Loading...
HomeMy WebLinkAbout20171170 Ver 1_Staff Comments_20200413 Carpenter,Kristi From: Ward, Garcy Sent: Monday, April 13, 2020 3:49 PM To: Lane, Stephen; Lentine, Sarah F Cc: Brittingham, Cathy; Capehart, Cadmus; Harrison, James A;Johnson, Jay B; Tom Steffens (Thomas.A.Steffens@usace.army.mil); Swain, William T; Lane, Heather C; Beasley, Jason B Subject: RE: B-5620 Beaufort Bridge#30 over Campbell Creek Sarah, This email serves as approval from DWR for an additional 2 days of relief from the in-water work moratorium for the above referenced project in accordance with the authorization from DMF. This is addition to the 2 weeks of relief that was previously granted and now allows in-water work until April 16'2020. Garcy Ward Environmental Specialist NC Divison of Water Resources (252)948-3917 From: Lane, Stephen Sent: Monday, April 13, 2020 3:17 PM To: Lentine, Sarah F<sflentine@ncdot.gov> Cc: Brittingham, Cathy<cathy.brittingham@ncdenr.gov>; Capehart, Cadmus<ccapehart@ncdot.gov>; Harrison,James A <James.Harrison@ncdenr.gov>;Johnson,Jay B<jbjohnson@ncdot.gov>; Tom Steffens (Thomas.A.Steffens@usace.army.mil) <Thomas.A.Steffens@usace.army.mil>; Swain,William T<wtswain@ncdot.gov>; Ward, Garcy<garcy.ward@ncdenr.gov>; Lane, Heather C<hclane@ncdot.gov>; Beasley,Jason B<jbbeasley@ncdot.gov> Subject: RE: B-5620 Beaufort Bridge#30 over Campbell Creek Hi Sarah, The DCM has reviewed your request for relief from the in-water work moratorium to allow in-water work to continue until April 16, 2020 at the NCDOT's project to replace Bridge No. 30 over Campbell Creek in Beaufort County . In accordance with conditions of the CAMA Major Permit issued for this project, and after consideration of your request and in consultation with the appropriate fisheries resource agencies, DCM has determined that a one-time relaxation of the in-water work moratorium is appropriate at this time. This email shall serve as official notification that in-water work as proposed in the attached email thread, may continue up until April 16, 2020. Please note that the USACE and NCDWR also have moratorium conditions in their permits and NCDOT will need to receive the formal authorizations from them for relief from the moratorium, prior to beginning any in-water work during the proposed relief period. Please let us know If we may be of any further assistance with this project. Sincerely, Stephen Lane Coastal Management Representative From: Lentine, Sarah F<sflentine@ncdot.gov> Sent: Monday, April 13, 2020 3:03 PM 1 To: Lane, Stephen <stephen.lane@ncdenr.gov> Cc: Brittingham, Cathy<cathy.brittingham@ncdenr.gov>; Capehart, Cadmus<ccapehart@ncdot.gov>; Harrison,James A <James.Harrison@ncdenr.gov>;Johnson,Jay B<ibiohnson@ncdot.gov>; Tom Steffens (Thomas.A.Steffens@usace.army.mil) <Thomas.A.Steffens@usace.army.mil>; Swain, William T<wtswain@ncdot.gov>; Ward, Garcy<garcy.ward@ncdenr.gov>; Lane, Heather C<hclane@ncdot.gov>; Beasley,Jason B<ibbeasley@ncdot.gov> Subject: RE: B-5620 Beaufort Bridge#30 over Campbell Creek Stephen, Although the contractor has worked diligently to meet this deadline, over the weekend their pile hammer had mechanical issues and was the cause of over a day of delay and todays storm conditions, caused even more work to be delayed. We are asking for 2 more days to be sure that we can get all the in water work completed for this project. Please let us know. Thanks, Sarah F. Lentine, PE From: Lane, Stephen <stephen.lane@ncdenr.gov> Sent:Tuesday, March 31, 2020 5:36 PM To: Lentine, Sarah F<sflentine@ncdot.gov> Cc: Brittingham, Cathy<cathy.brittingham@ncdenr.gov>; Capehart, Cadmus<ccapehart@ncdot.gov>; Harrison,James A <James.Harrison@ncdenr.gov>;Johnson,Jay B<ibiohnson@ncdot.gov>; Tom Steffens (Thomas.A.Steffens@usace.army.mil) <Thomas.A.Steffens@usace.army.mil>; Swain, William T<wtswain@ncdot.gov>; Ward, Garcy<garcy.ward@ncdenr.gov> Subject: RE: B-5620 Beaufort Bridge#30 over Campbell Creek Hi Sarah, The DCM has reviewed your request for relief from the in-water work moratorium to allow in-water work to continue until April 14, 2020 at the NCDOT's project to replace Bridge No. 30 over Campbell Creek in Beaufort County . In accordance with conditions of the CAMA Major Permit issued for this project, and after consideration of your request and in consultation with the appropriate fisheries resource agencies, DCM has determined that a one-time relaxation of the in-water work moratorium is appropriate at this time. This email shall serve as official notification that in-water work as proposed in the attached email thread, may continue up until April 14, 2020. I have coordinated with the USACE and NCDWR representatives working on this project, and they are generally in agreement with the moratorium relief as requested. However, please note that the USACE and NCDWR also have moratorium conditions in their permits and NCDOT will need to wait receive the formal authorizations from them for relief from the moratorium, prior to beginning any in-water work during the proposed relief period. Please let us know If we may be of any further assistance with this project. Sincerely, Stephen Lane Coastal Management Representative From: Lentine, Sarah F<sflentine@ncdot.gov> Sent: Wednesday, March 25, 2020 4:14 PM To: Lane, Stephen <stephen.lane@ncdenr.gov> 2 Cc: Capehart, Cadmus<ccapehart@ncdot.gov>;Johnson,Jay B<iblohnson@ncdot.gov> Subject: B-5620 Beaufort Bridge#30 over Campbell Creek Importance: High Stephen, We would like your consideration in postponing the start of the moratorium on permit 3-18 on the subject project by 14 days to April 14, 2020. Attached is the Contractors planned schedule, the concrete pours are scheduled close together,but they can use high early strength to achieve the needed strength. To drive the interior bent piles for stage II of the bridge they intend on cutting holes through the existing bridge deck to drive them. Then demolishing the rest of the bridge after the moratorium begins. Thanks, Sarah F. Lentine,PE Resident Engineer Resident Engineer's Office - Pitt NC Department of Transportation 252 439 2970 office ***New Number*** sflentine@ncdot.gov 1710 North Memorial Drive P. O. Box 1587 Greenville,NC 27835-1587 l 10. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 3