Loading...
HomeMy WebLinkAbout20021319 Ver 1_COMPLETE FILE_20020820U ?i i . 3 PRO ME % au N S ._ t ma VICINITY MAP INDEX OF SHEETS: co 1 TITLE SHEET O 1-A SYMBOLOGY - BUCK ENGINEERING CONSTRUCTION SEQUENCE, EARTHWORK, AND QUANTITIES 1-B SYMBOLOGY -NCDOT 2 AND 2-A TYPICAL POOL AND RIFFLE CROSS SECTIONS DESIGN PARAMETERS AND STRUCTURE DETAILS 4 PLAN VIEW OF PROPOSED DESIGN EIIIIIII!IiiiiIi 11 V GRAPHIC SCALES DESIGN DATA E II I STREAM DESIGN DESIGN REACH LENGTH 2172 SURRY SOIL AND WATER CONSERVATION DISTRICT S URR Y COUNTY LOCATION: UNNAMED TRIBUTARY TO MITCHELL RIVER MICKEY REACH TYPE OF WORK STREAM RESTORATION i1 ?? II %' f I !I I? \ I I \\ II ol?? If 0 50 25 0 50 100 RIFFLE POOL BANKFULL XSEC AREA 14.0 FT' 15.1 FT' PLANS BANKFULL WIDTH 14.0' 15.1' MAX BANKFULL DEPTH 1.5' 2.5' W/O RATIO 14 - EXISTING STREAM LENGTH = 2318 FEET PROPOSED DESIGN STREAM LENGTH = 2172 FEET NC 087 1 Gill Gy, wnfaaYU 21 i+ BUCC°°°°,n Srmo NON IN ?x n+n+ws?co IETTZNG DATE CONTACT: JULIE ELMORE PROJECT MANAGER KEVIN TWEEDY, PE PROJECT DESWA' ZNGIAT" PROJECT ENGINEER PRELIMINARY PLANS DO "T tm W4 (ANfT4UCTgN September 13, 2002 Mr. Joe Mickey 283 Timber Brook Trail State Road, NC 28676 SUBJECT: Mickey Property Stream Restoration Unnamed Tributary to Mitchell River DWQ # 02 1319 Surry County Dear Mr. Mickey: This Office is in receipt of the plans for the subject proposed stream restoration project. Since the proposed work is not for compensatory mitigation and meets the Division's definition of stream restoration, no written authorization is required to use Water Quality General Certification No. 3353. As such, this project may proceed without written approval from the Division. Please keep in mind that, while written authorization is not required, you are still covered under GC #3353 and you must adhere to the conditions of that Certification. A copy of GC #3353 has been enclosed for your reference. If you have any questions regarding this matter, please contact Mrs. Jennifer Frye at (336) 771-4600, ext. 275. Sincerely, Steve Mauney Acting Regional Supervisor Attachment: GC #3353 (3/18/02) cc: Julie Elmore, NRCS, PO Box 218, Dobson, NC 27017 Will Harmon, Buck Frigineering, 8000 Regency Parkway Suite 200, Cary, NC 27511 USACE - Raleigh Regulatory Field Office 401/Wetlands Unit- Central Office Central Files WSRO Date: ° a L - -- To: ?RRO Steve Mitchell ?FRO Ken Averitte []WaRO Deborah Sawyer OWiRO Joanne Steenhuis ,;gAFSRO Jennifer Frye ?ARO Mike Parker ?MRO Pete Colwell Triage Check List / n r r'l/K?Cs Project Name_- DWCQ Project Number D? /3iS County : " Telephone (919733- q From: Ile attached is being forwarded to you for your evaluation. Please call if you need Thef assistance. ? Stream length impacted Cg4 feam determination E] Wetland determination and distance to blue-line surface waters on USGW topo maps ? Minimization/avoidance issues [] Buffer Rules (Neuse, Tar-Pamilco, Catawba, Randleman) ? Pond fill [] Mitigation Ratios ? Ditching B06 the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concerns Comm DEM ID: CORPS ACTION ID: 02 13 19{ NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): 27 PRE-CONSTRUCTION NOTIFICATION APPLICATION,.'00' ?. FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION TO THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 401 CERTIFICATION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGE I SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM To THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT (SEE AGENCY ADDRESSES SHEET). PLEASE PRINT. i 1. OWNERS NAME: Joe Mickev 2. MAILING ADDRESS: SUBDIVISION NAME: CITY: State Road 283 Timber Brook Trail STATE: NC ZIP CODE: 28676 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAILING ADDRESS ABOVE): 3. TELEPHONE NUMBER (HOME):336-366-2982 (WORK):336-527-1547 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL,ADDRESS, PHONE NUMBER: Julie Elmore, Natural Resources Conservation Service, P.O. Box 218, Dobson, NC 27017 ?a. 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY: Surr _ _ NEAREST TOWN OR CITY:-.--Elkin---- See Enclosed Plans SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.) See Enclosed Plans 6. IMPACTED OR NEAREST STREAM/RIVER: Unnamed Tributary to the Mitchell River RIVER BASIN: Yadkin 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER(SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW) , WATER SUPPLY(ws-i OR WS-II) ? YES [x] NO H IF YES, EXPLAIN: This npje_ ro oses a riorit level III restoration on an unnamed tributary to the Mitchell River which is classified as Trout and ORW. 7b. IF THE PROJECT IS LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT ARE OF ENVIRONMENTAL CONCERN (AEC)? YES [ ] NO [x] 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION: N/A 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [ ) NO [X] IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION) : 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES [ ] NO [X] IF YES, DESCRIBE ANTICIPATED WORK: 9A. ESTIMATED TOTAL NUMBER OF ACRES IN TRACT OF LAND: 30 9B. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: 2 o.l 10A. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: F 1 1,1, 1 NG : 0 EXCAVATION: 0 FLOODING: 0 OTHER: 0 DRAINAGE: 0 TOTAL ACRES TO BE IMPACTED: 0 10B. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION): LENGTH BEFORE: 2318 FT AFTER: 2172 FT WIDTH BEFORE (based on normal high water contours): 11.7 ----21.7 FT WIDTH AFTER: 11.7 - 21.7 FT AVERAGE DEPTH BEFORE: 0.6 - 1.3 FT AFTER: 0.6 - 1.3 FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: X PLACEMENT OF PIPE IN CHANNEL: CHANNEL ELEVATION: CONSTRUCTION OF A DAM/FLOODING: OTHER: Construction of Instream structures and bank stabilization II. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? N/A WHAT IS THE EXPECTED POND SURFACE AREA? N/A 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUII'MEN'F TO BE USED (ATTACH PLANS: E31-," x 11" DRAWINGS ONLY) : This project is a priority level- III level stream restoration. It includes the stabilization of eroding banks and installation of instream structures. There are several meander bends that will be reshaped to improve-stability. The project is funded by the C_WMTF__a_nd_ is NOT for mitigation. See Plan Sheets for details. 13. PURPOSE OF PROPOSED WORK: To create a stable channel that does not a9_9rade of--degrade and provides the highest level of biologic function possible given the stream and valley tyke Bank stabilization ractices will reduce - -- -- bank erosion Instream structures will be used to improver bedform and habitat. 3 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS): N/A 15. VOU APP RRQUIRRD TO OOUTAOT TH STATR U19TORIO PRURRVATIOU OFFICER (911PO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED! 16. DOES THY, PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE OF PU13LIC(STATE) LAND? YES [X) NO [ ) (IF NO, GO TO 18) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMfiNTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES [ ) NO [X] b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES [ I NO [X) IF ANSWER TO 17D IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING TAE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD HE DIRECTED TO MIS. CHRYS RAGGETT, DIRECTOR STATE CLEARINGROUSIa, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 1302 Marl Service Center, RALEIGH, NORTH CAROLINA 27699-1302, TELEPHONE (919) 807-2425, 17. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26. 29, AND 38). ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST RR SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OR I INCH EQUALS 100 FEET OR THEIR EQUIVALENT. b, IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. c. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IP REQUIRED. e. WHAT IS LAND USE OF SURROUNDING PROPERTY? Pasture - Forest f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? g. SIGNED AND DATED BY AGENT AUTHORIZATION LETTER, IF APPLICABLE. WETLANDS OR WATERS OF THE U.S. MAY NOT BE IMPACTED PRIOR TO: 1) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, AND 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF ENVIRONMENTAL MANAGEMENT (WATER QUALITY) CERTIFICATION, R'S/AGENT'S S TE AT GENT'S SiGNATUR I0 ONLY F AUTHORIZATION LETTER FROM T" OWNER IS PROVIDED (18G.)) 4 STREAM CONVENTIONAL SYMBOLS SUPERCEDES SHEET 1B TOP OF BANK (EXISTING) CENTERLINE /rHALWEG (PROPOSED) THALWEG (EXISTING) ® CONSERVATION EASEMENT MINOR CONTOUR LINE 0 0 BARBED WIRE MAJOR CONTOUR LINE 7 Rock Vane C? Sediment Trap c Temporary Silt Check Root Wad Crass Vane ^ Permanent Ford Stream Crossing -NOTE: ALL ffEMS ABOVE MAY NOT BE USED W TMIS STANDARD SPECIFICATIONS N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DECEMBER 1993 6.62 SILT FENCE 6.70 TEMPORARY (FORD) STREAM CROSSING (USE THIS SPEC. FOR TEMPORARY AND PERMANENT CROSSINGS) SUMMARY OF QUANTITIES DESCRIPTION QUANTITY UNITS SITE MOBILIZATION/DEMOBILIZATION 1 Ls TEMPORARY SILT FENCE 200 LF PERMANENT FENCE (BARBED WIRE) 3000 LF TEMPORARY SEEDING RYE GRAIN 60 LBS PERMANENT SEED MIX, RIPARIAN 10 LBS MULCHING (STRAW) 30 BALES EXCAVATION, FILL AND GRADING 350 CY CLASS A RIP RAP - WASHED 45 TONS BOULDERS (4'x3'x2') MINIMUM 430 TONS ROOTWADS 50 EACH FILTER FABRIC (NON-WOVEN, TYPE 2) 500 SY MATTING FOR EROSION CONTROL 1000 SY WASHED STONE #57 9 TONS FILTER FABRIC, TYPE 2 (WOVEN, BLACK) 110 SY PLANTING BARE ROOT VEGETATION 650 STEMS LIVE STAKING 1500 STEMS EROSION AND SEDIMENTATION CONTROL MEASURES PRELIMINARY PLANS w M Yi MR cxn 9M11CTp BUCK na.. 9,9eis'm fc 919M15N0 l? 9155 ? INSTALLATION OF STRUCTURES AND GRADING ACTIVITIES IN THE EXISTING CHANNEL WILL BE PERFORMED IN THE WET. CONSTRUCTION SHALL BE ALLOWED ONLY DURING BASE FLOW CONDITIONS. TEMPORARY SEDIMENT TRAPS SHALL BE CONSTRUCTED DOWNSTREAM OF CONSTRUCTION AREAS. THE TEMPORARY SEDIMENT TRAPS SHALL BE REMOVED WHEN THE CONSTRUCTION OF EACH WORKING AREA IS COMPLETE. EROSION CONTROL MATTING OR MULCHING SHALL BE PLACED ON ALL DISTURBED BANK AREAS. EXCAVATED MATERIAL FROM THE LOWER REACH WILL BE USEDTO CONSTRUCT THE CHANNEL BLOCKS ON THE UPPER REACH. SILT FENCES SHALL BE USED TO PREVENT SEDIMENT MOVEMENT FROM AREAS OF DISTURBED SOIL TOWARD THE OPEN CHANNELS ON SITE. GENERAL CONSTRUCTION SEQUENCE THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE USED DURING CONSTRUCTION: 1. MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE, AND SET UP STAGING AREA. 2. CONSTRUCT SILT CHECK AT THE DOWNSTREAM END OF THE PROJECT LIMITS. 3. BEGIN CHANNEL MODIFICATIONS AT THE UPSTREAM END OF THE PROJECT REACH. TEMPORARY SILT CHECKS SHALL BE USED DOWNSTREAM OF THE CONSTRUCTION AREAS. EACH NEW MEANDER CURVE SHALL BE CONSTRUCTED IN THE DRY PRIOR TO ROUTING STREAM FLOW FROM THE EXISTING CHANNEL. 4. IN ORDER TO PREVENT RUNOFF FROM THE DISTURBED CHANNEL AREAS FROM INFILTRATING THE STREAM FLOW, A SILT CHECK SHOULD BE PLACED AT THE DOWNSTREAM END OF EACH NEW CHANNEL SECTION DURING CONSTRUCTION. 5. INSTALL IN-STREAM STRUCTURES IN THE CHANNEL MOVING FROM UPSTREAM TO DOWNSTREAM IN AREAS SHOWN ON PLANS. 6. IN AREAS WHERE STREAM PATTERN WILL BE ADJUSTED, THE STREAM FLOW SHALL BE DIVERTED INTO THE NEW CHANNEL ONLY AFTER EACH SECTION IS COMPLETED. FOLLOWING THE COMPLETION OF EACH NEW CHANNEL SECTION, EROSION CONTROL MATTING SHOULD BE PLACED ON THE BANKS. EACH NEW CHANNEL SECTION SHOULD BE STABLE BEFORE STREAM FLOW IS ROUTED FROM THE EXISTING CHANNEL. 7. MATERIAL EXCAVATED FROM THE BENCH AREA ON THE LOWER REACH WILL BE USED TO CONSTRUCT CHANNEL BLOCKS ON THE UPPER END. ANY EXCESS MATERIAL WILL BE SPREAD OVER THE SPOIL AREA AND STABILIZED. 8. REMOVE CULVERT CROSSING NEAR THE MIDPOINT OF THE PROJECT REACH AND REPLACE WITH A PERMANENT FORD CROSSING 9. CONSTRUCT THE ARTIFICIAL SEEP TO BE TIED INTO THE EXISTING WETLAND AREA AS SHOWN ON THE PLANS AND PER DIRECTION OF THE ENGINEER. 10. COMPLETE ALL TEMPORARY SEEDING AND MULCHING ALONG THE REACHES. 11. REMOVE SILT CHECK AT DOWNSTREAM END OF PROJECT. 12. DEMOBILIZE EQUIPMENT FROM THE SITE. 13. KILL ALL FESCUE WITHIN THE BUFFER AREA BY APPLICATION OF AN APPROPRIATE HERBICIDE (SEE SPECIFICATIONS DOCUMENT). 14. PLANT RIPARIAN VEGETATION, LIVESTAKING AND PERMANENT SEEDING AT THE APPROPRIATE TIME OF YEAR. EARTHWORK SUMMARY IN CUBIC YARDS EXCAVATION EMBANK TOTAL LINE STATION TO STATION TOTAL UNCLASS. UNDERCUT + % BORROW WASTE MAIN REACH 0+00.00 21+71.54 350 0 350 0 0 'S-U.E = SUBSURFACE UTILITY ENGINEER ROADS & RELATED ITEMS Edge of Pavement ... -..... ......... - Curb Prop. Slope Stakes Cut t Prop. Slope Stakes Fill .... _ ... .. .. - .. _ _ _ ! _ _ _ Prop. Woven Wire Fence .. Prop. Chain Link Fence .. Prop. Barbed Wire Fence .... ... ......... 0 0 Prop. Wheelchair Ramp , Curb Cut for Future Wheelchair Ramp Exist. Guardrail ................ i _ Prop. Guardrail ....... . .... __ .. . .. . . . . Equality Symbol ........................... Pavement Removal . . ......................... RIGHT OF WAY Baseline Control Point ........................ Existing Right of Way Marker . ................ . Exist. Right of Way Line wMarker ... . ....... . . - ?- _ Prop. Right of Way line with Proposed R/W Marker (iron Pin & Cap) .............. A Prop. Right of Way Line with Proposed (Concrete or Granite) RtW Marker ........... -? Exist. Control of Access Line ............. . .... -; ?`- .A, Prop. Control of Access Line - .. - _ - .... - _ _ . . Exist. Easement Line ........................... _ _ _ ?_ _ _ - Prop. Temp. Construction Easement line .-.-- . Prop. Temp. Drainage Easement Line .-..-.... Prop. Perm. Drainage Easement Line .....-.-. _ HYDROLOGY Stream or Body of Water .............. ...... ?.. _ River Basin Buffer --------------- ------- Flow Arrow ------- -R8B- ----- .------ Disappearing Stream .... ... ......... . Spring ... _.._....-_.. Swamp Marsh ... ........ .......... ...... 1 Shoreline. __.. ---------- - . .. ..... ...... ------- Falls,Rapids . ....------- ._.......... _._.. - -1- - Prop Lateral, Tail, Head Ditches ...... ...... STRUCTURES MAJOR Bridge, Tunnel, or Box Culvert Bridge Wing Wall, Head Wall and End Wall _ cac ..? STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONVENTIONAL SYMBOLS MINOR Head & End Wall _ ...... c/';c ?-. Pipe Culvert ........... ` - - - Footbridge ......_.__ _ > - _-----< Drainage Boxes............ _ ? CB Paved Ditch Gutter UTILITIES Exist. Pole .............................. . Exist. Power Pole ................ y Prop. Power Pole ------------------------ b Exist. Telephone Pole ......................... . -0- Prop. Telephone Pole ........................ . - 0-Exist. Joint Use Pole ..................... 4 Prop. Joint Use Pole .............. -------- - -• Telephone Pedestal ..................... . . ... _ M LPG Telephone Cable Hand Hold ---------- - Cable TV Pedestal .......................... . 19 LPG TV Cable Hand Hold.. . ......... . .... . . . 51 LPG Power Cable Hand Hold ..... _ ........ . Hydrant........ _ _ .............. _. _....... _ . 6 Satellite Dish ....... _ ......... _ ..... _ ...... . b Exist. Water Valve ............................ . Sewer Clean Out ........................ . . ... . Power Manhole . .............................. . Telephone Booth ................. . ........... .. m Cellular Telephone Tower- - . - . - .. _ . _ .. Water Manhole --------------- --------------- Light Pole ..... . ........................ . . ... . 0 H-Frame Pole ............................. 0---ra Power Line Tower--......_...... ------------ - 19 Pole with Base ........................ . ..... 0 Gas Valve ........... ........................ . 0 Gas Meter ----------- ._..._._....__._.. 0 Telephone Manhole ------- _.... ... ..... Power Transformer-....-.. -._...... . e Sanitary Sewer Manhole .... _ _ .. ... . Storm Sewer Manhole Tank; Water, Gas, Oil ....................... . O Water Tank With Legs ....... ............... . Traffic Signal Junction Box ............... . Fiber Optic Splice Box .. _ . - ...... - Television or Radio Tower ............. _ .. . Utility Power Line Connects to Traffic Signal Lines Cut Into the Pavement .. _ ... - - . . Recorded Water Line TF Designated Water Line (S.U.E.*) - , .-- Sanitary Sewer ------ - ...... - Recorded Sanitary Sewer Force Main Designated Sanitary Sewer Force Main(S.U.E.`) -m--',- Recorded Gas Line _ Designated Gas Line (S.U.E.*) ...... . Storm Sewer . - - - ..... _ ...... _ ....... -s--s- Recorded Power Line ................... . ... Designated Power Line (S.U.E.*) ........ Recorded Telephone Cable .................. -f-,- Designated Telephone Cable (S.U.E.*) . _ .... _ _ _,_ -,_ _ Recorded LPG Telephone Conduit -rc-,c- Designated LPG Telephone Conduit (S.U.E.*) _ -,c--rc- - Unknown Utility (S.U.E.*) . ........... . . . . . . -Am---Rm- Recorded Television Cable .................. - n-Tv-Designated Television Cable (S.U.E.*) .. - - - .. _ _n- -TV-- Recorded Fiber Optics Cable ............... -ro-ro- Designated Fiber Optics Cable (S.U.E.*) Exist. Water Meter . . . ....................... 0 LPG Test Hole (S.U.E.*) ---- ------------ 411 Abandoned According to LPG Record ------ .. AIIU End of Information ........................... E." BOUNDARIES & PROPERTIES State Line ---------------------------------- -- ------ County Line ... . ................ ------------- ----- Township Line .. . ..... . ........... _ . - - - - - ------- City Line .................. .._.....---....-... - ----- Reservation Line ------------------------------ -- ------ Property Line ............................... .. Property Line Symbol ....................... .. F Exist. Iron Pin ............................... . . Property Comer . .. . ............... . + Property Monument ............ ...... _ . .. Property Number .................... .. 123 Parcel Number ....... - ... _ ... 6 Fence Line ------------------- ..-- _----- - . -x-x-x- Existing Wetland Boundaries ........... ... .. n now - High Quality Wetland Boundary .... -,o n5- Medium Quality Wetland Boundaries. ... -w n8- Low Quality Wetland Boundaries..... -Lo ne- Proposed Wetland Boundaries... .- ..... .. -ae- Existing Endangered Animal Boundaries Ea8- _ Existing Endangered Plant Boundaries --- - -- EPB- _ BUILDINGS & OTHER CULTURE Buildings ..... ............................ .... lJ Foundations ............................... ..... ?J Area Outline .... -? ti Gate ...... Gas Pump Vent or LPG Tank Cap ..... .. Church ----------- U School ......................... C.-?3 Park --- ` 7 Cemetery ............. _.... _...._... - .. `t ] Dam.. _ .........................._.... _.. Sign .. ......................................... g Well ...................._......_....... .... o Small Mine . x Swimming Pool ............................... TOPOGRAPHY Loose Surface ............................ . .. Hard Surface ................................. Change in Road Surface . _ .... _ ........... .............. Curb Right of Way Symbol . . . . ...... . .. . ... . . . R/N Guard Post ..... ........._..-- .._.------ OcP Paved Walk Bridge .................. . -..............-- Box Culvert or Tunnel ` - - - - - - ................ . Ferry --------- -------------- ---------------- ------- Culvert .......... _ ....... Footbridge......._._ ............._... ------ .............. Trail, Footpath .. _ Light House VEGETATION Single Tree ... -------------------------------- 0 Single Shrub ...... - - ...... o Hedge ------ -------------------- _..... Woods Line ..... . ............................ .........,. Orchard ................ fl4Qfl{4 Vineyard ...... ...------ ....__-....------. wrum RAILROADS - - Standard Gauge ar rrmwom RR Signal Milepost a mow is Switch ........ =1 -f-1 m/w/m VEGETATION SELECTION LIVE STAKING COMMON NAME SCIENTIFIC NAME SILKY DOGWOOD CORNUSAMOMUM BLACKWILLOW SALIXNIGRA SILKY WILLOW SAL1X SERICEA ELDERBERRY SAMRUCUSCANADENSIS NOTE' IN5TALL LIVE STARS AT DENSITY OF 200 STAKES PER 1000 SO FT BARE ROOT VEGETATION COMMON NAME SCIENTIFIC NAME SYCAMORE PLATANUSOCCIDENTALIS BLACK WALNUT JUGLANSNIGRA BLACK GUM NYSSASYLVATICA BLACK CHERRY PRUNUSSEROTINA SILVER BELL HALESIACAROLIA64 PERSIMMON DIOSPYROSVIRGINIAAA BLACKGUM NYSSASYLVA77CA WITCH-HAZEL HAMAMELIS VIRGIN/ANA SPICEBUSH UNDERA SENZOW TAG ALDER ALNUS SERRULA TA NOTE PLANT RARE ROOT VEGETATION AT DENSITY OF 350 STEMS PER ACRE SEDIMENT TRANSPORT TABLE Shear Stress Analysis Existing Design Bankkjfl Xsec Area, Abkf (sq ft) 14 14 BarlkfLJI Width, Wbkf (ft) 21.7 21.7 Bankfull Mean Depth, Dbkf (ft) 0.6 0.6 Wetted Perimeter, WP1N+2D (ft) 23.0 23.0 Hydradic Radius R 0.6 0.6 Schan (ftfft) 0.0333 0.0333 Boundary Shear Stress t (lb/sq ft 1.27 1.27 d84 mm 88.4 88.4 d50 rif bed (mm) 30.8 30.8 d50 (mm) 30.8 30.8 tCi 0.0834 0.0834 d bar large mm 108 108 d bar large (ft) 0.35 0.35 Dcrit ft 1.4 1.4 Crag Creek" Parameter MIN MAX MIN MAX MIN MAX D ramps A rea, D A(sR mi) OAS 045 1.8 1.8 045 045 Stream Type(Ros9en) B4 B4 84 B4 B4 B4 Bankfull XSEC Area, Abkf (sR It) 13.1 16.2 26.0 33 13.1 16.2 Bankfdl Width, Wbkf(it) 117 21.7 27.6 27.6 11.7 21.7 B ankfull Mean Depth, D bkf(it) 0.6 1.3 1,0 1.1 0.6 10 Width to Depth Ratio, W7D(fUft) 10.1 30.4 25 27 10.7 17.0 Width Fkrodprone Area, Wfpa(It) 18.0 410.0 36 38.6 20 410 Emrenchmerd Ratio, WfpwWbkf (ft/ft) 1.1 32.0 1.3 1.4 1.7 32.0 M ax Depth a bkf, Dmax (ft) 0.9 2.5 1.6 1.6 0.9 2.5 Max Depth Ratio, Dmax/Dbkf 1.3 1.9 1.6 1.5 1.1 3.1 M ax 0 epth 0 tob, Dmaxtob (ft) 1.8 9.2 Na Na 1.0 10 Bank Height Ratio, DlotdDmax(ft/ft) 20 3.7 Na rVa 1.0 1.0 M sander Length, Lm (fig 70 280 Na Na 70 280 Meander Length Ratio, L mNVbkf 44 11.6 Na Na 44 17.6 Radius of Cv atme, Rc (ft) 19 47 Na rVa 28 4T Rc Ratio, RcNVbkf 1 t 10 Na Na 2.0 3.0 BeK Width, WbN (ft) 18 65 Na Na 18 65 M eander Width Ratio, W bIVW bkf (it) 1 1 4.1 Na Na 1.1 4.1 sinuosity. K 1.19 1.19 110 1.10 1.19 1.19 V alley slope, Sval (ftfft) 00396 0.0396 0.0364 0.0364 0.0396 0.0396 Channel Slope, Schan (ft/ft) 0.0333 0.0333 0.0331 0.0331 0.0333 0.0333 Slope Riffle, Srif (ft/ft) 0.0057 0.0625 0.0625 0.2500 0.0057 0.0625 Riffk Slope Ratio, Srif/Schan 0.2 1.9 1,9 7.6 0.2 19 Slope Pool, Spool (ftfft) 0.0000 0.0050 0.0000 0.0000 0.0000 0.0050 Pod Slope Ratio, SpodlSchan 0.DO 0.15 0.00 0.00 0.00 015 Pod M ax Depth, Dmaxpool (ft) 2.2 2.5 2.1 2.1 2.2 2.5 Pool M ax Depth Ratio, Dm"POOI/Obkf 2 2 2,5 21 21 2.0 4.0 Pool A rea, A pod (Sq ft) 14.8 15.9 37.1 37.1 14.8 15.9 Pool Area Ratio, A pool/A bkf 1.1 1.2 14 1.4 11 1.2 Pool W kith, W pool (ft) 14.3 14.6 26.0 26.0 14.3 14.6 Pool Width Ratio. Wpooi/Wbkf 0.7 12 0.9 0.9 09 0.9 Pool Length, I" (ft) 130 18.0 Na Na 13.0 18.0 Pool Length Rata, LpooWVbkf 08 1.1 Na Na 0.8 11 Pool-Pod Spacing, Lps (ft) 48.0 131.0 42.0 156.5 46.0 231 0 Pool-Pool Sparing Ratio, LpsmNbkf 30 14.5 1.5 5.7 3.0 7.0 d16 (mm) 5.6 5.6 100 1.00 56 5.6 d35 (mm) 143 I 143 14 14 14.3 14.3 d50 (mm) 3C 8 30.8 39 I 39 30 8 30.8 tl84 (mm) 884 88.4 512 512 88.a 88.4 095 (mm) 1100 1100 2100 I 2100 1100 1100 NOTE - CRAIG CREEK REFERENCE REACH LOCATED A EASTERN AVERY COUNTY - DESIGN PATTERN DATA TAKEN FROM REFERENCE REACH AND FROM EXISTING SECTIONS OF STABLE TYPICAL POOL AND RIFFLE CROSS SECTIONS RIFFLE WCkI D-Max 5 57 .? L PRELIMINARY PLANS eo Nor aaa nv 13aRrtxnrc?lRF1 moa K R? P-1 S- 2W I IBUCw. Rom crawvsn PF?o,,, Riwwsoee . sis?sls?c4 DESIGN VALUES POOL NOTE TYPICAL FIGURE NOT DRAWM TO SCALE RKFI F BANKFULL WIDTH (Wbkf) 14.0' 15.1' AVERAGE BANKFULL DEPTH 1.0' 1.0' MAXIMUM DEPTH (D-max) 1.5' 2.5' WIDTH TO DEPTH RATIO (bkf WID) 14 ---- BANKFULL AREA (Abkf) 14-Oft' 15.4ft2 BOTTOM WIDTH (Wb) 6.1' 3.0' TYPICAL STRUCTURE PLACEMENT ROCK VANE STRUCTURE ' (PLACEMENT PER DIRECTIONOF ENGINEER) / G? \ \ MAT BANK WITH EROSION CONTROL MATTING (SEE SPECIFICATION DOCUMENT( Z,Q \ 1 P CROSS VANE STRUCTURE (PLACEMENT PER DIRECTION OF ENGINEER) STRUCTURE NOTES MATTING TO BE INSTALLED ON RIFFLEfRUN 1 SECTIONS BETWEEN BENDS ONLY. MAT BANK WITH EROSION / CONTROL MATTING -/ (SEE SPECIFICATION DOCUMENT) - TOP OF BANK GENERALLY J-HOOK ROCK VANES, ROOT WADS, CROSS VANES AND MATTING WALL BE INSTALLED IN THE LOCATION AND SEQUENCE AS SHOWN ADDITIONAL STRUCTURES OR CHANGES TO STRUCTURE LOCATIONS MAY BE MADE WRING CONSTRUCTION. ROOT WADS - (NUMBER AND SIZE TO BE DETERMINED IN THE FIELD) - ROCK VANE STRUCTURE (PLACEMENT PER DIRECTION OF ENGINEER) CROSS VANE STRUCTURE (PLACEMENT PER DIRECTION OF ENGINEER) MAT BANK WITH EROSION CONTROL MATTING (SEE SPECIFICATION DOCUMENT) _I T,NIu,L RIFF; SECTION 11 II dN ARTIFICIAL SEEP DETAIL OIICT WERRENCE NO. SHHT NO. 7R " " FORD STREAM CROSSING SILT CHECK 057 - OPTION A PROFILE VIEW naECr ?,K, Woa CROSS SECTION A-A' FLOW 02= EXISTING GROUND CLASS A RIP RAP = n?'W - DDE EPPTTHOrTRENCCHAMSLOPE A 1 ? PRELIMINARY PLANS HAL L BE DETERMINED BY THE E E O o - oo Nor VA[ Ipl aN+nvnla+ NGINE R m BERM BERM ¢ ¢ SEEpy - t- A - CONSTRUCTION AREA UPSTREAM ARIP RAP __C ASS EXISTING WETLAND K 0 / STILLING BASIN \ TYPE ] FILTER IC 110 (2 FT. MAX DEPTH) TYPETTFIL7ERFABRD? - \ / A4W Npuy PrHArASMN 100 WETLAND - UDERNEATH RPPAP UNDERNEATH FABRIC (NCNIWOVEM \ BUCK .r.atvaw mn C E A' UIDERNEATI(RIPRAP Pmn c?wsssw _ Z Fn OiF?ATS,N OPTION"B" PROFILE VIEW PROFILE VIEW EXISTING GROUND NOTES. OPTONB . BOULDERS . WATER 1 SEEP TRENCH SHOULD TIE INTO STREAM SURFACE CHANNEL IIWEMATLY UPSTREAM OF A CROSS VANE . EXISTING CHANNEL . 2. TOP OF GRAVEL LAYER SHOULD BE SET TO THE IINVERT ELEVATION OF THE CROSS VANE PLAN VIEW THLLWEG SEEP, EL=A6A.OB - NOTES: EXISTING WETLAND I. CONSTRUCT STREAM CROSSING WHEN FLOW S LOW. Z HAVE ALL NECESSARY MATERIALS AND EQUIPMENT OWSITE BEFORE WORK 11(y 3- MINYIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. COMPLETE ONE SIDE BEFORE STARTING ON THE OTHER SIDE. WETLAND A. INSTALL STREAM CROSSING AT RIGHT ANGLE TO THE FLOW EL=181 W 5 GRADE SLOPES AS SHOWN IN THE DETAIL E MAINTAIN CROSSING SO THAT RUNOFF N THE CONSTRUCTION ROAD DOES NOTENIER EXISTIO CIMAIIFL 7. A STABILIZED PAD OF CLASS'A' RIP RAP B NGES I?- THICK LINED WITH TYPE 2 FILTER FABRIC SNAIL BE USED OVER THE BERM AND ACCESS SLOPES. BACKF ILL MOUND 7 -I IXLSTIIG GROUND TYPE 2 FILTER FABRIC, (WOVEN) OF THE CROSSED SMALL BE SLEFEKEST TO E WIDTO THE LARGEST VEHICLE SCROSSING UFFICIENT THE LlIANNEI. ACCOMMODATE 9. CONTRACTOR SHALL DETERMINE M APPROPRIATE RAMP ANGLE ACCORDING TO EOUIPMENT USED. FLOW 2 2 12 BANKFl1LL MAXIMUM DEPTH CONSTRUCTION NOTES. RACKFILTE I 1. BEGIN BY EXCAVATING TRENCH AT THE WETLAND AREA AND EXCAVATE UP EXCAVATED SOIL - : TRENCH OUY GRADIENT, PLACING EXCAVATED MATERIAL NEAR TRENCH. EXCAVATE L_ WILL VARY TRENCH WITH AN IEG EN BOTTOM SLOPE OF 2. RACE WOVEN FILTER FABRIC IN TRENCH AND ALONG SIDES. OVERLAP SPICED SECTIONS BY AT LEAST 2 FEET --' 1 3. PLACE WASHED STONE IN TRENCH TO INDICATED THICKNESS. GRAVEL CLASS A RIP FILTER FABRIC FILTER FABRIC-WOVEN LAYER SHOULD BE UNIFORM IN THICKNESS. (ENVELOPES GRAVEL LAYER) WASHED STONE 057 A. WRAP FILTER FABRIC OVER GRAVEL LAYER AND FILL TRENCH WITH TYPE 1( -??O EXCAVATED SOIL MATERIAL. COMPACT FILL WTH EXCAVATION EQUIPMENT CROSS SECTION CROSS SECTION ROCK VANE ROCK CROSS VANE ROOT WAD 113 113 13 OF PROPOSED DOF PIDPOSM 10 OF PROPOSIM m ,D TRANSPLANTS -C BOTfOIYDIN 801'fpIYD1H BOTTOMwDiH BOTTOM JA BOTTOM MOTH OF TH OF M BOTTOM < I < CHANNEL CHANNEL WIDTH NOTES FOR ALL VINE STRUMRES: CHANNEL N IBOULDERS MUST BE AT LEAST A' R T 2 NO GAPS BETWEEN 20'7030' 2INSTALL FILTER FABRIC BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND ROCKS EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM A /tl TOAMMUM aF TEN FEET. TOP OF BANK FOOTER ROCK 3. DG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND RACE FILL ON Fl00DPWN UPSTREAM SICE OF VANE MM, BETWEEN TILE ARM AND STREAM BANK l STMT AT BAWFULL AND RACE FOOTER ROCKS FIRST AND THEN LEADER (TOP) ROCK BANKFULL STAGE 4 SCONTINUE WITH STRUCTURE, FOLLONANG ANGLE AND SLOPE SPECIFICATIONS. FIRST ROCK TIED INTO WATER WATER FLOW = 8 HEADE0. ROCKS MUST TOUCH MNTHOUT GAPS. STREAM BANK FLOW FLOW 7M EXTRA BOULDER CM BE PLACED IN SCOUR POOL FOR HABITAT I PROVEMENT. ' BUSE ON SITE ALLUVIUM TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS. 7D-IS LONG BASEFLOW 9. WOODY DEBRIS MAY BE INCORPORATED INTO STRUCTURE PER DIRECTI N OF ENGINEER >1PDAMETER HEADER ROCK NOTE BOULDERS MUST BE AT LEAST f X 3' X Z. 6 X AO( 3' BOULDERS PLAN VIEW / I SCOUR POOL \ ME PREFERRED. NOTES: T WOODYVEGETATI MAYBE INCORPORATED C FOOTER LOG> t7DIAMETER INTO STRUCTURE PER DIRECTION OF ENGINEER - S OUR POOL EXCAVATED PER INSTALLED BELOW STREAM BED 2. IF AN S AR T USE TEMPORARY AVAILABLE, DIRECTION OF ENGINEER CO SEED AND D ERR EROSION NiitOl MATTING . In OF FROPUSU 10 OF PNT"M V30FPROPOSED GWNRMWTH CI MBIDTH OVAELM11i PLAN VIEW - I a CROSS SECTION BANKFULL I I -+ I I BACKFILL I I (ON-SITE ALLUVIUM) NOTES: -) DRIVE POINT METHOD'. i - - - - - - 1. SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE -OHMNG INTO THE BANK FOOTER ROCK ROOT WAD UPSTREAM SO THAT THE STREAM FLOW ORIENT MEETS 3 HEADER ROCK FETED. FABRIC t'-Z J_ THE ROOT WADATA90-0EGREENIGLE DEFLECTING THE WATER CROSS SECTION BANKFULL _ TYPE 2 NONWOVEN 5 MININIM A BOULDER FOM THE SBANK THE HOULD BE PLACED ON THE DOWNSTREAM J. H HEADER ROCK OOT WAD_ THE OOIF A BACK ODY S FORMED BY WATER SURFACE BOULDER SHALL BE APPROXIMATELY t X 3 X 7. ELEVATION HEADER ROCK WATER R SECTION A-K _ TRENCHING METHOD. STREAM FLANK AT BANKFULL STREAM BED WATER FLOW (MIN. 2/3 BANKFULL) ELEVATION N, SCOUR CA E TE iIF THE ROOTWAD RECONSTRUCTED CANNOT IE DRIVEN INTO THE BANK OR THE BANK R A E IX STREAM BEO i ( X VA ) ATED L TTRENCH B BE USEDTHIS METHOD REQUIRES THAT ELEVATION ? c BACIffEL WITH FOOTER ROCK FOR THE LOG PORTION OF THE ROOT WAD ON-SITE ALLUVIUM 2 A FOOTER LOG SHOULD BE INSTALLED UNDERNEATH THE R007 WAD BACIffILL WITH TYPE 2 NONWOVEN FILTER FABRIC FOUR OR IN A TRENCH EXCAVATED PARALLEL TO THE BANK AND WELL BELOW ON-SITE ALLUVIUM TRANSPLANT THE STRENIBED. FOOTER ROCK 3 ONE-THIRD OF THE ROOT WAD SHOULD REMAIN BELOW NORMAL PROFILE VIEW BASE FLOW CONDITIONS PROFILE VIEW FOR ROCK VANES PLAN VIEW 4 .? PROPOSE0 FENCE MICKEY REACH STA 0+00.00 NSTRUCTION FpER -MTF?MLNEIIAFq SEEPlOP71r N? l' . I ++ i ARTIFICIAL 0 BUFFER LWTS Vol J, V CHANNEL BLS yI ! "A?° /5'%? '?? ?/ =? _,~? PROPOSED FENCE , CHANNEL BLO CKS - - --1. IA ? t ? -- l"i, s? ? 1 ml 1 (( PROPOSEDFENCE U FF BU ER SHOULD R N PARRALLEL TOMITCHELL RNER AN OFFSET 75 FT D f I 1^L. ++ PROPOSED FENCE 1 t j - PROPOSEOFENCE SLOPE AND MAT BANKS - r \ In LU PROPOSED FENCE' SLOPE AxO MAT BANKS 9u^ is I ~ \? < / n % T ?/ P L ' I J ? . / N - E AND MAT BANNS S O i UFFER VoTS SLOPE A D MAT BANKS B - PROPOSED FENCE J " - - II PROPOSED FENCE". f F ' Q CULVERT TO BE REMOVED SEE FORD DETAIL ON SHEET 2? BUF ER SHOULD RUN PARRALEL TO MITCHELL RARER AND OFFSET 15 FT X iz 2 PRELIMINARY PLANS I 1G Rog.ncy -COY. N? o ff1 BUCK, [NOIN L[RLMO F,, 91?3-5 W UPPER REACH 50 25 0 50 100 SCALE (Fr) +71.54 _TA\ LOWER REACH 50 25 0 50 100 crAl r ILTL