Loading...
HomeMy WebLinkAbout20020730 Ver 3_2015 Work Plans & Application_MP-5_20200327Form OCM MP-5 BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ❑This section not applicable a. Is the pro bridge: '11b. Water body to be crossed by bridge. ommercial ublic/Government ❑Private/Community, + I<- A f i' w se� � V C ✓ c. Type of bridge (construction material): d. Water depth at the proposed crossing at NLW or NWL: e: (i) Will proposed bridge replace an existing bridge? ❑Yes &K. If yes, o^ t (ii) Length of existing bridge: �W ([it) Width of existing bridge: t Z r,/ (iv) Navigation clearance underneath existing bridge: 1Y 1iA (v) Will all, or a paA of, the existing bridge be removed? (Explain) /I�t1 a..,e LO �^pt`1 W4r� �, VC c.J. f. (i) Will proposed bridge replace an existing culvert? ❑Yes Lyrvo If yes, (ii) Length of existing culvert: _ (iii) Width or existing culvert: _ (iv) Height of the lop of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) 9. Length of proposed bridge: 160 - - - h Width of proposed bridge: 20 i. Will the proposed bridge affect existing water flow?. ❑Yes &<u j. Will the proposed bridge affect navigation by reducing or If yes, explaini increasing the existing navigable opening? ❑Yes e< If yes, explain: k. Navigation clearance underneath proposed bridge: 1v 1A I. Have you contacted the U.S. Coast Guard concernin heir approval? es ❑No If yes, explain: 'pC4V'Py ��1Yw��✓T V57d4G6p`re !fN J� m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: waters? ❑Yes Ly'No If yes, explain: RECEIVED DEC 3 b ?tr` DCM-M'i�DC::I111V 2. CULVERTS his section not applicable a. Number of culverts proposed: b. Water body in which the culvert is to be placed: DOM 0FC . :J /� 014 FO)rrll 0CM iVP S -.w, ='d, nnrd i,h _r>s, ?a - 7 of C. Will the proposed project require any work channels? []Yes ❑No If yes, complete Form DCM-MP-2. e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ❑Yes ❑No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. 1-7 / ,e;L Date Project Name St M[ - 'J L Ap can ame L Applicant Signature d. How will excavated or fill material be kept on site and erosion controlled? Will wetlands be crossed in transporting equipment to project site? ❑Yes ❑No If yes, explain steps that will be taken to avoid or minimize environmental impacts. OC. sri nit»' Cu a dris, Pa^. _ 2 a`, 1 < Form continues on back> C. Type of culvert (construction material): d. (1) Will proposed culvert replace an existing bridge? e. (i) Will proposed culvert replace an existing culvert? ❑Yes [:]No ❑Yes []No If yes, (ii) Length of existing bridge. _ (iii) Width of existing bridge: _ (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) I. Length of proposed culvert: h. Height of the top of the proposed culvert above the NHW or NWL. j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ❑Yes ❑No If yes, explain: If yes, (ii) Length of existing culvert(s): (iii) Width of existing culvert(s): (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) g. Width of proposed culvert: i. Depth of culvert to be buried below existing bottom contour. k. Will the proposed culvert affect existing water flow? (-]Yes ❑No If yes, explain: 3. EXCAVATION and FILL Cklhz section not applicable a. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ❑Yes ❑No If yes, (ii) Avg, length of area to be excavated: (iii) Avg. width of area to be excavated: _ (iv) Avg. depth of area to be excavated: _ (v) Amount of material to be excavated in cubic yards: C. (I) Will the placement of the proposed bridge or culvert require any high -ground excavation? []Yes ❑No If yes, (ii) Avg. length of area to be excavated (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v) Amount of material to be excavated in cubic yards: b. (1) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SS), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ ❑WL ❑None RECEIVED (ii) Describe the purpose of the excavation in these AC 3 1) 2014 DCM-MLln IIY D CM WlrLMVN G i C a�a; I"JCs d. If the placement of the bridge or culvert involves any excavation, please c (i) Location of the spoil disposal area: following: (ii) Dimensions of the spoil disposal area: (iii) Do you claim title to the disposal area? ❑Yes ❑No (If no, if h a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ❑Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW), s bmerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (S8)? ❑CW ❑SAV ❑WL ❑SB ❑None If any boxes are checked, give dimensions if different from (ii) abov (vi) Does the disposal area include any area below the NHW or NWL? !' [-]Yes[]No yes, give dimensions if different from (ii) above. I e. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ❑Yes ❑No If yes, (ii) Avg, length of area to be filled: (iii) Avg. width of area to be filled: _ (iv) Purpose of fill: g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes ❑No If yes, (ii) Avg. length of area to be filled: (iii) Avgwidth of area to be filled: _ (iv) Purpose of fill (i) Will the placement of the proposed bridge or culvert result in any rill (other than excavated material described in Item d above) to be placed within coastal wetlandslmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WI-)? If any boxes are checked, provide the number of square feet affected-. []CW ❑SAV ❑SB ❑WL ❑None (it) Describe the purpose of the excavation in these areas: a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? ❑Yes ❑No detour structures? ❑Yes ❑No If yes, explain: If yes, explain: If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. < Form continues on back> d. If the placement of the bridge or culvert involves any excavation,please comp[ he following: (i) Location of the spoil disposal area: � i P I/ 1 (it) Dimensions of the spoil disposal area: (III) Do you claim title to the disposal area? []Yes ❑No (Ifno; atta h a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ❑Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW), s bmerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV ❑WL ❑SB ❑None If any boxes are checked, give dimensions if different from (ii) abov (vt) Does the disposal area include any area below the NHW or NWL? ? ❑Yes ❑No. If yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? Elves ❑No 1f yes, (ii) Avg. length of area to be filled: (III) Avg. width of area to be filled: _ (iv) Purpose of fill: g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes []No If yes, (ii) Avg. length of area to be filled: (III) Avg. width of area to be filled: (iv) Purpose of fill: 4. GENERAL a. Will the proposed project require the relocation of any existing utility lines? Elves ❑No If yes, explain: If this portion of the proposed project has already received approval from localauthorities, please attach a copy of the approval or certification. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected: ❑m ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: b. Will the proposed project require the construction of any temporary detour structures? ❑Yes ,❑No If yes, explain: < Form continues on backe, RECEIVED DEC 1117014 j51"rl pf+rv'rt / r a^i39';`n iG1 r'"'-5 jM'9.ires Z „-,d i. rzs., Pswcz ;i of <;) c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion OYes []No controlled? If yes, complete Form DCM-MP-2. e. What type of construction equipment will be used (for example, I. Will wetlands be crossed in transporting equipment to project site? dragline, backhoe, or hydraulic dredge)? . Yes ONo If yes, explain steps that will be taken to avoid or minimize _ environmental impacts. g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? - E]Yes ❑No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only.. , Date US5 Af G- -Kj l Reea: v Project Name SSt^G - Tt'J L- kST / Ap ican ame Applicant Signature RECEIVED DEC V 0 7014 DCM-MM© CITY