Loading...
HomeMy WebLinkAbout20171170 Ver 1_DMF Comments_20200401 Carpenter,Kristi From: Lane, Stephen Sent: Wednesday, April 01, 2020 8:47 AM To: Brittingham, Cathy; Tom Steffens (Thomas.A.Steffens@usace.army.mil);Ward, Garcy Subject: FW: B-5620 Beaufort Bridge#30 over Campbell Creek FYI. From: Harrison,James A<James.Harrison@ncdenr.gov> Sent:Tuesday, March 31, 2020 4:07 PM To: Lane, Stephen <stephen.lane@ncdenr.gov> Cc: Deaton,Anne <anne.deaton@ncdenr.gov> Subject: Re: B-5620 Beaufort Bridge#30 over Campbell Creek Stephen, DMF does not oppose to the two week extension for the Beaufort Bridge #30 over Campbell Creek, with work planning to be completed by 14 April. DMF does request that turbidity curtains be utilized during in-water work to minimize the effects of increased turbidity. Thank you! Jimmy Jimm, Harrison Habitat and Enhancement Section NC Division of Marine fisheries james.harrison@ncdenr.gov 252-9+-8-3835 c .c }x * PIS Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lane, Stephen <stephen.lane@ncdenr.gov> Sent: Friday, March 27, 2020 9:14 AM 1 To: Harrison,James A<James.Harrison@ncdenr.gov> Cc: Deaton,Anne <anne.deaton@ncdenr.gov> Subject: FW: B-5620 Beaufort Bridge#30 over Campbell Creek Good morning, Would you give me a call on this request at your earliest convenience? My cell number is 252-617-3191. Thanks, Stephen Lane Coastal Management Representative From: Lentine, Sarah F<sflentine@ncdot.gov> Sent: Wednesday, March 25, 2020 4:14 PM To: Lane, Stephen <stephen.lane@ncdenr.gov> Cc: Capehart, Cadmus<ccapehart@ncdot.gov>;Johnson,Jay B<ibiohnson@ncdot.gov> Subject: B-5620 Beaufort Bridge#30 over Campbell Creek Importance: High Stephen, We would like your consideration in postponing the start of the moratorium on permit 3-18 on the subject project by 14 days to April 14, 2020. Attached is the Contractors planned schedule, the concrete pours are scheduled close together,but they can use high early strength to achieve the needed strength. To drive the interior bent piles for stage II of the bridge they intend on cutting holes through the existing bridge deck to drive them. Then demolishing the rest of the bridge after the moratorium begins. Thanks, Sarah F. Lentine, PE Resident Engineer Resident Engineer's Office -Pitt NC Department of Transportation 252 439 2970 office ***New Number*** sflentine@ncdot.gov 1710 North Memorial Drive P. O. Box 1587 Greenville,NC 27835-1587 //mot, 3� rFJ.1 L ' 1 Email correspondence to and from this address is subject to the 2 North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 3