HomeMy WebLinkAbout20021532 Ver 1_Complete File_20020918Jan-17-03 10:43P
1?.
1 9 ,? l
A?,-s
F ,2c M
JAN 2 4 2?3
P.O1
?CG/ill ? ?P.-?i? ??-?
?r?J f?S N?2
Gov 63?r q.-z
r-o-, ej- ff-- () --2- - (15- 3 --z
I
Jan-17-03 10:43P
Lake Norman Custom Dock & Pile Driving, Inc.
P.O. Box 1439, Denver, NC 28037
Telephone (704) 483-2144 Fax (704) 992-1744
Dec. 19, 2002
North Carolina Department of Environment, Health and Natural Resources
Division of Water Quality
c/oAlan Johnson /John Dorney
Parkview Bldg.
2321 Crabtree Blvd.
Raleigh, NC 27604
P_02
RE: DWQ#02-1532 Crown Harbor Expansion/Modification (Response to comments)
Dear Mr. Johnson,
Thank you for your comments and questions by phone. After your site visit, you now
understand that this is an existing facility with walkways, decks and other structures already built.
The modification calls for the removal of the existing 2200sgft walkway located with in the 50ft
buffer. At your suggestion the forklift pad can be reduced to 15ft wide, it is however a Duke Power
requirement. The original plan called for the forklift pad(1200sgft) to exit the rear of the building
and discharge straight into the lake. This plan was changed at the direction of Duke Power Lake
Manager Joe Hall in order to meet Duke's buffering guidelines. Since the pool amenity area has
already been constructed, the proposed forklift pad is the only configuration that will work. With
the removal of the old walkway and the installation of at least ten 3"dia or larger hardwoods and
new shrubbery plantings, every effort has been made to minimize the impact to the lake and replant
the buffer.
At your request, I have enclosed 7 copies of the revised site plan showing the existing
walkway removed, the forklift pad reduced to 15ft and all new plantings. Your comments will be
included as part of the final FERC application.
T hank `You,
Dean E. Fisher
President- Lake Norman Custom Dock
Enclosure
Jan-A-7-931-.10:43P
\\)enVamnl
.- --------,-.-.-.-'i
i
Crown Harbor Vrcanr /r 75• . ; ---31
!?- ............
'W )tq?_ 401
i i
Fox Raidcna
i
III X
Klcdingertiesideace
Exisding Crown Harbor Amenitics
\
?4 p
!5
2 \?.
762' El
r
r
U 4
I
-??.m --- •i
i
! 40• -?
i Dry Stom i.osdin
/
760tt Elevation
Lake Norman
Crown Harbor Marina
Wet Slip Configuration
Proposed Marine Dry Storage Facility
I Scale: I.-In
'
Crown Harbor e, //rter; ,?,µaUNrrr?,r
?A CAR
e k ?? i
Dry Boat Storage, LLC.
200 Max (Boats & PWCs) ?l ?O ?Q?FE??/pyp ?
SEAL
!fl w ?: L-1404
MA q
? I ( :0,??9y? F1C,'w
I t . y? su?.. Q
t!
_ II
YO 9/01
P. 03
W AT FR
QG
r
Y
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
January 21, 2003
DWQ# 02-1532
Mecklenburg County
Crown Harbor Dry Boat Storage, LLC
C/O Mr. Dean Fisher
19810-C West Catawba Ave.
Cornelius, NC, 28031
APPROVAL of 401 Water Quality Certification and Catawba River Buffer Rules with Additional Conditions
Dear Mr. Fisher:
You have our approval, in accordance with the attached conditions, to dredge 0.28 acre of waters at Lake Norman and to remove
ten trees from the protected Catawba Buffers in Mecklenburg County, as you described in your application received by the Division of
Water Quality on September 18, 2002, and in your revised site plan received November 25, 2002. After reviewing your application, we
have decided that this work is covered by General Water Quality Certification Number 3373, which can be viewed on our web site at
http://h2o.enr.state.nc.us/ncwetiands. This Certification allows you to use Regional Permit Number 198200030 when the Corps of
Engineers issues it. This approval is also valid for the Catawba River Mainstem and Lake Buffer Protection Rule (15A NCAC 2B .0243).
In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to)
Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will
expire when the accompanying 404 permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your project, you must
notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner
must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland
fills for this project (now or in the future) exceed. one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506
(h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional conditions listed
below:
1. This project is for the installation of a treated wood and rip-rap bulkhead to prevent further erosion of the property due to wave
action. The use of mechanical equipment on the beach must be minimized;
2. Equipment and materials may be offloaded to the beach at the bulkhead site, but steps must be taken to keep all equipment out
of the reservoir,
3. The width of the travel pad shall be limited to fifteen (15) feet. Trees shall be re-planted within the path of the removed sidewalk,
and from the construction access path, at a rate of 320 trees per acre.
4. You are required to return the attached Certification of Completion form to notify DWQ when all work included in the 401
Certification has been completed. An as-built site plan including tree plantings shall be included with the Certification of
Completion.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days
of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina
General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions
are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any
questions, please telephone Alan Johnson in DWQ's Mooresville Regional Office at 704-663-1699 or Cyndi Karoly in the Central Office at
919-733-9721. Questions regarding the Catawba Buffer Rules should be directed to Bob Zarzecki in Raleigh at 919-733-9726.
Sincerely,
I
rf
Kli ek, P.E.
4 ?
N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015
Customer Service
1 800 623-7748
MEMORANpUM
TO: John Dorney Regional Contact:
Non-Discharge Branch WQ Supervisor:
Date:
SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Facility Name Crown Lake Drive Crown Harbor Dry Boat Storage
Project Number 02 ' 1532
Recvd From APP
Received Date 9/18/02 Recvd By Region 12/3/2002
Project Type' shoreline stablization
County Mecklenburg
County2
Region Mooresville
Certificates Stream'
Permit' Wetland Wetland Wetland Stream Class Acres Feet
Type Type Impact Score Index Prim. Supp. Basin Req. Req.
GP 30 Waters PT-197N F__ F11-(75) WSN B & CA 30,832. F_ F__
CBR ..Buffers O Y O N F_F_r-F-F-F_F_-
-F__OY ON F F_ F_F_ F_ F_ F_
Mitigation Wetland
MitigationType Type Acres Feet
Is Wetland Rating Sheet Attached? O Y O N Did you request more info? O Y O N
Have Project Changes/Conditions Been Discussed With Applicant? Q Y O N
Is Mitigation required? O Y ON
Recommendation: O Issue 0 Issue/Coed O Deny
Provided by Region: Latitude (ddmmss) Longitude (ddmmss)
Comments:
Staff visited the site on December 3rd. The applicant is constructing a dry storage fa ili for boats at
the Crown Harbor Pier/Boat Slips. It has been requested that rip rap be installed along the shoreline
on Lake Norman. Also the construction of the boat storage facility _calls for a fork lift travel pad (20 ft
wide) that runs parallel with the lake and encroaches approximately 10 ft. into Zone 1 of the
Catawba Buffer. The removal of 10 trees is required for the construction of the facility. Staff
discussed with the applicant the possibility of reducing the travel pad width to 15 ft. This, however,
will not prevent the removal of the trees. The applicant stated that new trees
(5 - 7gal., 3" diameter) will be replanted along with other landscape vegetation. Revisions are
forthcoming.
Staff recommends approval upon receipt of the revisions. The revisions should state that the travel
pad will be limited to a width of 15 ft. and that trees (>/= 3" diameter breast height) will be replanted
at the ratio of 321 trees/acre (approximately 20 trees),
cc: Regional Office Page Number 1
Central Office
Facility Name Crown Lake Drive Crown Harbor Dry Boat Storage County Mecklenburg
Project Number 02 1532 Regional Contact: Alan Johnson
Date: 12/12/2002
Comments (continued from page 1):
cc: Regional Office Page Number 2
Central Office
Re: 02-1532
Subject: Re: 02-1532
Date: Thu, 12 Dec 2002 16:25:38 -0500
From: Bob Zarzecki <bob.zarzecki@ncmail.net>
Organization: Division of Water Quality; 401 Certification Unit
To: Cyndi Karoly <cyndi.karoly@ncmail.net>
CC: Alan Johnson <Alan.Johnson@ncmail.net>
Cyndi:
MRO said that revisions are coming and that it's ok to Issue once we
receive the revisions. I've put a copy of their comments in the file
and left the file in the To Region cabinet. Let me know if there is
anything else you need me to do.
- Bob
Alan Johnson wrote:
> project 02-1532 (crown harbor boat storage) has been approved with
> conditions.
> see staff report.
> Alan Johnson - Alan. Johnson@ncmail.net
> %TITLE$
> North Carolina Dept. of Environment & Natural Resources
> Div. of tti-ater Quality
> 919 N. Main St.
> Mooresville, NC 28115
> Ph: (704) 663-1699 Fax: (704) 663-6040
Bob Zarzecki
NC DENR/DWQ 401 Wetlands Certification Unit
919-733-9726
1 of 1 12/12/02 4:26 PM
- Triage Check List
Date: 1 21? o? Project Name:
v.,?JV? FILG?-
DWQ#: - QZ. - IS32
County:
To: ? ARO
? FRO
' MRO
RRO
Mike'Parker
Ken Averitte
Mike Parker
Steve Mitchell
? waRo
? WiRO
? WSRO
Deborah Sawyer
Joanne Steenhuis
Jennifer Frye
From: J S?D
Telephone : (919)
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
-Minimization/avoidance issues
offer Rules (Neese, Tar-P i , Catawba, dleman)
Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments:
Lake Norman Custom Dock & Pile Driving, Inc.
P.O. Box 1439, Denver, NC 28037
Telephone (704) 483-2144 Fax (704) 992-1744
Nov. 19, 2002
North Carolina Department of Environment, Health and Natural Resources
Division of Water Quality
% John Dorney
Parkview Bldg.
2321 Crabtree Blvd.
Raleigh, NC 27604
J^? lrr?
T 4-..r, ? r
t'!ry'/`? flip
CT10?J
RE: DWQ#02-1532 Crown Harbor Expansion,/Modification (Response to comments)
Dear Mr. Dorney,
Thank you for your comments by phone and in the letter dated Oct 3, 2002. In response,
their are no streams or ponds located in the proposed site or within 2008 of the site. This is an
existing facility with walkways, decks and other structures already built. The proposal calls for the
removal of the existing 2200sgft walkway located with in the 50ft buffer. The construction of the
approx. 4000sgft forklift pad is a Duke Power requirement. The original plan called for the forklift
pad(1200sgft) to exit the rear of the building and discharge straight into the lake. This plan was
changed at the direction of Duke Power Lake Manager Joe Hall in order to meet Duke's buffering
guidelines. Since the pool amenities area has already been constructed, the proposed forklift pad is
the only configuration that will work. With the removal of the old walkway and new plantings,
every effort has been made to minimize the impact to the lake and buffer. I also believe that this
property is Vested for Watershed, therefor buffering requirements may differ from current.
At your request, I have enclosed 6 copies of the location map and 7 copies of the site plan
showing the existing walkway to be removed. As you are the only agency to make comment, please
respond by Dec 14, 2002 so that your comments will be part of the final FERC application.
Thank You,
Dean E sher
President- Lake Norman Custom Dock
Enclosure
OF F9 Michael F. Easley, Governor
?Q? ; OG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
r? r
> Alan Klimek, P.E., Director Division of Water Quality
0
October 3, 2002
DWQ # 02-1532-
Mecklenburg County
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
Crown Harbor Dry Boat Storage, LLC
19810-C West Catawba Avenue
Cornelius, NC 28031
Dear Sirs:
On September 16, 2002 the Division of Water Quality (DWQ) was notified by receipt of your
application regarding your plan to fill wetland for the purpose of shoreline stabilization in Mecklenburg
County. Approval from DWQ is required to disturb these waters/buffers. Please provide 7 copies of the
following information and refer to the DWQ # listed above in your reply. In particular as described in
15A NCAC 2B .0502, we will require you to locate all streams and ponds on the property. Please show
these on maps of suitable scale (for instance 1" = 100 feet) so we can begin to determine your projects'
compliance with 15A NCAC 2H.0500.
1. Please provide a location map for the project. One copy was provided. We need six more.
2. This Office believes that the facilities labeled on the plans as "Forklift Travel Pad" and "Pool
Decking" can be moved or reconfigured to minimize the impacts to the lake buffer. Please
revise the plans to minimize the impacts.
Please telephone me at 919-733-1786 if you have any questions or would require copies of our rules
or procedural materials. This project will remain on hold as incomplete in accordance with 15A
NCAC 2H .0505(c). The processing time for this application will begin when this information is
received. If we do not hear from you by writing within three (3) weeks we will assume you no longer
want to pursue the project and will consider it withdrawn.
Sincerely,
JRDJbs
k-p?"
R. Dorney
1 Water Quality Ce 'fication Program
cc: Mooresville DWQ Regional Office
Asheville Corps of Engineers
Central Files
File Copy
Dean Fisher, Lake Norman Custom Dock & Pile Driving, Inc.
Post Office Box 1439, Denver, NC 28037
N. C. Division of Water Quality, 401 Wetlands Certification Unit,
'wu man service center, Hakign, Nt; 21b99-155U (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 276042260 (Location)
(919) 733-17W (phone), 919-733-6893 (fax), (http:l/h2o.enr.state.naus/ncwetlands
PO. Box 399
Qm 4n." . NC
28031
P 704 892 6031
F 704 896 2462
ETowmwtEhx)RmP.&oac
1ITTPJ/W WW.CORMLUA.MG
1
MAttA
CARSON CATO
MAVM PRO-TEM
THURMAN ROSS, JR.
JAMES NEKSMAN
JOHN RHODES
THURMAN ROSS, JR.
LEAH TROWBRIDGE
MmN MANACFR
ROBERTRACE
Planning Department
January 31, 2002
Conditional Use Permit
SITE 40-01
Owner: Mr. Art Sabates
Miami Beach at the Lake LLC
21000 Torrence Chapel Road, Suite 201
Cornelius, North Carolina 28031
Agent:
Acreage:
Tax Parcel Reference:
Project:
Proposed Use:
Zoning:
Location:
Approval Date:
Vesting Status:
Dear Mr. Sabates:
O'Shaughnessy Planning and Development
PO Box 2111
Cornelius, North Carolina 28031
1.859 Acres (Land)
1.904 Acres (Water)
3.763 Acres Total
001-762-44
Crown Lake Marine Storage Facility
Commercial Use exceeding 15,000 square feet
Neighborhood Mixed Use
At the end of Crown Lake Drive
Conditional Use Permit, Amended Site Specific Plan Approval January
22, 2002 (Subject to Conditions)
Vested for Watershed
On Tuesday, January 22, 2002, the Town Board of Commissioners approved the
Conditional Use Permit site-specific plan amendment and illustrative elevation for the
Crown Lake Boat Storage Facility.
This approval permits the construction of a 27,500 square foot commercial marine facility
per the proposed site-specific plan with the following conditions:
I . Approval of the project is contingent upon approval of the water-related structures
by Duke Power. Approval shall be granted upon receipt of an approval letter from
Duke Power.
j
i
I '
( i Sa £ I
I ? o ? I
fC X .d+ S
N
ao y Cr
I
m
v N Q I
j ? n n
I i 110' I
( 20' I
I I
? of
Veeative I 6 i
TraVe/ ?
I `\''? ' ? e4?er
rne_
I ZOO, go r- 0 (n
I CD (D
I O OQ F-'
I -n to
3 -v
I ?M-1 o
z ?
C7 0
:3 C
I
Q s
I
W o z
i 0 r 3
I
I
I
1 ?
? a
o i A
2 m
? N
v
N F
---------------.
Rip Rap Shoreline
pop
a/m/Mop -
7 ft Retaining Wall - Dredging Area -Approx-11000-Sqft-(1900-CuYd} -----------
cu ? I
Rock
g Shoal
J'
-' -------------
a
51 {??' ?=-
01
g
1 ?
1 ?
1 ?
1 ?
-n
;o
A
N /
------------ ------------------- ----- Rerrnitted Area-(32400-SgFlj
DUKE POWER EXCAVATION PERMIT APPLICATION FORM
021532
Are there any Co-Applicants*? (check one) ?Yes o (If Yes, include names, addresses, phone nos., lot nos., lot sizes
ADDITIONAL INFORMATION)
in PART V -ADDITIONAL*
* Co-Applicants exist when the proposed work is being done under a single application, will be performed by a single
contractor as one continuous project and is done to benefit multiple owners / lease holders of project-front properties within
a single development. The check for the application filing fee and security deposit should be from the party shown as
Applicant and not several checks from the Applicant and Co-Applicants.
PART II - DESCRIPTION OF PROJECT
A. BASIC INFO
L Type of excavation: (check one)WNew excavation ? Maintenance excavation
2. Purpose of excavation: (check one) Boat Access Chan'l ? Water Intake Chan'I ? Wastewater Disch. Chan'I
. ? Other (spec)
3. Lake user category: (check one) ?Private '(Commercial/Res. ?Commercial/Non-Res. ?Public
?Other (specify)
4. Max. Excavation Area Dimensions (ft) Length X10 - Width go 1 Depth 04,V15 L11 'DOWN Yo 750 /
E?cv?
5. Excavated material (TOTAL for the project) Cubic yards 19D0 cu.yo.
6. Type of material (applicant determines by field sample if practical) SAN D $ 1 t_T
7. Excavation Site area V 3q 5 Acre (s) Disposal Site area0• 'ZVS Acre (s)
8. Total Disturbed Area (including equipment staging area) O. 00 Acre (s)
9. Does the project meet the requirements of the applicable General Permit? (check one) KYes ?No
10. Do you claim title to the disposal area? (check one) Wes ?No
11. Do you claim title to the equipment staging area? (check one) XYes ?No
12. Are there any water-treatment facilities within 50 feet of the proposed excavation area? (check one) ?Yes )RfNo
(If Yes, specify)
13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion control plan and
disposal area design)
MNTF(RIYaf_ B COt-' TIN INFD 8Y 5i=1 t3ail- M WITI+ /!16GI2.E4 t?TE
, aArlN . 3f:aJA. tw1LL ?D E 511P-0-40 u0t)C-0 By Si4-TFENL.E AND DisTyt-9E0
JAo2t=i.rNE i.?lt? gE siP=RIt tZ?u wtr?+ ??SrhT?o J'WooQ y3LI?f?EvklZ Np iLtMW?
14. Type(s) of excavation equipment to be used: S-T P,- D0.tz,D AN O LONG t2c pc{ ?\ 'E Y, C_ A V A-t 025
t. t -r i-1 -D U I-A P -1 R0C w- S
15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) ?Yes XNo
Q(yes, explain)
16. Will return water re-enter the reservoir? (check one) Yes ? No (If Yes, specify point(s) of re-entry and show on
Excavation Area Drawing) iff?j( C- 1r_- S e, LJ NTG fit- C O N IA 10- E Q 11,J 5 201L,5 to i t_l-
L- CPtA14tJSe.ED INTO Ey(I:SrINt, gt,u0 FF BA5int IFtzor? A.6Glt>t<r_A-Ve7iZ-Ft' 1rJ
4'r S PO I L 5 5'T /S. L I U) to f.,Xe A-
Gpal\Lakemgmt\Lmppm\Excavation\Exvappfm9.19.0Ldoc f a.-e 2 REV: 9/19/01
Enectivc Date: 11/15/98
DUKE POWER EXCAVATION PERMIT APPLICATION FORM
FOR DUKE POWER USE ONLY
Duke File No.
Application Fee $ Security Deposit $ Check # Date Recv'd
Date of Duke Power Lake Management, applicant and/or contractor on-site inspections Date
Date Final Protection/Avoidance Area Markings Field - Verified
Approved to Start Work By * :
Date Completion Required
Date Passed Closeout Inspection*
Initials
Initials
Initials
Initials
Date
Any Stop Work Orders or SMG Violations*? (check one) DYes ONo (If Yes, explain in PART V)
Date Deposit Refunded Initials Date Permit Database Updated Initials
* Forward copy of approved application (all pages, plus any attachments that Duke Power changed) back to applicant
with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop
Work Orders with application.
PART I = APPLICANT INFORMATION (Please Print) Tax ID or Social Security Number t,r - 3q?- OZq Z
C Rauh tap.(t ??ofL ?R? gaotT S'raR-,'-GE f LL C
Name Telephone (70\1) Q)cl S 5rd9 S
Lake Address C Rd?> N e. P? ?C? tM _ Mailing Address (1f different) I q 8 U -
C O IZN ?? v S C- . 1T IM+' B lk 1?c V 6
Co l?N a vS Nc- Z3031
fc
Contractor Company L AVC.( N o 2 M N t• l Co srt O M ?? t ( Le Q(LkQ t(4 b t I NC.
Contractor ContactPerson3> -1 At?J ?5IAr?(Z-` V_5e'r-M
Telephone( Toy ) q8 3 Z1 yy
LAKE LOT INFORMATION
Lake )4r 4 County M6CI(E-P46uiz(City I.0P7,f f Li US State NCTax Map No. 0 1 7 G,2 y y
Grid Section Subdivision 2C auu N h4 A 2B (Z Section or Phase No.
- ?tr?0 3dVI=- C)? Z.y ( / I?J?7 ?rl(?F
Lot No. Lot Size 3.7l7JACreS
Do not continue the application until an on-site inspection has been conducted between a Duke Power Lake
Management Representative and the applicant and/or the excavation contractor.
Date of on-site inspection Z b Initials (Duke Power) ???8(1(applicant/contractor)i
Gpal\Lakemgmt\Lmppm\Excavation\Exvappfm9.19.01.doe Page 1
(Print)
(Sign)
Date of Any Approved Extension Initials
REV: 9/19/01
Effective Date: 11/15/98
DUKE POWER EXCAVATION PERMIT APPLICATION FORM
PART II (Continued)
B. PROTECTION / AVOIDANCE AREA DESCRIPTION
Complete the following table considering all land areas within and immediately adjoining the disturbed area:
Identification Method
Protection/Avoidance Areas Approx.
(check all that apply) Acreage Field ID Work Area Dwg. ID Avoid (A) or Mitigate (M)
**
a. Marshland, swamp, ponds, beneficial
aquatic vegetation or other potential wetlands (circle)
b. Buffer Zones (specify width & source of
requirement)
So FT Id F V? IJE R--S
, I
I,1 1?1`I-K F 9 V-' I T ?1 `J`At=?S
°?
TEXT i t)
?t N?V? lzfe fkGTt v'?
2Ei?, Et?v
W t-r??,.t P'
?Y S??vcy ?rkss ?? c?NCi:
REM
?o FT -
(3 (t Ep- u rz 'D? svv
Y-L&-Ic. Environmental Areas as identified by Duke
Power
d. Natural Areas as identified by Duke Power
e. Historic properties (specify)
f. Rare or threatened species (specify)
iN10 L,
3&o
Gpal\Lakemgnrt\Lmppm\Excavation\Exvappfm9.19.01.doc Page 4 REV: 9/19/01
Effective Date: 11/15/98
DUKE POWER EXCAVATION PERMIT APPLICATION FORM
17. Total planned duration of the work (Include first equipment mobilization thru final mitigation measures complete):
START J1_/ oo7. FINISH '? l ZOO APPxox 95 1)0.'Y
S
(Month) (Year) (Month) (Year) j fLoM s-r A R.T
18. Total planned duration of in-lake work (i.e. dredging and any other in-lake ground disturbance):
START 17-_/ Z002 FINISH _12 _ 2067- A ( Pox
(Month) (Year) Month (Year) A
ja lAKE /k(L6/k
Gpal\Lakemgmt\Lmppm\Excavation\Exvappfm9.19.0 Ldoc
Page 3
REV: 9/19/01
Effective Date: 11/15/98
1
' DUKE POWER EXCAVATION PERMIT APPLICATION FORM
C. APPLICANT SIGNATURE
Comments: -TI+6 ry2Fa5F57 of 11-fi5 :PF-Et7&11y6 F1Z0TFC-7- i5 TO I1(-Low
`[XA F'Ft C- I' 5TA6F ALONG syL-K i4yAD To 3E --ocz-vc,i FT
Lowe (L.c.o 12 t S rp F(LOrv. L-AKa /kN D -Dr-`{ S7t'o2A-(.E J?2+r/lA?a?+G Co"CXF-TF
f a 8o tr-? 1 w tt c. /?. r? ? ` :M &-revE- i A-5 DI S t- S G17 DN S i T E 1^.)
3r=?Mt=n A(;'-.r=A, AW-E-aX 200-3oo F-t- E2ow? ?r??pclrvc? A2??. &DQ IT10A -
(L?"?DC-, 1 ?C l? t c.? i3 F f2E.Q v ?2E r? I N 5 f.+lk?ou? ?L-It-?-?s A-20 y N /? F t.a? r ? NG
SLIPS
C(L.Owtj AACL&O(L- CRY 80Ar STogA-be?t LLC,
Applicant Na a rint) Lot #
Applicant Signature* Date
Co-Applicant Name (print) Lot #
Co-Applicant Signature*
Co-Applicant Name (print)
Co-Applicant Signature*
Co-Applicant Name (print)
Co-Applicant Signature*
Date
Lot #
Date
Lot #
Date
Co-Applicant Name (print) Lot #
Co-Applicant Signature* Date
*Per my signature, the information provided in this application is correct to the best of my knowledge.
BEFORE YOU MAIL THE APPLICATION TO DUKE POWER LAKE MANAGEMENT ENSURE YOU HAVE:
• CHECKED THE INFO THOROUGHLY
• MET ALL REQUIREMENTS FOR A COMPLETE APPLICATION (see cover letter ojapplieation package)
• INCLUDED A SINGLE CHECK TO DUKE POWER FOR THE APPLICATION FILING FEE AND SECURITY
DEPOSIT
• INCLUDED ALL AGENCY PERMITS OR COMMENT LETTERS AND RESOLVED ALL ISSUES RAISED
• INCLUDED ALL REQUIRED DRAWINGS, SURVEYS AND PLANS
• INCLUDED COPIES OF DEEDS AND AUTHORIZATION LETTERS
Gpal\Lakemgmt\Lmppm\Excavation\Exvappfm9.19.01.doc Page 6 REV: 9/19/01
Ellcetive Datc: 11/15/98
0
z
O
H
U
a
a
d
L
O
Q
v
'
o
d
A
t A
o
o ?
t ?
L
d d
i
0
3
a
0
A
? a
.
K
O
L CJ
R
6/
Q u
Q
T
N
C ?
? U U
U
'=
C •O
N ? 'UO O
d1
?
N td
O [
d U
Q ? U ? U
e 3 N w
d:
•
b N
N C
O ??
C
p
O S U
w 3 ? ?`?
c a
e
C N
N
CC ' c
[mod •O
U S Ml U r
G di id
td Oq
G. O v ?
? L
Ca C
-
y 0 i-
O
L o _
U
' R. U
L
v N
? N
O
O Q a
b
0
v
O
a
•o
c
ca
x
c
a
0
Q
C
O
3
0
a
v
a
Q
v Cd
u
.Y al
rC's U
G co
?, O
?`
N C
T O
CL U
N ?
3 0
3
°c 4T
v ?
cl U
v
c •^
0 o
•CJ N
U pp
U
T3 .D
y U
t .C
p C
U O
E
40 N
C p
0.0
U E
a h
O U
3
C O
d t
N N
c,.T C
c N
a.
N 0 =
U ?
C
U ?
? Q v
O .0.
D i id
U Q -p
k 1 CIS
O t
O?
O
Oh
?o
U
W
N
G
O
v
rn
O?
w
n
F
W
c
F
F
U
d
C
c_4
O t
1
F
r
U
rte,
your project. Also, see the example below for guidance. Both the vicinity map and
site plan must include a scale and north arrow. The footprints of all buildings,
impervious surfaces, or other facilities must be included.
1. Location
County: MC !' K. C E?J (3 U (L Nearest Town: C L0 eL-I US
Subdivision name or site address (include phase/lot number): CfLdw ?j 1AN(L B(s2
Directions to site please include road numbers, landmarks, etc. (This is not
necessary if an adequate vicinity map is included):
Er» of CoCpf:_?5A-C ON cXowN C.kv-r VRiQE
2. Describe the existing land use or condition of the site at the time of this
application: IPp_o po% e T) Doti ?P? _e,;:t-1 i tJ V \ 1 AC A-rJ °r- C onn N E 2C I xr t.
L
3. Property size (acres): 117 00 Sa FT 71 Q_Ei),( , iNG C Itao WiFT_ _'5 I-fN
4. Nearest body of water (stream/river/sound/ocean/lake): t-l?l 1?I6(t-WIktJ
5. Describe the purpose of the proposed work: '34L3=_96100 of "ep-6+ Igoo Q %J Y'D
R1?4Z? t Jr?E K!glLJ2?kTtory or- 5ECO FT OF(3A-JI ANE 61111b14
T'O Rcrn A r OATry-? FINE-I - -Y tA0D1 Rd/krlni4
6. List the type of equipment to be used to construct the project: -T21'CK_t-w e F^p DR.'IcJCS
7. Amount of impact (including all excavation, backfill, rip rap, retaining walls,
etc.) below the normal pool lake level in square feet or acres:. 12000 69t::::T- AwN6 WOF -
8. a. Amount of impact (including all clearing, back fill, excavation, rip rap,
retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in
square feet or acres: WOO 5q rr t+I-o o6 5/4otte c_1N S C106 So Fir' Q=o2
V o (L?L-I F-c-
b. Please describe vegetation above the normal pool lake level and 50 feet land-
ward to be impacted (number of trees for instance): kpf p-ox I b T s psO V 8CO 5Q_ F7
(3E GE&S,? SZ,F-t?VF._r7 w i Tµ 2 ob SQ T `T?" E `?3 v F ?r2 REPu?1FL
Applica gent's Signature Q Date
(Agent's sign a is valid only i author' ion l?etter from the applicant is provided.)
CM(L Srra rz. - KC . usl NC V eTt'A-hD s
ro v F6146 L-A-4 -
16-Dp S,- zotil'ic,
The following is an abbreviated application form for those applying for a 401 Water
Quality Certification to impact FERC (Federal Energy Regulatory Commission)
regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit
GP30. This Application cannot be used for wetland or stream impacts. Please
provide seven (7) copies of this application and supporting information as well as a
non-refundable application fee to the Division of Water Quality of $200.00 for
impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom
of greater or equal to 1 acre.
Applications should be sent to:
Division of Water Quality Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
1. Applicant Information
l A
1. Owner/Applicant Information
Name: Ct-2,M00 14,99-DF- (?-l &NT (-C C-
MailingAddress: 1g8l 0 -C WtLSt CP Tpew U N &V
CadLn???tc) ? N ? 7?30?
Telephone Number: 7 oy 8f2,5- 5 F3 S S Fax Number:
E-mail Address: . PIN
2
Agent Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: DEAN F_ X15 ?1%R
Company Affiliation: LA K-6 fyO ? N ? y s TO V? ?csC4? ? tLE ?t Rt e i NG
Mailing Address: &o)( l q3 9
Telephone Number:
E-mail Address: _j
II. Project Information
t"
Fax Number: 10q 992- 171(y
Attach a vicinity map clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. Also provide a detailed site
plan showing property boundaries and development plans in relation to ;
surrounding properties. You may use the diagram below to make a hand sketch of
WAIF Michael F. Easley, Governor
OF ?Q William G. Ross Jr., Secretary
O? O? North Carolina Department of Environment and Natural Resources
r Alan Klimek, P.E., Director Division of Water Quality
October 3, 2002
DWQ # 02-1532.
Mecklenburg County
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
Crown Harbor Dry Boat Storage, LLC
19810-C West Catawba Avenue
Cornelius, NC 28031
Dear Sirs:
On September 16, 2002 the Division of Water Quality (DWQ) was notified by receipt of your
application regarding your plan to fill wetland for the purpose of shoreline stabilization in Mecklenburg
County. Approval from DWQ is required to disturb these waters/buffers. Please provide 7 copies of the
following information and refer to the DWQ # listed above in your reply. In particular as described in
15A NCAC 2B .0502, we will require you to locate all streams and ponds on the property. Please show
these on maps of suitable scale (for instance 1" = 100 feet) so we can begin to determine your projects'
compliance with 15A NCAC 2H.0500.
1. Please provide a location map for the project. One copy was provided. We need six more.
2. This Office believes that the facilities labeled on the plans as "Forklift Travel Pad" and "Pool
Decking" can be moved or reconfigured to minimize the impacts to. the lake buffer. Please
revise the plans to minimize the impacts.
Please telephone me at 919-733-1786 if you have any questions or would require copies of our rules
or procedural materials. This project will remain on hold as incomplete in accordance with 15A
NCAC 2H .0505(c). The processing time.-for this application will begin when this information is
received.. If we do not hear from you by writing within three (3) weeks we will assume you no longer
want to pursue the project and will consider it withdrawn.
Sincerely,
i R. Dorney
Water QualiJCe ification Program
JRD/bs
cc: Mooresville DWQ Regional Office
Asheville Corps of Engineers
Central Files
File Copy
Dean Fisher, Lake Norman Custom Dock & Pile Driving, Inc.
Post Office Box 1439, Denver, NC 28037
?1CUEtta
N. C. Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
(919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetlands
Lake Norman Custom Dock & Pile Driving, Inc.
P.O. Box 1439, Denver, NC 28037 021532
Telephone (704) 483-2144 Fax (704) 992-1744
Sept. 17, 2002
North Carolina Department of Environment, Health and Natural Resources
Division of Water Quality
% John Dorney
Parkview Bldg. ""?----.?
2321 Crabtree Blvd.
Raleigh, NC 27604
S&P r
RE: Crown Harbor Boat Slip Area Expansion/Modification t & 2002
Dear Mr. Domey, ?AtQ ,yps GF;oim
This letter is written notification of Crown Harbor Dry Boat Dock Storage, LLC's request
for comment in the FERC application for the expansion/modification of the existing common slip
area associated with Crown Harbor Subdivision. Attached is a site plan indicating the corrected slip
configuration, dredging area, shoreline improvements with new bulkhead loading area, and all
surrounding land ownership. Existing site layout survey, photos and previous correspondence are
also included for your review.
Since our initial discussions with Lake Management, all existing problems have been
corrected by this plan. The proposed facility will be moved outside the 200ft-property corner radius.
The land under the facility has been deeded to Crown Harbor Dry Boat Dock Storage LLC,
allowing for the permit to be issued to only one entity. The dry storage facility is approximately
27,000 sgft with a capacity to store 200 boats and PWC's combined. The dry storage boats and
PWC's will be transferred from the building to the concrete bulkhead along Lake Norman using
low noise/emission forklifts. The dry storage boat slips and existing wet slips will be leased by
Crown Harbor residents. The existing 39 slips and PWC floats will be reduced to 34 wet slips and 1
dry storage loading area per the original FERC order, approving 35 slips/facility. After
approximately 1900 cu yd of dredging and 400ft of shoreline stabilization, the reconfigured wet
slips will be inside new permitted area and extend no further than 120ft from the 760ft elevation.
We believe this plan is the best use for the existing vacant land and surrounding lake area.
Several other plans were discussed, with this facility representing the most minimal impact to the
lake and environment. Your comments are required as part of the F.E.R.C. Permit application. All
comments and correspondence should be forwarded via return mail. Please consider all previous
discussions when reviewing this site plan. .
Thank You,
Dean E. Fisher
President- Lake Norman Custom Dock
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Govern or
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
Mr. B.K. Barringer Jr. P.E.
B.K. Barringer & Associates, P.A.
104 Westfield Center
Mooresville, NC 28115-8812
Dear Mr. Barringer.
October 27, 1996
i •
[?EHNl?
SEP
I $ cOuZ 1; 1
4 ff ?'?? ?tGt;?
I have received the site plan for the shoreline development at the Crown Harbor
Subdivision. The construction of docks and piers, and associated dredging will require a
Section 404 permit from the US Army Corps of Engineers and a Section 401 Water Quality
Certification from the NC Division of Water Quality.
If you have questions concerning Section 404 permits please contact the
Wilmington District U.S. Corps of Engineers, Regulatory Branch, PO Box 1890,
Wilmington, NC 28402-1890; Telephone: (910) 251-4511. This office may direct you to
the appropriate regulatory field office.
Questions concerning Section 401 Water Quality Certifications should be directed
to: Mr. John Domey, DWQ--Water Quality Laboratory, 4401 Reedy Creek Rd., Raleigh,
NC 27607; Telephone: (919) 733-1786.
A copy of the application form is enclosed.
Sincerely,
5AAn r A
Steven Kroeger
Environmental Sciences Branch 4101 Reedy Creek Road Raleieh. North Carolina 27607
Telephone 919-733-9960 FAX n 733-9959
A- Equal Opportunity Affumadve Action Employer 50% crndr:J10% post consumer paacr
\ \Jen Vacant /%
Crown Harbor Vacant
\ /
Fox Residence
4
CL
a
Kiedinger Residence
a=o
u 0
76' --
40• ------ ?,j
'ter
c?
d
4
T------------
u
t .s r
t
Crown Harbor Dry Boat Storage, LLQ
Vicinity Map w Q?2 -1R5' 3 =
0 300m
9ooft
Northwast Or
m,
4 ?C4tt`GtBBt ?'( Y?? IR
?fc FACILITY r? ? 4 rr Lake No man
t ,?' ? G° . a rroh
?? ?i ??rheFiu `S _
Pec
1r51 `,ry W
OVA
02002 Mapquest.com, Inc.; 02002 Navigation Technologies ¢cornefi,us
,D2 1,',t Z -
Crown Harbor Dry Boat Storage, LLC.
Existing Site Conditions
Crete Bulkhead Site & Dredging Are
t
Rock Shoal & Dredging Area
1
4
East End Dry Storage Shoreline Stabilization Area
West End Dredging Area
East End Existing Wet Slips
uJ/1O/_IUU4 11./V /U4-Ufj-Z///
K S HOLLIFIELD
Composite Map --- Existing Conditions
Crown Harbor Magna
Proposed Marine Dry Storage Facility
T-Pa-IT W1.762.44, 001-761-99 D. B.
Town of Cornelius - Afeckwburg Count); NC
- S.W. J•.lop+ ?
a s xore?ar
F-JsrQer Poll.rary ]22006 P. 4,p?sAd3Q Da
/uc suu
rnps»-/r?x?l./??p?o?4?nfam ?
twV(i ??L'oS1ta / O'A' RGQCNgI
Interstate Highway 77 (No Access)
PAGE 01101
1CO C 100 rn
Ev5T1NG CONP ITION 5FIOWih1? A<<'L WET Sc?IP5
IZO FT F(UIN` -76o E??V /DTI ON JkN D G? hoc INSIDE
'2.00 Fr -P0-OP5P-T-\Y
x
S? >. w
10 U QJ a .°. °?
m 0 y
a s
_1 m 0
C• ,••? dC.w-1 G X Ya Lim+Y.41 OOtYGC
E "'? 4^y U -I s mw G O++
u CY U Y U.
O IIAro010.0'mp, 1 °
L m
- O?Y w
ti mYWW W O >•-1gmY0 U ME Yc>
(? h OC mY O d<
Q7
>..1 M C W H m 0
C ar C r W C L r C s-e- O 4 0 7 m E U C w c"A
4m U- 0000Y 4ENHw m 0 _>•..>., C,0>.C?m
1 dAi O3mam 1 z0A •. Nomro fa Y•Y•tII6
I O U O U W k I W F E m m•H Y C •r m U i u
°-1 _o O o?+o- mwGO um EY
CamiWSU +HIOE4md N WZWw0.m.014IJ Uc .ti w0 m
mL d 3-i,COCA GUe YmII-+E>,mA •-°Gmk
0'•'1 ''a '0YU Em ms uw-I0 E41U a deM
'J,1 m O C A m E 0 0 7 m e•11 O. O+mi U U 07 .y C p 0l E aY
^?-/? 40, LH-°i C°7CY 0Ajx w`aOW> E"<,G It OYuUS.0r
'^ W C7 H G .r m 0 a -+ p 0..-1 o A C
r"q W 1 O 7 m A" >. 0 4
U Y H
{"1 .-1 >v U O U Q? +i m Y
O -I
. E
rl-O{ '_lJ}RJ[C{ 4{?-?{I,., -1 o f +q Y Y c 'D +-1 m H m w ,q Y a N 1? N 0+.1 .-1 0
Y Y e•I E 7 -4 41 .•1 > O M r m g w m b A U q +1 -1 U
G U m ~0 0 CYZ AQY 7a C7 CYlQ>.w3m
ro+m+•*udccuw omu°cY.'", ol°ou -°.0AJdj7, .
uN a-r
0 -H
?r a w a u
i4 Y w G .+ .C .1 p H w ro m m 0 U a' O N q L d c• C m
.4 '10 1u? Aw'a. m wYCmmu>
-u o m.0v aY uc o a> a u -+uY a'..
ro
H Y k m m U U .•? W .m1 N A ] Y Qwi C {., y 0 Q1 041
U ° d r0.1 IXO C fu0 M 0 YI ° .y V 1°•) 7 O W G 0 0, W .-o >,O , E o C
mpNYGasa uuF?GEG Ia°,mc i ca cuw?
O m CL w? y°.7 0? m -a -1 a 0 m ro 0,.Q -A d A Q' O m
ol t),
e O m n U d Y C C 0 m 0 4 Y G d Ol M o l
Y E >, q c a
n o C >C QQ 41 m U W Itl EEyW -1 'O G m m G O 17 •.I a Qi
n a m t U Y t w Y 0! O 'O ~i yS 9-1 i U U 0.p +wi
A O m w u Vi
N Yl7 U1? m>,YW C AO •a0 L U O
OE.•107 G
G W A W QI-
N Wm ZrmjGw-CIO mFIIO4 -7 W UW?Hw Cyr
11 2 "I
-11 41 rl 0 14 '"1 11 Ai
0 Cr. Y0 00 G~pW w07 W, . -a A wpro
z 00umm 0 41 13 -Iwz>0E0 4,z u" Ca°r•.,;u •••ui
41 1 fiUCw•.1 mYm .?IOWa.1gAN Gc 0)
rtGm4.41 r 00 U 0 Y U m 0. to c Q C C 41 -. Ek .QQ E w U 7 d.1>m U 4 W a ro'? c a
df U -+ F. y O L O E O Ol O Z +1 01 L N m la •n 4 yi ti M y c
T'+ E 0 u w Y _I O Y u H u> C) 0) .••1 -•1 .•1 U E
0 AUO a0Y UY.E m w061mwa+a > E
4, O!
0. gmbaro0. EA0U u0 a 0iOAla ue0' Nc.cacL )
F amYHN••14 q.Af 41G UY
n
A
w
u
W
d
Y
a
Y
C
ar
E
O
u
l
Q
z
O
H
N
N
H
N
c Wu
n a
,..1 O
'a t6 .HC
o F w
u Ra
z 0
a Hz
? zw
J K
a
zoo [n
124
14 0 0 1.4
14 0
41 F w w
N
ro
r
z c
°
uu a
o as ? w
"
z
row
Y I
o
m
U
C
o
v
c O.1
w of N O -1 of
U A O
. •n n z
Ww
Ni1
m-+
W
o
w N
?>?
a
n w>
II b m m
p
C A 4
?
OI
0'
m
D
m
w .L
? V
j d
Oa.
,
,1
C M
d Y
U w L
W
•
b
G
U
b ((??
61
N? Q
D N -
I C r ?j p 7 w fl
W s 0
0 0 O
A C S 0
N ? .-
1C yw y z
W 4j U
w E ? O p 41 0 Ow
,? zx u w zu?
?
a Y E
p,
I Y U C
0
O 'm
L Aj
z
, a
Gr .
07
U L u
-1
.-?
4J
.
p ?Y a E
W G &j -f 3
.C
X
Z
u „
v v
=
F
+ V i
O
?
m a
?
1 •
II
d
w i
m
Y a.
ro
O
c
A
u
a
t
II
tr.
u
au
w
N
N
I
u q
4, n
o
a
EN
v?
uu
0.?
u
Y
C
A
7
m
w
0
a
II
U
.1
co
m
mu
uu
u
W N
+1
CL
.7
?o
n
n
1
.•1
N
N
0
v
X
u n
C w
6 w
0
a
c a
61
V
r•,
r
Y .?
N O
evr4
A G?•
.m+D?OU
?
X U o Z n
O w ? . '1
3 xaui
m
?a°m°o"
W.l?oao
?coau=-
I r 16, 11 U IF
4)vuaw,.
u
a
Y
C
O
U
c
ro
V
-1
4
4
t
,LNdIVd?YNdGV NI dQ
G
O
E
°
u
w
v
u
x
7
?j :t
c
-0
Y
U
r
to
in
41
s
w
u
u
v
U
a
W
a
H
C
Qf 1!1 G W lOi
AYn m+°+d.C
c e° U> b d
? Y °+v-1
Y u-c1 roa OC
C > Y m 7
F C mIINW'O
w H +1 .ti O .?
0 .r 0 k L YPI 30
CN70IISC d
y w Os m
A m A3c II
U E wr•, y
-+0 AU?.c
-+Y.rc
w OF
a ro ., ]
a II -+ w o
4 C Y R
• Ei d E Y •Ya •YI
••G mL I U m I II U U d
W O w p O w W +/
w Qr {,,, w ro a 0.
uaYa c.•Ic
y w i a o w m
w°wFwfiO+.>I
oma >„ Gw
G V b O d L",
b? ado ow.
Y v-+ v a.1 u
aN?..mowm
-r n w m U w
1i Y w a R T
yU•+ mY C
C?O U A'i F b 7
T Y
C ca.
lT
Y
3
o J (?
ll) ? ?
c? ? v
x.71.
9
ro
II
C
b
Y
m
M
0
0
01
.C
Y
w
0
Y
m
N
O ?
u _
ou
m
ro m
m ..
um
C 4
m b
-t w
F a
.r
a
a
r-
.t
bT9i 9 98E VOL Xdd TT:BT 00/90/EO
DWQ# O-?
$$) Plan Detail Incomplete
Date
Please provide a location map for the project. 0at Lt'?C
? Please show all stream impacts including all fill slopes, dissipa forand bank stabilization on the site plan.
? Please show all wetland impacts including fill slopes on the site plan.
? Please indicate all buffer impacts on the site plan.
? Please indicate proposed lot layout as overlays on the site plan.
? Please indicate the location of the protected buffers as overlays on the site plan.
? Please locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan.
? Please provide cross section details showing the provisions for aquatic life passage.
? Please locate any planned sewer lines on the site plan.
? Please provide the location of any proposed stormwater management practices as required by GC
? Please provide detail for the stormwater management practices as required by GC
? Please specify the percent of project imperviousness area based on the estimated built-out conditions.
? Please indicate all stormwater ouffalls on the site plan.
? Please indicate the diffuse flow provision measures on the site plan.
? Please indicate whether or not the proposed impacts already been conducted.
$$) Avoidance and/or Minimization Not Provided
'rte , _
? The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional information as to why
it is necessary for this project.
? This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the . Please
revise the plans to avoid the i'rpp?ct?. T VOA '`A << Ob ) AAC ?pti r 6tl4 _
This Office believes that the p labeled on the plans as ? 1" can be moved or reconfigured to minimize the impacts to the Please
?
revise the plans to minimize the pacts.
D The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because . Please
revise the plans and provide calculations to show that diffuse flow will be achieved through the entire buffer. If it is not possible to achieve diffuse
flow through the entire buffer then it may be necessary to provide stormwater management practices that remove nutrients before the stonmwater
can be discharged through the buffer.
$$) Other
? The application fee was insufficient because over 150 feet of stream and/or over 1 acre of wetland impact was request. Please provide $
This additional fee must be received before your application can be reviewed.
? Please complete Section(s) on the application.
? Please provide a signed copy of the application.
? Please provide copies of the application,
$$) Mitigation
copies of the site plans and other supporting information.
? of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform
to the requirements in 15 A NCAC 2H.0500 and must be appropriate to the type of impacts proposed.
? Please indicate which 404 Permit the USACE would use to authorize this project.