Loading...
HomeMy WebLinkAbout20020730 Ver 3_2015 Work Plans & Application_MP-3_20200327Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. a. Type and number of buildings, facilities, units or structures proposed. 4 buildings - a new visitor center, anew dockmaster office, a restroom and an amphitheater as well as a new parking lot c. Density (give the number of residential units and the units per acre). none e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (1) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ®No ❑NA (ii) If yes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. approx. 2% i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. approx. 15% j. Describe proposed method of sewage disposal. Wastewater treatment will be provided by Cape Fear Public Utility Authority at a wastewater treatment plant. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). No discharges are proposed. b. Number of lots or parcels. one parcel d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. Approx. 6 acres f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. The parking lot will be constructed of permeable pavement. Typical roofing materials will be used for the visitor center and amphitheater h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ®No ❑NA fi) If yes, list the date submitted: Have the facilities described in Item (i) received state or local approval? ❑Yes ®No ❑NA RECEIVED If yes, attach appropriate documentation. Orr. A 0 1014 DCw-N,41in"10 m. Does the proposed project include an innovative stormwater design? ®Yes ❑No ❑NA If yes, attach appropriate documentation. RECEIVED DCM WILMINGTON, NC 252-808-28082 n 1-8$S4RCOAST : uvsntc r.aaq,t.�.��izlaaa rs�a�eirnurat=afarY rwviso& 12126106 Form M MP-3 Q6 pt and Development, Page 2 of m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Drinking water will be provided by Cape Fear Public Utility Authority o. When was the lot(s) platted and recorded? June 7. 1963 n. (i) Will water be impounded? ❑Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ®No ❑NA RECEIVED DFc A 1b 71`114 DCM-MidD CITY RECEIVED DCM WILMINGTON, NC 2524 t8-28ff :e f •4Q40-41iCt3AST vs€instan€-i ,ana. Y:u9a-raasausyc ert ea .?¢, ;9 revisa . 1212W 6