HomeMy WebLinkAboutNCS000504_E&SC Inspection Report_20200408FRP CONTACTL: J. Wayne Messangill CONTRACTOR CONTACT: PROJECT NAME: Patriot Bluffs Subdivision PERMIT ISSUE DATE: 12/5/2017 INSPECTION DATE: Monday, April 9, 2018 INSPECTION Not in Compliance with Wake County UDO STATUS: VIOLATIONS 1 NONCOMPLIANCE: Check all that apply A. Failure to have an approved plan (WC LIDO, 10-40-1) X B. Failure to protect against off -site sedimentation (WC UDO, 10-40-3 & 1040-4) X C. Failure to provide adequate groundcover (WC LIDO, 10-20-5 (A)(2) & 10-20-5(B)(5) X D. Failure to maintain erosion control measures (WC UDO, 10-23-1, 10-23-2, 10-23-3, 10-23-4) X E. Failure to follow approved plan (WC LIDO, 10-40-2) _ F. Failure to renew permit (WC UDO, 10-30-9) X G. Potential NPDES Violation H. Failure to self inspect (G.S. 113A-54.1(a) & NCAC 413.0131) OBSERVATIONS/CORRECTIVE ACTIONS: FRP CONTACT EMAIL: JMWBIdrs(a)amail.com CONTRACTOR EMAIL: PERMIT NUMBER: S5827 PERMIT EXPIRATION DATE: 12/5/2019 WEATHER, SITE CONDITIONS, ETC. 60s Sunny PREVIOUS INSPECTION STATUS: In Compliance with Wake County UDO HAS SEDIMENT DAMAGE OCCURRED? YES If YES, Check all that apply: Lake/Stream/Buffer Onsite Lake/Stream/Buffer Offsite Other Property Degree of Sediment damage? Slight 1. Slight off -site sediment was observed from the silt fence outlet near by the Sediment Basin 2. Remove off -site sedimentation. remove accumulated sediment from the outlet. Repair and maintain the silt fence outlet. Install rip -rap outlet protection for the outlet pipe as shown in the approved plan (Sheet C-23 and C-24). Stabilize the exterior slope of the Sediment Basin 2. Emergency spillway was not installed as per the approved plan. Re -install the emergency spillway as mentioned in the approved plan (C-23). 2. Slight off -site sedimentation was observed from the silt fence outlet (near the Johnson Pond). Remove off -site sedimentation and repair and maintain the silt fence outlet. Remove accumulated sediment from the outlet. Silt fences near this outlet was not installed properly. Re -install the silt fences at this portion. Also, stabilize the area uphill of this outlet. This area is very critical. The area needs to be stabilized immediately to prevent further sediment lose. Deadline to stabilize thsi area - April 16, 2018. 3. Most of the temporary ditches to the Sediment Basin 2 are either removed or backfilled. Re-establish all temporary ditches and stabilize them as mentioned in the approved plan. Some erosion was noticed near by the Sediment Basin 1 and run-off and sediment were not directed to the Basin 1. It was because temporary ditches to Sediment Basin 1 were not installed. Install all ditches to the Basin 1 as shown in the approved plan. 4. Skimmer from the Sediment Basin 4 was removed. Re -install skimmer to the basin. Maintain Skimmer basin 3 and 4. Also, repair and maintain silt fence outlets for the basin 3 and 4. 5. Construction entrance was filled with mud. Provide some fresh stone to the construction entrance. 6. Rain -gauge was not provided on site. Please have a rain -gauge on site and record data on NPDES records. 7. Stabilize all bare and inactive areas as per NPDES requirement. COMMENTS: Reminder: Per 15A NCAC 04B .0131 SELF -INSPECTIONS, Section (2); Any documentation of inspections that occur on a copy of the approved erosion and sedimentation control plan shall occur on a single co of the plan and that plan shall be made available on the site. An inspection reports shall also P 9 PY P P Y P P ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. be made available on the site. CORRECTIVE ACTION Thursday, April 19, 2018 DEADLINE: ENVIRONMENTAL Jeevan Neupane CONSULTANT: 919-819-8907 jeevan.neupane@wakegov.com FRP CONTACT: J. Wayne Messangill FRP CONTACT EMAIL: JMWBIdrS(aiomail.Com CONTRACTOR CONTACT: CONTRACTOR EMAIL: PROJECT NAME: Patriot Bluffs Subdivision PERMIT NUMBER: S5827 PERMIT ISSUE DATE: 12/5/2017 PERMIT EXPIRATION DATE: 12/5/2019 INSPECTION DETAILS WEATHER, SITE INSPECTION DATE: 4/9/2018 CONDITIONS, ETC. 60S Sunny INSPECTION PREVIOUS INSPECTION STATUS: Not in Compliance with Wake County UDO STATUS: In Compliance with Wake County LIDO Photo 1- Provide fresh stone on the construction entrance. Photo 2-Remove off -site sedimentation from the Sediment Basin 2 outlet. Photo 3:Re-Install rip -rap for the outlet protection for the outlet pipe from the Photo 4: Off -site sedimentation from the outlet protection near Sediment Sediment Basin 2. Stabilize slope. Basin 2. Remove off -site sedimentation. Photo 5: Install emergency spillway for Basin 2. Stabilize slopes. Photo 6: Remove off -site sedimentation from the silt fence outlet near the Johnson Pond. FRP CONTACT: J. Wayne Messangill FRP CONTACT EMAIL: JMWBIdrS(aiomail.Com CONTRACTOR CONTACT: CONTRACTOR EMAIL: PROJECT NAME: Patriot Bluffs Subdivision PERMIT NUMBER: S5827 PERMIT ISSUE DATE: 12/5/2017 PERMIT EXPIRATION DATE: 12/5/2019 INSPECTION DETAILS WEATHER, SITE INSPECTION DATE: 4/9/2018 CONDITIONS, ETC. 60s Sunny INSPECTION PREVIOUS INSPECTION STATUS: Not in Compliance with Wake County UDO STATUS: In Compliance with Wake County UDO Photo 7- Remove accumulated sediment along the silt fence outlet ( Near Johnson Pond). Repair and maintain the outlet. Photo 9:Re-Install silt fences (Near Johnson Pond) Photo 11: Re-establish all temporary ditches to the Sediment Basin 2. Photo 8-Stabilize slope ( Near Johnson Pond) immediately. Photo 10: Remove off -site sedimentation. (Near Johnson Pond) Photo 12: Re-establish all temporary ditches to the Sediment Basin 2. FRP CONTACT: J. Wayne Messangill FRP CONTACT EMAIL: JMWBIdrS(aiomail.Com CONTRACTOR CONTACT: CONTRACTOR EMAIL: PROJECT NAME: Patriot Bluffs Subdivision PERMIT NUMBER: S5827 PERMIT ISSUE DATE: 12/5/2017 PERMIT EXPIRATION DATE: 12/5/2019 INSPECTION DETAILS WEATHER, SITE INSPECTION DATE: 4/9/2018 CONDITIONS, ETC. 60s Sunny INSPECTION PREVIOUS INSPECTION STATUS: Not in Compliance with Wake County UDO STATUS: In Compliance with Wake County UDO Photo 13: Re -install skimmer to the Sediment Basin 4. Photo 15: Install temporary ditch to the Sediment Basin 1 as shown in the approved plan. Photo 14- Repair and maintain silt fence outlet near Sediment Basin 3.