HomeMy WebLinkAboutSW5200201_Plan (Set)_20200413EX. 20' ALLEY OR STREET(FORMERLY MANN STREET)PB 70 PG 304EXISTING 66' PUBLIC R/W
ELM STREET
EXISTING 66' PUBLIC R/W
MARKET STREET
EXISTING 66' PUBLIC R/WBROCKLYN STREETXXXXXXXX
X
X
X
X
X
X X
XX
X X
X
X
X
X X
XXXXX XXXXXXX X X X X X X X X X X X X X X X X X X X
XXXXXXX X X X
X XS55°15'33"E300.41'N34°28'18"E 642.01'
PINE
PINE
PINE
OAK
OAK
PINE
PINE
PINE
PINE
PINE
PINE
PICNIC
SHELTER
PICNIC
SHELTER
PLAY AREA
ASPHALT
A
S
P
H
A
L
T
T
R
A
C
K
S
EX. YI 6EX. 15"
HDPE
S
S
EX. SSMH
TOP 241.76
INV. IN 235.67
INV. IN 235.72
INV. IN 235.69
INV. OUT 235.65
BOTTOM 235.65
EX. YI 7
SDMH
N55°15'33"W297.39'N34°45'04"E 642.00'
N34°45'04"E 679.08'
WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
FIRE HYDRANT ASSEMBLY
GATE VALVE
TEE
THRUST (REACTION) BLOCKING
BLOW OFF VALVE
WATER METER
CLEANOUT
SANITARY MANHOLE
FLARED END SECTION
RISER STRUCTURE
YARD INLET
BACKFLOW PREVENTERRPZ
CATCH BASIN
WM
WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
FIRE HYDRANT ASSEMBLY
GATE VALVE
TEE
THRUST (REACTION) BLOCKING
BLOW OFF VALVE
WATER METER
CLEANOUT
SANITARY MANHOLE
FLARED END SECTION
RISER STRUCTURE
YARD INLET
BACKFLOW PREVENTERRPZ
CATCH BASIN
WMN
30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-05 PARTIAL SITE UTILITY PLAN IUTILITY LEGEND
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
MATCHLINE REFER TO C-06
GENERAL NOTES:
STANDARD UTILITY NOTES (AS APPLICABLE):
1. ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON DESIGN STANDARDS, DETAILS, AND SPECIFICATIONS (2. UTILITY SEPARATION
REQUIREMENTS:
a.A DISTANCE OF 100 FEET SHALL BE MAINTAINED BETWEEN SANITARY SEWER AND
ANY PRIVATE OR PUBLIC WATER SUPPLY SOURCE SUCH AS AN IMPOUNDED
RESERVOIR USED AS A SOURCE OF DRINKING WATER. IF ADEQUATE LATERAL
SEPARATION CANNOT BE ACHIEVED, FERROUS SANITARY SEWER PIPE SHALL BE
SPECIFIED AND INSTALLED TO WATERLINE SPECIFICATIONS. HOWEVER, THE
MINIMUM SEPARATION SHALL NOT BE LESS THAN 25 FEET FROM A PRIVATE WELL
OR 50 FEET FROM A PUBLIC WELL.
b.WHEN INSTALLING WATER AND/OR SEWER MAINS, THE HORIZONTAL SEPARATION
BETWEEN UTILITIES SHALL BE 10 FEET. IF THIS SEPARATION CANNOT BE
MAINTAINED DUE TO EXISTING CONDITIONS, THE VARIATION ALLOWED IS THE
WATER MAIN IN A SEPARATE TRENCH WITH THE ELEVATION OF THE WATER MAIN
AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER AND MUST BE APPROVED BY
THE PUBLIC UTILITIES DIRECTOR. ALL DISTANCES ARE MEASURED FROM OUTSIDE
DIAMETER TO OUTSIDE DIAMETER.
c.WHERE IT IS IMPOSSIBLE TO OBTAIN PROPER SEPARATION, OR ANYTIME A
SANITARY SEWER PASSES OVER A WATERMAIN, DIP MATERIALS OR STEEL
ENCASEMENT EXTENDED 10 FEET ON EACH SIDE OF CROSSING MUST BE
SPECIFIED AND INSTALLED TO WATERLINE SPECIFICATIONS.
d.5 FEET MINIMUM HORIZONTAL SEPARATION IS REQUIRED BETWEEN ALL SANITARY
SEWER AND STORM SEWER FACILITIES, UNLESS DIP MATERIAL IS SPECIFIED FOR
SANITARY SEWER.
e.MAINTAIN 18 INCH MIN. VERTICAL SEPARATION AT ALL WATERMAIN AND RCP
STORM DRAIN CROSSINGS; MAINTAIN 24 INCH MIN. VERTICAL SEPARATION AT ALL
SANITARY SEWER AND RCP STORM DRAIN CROSSINGS. WHERE ADEQUATE
SEPARATIONS CANNOT BE ACHIEVED, SPECIFY DIP MATERIALS AND A CONCRETE
CRADLE HAVING 6 INCHES MIN. CLEARANCE
f.ALL OTHER UNDERGROUND UTILITIES SHALL CROSS WATER AND SEWER
FACILITIES WITH 18 INCH MIN. VERTICAL SEPARATION REQUIRED.
3. ANY NECESSARY FIELD REVISIONS ARE SUBJECT TO REVIEW AND APPROVAL OF AN
AMENDED PLAN AND/OR PROFILE BY THE TOWN OF BENSON PUBLIC UTILITIES DEPARTMENT
PRIOR TO CONSTRUCTION.
4. CONTRACTOR SHALL MAINTAIN CONTINUOUS WATER AND SEWER SERVICE TO EXISTING
RESIDENCES AND BUSINESSES THROUGHOUT CONSTRUCTION OF THE PROJECT. ANY
NECESSARY SERVICE INTERRUPTIONS SHALL BE PRECEDED BY A 24 HOUR ADVANCE NOTICE
TO THE TOWN OF BENSON PUBLIC UTILITIES DEPARTMENT.
5. 3.0' MINIMUM COVER IS REQUIRED ON ALL WATER MAINS AND SEWER FORCEMAINS. 4.0'
MINIMUM COVER IS REQUIRED ON ALL REUSE MAINS.
6. IT IS THE DEVELOPER'S RESPONSIBILITY TO ABANDON OR REMOVE EXISTING WATER AND
SEWER SERVICES NOT BEING USED IN REDEVELOPMENT OF A SITE UNLESS OTHERWISE
DIRECTED BY THE TOWN OF BENSON PUBLIC UTILITIES DEPARTMENT. THIS INCLUDES
ABANDONING TAP AT MAIN AND REMOVAL OF SERVICE FROM ROW OR EASEMENT.
7. INSTALL 3/4 INCH COPPER* WATER SERVICES WITH METERS LOCATED AT ROW OR WITHIN A
2'x2' WATERLINE EASEMENT IMMEDIATELY ADJACENT. NOTE: IT IS THE APPLICANTS
RESPONSIBILITY TO PROPERLY SIZE THE WATER SERVICE FOR EACH CONNECTION TO
PROVIDE ADEQUATE FLOW AND PRESSURE.
8. INSTALL 4 INCH PVC* SEWER SERVICES AT 1.0% MINIMUM GRADE WITH CLEANOUTS
LOCATED AT ROW OR EASEMENT LINE AND SPACED EVERY 75 LINEAR FEET MAXIMUM.
9. PRESSURE REDUCING VALVES ARE REQUIRED ON ALL WATER SERVICES EXCEEDING 80 PSI;
BACKWATER VALVES ARE REQUIRED ON ALL SANITARY SEWER SERVICES HAVING BUILDING
DRAINS LOWER THAN 1.0 FEET ABOVE THE NEXT UPSTREAM MANHOLE.
10. ALL ENVIRONMENTAL PERMITS APPLICABLE TO THE PROJECT MUST BE OBTAINED FROM
NCDWQ, USACE, AND/OR FEMA FOR ANY RIPARIAN BUFFER, WETLAND, AND/OR FLOODPLAIN
IMPACTS (RESPECTIVELY) PRIOR TO CONSTRUCTION.
11. NCDOT/RAILROAD ENCROACHMENT AGREEMENTS ARE REQUIRED FOR ANY UTILITY WORK
(INCLUDING MAIN EXTENSIONS AND SERVICE TAPS) WITHIN STATE OR RAILROAD ROW PRIOR
TO CONSTRUCTION.
12. GREASE INTERCEPTOR/OIL WATER SEPARATOR SIZING CALCULATIONS AND INSTALLATION
SPECIFICATIONS SHALL BE APPROVED BY THE TOWN OF BENSON PRIOR TO ISSUANCE OF A
BUILDING PERMIT.
13. CROSS-CONNECTION CONTROL PROTECTION DEVICES ARE REQUIRED BASED ON DEGREE
OF HEALTH HAZARD INVOLVED AS LISTED IN APPENDIX-B OF THE RULES GOVERNING PUBLIC
WATER SYSTEMS IN NORTH CAROLINA. THESE GUIDELINES ARE THE MINIMUM REQUIREMENTS.
THE DEVICES SHALL MEET AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE) STANDARDS
OR BE ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVAL LIST. THE DEVICES SHALL
BE INSTALLED AND TESTED (BOTH INITIAL AND PERIODIC TESTING THEREAFTER) IN
ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS OR THE LOCAL CROSS
CONNECTION CONTROL PROGRAM, WHICHEVER IS MORE STRINGENT.
1. EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE COMPILED FROM A FIELD
SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC. (DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A
FIELD SURVEY BY SHIPMAN ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS DATA, AND OTHER DATA
SOURCES AS REQUIRED.
2. REFER TO EROSION AND SEDIMENT CONTROL PLAN AND CONSTRUCTION SEQUENCE BEFORE PERFORMING
ANY CLEARING, GRUBBING, OR DEMOLITION OPERATIONS.
3. NO TITLE OPINION ON THIS PROPERTY HAS BEEN FURNISHED.
4. AREAS COMPUTED BY THE COORDINATE METHOD.
5. THE PROPERTY SHOWN HEREON IS SUBJECT TO ALL RIGHTS-OF-WAY, EASEMENTS, COVENANTS, AND
RESTRICTIONS OF RECORD.
6. ALL DISTANCES SHOWN ON THE SURVEY ARE HORIZONTAL GROUND DISTANCES.
7. THE PROPERTY SHOWN IS LOCATED OUTSIDE OF ANY FLOOD HAZARD AREAS AS SHOWN ON FEMA FIRM
3720152800K DATED OCTOBER 3, 2006.
8. REFER TO SEALED TOPOGRAPHICAL SURVEY BY LAMBERT SURVEYING, INC. FOR HORIZONTAL AND VERTICAL
DATUM INFORMATION AND OTHER SURVEY CONTROL DATA.
9. ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB, UNLESS NOTED OTHERWISE.
10. CONTRACTOR SHALL FIELD LOCATE SPILL CURB AS NEEDED FOR PROPER DRAINAGE. SPILL CURB LOCATIONS
ARE NOT INDICATED ON THIS PLAN.
11. COORDINATE POWER, TELEPHONE, CABLE, AND OTHER UNDERGROUND UTILITY INSTALLATION WITH THE
APPROPRIATE UTILITY PROVIDER AND THE TOWN OF BENSON.
12. ALL PROPOSED SIGNAGE WILL COMPLY WITH THE TOWN OF BENSON SIGN ORDINANCE.
13. CONTRACTOR IS RESPONSIBLE FOR VERIFIYING ALL GRADES PRIOR TO THE START OF CONSTRUCTION.
14. MAXIMUM SIDEWALK CROSS SLOPE IS 2% (1/4 INCH PER FOOT).
15. THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FDC POINTS, OR
OTHER WATER-USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN THE WATER METER AND ANY
REQUIRED BACKFLOW PREVENTION DEVICES.
16. MAINTAIN A MINIMUM OF 3' COVER OVER ALL WATER PIPING.
17. ALL SANITARY SEWER CLEANOUTS IN PAVEMENT AREAS SHALL BE TRAFFIC RATED.
LOCATION OF SANITARY SEWERS IN RELATION TO
WATER AND STORM SEWERS:
A. SEWERS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY EXISTING OR
PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES
WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10 FOOT SEPARATION, THE APPROPRIATE
REVIEWING AGENCY (DEH OR DENR) MAY ALLOW DEVIATION ON A CASE BY CASE BASIS, IF
SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION MAY ALLOW
INSTALLATION OF THE SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER
MAIN IS IN A SEPERATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE
SIDE OF THE SEWER AND AT AN ELEVATION SO THAT THE BOTTOM OF THE WATER MAIN IS
AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER.
B. IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS
DESCRIBED ABOVE OR ANYTIME THE SEWER IS OVER THE WATER MAIN, BOTH WATER
MAIN AND SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH PUBLIC
WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150 PSI TO ASSURE
WATERTIGHTNESS BEFORE BACKFILLING.
C. A 24 INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND
SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED.
CROSSINGS:
A. SEWERS CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM
VERTICAL DISTANCE OF 18 INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE
OUTSIDE OF THE SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SEWER
JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS.
B. WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL
SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE
SPECIFIED
I. THE SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE
AND SHALL BE PRESSURE TESTED AT 150 PSI TO ASSURE WATERTIGHTNESS PRIOR TO
BACKFILLING, OR
II. EITHER THE WATER MAIN OR THE SEWER LINE MAY BE ENCASED IN A
WATERTIGHT CARRIER PIPE WHICH EXTENDS 10 FEET ON BOTH SIDES OF THE CROSSING,
MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF
MATERIALS APPROVED BY THE REEGULATORY AGENCY OF USE IN WATER MAIN
CONSTRUCTION.
EXISTING 60' PUBLIC R/W
LEE STREETEXISTING PUBLIC R/WMANN STREETX X X X X X X X
X
X XXXXXXXXXXXX X X X XXXXXXXXXXXXXXXXXXX
XXXXXXX
X XXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X X X X
XFMR
XFMR
X
X X X
EX. DUGOUT EX. DUGOUTEX. DUGOUTEX. DUGOUTASPHALT TRACK
ASPHALT
CONC. S/W
CONC. S/WCONC. S/W
EX. CHAIN
LINK FENCE
EX. CHAIN LINK
FENCE
EX. CHAIN LINK
FENCE
WMS
EX. 15" HDPE
EX.
1
5"
H
D
P
E
E
X
.
1
5
"
H
D
P
EEX. 15" HDPEEX. YI 1
EX. YI 2
EX. YI 3
EX. YI 4
S
EX. SSMH
TOP 241.80
INV. IN 236.89
INV. IN 236.90
INV. OUT 236.89
BOTTOM EL. 236.92
EX. SSMH
TOP 241.76
INV. IN 237.85
INV. OUT 237.77
BOTTOM 237.80N55°15'33"W629.49'N55°15'33"W629.49'S34°43'27"W 1237.44'S34°43'27"W 1237.44'XXXXXX
XXXX X
X
XXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
XXX
XXXX
X
XXXXXX
X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXX
X
XX
X
X
X
X
X
X
X
X
X X X X
X X X X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXX
XXX
WWSAN SAN SAN SAN SAN SAN
FM FMFMFMFMFMFMFM FM FM FM FM FM FM FM FM FM FM FM FM
RPZWMPACKAGE SANITARY SEWER
EJECTOR PUMP STATION -REFER TO
DETAILS
1.5" PVC SANITARY
SEWER FORCE MAIN (SDR-21,
200 PSI)
TIE FORCE MAIN
TO EXISTING SANITARY
SEWER MANHOLE
(CORE DRILL & SEAL
PENETRATION)
141 LF 4" PVC SDR-35
SANITARY
SEWER SERVICE @
1.00%
SSCO
(ACCESSIBLE
RATED)-TIE TO BLDG
WASTE PIPING
2" CTS WATER
SERVICE TUBING
MIN. 36" COVER
1 1/2" DOMESTIC
WATER METER
1 1/2" RPZ BACKFLOW
PREVENTER IN
HEATED ENCLOSURE
10+00 11+0012+00 13+00 14+00 14+75
WWWWWWWWWWWWWWWWW2" SERVICE SADDLE
W/ 2" GATE VALVE
EX. WATER MAIN
(APPROX. LOCATION,
MATERIALS UNKNOWN)
NOTE: CONTRACTOR SHALL TEST PIT TO DETERMINE
EXACT WATERLINE LOCATION, DIAMETER, AND
MATERIALS PRIOR TO INSTALLATION OF NEW SERVICE
SADDLE.
1.5" 45° ELBOW
1.5" 45° ELBOW
WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
FIRE HYDRANT ASSEMBLY
GATE VALVE
TEE
THRUST (REACTION) BLOCKING
BLOW OFF VALVE
WATER METER
CLEANOUT
SANITARY MANHOLE
FLARED END SECTION
RISER STRUCTURE
YARD INLET
BACKFLOW PREVENTERRPZ
CATCH BASIN
WM
WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
FIRE HYDRANT ASSEMBLY
GATE VALVE
TEE
THRUST (REACTION) BLOCKING
BLOW OFF VALVE
WATER METER
CLEANOUT
SANITARY MANHOLE
FLARED END SECTION
RISER STRUCTURE
YARD INLET
BACKFLOW PREVENTERRPZ
CATCH BASIN
WM
N30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-06 PARTIAL SITE UTILITY PLAN IIALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
MATCHLINE REFER TO C-05
SITE PLAN LEGEND
GENERAL NOTES:
STANDARD UTILITY NOTES (AS APPLICABLE):
1. ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON DESIGN STANDARDS, DETAILS, AND SPECIFICATIONS (2. UTILITY SEPARATION
REQUIREMENTS:
a.A DISTANCE OF 100 FEET SHALL BE MAINTAINED BETWEEN SANITARY SEWER AND
ANY PRIVATE OR PUBLIC WATER SUPPLY SOURCE SUCH AS AN IMPOUNDED
RESERVOIR USED AS A SOURCE OF DRINKING WATER. IF ADEQUATE LATERAL
SEPARATION CANNOT BE ACHIEVED, FERROUS SANITARY SEWER PIPE SHALL BE
SPECIFIED AND INSTALLED TO WATERLINE SPECIFICATIONS. HOWEVER, THE
MINIMUM SEPARATION SHALL NOT BE LESS THAN 25 FEET FROM A PRIVATE WELL
OR 50 FEET FROM A PUBLIC WELL.
b.WHEN INSTALLING WATER AND/OR SEWER MAINS, THE HORIZONTAL SEPARATION
BETWEEN UTILITIES SHALL BE 10 FEET. IF THIS SEPARATION CANNOT BE
MAINTAINED DUE TO EXISTING CONDITIONS, THE VARIATION ALLOWED IS THE
WATER MAIN IN A SEPARATE TRENCH WITH THE ELEVATION OF THE WATER MAIN
AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER AND MUST BE APPROVED BY
THE PUBLIC UTILITIES DIRECTOR. ALL DISTANCES ARE MEASURED FROM OUTSIDE
DIAMETER TO OUTSIDE DIAMETER.
c.WHERE IT IS IMPOSSIBLE TO OBTAIN PROPER SEPARATION, OR ANYTIME A
SANITARY SEWER PASSES OVER A WATERMAIN, DIP MATERIALS OR STEEL
ENCASEMENT EXTENDED 10 FEET ON EACH SIDE OF CROSSING MUST BE
SPECIFIED AND INSTALLED TO WATERLINE SPECIFICATIONS.
d.5 FEET MINIMUM HORIZONTAL SEPARATION IS REQUIRED BETWEEN ALL SANITARY
SEWER AND STORM SEWER FACILITIES, UNLESS DIP MATERIAL IS SPECIFIED FOR
SANITARY SEWER.
e.MAINTAIN 18 INCH MIN. VERTICAL SEPARATION AT ALL WATERMAIN AND RCP
STORM DRAIN CROSSINGS; MAINTAIN 24 INCH MIN. VERTICAL SEPARATION AT ALL
SANITARY SEWER AND RCP STORM DRAIN CROSSINGS. WHERE ADEQUATE
SEPARATIONS CANNOT BE ACHIEVED, SPECIFY DIP MATERIALS AND A CONCRETE
CRADLE HAVING 6 INCHES MIN. CLEARANCE
f.ALL OTHER UNDERGROUND UTILITIES SHALL CROSS WATER AND SEWER
FACILITIES WITH 18 INCH MIN. VERTICAL SEPARATION REQUIRED.
3. ANY NECESSARY FIELD REVISIONS ARE SUBJECT TO REVIEW AND APPROVAL OF AN
AMENDED PLAN AND/OR PROFILE BY THE TOWN OF BENSON PUBLIC UTILITIES DEPARTMENT
PRIOR TO CONSTRUCTION.
4. CONTRACTOR SHALL MAINTAIN CONTINUOUS WATER AND SEWER SERVICE TO EXISTING
RESIDENCES AND BUSINESSES THROUGHOUT CONSTRUCTION OF THE PROJECT. ANY
NECESSARY SERVICE INTERRUPTIONS SHALL BE PRECEDED BY A 24 HOUR ADVANCE NOTICE
TO THE TOWN OF BENSON PUBLIC UTILITIES DEPARTMENT.
5. 3.0' MINIMUM COVER IS REQUIRED ON ALL WATER MAINS AND SEWER FORCEMAINS. 4.0'
MINIMUM COVER IS REQUIRED ON ALL REUSE MAINS.
6. IT IS THE DEVELOPER'S RESPONSIBILITY TO ABANDON OR REMOVE EXISTING WATER AND
SEWER SERVICES NOT BEING USED IN REDEVELOPMENT OF A SITE UNLESS OTHERWISE
DIRECTED BY THE TOWN OF BENSON PUBLIC UTILITIES DEPARTMENT. THIS INCLUDES
ABANDONING TAP AT MAIN AND REMOVAL OF SERVICE FROM ROW OR EASEMENT.
7. INSTALL 3/4 INCH COPPER* WATER SERVICES WITH METERS LOCATED AT ROW OR WITHIN A
2'x2' WATERLINE EASEMENT IMMEDIATELY ADJACENT. NOTE: IT IS THE APPLICANTS
RESPONSIBILITY TO PROPERLY SIZE THE WATER SERVICE FOR EACH CONNECTION TO
PROVIDE ADEQUATE FLOW AND PRESSURE.
8. INSTALL 4 INCH PVC* SEWER SERVICES AT 1.0% MINIMUM GRADE WITH CLEANOUTS
LOCATED AT ROW OR EASEMENT LINE AND SPACED EVERY 75 LINEAR FEET MAXIMUM.
9. PRESSURE REDUCING VALVES ARE REQUIRED ON ALL WATER SERVICES EXCEEDING 80 PSI;
BACKWATER VALVES ARE REQUIRED ON ALL SANITARY SEWER SERVICES HAVING BUILDING
DRAINS LOWER THAN 1.0 FEET ABOVE THE NEXT UPSTREAM MANHOLE.
10. ALL ENVIRONMENTAL PERMITS APPLICABLE TO THE PROJECT MUST BE OBTAINED FROM
NCDWQ, USACE, AND/OR FEMA FOR ANY RIPARIAN BUFFER, WETLAND, AND/OR FLOODPLAIN
IMPACTS (RESPECTIVELY) PRIOR TO CONSTRUCTION.
11. NCDOT/RAILROAD ENCROACHMENT AGREEMENTS ARE REQUIRED FOR ANY UTILITY WORK
(INCLUDING MAIN EXTENSIONS AND SERVICE TAPS) WITHIN STATE OR RAILROAD ROW PRIOR
TO CONSTRUCTION.
12. GREASE INTERCEPTOR/OIL WATER SEPARATOR SIZING CALCULATIONS AND INSTALLATION
SPECIFICATIONS SHALL BE APPROVED BY THE TOWN OF BENSON PRIOR TO ISSUANCE OF A
BUILDING PERMIT.
13. CROSS-CONNECTION CONTROL PROTECTION DEVICES ARE REQUIRED BASED ON DEGREE
OF HEALTH HAZARD INVOLVED AS LISTED IN APPENDIX-B OF THE RULES GOVERNING PUBLIC
WATER SYSTEMS IN NORTH CAROLINA. THESE GUIDELINES ARE THE MINIMUM REQUIREMENTS.
THE DEVICES SHALL MEET AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE) STANDARDS
OR BE ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVAL LIST. THE DEVICES SHALL
BE INSTALLED AND TESTED (BOTH INITIAL AND PERIODIC TESTING THEREAFTER) IN
ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS OR THE LOCAL CROSS
CONNECTION CONTROL PROGRAM, WHICHEVER IS MORE STRINGENT.
1. EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE COMPILED FROM A FIELD
SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC. (DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A
FIELD SURVEY BY SHIPMAN ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS DATA, AND OTHER DATA
SOURCES AS REQUIRED.
2. REFER TO EROSION AND SEDIMENT CONTROL PLAN AND CONSTRUCTION SEQUENCE BEFORE PERFORMING
ANY CLEARING, GRUBBING, OR DEMOLITION OPERATIONS.
3. NO TITLE OPINION ON THIS PROPERTY HAS BEEN FURNISHED.
4. AREAS COMPUTED BY THE COORDINATE METHOD.
5. THE PROPERTY SHOWN HEREON IS SUBJECT TO ALL RIGHTS-OF-WAY, EASEMENTS, COVENANTS, AND
RESTRICTIONS OF RECORD.
6. ALL DISTANCES SHOWN ON THE SURVEY ARE HORIZONTAL GROUND DISTANCES.
7. THE PROPERTY SHOWN IS LOCATED OUTSIDE OF ANY FLOOD HAZARD AREAS AS SHOWN ON FEMA FIRM
3720152800K DATED OCTOBER 3, 2006.
8. REFER TO SEALED TOPOGRAPHICAL SURVEY BY LAMBERT SURVEYING, INC. FOR HORIZONTAL AND VERTICAL
DATUM INFORMATION AND OTHER SURVEY CONTROL DATA.
9. ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB, UNLESS NOTED OTHERWISE.
10. CONTRACTOR SHALL FIELD LOCATE SPILL CURB AS NEEDED FOR PROPER DRAINAGE. SPILL CURB LOCATIONS
ARE NOT INDICATED ON THIS PLAN.
11. COORDINATE POWER, TELEPHONE, CABLE, AND OTHER UNDERGROUND UTILITY INSTALLATION WITH THE
APPROPRIATE UTILITY PROVIDER AND THE TOWN OF BENSON.
12. ALL PROPOSED SIGNAGE WILL COMPLY WITH THE TOWN OF BENSON SIGN ORDINANCE.
13. CONTRACTOR IS RESPONSIBLE FOR VERIFIYING ALL GRADES PRIOR TO THE START OF CONSTRUCTION.
14. MAXIMUM SIDEWALK CROSS SLOPE IS 2% (1/4 INCH PER FOOT).
15. THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FDC POINTS, OR
OTHER WATER-USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN THE WATER METER AND ANY
REQUIRED BACKFLOW PREVENTION DEVICES.
16. MAINTAIN A MINIMUM OF 3' COVER OVER ALL WATER PIPING.
17. ALL SANITARY SEWER CLEANOUTS IN PAVEMENT AREAS SHALL BE TRAFFIC RATED.
LOCATION OF SANITARY SEWERS IN RELATION TO
WATER AND STORM SEWERS:
A. SEWERS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE
DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10 FOOT
SEPARATION, THE APPROPRIATE REVIEWING AGENCY (DEH OR DENR) MAY ALLOW DEVIATION ON A CASE BY CASE BASIS, IF
SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION MAY ALLOW INSTALLATION OF THE SEWER CLOSER
TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPERATE TRENCH OR ON AN UNDISTURBED EARTH SHELF
LOCATED ON ONE SIDE OF THE SEWER AND AT AN ELEVATION SO THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18
INCHES ABOVE THE TOP OF THE SEWER.
B. IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME
THE SEWER IS OVER THE WATER MAIN, BOTH WATER MAIN AND SEWER MUST BE CONSTRUCTED OF FERROUS PIPE
COMPLYING WITH PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150 PSI TO ASSURE
WATERTIGHTNESS BEFORE BACKFILLING.
C. A 24 INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR
FERROUS PIPE SPECIFIED.
CROSSINGS:
A. SEWERS CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES
BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SEWER. THE CROSSING SHALL BE ARRANGED SO
THAT THE SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS.
B. WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE
OF THE FOLLOWING METHODS MUST BE SPECIFIED
I. THE SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT
150 PSI TO ASSURE WATERTIGHTNESS PRIOR TO BACKFILLING, OR
II. EITHER THE WATER MAIN OR THE SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE WHICH
EXTENDS 10 FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER
PIPE SHALL BE OF MATERIALS APPROVED BY THE REEGULATORY AGENCY OF USE IN WATER MAIN CONSTRUCTION.
24
1
241
2
4
1
241241241241241241241241
241241241241240240240240
240
2
4
0
24
0
24
0
240 240241241
240
240
238239
239 239239238238 238239239
23
9
240240240239241242
24224024024124124
1
24223823823723823
8 237238 238236236238
237 237238239
239
23
9
23
9
239239239
239239242240241239
239EXISTING 60' PUBLIC R/WLEE STREETE
X
I
S
T
I
N
G
P
U
B
L
I
C
R
/
W
M
A
N
N
S
T
R
E
E
T
E
X
.
2
0
'
A
L
L
E
Y
O
R
S
T
R
E
E
T
(F
O
R
M
E
R
L
Y
M
A
N
N
S
T
R
E
E
T
)
P
B
7
0
P
G
3
0
4 EXISTING 66' PUBLIC R/W
ELM STREETEXISTING 66' PUBLIC R/WMARKET STREETE
X
I
S
T
I
N
G
6
6
'
P
U
B
L
I
C
R
/
W
B
R
O
C
K
L
Y
N
S
T
R
E
E
T
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
XXXXX
XXXXXXX
X
X
XXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXFMRXFMRX XXXXXXXXXXN/F TOWN OF BENSON
DB 00060 PG 0185
PIN 153911-55-7124
XXXS
5
5
°
1
5
'
3
3
"
E
30
0
.
4
1
'N34°28'18"E642.01'N/F STATE OF NORTH CAROLINA
DB 00572 PG 0584
PIN 153918-41-2350PINEPINEPINEOAKOAKPINEPINEPINEPINEPINEPINE SSWM
SEX. 15" HDPEEX. 15" HDPEEX. 15" HDP
E
EX
.
1
5
"
H
D
P
EEX. YI 6EX. 15
"
H
D
P
E
EX. YI 1EX. YI 2EX. YI 3EX. YI 4SSSEX. YI 7SDMHN
5
5
°
1
5
'
3
3
"
W
29
7
.
3
9
'N34°45'04"E 642.00'N
5
5
°
1
5
'
3
3
"
W
62
9
.
4
9
'N34°45'04"E 679.08'S34°43'27"W 1237.44'xxxxxxxxxxxxxxxxxxxxxxxx238237236235238238238.5237.5236.5239.5239.5239.5CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
N30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-09 OVERALL PHASE 1 EROSION CONTROLPLANALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
SITE PLAN NOTES:
1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE
LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND
ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND
OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING
COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR
UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.
2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF BENSON
STANDARD SPECIFICATIONS AND DETAILS.
3.EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE
COMPILED FROM A FIELD SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC.
(DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A FIELD SURVEY BY SHIPMAN
ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS
DATA, AND OTHER DATA SOURCES AS REQUIRED.
4.RIPARIAN BUFFER AREAS SHALL NOT BE CLEARED, DRAINAGE, OR OTHERWISE
DISTURBED UNLESS SPECIFICALLY PERMITTED BY THE US ARMY CORPS OF ENGINEERS
AND NCDENR-DWQ.
5.TREE PROTECTION FENCING SHALL BE PROVIDED ALONG ALL VEGETATED RIPARIAN
AND VEGETATED PERIMETER BUFFER AREAS AS WELL AS TREE CONSERVATION AREAS.
6.PRIVATE UTILITIES (POWER, TELEPHONE, NATURAL GAS, CABLE TV) ARE NOT SHOWN ON
THIS PLAN. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THOSE
UTILITIES WHEN INSTALLING STORM DRAINAGE TO AVOID CONFLICTS.
7.CUT/FILL SLOPES SHALL BE GRADED AT A MAXIMUM OF 3H:1V UNLESS OTHERWISE
INDICATED.
8.NO GRADING EQUIPMENT SHALL BE PERMITTED ON-SITE UNTIL A GRADING PERMIT HAS
BEEN ISSUED BY JOHNSTON COUNTY AND/OR NCDEQ DIVISION OF LAND QUALITY.
9.ALL RIP-RAP IS TO BE INSTALLED WITH NON-WOVEN FILTER FABRIC BENEATH (MIRAFI
140N OR APPROVED EQUAL).
GROUND COVER STABILIZATION SCHEDULE:
1. STABILIZE BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION.
2. STABILIZE DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE
WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING.
3. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND
COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF 7 DAYS.
4. PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE
SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN
WITHIN 14 CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND
DISTURBING ACTIVITY.
5. ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 14
CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR
PRIOR TO FINAL INSPECTION.
7 daysPerimeter dikes, swales, ditches and slopes
SITE AREA DESCRIPTION STABILIZATION
NPDES STABILIZATION TABLE
TIMEFRAME EXCEPTIONS
7 days
14 days
NoneHigh Quality Water (HQW) Zones
Slopes steeper than 3:1 If slopes are 10' or less in length and are not
steeper than 2:1, 14 days are allowed.
Slopes 3:1 or flatter 7 days for slopes greater than 50' in length
7 days
All other areas with slopes fatter than 4:1 14 days None, except for perimeters and HQW Zones
None
EROSION CONTROL LEGEND
241241
241
241
2412412412412402402402
4
0 240
241
241
24
0
2
4
0
238
23
9
2
3
9
239
239238238
2382392
3
9239240240240239241
2
4
2
242
240
240241241241242 238238237238238237 238238236
2362
3
8
2
3
7
237239EX. 20' ALLEY OR STREET(FORMERLY MANN STREET)PB 70 PG 304EXISTING 66' PUBLIC R/W
ELM STREET
EXISTING 66' PUBLIC R/W
MARKET STREET
EXISTING 66' PUBLIC R/WBROCKLYN STREETXXXXXXXXXXXX
X
X
X
X
X
X X
XXXX
X X
X
X
X
X
XXX X
XXXXX XXXXXXX X X X X X X X X X X X X X X X X X X X
XXXXXXXXX X X X
X XS55°15'33"E300.41'N34°28'18"E 642.01'
PINE
PINE
PINE
OAK
OAK
PINE
PINE
PINE
PINE
PINE
PINE
PICNIC
SHELTER
PICNIC
SHELTER
PLAY AREA
ASPHALT
A
S
P
H
A
L
T
T
R
A
C
K
S
EX. YI 6EX. 15" HDPE
S
S
EX. SSMH
TOP 241.76
INV. IN 235.67
INV. IN 235.72
INV. IN 235.69
INV. OUT 235.65
BOTTOM 235.65
EX. YI 7
SDMH
N55°15'33"W297.39'N34°45'04"E 642.00'
N34°45'04"E 679.08'
x x
xx
x x
xx
238
237
236
235
238
238
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE20'
50'
RIP RAP CONSTRUCTION
ENTRANCE
TOTAL DISTURBED AREA:
6.51 ACRES LIMITS OF DISTURBANCETEMPORARY DIVERSION
BERM 1-MIN. SLOPE 0.50%
GRAVEL CHECK
DAM (TYP.)TEMPORARY DIVERSION
BERM 2-MIN. SLOPE 0.50%
COIR MESH SEDIMENT
BAFFLES (TYP. OF 3)
20'
20' WIDE EMERGENCY
SPILLWAY
BOTTOM EL. 237.00
NCDOT CLASS 1 STONE
3" SKIMMER W/ 1.25" ORIFICE
INV. 235.00
4" SCH. 40 PVC
SKIMMER PIPE-TIE TO EX.
DROP INLET
HARDWARE CLOTH &
GRAVEL INLET PROTECTION
(TYP. EACH INLET)
SKIMMER SEDIMENT TRAP 1
TOP EL. 238.00
BOTTOM EL.: 235.00
DEPTH: 3 FEET
SURFACE AREA: 6,040 SF
SIDE SLOPES: 2.5:1 (H:V)
DAM HT: 1.5 FEET
DEWATERING TIME: 3.36 DAYS
5'
SKIMMER SEDIMENT TRAP 1
DISTURBED AREA: 3.37 AC.
DRAINAGE AREA: 3.71 AC.
HARDWARE CLOTH &
GRAVEL INLET PROTECTION
(TYP. EACH INLET)
SILT FENCE (TYP.)
SILT FENCE (TYP.)
TEMPORARY DIVERSION
BERM 3-MIN. SLOPE 0.50%
PROVIDE SILT FENCE
AROUND STOCKPILE AREA
SILT FENCE OUTLET
(TYP.)
STOCKPILE/STAGING
AREA
OPPOSE EXISTING GRADE IF NEEDED
TO PROVIDE POSITIVE DRAINAGE
INTO BASIN
49.48'
92.47'
SILT BAG (REFER TO
CONST. SEQUENCE)
SILT BAG PUMP
& FLEX PIPING
(REFER TO CONST.
SEQUENCE)
ECX-2 EROSION
CONTROL MATTING
ECX-2 EROSION
CONTROL MATTING
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
N30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-10 PARTIAL EROSION & SEDIMENTCONTROL PLAN I-INITIAL PHASEALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
MATCHLINE REFER TO C-11
SITE PLAN NOTES:
1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE
LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND
ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND
OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING
COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR
UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.
2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF BENSON
STANDARD SPECIFICATIONS AND DETAILS.
3.EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE
COMPILED FROM A FIELD SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC.
(DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A FIELD SURVEY BY SHIPMAN
ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS
DATA, AND OTHER DATA SOURCES AS REQUIRED.
4.RIPARIAN BUFFER AREAS SHALL NOT BE CLEARED, DRAINAGE, OR OTHERWISE
DISTURBED UNLESS SPECIFICALLY PERMITTED BY THE US ARMY CORPS OF ENGINEERS
AND NCDENR-DWQ.
5.TREE PROTECTION FENCING SHALL BE PROVIDED ALONG ALL VEGETATED RIPARIAN
AND VEGETATED PERIMETER BUFFER AREAS AS WELL AS TREE CONSERVATION AREAS.
6.PRIVATE UTILITIES (POWER, TELEPHONE, NATURAL GAS, CABLE TV) ARE NOT SHOWN ON
THIS PLAN. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THOSE
UTILITIES WHEN INSTALLING STORM DRAINAGE TO AVOID CONFLICTS.
7.CUT/FILL SLOPES SHALL BE GRADED AT A MAXIMUM OF 3H:1V UNLESS OTHERWISE
INDICATED.
8.NO GRADING EQUIPMENT SHALL BE PERMITTED ON-SITE UNTIL A GRADING PERMIT HAS
BEEN ISSUED BY JOHNSTON COUNTY AND/OR NCDEQ DIVISION OF LAND QUALITY.
9.ALL RIP-RAP IS TO BE INSTALLED WITH NON-WOVEN FILTER FABRIC BENEATH (MIRAFI
140N OR APPROVED EQUAL).
PHASE 1 EROSION AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE:
1. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE LAND DISTURBING
ACTIVITIES OCCUR.
2. A LAND DISTURBANCE PRECONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY DISTURBANCE ON SITE. THE MEETING SHALL BE
BETWEEN THE SITE GRADING CONTRACTOR, ENGINEER, AND NCDEQ STAFF. THE CONTRACTOR SHALL SCHEDULE THE MEETING TO OCCUR AT
LEAST 48 HOURS PRIOR TO ANY DISTURBANCE ON SITE.
3. INSTALL TREE PROTECTION FENCING, IF REQUIRED, IN ACCORDANCE WITH THE TREE CONSERVATION PLAN. FENCING SHALL BE INSTALLED
AROUND TREE CONSERVATION AREAS AND OTHER PROTECTED AREAS.
4. INSTALL CONSTRUCTION ENTRANCE TO THE PROPERTY. BARRICADE ANY ADDITIONAL ENTRANCES TO PREVENT UNAUTHORIZED ENTRY.
5. INSTALL SILT FENCE AROUND THE PERIMETER OF THE SITE, AS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN. INSTALLATION
SHALL DISTURB ONLY THOSE AREAS NECESSARY FOR COMPLETE AND PROPER INSTALLATION OF THE FENCE.
6. BEGIN EXCAVATION OF THE SKIMMER SEDIMENT BASIN. INSTALL THE OUTLET BARREL, SKIMMER DEVICE, AND COIR MESH BAFFLES. INSTALL
THE ANTI-SEEP COLLAR, EMERGENCY SPILLWAY, AND OTHER REQUIRED PERMANENT IMPROVEMENTS AS SHOWN ON THE PLAN. THE
EMBANKMENT BERM SHALL BE INSTALLED UNDER THE SUPERVISION OF A QUALIFIED GEOTECHNICAL ENGINEER.
7. ONCE EROSION CONTROL MEASURES HAVE BEEN INSTALLED, SCHEDULE AN EROSION CONTROL INSPECTION WITH THE APPROPRIATE
REGULATORY STAFF IN ACCORDANCE WITH THE GRADING PERMIT. UPON APPROVAL OF THE EROSION CONTROL MEASURES, LAND DISTURBING
ACTIVITY MAY COMMENCE.
8. BEGIN DEMOLITION ACTIVITIES ON THE SITE AS OUTLINED IN THE DEMOLITION PLAN. BEGIN BY REMOVING THE EXISTING CONCESSIONS
STAND, SIDEWALK, FENCING, AND OTHER FEATURES AS S HOWN.
9. CLEAR AND GRUB THE PROJECT AREAS, REMOVING ORGANIC MATERIALS, TOPSOIL, ROOT MAT, AND OTHER UNSUITABLES AS NECESSARY.
SIFT AND STOCKPILE TOPSOIL AND OTHER MATERIAL ON SITE.
10. BEGIN ROUGH GRADING OF THE PROJECT AREA, TAKING CARE TO ADJUST ANY EROSION CONTROL MEASURES AS THE SITE COMES TO FINAL
GRADE.
11. BEGIN CONSTRUCTION OF THE NEW FI ELD HOUSE STRUCTURE AND NEW FIELDS.
12. REFER TO PHASE 2 EROSION CONTROL PLAN FOR ADDITIONAL MEASURES AND STABILIZATION DETAILS.
GROUND COVER STABILIZATION SCHEDULE:
1. STABILIZE BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION.
2. STABILIZE DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE
WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING.
3. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND
COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF 7 DAYS.
4. PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE
SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN
WITHIN 14 CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND
DISTURBING ACTIVITY.
5. ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 14
CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR
PRIOR TO FINAL INSPECTION.
7 daysPerimeter dikes, swales, ditches and slopes
SITE AREA DESCRIPTION STABILIZATION
NPDES STABILIZATION TABLE
TIMEFRAME EXCEPTIONS
7 days
14 days
NoneHigh Quality Water (HQW) Zones
Slopes steeper than 3:1 If slopes are 10' or less in length and are not
steeper than 2:1, 14 days are allowed.
Slopes 3:1 or flatter 7 days for slopes greater than 50' in length
7 days
All other areas with slopes fatter than 4:1 14 days None, except for perimeters and HQW Zones
None
EROSION CONTROL LEGEND
241241241241241241
241
241
240
2402402
4
0240 238
23
9
239239239239
239
239239242240
241
2
3
9
239
EXISTING 60' PUBLIC R/W
LEE STREETEXISTING PUBLIC R/WMANN STREETX X X X X X X X
X
X XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX
XXXXXXX
X XXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X X X X
XFMR
XFMR
X
X X X
EX. DUGOUT EX. DUGOUTEX. DUGOUTEX. DUGOUTASPHALT TRACK
ASPHALT
CONC. S/W
CONC. S/WCONC. S/W
EX. CHAIN
LINK FENCE
EX. CHAIN LINK
FENCE
EX. CHAIN LINK
FENCE
WMS
EX. 15" HDPE
EX.
1
5"
H
D
P
E
E
X
.
1
5
"
H
D
P
EEX. 15" HDPEEX. YI 1
EX. YI 2
EX. YI 3
EX. YI 4
S N55°15'33"W629.49'N55°15'33"W629.49'S34°43'27"W 1237.44'S34°43'27"W 1237.44'
x x
xx
x x
xx
x x
xxxx
xx
238.5237.5236.5SKIMMER SEDIMENT TRAP 2
DISTURBED AREA: 1.63 AC.
DRAINAGE AREA: 1.66 AC.
DRAINAGE AREA BOUNDARY
COIR MESH SEDIMENT
BAFFLES (TYP. OF 3)
10' WIDE EMERGENCY SPILLWAY
BOTTOM EL. 238.50
NCDOT CLASS 1 STONE
SILT FENCE OUTLET
(TYP.)239.5239.5239.5TEMPORARY DIVERSION BERM 4
MIN. SLOPE 0.50%
SILT FENCE (TYP.)
TIE SKIMMER DRAWDOWN
INTO EX. DROP INLET
4" SCH. 40 PVC
SKIMMER OUTLET PIPE
2" SKIMMER W/ 1" ORIFICE
INV. 236.50
5'
GRAVEL CHECK
DAM (TYP.)
SILT FENCE
(TYP.)
HARDWARE CLOTH
& GRAVEL INLET
PROTECTION (TYP.
EACH INLET)
HARDWARE CLOTH &
GRAVEL INLET
PROTECTION (TYP.
EACH INLET)
LIMITS OF DISTURBANCE
LI
M
I
T
S
O
F
D
I
S
T
U
R
B
A
N
C
E
LIMI
T
S
O
F
DI
S
T
U
R
B
A
N
C
E
LIMITS OF DISTURBANCE
TOTAL DISTURBED AREA:
6.51 ACRES
CONCRETE WASHOUT
STATION
20'
50'
RIP RAP CONSTRUCTION
ENTRANCE
15" HDPE TEMP.
CULVERT
REMOVE & PRESERVE
EXISTING FENCE AT ENTRANCE
(REINSTALL AT CONCLUSION OF
CONSTRUCTION)
STOCKPILE/STAGING
AREA
SILT FENCE (TYP)
TEMPORARY DIVERSION BERM 5
MIN. SLOPE 0.50%
SKIMMER SEDIMENT TRAP 2
TOP EL. 239.50
BOTTOM EL.: 236.50
DEPTH: 3 FEET
SURFACE AREA: 2,465 SF
SIDE SLOPES: 2.5:1 (H:V)
DAM HT: 1.0 FEET
DEWATERING TIME: 3.11 DAYS
46.45'
34.06'
SILT BAG (REFER TO
CONST. SEQUENCE)
SILT BAG PUMP
& FLEX PIPING
(REFER TO CONST.
SEQUENCE)
RIP RAP APRON
8'L x 10'W x 12"T
NCDOT CLASS B
STONE
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
N30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-11
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
MATCHLINE REFER TO C-10
PARTIAL EROSION & SEDIMENTCONTROL PLAN II-INITIAL PHASESITE PLAN NOTES:
1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE
LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND
ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND
OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING
COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR
UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.
2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF BENSON
STANDARD SPECIFICATIONS AND DETAILS.
3.EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE
COMPILED FROM A FIELD SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC.
(DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A FIELD SURVEY BY SHIPMAN
ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS
DATA, AND OTHER DATA SOURCES AS REQUIRED.
4.RIPARIAN BUFFER AREAS SHALL NOT BE CLEARED, DRAINAGE, OR OTHERWISE
DISTURBED UNLESS SPECIFICALLY PERMITTED BY THE US ARMY CORPS OF ENGINEERS
AND NCDENR-DWQ.
5.TREE PROTECTION FENCING SHALL BE PROVIDED ALONG ALL VEGETATED RIPARIAN
AND VEGETATED PERIMETER BUFFER AREAS AS WELL AS TREE CONSERVATION AREAS.
6.PRIVATE UTILITIES (POWER, TELEPHONE, NATURAL GAS, CABLE TV) ARE NOT SHOWN ON
THIS PLAN. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THOSE
UTILITIES WHEN INSTALLING STORM DRAINAGE TO AVOID CONFLICTS.
7.CUT/FILL SLOPES SHALL BE GRADED AT A MAXIMUM OF 3H:1V UNLESS OTHERWISE
INDICATED.
8.NO GRADING EQUIPMENT SHALL BE PERMITTED ON-SITE UNTIL A GRADING PERMIT HAS
BEEN ISSUED BY JOHNSTON COUNTY AND/OR NCDEQ DIVISION OF LAND QUALITY.
9.ALL RIP-RAP IS TO BE INSTALLED WITH NON-WOVEN FILTER FABRIC BENEATH (MIRAFI
140N OR APPROVED EQUAL).
GROUND COVER STABILIZATION SCHEDULE:
1. STABILIZE BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION.
2. STABILIZE DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE
WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING.
3. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND
COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF 7 DAYS.
4. PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE
SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN
WITHIN 14 CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND
DISTURBING ACTIVITY.
5. ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 14
CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR
PRIOR TO FINAL INSPECTION.
7 daysPerimeter dikes, swales, ditches and slopes
SITE AREA DESCRIPTION STABILIZATION
NPDES STABILIZATION TABLE
TIMEFRAME EXCEPTIONS
7 days
14 days
NoneHigh Quality Water (HQW) Zones
Slopes steeper than 3:1 If slopes are 10' or less in length and are not
steeper than 2:1, 14 days are allowed.
Slopes 3:1 or flatter 7 days for slopes greater than 50' in length
7 days
All other areas with slopes fatter than 4:1 14 days None, except for perimeters and HQW Zones
None
EROSION CONTROL LEGEND
PHASE 1 EROSION AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE:
1. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE LAND DISTURBING
ACTIVITIES OCCUR.
2. A LAND DISTURBANCE PRECONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY DISTURBANCE ON SITE. THE MEETING SHALL BE
BETWEEN THE SITE GRADING CONTRACTOR, ENGINEER, AND NCDEQ STAFF. THE CONTRACTOR SHALL SCHEDULE THE MEETING TO OCCUR AT
LEAST 48 HOURS PRIOR TO ANY DISTURBANCE ON SITE.
3. INSTALL TREE PROTECTION FENCING, IF REQUIRED, IN ACCORDANCE WITH THE TREE CONSERVATION PLAN. FENCING SHALL BE INSTALLED
AROUND TREE CONSERVATION AREAS AND OTHER PROTECTED AREAS.
4. INSTALL CONSTRUCTION ENTRANCE TO THE PROPERTY. BARRICADE ANY ADDITIONAL ENTRANCES TO PREVENT UNAUTHORIZED ENTRY.
5. INSTALL SILT FENCE AROUND THE PERIMETER OF THE SITE, AS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN. INSTALLATION
SHALL DISTURB ONLY THOSE AREAS NECESSARY FOR COMPLETE AND PROPER INSTALLATION OF THE FENCE.
6. BEGIN EXCAVATION OF THE SKIMMER SEDIMENT BASIN. INSTALL THE OUTLET BARREL, SKIMMER DEVICE, AND COIR MESH BAFFLES. INSTALL
THE ANTI-SEEP COLLAR, EMERGENCY SPILLWAY, AND OTHER REQUIRED PERMANENT IMPROVEMENTS AS SHOWN ON THE PLAN. THE
EMBANKMENT BERM SHALL BE INSTALLED UNDER THE SUPERVISION OF A QUALIFIED GEOTECHNICAL ENGINEER.
7. ONCE EROSION CONTROL MEASURES HAVE BEEN INSTALLED, SCHEDULE AN EROSION CONTROL INSPECTION WITH THE APPROPRIATE
REGULATORY STAFF IN ACCORDANCE WITH THE GRADING PERMIT. UPON APPROVAL OF THE EROSION CONTROL MEASURES, LAND DISTURBING
ACTIVITY MAY COMMENCE.
8. BEGIN DEMOLITION ACTIVITIES ON THE SITE AS OUTLINED IN THE DEMOLITION PLAN. BEGIN BY REMOVING THE EXISTING CONCESSIONS
STAND, SIDEWALK, FENCING, AND OTHER FEATURES AS S HOWN.
9. CLEAR AND GRUB THE PROJECT AREAS, REMOVING ORGANIC MATERIALS, TOPSOIL, ROOT MAT, AND OTHER UNSUITABLES AS NECESSARY.
SIFT AND STOCKPILE TOPSOIL AND OTHER MATERIAL ON SITE.
10. BEGIN ROUGH GRADING OF THE PROJECT AREA, TAKING CARE TO ADJUST ANY EROSION CONTROL MEASURES AS THE SITE COMES TO FINAL
GRADE.
11. BEGIN CONSTRUCTION OF THE NEW FI ELD HOUSE STRUCTURE AND NEW FIELDS.
12. REFER TO PHASE 2 EROSION CONTROL PLAN FOR ADDITIONAL MEASURES AND STABILIZATION DETAILS.
241241
241
241
2412412412412402402402
4
0 240
241
241
24
0
2
4
0
238
23
9
2
3
9
239
239238238
2382392
3
9239240240240239241
2
4
2
242
240
240241241241242 238238237238238237 238238236
2362
3
8
2
3
7
237239EX. 20' ALLEY OR STREET(FORMERLY MANN STREET)PB 70 PG 304EXISTING 66' PUBLIC R/W
ELM STREET
EXISTING 66' PUBLIC R/W
MARKET STREET
EXISTING 66' PUBLIC R/WBROCKLYN STREETXXXXXXXXXXXX
X
X
X
X
X
X X
XXXX
X X
X
X
X
X
XXX X
XXXXX XXXXXXX X X X X X X X X X X X X X X X X X X X
XXXXXXXXX X X X
X XS55°15'33"E300.41'N34°28'18"E 642.01'
PINE
PINE
PINE
OAK
OAK
PINE
PINE
PINE
PINE
PINE
PINE
PICNIC
SHELTER
PICNIC
SHELTER
PLAY AREA
ASPHALT
A
S
P
H
A
L
T
T
R
A
C
K
S
EX. YI 6EX. 15" HDPE
S
S
EX. YI 7
SDMH
N55°15'33"W297.39'N34°45'04"E 642.00'
N34°45'04"E 679.08'
YI# 101
YI# 100
53 LF 15" RCP
@ 0.40%241240
239
240
239
238
241
240 239
240
23
9
238 237
238
2
4
1
238240239 2
3
9
2
4
0
x x
xx
x x
xx
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE20'
50'
RIP RAP CONSTRUCTION
ENTRANCE
TOTAL DISTURBED AREA:
6.51 ACRES LIMITS OF DISTURBANCEHARDWARE CLOTH &
GRAVEL INLET PROTECTION
(TYP. EACH INLET)
HARDWARE CLOTH &
GRAVEL INLET PROTECTION
(TYP. EACH INLET)
SILT FENCE (TYP.)
SILT FENCE (TYP.)
GRAVEL CHECK DAM
(TYP.)
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
N30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-12 PARTIAL EROSION & SEDIMENTCONTROL PLAN I-FINAL PHASEALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
MATCHLINE REFER TO C-13
SITE PLAN NOTES:
1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE
LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND
ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND
OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING
COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR
UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.
2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF BENSON
STANDARD SPECIFICATIONS AND DETAILS.
3.EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE
COMPILED FROM A FIELD SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC.
(DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A FIELD SURVEY BY SHIPMAN
ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS
DATA, AND OTHER DATA SOURCES AS REQUIRED.
4.RIPARIAN BUFFER AREAS SHALL NOT BE CLEARED, DRAINAGE, OR OTHERWISE
DISTURBED UNLESS SPECIFICALLY PERMITTED BY THE US ARMY CORPS OF ENGINEERS
AND NCDENR-DWQ.
5.TREE PROTECTION FENCING SHALL BE PROVIDED ALONG ALL VEGETATED RIPARIAN
AND VEGETATED PERIMETER BUFFER AREAS AS WELL AS TREE CONSERVATION AREAS.
6.PRIVATE UTILITIES (POWER, TELEPHONE, NATURAL GAS, CABLE TV) ARE NOT SHOWN ON
THIS PLAN. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THOSE
UTILITIES WHEN INSTALLING STORM DRAINAGE TO AVOID CONFLICTS.
7.CUT/FILL SLOPES SHALL BE GRADED AT A MAXIMUM OF 3H:1V UNLESS OTHERWISE
INDICATED.
8.NO GRADING EQUIPMENT SHALL BE PERMITTED ON-SITE UNTIL A GRADING PERMIT HAS
BEEN ISSUED BY JOHNSTON COUNTY AND/OR NCDEQ DIVISION OF LAND QUALITY.
9.ALL RIP-RAP IS TO BE INSTALLED WITH NON-WOVEN FILTER FABRIC BENEATH (MIRAFI
140N OR APPROVED EQUAL).
GROUND COVER STABILIZATION SCHEDULE:
1. STABILIZE BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION.
2. STABILIZE DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE
WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING.
3. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND
COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF 7 DAYS.
4. PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE
SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN
WITHIN 14 CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND
DISTURBING ACTIVITY.
5. ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 14
CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR
PRIOR TO FINAL INSPECTION.
7 daysPerimeter dikes, swales, ditches and slopes
SITE AREA DESCRIPTION STABILIZATION
NPDES STABILIZATION TABLE
TIMEFRAME EXCEPTIONS
7 days
14 days
NoneHigh Quality Water (HQW) Zones
Slopes steeper than 3:1 If slopes are 10' or less in length and are not
steeper than 2:1, 14 days are allowed.
Slopes 3:1 or flatter 7 days for slopes greater than 50' in length
7 days
All other areas with slopes fatter than 4:1 14 days None, except for perimeters and HQW Zones
None
EROSION CONTROL LEGEND
PHASE 2 EROSION AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE:
1. CONTINUE ROUGH GRADING SITE TO BRING PROJECT AREA TO FINAL GRADE. ADJUST EROSION CONTROL MEASURES DAILY TO FIT NEW SITE
GRADES AS LAND AREA IS BROUGHT TO FINAL ELEVATION.
2. CONTINUE WORK ON THE NEW FIELD HOUSE, BASEBALL FIELDS, AND MULTIPURPOSE FIELDS.
3. BEGIN INSTALLATION OF ANY STORM DRAINAGE PIPING, WATER, AND SANITARY SEWER IN THE PROJECT SITE. INSTALL HARDWARE CLOTH INLET
PROTECTION TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN NETWORK AS SOON AS NEW STORM INLETS ARE INSTALLED.
4. DIRECT ALL STORMWATER RUNOFF TO THE SEDIMENT BASIN AS NECESSARY FROM ALL DISTURBED SOILS. DO NOT PERMIT SEDIMENT LADEN
WATER TO ESCAPE OFFSITE WITHOUT FLOWING THROUGH THE SEDIMENT BASIN.
5. FINE GRADE ALL PAVED AREAS AND INSTALL ROADWAY SUBGRADE, CURB AND GUTTER, AND OTHER SITE FEATURES.
6. COMPLETE PAVING AND CONCRETE FLATWORK AREAS. INSTALL LANDSCAPING AS SHOWN ON THE LANDSCAPING PLAN.
7. ONCE ALL UPGRADIENT AREAS ARE PERMANENTLY STABILIZED WITH VEGETATION AND BUILDING CONSTRUCTION IS SUBSTANTIALLY COMPLETE,
THE CONTRACTOR MAY REMOVE THE SKIMMER SEDIMENT BASINS. NOTE THAT SEEDING DOES NOT QUALITY AS PERMANENT STABILIZATION.
UPGRADIENT AREAS MUST INCLUDE AN ADEQUATE STAND OF PERMENENT VEGETATION TO BE CONSIDERED STABILIZED.
8. DEWATER THE EXISTING SEDIMENT BASINS BY PUMPING SEDIMENT LADEN WATER THROUGH A SILT BAG PRIOR TO DISCHARGE. THE PUMP FOR
THE SILT BAG SHALL BE INSTALLED IN OUTLET CELL OF THE SKIMMER BASIN (I.E. THE SAME CELL AS SKIMMER DEVICE). REFER TO PHASE I EROSION
CONTROL DRAWINGS FOR BAG LOCATION, PUMP LOCATION, AND DISCHARGE PIPING LOCATIONS.
9. ONCE BASIN IS SUFFICIENTLY DEWATERED, REMOVE COIR MESH SEDIMENT BAFFLES, TRASH, AND OTHER ACCUMULATED DEBRIS. REMOVE THE
SKIMMER DEVICE AND SEAL THE EXISTING DRAINAGE STRUCTURES WITH WATERTIGHT SEAL.
10. FINE GRADE, SEED, AND STABILIZE THE AREAS PREVIOUSLY OCCUPIED BY THE SKIMMER BASIN AS SHOWN ON THE PLANS.
11. IF CONSTRUCTION IS COMPLETE, SCHEDULE A FINAL INSPECTION WITH NCDEQ INSPECTIONS STAFF. IF THE SITE IS APPROVED, REMOVE
TEMPORARY DIVERSIONS, SILT FENCE, BASINS, ETC. AND SEED OR STABILIZE ANY REMAINING BARE AREAS. ALL REMAINING PERMANENT EROSION
CONTROL DEVICES, SUCH AS VELOCITY DISSIPATORS, SHOULD NOW BE INSTALLED.
12. WHEN THE PROJECT IS COMPLETED, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE
PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC
NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT.
241241241241241241
241
241
240
2402402
4
0240 238
23
9
239239239239
239
239239242240
241
2
3
9
239
EXISTING 60' PUBLIC R/W
LEE STREETEXISTING PUBLIC R/WMANN STREETX X X X X X X X
X
X XXXXXXXXXXXX X X X XXXXXXXXXXXXXXXXXXX
XXXXXXX
X XXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X X X X
XFMR
XFMR
X
X X X
EX. DUGOUT EX. DUGOUTEX. DUGOUTEX. DUGOUTASPHALT TRACK
ASPHALT
CONC. S/W
CONC. S/WCONC. S/W
EX. CHAIN
LINK FENCE
EX. CHAIN LINK
FENCE
EX. CHAIN LINK
FENCE
WMS
EX. 15" HDPE
EX.
1
5"
H
D
P
E
E
X
.
1
5
"
H
D
P
EEX. 15" HDPEEX. YI 1
EX. YI 2
EX. YI 3
EX. YI 4
S N55°15'33"W629.49'N55°15'33"W629.49'S34°43'27"W 1237.44'S34°43'27"W 1237.44'XXXXXX
XXXX X
X
XXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
XXX
XXXX
X
XXXXXX
X
X X X
X X X
X X X
XXXXXXXXXXXXXXXXXXXXX
XX
X
X
X
X
X
X
X
X
X X X X
X X X X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXX
XXX
WWSAN SAN SAN SAN SAN SAN
FM FMFMFMFMFMFMFM FM FM FM FM FM FM FM FM FM FM FM FM
RPZWM10+00 11+0012+00 13+00 14+00 14+75
WWWWWWWWWWWWWWWWWPROPOSED
FIELD HOUSE
FFE= 240.30
240
2
4
1
240
240
239239239 LIMITS OF
DISTURBANCE
(REFER TO EROSION
CONTROL PLAN )
LIMITS OF
DISTURBANCE
(REFER TO EROSION
CONTROL PLAN )
DRAINAGE SWALE
MIN. SLOPE 0.5%
DRAINAGE SWALE
MIN. SLOPE 0.5%
(CONTRACTOR SHALL ENSURE
POSITIVE DRAINAGE AWAY
FROM BUILDING INTO EX. YARD
INLET)2402
4
0
x x
xx
x x
xx
x x
xxxx
xx
10' WIDE EMERGENCY SPILLWAY
BOTTOM EL. 238.50
NCDOT CLASS 1 STONE
SILT FENCE OUTLET
(TYP.)
SILT FENCE (TYP.)
SILT FENCE
(TYP.)
HARDWARE CLOTH
& GRAVEL INLET
PROTECTION (TYP.
EACH INLET)
HARDWARE CLOTH &
GRAVEL INLET
PROTECTION (TYP.
EACH INLET)
LIMITS OF DISTURBANCE
LI
M
I
T
S
O
F
D
I
S
T
U
R
B
A
N
C
E
LIMI
T
S
O
F
DI
S
T
U
R
B
A
N
C
E
LIMITS OF DISTURBANCE
TOTAL DISTURBED AREA:
6.51 ACRES
20'
50'
RIP RAP CONSTRUCTION
ENTRANCE
15" HDPE TEMP.
CULVERT
REMOVE & PRESERVE
EXISTING FENCE AT ENTRANCE
(REINSTALL AT CONCLUSION OF
CONSTRUCTION)
RIP RAP APRON
8'L x 10'W x 12"T
NCDOT CLASS B
STONE
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
N30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-13
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
MATCHLINE REFER TO C-12
PARTIAL EROSION & SEDIMENTCONTROL PLAN II-FINAL PHASESITE PLAN NOTES:
1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE
LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND
ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND
OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING
COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR
UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.
2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF BENSON
STANDARD SPECIFICATIONS AND DETAILS.
3.EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE
COMPILED FROM A FIELD SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC.
(DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A FIELD SURVEY BY SHIPMAN
ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS
DATA, AND OTHER DATA SOURCES AS REQUIRED.
4.RIPARIAN BUFFER AREAS SHALL NOT BE CLEARED, DRAINAGE, OR OTHERWISE
DISTURBED UNLESS SPECIFICALLY PERMITTED BY THE US ARMY CORPS OF ENGINEERS
AND NCDENR-DWQ.
5.TREE PROTECTION FENCING SHALL BE PROVIDED ALONG ALL VEGETATED RIPARIAN
AND VEGETATED PERIMETER BUFFER AREAS AS WELL AS TREE CONSERVATION AREAS.
6.PRIVATE UTILITIES (POWER, TELEPHONE, NATURAL GAS, CABLE TV) ARE NOT SHOWN ON
THIS PLAN. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THOSE
UTILITIES WHEN INSTALLING STORM DRAINAGE TO AVOID CONFLICTS.
7.CUT/FILL SLOPES SHALL BE GRADED AT A MAXIMUM OF 3H:1V UNLESS OTHERWISE
INDICATED.
8.NO GRADING EQUIPMENT SHALL BE PERMITTED ON-SITE UNTIL A GRADING PERMIT HAS
BEEN ISSUED BY JOHNSTON COUNTY AND/OR NCDEQ DIVISION OF LAND QUALITY.
9.ALL RIP-RAP IS TO BE INSTALLED WITH NON-WOVEN FILTER FABRIC BENEATH (MIRAFI
140N OR APPROVED EQUAL).
GROUND COVER STABILIZATION SCHEDULE:
1. STABILIZE BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION.
2. STABILIZE DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE
WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING.
3. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND
COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF 7 DAYS.
4. PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE
SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN
WITHIN 14 CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND
DISTURBING ACTIVITY.
5. ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 14
CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR
PRIOR TO FINAL INSPECTION.
7 daysPerimeter dikes, swales, ditches and slopes
SITE AREA DESCRIPTION STABILIZATION
NPDES STABILIZATION TABLE
TIMEFRAME EXCEPTIONS
7 days
14 days
NoneHigh Quality Water (HQW) Zones
Slopes steeper than 3:1 If slopes are 10' or less in length and are not
steeper than 2:1, 14 days are allowed.
Slopes 3:1 or flatter 7 days for slopes greater than 50' in length
7 days
All other areas with slopes fatter than 4:1 14 days None, except for perimeters and HQW Zones
None
EROSION CONTROL LEGEND
PHASE 2 EROSION AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE:
1. CONTINUE ROUGH GRADING SITE TO BRING PROJECT AREA TO FINAL GRADE. ADJUST EROSION CONTROL MEASURES DAILY TO FIT NEW SITE
GRADES AS LAND AREA IS BROUGHT TO FINAL ELEVATION.
2. CONTINUE WORK ON THE NEW FIELD HOUSE, BASEBALL FIELDS, AND MULTIPURPOSE FIELDS.
3. BEGIN INSTALLATION OF ANY STORM DRAINAGE PIPING, WATER, AND SANITARY SEWER IN THE PROJECT SITE. INSTALL HARDWARE CLOTH INLET
PROTECTION TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN NETWORK AS SOON AS NEW STORM INLETS ARE INSTALLED.
4. DIRECT ALL STORMWATER RUNOFF TO THE SEDIMENT BASIN AS NECESSARY FROM ALL DISTURBED SOILS. DO NOT PERMIT SEDIMENT LADEN
WATER TO ESCAPE OFFSITE WITHOUT FLOWING THROUGH THE SEDIMENT BASIN.
5. FINE GRADE ALL PAVED AREAS AND INSTALL ROADWAY SUBGRADE, CURB AND GUTTER, AND OTHER SITE FEATURES.
6. COMPLETE PAVING AND CONCRETE FLATWORK AREAS. INSTALL LANDSCAPING AS SHOWN ON THE LANDSCAPING PLAN.
7. ONCE ALL UPGRADIENT AREAS ARE PERMANENTLY STABILIZED WITH VEGETATION AND BUILDING CONSTRUCTION IS SUBSTANTIALLY COMPLETE,
THE CONTRACTOR MAY REMOVE THE SKIMMER SEDIMENT BASINS. NOTE THAT SEEDING DOES NOT QUALITY AS PERMANENT STABILIZATION.
UPGRADIENT AREAS MUST INCLUDE AN ADEQUATE STAND OF PERMENENT VEGETATION TO BE CONSIDERED STABILIZED.
8. DEWATER THE EXISTING SEDIMENT BASINS BY PUMPING SEDIMENT LADEN WATER THROUGH A SILT BAG PRIOR TO DISCHARGE. THE PUMP FOR
THE SILT BAG SHALL BE INSTALLED IN OUTLET CELL OF THE SKIMMER BASIN (I.E. THE SAME CELL AS SKIMMER DEVICE). REFER TO PHASE I EROSION
CONTROL DRAWINGS FOR BAG LOCATION, PUMP LOCATION, AND DISCHARGE PIPING LOCATIONS.
9. ONCE BASIN IS SUFFICIENTLY DEWATERED, REMOVE COIR MESH SEDIMENT BAFFLES, TRASH, AND OTHER ACCUMULATED DEBRIS. REMOVE THE
SKIMMER DEVICE AND SEAL THE EXISTING DRAINAGE STRUCTURES WITH WATERTIGHT SEAL.
10. FINE GRADE, SEED, AND STABILIZE THE AREAS PREVIOUSLY OCCUPIED BY THE SKIMMER BASIN AS SHOWN ON THE PLANS.
11. IF CONSTRUCTION IS COMPLETE, SCHEDULE A FINAL INSPECTION WITH NCDEQ INSPECTIONS STAFF. IF THE SITE IS APPROVED, REMOVE
TEMPORARY DIVERSIONS, SILT FENCE, BASINS, ETC. AND SEED OR STABILIZE ANY REMAINING BARE AREAS. ALL REMAINING PERMANENT EROSION
CONTROL DEVICES, SUCH AS VELOCITY DISSIPATORS, SHOULD NOW BE INSTALLED.
12. WHEN THE PROJECT IS COMPLETED, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE
PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC
NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT.
240
X X
XX
XXX
SANFMFM13+00
240
CBU
ROADWAY CENTER LINE
LOT LINE
RIGHT OF WAY LINE
SETBACK LINE
BMP LIMITS
STANDARD CURB & GUTTER
WCR WHEELCHAIR RAMP
SIGN
STREET LIGHT
SPILL CURB & GUTTER
CLUSTER MAILBOX UNIT
EASEMENT
RETAINING WALL
ORNAMENTAL FENCE
OPEN SPACE AREA
FENCEXCBU
ROADWAY CENTER LINE
LOT LINE
RIGHT OF WAY LINE
SETBACK LINE
BMP LIMITS
STANDARD CURB & GUTTER
WCR WHEELCHAIR RAMP
SIGN
STREET LIGHT
SPILL CURB & GUTTER
CLUSTER MAILBOX UNIT
EASEMENT
RETAINING WALL
ORNAMENTAL FENCE
OPEN SPACE AREA
FENCEX
N30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-14 SANITARY SEWER PACKAGED LIFTSTATION DETAILS & SECTIONSSITE PLAN LEGEND
GENERAL NOTES:
1. EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT
PARCEL ARE COMPILED FROM A FIELD SURVEY OF THE PROPERTY BY
LAMBERT SURVEYING, INC. (DATED APRIL 5, 2019) AND IS NOT THE RESULT OF
A FIELD SURVEY BY SHIPMAN ENGINEERING, PLLC. ADDITIONAL EXISTING
CONDITIONS DATA PROVIDED BY SUPPLEMENTAL DATA INCLUDING AERIAL
PHOTOGRAPHY, JOHNSTON COUNTY GIS DATA, AND OTHER DATA SOURCES
AS REQUIRED.
2. REFER TO EROSION AND SEDIMENT CONTROL PLAN AND CONSTRUCTION
SEQUENCE BEFORE PERFORMING ANY CLEARING, GRUBBING, OR DEMOLITION
OPERATIONS.
3. NO TITLE OPINION ON THIS PROPERTY HAS BEEN FURNISHED.
4. AREAS COMPUTED BY THE COORDINATE METHOD.
5. THE PROPERTY SHOWN HEREON IS SUBJECT TO ALL RIGHTS-OF-WAY,
EASEMENTS, COVENANTS, AND RESTRICTIONS OF RECORD.
6. ALL DISTANCES SHOWN ON THE SURVEY ARE HORIZONTAL GROUND
DISTANCES.
7. THE PROPERTY SHOWN IS LOCATED OUTSIDE OF ANY FLOOD HAZARD
AREAS AS SHOWN ON FEMA FIRM 3720152800K DATED OCTOBER 3, 2006.
8. REFER TO SEALED TOPOGRAPHICAL SURVEY BY LAMBERT SURVEYING, INC.
FOR HORIZONTAL AND VERTICAL DATUM INFORMATION AND OTHER SURVEY
CONTROL DATA.
9. ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB, UNLESS NOTED
OTHERWISE.
10. COORDINATE POWER, TELEPHONE, CABLE, AND OTHER UNDERGROUND
UTILITY INSTALLATION WITH THE APPROPRIATE UTILITY PROVIDER AND THE
TOWN OF BENSON.
11. ALL PROPOSED SIGNAGE WILL COMPLY WITH THE TOWN OF BENSON SIGN
ORDINANCE.
12. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL GRADES PRIOR TO
THE START OF CONSTRUCTION.
13. NO INVESTIGATION HAS BEEN PERFORMED AS TO THE PRESENCE OF
WETLANDS, STREAMS, SURFACE WATERS, RIPARIAN BUFFERS, OR OTHER
ENVIRONMENTALLY SENSITIVE AREAS.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
SANITARY SEWER PACKAGED EJECTOR LIFT STATION DETAILS
NOT TO SCALE
LOCKING FIBERGLASS OR ALUMINUM HATCH
(SUPPLIED W/ PACKAGE)
2" VENT WITH
BUG SCREEN
AUDIBLE ALARM
WITH FLASHING LIGHT
1" SST GUIDE
RAILS
36"
2" SCH. 80 PVC
DISCHARGE PIPING
BERS125CV LIFTOUT
WITH CHECK VALVE OR
APPROVED EQUALZOELLER 818 GRINDER PUMP
(115V, 1 PHASE WM818 AUTO)
OR APPROVED EQUAL
GRAVITY SANITARY
SEWER LINE-REFER
INV. IN 235.70
PUMP OFF EL. 232.94
LEAD PUMP ON EL.233.95
LAG PUMP ON EL. 234.75
HIGH WATER ALARM EL. 235.35
CONCRETE ANTI-
FLOTATION BASE-REFER TO
NOTE
48" DIAMETER FIBERGLASS
WET WELL
1/4" SS LIFTING
CHAIN (SECURED-
REFER TO NOTE)
NOTES:
1. STAINLESS STEEL LIFTING CHAIN SHALL NOT INTERFERE
WITH ACCESS COVER AND SHALL BE SECURED PER TOWN
OF BENSON STANDARDS.
2. ANTI-FLOTATION PUMP BASE SHALL BE SECURED TO THE
FIBERGLASS ENCLOSURE PER THE MANUFACTURERS
RECOMMENDATIONS. ALL ANCHORS SHALL BE STAINLESS
STEEL. THE BOLTS SHALL BE THREADED INTO CONCRETE
ANCHOR INSERTS WHICH HAVE BEEN CAST INTO THE
INVERT OR THREADED IN A CAPSULE ANCHOR. THE BOLTS
SHALL HAVE A PULL OUT STRENGTH OF NOT LESS THAN
5000 POUNDS AND SHALL BE SUITABLE FOR USE WITH
VIBRATING EQUIPMENT.
3. POWER REQUIREMENT FOR ZOELLER 819 PUMP IS
230VOLTS SINGLE PHASE. COORDINATE WITH ELECTRICAL
DESIGN PLANS TO ENSURE PROPER POWER DELIVERY TO
EJECTOR PUMP STATION.
4. CONTRACTOR TO PROVIDE SITE LIGHTING FOR PUMP
STATION AREA IN ACCORDANCE WITH NCDENR AND TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.
5. PUMP CONTROLLER SHALL BE CONFIGURED TO
ALTERNATE PUMP RUN TIMES AT EACH PUMP CYCLE.
6. CONTRACTOR SHALL FIELD ADJUST THE LOCATION AND
CONFIGURATION OF THE EMERGENCY PUMP CONNECTION
AS REQUIRED TO PROVIDE ADEQUATE ACCESS TO THE
CONNECTION CAM-LOCK IN ACCORDANCE WITH TOWN OF
BENSON STANDARDS AND SPECIFICATIONS.
2" PVC VAULT DRAIN WITH
FLAP GATE VALVE
2" ELECTRICAL
CONDUIT
2" CONDUIT FLANGE
W/ EY CONDUIT SEAL
LEVEL FLOAT
SWITCHESWATERTIGHT BOOT
AT ENCLOSURE PENETRATION
CONCRETE
FOOTING
12" DIA. X 24"
DEEP
BASIN FILLET; 1:1 SLOPE,
12" HEIGHT
SS COUPLING
2" 90° ELBOW
GUIDE RAIL
SUPPORT
30/70 SPLIT FROG MOUTH
FIBERGLASS HATCH W/
SLAM LOCK
48"
48" DIA. FIBERGLASS
VALVE VAULT
ENCLOSURE
2" BRASS
SWING CHECK
VALVE
2" UNION
2" OS&Y
GATE VALVE
48" DIA. FIBERGLASS VALVE
VAULT ENCLOSURE
2" OS&Y GATE VALVE
W/ BRICK SUPPORTS
(TYP. OF TWO)
2" BRASS SWING
CHECK VALVE
(TYP. OF TWO)
1.5" PVC FORCE MAIN
DISCHARGE2" NPT
COUPLING
(PER MANUFACTURERS
INSTRUCTIONS)
GRAVITY SANITARY SEWER
INLET PIPE
2" VENT W/
BUG SCREENPUMP CONTROL ELECTRICAL
RISER -REFER TO DETAILS
SST FLOAT
BRACKET
FIBERGLASS OR ALUMINUM ACCESS
HATCH
20" CENTER
TO CENTER
2" x 1.5" SCH. 80
REDUCING TEE
1.5" UNION
48" DIAMETER FIBERGLASS
WET WELL
2" SCH. 80
PVC DISCHARGE
PIPING
PUMP CONTROL ELECTRICAL
RISER (SUPPLIED BY BASIN PACKAGE
MANUFACTURER)
TOP EL.= 240.75
BOTTOM EL. 230.75
TOP EL.= 240.75
20"
7'-0"
1
40"
PACKAGED SANITARY SEWER
EJECTOR PUMP STATION
(ZOELLER QLS OR APPROVED
EQUAL)
FIBERGLASS VALVE VAULT
4" PVC GRAVITY SERVICE
LINE (FROM FIELD HOUSE)
1.5" DIA. PVC FORCE MAIN
(36" MIN. COVER)
SANITARY SEWER PACKAGED EJECTOR LIFT STATION PLAN VIEW
SCALE: 1"=5'
CONTROL PANEL WITH
A/V ALARM (NEMA 4X)
1.5" UNION
2"x2" x 1.5"
REDUCING
TEE
IMPORTANT NOTES:
1. THE PACKAGED PUMP STATION MANUFACTURER SHALL SUPPLY A
DUPLEX CONTROL PANEL FOR AUTOMATIC PUMPS AS A COMPONENT OF
THE PACKAGED SYSTEM.
2. THE CONTROL PANEL SHALL INCLUDE AN AUDIBLE/VISUAL HIGH
WATER ALARM.
3. CONTROL PANEL ENCLOSURE SHALL COMPLY WITH NEMA 4X AND
SHALL FEATURE A HAND-OFF-AUTO TOGGLE FOR EACH PUMP, GREEN
PUMP RUN PILOT LIGHT, AND ALARM TEST AND SILENCE SWITCHES.
4. THE CONTROL PANEL SHALL BE CONFIGURED TO PROVIDE
AUTOMATIC PUMP ALTERNATION WITH EACH PUMPING CYCLE.
6' CHAIN LINK FENCETWIN 6' SWINGING GATES
W/ LOCKABLE HASP
240
2
4
1
240 2392
4
0
2
4
0X
XXX
XXXXXX
XXXXXXXX
X
X
X X
X
XXXXXXXXXX
XX
SAN SAN SAN SAN
FMFMFMFMFM FM FM FM FM FM FM FM FM
10+00 11+0012+00 13+00 14+00 14+75
WWWWWWW2412
4
0
242240
241
239
X X X X X
XX XXXXXXXXXFMR
XFMR
EX. DUGOUT EX. DUGOUTEX. DUGOUTCONC. S/W
EX. CHAIN LINK
FENCE
EX. CHAIN LINK
FENCE
S
EX. SSMH
TOP 241.80
INV. IN 236.89
INV. IN 236.90
INV. OUT 236.89
BOTTOM EL. 236.92N55°15'33"W629.49'N55°15'33"W629.49'230
235
240
245
250
230
235
240
245
250
9+75()10+00()10+50()11+00()11+50()12+00(241.31)241.3112+50(241.01)241.0113+00(240.27)240.2713+50(240.07)240.0714+00(240.01)240.0114+50(240.00)240.0015+00()EX. 15" HDPE STORM
STA 14+62.41
INV. 235.26 +/-
PACKAGED SANITARY
SEWER PUMP STATION
STA 13+32.53
TOP EL. 240.75
PUMP STATION VALVE
VAULT
STA 13+25.53
EX. SSMH
STA 10+00.00
TOP 241.80
INV. IN 236.89
INV. IN 236.90
INV. IN 237.00 (FM)
INV. OUT 236.89
3' MIN. COVER
EXISTING GRADE
FINISHED GRADE
TIE TO BLDG WASTE
PIPING
STA 14+75.34
INV. 237.10
140 LF 4" PVC SDR
-
3
5
S
S
L
A
T
E
R
A
L
@
1
.
0
0
%
CONCRETE CRADLE
OVER EX. STORM
END 4" DIP
STA 14+52.41
23 LF 4" DIP
(EXTEND 10' PAST
STORM CROSSING
SSCO
STA 14+75.34
1.5" PVC SDR-21 SS FORCE M
A
I
N
INV. IN TO PACKAGED
LIFT STATION
EL. 235.70
INVERT EL. 230.75
1.5" 45° BEND
STA 10+24.41
1.5" 45° BEND
STA 10+28.65
TIE TO EX. SSMH
CORE DRILL & SEAL
PENETRATION W/WATERTIGHT
SEALANT
1.5" 45° BEND
STA 11+19.64
1.5" 45° BEND
STA 11+23.29
WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
FIRE HYDRANT ASSEMBLY
GATE VALVE
TEE
THRUST (REACTION) BLOCKING
BLOW OFF VALVE
WATER METER
CLEANOUT
SANITARY MANHOLE
FLARED END SECTION
RISER STRUCTURE
YARD INLET
BACKFLOW PREVENTERRPZ
CATCH BASIN
WM
30'60'
SCALE IN FEET
15'30'
SCALE: 1 IN = 30 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSNALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.C-15 SANITARY SEWER FORCE MAINPLAN & PROFILESCALE IN FEET
0
3'SCALE:1"=3'VERTICAL
SCALE:
1
C-15
STA 10+00-14+71
1"=30'
SANITARY SEWER FORCE MAIN PLAN VIEW
M A N N S T R E E T
(EX. PUBLIC R/W)
SCALE:
2
C-15
STA 10+00-14+71
1"=3'
SANITARY SEWER FORCE MAIN PROFILE VIEW
200
YI
PACKAGE SANITARY
SEWER EJECTOR PUMP
STATION
VALVE VAULT
1.5" PVC SANITARY
SEWER FORCE MAIN
(SDR-21)
TIE TO EX. SSMH
CORE DRILL & INSTALL
WATERTIGHT SEAL
140 LF 4" SANITARY
SEWER SERVICE @ 1.00%
(REFER TO PROFILE FOR
MATERIALS)
SANITARY SEWER
CLEANOUT
(ACCESSIBLE RATED)-TIE
TO BUILDING WASTE
PIPING
EX. YI 4
RIM 239.65
INV. OUT 236.44
EX. 15" HDPE
EX. YI 3
RIM 239.16
INV. IN 235.55
INV. OUT 235.45
EX. YI 2
RIM 238.63
INV. IN 234.77
INV. IN 234.76
INV. OUT 235.02
EX.
1
5"
H
D
P
E
UTILITY LEGEND
GENERAL NOTES:
STANDARD UTILITY NOTES (AS APPLICABLE):
1. ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH TOWN OF BENSON DESIGN
STANDARDS, DETAILS, AND SPECIFICATIONS (2. UTILITY SEPARATION REQUIREMENTS:
a.A DISTANCE OF 100 FEET SHALL BE MAINTAINED BETWEEN SANITARY SEWER AND ANY PRIVATE OR
PUBLIC WATER SUPPLY SOURCE SUCH AS AN IMPOUNDED RESERVOIR USED AS A SOURCE OF
DRINKING WATER. IF ADEQUATE LATERAL SEPARATION CANNOT BE ACHIEVED, FERROUS SANITARY
SEWER PIPE SHALL BE SPECIFIED AND INSTALLED TO WATERLINE SPECIFICATIONS. HOWEVER, THE
MINIMUM SEPARATION SHALL NOT BE LESS THAN 25 FEET FROM A PRIVATE WELL OR 50 FEET FROM A
PUBLIC WELL.
b.WHEN INSTALLING WATER AND/OR SEWER MAINS, THE HORIZONTAL SEPARATION BETWEEN UTILITIES
SHALL BE 10 FEET. IF THIS SEPARATION CANNOT BE MAINTAINED DUE TO EXISTING CONDITIONS, THE
VARIATION ALLOWED IS THE WATER MAIN IN A SEPARATE TRENCH WITH THE ELEVATION OF THE WATER
MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER AND MUST BE APPROVED BY THE PUBLIC
UTILITIES DIRECTOR. ALL DISTANCES ARE MEASURED FROM OUTSIDE DIAMETER TO OUTSIDE
DIAMETER.
c.WHERE IT IS IMPOSSIBLE TO OBTAIN PROPER SEPARATION, OR ANYTIME A SANITARY SEWER PASSES
OVER A WATERMAIN, DIP MATERIALS OR STEEL ENCASEMENT EXTENDED 10 FEET ON EACH SIDE OF
CROSSING MUST BE SPECIFIED AND INSTALLED TO WATERLINE SPECIFICATIONS.
d.5 FEET MINIMUM HORIZONTAL SEPARATION IS REQUIRED BETWEEN ALL SANITARY SEWER AND STORM
SEWER FACILITIES, UNLESS DIP MATERIAL IS SPECIFIED FOR SANITARY SEWER.
e.MAINTAIN 18 INCH MIN. VERTICAL SEPARATION AT ALL WATERMAIN AND RCP STORM DRAIN CROSSINGS;
MAINTAIN 24 INCH MIN. VERTICAL SEPARATION AT ALL SANITARY SEWER AND RCP STORM DRAIN
CROSSINGS. WHERE ADEQUATE SEPARATIONS CANNOT BE ACHIEVED, SPECIFY DIP MATERIALS AND A
CONCRETE CRADLE HAVING 6 INCHES MIN. CLEARANCE
f.ALL OTHER UNDERGROUND UTILITIES SHALL CROSS WATER AND SEWER FACILITIES WITH 18 INCH MIN.
VERTICAL SEPARATION REQUIRED.
3. ANY NECESSARY FIELD REVISIONS ARE SUBJECT TO REVIEW AND APPROVAL OF AN AMENDED PLAN
AND/OR PROFILE BY THE TOWN OF BENSON PUBLIC UTILITIES DEPARTMENT PRIOR TO CONSTRUCTION.
4. CONTRACTOR SHALL MAINTAIN CONTINUOUS WATER AND SEWER SERVICE TO EXISTING RESIDENCES
AND BUSINESSES THROUGHOUT CONSTRUCTION OF THE PROJECT. ANY NECESSARY SERVICE
INTERRUPTIONS SHALL BE PRECEDED BY A 24 HOUR ADVANCE NOTICE TO THE TOWN OF BENSON PUBLIC
UTILITIES DEPARTMENT.
5. 3.0' MINIMUM COVER IS REQUIRED ON ALL WATER MAINS AND SEWER FORCEMAINS. 4.0' MINIMUM COVER
IS REQUIRED ON ALL REUSE MAINS.
6. IT IS THE DEVELOPER'S RESPONSIBILITY TO ABANDON OR REMOVE EXISTING WATER AND SEWER
SERVICES NOT BEING USED IN REDEVELOPMENT OF A SITE UNLESS OTHERWISE DIRECTED BY THE TOWN OF
BENSON PUBLIC UTILITIES DEPARTMENT. THIS INCLUDES ABANDONING TAP AT MAIN AND REMOVAL OF
SERVICE FROM ROW OR EASEMENT.
7. INSTALL 3/4 INCH COPPER* WATER SERVICES WITH METERS LOCATED AT ROW OR WITHIN A 2'x2'
WATERLINE EASEMENT IMMEDIATELY ADJACENT. NOTE: IT IS THE APPLICANTS RESPONSIBILITY TO
PROPERLY SIZE THE WATER SERVICE FOR EACH CONNECTION TO PROVIDE ADEQUATE FLOW AND
PRESSURE.
8. INSTALL 4 INCH PVC* SEWER SERVICES AT 1.0% MINIMUM GRADE WITH CLEANOUTS LOCATED AT ROW OR
EASEMENT LINE AND SPACED EVERY 75 LINEAR FEET MAXIMUM.
9. PRESSURE REDUCING VALVES ARE REQUIRED ON ALL WATER SERVICES EXCEEDING 80 PSI; BACKWATER
VALVES ARE REQUIRED ON ALL SANITARY SEWER SERVICES HAVING BUILDING DRAINS LOWER THAN 1.0
FEET ABOVE THE NEXT UPSTREAM MANHOLE.
10. ALL ENVIRONMENTAL PERMITS APPLICABLE TO THE PROJECT MUST BE OBTAINED FROM NCDWQ, USACE,
AND/OR FEMA FOR ANY RIPARIAN BUFFER, WETLAND, AND/OR FLOODPLAIN IMPACTS (RESPECTIVELY) PRIOR
TO CONSTRUCTION.
11. NCDOT/RAILROAD ENCROACHMENT AGREEMENTS ARE REQUIRED FOR ANY UTILITY WORK (INCLUDING
MAIN EXTENSIONS AND SERVICE TAPS) WITHIN STATE OR RAILROAD ROW PRIOR TO CONSTRUCTION.
12. GREASE INTERCEPTOR/OIL WATER SEPARATOR SIZING CALCULATIONS AND INSTALLATION
SPECIFICATIONS SHALL BE APPROVED BY THE TOWN OF BENSON PRIOR TO ISSUANCE OF A BUILDING
PERMIT.
13. CROSS-CONNECTION CONTROL PROTECTION DEVICES ARE REQUIRED BASED ON DEGREE OF HEALTH
HAZARD INVOLVED AS LISTED IN APPENDIX-B OF THE RULES GOVERNING PUBLIC WATER SYSTEMS IN NORTH
CAROLINA. THESE GUIDELINES ARE THE MINIMUM REQUIREMENTS. THE DEVICES SHALL MEET AMERICAN
SOCIETY OF SANITARY ENGINEERING (ASSE) STANDARDS OR BE ON THE UNIVERSITY OF SOUTHERN
CALIFORNIA APPROVAL LIST. THE DEVICES SHALL BE INSTALLED AND TESTED (BOTH INITIAL AND PERIODIC
TESTING THEREAFTER) IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS OR THE LOCAL
CROSS CONNECTION CONTROL PROGRAM, WHICHEVER IS MORE STRINGENT.
1. EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE COMPILED FROM A FIELD
SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC. (DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A
FIELD SURVEY BY SHIPMAN ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS DATA, AND OTHER DATA
SOURCES AS REQUIRED.
2. REFER TO EROSION AND SEDIMENT CONTROL PLAN AND CONSTRUCTION SEQUENCE BEFORE PERFORMING
ANY CLEARING, GRUBBING, OR DEMOLITION OPERATIONS.
3. NO TITLE OPINION ON THIS PROPERTY HAS BEEN FURNISHED.
4. AREAS COMPUTED BY THE COORDINATE METHOD.
5. THE PROPERTY SHOWN HEREON IS SUBJECT TO ALL RIGHTS-OF-WAY, EASEMENTS, COVENANTS, AND
RESTRICTIONS OF RECORD.
6. ALL DISTANCES SHOWN ON THE SURVEY ARE HORIZONTAL GROUND DISTANCES.
7. THE PROPERTY SHOWN IS LOCATED OUTSIDE OF ANY FLOOD HAZARD AREAS AS SHOWN ON FEMA FIRM
3720152800K DATED OCTOBER 3, 2006.
8. REFER TO SEALED TOPOGRAPHICAL SURVEY BY LAMBERT SURVEYING, INC. FOR HORIZONTAL AND VERTICAL
DATUM INFORMATION AND OTHER SURVEY CONTROL DATA.
9. ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB, UNLESS NOTED OTHERWISE.
10. CONTRACTOR SHALL FIELD LOCATE SPILL CURB AS NEEDED FOR PROPER DRAINAGE. SPILL CURB LOCATIONS
ARE NOT INDICATED ON THIS PLAN.
11. COORDINATE POWER, TELEPHONE, CABLE, AND OTHER UNDERGROUND UTILITY INSTALLATION WITH THE
APPROPRIATE UTILITY PROVIDER AND THE TOWN OF BENSON.
12. ALL PROPOSED SIGNAGE WILL COMPLY WITH THE TOWN OF BENSON SIGN ORDINANCE.
13. CONTRACTOR IS RESPONSIBLE FOR VERIFIYING ALL GRADES PRIOR TO THE START OF CONSTRUCTION.
14. MAXIMUM SIDEWALK CROSS SLOPE IS 2% (1/4 INCH PER FOOT).
15. THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FDC POINTS, OR
OTHER WATER-USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN THE WATER METER AND ANY
REQUIRED BACKFLOW PREVENTION DEVICES.
16. MAINTAIN A MINIMUM OF 3' COVER OVER ALL WATER PIPING.
17. ALL SANITARY SEWER CLEANOUTS IN PAVEMENT AREAS SHALL BE TRAFFIC RATED.
1.5" 45° BEND
(TYP.)
1.5" 45° BEND
(TYP.)
24
1
241
2
4
1
241241241241241241241241
241241241241240240240240
240
2
4
0
24
0
24
0
240 240241241
240
240
238239
239 239239238238 238239239
23
9
240240240239241242
24224024024124124
1
24223823823723823
8 237238 238236236238
237 237238239
239
23
9
23
9
239239239
239239242240241239
239EXISTING 60' PUBLIC R/WLEE STREETE
X
I
S
T
I
N
G
P
U
B
L
I
C
R
/
W
M
A
N
N
S
T
R
E
E
T
E
X
.
2
0
'
A
L
L
E
Y
O
R
S
T
R
E
E
T
(F
O
R
M
E
R
L
Y
M
A
N
N
S
T
R
E
E
T
)
P
B
7
0
P
G
3
0
4 EXISTING 66' PUBLIC R/WELM STREETEXISTING 66' PUBLIC R/WMARKET STREETE
X
I
S
T
I
N
G
6
6
'
P
U
B
L
I
C
R
/
W
B
R
O
C
K
L
Y
N
S
T
R
E
E
T
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
XXXXX
XXXXXXX
X
X
XXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXN34°28'18"E642.01'S
5
5
°
1
5
'
3
3
"
E
30
0
.
4
1
'XFMRXFMRX XXXXXXXXXXN/F TOWN OF BENSON
DB 00060 PG 0185
PIN 153911-55-7124
XXXS
5
5
°
1
5
'
3
3
"
E
30
0
.
4
1
'N34°28'18"E642.01'N/F STATE OF NORTH CAROLINA
DB 00572 PG 0584
PIN 153918-41-2350PINEPINEPINEOAKOAKPINEPINEPINEPINEPINEPINE PICNICSHELTERPICNICSHELTERPLAY AREAASPHALTEX. DUGOUTEX. DUGOUTEX.
D
U
G
O
U
T
E
X
.
D
U
G
O
U
T
ASPHALT TRACKASPHALTCONC. S/WCONC. S/WCONC. S/WASPHA
L
T
T
R
A
C
K
EX. CHAINLINK FENCEEX. CHAIN LINKFENCEEX. CHAIN LINKFENCESSWM
SSSSSDMHN
5
5
°
1
5
'
3
3
"
W
29
7
.
3
9
'
N
5
5
°
1
5
'
3
3
"
W
29
7
.
3
9
'N34°45'04"E642.00'N34°45'04"E 642.00'N
5
5
°
1
5
'
3
3
"
W
62
9
.
4
9
'
N
5
5
°
1
5
'
3
3
"
W
62
9
.
4
9
'N34°45'04"E679.08'N34°45'04"E 679.08'S34°43'27"W1237.44'S34°43'27"W 1237.44'X
X
XXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X XX XXX XX XX
XXXX
X
X
X
X
XX
XX
XXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X XXX XXXX
X XXXXXXXXXXXXXXXXXXX
XXXX
X
XX
XX
W
WSANSANSANSANSANSAN
FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMR
P
Z
W
M
10+0011
+
0
0 12+0013+0014+0014+75W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W241240239240239238241240239240
239238 237238241
238240239239
240
240
241 24024023
9
239239
240
240xxxxxxxxxxxxxxxx
xxxxxxxxCONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
CONSTRUCTION ENTRANCE/EXIT
SILT FENCE OUTLET
TEMP. SEED/MULCH/PERM. SEED
SILT FENCE
COIR MESH SEDIMENT BAFFLES
OUTLET PROTECTION
TS M
PS
DIVERSION DITCH
GRAVEL CHECK DAM
INLET PROTECTION
DISTURBANCE LIMITS
DRAINAGE AREA LIMITS
TREE PROTECTION FENCE
SKIMMER DEVICE W/ OUTLET PIPE
SEDIMENT TRAP BOTTOM AREA
RIP RAP FILTER DAM
DITCH LINER-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
DITCH LINER-ECX-2 EROSION CONTROL MAT
SLOPE MATTING-ECSC-3 COCONUT TURF
REINFORCEMENT MAT
x x
xx
ASPHALT PAVEMENT STABILIZATION
BUILDING ROOF COVERAGE
CONCRETE SIDEWALK
SLOPES LESS THAN 4:1 (14 DAY
STABILIZATION)
DITCHES, SWALES, & SLOPES GREATER
THAN 3:1 (7 DAY STABILIZATION)
SCALE IN FEET
60'120'30'60'
SCALE: 1 IN = 60 FT
SCALE IN FEET
HORIZONTAL
0
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSC-17
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN
OF BENSON STANDARDS AND SPECIFICATIONS.NPDES STABILIZATION PLANSITE PLAN NOTES:
1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE
LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND
ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND
OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING
COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR
UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.
2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF BENSON
STANDARD SPECIFICATIONS AND DETAILS.
3.EXISTING CONDITIONS AND TOPOGRAPHICAL DATA OF THE SUBJECT PARCEL ARE
COMPILED FROM A FIELD SURVEY OF THE PROPERTY BY LAMBERT SURVEYING, INC.
(DATED APRIL 5, 2019) AND IS NOT THE RESULT OF A FIELD SURVEY BY SHIPMAN
ENGINEERING, PLLC. ADDITIONAL EXISTING CONDITIONS DATA PROVIDED BY
SUPPLEMENTAL DATA INCLUDING AERIAL PHOTOGRAPHY, JOHNSTON COUNTY GIS
DATA, AND OTHER DATA SOURCES AS REQUIRED.
4.RIPARIAN BUFFER AREAS SHALL NOT BE CLEARED, DRAINAGE, OR OTHERWISE
DISTURBED UNLESS SPECIFICALLY PERMITTED BY THE US ARMY CORPS OF ENGINEERS
AND NCDENR-DWQ.
5.TREE PROTECTION FENCING SHALL BE PROVIDED ALONG ALL VEGETATED RIPARIAN
AND VEGETATED PERIMETER BUFFER AREAS AS WELL AS TREE CONSERVATION AREAS.
6.PRIVATE UTILITIES (POWER, TELEPHONE, NATURAL GAS, CABLE TV) ARE NOT SHOWN ON
THIS PLAN. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THOSE
UTILITIES WHEN INSTALLING STORM DRAINAGE TO AVOID CONFLICTS.
7.CUT/FILL SLOPES SHALL BE GRADED AT A MAXIMUM OF 3H:1V UNLESS OTHERWISE
INDICATED.
8.NO GRADING EQUIPMENT SHALL BE PERMITTED ON-SITE UNTIL A GRADING PERMIT HAS
BEEN ISSUED BY JOHNSTON COUNTY AND/OR NCDEQ DIVISION OF LAND QUALITY.
9.ALL RIP-RAP IS TO BE INSTALLED WITH NON-WOVEN FILTER FABRIC BENEATH (MIRAFI
140N OR APPROVED EQUAL).
GROUND COVER STABILIZATION SCHEDULE:
1. STABILIZE BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION.
2. STABILIZE DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE
WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING.
3. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND
COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF 7 DAYS.
4. PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE
SITE UPON WHICH FURTHER LAND-DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN
WITHIN 14 CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND
DISTURBING ACTIVITY.
5. ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 14
CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR
PRIOR TO FINAL INSPECTION.
7 daysPerimeter dikes, swales, ditches and slopes
SITE AREA DESCRIPTION STABILIZATION
NPDES STABILIZATION TABLE
TIMEFRAME EXCEPTIONS
7 days
14 days
NoneHigh Quality Water (HQW) Zones
Slopes steeper than 3:1 If slopes are 10' or less in length and are not
steeper than 2:1, 14 days are allowed.
Slopes 3:1 or flatter 7 days for slopes greater than 50' in length
7 days
All other areas with slopes fatter than 4:1 14 days None, except for perimeters and HQW Zones
None
EROSION CONTROL LEGEND
N
STABILIZATION LEGEND
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSD-01 SITE DETAILSCOMPACTED
SUBGRADE
CONCRETE W/ WWF
W6x6 x W2.1x2.1 WWF
4"
1"
MIN.
PLAN
EXPANSION JOINT
1/4" TOOLED
RADIUS (TYP.)
HAND TROWEL SCORE JOINT-1/2"x1" DEEP
W/ 4" WIDE TOOL BANDING
TOOLED JOINTS TO EXTEND ENTIRE
WIDTH OF SIDEWALK
STIFF BROOM FINISH PERPENDICULAR
TO TRAFFIC FLOW
EQ. TO WIDTH
OR AS INDICATED
SEE PLAN
COMPACTED
SUBGRADE
CONCRETE W/ WWF
W6x6 x W2.1x2.1 WWF
4"
1/4" TOOLED
RADIUS (TYP.)
1/2"
1/2" PREMOLDED
EXPANSION
JOINT MATERIAL
WITH SEALANT
NOTE:
LOCATE EXP.
JOINTS @ 30' (TYP.)
OR AS INDICATED
ON PLAN
NOTE:
LOCATE CONTROL JOINTS @ A
DISTANCE EQUAL TO WIDTH OF
WALK OR AS INDICATED ON PLAN.
A.A CONTROL JOINT 1" DEEP WITH 1/4" RADII SHALL BE REQUIRED IN THE
CONCRETE SIDEWALK AT EQUAL SPACES AS DELINEATED ON SITE
LAYOUT PLAN. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT
LOCATIONS SHOWN ON SITE LAYOUT PLAN. A 1/2" EXPANSION JOINT
WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID
STRUCTURE. A SAWED SCORE JOINT MAY BE USED IN LEIU OF
EXPANSION JOINT EXCEPT AGAINST RIGID STRUCTURES.
B.ALL CONCRETE TO BE AT LEAST 4000 P.S.I. IN 28 DAYS.
C.INSTALL1/2" EXPANSION MATERIAL WHERE SIDEWALK ABUTS CURB
AND GUTTER.
D.CROSS SLOPE OF SIDEWALKS SHALL NOT EXCEED 2.0%.
1/2" EXPANSION JOINT AGAINST
ALL RIGID STRUCTURES (SEALED)
MAX. 2.0% CROSS SLOPE
4" CONCRETE
SIDEWALK
1/2" EXPANSION
JOINT
RIGID
STRUCTURE
2"
CONTROL JOINT
CURB / GUTTER
CONCRETE SIDEWALK
NOT TO SCALE
REGULAR SPACE
9'
18'18'
5'8'8'
ACCESSIBLE SPACES
8'8'
CONCRETE WHEEL STOP,
ANCHOR WITH 5 8" REBAR
IMBEDDED 24" IN GROUND
4"
ACCESSIBLE SIGN LOCATION (VAN)
REFER TO DETAIL ON DRAWING THIS SHEET
SIDEWALK
3'
ACCESSIBLE SIGN LOCATION(TYP.)
REFER TO DETAILS ON DRAWING THIS SHEET
FACE OF CURB
4"
WHITE
PAINTED
STRIPE
(TYP.)
FACE OF
CURB
FLUSH W/
PAVEMENT
NOTES:
1.REFER TO GRADING PLANS FOR SPOT
ELEVATIONS AT ACCESSIBLE PARKING
SPACES. THE MAXIMUM SLOPE OF
ACCESSIBLE PARKING SPACES IS 2% IN ALL
DIRECTIONS.
2.VERIFY WITH SITE PLANS FOR NON-TYPICAL
ACCESSIBLE SPACES.
TYPICAL
ACCESSIBLE
VAN
ACCESSIBLE
4" WIDE WHITE
PAINTED
STRIPING (TYP.)
PARKING SPACE STRIPING
NOT TO SCALE
6'-0" LENGTH
7 1/2"
4"
ANCHOR WITH 5 8" REBAR EMBEDDED
24" IN GROUND (TWO PER WHEEL
STOP, COUNTERSINK 1 2")
PAVEMENT
2'-0" DIAMETER
CONC. FOOTINGBUILDING OR STRUCTURE4'
7.5'
3.5'
1-6"
4" DIAMETER STEEL PIPE
FILLED WITH CONCRETE
3' HIGH AT FIRE HYDRANT 6"
PROVIDE 2 SLOTS
ON UNDERSIDE OF
BLOCK FOR DRAINAGE
CONCRETE PIPE BOLLARD
NOT TO SCALE
PRE-CAST CONCRETE WHEEL STOP
NOT TO SCALE
ASPHALT PAVEMENT PATCH DETAIL
NOT TO SCALE
LITTLE LEAGUE BASEBALL FIELD LAYOUT DETAIL
NOT TO SCALE
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSD-02 SITE DETAILSNO SCALE
NO SCALE
STEEL POST SCHEDULE
USE AND SECTION
MINIMUM OUTSIDE DIMENSIONS (NOMINAL)
CORNER, END & PULL POSTS
TUBULAR - ROUND
LINE POSTS
TUBULAR - ROUND
TUBULAR - ROUND
TUBULAR - SQUARE
H-SECTION
C-SECTION (ROLL-FORMED)
2.375" O.D.
2.375" O.D.
2.875" O.D.
2.875" O.D.
4.00" O.D.
1.90" O.D.
1.66" O.D.
1.50" SQ.
1.625" x 1.50"
1.625" x 1.25"
NOTES:
NO SCALE
SECURE SIDE
NOTE:
BOTTOM & BRACE RAILS
PROVIDE BRACE PANEL WHENEVER
STRAIGHT RUNS EXCEED 500 FEET.
LINE POST ATTACHMENTS
BOTTOM RAIL DETAILS
BRACE PANEL DETAIL
TRUSS ROD AND BAND
BRACE RAIL CLAMP DETAIL
FASTENING DETAILS
TENSION BAND DETAIL
END OR GATE POST DETAIL
FABRIC WIDTH 72" OR LESS FABRIC WIDTH 84" TO 96"FABRIC WIDTH 108" AND OVER
3. BOTTOM RAIL SHALL BE ATTACHED TO DOUBLE RAIL ENDS USING
3/8 " CARRIAGE BOLTS AS SHOWN. ADDITIONAL HOLES SHALL BE
DRILLED THROUGH THE BOTTOM RAIL ENDS TO INSURE THAT CARRIAGE
BOLTS PASS THROUGH THE BOTTOM RAIL AS SHOWN.
1. WIRE TIES, RAILS, POSTS, AND BRACES SHALL BE CONSTRUCTED
ON THE SECURE SIDE OF THE FENCE ALIGNMENT. CHAIN-LINK
FABRIC SHALL BE PLACED ON THE SIDE OPPOSITE THE SECURE AREA.
BRACE RAIL ATTACHMENT
2. ONLY 9-GAGE GALVANIZED STEEL TIE WIRES SHALL BE USED
FOR FASTENING THE FENCE FABRIC TO FENCE POSTS AND RAILS.
16-GAGE, STAINLESS STEEL TIE WIRES SHALL BE USED
FOR FASTENING FENCE FABRIC TO TENSION WIRES. HOG RINGS
SHALL NOT BE ALLOWED ON SENSORED FENCES.
CONCRETE BASE
TRUSS ROD
(3 8" MIN. DIA.)
TRUSS ROD
(3 8" MIN. DIA.)
TENSION BAND
FABRICTENSION BAND (15" O.C. MAX.
AND WITHIN 4" FROM TOP
AND BOTTOM OF FABRIC)
TENSION BAR TO
ENGAGE EACH FABRIC LINK
CARRIAGE BOLT
TENSION BAR
BARBED-WIRE OR
TENSION WIRE
9-GAGE STEEL TIE WIRE
(15" O.C. MAX. AND
WITHIN 4" FROM TOP AND
BOTTOM OF FABRIC)
ENDS TWISTED AT
LEAST THREE FULL TURNS
FABRIC
9-GAGE STEEL TIE WIRES
(12" O.C. MAX.)
DOUBLE RAIL END
LINE POST
3 8" CARRIAGE
BOLT W/ PEENED
THREADS
FABRIC
BOTTOM RAIL
9-GAGE STEEL TIE WIRE
(12" O.C. MAX.)
1" MAX
TO BOTTOM OF FABRIC
TRUSS ROD
BRACE
RAILS
LINE POST
BOTTOM RAIL
TRUSS ROD
PULL POST
BRACE
RAILS
10'-0" MAX.10'-0" MAX.
CHAIN-LINK FENCE DETAILS
NOT TO SCALE
NO SCALE
6' GALVANIZED CHAIN LINK FENCE DETAIL
1" MAX
6"
3'-4"
6"
3'-4"
6"
3'-4"
72" FABRIC WIDTH
BOTTOM RAIL
LINE POST
BRACE RAIL
TIE WIRES
(TYP.)
TRUSS ROD
(3/8" MIN. DIA.)
CORNER, END,
OR PULL POST
CONCRETE BASE
CHAIN LINK FABRIC
(9 GAGE, 2" MESH,
GALVANIZED)
LINE POST
6'
16" MIN. DIA.10" MIN. DIA.
10' MAX. SPACING 10'-0" MAX. SPACING
LINE POSTS TO BE EQUALLY SPACED
x x xxxxxx xxxx x x x x
GATE POST SCHEDULE
A
OFFSET HINGE
STANDARD HINGE
GATE KEEPER
SWING GATE DETAILS
(TO HOLD GATE OPEN)
PLAN
DOUBLE SWING GATE
ELEVATION
A
DROP ROD FOUNDATION
NO SCALE
NO SCALE
CHAIN LINK
FABRIC
FENCE FABRIC (TYP)
GATE OPENING
DIRECTION GATE
SWING (TYP.)
GATE FRAME
LEAF
LINE POST
GATE
FRAME
LATCH
ASSEMBLY
DROP ROD
3 8" DIA TRUSS
ROD (TYP)
FENCE
FABRIC
3'-10" FOR POSTS 85 8" OD
3'-4" FOR POSTS 65 8" OD
3'-0" MIN FOR POSTS
4" OD & LESS
6"
16" DIA MIN FOR GATE
POSTS 4" OD & LESS
24" DIA FOR GATE
POSTS OVER 4" OD
2" MIN
2" MAX FOR SENSORED FENCES
5" MAX FOR NON-SENSORED FENCES
CHAIN-LINK
FABRIC
TOP TENSION WIRE OR
RAIL AS SPECIFIED (TYP)
BRACE RAIL (TYP)
HINGES (TYP)
LINE POST
TRUSS ROD (TYP)
BRACE RAIL (TYP)
GRADE LINE
NOTES:
1.FOR NON-SENSORED FENCES, DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE NOT INTENDED TO
LIMIT OTHER TYPE OF FENCE SECTIONS AND METHODS OF INSTALLATION WHICH COMPLY WITH THE
SPECIFICATIONS.
2.SWING GATES SHALL BE CONSTRUCTED WITH DROP RODS, PADLOCKS, LATCH ASSEMBLY AND GATE KEEPERS
EXCEPT AS NOTED.
3.ALL GATE FRAMES SHALL MEET THE MINIMUM REQUIREMENTS OF ASTM F900 1.90" NOMINAL (ROUND) OR
2.00" NOMINAL (SQUARE). GATE FRAMES SHALL BE OF WELDED CONSTRUCTION OR SHALL BE ASSEMBLED
USING HEAVY FITTINGS. AT CONTRACTOR'S OPTION A WELDED HORIZONTAL BRACE MAY BE USED IN LIEU
OF TRUSS RODS TO BRACE ALL-WELDED GATE FRAMES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PROPER RIGID CONSTRUCTION OF ALL GATES SUPPLIED.
GATE LEAF WIDTH
(NOMINAL)
OUTSIDE DIMENSION
(NOMINAL)
6' OR LESS 2.875" OD
2.5" SQ
GREATER THAN 6' TO 12' 4.0" OD
GREATER THAN 12' TO 18' 6.625" OD
MORE THAN 18' 8.625" OD
DROP ROD
ASSEMBLY
LATCH
ASSEMBLY
Ø6"12" DIA DROP ROD
(INDUSTRY STANDARD)
PC CONC
36"
1"
12"
43"
6"
48"
SAND/GRAVEL
6" DIA
PC CONC
1" ID
STEEL
PIPE
PAVED SURFACE
BITUMINOUS
6"
10"
2'-0"
CHAIN LINK ACCESS GATE DETAIL
NOT TO SCALE
D-03 NOTES AND DETAILSTHESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTS
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSD-05 NOTES AND DETAILSBAFFLES
SKIMMER
DEWATERING
DEVICE EMERGENCY
SPILLWAYEMBANKMENT NOTES
BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN
ELEVATION REPRESENTING THAT THE SEDIMENT STORAGE
ZONE IS HALF-FULL OR EVERY 90 DAYS WHICHEVER COMES
FIRST.
THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH
SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO
AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN
TARPS SHALL BE OVERLAPPED AT LEAST 12". THE UPSTREAM 12"
TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP
SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR
EQUIVALENT FOR U.V. RESISTANCE.
PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY
DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE.
BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND
SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE.
MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY,
SO THIS SHOULD BE READILY AVAILABLE FOR MAINTENANCE.
DURING THE CONSTRUCTION PHASE OF THE PROJECT, RISER
SHALL ONLY DEWATER FROM THE TOP OF PIPE.
POND SHALL NOT BE CONVERTED FOR STORMWATER USE UNTIL
APPROVED BY ENVIRONMENTAL ENGINEER.
ORIFICE
18" MIN TOP OF DAM
DITCH AND BURY TARP
EDGE (MIN. 12")
WEIR LENGTH
10' MIN
TARP PROTECTION
BAFFLES
1' MIL FREEBOARD
EMERGENCY
SPILLWAY
ELEVATION
TREATMENT
ZONE
DISSIPATER
PAD
RIP RAP
TRASH
RACK
CMP OUTLET
PIPE
ANTI-FLOATATION
DEVICE
TOP OF BERM
SKIMMER
ANTI-SEEP
COLLAR
INLET SHALL BE
PROTECTED (AS NEEDED)
FROM EROSION WITH
RIPRAP, TARP, MATTING
OR EQUIVALENT.
DIVERSION
DITCH
CROSS SECTION
PLAN VIEW
SECTION THRU WEIR
SEDIMENT
STORAGE
ZONE
SUPPORT ROPE
TO WIRE TO
PREVENT SAGGING
SUPPORT POST
24" INTRO BOTTOM
OR SIDE STAKE TO
SUPPORT WIRE
COIR MESH OR SIMILAR, STAPLED OR
TRENCHED INTO BOTTOM OR SIDE
OUTLET ZONE
NOTES:
1.BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES
USING STAPLES OR BY TRENCHING AS FOR SILT FENCE.
2.MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY,
WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE.
3.PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE
5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES.
4.BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET.
5.TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS
6.INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL
INLET ZONE
35% of
basin surface area
1st Cell
25% of basin
surface area
2nd Cell
25% of basin
surface area
15% of
basin surface area
CROSS SECTIONPLAN VIEW
SECTION VIEW AT OPENING
FENCE AND FABRIC
BURIED IN TRENCH
6"X6" TRENCH,
BACKFILLED AND
COMPACTED
STEEL POST
VENT SCREEN ACCESSIBLE THROUGH DOOR
FLOAT
BARREL PIPE LONGER THAN SHOWN.
FLEXIBLE JOINT
(RADIATOR HOSE)
OUTLET END: CONNECTION
TO OUTLET PIPE OR RISER
MAINTENANCE
INSPECT TEMPORARY SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE
SEDIMENT AND RESTORE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PULL THE SKIMMER TO ONE SIDE SO THAT THE
SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS.
MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER.
IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASING, USUALLY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE
THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE
INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS.
IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH
WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER.
FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM
PLUGGING WITH ICE.
CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS
IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA.
MAINTENANCE
INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY.
BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.
REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE
BAFFLES. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH.
REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA
HAS BEEN PROPERLY STABILIZED.
BASIN SIDES AND WEIR SHALL HAVE MAXIMUM SLOPES OF 3:1 OR FLATTER DIMENSIONS SHOWN ARE AT WEIR ELEVATION OF BASIN
BASIN VOLUMES PROVIDED ARE BASED ON AVAILABLE VOLUME AT THE PRINCIPAL SPILLWAY 3:1
SLOPE3:1 SLOPEPROVIDE A MINIMUM OF THREE
TEMPORARY BAFFLES BETWEEN
STORM DRAINAGE DISCHARGES INTO
THE BASIN AND THE BASIN OUTFALL 3:1AT ENTRANCE
(CREST) OF SPILLWAY
NO SCALE
EMERGENCY SPILLWAY DETAIL
3
:1
2'
W
ROCK PAD AT
SKIMMER BASE
(FILL TO TOP OF
SEDIMENT
STORAGE)
NOTES:
1. PROVIDE 3 BAFFLES (USE 2 IF LESS THAN 20 FEET IN LENGTH).
2. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES
OR BY TRENCHING AS FOR SILT FENCE.
3. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY, WHICH SHOULD BE READILY
ACCESSIBLE FOR MAINTENANCE.
4. BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET.
5. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS.
6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL.
7. BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN ELEVATION REPRESENTING
THAT THE BASIN IS HALF FULL.
5' MIN.
TEMPORARY
SKIMMER
4" SCH. 40 PVC
PIPE
4" SKIMMER OUTLET
PIPE THROUGH EMBANKMENT
CONNECT SKIMMER
TO OUTLET ORIFICE WITH
FLEXIBLE TUBING
TOP OF DAM ELEVATION
EMERGENCY SPILLWAY ELEVATON
RIP RAP ENERGY
DISSPATER
SEDIMENT BASIN WITH STANDARD SKIMMER (NCDENR 6.61)
NOT TO SCALE
SEDIMENT TRAP WITH STANDARD SKIMMER (NCDENR 6.61)
NOT TO SCALE
COIR MESH SEDIMENT BAFFLES DETAIL (NCDENR 6.65)
NOT TO SCALE
ROPE TETHERED TO SKIMMER
STEEL SUPPORT
POST
ROPE
STEEL POST
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSD-06 NOTES AND DETAILSCROSS SECTION
PROPOSED STREET,
25' OR WIDTH OF
WHICHEVER IS
EXISTING ROADWAY
6" MIN.
PLAN VIEW
35' MIN.
ROADWAY
EXISTING
50' MIN.
GREATER.
NEW CONSTRUCTION15' MIN.
12" MIN.
BUT SUFFICIENT TO KEEP
SEDIMENT ON SITE
FABRIC UNDER STONE
NOTES:
1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO
ENSURE CONSTRUCTION ENTRANCE IS USED.
2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD
IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE
STONE, THEN THE TIRES OF THE VEHICLES MUST BE WASHED
BEFORE ENTERING THE PUBLIC ROAD.
3. MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR
SEDIMENT FROM LEAVING CONSTRUCTION SITE. ENTRANCE
WILL REQUIRE PERIODIC REMOVAL OF SEDIMENT-LADEN
STONE AND REPLACEMENT WITH FRESH STONE.
MAINTENANCE
MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT
MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION
SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH
TWO-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY
STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT
AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED, OR
TRACKED ONTO PUBLIC ROADWAYS.
EXISTING ROADWAY
6" MIN.
35' MIN.
NEW CONSTRUCTION15' MIN.
12" MIN.
FABRIC UNDER STONE
ENTRANCE GRADE GREATER
THAN 2%
6" TO 8" STONE RIDGE
TEMPORARY CONSTRUCTION ENTRANCE (NCDENR 6.06)
NOT TO SCALE
NCDOT #4
STONE
(2"-3" THICK
6.0 in.
6.0 in.6.0 in.
Figure A
Figure D
Ground
Surface
Figure C - Cross Section ViewFigure B - Profile View
Figure F - Profile View
Figure E
Toe of Slope
Crest of Slope
Ground Surface
Ground Surface
3.0 in.
3.0 in.
Flow
Crest of Slope
Figure E
Figure B/
Figure CFigure C
Figure F
Blanket 3
Blanket 2
Blanket 1 Blanket 2
Blanket 1
Flow
Blanket 2
Blanket 3
Product Application/Equivalency Specifications
Figure A
Figure E
Figure D
Figure B/
Figure E
Figure F
Figure C
Figure E
Ground
Surface
Figure C - Cross Section ViewFigure B - Profile View
Figure F - Profile View
Figure E
Figure G - Critical Point Securing
Ground Surface
Critical Point
Terminal End
Ground Surface
Critical Point
Blanket 3
Blanket 2
Blanket 1
Ground Surface
Blanket 2
Blanket 1
Blanket 3 Blanket 1
Product Application/Equivalency Specifications
Flow
* Drawings Not to Scale * Drawings Not to Scale
6.0 in.
3.0 in.
3.0 in.
WESTERN
R PCO O ATRI NO
EXCELSIOR
WESTERN
R PCO O ATRI NO
EXCELSIOR
Figure G - Critical Point Securing
Step 1 - Site Preparation
Prepare site to design profile and grade. Remove
debris, rocks, clods, etc.. Ground surface should be
smooth prior to installation to ensure blanket remains
in contact with slope.
Step 2 - Seeding
Seeding of site should be conducted to design
requirements or to follow local or state seeding
requirements as necessary.
Stap 3 - Staple Selection
At a minimum, 6 in. long by 1 in. crown, 11 gauge
staples are to be used to secure the blanket to the
ground surface. Installation in rocky, sandy or other
loose soil may require longer staples.
Step 4 - Excavate Anchor Trench and Secure
Blanket
Excavate a trench along the top of the channel side
slopes and the upstream terminal end of the channel to
secure the edges of the blanket. The trench should run
along the length and width of the installation, be 6 in.
wide and 6 in. deep. Staple blanket along bottom of
trench, fill with compacted soil, overlap blanket
towards toe of slope and secure with row of staples
(shown in Figures A, E and F).
Step 5 - Secure Body of Blanket
Roll blanket down slope from anchor trench. Staple
body of blanket following the pattern shown in Figure
D. Leave end of blanket unstapled to allow for
overlap shown in Figure B. Place downstream
blanket underneath upstream blanket to form shingle
pattern. Staple seam as shown in Figure E. Secure
downstream blanket with stapling pattern shown in
Figure D. Stapling pattern shown in Figure D reflects
minimum staples to be used. More staples may be
required to ensure blanket is sufficiently secured to
resist mowers and foot traffic and to ensure blanket is
in contact with soil surface over the entire area of
blanket. Further, critical points require additional
staples. Critical points are identified in Figure G.
Step 6 - Continue Along Slope - Complete
Installation
Overlap adjacent blankets as shown in Figure C and
repeat Step 5. Secure toe of slope using stapling
pattern shown in Figure E. Secure edges of
installation by stapling at 1.0' intervals along the
terminal edge.
Ground Surface
Figure E -
Plan View
Figure D - Plan View
- Denotes Staple Location
Figure E -
Plan View
Figure D - Plan View
- Denotes Staple Location
8ft. Blanket
1ft.1ft.
- Denotes Staple Location
1ft.1ft.1ft.1ft.1ft.
1.5 ft.
1.5 ft.
- Denotes Staple Location
2.5 ft.
2.5 ft.
1ft.
8ft. Blanket
1ft.1ft.1ft.1ft.1ft.1ft.1ft.1ft.
8ft. Blanket
2ft.2ft.2ft.2ft.
8ft. Blanket
2ft.2ft.2ft.2ft.
1ft.
Channel Installation
TM
Document # WE_EXCEL_SS2AN_CII
Excel SS-2 All Natural is produced by Western Excelsior and
consists of a temporary Rolled Erosion Control Product (RECP) comprised of a 100% certified weed free
agricultural straw matrix mechanically (stitch) bound between two, biodegradable jute/scrim nets (top and
bottom). The expected longevity of Excel SS-2 All Natural is approximately 12 months (actual longevity
dependent on field and climatic conditions). Excel SS-2 All Natural is manufactured to include physical
properties sufficient to provide the intended longevity and performance. Product specifications may be
found on document WE_EXCEL_SS2AN_SPEC and performance information may be found on
document WE_EXCEL_SS2AN_PERF. All documents are available from Western Excelsior Technical
Support or www.westernexcelsior.com. Additional to above, equivalent products to Excel SS-2 All
Natural must meet identical criteria as Excel SS-2 All Natural as follows:
1.Consist of debris free and 100% certified weed free
agricultural straw bound between two, biodegradable jute/scrim nets.
2. Sufficient tensile strength, thickness and coverage to maintain
integrity during installation
and ensure material performance.
3. Listing within AASHTO NTPEP database.
4. Meet ECTC specification for category 2D products.
Instructions EXCEL SS-2
All Natural
Slope Installation
Instructions EXCEL SS-2 TM
All Natural
Document # WE_EXCEL_SS2AN_SII
Excel SS-2 All Natural is produced by Western Excelsior and
consists of a temporary Rolled Erosion Control Product (RECP) comprised of a 100% certified weed free
agricultural straw matrix mechanically (stitch) bound between two, biodegradable jute/scrim nets (top and
bottom). The expected longevity of Excel SS-2 All Natural is approximately 12 months (actual longevity
dependent on field and climatic conditions). Excel SS-2 All Natural is manufactured to include physical
properties sufficient to provide the intended longevity and performance. Product specifications may be
found on document WE_EXCEL_SS2AN_SPEC and performance information may be found on
document WE_EXCEL_SS2AN_PERF. All documents are available from Western Excelsior Technical
Support or www.westernexcelsior.com. Additional to above, equivalent products to Excel SS-2 All
Natural must meet identical criteria as Excel SS-2 All Natural as follows:
1.Consist of debris free and 100% certified weed free
agricultural straw bound between two, biodegradable jute/scrim nets.
2. Sufficient tensile strength, thickness and coverage to maintain
integrity during installation
and ensure material performance.
3. Listing within AASHTO NTPEP database.
4. Meet ECTC specification for category 2D products.
6.0 in.6.0 in.
Step 1 - Site Preparation
Prepare site to design profile and grade. Remove
debris, rocks, clods, etc.. Ground surface should be
smooth prior to installation to ensure blanket remains
in contact with slope.
Step 2 - Seeding
Seeding of site should be conducted to design
requirements or to follow local or state seeding
requirements as necessary.
Stap 3 - Staple Selection
At a minimum, 6 in. long by 1 in. crown, 11 gauge
staples are to be used to secure the blanket to the
ground surface. Installation in rocky, sandy or other
loose soil may require longer staples.
Step 4 - Excavate Anchor Trench and Secure
Blanket
Excavate a trench along the top of the slope to secure
the upstream end of the blanket. The trench should
run along the length of the installation, be 6 in. wide
and 6 in. deep. Staple blanket along bottom of trench,
fill with compacted soil, overlap blanket towards toe
of slope and secure with row of staples (shown in
Figures A, E and F).
Step 5 - Secure Body of Blanket
Roll blanket down slope from anchor trench. Staple
body of blanket following the pattern shown in Figure
D. Leave end of blanket unstapled to allow for
overlap shown in Figure B. Place downstream
blanket underneath upstream blanket to form shingle
pattern. Staple seam as shown in Figure E. Secure
downstream blanket with stapling pattern shown in
Figure D. Stapling pattern shown in Figure D reflects
minimum staples to be used. More staples may be
required to ensure blanket is sufficiently secured to
resist mowers and foot traffic and to ensure blanket is
in contact with soil surface over the entire area of
blanket. Further, critical points require additional
staples. Critical points are identified in Figure G.
Step 6 - Continue Along Slope - Complete
Installation
Overlap adjacent blankets as shown in Figure C and
repeat Step 5. Secure toe of slope using stapling
pattern shown in Figure E. Secure edges of
installation by stapling at 1.0' intervals along the
terminal edge.
FI
L
L
S
L
O
P
E
WASTE MATERIAL-COMPACT,
SEED & MULCH AFTER
CONSTRUCTION OF DITCHVAR.
2' - 10'
VAR.
0' - 2'
CROSS SECTIONAL VIEW
2:
1
M
A
X
.
2:1 M
A
X.
12"
NOTES:
2' MIN.
12"
1.TEMPORARY DIVERSION DITCH TO BE USED TO INTERCEPT FLOW AND/OR DIVERT TO A SEDIMENT CONTROL MEASURE OR BMP.
2.SILT SHALL BE REMOVED WHEN DITCH IS ONE-HALF FULL.
3.DITCH SHALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT OR COVERED BY FILL.
4.STABILIZE DIVERSION DITCH BERM WITH TEMPORARY SEEDING, MULCH WITH TAC, AND/OR EROSION CONTROL NETTING.
MAINTENANCE
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER
EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM
THE FLOW AREA AND REPAIR THE DIVERSION RIDGE.
CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS
NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY
STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO
BLEND WITH THE NATURAL GROUND LEVEL AND
APPROPRIATELY STABILIZE IT.2:1 MAX.
2
:
1
M
A
X
.
DIVERSION DITCH (NCDENR 6.20)
NOT TO SCALE
THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS
DRAWN BY:WZS
CHECKED BY:WZS
DRAWING DATE:
SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER:
2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSD-07 NOTES AND DETAILS