Loading...
HomeMy WebLinkAboutWQ0013402_Permit (Issuance)_19970305State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director March 5, 1997 Mr. Bobby B. Teague, P.E., Director of Public Works Town of Southern Pines 140 Memorial Park Court Southern Pines, North Carolina 28387 Dear Mr. Teague: A 141* [DEHNR NIAR 51991s FAYETTEVILLE REG. OFFICE Subject: Permit No. WQ0013402 Town of Southern Pines Talamore Villas, Phase 4 Sewer Extension Moore County In accordance with your application received January 27, 1997, we are forwarding herewith Permit No. WQ0013402, dated March 5, 1997, to the Town of Southern Pines for the construction and operation of the subject wastewater collection extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. One set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Rick Moore at (919) 733-5083 extension 527. Sincerely, A. Preston Howard, Jr., P.E. cc: Moore County Health Department Fayetteville Regional Office, Water Quality Section Hobbs, Upchurch and Associates, P.A. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper f� NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Town of Southern Pines Moore County FOR THE construction and operation of approximately 2,935 linear feet of 8 inch gravity sewer, a 50 GPM pump station with duplex pumps, high water alarms, telemetry monitoring system, portable generator connection, available portable generator and approximately 2,050 linear feet of 2.5 inch force main to serve 100, two bedroom units in Talamore Villas, Phase 4 and the discharge of 28,000 GPD of collected domestic wastewater into the Town of Southern Pines' existing sewerage system, pursuant to the application received January 23, 1997, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities must be properly maintained and operated at all times. 4. The sewage and wastewater collected by this system shall be treated in the Moore County Regional Wastewater Treatment Facility prior to being discharged into the receiving stream. 5. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 6. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. I 7. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting materials. Mail the Certification to the Water Quality Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. 9. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 11. The Permittee shall provide for the pump station and force main the following items: a. Pump on/off elevations located so that 2-8 pumping cycles may be achieved per hour in the pump station, b. An air relief valve located at all high points along the force main, c. A screened vent for the wet well, d . Fillets located in the wet well at the intersection of the flooring and sidewalls, e. Three feet of cover (minimum) over the force main or the use of ferrous material where three feet cannot be maintained, f. Sufficient devices which will protect the pump station from vandals, and g. Flood protection if the pump station is located below the 100-year flood elevation. 12. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division of Water Quality, such as the construction of additional or replacement wastewater collection facilities. 13. NONCOMPLIANCE NOTIFICATION: The Permittee shall report by telephone to the Fayetteville Regional Office, telephone number (910) 486-1541 as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within five (5) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. 2 14. This permit shall become voidable unless the agreement between the Town of Southern Pines and Moore County for the collection and final treatment of wastewater is in full force and effect. Permit issued this the 5th day of March, 1997. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION reston Floward, Jr., P.E., birector ivision of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0013402 Permit No. WQ0013402 March 5, 1997 ENGINEER'S CERTIFICATION 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, Project Name Location for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of this permit, the approved plans and specifications, and other supporting materials. Signature Date Registration No. 4