HomeMy WebLinkAbout20171170 Ver 1_USACE Correspondence_20200401 Carpenter,Kristi
From: Steffens, Thomas A CIV USARMY CESAW (USA) <Thomas.A.Steffens@usace.army.mil>
Sent: Wednesday, April 01, 2020 11:00 AM
To: Lentine, Sarah F;Ward, Garcy; Lane, Stephen
Cc: Beasley, Jason B;Johnson, Jay B
Subject: [External] RE: B-5620 Beaufort Bridge#30 over Campbell Creek
External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
report.spam@nc.gov
The USACE has reviewed your request for relief from the in-water work moratorium to allow in-water work to continue
until April 14, 2020 on Bridge No. 30 over Campbell Creek in Beaufort County. After consultation with the appropriate
agencies,the Corps finds the request for moratorium relief to have merit. As such,you may consider this transmission
to be official approval to proceed with the activities as described in your request of 25 March 2020. Be advised that if
the proposed project and plans change from what was originally requested,you are required to contact the Corps to
review the new plans and proposal.
Thomas A Steffens
Regulatory Project Manager
US Army Corps of Engineers
2407 West 5th Street
Washington, NC 27889
(910)-251-4615
From: Lentine, Sarah F<sflentine@ncdot.gov>
Sent:Tuesday, March 31, 2020 8:04 PM
To:Ward, Garcy<garcy.ward@ncdenr.gov>; Steffens,Thomas A CIV USARMY CESAW (USA)
<Thomas.A.Steffens@usace.army.mil>
Cc: Beasley,Jason B<jbbeasley@ncdot.gov>;Johnson,Jay B<jbjohnson@ncdot.gov>
Subject: [Non-DoD Source] Fwd: B-5620 Beaufort Bridge#30 over Campbell Creek
Garcy&Tom,
Now that we have received authorization from CAMA,we need your authorization to allow in water work up until April
14, 2020. Please let us know as soon as possible.
Thanks,
Sarah F. Lentine, PE
Resident Engineer
Resident Engineer's Office- Pitt
NC Department of Transportation
252 439 2970 office ***New Number***
sflentine@ncdot.gov
i
1710 North Memorial Drive
P. O. Box 1587
Greenville, NC 27835-1587
NC State Seal Gold Email
From: Lentine, Sarah F<sflentine@ncdot.gov>
Sent:Tuesday, March 31, 2020 7:42 PM
To: Beasley,Jason B; Lane, Heather C
Subject: Fwd: B-5620 Beaufort Bridge#30 over Campbell Creek
FYI great news
Get Outlook for iOS
From: Lane, Stephen <stephen.lane@ncdenr.gov>
Sent:Tuesday, March 31, 2020 5:36:24 PM
To: Lentine, Sarah F<sflentine@ncdot.gov>
Cc: Brittingham, Cathy<cathy.brittingham@ncdenr.Rov>; Capehart, Cadmus<ccapehart@ncdot.gov>; Harrison,James A
<James.Harrison@ncdenr.gov>;Johnson,Jay B<ibiohnson@ncdot.gov>; Tom Steffens
(Thomas.A.Steffens@usace.army.mil) <Thomas.A.Steffens@usace.army.mil>; Swain, William T<wtswain@ncdot.gov>;
Ward, Garcy<garcy.ward@ncdenr.gov>
Subject: RE: B-5620 Beaufort Bridge#30 over Campbell Creek
Hi Sarah,
The DCM has reviewed your request for relief from the in-water work moratorium to allow in-water work to continue
until April 14, 2020 at the NCDOT's project to replace Bridge No. 30 over Campbell Creek in Beaufort County . In
accordance with conditions of the CAMA Major Permit issued for this project, and after consideration of your request
and in consultation with the appropriate fisheries resource agencies, DCM has determined that a one-time relaxation of
the in-water work moratorium is appropriate at this time. This email shall serve as official notification that in-water
work as proposed in the attached email thread, may continue up until April 14, 2020. I have coordinated with the
USACE and NCDWR representatives working on this project, and they are generally in agreement with the moratorium
relief as requested. However, please note that the USACE and NCDWR also have moratorium conditions in their permits
and NCDOT will need to wait receive the formal authorizations from them for relief from the moratorium, prior to
beginning any in-water work during the proposed relief period. Please let us know If we may be of any further
assistance with this project.
Sincerely,
Stephen Lane
Coastal Management Representative
From: Lentine, Sarah F<sflentine@ncdot.gov>
Sent: Wednesday, March 25, 2020 4:14 PM
To: Lane, Stephen <stephen.lane@ncdenr.gov>
Cc: Capehart, Cadmus<ccapehart@ncdot.gov>;Johnson,Jay B<Lbiohnson@ncdot.gov>
Subject: B-5620 Beaufort Bridge#30 over Campbell Creek
Importance: High
2
Stephen,
We would like your consideration in postponing the start of the moratorium on permit 3-18 on the
subject project by 14 days to April 14, 2020.
Attached is the Contractors planned schedule, the concrete pours are scheduled close together,but
they can use high early strength to achieve the needed strength. To drive the interior bent piles for
stage II of the bridge they intend on cutting holes through the existing bridge deck to drive them.
Then demolishing the rest of the bridge after the moratorium begins.
Thanks,
Sarah F. Lentine,PE
Resident Engineer
Resident Engineer's Office - Pitt
NC Department of Transportation
252 439 2970 office ***New Number***
sfientine@ncdot.gov
1710 North Memorial Drive
P. O. Box 1587
Greenville,NC 27835-1587
11
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
3