIES SHOW n CONTRACTOR SHALL BE RESP~NSIRI F „ N ARE APPROXIMATE. PC Pon a eri _ f h ~ nR •~'Mp cTr~ ~J4'~?Jf~~ Ji ~ ~ci b v ~'~c eretweed 111tNIN7Nh~" r,~nTIIV(, FiEUS AT SPACING SHOWN, ahdus . 2 0, c. Q^ 20. ALL DISTURBED AREAS ARE TOR Bullrush 781 Pr I ~ ECEIVE 4" 2' o '~i' OF TOP SOIL, 745 •c• ~ Q~ MULCH, AND WATER UNTIL A HEALTHY STAND Pr I OF GRASS IS 2 o.c. r'~'~ NDS OBTAINED. THIS IS EXCLUDING ALL LANDSCAP ~ ED ISLANDS AND = p ENTRANCE AREAS. ~ 21, REFER TO WALMART SPECIFICATIO a ~ NEEDED FOR IMP NS FOR ALL INFORMATION ~ ~ X CEMENTATION OF PLANTING PLANS. o d ~ DETENTION POND PLANTING SPECIFCATIONS ~81103~' ~ 0•y y ,d 1. PLANTS WILL BE ~ ~-S ~ INSTALLED OVER THE SHALLOW P " W~ IN DEPTH NORM ORTIONS <6" ~„w ( AL POOL) OF THE WET POND. 7 ~ q d3 2. PLANT MATERIAL IS TO BE MAINTAINED IN ENVIRONMENT UNTIL PLANTING. COOL, MOIST 3. LIVE PLANTS ARE TO BE INSTALLED BY HAND PLANTING BARS (DIBBLE BARS. USING TREE 4. LIVE PLANTS ARE TO BE INSTALLED SO THAT AT (OR SLIGHTLY BELOW SOIL SU ROOT COLLAR IS I RFACE (NOT SIGNIFICANTLY OR BELOW GRADE). ABOVE 5. PLANTING HOLE WILL BE OPENED BY TH PLAN PROPERLY PLACED VERTIC E DIBBLE BAR, PLANT EXI ( ALLY, WITH ROOT COLLAR AT APP STING GROUND ELEVATION) AND THE HOLE WILL BE CLOSE ROPRIATE I SPACE AROUND ROOTS D COMPLETELY (NO AIR 6" 2-PLY RUBBER WITH DIBBLE BAR AND FOOT PRESS HOSE LIRE. DOUBLE STRAND 1 6. LIVE PLANTS SHOULD NOT LEAN MOR COVERED W 2_p Y GAUGE WIRE D E THAN t0 DEGREES FROM p~~D L RUBBER HOSE VERTICAL, ~ , ~ UORESCENT ORANGE CUi BACK LOPE ~ WHITE FLAGGING (TYP. 7. ALL ROOT PARTS MUST BE IN GROUND. TO PROVIDE ~ ~ ~ THE Q A FLAT SU 'ACE E WRAP e• PROPAGULES (DORMANT RHIZOMES, ETC, WILL FOR PLANTIIG ~~~~~~1 BEP Z HAND 1 2 INTO 501E SUR ) CANTED BY 4 INCHES MULCH FACE WITH VEGETATIVE PORTIONS OR 1 4 INCH DEEP a BUDS) FACING UPWARDS. ( SAUCER "J J Z 8' STEEL TEE POST ~ ~ ti7 9. PLANTING WILL NOT OCCUR WHEN SOIL C ONDITIONS ARE NOT a BACKFlLL MIX CONDUCIVE TO PROPER INSTALLATION (E.G. FROZEN GROUND). Z i 10. PLANTING SH OULD OC ~ UNDI O W Q CUR DURING THE PERIOD FROM MARCH ~T~a STURBED SUBSOIL I 1ST THROUGH APRIL 30TH. ~ ' ~ ~ U REMOVE BURLAP ~ Wa FROM TOP 1/3 OF TH PE E BALL O ~ NOTE: SEE WVDSCAPE NO ~ Q L O TES FOR THE TYPE OF MULCH V W ~ MATERIAL T I~ 0 USE. V Z ~ • Z ~ W3 T LAWN R SE E W EDIN P GS L HA A L N L TI BE N AT T G HE O N S OP FOLLO N. Z WING RATES: T.S. Ln W eW PER 1000 S.F. OF LAWN AREA; Z' 3 3 LB W S. TURF TYPE FESCUE "TYPE A" Z,' E 3 CBS. TURF TYPE FESCUE "TYPE B" W (TWO DIFFERENT FESCUES T 0 BE SELECTED FROM , o J V VARIETIES RECOMMENDED FOR PR 0 OJECT AREA) 0 Q 1 LB. KENTUCKY BLUE GRASS 00 G 0 0 (~0 Uee 2" x 2" x 6' hardwood ttoke Op 0 ° 0 o wire encored In rubber hots t and ~9 0 0 o when needed or oe dlrec for ttakln9 ted by architect. ~ Use tree wrap up to first whirl of op 0 on trees above 1-1 2" branches . o scaldin , ~ caliper to prevent QOo ~ g p. ~ ~ To promote aeration and percolation ' a o1 heavy eolle. plant ..!n l+vvve existing - grade as shown. a o~ well Backfill mixed. attar with 80x parent ma decomposed organic m material and 20X by volume Provide 6" minimum of backfill on each side of rootball to promote rapid re- establishment. Provide an earth saucer for water retention. i I i Minimum 4" thick diameter circle or pine straw in 5 REVISIONS F an shown on lane, BY p 29 JUL 2003 Sco TREE Ps N NG I W To promote aeration and Percolation • heavy soil, plant rootball in grade an shown. ° existing Provide an earth saucer for wat retention. er Backfill with 807. parent material decomposed organic material and 207 by volume well mixed as approved by the architect. Provide 6" minimum of backfill on I _ each side of rootball to promote rapid reestablishment. Provide minimum 3" thick pine straw in 5' wide planting bade or as directed on plena. SHRUB G PLANTING DRAWN sKo c PW CHECKED GPW DATE 11 JUN 2003 (90X CD SCALE JOB No. PJBPCW SHEET LANDSCAPE DETAILS ¦ 6 ~ 1 2 3 4 5 8 9 \ \ \ ~ ~ \ GENERAL NOTES v v ~ v ~ ~ ! v v y ~ ~ ~ ~ y 1\ \ \ \ ~v y v y v I v 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF RALEIGH AND THE STATE OF NORTH CAROLINA STANDARDS AND \ ~ \ ~ ~ ~ ~1 SPECIFICATIONS. ~ 'v , V ~ ~ A I~~ 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (1-800-632-4949) ~ v~ ~ ~ v i, A \ \ LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. PROVIDE DIVERSION Z I N \ ~ 1 ~ \ I \ r ~WA'_F IN~4LLY IF 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING REQUIRED .Y IF ~ i i i ~ { A ~ GRAVEL AND RIP-RAP ~ ~ \ A UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS i } 1, ~ I ~ 1 ~ \ ` MPORARY~ RStf)N _t- FILTER BASIN 5 ~ I I \ ~ 1 \ \ \ ~ ~ ! ! to r ~ ~ ~ LE ~ _ ~ i N I \ MCI PRIOR TO BEGINNING CONSTRUCTION. I I i I - ~ 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY BY INSTALL SILT FENCE C~NTR~tCT S L 0 IpE \ ~ ~ ~ ~ \ 1 RAV ND RIP= ~ ~ •ENCE A DITIdNAL SONS U IONS ENTRAN S / ''J ~ EL\ NEW SILT FENCE WITH ~ / ~ K N CLOSE INC. GRAVEL & RIPRAP HORSESHOE REFER TO SHEET C-8.1 AND E ~ GRAVEL & RIPRAP FILTER BASIN ~2 FILTER BASIN ~3 8.2 FOR IMPROVEMENTS IN _ _ACROSS PIPE ONCE ONCE ~ ~ , , FILTJrR N #4 ~ TREE PROTECTION SIGNAGE / ~ ~ \ ~'.T~~ _LED AND A . COfQPORA~ION R AY ~~S \ , r\` ~ ~ ~ ~ I / ~ DISTURBED AREA = 2.4 AC DISTURBED AREA = .92 AC ~ CORPORATION PARKWAY PIPE IS INSTALLED AND 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. ~ {,DRAINAGE AREA = 2.4 AC BACKFILL BEGINS \ , ~ DRAINAGE AREA = .92 AC CdMPLE~ED AND EXIT. ~ ~ ~ ~ ~ • (TYP CAL) ) ~ \ A NS ~ 1~ ~ / / ` / \ ! CROSS-ACCESS, DRIVE. IS EMOVf`D AS \ ` \ r'~ / ~ / ~ MIN. -VOL. = 2.4(1815) = 4,368 CF ~ MIN. VOL. _ .92 1815 = 1 670 CF 6. SEDIMENT TO BE DISP05ED OFF-SITE. ~ ~ \ ( ) , l ~ REgUIRED~,TO PREVENT\MU AND ~ ~ ~ ' ~ ~ ~ \ ~ ~ h° NEW TEMPORARY GRAVEL \ r I ~ \ ~ A ~ \ \ \ , \ USE 27'x 54'x 3' DEEP PIT USE 17 x 34 x 3' DEEP PIT ~ ~ _ _ ; / 1 + v vV A' BERM ELEVATION = 288.0 - 4.5 ~ ~ / / DEDRIS FROM BEING DE SIT ON \ / \ Il\ ~ ~ \ ~ / CONSTRUCTION ENTRANCE / \ ~ \ f r THE PUBLIG~ STREET. \ \ , - ~ ~ BEGIN AT EDGE OF EXIST. ~ ` ~ ~ l ~ ~ A VAv A V - _BERM ELEVATION - 26 / i v ~ 1 1 ` ~ ~ ~ m / ~ v v \ / l~ ~ v 1 ENT) a i A n I ~ l \ \ - ~ I \ ~ ~ fC}t DAM ` - -~1--=. 1 / I _ / I I v 1 V 1 FEN~~E ONCI` _ _ ~ 1 - - - _ s ~ ss _ v 1 - ~ ~ 1 I l ~ \DITCHIS RFMO U =J 1! , . _ ~ ~ ~ - ss ~ _ 6 i 0 _ - __m . _ _ _ r ~ ~ I I j 1 ~ ~ mac. ~ I I \ ~ ~ ~ ~ } • ~ - ~ o • ~ _~>_~~r+r~ s..a • - _ .mac _ _ - = 1 _ 1 . ~ ~ ___.y a:. ~ _ \ ~ ~ , 15 RCMP , i \ \ ~ I - 28o-L~"~~. 280.' X15" RCPT A I I 7 ~ i~'~~• li'~ +1\ ~ V A i v ~ ,_~0 RCS ~ ~ ) . \ NEW SILT FENCE WI H TREE ~ , f \ ;t . , ~ ~ = ~ 1 ~ ® u. ~ , \ \ ~ ~ 1 FRCP ~ \ ~ ® :._t. i i . , ~ _ . - ,,L;:.:ywx. . _ 7 „s.~ , + PROTECTION SIGNAGE \ \ \ y ` ' _ _ - • _ . 1 ~ - - ~ _ \ ! = ` 1 INSTALL TREE PROT CTION FEN AN I T M-~ m ~ ~ ' ~ ~ , , - - E CE D S LT FENCE WITH TREE PROTEC ION i ~ . ~ 55 . + - \ ~ \ I SIGNAGE. CALL FOR ON-SITE INSPECTION BY ZONING INSPECTOR. ao Wo+ - ~ . ~ ~ I ' P ~ \ ~ - - ~ ~ ~ - - ~ _ ~ ~ ~ ~ e Ro i L, SEW TEMPORARY ROCK ~ \ ~ C ~ o \ ~ ~ ~ ~ .~51 k ; - c C' - ! a..,. S° ~ ~ ~ l ~ ~ ~ CHECK DAM ~ \ I~ 2. IF APPROVED, OBTAIN GRADING PERMIT. _ PORARY ROCK I ~ NEW CL. B EROSION ~ \ o _ _ _ ~ ~ ~ v v \ V ! \CONTROL STONE APRON ~ ~ ! I t ~ ~ \ \ I 3. INSTALL INITIAL EROSION CONTROL MEASURES INCLUDING GRAVEL CONST. ~ 1 ~ \ ~ \ ~ ~IN. 32'Lx12'Wx22"TH) ENTRANCES, GRAVEL AND RIP-RAP FILTER BASIN 1, 2, 3, 4 AND 5 z5° i \ ~ \ \ \ I ON `GEOTEXTILE FABRIC # # # # # . v~--.~-- ~ I , \ ~ RISER BASIN #6,#7 AND #8, ROCK CHECK DAM, INLET PROTECTION ~ ~ --6==~ r•'\`~ 1 i T \ ~ \ ~ \ ~ \ I ~ SEDIMENT PIT, SILT FENCE AND TEMPORARY DIVERSION SWALES. INSTALL \ . \ 1 ~ I 2 ~ ~ 1 I c,, ~PHBX 1 Ll/ ~ ~ ~ i l , y ~ \ i - Er y } / ~ ; i \ ~ i,'~ ~ • _ RISER BASIN FILTER - PERMANENT STORM DRAINAGE AS SHOWN ON DETAIL AT RISER BASIN 6, l,/ / ~v~A ~ ,r A } 1 ~ ~ ~ s ,l_ ~ \ V ~ I i ~ ~ wz.,~., \ \ 7 \ ~ l / ~ _ .1 \ ~ I \ } l I \ \ \ ~ (REFER TO DETAIL FOR ~ ,AND ~8. \ ~ ~ \ ~ v v v \ v .._,r.. I ~ ~ . Av i/ , i/ \ ` ~ \ \ \ \ / \ \ \ I \ 1 ELEVATIONS ON DWG. \ ~r~\ \ i ? } ~ r N 4. CALL 890-3453 FOR ON-SITE INSPECTION BY CONSERVATION INSPECTOR. v ~ 1 ~ \ ~ A 0 C-3.2) _ ~ I + 59 ' \ _ - / ~ ~ ~ i ~ 1____ 1 a~ _ ~ ~ IF APPROVED, BEGIN CLEARING AND GRUBBING. . , _ ; + ~(r~, t 60 - ~ 38•• V` ~ ~ ~ ~ \ t i ~ u ~ i I i ~ ~ ~ RCP ~ ~ / ~ y. \ i i J r_ ~ Q1 \ \ 'LP a ! ='v ~ . v 5. MAINTAIN \ DEVICES AS NEEDED. GRADE SITE. INSTALL STORM DRAINAGE AS 1 W F D 01 0 LOOD HAZAR S LS \ ~ \ V \ ~ \ i~ - w V~:..._-~- ~ I it I ~ I ' _ - . - . \ 1 \ a • SIT I E S BROUGHT UP TO GRADE. PROVIDE IN PR 2 LET OTECTION AS SHOWN RcA ~ I ~ BM 1988, PG 1363 12° P \ ~ \ ~ ON THE PLAN. DIVERT STORMWATER_TO PROTECTED INLETS.. FILTER. BASIN \ \ v I I v ~ f.... ~ v w 12 1 ~ - A O ~r I i ! AV ~ `^----~90 A I ~ I ~ I ~ ~ ~0 9 IN. RCP~~ \ \ `V AV (TYP. EA. SIDE) ® 2.O .:M ~ , _ \ \ / #i,#2, AND #3 AND RISER. BASIN #8 SHALL BE REMOVED .ONCE ALL j o ~T A \ §,r\ ~ ~ \ ~ \ I I I~ ' ' ~ ~ ' / I ~ ~ _ _ 1 - • ~ ~ - ~ \ \ / STORMWATER IS DIRECTED TO RISER BASIN 6 AND 7. RISER BASIN 8 \ - # # # a ~ ~ ' ~ " RAVEL RIP P FILTER BASIN 1 1 I I r` ~ ~ ~ ~ 1 I ~ ~ 1 ~ ~ ~ i +,~y ~ ~6t R~ - # i l l I i A ~s ~ ~ V ~ I ~ 1 ~ ~ STURBEb AREA1- 1.25 A~ ~ , ,I I i,. ~ I ! ~ . ~ ~ ~ I ~ ~ ~ 1 V'+ \ ~ ~ \ \ \ \ i SHALL BE REMOVED ONCE STORM DRAINAGE SYSTEM TO IT IS OPERATIONAL ~ \ ~ Wc' 62 i } \ \ I ( AND STORMWATER IS DIRECTED TO PROTECTED INLETS AS ALLOWED BY ~ ' " + D, INAGE 1AREA ~ 4.19 AC \ ~ I~ I I I I i V \ ~ 1 ~ ! i . 1 ~ ? ~ ~ i PVC I IN = 265.18 j \ \ ~ 1 i "`D ~0 MAN ~ ' ' \ \ \ ~ \ t l ~ CONSERVATION INSPECTOR. i. ~ - F ~ ~~~II ~ / ~ ~ _ A 1 ,iIi~ Till I I t 1 i ~ 12 \1 ~ 1 Mil. VOL. 1.25(1815) - `2,269 C ~ ! , ~ I ®2.OS~ M~1~, ~ NEW TEMPORAR DIVERSION \ ~ ~ A \ v v o ; 1 ~ \ ~ ~ OA . } S o 36" RCP \ \ ~ 1 ~ i ~ U E 19'x 4b'x 3 ~pEEP PIT ~ ~ V \ _ 1 I , i 1 ~ ~ i ~ J I ~ / - 6$.0 { ~ ~ ~ WALE. ADJUST LOCATION AS - ~ ~ ERM ELEV TION 284.0 I 1 ' ! / ~ ~ ~ I i I i I ~ ~ y I INV = 264.9 S I I \ \ ~ ~ O \ ~ } \ ~ 6. BEGIN BUILDING CONSTRUCTION. \ ~ 60" RCP ~ \ \ ~ i I ~ I I ! l \ \ „ I I ~ ' ! ~ i A; / REQUIRED AS % ITE IS ~ i I ~ _ _ ~ \ , , I , l ~ I ~ , ~ A~ BROUGHT UPS TO GRADE i ~ u \ \ ~ ~ N N 7. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE WITH `^~~Y +,,~Pf ' a ; ~ { , ,j;_ ~ I $ ~a V EW CL. B EROSIO VEGETATION, PAVING, ETC. yep u~~.~i~r "s, ~ ~ \ \ \ ~ CONTROL STONE APRON ~~E,~.. ,<<1,~,• A., . + + (I v ~ ~ ~ M i i NEW SILT FENCE W T'~EE TEMPORA DNERS~ON ~ I ~ ~i~l i ~ NOTE: REFER TO STORM ~ \ ~ 11 BERM: 249.0 ~ ~ ' ' ~a;#' ~ ' ~ \ ~ \ (MIN. 40 Lx15 Wx22°TH) 8. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED o. O i~ 11`~' ~ ~ ~ f " ~ Av \ ~ i ! ' f ~ i I i ~ ~ ~ AI SH PROTECTI N SIGNAGE TYP ~ SWALE I ( DRAINAGE DET L EET ~ ) , ~ I ~ SITE 3.4 FOR PAD PREP ~ ` ON GEOTEXTILE FABRIC COMPLETELY, CALL FOR INSPECTION BY CONSERVATION INSPECTOR. r V ~ ~ ~ V ` ~ • ~ I I I i I ~ A ~ ~ P;' ~ ~ TEMPORA GRAVEL = , j~ I ~ r~ ~ 7 ~ \ ' I I I l f I i I I / ~ ~ NOTES ~ ~ ~ ~ 9. IF SITE IS APPROVED, REMOVE TEMPORARY EROSION CONTROL MEASURES \ V ~1 6~~ °1 ` ~ ~ VA V A. TI NTRANCE r ) v i 1 w~i I I I~ L 1 l ! ~ ~ \ A CONST CONE ~ I ~ , ~ v ~ I ~ I , I , i i , ~ 1 / ~ - ~ ( _ / , , , ~ ~ ~ i ~ ~ ~ ~XIST. DRIVE 0 REMAIN ~ ,x~ V e ~ ~ _ ~ I 1 ~ I ~ ~ ~JNr~i rr}ACOR ri,ON \ ~ + ~ ~ ~ AND SEED OUT OR PAVE ANY BARE AREAS. ALL SEDIMENT SHALL BE ~ ~ ~ ~ ~ ` ~ • \ REMOVED FROM THE WET PONDS AND THEY SHALL BE GRADED A5 SHOWN 1, C _ - ~ ~ ,goo ! ~ ~ ~ I F ~ ~ A i i Ni0 ~ ~ ~ ~ i ~ I ~ ~ I I~ i ~ / ~ARKWAY I -.OMEN TO SERVE ~ ~ ~ AND SEEDED. •,9 •.,CIN~ r i i \ ~ ~ z ~ vv , i' i c i j o i' I I I i I i ~ I \ ~ I Ah~ I f ~ v ~ ~ I ~ ~ ~ 'ADJACEN PERTY + i } ~ \ r ' ~ ~ r;1 a1., , v~ A - ~ I i! I I f ~ i I I ~ r ~ 1 r..~ti ~ 1 I r ~ e ~ • . , ~ • \ \ . 10, WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL INSPECTION ~ ~ Q 7 I ~ ~ ` ~ BY CONSERVATION INSPECTOR. / NE L L ~ \ \ ~ / ~ 14 A ~ \ \ II ~ ~ i ~ I I i : x ~ / / kl ~ / } ~ , i r I~ ~ t ~ I Iii ! l I -r ' ~ \ i,~ I ~ ~ ~ ~ r NEW CL. 8 EROS N TOTAL DISTURBED AREA: 36.8 AC f ~ CONTROLS NE APRON _ ~ i i i. ~ i ~i ' i t i i \ ` 15 RCP ~ i' i~ V ~ I ~ . ~ ~ I i t, I ~ I I ~ , I l ~ i I ~ ~ ~ MIN. 21'Lx12 x22'GH I i 5 ( } ~ \ : ~ ; ~ I . r , I I ~ V ~ ' ' I I ~ I ~ I I ! P ~"RC~'~~ ~-~..°"°~"~gL-~iART ~ NEW CL. B EROSION , ~ 11 Iii , I , ° ;4 i ~ I l ~ ~ i ~ ~ ~ i I I . 1 SION a; ~ I ~ ON GEOTEXTIL FABRIC ~ / ~ ° ° ~ ~ ~1PERCENTER CONTROL STONE APRON \ r ~ I m o I. 1 1 1 11 I I I I f~EMOV~ V / J I ' 1 1 I° . I - _ I - ~ m ~ i ! ll ! , l ~ I I i i ~ ~E = 2~2 0 (MIN. 20'Lx7.5'Wx22"fH) APR N ~ o ~ & l i'!. ~ 1 \ O ^ ~ _ ~ ~ ~ ~ ~ \ ~r v ~ ~ i ~ I I} i ~ y ~ I," I i I I I I I~ i~ ON GEOTEXTILE FABRIC FABRIC / / ~ ; l;~•.... r ~ \ V ~ 13 i I i I~I~ ~ r V~ ~ 1 \ ~ ~ lil i I~ ~ I,~ I i ~ ~ r~~ ~ ~ , / 4 ~ .:.~~1:..... J: ~ F ~ v ~ a NEUSE BASIN NOTE ~V PROVIDE BLOCK ~ ND GRAVEL i i ~ 1, v I i t ~ v ~ 1 1 1„; I~ I I; ~ I~, + N TEMPORARY VERSION v\ ~ w ~ i~ 1 i i I 1 i I i t.~ ~ 1 ~ (VERSION . , , ~ _ _ ~ a2" RCyP ~ ~ ~ ev \ 00 ~ . ~ ' i )1 y v ~ INLET PROTECTIO FOR A is I I i ~ ~ ~ M I ! ' V ~ i / i ~ I, I I ~ ~ ~ ~ , ~ ~ i I I ~ SW LE. ADJUST L ,CATION AS \ ; ~ INLETS UNDER C NSTRUC ION I I 1 I i ; ~ i le f I I I i I I ~ ' ~ ~ \ REO IRED AS SITE IS . CATION AS i _ i ^ of \ ~ THIS PROPERTY IS VESTED FROM THE / / ~ ~;E,-, i r a--.~- RISER BASIN FILTER 7 REQUIREMENTS OF THE NEUSE BUFFER IS V I ill s li ~ I III III {I ~ ~ I ~ 1 HT UP TO RAE \ v 1 1 1: A ' l l l i ~ I I I I 1 I ~ BRO ~ D GRADE r oe ~ ~ ~ • ~ • ~ • ~ ~ , / ` ~ \ ti (REFER TO DETAIL FOR RULES AS INDICATED IN THE VESTED ~ v v ~ ~ ~Il l 1, ~ i \ I w i. I ~,I~ I ,r 1 i A 1 11111~,1~ l; i ~r; !,II ~ ! I / . ~ , - ~ \ \ E~.EVATIONS ON DWG. RIGHTS LETTER FROM NCDENR DATED _ \ \ \ N0. C-3,2) FEBRUARY 14, 2003. i _ _ ,,i, y _ ~ I \ GTCN 8441N ~ I i ~ ~ \ 297.11 / ~ i I / i i I I ~ ! ~ I ~ i ~ ~ ~ I , y ~ DO NO DISTUR STREAM STREAM ,,j,•?••.• f ~ 1~ • ~ ~ v i \ our 2as.~s ' i ~ , ! , , 'III I ~ { I , AREA P ST THIS; POINT POINT as J 4;i ~ ~ ~ . Ir" - ~ ~ V ~ ~ \ ~ !I ~ ~ 1~ ill h I ~ ~ ~ ~ ~ ~ a / ~ ~ A I I ,y ~ ~ ~ ~ ~ 'i I I { ~ I ~ V i ~ I 7 ~ ~ ~ ~ ~ ~ W OSION ~ i ~ ~ 1 ~ ; f , I , ! I i i v NE CL. B ER r--. i ~ ~ A A ~ I,,:, _ Il+, Il, - ~ ! ~ TROL STONE APR l 4 t ~ i i1 A A~ . t ~ a t, , \ ~ ~ ~ ~ I - ,.1 ~ J !1 . I Iii %'II II I i~ ~ ~ ~ ~ I I, \ V ~ r ~ ~ : A / i ~ I (MINM 32 Lx12bV,ti22"TH) / ~ / ~ ti ~ \ \ FINANCIALLY RESPONSIBLE PERSON/AGENT 1 • • ~ ~ / I .RcP So \ \ ~ Z PP i ~ 1 1 A r ~ ~ ~ i ~ I 1 l~ ~ ~ 1I ) ~ ~ J ; ~ $ I ~ ' i ~ 1 I ON GE~OTEXTILE F IC r: ' 't l w ~ r r 3 ~ \ t 1 \ ~ d ~ , . r i ~ - - - N i i 1 A 1 CUY 1 V I ~ I i~ i! GiCH 8~ i A I ~ ~ + - ~ ~ ' _ ' D ~ ~ ~ ~ _ 2A1 as ~ I 2 ~ ~ 7 roP '8~.~ ~ ~ - PRIV TE ACCESS EASEMENT - i 50 - ~ , ~ 1. Person to contact should sediment control issues arise during land-disturbing activity. (n IN - , ; F ~ , ~ ~ ~ ~ i~v o~ 2ass5 r~ DB 4425 PG.499_ ...1 N ' 1 ' _ 1 _ _ ur 2es•2a ~ i so-, \ /r • ~ + ~ ~ 0 254 ~ , i / > _ ~ ~ ~ ~ ~ ~ ~ + ~ 19 A ~ DB 4365. PG 639 ' a > ~ ~ ; . ~ . i I ~ o , ~ y o ~ se N~ ~ Name: GUY SCOGGIN Tele hone: 865-522-7785 ~ W _ , ` B 4515, PG f Sk + ~ f - A ; ' D 7796,E 296 " ' ' _ ~ ~ ` ~ ~ / / f ~ i 1 ~ i ~ ~ b ` _ A 1 15. R ~ 0 x a ~ ~ \ 4 0 0 U 26 \ ° ` ~ ~ • ~ ~ ~ ~ ~5' 2. Person (s) firm (s) financially responsible for the land-disturbing activity. 0 W C..-- ~ r / ' BM~988, PG 1,509• " •Y' ~ I ~ ~ _ , ~ \ ~ ~ h / k ~ / I _ ~ ~ V A \ _ _ _ • ~ ~ _ } `v % \ COMMONWEALTH NEW BERN PARTNERS, LLP ~ Z ~ l ~ ~ 6^ ®iL MIN. i _ , 48 ~ s ~ ~ ~ ~ \ ~ W W Z Z - i ~ Nome of Person (s) Firm (s) ~ t , i ~ ~ - _ ~ l~ _ - ~ ~ ~ ~ p, ~i 6 V ~ \ 1 i.Vv ° ~ v 0 Q i ~V / ~`i 500 HENLEY STREET SUITE 200 -SAM - ~ Q ~m 1 3 r r 7p --.-1 ~ \ ~ ( I \ ~ ~V I } d i i` I ~ ~ \ Mailin Address Street Address ~ ~EraL v ~ ~ v g V ~ w~ F , ~ " BROPOSED~ \ ~ ~ / \ i P ~4 I \ !I I _ `k d I ~ i ;-INV IN ° I rx~ 263.0 - --a Z ~ ~ Q.W i°n - RCA ; / OFFICE.' ~ n ~ 1 KNOXVILLE TN 37902 -SAME- CZ ±I a FF ~ ~ ~ ~ WW J f \ 15` RCP ..i -r r -f- SW - - / 4 , o- ~ ~ I a a t E 763.0 ~ City State Zip City State Zip ~ m W= j ~ A \ ;l ~ v \ / ' W ~ . t I I A V 0' I / ~ k } v . ~ ~ > F. ~ - - ~EOP ~ R~MO ( \ ~ ~ ~ \ oe - a-- -f - ~ I 4 'i i ~ ~ 9s 90 ~ v 1 o I A NfVY TEMPORARY G V{-~ ; y~ ` ~ ' i ~ ~ ° - „ } \ 3. Appointed Agent to receive any notices, process, or le°din in °n action or le al ~ I I ( ~ ~ ' i L-~~. ~ T~ r--~ ' ..L="` C=7°~C` ' • - roceedin arisin out of an matter relatin to Ralei h Cit CodeYCha ter g W ~ W ~ , I I ~ ~ - - i ~ ~ CONS UCTION ENT i i - y? C_~ ~ TIC 3~ I f•,J/ P 9 9 Y 9 9 Y P art 10. Z ~ 3 I ~ _ ~ _ _ _ _ ' u.. I , ~ - I_ _ - 4 ' i" -38" RCP - ~ ] R - $I/ ~ e I Cp } ~ ~ b / d ~ ~ ~ W Z a , } , 11, _ _ EuzABETH w. voLrz Z O i I ~ , / 0 30' CF ~ ~ ~ ~ k~ i (I i I ~ o i , > > - - - - `MCP E ~ I ~ ~ ~ ~ za' ~ Name of Individual Si nature of A ent ~ ~ I j , I II / ~ 23 CP ~ _ _ 15" RCP + A 9 9 / r I ( ~ W / / 1i ! ~ o I KILPATRICK STOCKTON LLP 919-420-1700 ~ , , ' ,rJ ~c2 ! _ e 15" RcP - ~ } ~ Place of Business inside the Gty of Raleigh Business Telphone i ~ ~ ; I I~I ~ - -Q - ~ ~ I ~ „ , / - iI u r ~ ,.C. `t~ r .r I ~ 2so ~ ` ~ ~ ~ ' \ ~ ! r ~ ' ~ '~±SER IN" 8 ' ~ ~ - / - . - - - - z \ ~ - :ter ~ ; T _ _ _ , i ~ / J(REJ~R T ETti~ F . i r 8 ~ ~ ' J-- ~ ~ r k ~ s~ ~ ~ _ ~ _ ~ _ ~ 3737 GLENWOOD AVE, SUITE 400 RALEIGH, NC 27612 - LrL I x.- , - ~ ~ i / ~ t ~ r , r~ A A \ ii ( C / ~ ~ ~ '°ELfVATIp(JS D ~i f tirt F . i = ~ - Address ~~;D ~r ~ ~ E I 1 ; 1 la°RCP ~ 5 / v ~ I~: I ~ s:, / I ~'I ~ / k O 1,I 11 / + i ~ NEW MPORARY DIVERSION ~ Complete the above and adhere to cover sheet of erosion control plans. This does not / s' i - 1` 1- a ~ ~ i ,1 w / J ~ / ) l ~ I ~ j ! / I)/ 11l ~ ~ i ~ \ SWA .ADJUST OCATION AS ( } ~ take the place of ° complete financial responsibility form. A completed form must be --~f 1 1, t. ~ a; , ~ / I ~ ~ R UIRED AS ~ E IS }1 / filed with the Raleigh Inspections Department prior to issuance of permit, 1 26Q ~ OUGHT UPi TO DF<'~ / z, ~ , / / ~ t~ ~ ~ i I ' i + BENCH MARK ~ FIRE HYDRANT / ~ \ ~ _ i ;2 / r - 24' RCP ~ I NEW SILY FENCEi EE \ ~ I ~ o I ' } \ 1 TOP PAINTED FLANGE BOLT \ / $ . ~ • • ~ ` - ~ / I 1 r / / ~ \ - - ! N PROTEG'fION SIGIJ ~ (TYR) ~i - , I 1 ti I I } ELEV=297.53 A R . ~ k . J~ / ~ / ~ ~ ~ 1 % ; ~ ~ v ~ ~ ' I `~+IESE ' OPQSED ENT ANCES ~ i NEW BENCHMARK WILL NEED ~ o \ " J - - ( ~ --ARE-170 •6 USER AS . • _ _ , i ~ i i ; SURVEY LEGEND _ - ti - ' ~ ~ 2'~ R>rw - ~ - - _ ~ / ~ • N~1N TEM RY SILT ~ TO BE ESTABLISHED A ~ ~ ~ ` ~ _ - / \ I , ~CONSTR ION - S - . ~ u - _ _ r-- %'i: ~ F~N NG TOE= ~ ~ ~ + , : ? - J' ~ OHSUPL)-OVERHEAD SUPPORT LINE AT ANY 01N'T flUBTNG ' - ~ ~ : ~ ~ / / - ~ , \ ~ \ '~~~~v ~ _ _ ~ /(TYP. E,<t:' SIDE / , ~ ~ _ , ~ , ~ 3 ~ i ,I ~ CONSTRU TION . . - _ - _ i P P SU SU PO.T OLE i; ~ " WM =WATER METER - 1 ~ ~ i - \ / i I 1 _ _ vi \ " S'}"=TfiARSF•0}iFIEI~ + ~ I Z7 V ~ ~ ~ ~ - . ~ _ _ ~i , . NEW SILT FENCE ALONG ~ ' . ~ \ ~ ~ - - _ - - _ _ _ _ s i ~ PHBX)-PHONE BOX - I. i ~ r UGFOCM)-UNDERGROUND FIBER OPTIC CABLE MARKER , i r ; -x BACK OF EXISTING CURB ;7 i _ - - - \ I,~ / UUYFiM UNUtKUKVUNU YHVNL MAKKtK 1 FES)-FLARED END SECTION ~I ; I I PHMH)-PHONE MANHOLE \ \ I 18- FH)-FIRE HYDRANT 1 I I UGPHL)-UNDERGROUND PHONE LINE C , 15° RGP' 1\ 1 r i~ • rr li \ J/ r ~f ( l 1 WV)-WATER VALVE ,R 1 EOP -EDGE OF PAVEMENT REVISIONS BY - - s i~ CMP -CORRUGATED METAL PIPE - - - f ( ( RCP)-REINFORCED CONCRETE PIPE 4 - . - ) M 18' RCP , s 21 JUL 2008 17 ( BC)-BACK OF CURB SKO 2a RCP 15° RCP ( IPF -IRON PIPE FOUND (PERMITS) I, ~ .,r,-----v I / e 'moo - ~ _ ! ( - IPS -IRON PIPE SET a r - _ s{ RWMF) RIGHT OF WAY MONUMENT FOUND 29 JUL 2003 10 to OHPL)-OVERHEAD POWER LINES DLH (EXPRESS REVIEW) LP)-LIGHT POLE I I 20 I' I I I 15 RCP r _ n 1 1`~ ~ z ti,r _ CA F I~ f v I I I ~IIv 18' RCP SP)-SIGNAL POLE 26 JUL 2003 'o ' s' I, e I OHSL -OVERHEAD SIGNAL LINE DLH PROVIDE ~L66K,& GRAV~I<• - / 1 I ) (EXPRESS REVEW) = oq f OHPHL) OVERHEAD PHONE LINES r 15 Rc~ OHP&PHL -OVERHEAD POWER AND PHONE LINES 08 AUG 2003 I+ I _ I I I 1 1 INLET PROTECTION-FOR- ALL I I. l t ea REFER TO SHEET C_8.5 I I I i; I I I I INLETS--UNDER v v pia A DLH FOR IMPROVEMENTS IN r{ I I 9 CONSTRUCTiDN 6 NEW HOPE ROAD I I I I ~I ( UGWL -UNDERGROUND WATER LINE (DWO REVIEW) =1;: RCP UGGL -UNDERGROUND GAS LINE I ;I V a 3 I 1 _ I e PROPOSED., \ I GTV)-GAS TEST VALVE 23 SEP 2003 PROPOSED ;15 t 1HICS)-HOLE IN CONCRETE SET DLH REWIL FIFE - - ETAIL ( ( - (WAL-MART) IN CONCRETE FFE 267.0 °s°M I NSIC) NAIL ET 1 TH 277.0 ~ ~ I _ - . _ _ I 1 1 ~ - -09- -901 USE • AS CONSY UCTION PROPOSED I _1 I I f \ / EOG) IEV E SEGRAVEL 4 I CLF -CHAINLINK FENCE •~lI - e ENTRANCE \ - - RETAIL (of / ) FFE = 271 7 I s' Pvc ®1 j WPF -WOOD PRIVACY FENCE \ - _ ---290J \ \ \ \ 10 a Mw BW)-BARB WIRE NEW ROCK CHECK s t ( 1~ II' WVMH)-WATER VALVE MANHOLE _ AM GP)-GATE POST : _ UGJB -UNDERGROUND JUNCTION BOX _ „ FINAL CONSTRUCTION }\VA~ 9A V y 6Ai---- . v v ~ _ _ ~ ~ v ~ ~ a" PVC ~ -r.o-z~• Mw. TSB TRAFFIC SIGNAL BOX \ l ENTRANCE LOCATION AFTER e' PVC ®1 70 sa 2ss I ~ ` ~ EXISTING DRIVE IS REMOVED. \ % MIN 1-T - - G - - - T 0 9 0 ~P PHMH f, PP 0 rt o OHP&PHL P P P - 67 PP - - x - Yom. DRAWN P MH 1 _ d - - _ -7 7 (3PW AM I -w - - - 6GFOCM OUTHERN BELL 1 \ A TEMPORARY G VEL a \ FI ER OPTIC CABLE MARKER \ O \ CONSTRUCTION ENTRANCE - I a a \ o R4 ~ v v ~ ~ JDLIRPH Y'° cnGr OF' 7 - + 7\w \ CHECKED ~ DATE - a dt / PAVEMENT) i i z", NORTH 11 JUN 2003 CD) L o - - - _ - -c - - - l ` r' l SCALE t r - - - - - - - - - - - - 1~ • 80 NEW BLOCK & GRAVEL INLET REFER T0\ SHEET C-8.3 AND 0 60 120 180 JOB No. o \PROTECTION W/ EDIMENT PIT \ 8.4 FOR IMPROVEMENTS IN RIBPCW SERVES 0.55 AC. DISTURBED AREA > NEW BERN ;AVENUE /USE 13'x26'x3' SEEP PIT o° SHEET IL PP PP ~ j. ~z SCALE IN FEET a P•~ pp pr- _ P . ~ 1. C-3ni EROSION CONTROL PLAN. l OF SHEETS w an C A E F G 1 1800 CU FT/ACRE NOTES: 12" MIN. 1. USE FOR DRAINAGE AREAS NOT EXCEEDING 5 (FIVE) A\CRE 2. EARTH BERM SHALL BE STABILIZED w/ SEEDING ACCORDING TO TRIANGLE SPECIFICATIONS. 3. USE CLEAN COMPACTOR FILL MATERIAL FOR EARTH BERM. DESIGN SETTLED 21" TOP MIN 7FT LFT 5 MAX o FILTER FABRIC 2 Aw =�:;�:�tA\ r 111TH\ fr\- /�IND�•• ,:- �.5 ��1t�111.Nf�'i0 AMS t &71 MW�1r'�� �i::�\'r•� • •... CROSS• OVERFILL 6" • SETTLEMENT - FREEBOARD •11.-11-11:.11f� II(=11�II�II=11 • ; � • _ -1111=11=11=� ���-�-,I-1:=L • -t1i VU ■ 3 m in ■ 5 STANDARD METAL POSTS 2'-0' IN GROUND GALVINIZED HARDWARD WIRE EXTENDS TO TOP OF BOX ao.■o • -------------- 8$ e $ O 3 O ' 'U w .� MIN `j�Q1W�•000Cb p o • o - MAINTENANCE ASPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORMK*L DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN � WASHED STONE PLACED A A DESATM DISPOSAL AAND REPLACE THE CONTAMINATED PART a THE GRAVEL FACING. HEIGHT OF 12"-18" MIN. ABOVE 04REA TOP OF BOX ISIONS CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO EHR^:iRE R MINIMUM A MMUM REVISIONS OF 1.5 FT BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SUGHTO ,TONE DESIGN DATE DESCRIPTION ,ESCRIPTION GRADE. ANY RIP RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY AFTER CONSTRUCTION WITH SEEDING. GRAVEL & RIP RAP BASIN/OUTLET 3A STANDARD CATCH BASIN/YARD INLET PROTECTION 114 BAFFLE (TYP.) Ofi F� 50' MIN. NOTES • EARTH BERM BUT SUFFICIENT TO KEEP 1. PUT SILT FENCE OR TREE PROTE4'TION FENCE UP SEDIMENT ON SITE TO ENSURE CONSTRUCTION ENTRPNCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT _ THE MUD IS NOT REMOVED BY THE VEHICLE TRAVEL- ING OVER THE STONE, THEN THE TIRES OF THE 2'-3" STONE TO BE USED`'.:T 25' OR WIDTH OF VEHICLES MUST BE WASHED BEFORE ENTERING THE EXISTING 1 :.,!•; (SURGE STONE OR RAILROAD ':,: PROPOSED STREET, PUBLIC ROAD. ROADWAY ... BALLAST) WHICHEVER IS *`~ GREATER. 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY EXTRA POST IN MIDDLE RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL "I"WIRE ATTACHED OF OPENING TD POSTS WITH LENGTHS RESPONSIBILITY FORM. OF WIRE � SEDIMENT PIT HORIZONTAL METAL POST WIRED SECURELY TO VERTICAL POSTS PLAN BAFFLE INSTALLATION - STEP 1 CLASS }, RIP NOTES FABRIC CUT AND FOLDED FABRIC FOLDED NEW CONSTRUCTION 1. DRIVE �LNFENCE POST AT LEAST 18' INTO OVER THE HORIZONTAL OVER HORIZONTAL 35' MIN. 15' MIN. FENCE POST �� 1 EXISTING ROADWAY 2• WOOD POSTS ARE NOT ACCEPTABLE HORIz°"TAL PosT 3. USE STAPLES ,' MART TO ATTACH FABRIC PERSPECTIVE VIEW TO 'HOG WIRE" FENCE AND FABRIC . ''•::� 12" MIN. BURIED IN TRENC 4. BAFFLE SPACED AS PER APPROVED PLAN. TOP OF BAFFLE SHOULD BE 6• 6" MIN. BOTTOM OF HIGHER THAN THE EKO 0 THE SPILLWAY BOTTOM OF BAFFLE IN 8'x6" TRENCBACKFILH, AN TRENCH COMPAC ED AND TRENCH D FABRIC UNDER STONE FILLED WITH SOIL AND COMPACTED COMPACTED ASIONS REVISIONS DESCRIPTION CROSS SECTION DESCRIPTION SECTION AT OPENING BAFFLE INSTALLATION - STEP 2 CONSTRUCTION ENTRANCE 7 GRAVEL & RIP RAP FILTER BASIN 3B - PERMANENT RCP OUTLET PIPE EARTH DAM PLAN VIEW 6 7 - - - - _ - TOP ELEVATION OF STORMWATER #57 WASHED r` Y 1STONE DESIGN OF SPILLWAYS EXISTING SLOPE DRAINAGE AREA WEIR LENGTH 1 - (ACRES) (FT) CLASS 1 RIP -RAP FILTER FABRIC 1 4.0 VARIES 2 6.0 3 8.0 4 10.0 s 12.0 SIDE VIEW 1 DIMENSIONS SHOWN ARE MINIMUM EXISTING SLOPES NOTE: HEIGHT &WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. VARIES KEY RIP RAP INTO THE DAM FOR STABILIZATION. 6"-1' W WEIR'` KEYED RIP RAP #57 WASHED STONE FRONT VIEW 1!/88 1 NOTE ADDITION Y. x4/96 ADD SPILLWAY CHART G.MA. CHECK DAM EXrSTrNG SLOPE STEP SEQUENCE Z MIN Z MIN COMPACTED STEEP CUT OR FILL SLOPE - - - - - 2:1 SLOPE (MAX) 1 - STABILIZE DIVERSION DITCH WITHCROSS SECTION AND TEMPORARY SEEDING AND EROSION CONTROL NETTING MIN. 10 GA. UNE WIRES 8 9 Is• MAX. VARIABLE AS DIRECTED BY THE ENGINEER FRONT VIEW STEEL POST WOVEN WIRE FABRIC SILT FENCE GEOTEXTILE FABRIC NOTE -USE SILT FENCE ONLY WHEN DRAINAGE AREA 4 Fly SLOPE DOES NOT EXCEED 1/4 ACRE AND NEVER IN N� AREAS OF CONCENTRATED FLOW N ;r -END OF SILT FENCE NEEDS TO BE TURNED UPHILL ti n ' GRADE 6" MIN. COVER OVER SKIRT REVISIONS N , DATE DESCRIPTION ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW 6 STANDARD TEMPORARY SILT FENCE 6' MAX. VARIABLE AS DIRECTED BY THE ENGINEER MIN. 10 GA LINE WIRES 12-1/2 GA. `EDIATE GRADE • FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 12-1/2 GA MEDIATE GRADE 1 HIGH - TENSILE STRENGTH - POLY BARRICADE FABRIC (TYP1CA0 - Ti I - _ FRONT VIEW c , STEEL N WI 40" WOVEN WIRE FABRIC UPSLOPE TOE POSITIVE GRADE 1.0% MAX. WARNING SIGN 2 ORAIIGE. UV RESISTANT, ~ TAIGA - TENSILE STRENGTH M TREE PROTECTION AREA cv o p POLY 6AIMI ADE FABRIC (TYPICAL) ~ 18" DO NOT ENTER SIDE SLOPES f7 N � "f 2 1 (MAX.) GRADE WARNING SIGN DETAIL \ \ \ \ \ NOTES: T \ \ \ WARNAVG SIQNS 10 BE MADE OF DURABLE, WEATHERPROOF MA7ERALL. \ \ \ \ \ \ \ \ \ \ \ \ \ 1 I LETTERS 70 BE 3' NIGH AMIMIA", CLEARLY LEGIBLE AND SPACED AS DETAILED. N SIGNS SNALL BE PLACED AT 30' MAXIMUM INTERVALS. STEEP CUT OR FILL SLOPE PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TIEE PROTECTION AREAS LESS THAN 200' Ni PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SOMI SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN nW PROTECTION FENCE DURATION OF PROJECT, ADDITIONAL SIGNS MAY BE REOUIRED OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS TION . PLAN VIEW SIDE VIEW PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. NOTE: FOR TREE PROTECTION ONLY DIVERSION DITCH 9 STANDARD TREE PROTECTION DETAIL 113 DEWATERING CONCRETE BLOCK 8 CLASS 1 RIP RAP(SEE SECTION THRU BASIN .° DISSIPATER PAD - - ° RIP RAP om - - C7 $ \\ CLASS 1. RIP RAP HEADWALL >• 7 \0 p -� -_ SEa�///////llllllll Ulll�j• •Y• • 05 S•Tow- 1' THICK X 3' HIGH MIN. PERMANENT o / OUTLET PIPE RCP CONSTRUCTION SPECIFICATIONS ��� O o o b. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE C91XXDi c o EARTH DAM ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL (D•o000. 0 °'e / DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED -� AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST PERSPECTIVE VIEW THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT 2:1 SLOPE GRAVEL FILTER NO SCALE DISSIPATER DIMENSIONS ELEV EMERGENCY SPILLWAY INLET 66 247.65 TOP OF DAM WIDTH 10' 254.3 ANTI -SEEP COLLAR 7' X 7' - RIP RAP DISSIPATOR PAD SEE DWG C-3 - ANTI -FLOATATION DEVICE 4'X4'X1' THICK - TOP OF RISER 24" CMP 246.65 OUTLET PIPE INVERT IN 25'±18"CMPO 1% 241.65 OUTLET PIPE INVERT OUT - 241.4 SEDIMENT STORAGE AREA 129'X64'X5' DEEP 241 65 - PERMANENT RCP OUTLET PIPE EARTH DAM PLAN VIEW 6 7 - - - - _ - TOP ELEVATION OF STORMWATER #57 WASHED r` Y 1STONE DESIGN OF SPILLWAYS EXISTING SLOPE DRAINAGE AREA WEIR LENGTH 1 - (ACRES) (FT) CLASS 1 RIP -RAP FILTER FABRIC 1 4.0 VARIES 2 6.0 3 8.0 4 10.0 s 12.0 SIDE VIEW 1 DIMENSIONS SHOWN ARE MINIMUM EXISTING SLOPES NOTE: HEIGHT &WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. VARIES KEY RIP RAP INTO THE DAM FOR STABILIZATION. 6"-1' W WEIR'` KEYED RIP RAP #57 WASHED STONE FRONT VIEW 1!/88 1 NOTE ADDITION Y. x4/96 ADD SPILLWAY CHART G.MA. CHECK DAM EXrSTrNG SLOPE STEP SEQUENCE Z MIN Z MIN COMPACTED STEEP CUT OR FILL SLOPE - - - - - 2:1 SLOPE (MAX) 1 - STABILIZE DIVERSION DITCH WITHCROSS SECTION AND TEMPORARY SEEDING AND EROSION CONTROL NETTING MIN. 10 GA. UNE WIRES 8 9 Is• MAX. VARIABLE AS DIRECTED BY THE ENGINEER FRONT VIEW STEEL POST WOVEN WIRE FABRIC SILT FENCE GEOTEXTILE FABRIC NOTE -USE SILT FENCE ONLY WHEN DRAINAGE AREA 4 Fly SLOPE DOES NOT EXCEED 1/4 ACRE AND NEVER IN N� AREAS OF CONCENTRATED FLOW N ;r -END OF SILT FENCE NEEDS TO BE TURNED UPHILL ti n ' GRADE 6" MIN. COVER OVER SKIRT REVISIONS N , DATE DESCRIPTION ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW 6 STANDARD TEMPORARY SILT FENCE 6' MAX. VARIABLE AS DIRECTED BY THE ENGINEER MIN. 10 GA LINE WIRES 12-1/2 GA. `EDIATE GRADE • FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 12-1/2 GA MEDIATE GRADE 1 HIGH - TENSILE STRENGTH - POLY BARRICADE FABRIC (TYP1CA0 - Ti I - _ FRONT VIEW c , STEEL N WI 40" WOVEN WIRE FABRIC UPSLOPE TOE POSITIVE GRADE 1.0% MAX. WARNING SIGN 2 ORAIIGE. UV RESISTANT, ~ TAIGA - TENSILE STRENGTH M TREE PROTECTION AREA cv o p POLY 6AIMI ADE FABRIC (TYPICAL) ~ 18" DO NOT ENTER SIDE SLOPES f7 N � "f 2 1 (MAX.) GRADE WARNING SIGN DETAIL \ \ \ \ \ NOTES: T \ \ \ WARNAVG SIQNS 10 BE MADE OF DURABLE, WEATHERPROOF MA7ERALL. \ \ \ \ \ \ \ \ \ \ \ \ \ 1 I LETTERS 70 BE 3' NIGH AMIMIA", CLEARLY LEGIBLE AND SPACED AS DETAILED. N SIGNS SNALL BE PLACED AT 30' MAXIMUM INTERVALS. STEEP CUT OR FILL SLOPE PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TIEE PROTECTION AREAS LESS THAN 200' Ni PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SOMI SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN nW PROTECTION FENCE DURATION OF PROJECT, ADDITIONAL SIGNS MAY BE REOUIRED OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS TION . PLAN VIEW SIDE VIEW PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. NOTE: FOR TREE PROTECTION ONLY DIVERSION DITCH 9 STANDARD TREE PROTECTION DETAIL 113 DEWATERING CONCRETE BLOCK 8 CLASS 1 RIP RAP(SEE SECTION THRU BASIN .° DISSIPATER PAD - - ° RIP RAP om - - C7 $ \\ CLASS 1. RIP RAP HEADWALL >• 7 \0 p -� -_ SEa�///////llllllll Ulll�j• •Y• • 05 S•Tow- 1' THICK X 3' HIGH MIN. PERMANENT o / OUTLET PIPE RCP CONSTRUCTION SPECIFICATIONS ��� O o o b. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE C91XXDi c o EARTH DAM ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL (D•o000. 0 °'e / DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED -� AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST PERSPECTIVE VIEW THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT 2:1 SLOPE GRAVEL FILTER NO SCALE DISSIPATER DIMENSIONS ELEV EMERGENCY SPILLWAY INLET 25C 248.25 TOP OF DAM WIDTH 8' 250.8 ANTI -SEEP COLLAR 5.5' X 5.5' - RIP RAP DISSIPATOR PAD SEE DWG C-3 - ANTI -FLOATATION DEVICE 350.5'X9" THICK - TOP OF RISER 18" CMP 247.25 OUTLET PIPE INVERT IN 25'±25"CMP@ 1% 242.25 OUTLET PIPE INVERT OUT -1242.0 ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH SEDIMENT STORAGE AREA 88'X44'X5' DEEP 242.25 - PERMANENT RCP OUTLET PIPE EARTH DAM PLAN VIEW 6 7 - - - - _ - TOP ELEVATION OF STORMWATER #57 WASHED r` Y 1STONE DESIGN OF SPILLWAYS EXISTING SLOPE DRAINAGE AREA WEIR LENGTH 1 - (ACRES) (FT) CLASS 1 RIP -RAP FILTER FABRIC 1 4.0 VARIES 2 6.0 3 8.0 4 10.0 s 12.0 SIDE VIEW 1 DIMENSIONS SHOWN ARE MINIMUM EXISTING SLOPES NOTE: HEIGHT &WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. VARIES KEY RIP RAP INTO THE DAM FOR STABILIZATION. 6"-1' W WEIR'` KEYED RIP RAP #57 WASHED STONE FRONT VIEW 1!/88 1 NOTE ADDITION Y. x4/96 ADD SPILLWAY CHART G.MA. CHECK DAM EXrSTrNG SLOPE STEP SEQUENCE Z MIN Z MIN COMPACTED STEEP CUT OR FILL SLOPE - - - - - 2:1 SLOPE (MAX) 1 - STABILIZE DIVERSION DITCH WITHCROSS SECTION AND TEMPORARY SEEDING AND EROSION CONTROL NETTING MIN. 10 GA. UNE WIRES 8 9 Is• MAX. VARIABLE AS DIRECTED BY THE ENGINEER FRONT VIEW STEEL POST WOVEN WIRE FABRIC SILT FENCE GEOTEXTILE FABRIC NOTE -USE SILT FENCE ONLY WHEN DRAINAGE AREA 4 Fly SLOPE DOES NOT EXCEED 1/4 ACRE AND NEVER IN N� AREAS OF CONCENTRATED FLOW N ;r -END OF SILT FENCE NEEDS TO BE TURNED UPHILL ti n ' GRADE 6" MIN. COVER OVER SKIRT REVISIONS N , DATE DESCRIPTION ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW 6 STANDARD TEMPORARY SILT FENCE 6' MAX. VARIABLE AS DIRECTED BY THE ENGINEER MIN. 10 GA LINE WIRES 12-1/2 GA. `EDIATE GRADE • FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 12-1/2 GA MEDIATE GRADE 1 HIGH - TENSILE STRENGTH - POLY BARRICADE FABRIC (TYP1CA0 - Ti I - _ FRONT VIEW c , STEEL N WI 40" WOVEN WIRE FABRIC UPSLOPE TOE POSITIVE GRADE 1.0% MAX. WARNING SIGN 2 ORAIIGE. UV RESISTANT, ~ TAIGA - TENSILE STRENGTH M TREE PROTECTION AREA cv o p POLY 6AIMI ADE FABRIC (TYPICAL) ~ 18" DO NOT ENTER SIDE SLOPES f7 N � "f 2 1 (MAX.) GRADE WARNING SIGN DETAIL \ \ \ \ \ NOTES: T \ \ \ WARNAVG SIQNS 10 BE MADE OF DURABLE, WEATHERPROOF MA7ERALL. \ \ \ \ \ \ \ \ \ \ \ \ \ 1 I LETTERS 70 BE 3' NIGH AMIMIA", CLEARLY LEGIBLE AND SPACED AS DETAILED. N SIGNS SNALL BE PLACED AT 30' MAXIMUM INTERVALS. STEEP CUT OR FILL SLOPE PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TIEE PROTECTION AREAS LESS THAN 200' Ni PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SOMI SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN nW PROTECTION FENCE DURATION OF PROJECT, ADDITIONAL SIGNS MAY BE REOUIRED OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS TION . PLAN VIEW SIDE VIEW PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. NOTE: FOR TREE PROTECTION ONLY DIVERSION DITCH 9 STANDARD TREE PROTECTION DETAIL 113 DEWATERING CONCRETE BLOCK 8 CLASS 1 RIP RAP(SEE SECTION THRU BASIN .° DISSIPATER PAD - - ° RIP RAP om - - C7 $ \\ CLASS 1. RIP RAP HEADWALL >• 7 \0 p -� -_ SEa�///////llllllll Ulll�j• •Y• • 05 S•Tow- 1' THICK X 3' HIGH MIN. PERMANENT o / OUTLET PIPE RCP CONSTRUCTION SPECIFICATIONS ��� O o o b. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE C91XXDi c o EARTH DAM ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL (D•o000. 0 °'e / DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED -� AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST PERSPECTIVE VIEW THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT 2:1 SLOPE GRAVEL FILTER NO SCALE DISSIPATER TRAP \ SEDIMENT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. CHECKED RPH DATE 11 JUN TEMPORARY CMP RISER -PERFORATED SCALE IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ,�..v RIBPCW 71. - PERMANENT RCP OUTLET PIPE EARTH DAM PLAN VIEW 6 7 - - - - _ - TOP ELEVATION OF STORMWATER #57 WASHED r` Y 1STONE DESIGN OF SPILLWAYS EXISTING SLOPE DRAINAGE AREA WEIR LENGTH 1 - (ACRES) (FT) CLASS 1 RIP -RAP FILTER FABRIC 1 4.0 VARIES 2 6.0 3 8.0 4 10.0 s 12.0 SIDE VIEW 1 DIMENSIONS SHOWN ARE MINIMUM EXISTING SLOPES NOTE: HEIGHT &WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. VARIES KEY RIP RAP INTO THE DAM FOR STABILIZATION. 6"-1' W WEIR'` KEYED RIP RAP #57 WASHED STONE FRONT VIEW 1!/88 1 NOTE ADDITION Y. x4/96 ADD SPILLWAY CHART G.MA. CHECK DAM EXrSTrNG SLOPE STEP SEQUENCE Z MIN Z MIN COMPACTED STEEP CUT OR FILL SLOPE - - - - - 2:1 SLOPE (MAX) 1 - STABILIZE DIVERSION DITCH WITHCROSS SECTION AND TEMPORARY SEEDING AND EROSION CONTROL NETTING MIN. 10 GA. UNE WIRES 8 9 Is• MAX. VARIABLE AS DIRECTED BY THE ENGINEER FRONT VIEW STEEL POST WOVEN WIRE FABRIC SILT FENCE GEOTEXTILE FABRIC NOTE -USE SILT FENCE ONLY WHEN DRAINAGE AREA 4 Fly SLOPE DOES NOT EXCEED 1/4 ACRE AND NEVER IN N� AREAS OF CONCENTRATED FLOW N ;r -END OF SILT FENCE NEEDS TO BE TURNED UPHILL ti n ' GRADE 6" MIN. COVER OVER SKIRT REVISIONS N , DATE DESCRIPTION ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW 6 STANDARD TEMPORARY SILT FENCE 6' MAX. VARIABLE AS DIRECTED BY THE ENGINEER MIN. 10 GA LINE WIRES 12-1/2 GA. `EDIATE GRADE • FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 12-1/2 GA MEDIATE GRADE 1 HIGH - TENSILE STRENGTH - POLY BARRICADE FABRIC (TYP1CA0 - Ti I - _ FRONT VIEW c , STEEL N WI 40" WOVEN WIRE FABRIC UPSLOPE TOE POSITIVE GRADE 1.0% MAX. WARNING SIGN 2 ORAIIGE. UV RESISTANT, ~ TAIGA - TENSILE STRENGTH M TREE PROTECTION AREA cv o p POLY 6AIMI ADE FABRIC (TYPICAL) ~ 18" DO NOT ENTER SIDE SLOPES f7 N � "f 2 1 (MAX.) GRADE WARNING SIGN DETAIL \ \ \ \ \ NOTES: T \ \ \ WARNAVG SIQNS 10 BE MADE OF DURABLE, WEATHERPROOF MA7ERALL. \ \ \ \ \ \ \ \ \ \ \ \ \ 1 I LETTERS 70 BE 3' NIGH AMIMIA", CLEARLY LEGIBLE AND SPACED AS DETAILED. N SIGNS SNALL BE PLACED AT 30' MAXIMUM INTERVALS. STEEP CUT OR FILL SLOPE PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TIEE PROTECTION AREAS LESS THAN 200' Ni PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SOMI SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN nW PROTECTION FENCE DURATION OF PROJECT, ADDITIONAL SIGNS MAY BE REOUIRED OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS TION . PLAN VIEW SIDE VIEW PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. NOTE: FOR TREE PROTECTION ONLY DIVERSION DITCH 9 STANDARD TREE PROTECTION DETAIL 113 DEWATERING CONCRETE BLOCK 8 CLASS 1 RIP RAP(SEE SECTION THRU BASIN .° DISSIPATER PAD - - ° RIP RAP om - - C7 $ \\ CLASS 1. RIP RAP HEADWALL >• 7 \0 p -� -_ SEa�///////llllllll Ulll�j• •Y• • 05 S•Tow- 1' THICK X 3' HIGH MIN. PERMANENT o / OUTLET PIPE RCP CONSTRUCTION SPECIFICATIONS ��� O o o b. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE C91XXDi c o EARTH DAM ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL (D•o000. 0 °'e / DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED -� AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST PERSPECTIVE VIEW THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT 2:1 SLOPE GRAVEL FILTER NO SCALE DISSIPATER PLAN VIEW TEMPORARY CMP RISER -PERFORATED SKO AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. CHECKED RPH DATE 11 JUN TEMPORARY CMP RISER -PERFORATED SCALE IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT RIBPCW SHEET WATER LEVEL DURING STORM TRASH RACK I V MIN. FREEBOARD TOP OF � WATER LEVEL DURING STORM TRASH RACK I V MIN. FREEBOARD (L TOP OF DAM ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH IL - BLOCK OPENINGS. WIRE SCREEN - 2. FI HARDWARE HCOMPARABLETEMPO CAREFULLY T ARD E CLOT OR TEMPORARY SEDIMENT AREAS To BE DISTURBED SEDIMENT RAGE PIPE INVERT J . SEDIMENT STORAGE " FILTER . - - SEDIMENT STORAGEVEL TER '* :. •• %p GRA - MINIMUM SLOPES 2 1/2:1 WIRE MESH WITH 1/2 -INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. POOL DEWATERING cur ETC. ( FILL. ) FLOOD STORAGE ZONE RIP RAP HEADWALL GRAVEL t RIP RM FILTER BERM BASH DETAIL s DESIGNED TO PROTECT EXISTING PIPE lITAIL IERTS TNMT DRAIN 10 ACRES OR LESS. •GRAVEL 0'. • ..� ..0� MINIUM SLOPES 2 1/2:1 .. • .Loa O O • fJb 3. USE CLEAN GRAVEL, 3/4- TO 1/2 -INCH IN - - - - - - - - ' �j' I r�2,'I 3 UND F�w CLEANOUT MARK I �o� m ' ` N PAINTED RED CLEANOUT MARK LOCATED HALFWAY FWAY UP RISER EARTH DAM DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND 1' MIN. __ : , _ 16" --� � 1 - - - - FILTER FABRIC H�wFwA RISER PIPE ANTI -sem ANTI- P � 2' MAX. o° °° - -., 1 CLASS 1 RIP -RAP SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED n di� .: DIMENSIONS ARE MRI -FLOATATION DEVICE PAD ANTI -FLOATATION DEVICE DISSIPATER PAD STONE IS RECOMMENDED. ��� y d $ •' J MINIMUM ACCEPTABLE /57 WASHED STONE RIP RAP RIP RM - TEMPORARY CMP 2' X 2' AIN. CUTE - _ TEMPORARY CMP 2' X 2' MIN, CUTOFF - TRENCH MI i:1 SIDE SLOPE - - TRENCH W/ 1:1 SIDE SLOPE REVISIONS = - REVISIONS DATE DESCRIPTION PERMANENT RCP CMP OUTLET PIPE DESCRIPTION PERMANENT RCP CMP OUTLET PIPE AN ,! 86 NOTE ADDITION SLS 10/88 NOTE ADDITION S.S. . 4/96 ADD TABLE : NOTEs G.M CROSS SECTION + 96 Mol TABLE NOTES G.M CROSS SECTION RISER BASIN # 6 15 RISER BASIN # 7 16 UPSTREAM END OF • FOR REPAIR OF SILT STORM DRAIN OVERFLOW 8' MAX. FENCE FAILURES, USE VARIABLE AS DIRECTED BY THE ENGINEER No. 57 WASHED STONE. In FOR ANCHOR WHEN SILT ° T 1/3 PIPE FENCE IS PROTECTING > P d 1 DIAMETER CATCH BASIN. p ' ° D 0 WARNING SICK MIN. 12-1/2 CA INTERMEDIATE MIN. 10 GA WIRES sD oD', LINE WIRES 7 =' / j ° IN! L FD ETO EMCOPID BURY BOTTOM �,� _ OF PLYWOOD m-7Tf j jjl==1Ii=1I1=1I I III =III=�(r GRADE - - - � 1 "� rw 77,wr� _ .� -:`iR .�'.�C ,��w ,„'- in-,9T;.�!Y,; �-r, .n-�.,7 ��F :' I {.--.'.I:, - - - -•�- NOTE: ALL PARTIALLY COMPLETED STORM DRAINS �- 3/4" EXTERIOR STEEL POST PLYWOOD wovE1VIFABRIC - SHALL BE PROTECTED AT THE END OF WARNN ING SIGN = -- EACH DAY IN ACCORDANCE WITH THESE STEEL FENCE PLYWOOD INLET PROTECTION 0 TLE FABRIC - DETAILS. OOD SILT FENCE CE TEXT - ET _� L l POST (TYP.) 4UPSTREAM END OF OVERFLOW N FILL SLOPE - FRONT VIEW M STORM DRAIN �" " II 11 II N � II GRADE II II 1/3 PIPE DIAMETER 6' MIN. COVER TREE PROTE :TION AREA i II II II p o c _ OVER SKIRT• '• 18' II I I c N 10 DO NOT ENTER •oo i EXTEND WIRE 6' MN. INTO TRENCH �° • AND ANCHOR SKIRT AS ~ ' WASHED STONE FILTER DIRECTED BY ENGINEER • s D SIDE VIEW NOTES: WARNING SIGN DETAIL ACROSS PIPE INLET ° WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIA.. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. r1 l 1 l J �� - - •I ~ 11 NOTE: PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THHEREAFTER• FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SON PER PROTECTION ARIA 1 � HARDWARE CLOTH -USE SILT FENCE ONLY WHEN DRAINAGE AREA ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. REVISIONS I I I U DOES NOT EXCEED 1/4 ACRE AND NEVER IN MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. DATE DESCRIPTION AREAS OF CONCENTRATED FLOW ADDITIONAL SIGNS ALLY BE REQUIRED BY CROY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD WPONS. U U u PLACE A SIGN AT EACH END OF LINEAR TREE PR07UCTION AND 50' ON CENTER 711ERiAF7ER. STONE FILTER INLET PROTECTION -END OF SILT FENCE NEEDS TO BE TURNED UPHILL STANDARD TEMPORARY SILT / TREE PROTECTION FENCE 1 A PIPE INLET PROTECTION (PLYWOOD AND STONE) 12 } UNLESS OTHERWISE MAX. SEDIMENT DEPTFI(CLEW OUT POINT) NOTED. _ ' r REVISIONS )N SEDIMENT T` .•• DATE DESCRIPTION SECTION THRU BASIN. FILTER AND CULVERT PIPE I� NO SCALE BLOCK AND GRAVEL DROP INLET PROTECTION 13(EXISTING PIPE INVERTS) 4 GRAVEL & RIP RAP HORSESHOE INLET BASIN (3' - 10') DIMENSIONS ELEV VARIABLE MATERIAL 4° Mpl� EMERGENCY SPILLWAY INLET 39 254.45 STAPLED IN 2 TOP OF DAM WIDTH 10' 259.0 \ SEDIMENT 1H1°� TRIP- PLACEF- I -i { 11= ANTI -SEEP COLLAR 6'X6' " - I! {-{! {-� RIP RAP DISSIPATOR PAD SEE DWG C-3 6 MIN. - \ : ;; :: <• :... %==�= DISSIPATOR PAD -111 -I i=i { i=1 = _ =� 1=, f {_ ;) 1=1 !; ANTI -FLOATATION DEVICE 4'X4'X1' THICK RIP RM I _ TOP OF RISER 24" CMP 253.45 - 8..0 % 248.45 - •- _�; -- - OUTLET PIPE INVERT IN 25't 1 MP® 1 \ " . • . :.. < _ hIi III 'I1I�-III I �I =j I ^�ii a.. LEVEL LIP I L_ , �,..I , •--1 -f I I - _ i=I {; 1 -! f - ! {- OUTLET PIPE INVERT OUT OF SPREAD R1 _�i{{-_:;{--i i{ �;_ I�{= I{�,i��_:_%;F • SEDIMENT STORAGE AREA 98'X49'X5' DEEP 248.45 \ ?< PERMANENT RCP 1 i- I I I f I .I ',>••' OUTLET PIPE 6' MIN. -1 I CROSS-SECTION _--_-- EARTH DAM TEMPOIV Y CMP RISER-PIE11WOMM PLAN VIEW 1 0'TOP OF DAM WATER LEVEL DURING STORK -'\ TRASH RACK I1' MIN. FREEBOARD SEDIMENT STORAGE 1L M' GRAVEL FILTER �'• MINIMUM SLOPES 2 1/2 1 LOW POINT o' lt Do - RK 10' 3' PLACATED AINTED REDLFNA UP RIMAF PIPE !. EARTH DAM -� ANTI -SEEP COLLAR ANTI -FLOATATION DEVICE DISSIPATER PAD RIP RM LEVEL LIP TEMPORARY CMP 2' X 2' MIN. CUTOFF OF SPREADER REVISIONS TRENCH W/ 1:1 SIDE SLOPE PLAN ' /� N DATE DESCRIPTION PERMANIOOUTLET PERMANENT ROP CMP O PIPE 10/86 NOTE ADDITION S.S. . 4/96 AM TABLE & NOTES G.M CROSS SECTION LEVEL SPREADER DETAIL RISER BASIN # 8 17 N.T.S. STORM DRAINAGE & EROSION CONTROL DETAILS /-A Goom n N = Z 8 Y Qcc o av c X � Nz�n n n E �� ap OR co d 00 030) F� PIF r Q 4L a 0 Y f Y ' Oc t•f�'.'Gt_c.. n • • N` f / • e i ,tom Q Z a J ''^^ O C V♦ z � °C Lu 0 �a�� c a Lu G H 3cc Z Q = OW O Z.m V U z a3 WW OOz mmco) z Lux wP W " �W W V Z z V O W 2 J 0 REVISIONS BY 21 JUL 2003 SKO (PERrtINi'S) 23 SEP 2003 (WAL-MART) SKO DRAWN SKO CHECKED RPH DATE 11 JUN 2003 (90% CD) SCALE JOB No. RIBPCW SHEET 1 2 3 4 5 6 7 8 9 A ~--a - PROVIDE MANHOLE RING, COVER -I I . M & 8' _ ANHOLE STEPS PER DETAIL 2 - - 1 - _ 5 OPENINGS REFER TO ST 1 - c ALL 4 SIDES ANDARD RTCB DETAIL - - 'E FOR WALL & SlA6 CONSTRUCTION _ ~1 250.8 -BERM - - ~n z r_~ - - qk ~ d. , . e - 250.3 - W 2.5 - - 3 - = 250.8 S~Op TOP OF SLAB 3 - - F 3, - _ • J ,n - 249.8 -MAX. WATER SURFACE ELEVATION FOR - 1 100 YR STORM - ~ I- - A ~ - - 8 247.3 -P.W.E. - - - - 6 - - 1 - I- 6 - j- - 248.7 -TEMP " - _ 1 - 1 - - I ORARY STORAGE OF 1 RAINFALL EVENT m " ° . ~ n i 2.5 2.5 N _ 245.3 -SHELF _ ~ _ _ - ~ _ E - - 1 - VEGETATED SHELF _ 242.0 -BOTTOM 1 ~ i I I - - - _ - 247.3 PERMANENT - - - - WATER ELEVATION 42" RCP 'd ' ~ W v~ " COMPACTED STRUCTURAL ~ Z MATERIAL 5~-0 z TO ~ - - - - - - - a _ © ~ LL~L~ 4 C d4 d x e ~O OO SECTION THR OUGH PON D 1 ` ~ aZnn E o B NOT TO SCALE w~=~~~ d o . ~ m~~o~ a a . ~o a~ o~ M , ~ e, ~ ' e. ~ 'd a ~ ° 'a a ee . •e .d W Ol ~ I 1' MIN. {TYPICAL) e. ANCHOR BASE SECU " I RELY Q. 8 DI PIPE I~I ~ TO WALLS W/ VALVE ASSEMBLY I I li ' POND BOTTOM II It' 242.0 ~ I I ~ 242.0 KEYSTON E I 'I'. RETAINING WALL a ' . a ' ~ d' _ -.a e .a ° e , ° d a , , e ELY ANCHOR BASE SECUR ' . ' d'.'. TO WALLS 3 - 254.3 -BERM 3 1 - - CONCRETE BASE. MIN. 1' THICK 1 - - 250.0 -P.W.E. _ = i 1 _i~ ~ - RAIS - ED T OP CATC - 1 _ -i HB - _ ASIN _ - 25C ~ 2.25 - `F~e~p:M§arsct~ ~ _ _ 248.0 - 248.0 -VEGETATED - - ry - _ _ - - SHELF C I - SHELF - - 1 ` t.`: a A,rrr. i 2 2 -III 1 -1 VEGETATED SHELF-' _ - - fG • - ~ _ _ III- (TYP.) _ ~ -COMPACTED ~ ~ = PROVIDE M ANHOLE RING, COVER & $ COMPACTED STRUCTURAL -I MANHOLE STEPS PER D - - 241.2 -BOTTOM MATERIAL _ _ - ETAIL ~ MATERIAL 15" OPENIN • ~ ~ f ~ ~ - ~ - _ - _ - - - -i GS REFER TO STANDARD RTCB DETA ee°:;;'~~~.~" ~ c ALL 4 SIDES IL rr aat - - I - - - ~E FOR WALL & SLAB CONSTRUCTION r+e ,rr tN - - i - _ ' Mqk d. ; ^ • ' - - 253.9 - S( TOP OF SLAB Op SECTION THR OUCH PON D 2 F3. - J - 253.3 MAX. WATER SURFACE ELEVATION FOR - 100 YR STORM NOT TO SCALE - 252.3 -TEMPORARY STORA " GE OF 1 RAINFALL EVENT N ° , e,e' - - - - 2 - - _ 50,0 PERMANENT WATER ELEVATION 42" RCP ~d MANHOLE LID (60" RCP FOR 66 a 7~-O" ' ' i~ ) 250.8 -TOP OF BERM ~I 'aa a. M'4k 249.8 -TOP S(Op f.' f 3; ~ d , D 2 PVC DRAWDOWN PIPE. d d, EXTEND 6" BELOW PERMANENT ~ e. ANENT d WATER ELEV. a do ~.d ~.d 247., 247.3 - P.W,E. aa ~ J J MAk SLOPE 6, ~ 1' MIN. (TYPICAL y I ANCHOR BASE SECURELY TO WALLS ° 8" DI PIPE z I ~ I °I W/ VALVE ASSEMBLY ~ W Q PON 0 ~ V I I I D BOTTOM ~ MqX 241.20 66 I~ 241.2 ~ ~ U a IIII O~Z S~Op 241.56 65 ~ W W I I ~ F ~ °II. 0 ~ _ a' • F Q W z ~ ' ~ d ~ ANCHOR ~ ~ d W 1.0' . BASE SECURELY ~ (V QZ TO WALLS a m W, w2 242.0 -BOTTOM ~ ~ Z> m ~ ~ W CONCRETE BASE. MIN. 1' THICK W • C T 2= RAI w SED TOP JUNCTION - - BOX 25A DRAW DOW CAT CH 8AS1 N 65 66 z N BOX W ~ E NOT TO SCALE 0 J ~ Q MANHOLE LID 254.3 -TOP OF BERM MqX 253.2 -TOP S~Op f 3; ~ 3" PVC DRAWDOWN PIPE. EXTEND 6" BELOW PERMANENT WATER ELEV. ENT MAX SCOPE g. - 250.0 250.0 - P.W.E. .i Mqx Sapp f?~1 REVISIONS BY 11 JUN 2005 F (90% CD) SKO 21 JUL 2003 0_1 O'ERMTS) DLH 241,2 BOTTOM - x 23 SEP 2003 T (WAL-MART) DLH JUNCTION - BOX 63 (DRAW-DOWN BOX NOT TO SCALE DRAWN SKO G CHECKED RPH DATE 08 JUN 03 (DWQ REVIEW) SCALE 1'.80' JOB No. SHEET STORM DRAINAGE & EROSION RIBPCW CONTROL DETAILS C~3m5 1 2 3 4 5 6 ~ 8 g I i ~ ~ A\ ~ ~ \ _ _ \ y I r \ 1 i I / ~ \ i ~ ~ _ I ~ 1 ,ti ~ 1 ~ ~ V ~ . ~ 1 , / ~ ~ A \ \ ~ ~4 ~ ~ ~ ~ i ti ~ ~ ~ i 'y `G \ \ } ~ ~ ~ 1 \ \ ~ / ~ -i' ~ ~ ~ I 1 i\ I i I ~ ~ V ; ~ ~ 1 ~ ~ i ~ l ' ~ \ V ~ - _ ~ 1 t A ~ - ~ ~ ~ ~ j I ~ I \ 1 ~ , ~ 1 ~ ~ { \ ~ i ~ ~ 1 f ~ ! 1 i ~ ~ ~ ~ ~ ~ i I ' 1 I~ ) I I \ ~ % ~ l v ~ i ~ 1~~1 ~ V. 1 ~ ~ l r ~ ` ~ ~ ~ ~ ~ I ~ '0 1 1 i \ ~ ~1 i r' ~ ~ ~ r ~ ~ ~ t ~ f 1 t ~ ~ I ~ ~ ~ r. ~ ~ r: ~ I ~ ~ I ti ~ ~ ~ } I I ~ ~ 1 1 i A 1 ~ 1 ~ I ~ \f I I 1 ~ ~ ~ ~ , r I I j , A ~ 1 I i ~ ~ ~ 1 ` y ' ~ > > , ~ ~ ~ ~ j( ~ _ N / \ ~ \ 1 ~ l t ~ 1. ~ A A ~ l ~ ~ ~ ~ I ` ~ ~ A~ ~ ~ ~ ~ ~ ( ~ N h I i , ~ ~ ~ I~~ E ' - - a ~ _ _ - ~ \ \ I , ~ ~ 1 i ~ ~ ~ ~ V ~ ~ A ~ , ~ A ~ / r ~ ~ ~ ~ ~ t ~ ~ ~ ~ ~ ~ W ~ ~ ~ i ~ a ~ ~ ~ O ~ / t 1 \ `ti \ r O I~~ ~ - _ A ~ ~ J \ ~ ~~f / ~ I \ ~ i ~ s , ~ / ~ ` o V i ~ ~ ~ ' ~ , s 1 , A ~ ~ x ~ ~~p ~ ~ ~ ~ ~ i ~ ~ ~ ' V ~ ` ~ ~ Uf ~ c ~'t A ~ \ ~ ~ ~ O O ~ ~ , \ ~ ~ Z I~ 1 10 ~ ~ ~ ~ y~ ~ 1 \ ~ ~ ~ ~ ~ rr o ~ y k ; ~ 1° 1` ~ \ ~ I ~ ~ ~ ~ ~ A A ...T~ I t~ \ ~ ~ ~ ~ -ooao a - ; ~ , V'. ~ ~ ~ ' ~ i m of of 3 ~ Q ~ M B ` ~ ~ ~ ~ ~ ~ ~ ~ I ~ V ~ I V 1 I ~ ~ ~ I ~ t \ .~A ~ i, I ~ ~ ~ J ~ N ~ ~ \ ~ 1 , ~ ~ ~ ~ i ~ s ~ N ~ ~ ~ ~ ~ V A A ~ V \ ~ ~ ~ ~ \ ~ \ \ ~ ~ \ \ \ \ I ~ ) i oo r A ~ ~ ~ A 1 ~ ~ \ ~ ~ ' \ I ~ ~ A ~i ~ \ ~ ~ ~ _ 1 ~ 1__ ~A ~ ~ ~ ~ y t ~ i _"'i( V` I ` ~ ` i I 1 1 ~ ~ - ~ ~ ' \ ~ 1. l ~ ~ ~ ~ I 1 A ~i ~ ! ' ~ i N ~ A ~ ~ 'i ` ~ \ ~ y. ~ ~ } . A ~ ~ ~ ~ I ~ ~ ~ , , ~ \ ' ~ r i 1 ~ i ~ ~V ~ ~ ~ ~ ~ I ~ j ; ~ ~ 1 \ I ~ ~ ~ ~ i A ~ , ~ ~ ` ~ \ ~ ~ ~ ~ 1 ~l ' k ~ ~ \ - - ~ ~ < \ ~ ~ 1 V ~ l i I ~ ~ i ~ ~ ~ i ' ?1 ~ ~ 0~. I i ~ A ~ ~ ~ . ~ ~ S I ~ ~ ~ I i y ~ ~ ~ ~ \ ~ ~ 1 ~ i ~ 0 ~ ~ ~ I I , , ~ ~ ~ _ ~ 01 t ~ / ~ i p ~ C i i~ ~ 1 ~ ~ ~ i ' ! i ~ ~ / ~ ! I / ~ I r< ~ ~ ' ~ \ ~ Q ~ ~ ~ ~ ~ ~ O~ ~ ~ } ~ ~ ~ _ ~ ~ ! ~n r ~ ~ 1, 66 / \ , i ~ i I i ~ ~ f ' i I ~j A ~ i ~ i ! ~ i i i i ~ ~ r ~ , ~ j 65 ~ I f 1 ~ ~ ~ A ~ ~ ~ ti ~ ~ ~ ~ ~ ~ ~ ~ A / 1 - - f '"yam / ~ J ~ ' 1 ~ / F v l _ \ F ~ ~ 1 j I ~ ry \ , , ~ ~ ~ I i i < < / I r M r~ ~ / ~ ~ 1 , ` ~ ~ Q ~ ~ ~ ~ , ~ I t i / l ~ ~N ~ / ~ `o.~ 1 ~ I i ~ ~ ~ / ~ / ~ / • ~ ~ i ,.i 11 N i ` i 1 ' , ~ ~ ~ / ~ ~ ~Y - / ~ yz ~ ~ ~ A ~ ~ i / i ~ i ~ i' i i' 11 j , i ~ ~ / l ~ l,% / ' 1 ~ ~ i I ~ ~ l i i 1 i i ~ ~ ~ ~ ! ~ ~ , ~ i ~ ~ Q ~ ~ 2~ / ~ ~ 'G / t nn ~ ~i ' - , 'V r ~ ' /~QP ~ ~ ~ \ - a D ~ ' / ~ r ~ J I ~ ~ 5 / ~4 ~~0 ` i ~ V A J ~ _ _ 5 ? to + ~V - 244; ~ `Ihly _ _ _ _ / . ~ ~ ~ ~ u ~ ~ ; i i F, 1 \ ~ ~ ' / 64 F. ~ ~ ~ / . ~ ~ W ~~0 ~ r~~ / ~ i LL 1 Z 63 ~ ~ / w ~ ~ ~ \ Q ~ i ~ ~ ~ ~ i~ / F~ ~ ~ d ~ / ~ ~ W b l ~ ~ / 1'~ i ~ Z ~ i N ~ ~ W W z - , f - ~ ; • 1' ~ ~ I ~ Z i~ ~ ~ ~ ~ ~ ~ - _ / ~ Z Q ~m ~ - / ~ i A ' ~ . ~ ~ , ~ ~ , I U W ~ - ~ if ~ ~ / ~ i ~ ~ W W Oz . ; / - ~ ~v ~ I J • ~ ; ~ . m ~ ~ m ~ _ ~r / ~ , ' ~ , ~ 1 W • , i I ~ ~ ` ~ ~ ~ ~ Q 5 ~ J ~ ~ ~ ~ W w . ~ : 1~ _ ~ ~ 5 ~ - z 2 Y ~ G~ , ~ i _ ~ W z - i ~ A ~ i , i ~ ~ INV 243,710 - ~ 0 - - Z ti ~ ~ i ~ 1 ~ ~ ~ ~ W i 5 ~ ~ ' 0 - ~ J t ~ i 1 ~ ~ A ~ ~ ~ ~ ~ , ~ ? ~y. ~ 1 V ~ ~ ~1 \ LL _ _ _ _ ~ ~ ~ ' - ~ ~ APPROXIMATE LIGHTS OF E%IS . ~ \ ~ , ~ ' , , ' ' ~ ~ ~ FOREST D VEGETATION TO RE AIN ~ ~ i ~ ~ ~ ' n , _ - i , , /r. s ~ \ A ~ 1 ARTER CONSTR CTION (TYP.) ~ 1 - i , ~ ~ ~ W ~ i~ \ - - 1, , / ;N I _ r i I r ~ ~ ~ i ~ _ - V ~ i/ ~ ' / / I A ~ (n 1 i ~ ~ l r ~ _ ~ ~ / ~ ` ~ ~2. ~ ~ ~ ~ - - - ~ ss ~ ~ - i ~ p l i ~ ~ ~ 55 ~ ` ' r ~ ~ ~ / ~ y n • ~ / ~ i' i i Q V ~ ~ V \ A ~ / I Y~' ~i i / 1 ~ ~ , ~I ~ ~ 'SS ~ i ~ ~ - ~ ~ ~ ~ ~l - - - - i r' i ~ ` \ ` , ~ ss _ ~ ~ ~ • / / ~ \ ~ ~ ~ ~~l / ~ PONa" # 1 REVISIONS "J \ \ \ 2 I 5 0 2 - - i 5 4 2 6 2 O jll~ - N :i 1 2~ 6 2 DRAWN V DLH 71 CHECKED 5 , RPH NORTH DATE 08 AUG 2003 G SCALE r•20' 0 20 40 60 JOB No. RIBPCW SHEET SCALE IN FEET ENLARGED POND PLANS ¦ L 1 2 3 4 5 6 7 8 g a Ics-s ' LJR-2 ti SEASONAL COLOR , ~ BT-12 N 0 ~ ~ ti ~ LM-250 c Wig y ®12" O.C. i 9 a N/F THE BODY, LLC , r ' I N ' ~ I r-~ r ~ r O ~ Z G A 1 ~ ~ < 1 ~ a ' TRACT ID SIGN \ ~ 9 ~ 2.s2' ~J ~ 0 ~ \ 1' r - - ~ A a ~ TT - _ - r A - c ~ / ' a. , ~ ~ 1'' - ' - _ S 84'33'18" E 1131.92' ~ - ~J 0.57' ~ ~ / e/1 ~ as :a e,• ~o 12.18' ~r~~~~~~~ . N _ I~~ E \ 'J' ~ - - I I o.7T ~ ~ ~ TD-1 LS-3 TD-4 LS- TD 3 LS-3 TD-1 PROPOSED C BP-OR~rT1~ 9 ?P-4R~rT~t01V"PARKWAY C-~ ~ _ N Z - _ TRACT ID SIGN PLANTINGS - Y 0 _ _ s C O . ©lL d 4, 9 C . 1 ~ ~ 877.1' SCALE• 2 - N F PEGGY W. JOHNSTON AND ~ / / ~ JAMES MARION WILBURN - t / jr , y0 O~ ~ I p ' A ~z~FE 6.77' \ ~ APPROXIMATE LIMITS OF r'~ ° i ~ EXISTING WOODED 1~1 I c~ ~ JCP-46 / lS EXIST. FORESTED VEGETATION ~ ~ a AREA TO REMAIN TREE PROTE TION TO REMAIN (TYP.) m ~ of ' \ ~ 4~ ~ ' .L BN-2 i t FENCE ~ ! ~ M / ~ ~ ~ PT-20 ao ~ EP-45 B . PR OSED FENCE N/F HEDINGHAM PROPERTIES, LLC \ 5' O.C. / ~ ~ ARF-5 I ZONED:I-1 ~ USE: VACANT \ / QPA-6 LI-3 \ I 18 _ O _ ~i OL 9 / \ / \ _ ' ~ ' ' ~ JE-280 ~ ~ CJ-42 ~ AR-3 SV-438 ~ , ,c:,:::~ ~ ~I PC-496 i , i ~ GRASS ALL DISTURBED / ~ AREAS , ` 1 1 ~ ~ 1 ~ • PROVIDE 4' DIAMETER BY 3" DEEP MULCH RING ~ ~ . AROUND AlL TREES IN I AR-1 ~ . LAWN AREAS ~ JUN-16 ' ' ' ' ' \ Y rrnrMrrr ryrrr \ ~ i PK- Y ~ ~N ~ ~ ~ m o~ QPA- . ~ 0 I CD- \ w y ~ rn n ~ ~ o ~ ~ +u \ /1 ~ ~ X I ~ I ~ Z / iO ~ ~ I ~ ~ I I 'P ~b 10 ~ \ ~I~I~C1~VLiv I LR ~L~L • h P VJ-10 ' ' ' ' ' ' ' SEED ALL SLOPES ON DETENTION \ ~ CD-1 C-192-EGL-OL 6 (I ~ 20 ~ ~ PONDS THAT EXCEED 2.5:1 WITH 1 203,942 S.F. 9 !4 ~3 I I I WEEPING LOVE GRASS. REFER TO ~ JUN-24 ~ GRADING PLAN FOR CONTOURS N/F PEGGY W. JOHNSTON AND ~ F•F•E• - 272.0 I I f ~ \ JAMES MARION WILBURN cn _ y u d • AREA BELOW LEVEL SPREADER (MIN. 50' \ ~ 1 ZONED: I 1 C.U.D. ~ USf: VACANT AR-1 JE-318 LONG x 23' WID T ~ s SV-307 E) 0 BE SEEDED W/ ' ' ' i~,.s ~ WEEPING LOVE GRASS TO PROVIDE THICK • • PC-285 4 • ~ ' ' ' ' ' ' ' GROUND COVER. OAK AND MAPLE o ,O PROVIDE 3" DEEP ICR-10 SAPLINGS (18" TALL) SHALL BE ADDED 1 PINE STRAW MULCH * • .T ' ~ AS REQUIRED TO PROVIDE DENSE IN ALL SHRUB BEDS PK-3 ~ AND GROUPINGS QPA-4 JCD-30 ~ 1~ FR ` • • • ~ 0 ESTED VEGETATION• . PK-3 ` ' ' ` (10' ON CENTER) . . JCD-30 • I STORMWA R P N TE 0 D ~ CD-2 1 VJ-.12 LT-8 4 l ~ . . EP-15 ~ KP-4 PA-5 ~ ~ ' 8 ~ _ _ LANDSCAPE RE UIR M . E ENTS R~~4 • ~ LS-3 LS-1 - _ - _ - TPY~2 LS1 LS-1 - ICC-18 AR-1 ~ Q ICC-1 G-18 - LS-1 LS-1 LS-~ _ - B Z ' AR- STREETYARD/ SHOD REQUIREMEtJTS - a PA1-1 LI 2 ICC-18 ICC-18 CC-18 ~ O D } + J~ LS-1 is J CD-3 J LR-30 1 ~ - ~ ~ ~ _ ~ P } 12 - ICC-18 ! t t \ CORPORATION PARKWAY: 945 L.F. N I-2 ~ ! 6 TREE DIA. PER 50 LF REQUIRED -4 i a Cf-3 LS-2 VJ-7 945 L.F./50x6"=114" TOTAL TREE CALIPER REQUIRED W MC-12 r + ° ~ a VJ-12 d ~ EXISTING TREES EXCEED R I • CC-23 ICC-18 PROPOSED N PT-5 EQU REMENTS FOR TOTAL CALIPER Z ~ QPA-3 ¢ a + a • p a ¢ -0 • RETAIL JF-7 5 TREES PROVIDED TO MEET MIN. SPACING REQUIREMENTS Q ~ PROPOSED O W e ~ • ~ } ~ a ~s,ooo sF ~ - ~ c U JF-8 + ~ ~ } OFFlCE CD-3 NEW HOPE ROAD. 398 L.F. ~a + L W _ ~ f 9 0c z e L1_2 ,600 SF - 6" TREE DIA. PER 50 LF REQUIRED ZZ 4. 4' LT-1 58 o- QPA- ¢ + 8 13 E a P QPA-13 QPA-13 26 VJ 7 448 .F. - ~ W W QPA_1 0 L /50x6 - 54 TOTAL TREE CALIPER REQUIRED ~ ~ I- > ~ ? CF- ZV-1 ICC-120 16 3.5" TREES PROVIDED ~ W LT- 0 O _ - 2 ~ Q ~m ? JUN-20 Zt/-1 a + ICC-12 « 62 ICC-12 Icc-, - - _ _ U W ~ - - - NEW BERN AVE: 255 L.F. y~+ ~ 1 27 VJ-6 cc + JUN-20 cc - - - PT-2. (SHOD 3 PLANTING} V Z ~ W3 * ~ , 10 SHADE TREES & 6 UNDERSTORY TREES 100 LF R LL b b l s a / EQUIRED Z ~ (r aw LT-1 32 32 cc cc + _ - r,~•,~+, 32 SHRUBS PER 100 LF REQUIRED W LLI OZ ZV 1 I-3 255 L.F. 100x10 = 26 HA ~ J C 68 JF- 66 + _ sa 58 + LI-1 LI-2 ~e,;i~;: / S DE TREES REQ D. a m WI JUN-2 I - CC-3 255 L.F./100x6 = 15 UNDERSTORY TREES REQ'D. W H CC 18 ZV-5 ~ JF-8 ~ Z > • 48 68 33 ~ 255 L.F./100x32 = 82 SHRUBS REQ'D m (n ~ WJ i N ~ W w VJ-12 CC + QP-2 ~ D - 19 NEW BERN AVE: 546 L.F. (SHOD 4 PLANITNG) Z 3 cc CF- - AR-1 3 SHADE TREES & 4 UNDERSTORY TREES/100 LF REQUIRED Z JF-6 _ + + + * + + 50 SHRUBS PER 100 LF REQUIRED W 28 ~ ~ 546L.F. 100x3= 17 SHADE TR Z ~ ~ 19.4' / - EES REQ'D. ~ ICR-23 _ N_1 RASS 546L.F./100x4- 22 UNDERSTORY TREES REQ'D. W ~ _ 62 31 TRIP PT-2 CARL R. GU_TTMAN 546L.F./100x50= 273 SHRUBS REQ'D Q PK-4 ZV 1 T- - JUN-2 JUN-2 + RASS ZV-1 BRASS i VJ-7 ZONED: 1-1 ~ ~ J U I B 12 QPA g RASS SEASONAL TRIP UN-2 + TRIP 44 JF-8 STRIP 3i 23 USE: COMMERCIAL NEW BERN AVE: 354 L.F. (SHOD 4 PLANTTNG) Q PLAhTfhGS i cc rn_3 3 SHADE TREES & 4 UNDERSTORY TREES/100 LF REQUIRED I + ZV-1 CC-3 50 SHRUBS PER 100 LF RE UIRED LT-2 Q E + UN-20 + 354L.F•/t00x3= 11 SHADE TREES REQ'D. cc , PT-3 354L.F./100x4= 15 UNDERSTORY TREES REQ'D. VJ-7 354L.F•/100x50= 177 SHRUBS REQ'D JF-9 TRANSmONAL PROTECTVE YARD 1 4 LS-1 + LS-5 _ * QP-2 OPA1-15 + ICR-9 LS 1 + 582 LINEAR FEET (1 /2 TYPE D TPY, 18' AVERAGE WIDTH) . 2.5 TREES & 15 SHRUBS/100 L.F. REQUIRED / ~ ~ ICR- - / + LS 1 LS-1 + 15 TREES 87 SHRUBS REQUIRED/ PROVIDED I \ ~ ~ ' ' ' ' ICR-9 LS- ~ 11 ICR-9 + LS-1 Ls-1 LS-1 + ~ _ = TRANSITI N - - 1 ~ ~ _ ICR- , - - ~ ~ ~ ~ + LI 2 AR-1 AR-1 0 AL PROTECTIVE YARD ~2 ICR-9 ICR-9 ICR-9 ICR-9 ICR-9 \ 190 LINEAR FEET (TYPE D TPY, 35' AVERAGE WIDTH) ~ ~ ~ ~ ~ LI-2 I-2 + LI-2 LI-1 M BN-1 4 TREES & 19 SHRUBS/100 L.F. REQUIRED J ~ ~ ~ + ~ ~ ~ I I + - ~ ~ CC-3 8 TREES & 36 SHRUBS PROVIDED 1 ~ ~ ~ ` r _ _ r J IKI-AKU NUUU 5Y5TEM5 VlA Sl:KttNING BN-2 ZONED: 1-1 CORPORATION PARKWAY USE: COMMERCIAL 1 SHRUB /61-F OF VSA WITHIN 50' OF RIGHT F AR-3 0 WAY PC-3 ~1 BOJANGLES RESTAURANT 270 L.F 6 = 45 SHRUBS REQUIRED/PROVIDED + + SP-41-02 1 NEW BERN AVENUE VJ-23 JCD-94 GRASS- 1 BN-3 I + AR-8 1 SHRUB /61-F OF VSA WITHIN 50' OF RIGHT OF WAY REVISIONS BYJ ,41 GRASS LI-1 AR-3 182 L.F 6 = 30 SHRUBS REQUIRED/PROVIDED PL- I I-! 36 LI-1 PL-18 PL-16 GRASS I 14 APR 2003 PC-3 SKO . + VJ-35 V.S.A.: 604,860 S.F. (DESIGN CIVIL) ~v Q I v RASS- 1 TREE I-- _1 - - - - _ BT-6 /2000 SF & 1 SHRUB/500 SF REQ D 11 JUN 2003 JUN-18-- -11 REFER TO ENLARGED LT-1- 8 JUN 18 + 604,860 S.F. /2000 = 303 TREES REQUIRED (90% CD) DLH LT-1 GRASS * 604,860 S.F./500 = 1,210 SHRUBS REQUIRED _ PLAN, THIS SHEET FOR F PLANTING IN THIS AREA BT-6 JUN-18 IC 100 UNDERSTORY TREES ALLOWED FOR VSA 21 JUL 2003 ZV_4 - PK-3 LT-1 SKO PROPOSED I PK-3 REQUIREMENTS IN LIEU OF CREDIT FOR EXISTING (PERMITS) TRACT ID ICR-10 e RETAIL a TREES ALONG STREAM PER AGREEMENT WITH THE 8,200 SF 2' WIDE GRAS TRIP CITY OF RALEIGH ZONING/INSPECTIONS DEPT. 29 JUL 2003 PROPOSED o 41 41 - t 37 1 a PROPOSED TYPICAL (EXPRESS REVIEW) SKO SEASONAL RETAIL 11,025 SF P 7 A 2 RETAIL AR-1 )LO COLOR , DLH 7 A 2 sEASON L~`~.' 'NOTE: 08 AUO 2003 COLOR PT-3 J P- C 1 11,225 SF 1. REFER TO DRAWING NO. C-7.1 FOR LANDSCAPE (DWO REVIEW) P I ril o ~ PLANT LIST AND DETAILS. 23 SEP 2003 (WAL-MART) QPW l + + d6 1+ 2. ALL ABOVE GROUND UTILITIES SHALL BE SCREENED FROM RIGHT OF WAY AND ADJACENT PROPERTY. J • P8~ 0 EP-115 LR-158 QPA-6 LR-88 j QPA1-2 KP1-4 QPA1-3 CC1-3 CC1-2 KP1-4 CC1-3 GRAS AR1-3 KP1-3 CC1-3 PT1-2 KP1-4 PT1-2 QPA1-4 CC1-4 CC1-3 - QP1-2 CC1-3 QP1-2 KP1-3 CC1-3 -OP-6 QPA1-5 KP1-4 DRAWN CC1-3 EP-89 SKO (TF- Di AR-4 EP1-41 QP1-3 CHECKED aPW/RPH LR1-41 MEW BERN AVE. U.S. HIGHWAY 6 NORTH DATE 31 MAR 2003 G SCALE 1'•80' 546 L.F. 25' AV. WIDTH SHOD 4 PLANTINGS 255 L.F. 50' AV. WIDTH SHOD 3 PLANTINGS ITINGS 354 L.F. 25' AV. WIDTH SHOD 4 PLANTINGS 0 60 120 180 JOB No. (EXCLUDING DRIVE) (EXCLUDING DRIVE) RIBPCW SCALE IN FEET SHEET LANDSCAPE PLAN. c 7 OF SHEETS