Loading...
HomeMy WebLinkAboutNCC191145_MODIFICATION Supporting Documents_20200414ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN W RENN Acting Director NORTH CAROLINA Environmental Quality April 13, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Progress, LLC ATTN: Mr. Timothy J. Same 550 South Tryon St. DEC22A Charlotte, NC 28202 RE: Project Name: DUKE PATTON AVENUE 115kV S013S`l'A` ION Acres Approved: 4.82 Project ID: BUNCO-2019-001 County: Buncombe City: Asheville Address: 252 Patton Ave. River Basin: French Broad Stream Classification: French Broad River - B Submitted By: Mr. Cory George, P.E. Date Received by LQS: July 18, 2018 Date Revision Received by LQS: April 9, 2020 Plan Type: Utility Dear Mr. Same, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCGO1O00O Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eN01 form to Annette Lucas at Annette.lucas@ncdenr.goy or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office { 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rnannicnaouKa � ospartmeitotfnvlmnmental Qual� /'s 828.296.4500 Letter of Approval with Modifications Duke Energy Progress, LLC April 13, 2020 Page 2 of 4 of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, Fred Walker, P.E. Express Engineer Land Quality Section Letter of Approval with Modifications Duke Energy Progress, LLC April 13, 2020 Page 3 of 4 Enclosures: Modifications Required for Approval ec: Mr. Cory George, P.E. (george@mcadamsco.com) cc: Regional Office file Letter of Approval with Modifications Duke Energy Progress, LLC April 13, 2020 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: DUKE PATTON AVENUE 1151KV SUBSTATION Project ID: BUNCO-2019-001 County: Buncombe Submit an original notarized Financial Responsibility Ownership form with the updated disturbed acreage amount. {G,S.113A-54.1)