Loading...
HomeMy WebLinkAboutNCC191145_Modification Review_20200415Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/14/2020 4:38:10 PM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 4/15/2020 7:32:27 AM (Construction COC ADD TO FILE Review- NCC191145) • The task was assigned to Georgoulias, Bethany. The due date is: April 17, 2020 5:00 PM 4/14/2020 4:38 PM Y. , NORTH CAPCLINA Emlremmentel Quality Certificate of NCC191145 Coverage (COC) Enter the Certificate of Coverage N nber (Use capital letters) No.* Information associated with this permit Project Name Duke Patton Avenue 115kV Substation Address 252 Patton Avenue, Asheville, NC County Buncombe Latitude 35.5920 Longitude -82.5632 Permittee Listed Duke Energy Progress, LLC Legally Responsible Timothy Same Individual NC Reference No. NCG01-2019-1145 E&SC Plan ID BUNCO 2019-001 Original NOI 14135 Tracking No.* Date COC Issued* 07/30/2019 Prior Rescission This field will populate only ff OOChas already been rescinded. Date Modification Information: Reason for f Closed -Out Lots/Outparcels in E&SC Plan Modification* r Additional Lots/Outparcels Approved - E&SC Revised r Other Revision(s) to E&SC Plan r Multiple Reasons (List) Addional ivbre inforrration if necessary Explanation Adding less than 1 acre of disturbed area to plans for underground utility installation. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). Supporting Upload Supporting Documentation (%vised ESCApproval, (lose -Out Doc, etc.) Documentation LOAwM revision 4-13-2020.pdf 988.57KB Mast be FDFfon-rat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Timothy J. Same Title * Transmission Line Engineering Manager Organization* Duke Energy Progress, LLC Date * 04/14/2020 Email Address* tim.same@duke-energy.com Email for Confirmation Telephone Number* 919-546-7468 Contact Nbrrber if we need to reach you Review Date 04/15/2020 Request Date 20200414 Formatted Review Date 20200415 Formatted