April 13, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Progress, LLC
ATTN: Mr. Timothy J. Same
550 South Tryon St. DEC22A
Charlotte, NC 28202
RE: Project Name: DUKE PATTON AVENUE 115kV S013S`l'A` ION
Acres Approved: 4.82
Project ID: BUNCO-2019-001
County: Buncombe
City: Asheville
Address: 252 Patton Ave.
River Basin: French Broad
Stream Classification: French Broad River - B
Submitted By: Mr. Cory George, P.E.
Date Received by LQS: July 18, 2018
Date Revision Received by LQS: April 9, 2020
Plan Type: Utility
Dear Mr. Same,
This office has reviewed the subject revised erosion and sedimentation control plan. We find
the plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the
NCGO1O00O Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eN01 form to Annette Lucas at
Annette.lucas@ncdenr.goy or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office { 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
rnannicnaouKa �
ospartmeitotfnvlmnmental Qual� /'s 828.296.4500
Letter of Approval with Modifications
Duke Energy Progress, LLC
April 13, 2020
Page 2 of 4
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
Fred Walker, P.E.
Express Engineer
Land Quality Section
Letter of Approval with Modifications
Duke Energy Progress, LLC
April 13, 2020
Page 3 of 4
Enclosures: Modifications Required for Approval
ec: Mr. Cory George, P.E. (george@mcadamsco.com)
cc: Regional Office file
Letter of Approval with Modifications
Duke Energy Progress, LLC
April 13, 2020
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: DUKE PATTON AVENUE 1151KV SUBSTATION
Project ID: BUNCO-2019-001
County: Buncombe
Submit an original notarized Financial Responsibility Ownership form with the
updated disturbed acreage amount. {G,S.113A-54.1)