Loading...
HomeMy WebLinkAbout20020730 Ver 3_2015 Work Plans & Application_MP-2_20200327Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization) Length Width Avg. Existing Depth Final Project Depth EXCA1�ATf©N QThls sect�oi? not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Sand/gravel fill mixture 0 cubic yards C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW) submerged aquatic vegetation (SAV), shell bottom (SB), Approx. 1500 to 1900 cubic yards or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: U/SPOSAL;QF EXCA'VATED,MATER/AL []Th/s s,=pfion not applicable' . . a. Location of disposal area. b. Dimensions of disposal area. Onsite for bulkhead backfill 7,153 sq feet c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA ❑Yes ®No ❑NA 00 If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (1) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ®Yes []No ❑NA DR. ,1 0 mg (ii) If yes, how much water area is affected? f5r"Ail_Ail{{q pyfiv 7,153 sq feet within the existing, man-made ship basin RECEIVED DCM WILMINGTON. NO FI h j'.2i. f,,i�,1 2152-608-2809 n 1a3684RCOAST e: wvau?»z.c :e¢a>@a4er r� aye:asa ¢a&.ra +t eeOsud� 12126106 Form M RIP- $,,Excavation and RN, Baggy ? of 3) 3; SH , RELINESTAB7LiZA770N r: r C]Thls s ifo n not aPP� )e ; (ff deue,IrjpmchE IS aYyobd groin; psc MR 4.' Structcres a. Tvpe of shoreline stabilization: b. Length: 540 feet ®Bulkhead ❑Riprap ❑Breakwater/Sill [-]Other: c. Average distance waterward of NHW or NWL: 35 feet e. Type of stabilization material: sheet pile and concrete g. Number of square feet of fill to be placed below water level. Bulkhead backfill 7 153 Riprap Breakwater/Sill Other I. Source of fill material. onsite excavation during bulkhead realignment Width, 4feet d. Maximum distance waterward of NHW or NWL: 70 feet f. (i) Has there been shoreline erosion during preceding 12 months? []Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. existing sand/gravel fill material v d.'; OTH R,;FI4L ACTIVITIES C Tb s secioon not appfic ble ;` (Excludlrig Shore6n�S#abrlizetion) a. (i) Will fill material be brought to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water aoorox 50 cubic Yards for bulkhead backfill (iii) Dimensions of fill area approx. 6 acres for narking lot (iv) Purpose of fill Additional backfill for new bulkhead and to raise the parking lot area to eliminate recurring flooding problem. submerged aquatic vegetation (SAV), shell bottom (SIS), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the fill in these areas: a. How will excavated or fill material be kept on site and erosion b. What type of construction equip controlled? backhoe, or hydraulic dredge)? Silt curtains will be installed in the ship basin prior to construction backhoe activities. Silt fencing will be used in the parking lot area to prevent offsite sedimentation. c. (i) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. used (e.g., dragline, d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No [_-]NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. RECEIVED n252-308.2,HCt6:-1-d3884ktm.0AST. vrenrvvs:cc.Cas@GaBaaaeneg(er ef, t,nc-t Voldsock 12/26106 - (Fxca cation and FM, Page 3 of 3) RECEIVED D_r A 91 7014 Krer_e,44M ,Mml RECEIVED DCM WILMINGTON, NIC 10 F. C, .i! -�. ?.(1 vovocde 1212610